eComments During Meetings: When available, click here to submit eComments during a live meeting | Attendees must register here to attend all virtual meetings.

File #: 21-100    Version: 2 Name: Vet's Rotunda Room Remodel
Type: Minute Order Status: Consent Agenda
File created: 7/23/2020 In control: City Council Meeting Agenda
On agenda: 8/3/2020 Final action:
Title: CC - (1) Approval of an Agreement with MDJ Management in an Amount Not-to-Exceed $103,250.04 for the Remodel of the Rotunda Room at Veteran's Memorial Auditorium; and (2) Authorize $10,325.00 in Change Order Authority for the Public Works Director/City Engineer
Attachments: 1. Culver City VA Rotunda Room remodel - WO Package 7.22.20rev.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

CC - (1) Approval of an Agreement with MDJ Management in an Amount Not-to-Exceed $103,250.04 for the Remodel of the Rotunda Room at Veteran's Memorial Auditorium; and (2) Authorize $10,325.00 in Change Order Authority for the Public Works Director/City Engineer

 

body

Meeting Date:  August 3, 2020

 

Contact Person/Dept:                     Eric Mirzaian/Public Works Department

Phone Number:  (310) 253-6444

 

Fiscal Impact:  Yes [X]    No []                                                                General Fund:  Yes [X]     No []

 

Public Hearing:  []          Action Item:                     []          Attachments: [X]   

 

Commission Action Required:     Yes []     No [X]    Date:

 

Public Notification:   (E-Mail) Meetings and Agendas - City Council (07/230/2020)

 

Department Approval:  Charles D. Herbertson, Director of Public Works/City Engineer (07/23/2020)

_____________________________________________________________________

 

 

RECOMMENDATION

 

Staff recommends the City Council (1) approve an agreement with MDJ Management (MDJ) in an amount not-to-exceed $103,250.04 for the remodel of the Rotunda Room at Veteran's Memorial Auditorium; and (2) authorize $10,325.00 in change order authority for the Public Works Director/City Engineer.

 

 

BACKGROUND/DISCUSSION

 

The Rotunda Room at the Veteran’s Memorial Auditorium is one of the most frequently used rooms within the facility and has not gone through any major upgrades for quite some time.  Staff has identified an urgent need to replace the ceiling tiles of the room due to the fact they are starting to become unstable and brittle.  While staff was assessing the ceiling tiles, it was determined it would be an opportune time to also remodel other aspects of the room due to the minimal usage of the facility at this time. 

 

The proposed project will include the following scope of work:

                     Removal of old ceiling tiles and the installation of new tiles

                     Upgrade lighting with new LED fixtures with dimmable switches

                     New HVAC vents and grates

                     New sound absorbing wall carpeting

                     New audio-visual projection equipment

                     Refurbish existing wood walls

                     Electrical upgrades

                     Painting

 

With assistance from The Gordian Group, the services retained for this project are exempt from the formal competitive bidding process, pursuant to Culver City Municipal Code (CCMC) Sections 3.07.045.G (see below) and 3.07.065.C.6 (repair and maintenance of City-owned real property and buildings). 

 

CCMC Section 3.07.055.G provides and exception to bidding “where competitive bid procedures have already been utilized by the City, another public agency, including, but not limited to, federal, state and county governments, including, state of California agencies, counties, cities, joint power agencies and special districts, or non-profit agencies whose main purpose is to assist cities or other public entities…provided, the equipment, goods or supplies are supplied to the City  at the same or better prices, as was obtained through the competitive bid procedures of that entity.”  MDJ is a contractor that has been pre-approved and selected by the National Joint Powers Alliance (recently renamed “Sourcewell <https://www.sourcewell-mn.gov/about>), which is a public and transparent bidding process agency whose aim is to create a pool of pre-qualified contractors for such projects.  The Gordian Group is the local administrator of the Sourcewell contracts for such projects and they reviewed the MDJ proposal and confirmed that it adheres to the labor rates, prices, terms and conditions of their existing Sourcewell agreement.

 

Over the past few years, The Gordian Group has provided similar assistance to the City on other projects including the lighting upgrade at the City Hall parking structure and the installation of EV charging stations at the Transportation facility.

 

 

FISCAL ANALYSIS

 

There are sufficient funds available for this project in the City Council adopted Fiscal Year 2020-2021 for Capital Improvement Project PZ-132 - Building Repairs.

 

 

ATTACHMENTS

 

1.                     MDJ Management Quotes

 

 

MOTION

 

That the City Council:

 

1.                     Approve an agreement with MDJ Management in an amount not-to-exceed $103,250.04 for the remodel of the Rotunda Room at the Veteran’s Memorial Auditorium; and

 

2.                     Authorize $10,325.00 in change order authority for the Public Works Director/City Engineer; and

 

3.                     Authorize the City Attorney to review/prepare the necessary documents; and

 

4.                     Authorize the City Manager to execute such documents on behalf of the City.