Legislation Details

File #: HIST-11382    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 5/11/2009 Final action: 5/11/2009
Title: Approval of an Agreement with Angelus Restoration, Inc. to Repair the Entryway into the City Hall Parking Structure from Duquesne Avenue.
Attachments: 1. Approval of an Agreement with Angelus Restoration, - C-7__09-05-11_PW-MaintOps_Contract Award CH Driveway - FINAL.doc, 2. Approval of an Agreement with Angelus Restoration, - Agreement with Angelus Restoration to Repair Entryway into City Hall.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends the City Council approve an agreement with Angelus Restoration, Inc. in the amount of $39,000.00 to repair the entryway into the City Hall parking structure from Duquesne Avenue. BACKGROUND: The slip resistant surface coating on the entryway into the City Hall parking structure is deteriorating due to weather conditions, the large volume of vehicular traffic, and age. The existing urethane coating is the original coating that was applied when City Hall was built in 1995. The proposed scope of work will include the removal of the existing coating, the installation of extra heavy duty traffic system coating, repainting of traffic control striping and installation of new reflectors. DISCUSSION: Public Works Staff received the following three quotes for this project: Hull Brothers Roofing Company…………………….$34,500.00 Angelus Restoration, Inc….…………………….……$39,000.00 Ace Restoration & Waterproofing, Inc…………….$66,740.00 Meeting Date: 5/11/09 Item Number: C-7 AGENDA ITEM: Approval of an Agreement with Angelus Restoration, Inc. to Repair the Entryway into the City Hall Parking Structure from Duquesne Avenue. Contact Person/Dept.: Eric Mirzaian Public Works-Maintenance Operations Phone Number: (310) 253-6410 Fiscal Impact: Yes [x] No [] General Fund: Yes [] No [x] Public Hearing: [] Action Item: [] Attachments: [X] Public Notification: Master E-Mail Notification List (05/06/09); Angelus Restoration, Inc. (5/4/09) Department Approval: Charles D. Herbertson (04/30/09) City Attorney Approval: Carol Schwab (by H. Baker) (05/06/09) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (05/05/09) City Manager Approval: Jerry B. Fulwood (05/06/09) City of Culver City, California City Council Agenda Item Report Angelus Restoration’s quote provides a more detailed scope of work compared to the quote provided by the lowest respondent, Hull Brothers Roofing Company. Additionally, the proposed scope of work by Angelus Restoration, Inc utilizes a more durable coating material compared to the other quotes. The proposed coating material will also cure faster compared to the other quotes, thus allowing vehicular traffic to enter/exit City Hall sooner following completion of the work. Culver City Municipal Code Section 3.07.070 provides an exemption from the formal bidding process for personal and professional services, and only requires the award of the contract be based upon competitive quotations from no less than three vendor contractors whenever practical. Per Section 3.07.070.B.6., this project falls under the category of personal services, which includes the repair and maintenance of City-owned or occupied real property and buildings. Therefore, an informal bidding process was used in which staff requested three companies to supply a quote to perform the needed repairs. The bid representing the best value for the City was then recommended. FISCAL ANALYSIS: There are sufficient funds available in the Capital Improvement Project P-132, Citywide Building Repairs (42000132), to cover the requested repair. ATTACHMENTS: 1. Quote from Angelus Restoration, Inc. MOTION: That the City Council: 1. Approve an agreement with Angelus Restoration, Inc. in the amount of $39,000.00 to repair the entryway into the City Hall parking structure from Duquesne Avenue; and, 2. Authorize the City Attorney to review/prepare the necessary documents; and, 3. Authorize the City Manager to execute such documents on behalf of the City. MEETING DATE: 5/11/09 AGENDA ITEM: Approval of an Agreement with Angelus Restoration, Inc. to Repair the Entryway into the City Hall Parking Structure from Duquesne Avenue ATTACHMENTS Pages|109| Quote from Angelus Restoration, Inc. 1-2ANGELUS RESTORATION, INC. PROPOSAL 08-12-E02 To: 3effWolf—Faxit(310)253-6911 Date: • December2;2008 Culver City Public Works . . Project: City Hall Parking. Level Entry Coating . 9505 W. Jefferson BouleVard Culver City, CA 90232 • We propose to furnith. all necessary labor, rnaterlal,. equipment, stlpervIsion, arid insurance to complete the following work at the above address: AREA: Parking Level Entry — 4,370 Square Feet . WORK: Remove existing coating. Install Sonne born Conipur II extra heavy duty traffic system coating. Repaint traffic control striping. Install new reflectors. PRICE: Total Price, Tax Included $39,000.00 Jeff, Due to ramp use requirements, safety issues and the potential for splatter damage on cars, we intend to install the entire coating starting on a •Friday morning and finishing by Saturday evening. This will allow SUnday for curing time and be ready for traffic on Monday. The .paint striping would be performed on Sunday or Monday. The existing coating will be removed on Friday, Saturday and Sunday. of the preceding weekend. It may also be necessary to work Pre 8:00 am and post 5:00 pm in complete this work so that the ramp will be ready for use on Monday morning, • It should also be noted that the cost to complete One lane at a time would be considerably higher approximately an additional $12,000 so the above plan Seems to be the most logical way to proceed. STANDARD NOTES: a. Angelus Waterproofing 8t Restoration! /nc. is a certified VS/BE/MBE business and signatory to the Cement Masons and Painters UNIONS. • b. Insurance Coverage Carried: One Million Dollars General Liability and Automobile. Liability excluding XCL.L. Contracts under $40,000.60 will not be issued additional Insured endorsements. c. Performance and Payment Bonds are not included in the Total Price. CL Permits and Inspections are not Included. e. All work to be performed as permanuacturers specifications and recommendations. f. Waiver of Subrogation Endorsement is not included in Totel Price, if required; please contact us before execution of authorization, " g. 5 days advance notice prior to commencing work. - Ii. All items not included In scope of work are specifically excluded. i. Payment is based on Net 30 Days or subject to late charge of rv20 /aver month'. TERMS: This proposal is subject to review if not accepted vtrithln 30 days from above date and is contingent upon strikes, fires, accidents, labor or material price increases or any other causes beyond our control. ACCEPTED BY RESPECTFULLY SUBMITTED, ANGELUS WATERPROOFING AND RESTORATION, INC. • . DATE BY 6-cf .-7 „.464$1Mg Authorized Representative Paul Finch . Print Name 13217 BARTON OIRCLE,WHITTIBR,OALIFORNIA 96605*(662) 941 .7876 *MX (582) 941-1166 • - . arvaiuswptaverizon.not • Ca. State Contractgns Lima* R461100 weEthee:cortffred "10110,k 1,1c192 :ET 8E1E. E.0 ' 0 iCEL 9911 W6E9s: 'ON XUA 99I1T476E9GdM51-11E0NU: wauANGELUS RESTORATION!, INC. PROPOSAL 08-12-E03 To Jeff Wolf — Fax # (310) 253-6911 Date! • • December 2, 2008. Culver City Public Works Project: City Hall and Council Chambers Plaza Areas 9505 W Jefferson Boulevard Culver City, CA 90232 • . We propose to furnish all necessary labor, material; equipment, supervision, and insurance to complete the following work at the above address: AREA #1: In front of City Hail in the exterior plaza area — 400 IF WORK #1: Remove and replace caulking around planters and at sidewalk PRICE #1: Total Price, Tax Included AREA #2: In front of council chambers in the exterior plaza area — 280 IF WORK #2: Remove and replace caulking at sidewalk. PRICE #2; Total Price, Tax Included $2,600.00 $1,820.00. STANDARD NOTES a. Angelus Waterproofing & Restoration, Inc_ Is a certified W6E/MBE business and signatory to the Cement Maisons and Painters UNIONS. . b, Insurance Coverage Carded: One Million Dollars Genera/ Liability and Automobile Liability excluding XCU:. Contracts under $10,000.00 will not be Issued additional insured endorsements. c. Performance and Payment Bonds are not included in the Total . Price. d. Permits and Inspections are not intluded. e. MI work to be . performed as per manufacturers specifications and recommendations. 1. Waiver of Subrogation Endorsement is not included in Total Price, if required; please contact us before execution of authorization. • g. 5 days advance notice prior to commencing work. . h. All items not included in Scope of work are specifically excluded, I. Payment is based on Net 30 Days or subject to fate charge of Ph% per month. TERMS; This proposal is subject to review if not accepted within 30 days from above date and is contingent upon strikes, fires, accidents, labor Or material price inaeases or any other causes beyond our control. ACCEPTED BY RESPECTFULLY SUliMMED, ANGELUS WATERPROOFING AND RESTO ON,. C. • /<72.7 f. BY DATE BY( .a7-rper)..01 ,440r. Paul Finch 13217 BARTON CIRCLE, WiirrriER, CALIFORNIA 90606 • (62) 941-7676 • .FAx 082) 341.1166 4neetuswp9votizgarler .ca: SlorOvntrecionriioanstii4i51.1150* WE/MBE Certified MN& okiassod Authorized Representative 2d Wd92:ET 800E E0 .0a 99T1 T176 a'9G: "ON XHJ 99TITVEZ9GdMSME9NU: WOLIA