Legislation Details

File #: HIST-17738    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 9/12/2011 Final action: 9/12/2011
Title: Award of a Contract to Structural Group, Inc. for the Culver City Transfer Station Tipping Floor Repair Project, P-948.
Attachments: 1. Award of a Contract to Structural Group, Inc. for - C-3__11-09-12__PW-ENG__CITY COUNCIL__Award of Transfer Station Tipping Floor Repair Contract - FINAL.doc, 2. Award of a Contract to Structural Group, Inc. for - 11-09-12__PW-Eng__CITY COUNCIL__Award of Transfer Station Tipping Floor Repair Contract__Attachment with cover.pdf
Award of a Contract to Structural Group Inc. for the Culver City Transfer Station Tipping Floor Repair Project P 948. City of Culver City California Agenda Item Report Meeting Date: 9/12/2011 CITY COUNCIL AGENDA ITEM: Award of a Contract to Structural Group Inc. for the Culver City Transfer Station Tipping Floor Repair Project P 948 Contact Person/Dept.: Hong Wang/PW Phone Number: (310) 253 5604 Item Number: C 3 Fiscal Impact: Yes X No General Fund: Yes No X Public Hearing: Action Item: Attachments: X Commission Action Required: Yes No Date: _______________ Public Notification: (E Mail) Meetings and Agendas City Council (09/07/11); (E Mail) Structural Group Inc. (09/07/2011); Department Approval: Charles D. Herbertson(09/02/11) Chief Financial Officer Approval: Jeff Muir (09/07/11) City Attorney Approval: Carol A. Schwab (by H. Baker) (09/08/11) City Manager Approval: John M. Nachbar (09/08/11) RECOMMENDATION: Staff recommends the City Council award a contract to Structural Group Inc. in the amount of $125 000 for the Culver City Transfer Station Tipping Floor Repair Project P 948. BACKGROUND: The transfer station is a two story reinforced concrete structure located adjacent to Ballona Creek at 9255 Jefferson Boulevard. Collection trucks dump their loads on the upper level tipping floor and a large tractor loader pushes the material through an opening in the tipping floor and into transfer trucks parked on the lower level. These loading activities wear the surface of the tipping floor requiring that the floor be repaired approximately every 10 years. Presently the tipping floor surface is showing significant wear and it is recommended that a repair effort be conducted at this time. The last repair was conducted in 1999. DISCUSSION: The recommended repair will consist of the application of a special high strength metallic concrete overlay on the worn portions of the tipping floor. Structural Group has indicated to staff that they have developed a proprietary installa...

Click here for full text