Legislation Details

File #: HIST-849    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 7/25/2005 Final action: 7/25/2005
Title: Approve plans and specifications for the Washington Blvd. resurfacing project and authorize advertising bids.
Attachments: 1. 05-07-25 Washington Blvd Resurfacing C-6.doc, 2. C6-Washington Blvd.pdf
Approve plans and specifications for the Washington Blvd. resurfacing project and authorize advertising bids. City of Culver City California City Council Agenda Item Report Meeting Date: 7/25/05 AGENDA ITEM: Consideration to Approve the Final Plans and Specifications and to Authorize the Advertising of Bids for the Washington Boulevard Resurfacing Project P 843 Contact Person/Dept.: Lee Torres/PW Phone Number: 310.253.5623 Item Number: C 6 Action Item: X Attachments: X X No General Fund: Yes X No Fiscal Impact: Yes Public Hearing: Public Notification: Master Notification List emailed on July 20th and Washington Boulevard businesses adjacent to the project limits via First Class Postcard mailed July 14 2005 Department Approval: Charles D. Herbertson 7/14/05 City Controller Approval: Marlee Chang 7/19/05 CAO Approval: Jerry Fulwood 7/20/05 RECOMMENDATION: Staff recommends that the City Council approve the final plans and specifications and authorize the advertising of bids for the Washington Boulevard Resurfacing Project (Sepulveda to Elenda Boulevards) P 843. BACKGROUND/ DISCUSSION: Washington Boulevard between Sepulveda Boulevard and Elenda Avenue is an arterial street and is identified in the Pavement Management System as a high priority for resurfacing. The existing asphalt pavement has deteriorated due to age and impacts from high traffic. The project consists of the following: 1. Removal of 3.0 inches of the existing asphalt concrete pavement by grinding and replacing it with 3.0 inches of new rubberized asphalt concrete along Washington Boulevard between Harter Avenue and Huron Avenue. 2. Removal of 1.5 inches of the existing asphalt concrete pavement by grinding and replacing it with 1.5 inches of new rubberized asphalt concrete along Washington Boulevard between Sepulveda Boulevard to Harter Avenue and from Huron Avenue to Elenda Street. 3. Total pavement reconstruction of limited areas located between two residential streets (Commonwealth Avenue and Center S...

Click here for full text