Legislation Details

File #: HIST-25876    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 9/8/2014 Final action: 9/8/2014
Title: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Washington Boulevard Striping and Bike Lane Project, PZ-965.
Attachments: 1. Approval of Final Plans and Specifications and Aut - C-5__14-09-08__PW-Eng__CITY COUNCIL__Washington Boulevard Project_PSE Approval - FINAL.pdf, 2. Approval of Final Plans and Specifications and Aut - 14-09-08__PW-Eng__CITY COUNCIL__WASHINGTON BLVD STRIPING PROJECT_PSE Approval Auth to Release Bid _ Attachment.pdf
City of Culver City, California Agenda Item Report Meeting Date: 09/08/14 Item Number: C-5 CITY COUNCIL AGENDA ITEM: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Washington Boulevard Striping and Bike Lane Project, PZ-965. Contact Person/Dept.: Christopher Evans/PW & Hong Wang/PW Phone Number: (310) 253-5621, (310) 253-5604 Fiscal Impact: Yes [X] No [] General Fund: Yes [ X] No [] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (09/02/14) Department Approval: Charles D. Herbertson (08/29/14) City Attorney Approval: Carol Schwab (by H. Baker) (09/02/14) Chief Financial Officer Approval: Jeff Muir (by M. Noller) (09/03/14) City Manager Approval: John M. Nachbar (09/03/14) RECOMMENDATION: Staff recommends the City Council approve the final plans and specifications and authorize the publication of a notice inviting bids for the Washington Boulevard Striping and Bike Lane Project, PZ-965 (Project). BACKGROUND/DISCUSSION The existing lane line striping and pavement markings on Washington Boulevard from Sepulveda Boulevard to the westerly city boundary at Walnut Avenue/Del Rey Avenue are faded and are in need of repainting. To enhance lane line visibility on the concrete roadway, the project will include black paint extensions to the standard lane lines, in the same fashion as used on the Sepulveda Boulevard widening project. The Culver City Bicycle & Pedestrian Master Plan (BPMP) categorizes Washington Boulevard as a Primary Bikeway Corridor in need of bike facility improvements. The proposed Project would add approximately 2.45 miles of Class II bike lane or Class III bike route on Washington Boulevard. Shared lanes (bike routes) are proposed where lane widths do not allow adequate space for bike lanes. The proposed bike lane and bike route (shared lanes) segments are: Proposed Bike Lanes/Bike Routes on Washington Boulevard: 1. From Walnut Ave./Del Rey Ave. to Walgrove Ave. – Bike Route 2. From Walgrove Ave. to Lyceum Ave. – Bike Lane 3. From Lyceum Ave. to Wade St. – Bike Route 4. From Wade St. to Chase Ave. – Bike Lane 5. From Chase Ave. to Centinela Ave. – Bike Route 6. From Centinela Ave. to Sepulveda Blvd. – Bike Lane City of Culver City, California Agenda Item Report The proposed bike lane/bike route will connect to the existing bike lane/bike route in the City of Los Angeles from the Project limit to Venice Beach. The City’s engineering consultant, Willdan Engineering, prepared the Project plans and specifications at a cost of $23,320. FISCAL ANALYSIS: There is no fiscal impact associated with this item at this time. ATTACHMENT: 1. Location Map The Plans and Specifications are available at the following link: http://www.culvercity.org/Government/PublicWorks/CouncilItems.aspx MOTIONS: That the City Council: 1. Approve the final plans and specifications for the Washington Boulevard Striping and Bike Lane Project, PZ-965; and, 2. Authorize the publication of a notice inviting bids for construction of the Washington Boulevard Striping and Bike Lane Project, PZ-965.