Consideration of a Budget Amendment and Acceptance of Work Performed by PCN3 Inc. and Authorize Filing a Notice of Completion for the Teen Center Remodel Project P 819. MEETING DATE 05/08106 AGENDA ITEM Consideration of a Budget Amendment and Acceptance of Work Performed by PCN3 Inc and Authorize Filing a Notice of Completion for the Teen Center Remodel Project P 819 ATTACHMENTS 1 2 3 April 25 2006 PCN3 Inc Change Order Table April 19 2006 Wolcott Architecture Interiors Invoice Teen Center Space Plan & Room Legend Paws 1 2 3 8 9 10 TEEN CENTER REMODEL PROJECT P 819 PCN3 CHANGE ORDERS No 1 2 Description Removal of cabinet in room 123 salvaging cabinet in room 124 and 116 removal of 50 If of soffit In rooms 109 and 110 (RFI#24) Deduction for asbestos contractor prior removal of restroom tile walls/floors and fixtures (RFI#25) 3 Remove existing drinking fountain and patch return grills in bnck 4 5 6 7 wall at restroom entrances (RFI#32) Revise locatIOn of new emergency exit in room 105 and construct ADA ramp with handrails (RFI#36) InstallatiOn of c*Wall on west wall of room 108 (24'X 12') (Rri#28) Provide drywalipiling above west interior entryway (RFI#30) Change thicknriSS of metal studs used throughout project from 2 518 to 3 5/8 to provide add clearances (RFI#33) 9 8 Change finish flooring in rooms 101 105 and 108 from Linoleum to stained concrete (RFI#341 Replace drywall rernoved by asbestos contractor on extenor of rooms 103 and 104 (RF1#381 10 Remove ceiling tfies lights and ductwork in room 111 installation of lighting and switchs (fixtures Wind ) and drywall ceiling l#39 9 11 Remove/replica electrical conduit exposed by demo of freestanding cabinetwith 2 new floor boxes w/covered outlets (RFI#39 6) Also deni /replace conduit w/floor box at north wall 'of room 108 exposed* demo of bookshelves 12 Remove wood paneling on wdenor of room 126 adjacent to west entry and replace with drywall Also remove carpeting from room 124 (tF1039 3)) and replace with drywall/fram...
Click here for full text