Legislation Details

File #: HIST-14188    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 6/14/2010 Final action: 6/14/2010
Title: PUBLIC HEARING - Adoption of a Resolution Approving the Engineer’s Report and Affirming the Existing Annual Assessment Levy for the Sewer User’s Service Charge for Fiscal Year 2010/2011.
Attachments: 1. PUBLIC HEARING - Adoption of a Resolution Approv - PH-2__10-06-14__PW__CITY COUNCIL__PUBLIC HEARING__SUSC 2010-2011 - FINAL.doc, 2. PUBLIC HEARING - Adoption of a Resolution Approv - 10-06-14__PW-Eng__PUBLIC HEARING__SUSC 2010-2011__Attachments with cover.pdf
City of Culver City, California Agenda Item Report Meeting Date: 06/14/2010 Item Number: PH-2 CITY COUNCIL AGENDA ITEM: PUBLIC HEARING - Adoption of a Resolution Approving the Engineer’s Report and Affirming the Existing Annual Assessment Levy for the Sewer User’s Service Charge for Fiscal Year 2010/2011 Contact Person/Dept.: Mate Gaspar/PW Phone Number: 310-253-5602 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [X] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (06/09/2010); Culver City News (05/27/2010); Department Approval: Charles D. Herbertson (06/03/10) City Attorney Approval: Carol Schwab (by H. Baker) (06/09/10) Chief Financial Officer Approval: Jeff Muir (by M. Noller) (06/10/10) City Manager Approval: P. Lamont Ewell (06/10/10) RECOMMENDATION: Staff recommends the City Council adopt a resolution: 1. Approving the Engineer’s Report for the Sewer Users’ Service Charge for Fiscal Year 2010-2011; and , 2. Affirming the existing annual assessment levy for the Sewer Users’ Service Charge in an amount equal to last year’s rate for Fiscal Year July 1, 2010 to June 30, 2011. PROCEDURE: 1. Mayor seeks motion from City Council to receive and file the affidavits of publication and posting of notices and correspondence received in response to the public hearing notices; and, 2. Mayor calls for a staff report and the City Council Members may pose questions to staff as desired; and, 3. Mayor seeks a motion to open the public and, 4. Mayor seeks a motion to close the public hearing after all public testimony has been presented and all ballots have been tabulated; and, 5. City Council discusses the item and arrives at its decision. City of Culver City, California Agenda Item Report BACKGROUND: Culver City currently obtains sewage treatment services at the City of Los Angeles' Hyperion Treatment Plant through an Amalgamated Agreement with the City of Los Angeles. This Agreement requires Culver City to pay a proportionate share of the costs of conveyance, operation, maintenance, repair and capital improvements to upgrade and improve the amalgamated sewerage system. Culver City owns and operates a separate sewage collection system, which is connected to the amalgamated system. Federal law requires that all other agencies using the City of Los Angeles' Hyperion Treatment Plant adopt a system of charges to assure that each property served by a public sewer pay its fair share of costs for the operation, maintenance, repair and improvement of Hyperion Treatment Plant. The “fair share” of each sewer-using property is based on its contribution to the system in terms of flow quantity and sewage quality (biochemical oxygen demand and suspended solids). This is in addition to the costs experienced by Culver City in the collection, operation, and improvement of our own sewage system. All of these costs are annually determined and presented to the City Council in the City Engineer's Report, in accordance with Section 5.02.035 of the Culver City Municipal Code (CCMC). The proposed charges for Fiscal Year 2010/2011 will address estimated costs for providing complete operation, maintenance, and local capital improvements for the Culver City sewerage system and for the estimated payments due to the City of Los Angeles for Culver City's share of the Los Angeles Amalgamated System costs. In addition to formulating and adopting a system of Sewer User’s Service Charges, the City must also select a system of collecting these charges. In 1980, based on an engineering study and the City Engineer’s recommendation, the City Council initiated a once-a-year billing procedure for Sewer User’s Service Charges that places each property owner’s charges on their property tax bill. This method of collection has proven to be very efficient and provides the lowest cost billing and collection service for Culver City. The following table is a summary of historical rate increases to the Sewer User’s Service Charge: FISCAL YEAR RATE INCREASE 1990/91 TO 2001/02 No rate increases - $20.5 million wastewater revenue bond issued in 1991/1992 2002/03 10% rate increase City of Culver City, California Agenda Item Report 2003/04 10% rate increase* 2004/05 10% rate increase 2005/06 5% rate increase 2006/07 10% rate increase 2007/08 10% rate increase 2008/09 No rate increase 2009/10 No rate increase 2010/11 No rate increase proposed *Included revisions to sewer user charges formulas. DISCUSSION: The Sewer User’s Service Charge budget is 100 percent self-supporting for all expenditures related to the collection, operation & maintenance, capital improvements, conveyance and treatment of the City’s sewer system. The sewer user service charge is collected based on the prior calendar year’s total water consumption for each parcel that is on the sewer system. For single family dwelling unit, 42% of the water consumption amount is deducted due to landscape irrigation. For a multi-family dwelling, 15% of the water consumption is deducted due to landscape irrigation. With the Amalgamated Agreement with the City of Los Angeles, certain costs related to conveyance and treatment are included in this charge by Los Angeles which the City pays based on flow measurements throughout the year. The City of Los Angeles sends Amalgamated Cities their 5-year projections for costs related to the agreement. In a February, 2010 letter from the City of Los Angeles to Culver City they have projected a total charge of $2,145,000 for Fiscal Year 2010/11. The final amount is not known until August every year and has historically been less than the projected amount. The Sewer Enterprise Fund currently maintains an adequate reserve. Staff does not recommend any rate increase this year. In future years, due to a planned aggressive capital improvement program, the sewer fund reserve is expected to diminish, and it will be likely that staff will recommend increases in the sewer user charge rates at that time. Golden State Water Company (GSWC) has informed the City in writing that they will no longer provide the water consumption data for each parcel. GSWC has stated that they consider the water consumption data to be private and that the California State Public Utilities Commission (CPUC) has not directed them to release it. City of Culver City, California Agenda Item Report There was not enough time to schedule an agenda item with the CPUC regarding obtaining the water consumption data. Therefore, staff recommends that the water consumption data for the Fiscal Year 2009/2010 sewer charges be used to calculate the Fiscal Year 2010/2011 sewer user service charges. Property owners will still be entitled to refunds to the sewer charges if they can provide GSWC billings that show their water consumption is less than the previous year’s water consumption. Staff will present to the City Council recommendations regarding future billing options at an upcoming City Council meeting. FISCAL ANALYSIS: The report contains a spreadsheet of the 5 year estimated sewer user service fund cash flow projections. ATTACHMENTS: Ÿ Engineer’s Report Ÿ Resolution Ÿ Sewer Enterprise Funds 5 year cash flow projection MOTION: That the City Council: (Absent a majority protest) Adopt a Resolution approving the Engineer’s Report and confirming the existing rates and ordering the annual assessment levy for the Sewer User’s Service Charge in an amount equal to last year’s rate for Fiscal Year July 1, 2010 to June 30, 2011. 6/14/10 PUBLIC HEARING - Adoption of a Resolution Approving the Engineer's Report and Affirming the Existing Annual Assessment Levy for the Sewer User's Service Charge for Fiscal Year 2010/2011 MEETING DATE: AGENDA ITEM: ATTACHMENTS Pages|109| Resolution 1-3|109| City Engineer's Report 4-11RESOLUTION NO. 2010-R A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CULVER CITY, CALIFORNIA, APPROVING THE ENGINEER'S REPORT AND AFFIRMING THE EXISTING ASSESSMENT LEVY FOR THE SEWER USER'S SERVICE CHARGE FOR FISCAL YEAR 2010/2011 WHEREAS, the City Council of the City of Culver City desires to assess a levy for fiscal year 2010/2011 of the Sewer User's Service Charge pursuant to the provisions of Chapter 5.02 of the Culver City Municipal Code ("CCIVIC") for a service charge to be known and designated as SEWER USER'S SERVICE CHARGE (hereinafter referred to as the "Service Charge"); and WHEREAS, on May 17, 2010, the City Council declared its intention to order the annual assessment levy, to collect the assessments, and to carry on all other proceedings necessary for the levy of annual assessments for the Assessment District; and ordered the City Engineer to prepare a Report on the Annual Levy 2010-2011, Sewer User's Service Charge, (the "Engineer's Report") to be filed with the City Clerk and submitted to the City Council for consideration at a public hearing on June 14, 2010; and• WHEREAS, the City Engineer prepared and filed the Engineer's Report (attached hereto as Exhibit "A" and incorporated herein by reference) for the City Council's consideration; and WHEREAS, the City Council has heard all testimony and evidence at a duly noticed public hearing held on June 14, 2010 and has determined to proceed with the levy of annual assessment for the Service Charge. NOW, THEREFORE, the City Council of the City of Culver City, DOES HEREBY RESOLVE as follows: I|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 282.|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1. Upon the conclusion of the public hearing arid consideration of all public testimony, the Engineers Report is hereby approved, the existing annual levy as set forth and described in the Engineers Report is hereby ordered, and no increase is ordered at this time|109| The adoption of this Resolution constitutes the levy of the existing assessment for the fiscal year commencing July 1, 2010 and ending June 30, 2011. 3. The estimates of costs and all other matters as set forth in the Engineer's Report as submitted pursuant to GCMG § 5.02.035 are hereby approved and adopted. 4. The existing assessment as set forth in the Engineers Report shall - be performed pursuant to law. The County Auditor shall enter on the County Assessment Roll the amount of the assessment and the assessment shall then be collected at the same time and in the same manner as the County property taxes are collected. After collection by the County, the net amount of the assessment shall be paid to the City Treasurer of the City of Culver City. 5. Upon receipt of monies representing assessments collected by the County, the City Treasurer for the City of Culver CO shall deposit the monies into a special fund known as the "Fund for Sewer Users Service Charge," which was previously established. 6. Immediately upon the adoption of this Resolution, the City Clerk shall file a certified copy of the Engineers Report containing the assessment, with the County Auditor. -2-MARTIN•R. COLE, City Clerk A10-00199 7. A certified copy of the Engineer's report shall also be filed in the Office of the City Engineer, with a duplicate copy on file in the Office of the City Clerk, and shall be open for public inspection. APPROVED and ADOPTED this day of June 2010. CHRISTOPHER ARMENTA, MAYOR City of Culver City, California I|1010101010101010 10 10|11 12 13 14 -15 16 17 18 19 20 21 22 23 24 25 26 27 28 -3- 3PUBLIC WORKS DEPARTMENT 9770 CULVER BOULEVARD, 2ND FLOOR CULVER CITY, CALIFORNIA 90232-0507 Ajciimahl. CULV6.4, HEART .I scast.a.n7=0 rel *A oillirSV ENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE CHARLES D. HERBERTSON Phone (310) 253-5600 Public Works Director/City Engineer FAX (310) 253-5626 ENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE IN THE CITY OF CULVER CITY UNDER THE PROVISIONS OF CHAPTER 5.02 OF THE CODE OF THE CITY OF CULVER CITY, CALIFORNIA FILED with the City Clerk on June 03, 2010 PRESENTED to the City Council and APPROVED by Resolution No. 2010-R , adopted by said City Council on June 14, 2010 and thereafter filed in the Office of the City Clerk Martin Cole City Clerk City of Culver CityENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE TO: The Honorable Mayor and Members of the City Council FROM: Charles D. Herbertson, Public Works Director and City Engineer CITY ENGINEER'S REPORT FOR SEWER USER'S SERVICE CHARGES FOR FISCAL YEAR 2010-11 1.0 Introduction A major challenge confronting those responsible for wastewater infrastructure, transportation, treatment and disposal is acquiring adequate funds to finance and operate facilities and capital equipment, along with implementing appropriate pricing structures to ensure the self-sufficiency of the utility. The financing vehicle that is used by the utility and the timing of the financing are crucial in ensuring that wastewater customers are appropriately paying for facilities that they need, and not inappropriately financing facilities for future customers. It is a major goal of an effective financial plan to 'match' the economic impact on customers with the benefits received from the service. Regulations governing Federal and State grant funds require the City of Los Angeles to maintain a Cost Recovery Program (Sewer User Charges System) which includes all operations and maintenance costs directly or indirectly related to the treatment and collection of liquid waste discharge by residents and businesses. As a result of Culver City's contractual relationship with the City of Los Angeles for wastewater treatment at the Hyperion Treatment Facility, Culver City (City) is also required to recover from each wastewater user their proportionate share of the costs incurred for wastewater collection capital improvements within Culver City, wastewater system operation and maintenance, City of Los Angeles capital improvements for conveyance to Hyperion and operation and maintenance at Hyperion. Accordingly, Culver City adopted a plan to collect wastewater user charges and implemented it for the first time in fiscal year 1 980- 81. The City recovers wastewater user charges on an annual basis. Since the plan's inception, the County Auditor-Controller's offices, and the annual property tax bill, have been utilized as the vehicle for both billing and collection. This method has proven to be both functionally satisfactory and exceptionally economical over the last twenty eight years. In order to achieve a fair and equitable system of wastewater user charges, users are charged in a manner consistent with their actual use of the system. This comprises not only the flow quantity, but also the wastewater strength (quality) as characterized by ROD (biochemical oxygen demand) and SS (suspended solids). Pursuant to the Culver City Municipal Code, in FY 2003-04 the City reviewed and approved the Sewer User's Service Charges (SUSC) structures and billing formulas to ensure that the City utilizes an effective pricing structure within the constraints of Proposition 218. Additionally, the City wanted to ensure that its sewer pricing structureENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE continues to achieve the goals and objectives of the community, while maintaining a fair and equitable distribution of costs to all of its customers. 2,0 Discussion Staff recommends that the existing rates be affirmed for 2010-11 tax rolls. Staff believes, based on the current Sewer Fund balances and the anticipated revenues and costs, that the existing rates will protect the solvency of the Fund. Credits for residential landscaping can be given in two ways. 1) Either the resident can install a separate water meter for landscaping which will not be assessed on the tax bill or 2) prove by submitting calculations and evidence that the percentage reduction in the tabled formula is not adequate. Last year, the City of Los Angeles charged $1.75 million for operations, maintenance and capital improvements for the treatment and conveyance of Culver City wastewater. For fiscal year 2010-11, the charge is projected to be about $2,145,000. 3.0 Calculation of Annual Expenditures and Revenue For fiscal year 2010-11 the estimated annual expenditures are as follows: Operating Costs — City $3,087,941 Operating and Capital Projected charges from $2,145,000 City of Los Angeles* Debt Service on Sewer Bond $1,552,000 Capital Projects — City $ 4,600,000 Total FY 2010-2011 budget $ 11,384,941 Table 1 shows the Five-Year Cash Flow Projection for the Sewer Enterprise Fund. *Operating and capital projects charges from the City of Los Angeles for fiscal year 2010-11 is a projection that was made in February 2010. Based on past experience, the charges amount will likely change and be at a lower amount. In addition to annual operating and capital expenditures, sewer fund rates are set so as to maintain a minimum reserve within the sewer fund. The minimum reserve amount is calculated as follows: Minimum Reserve Fund = 70% of annual operations budget + 2 yrs of debt service ÷ annual capital improvements budget For fiscal year 2010-2011 the minimum required reserve fund is estimated to be $9,865,558 and the available cash balance is projected to be $24,213,328.ENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE For fiscal year 2010-11 the estimated annual revenue is as follows: Sewer User Service Charge $8,104,500 Interest Income $ 350,000 $8,454,500 Staff recommends that the current SUSC billing formulas and charges remain the same for fiscal year 2010-11 due to the healthy cash reserve balance. 4.0 Summary of Current SUSC Rate Structure The current SUSC Rate Structure is composed of a base charge and a commodity charge for all customer classifications. A. Base Charge The base charge of the SUSC are fixed costs and are comprised of two components: Customer Costs — Calculating the sewer user service charge for the annual property tax bill and responding to property owner inquiries regarding the charges Capacity Costs — Capacity costs are fixed costs associated with the cost of providing the required capacity within the sewer collection system . These costs include rents and leases. B. Commodity Charge The Commodity Charge is also comprised of two components: Collection System Costs — Collection system costs are debt service and variable costs associated with the maintenance of the underground pipelines from each customer and the integrated pipeline system prior to the discharge points to the City of Los Angeles transmission system. As there are no treatment costs involved in the maintenance of the Culver City's collection system, these costs are allocated on a flow basis only. Treatment Costs —The process and costs of providing transmission, treatment, and disposal of Culver City's customers' sewage are provided and determined by the City of Los Angeles. These costs are considered variable costs, as they vary with the flow and sewage strength as metered and determined by the City of Los Angeles. Treatment costs are recovered through commodity rates charged on the basis of each customer's adjusted actual water usage and their assumed sewage strengths_ In July of every yearENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE the City of Los Angeles provides Culver City with the Amalgamated System Sewerage System charge rates for the upcoming fiscal year. Base Charge Commodity Charge Annual Water Return to Rate for the Usage X SewerX Customer SUSC 5.0 Current SUSC Rates for 2009-10 SUSC Current Billing Formulas for FY 09/10 Base Charge Commodity Charge (Per HCF Annual total flow) Multi-Family $ 42.32 per unit + (0.85W x $3.85) Single Family $ 42.32 + (0.58W x $3.85) Group II Users: $ 42.32 + ( W x $3.85) (Commercial no food preparation) Group III Users: $ 42.32 + (W x $7.63) (Commercial with food preparation) Group IV Users: $ 42.32 + (W x $3,75) (Institutional) Group V Users: $ 42.32 + (W x $3.26) (Schools) Group VI Users: Individual Special Users 601 $ 42.32 + (W x $4.10) 602 $ 42.32 + (W x $5.35) 603 $ 42,32 + (W x $5.35) 604 $ 42.32 + $3.75) (W x$3.75) 605 $ 42.32 + (W x $3.21) 606 $ 42.32 1- (W x $5.35) 607 $ 42.32 + (W x$3.85) $3.85) 609 $ 42.32 + (W x $3.85) 610 $ 42.32 + (W x $0.77) W=Annual Water Consumption In HCF Unit is a resident dwelling unit. Annual Water Consumption was based on calendar year 2008. sq.ENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE 6.0 Proposed SUSC Rates for 2010-11 Base Commodity Charge Charge Annual Water Return to Rate for the SUSC Usage X Sewer X Customer SUSC Proposed Billing Formulas for FY 10/11 Base Charge Commodity Charge (Per HCF Annual total flow) Multi-Family $ 42.32 per unit + (0.85W x $3.85) Single Family $ 42.32 + (0.58W x $3.85) Group II Users: $ 42.32 + ( W x $3.85) (Commercial no food preparation) Group ill Users: $ 42.32 + (W x $7.63) (Commercial with food preparation) Group IV Users: $ 42.32 + (W x $3.75) (Institutional) Group V Users: $ 42.32 + (W x $3.26) (Schools) Group VI Users: Individual Special Users 601 $ 42.32 + (VV x $4.10) 602 $ 42.32 + NV x $5-35) 603 $ 42.32 + (W x $5.35) 604 $ 42.32 + (W x $3.75) 605 $ 42.32 + (W x $3.21) 606 $ 42.32 + (W x $5.35) 607 $ 42.32 + (W x $3.85) 609 $ 42.32 + (W x $3.85) 610 $ 42.32 + (IN x $0.77) W=Annual Water Consumption In HCF Unit is a residential dwelling unitPublic Works 1-ctor and City Engineer ENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE Annual water consumption is based on calendar year 2009. However, as was reported to the City Council on May 24, 2010, Golden State Water Company has stated they will no longer provide water consumption data to the City. They believe that the water consumption data is private and cannot be released to the City. Also they have stated that they have not been directed to release water consumption data by the California Public Utilities Commission. It is recommended that water consumption data from 2008 be used in calculations of the fiscal year 2010-2011 sewer user service charges. Staff will present to the City Council alternative options on securing water consumption data and conducting billings in a separate City Council report in the early part of fiscal year 2010-2011. 7.0 Recommendations: In Summary, Staff makes the following recommendations: • Continue to use Los Angeles Auditor-Controller property tax roll for SUSC billing purposes for FY 2010-2011 as it eliminates costly billing systems, additional staff, and minimizes bad debt. • Adopt a resolution that reaffirms the existing SUSC billing formulas for fiscal year 2010-11. tOENGINEER'S REPORT ON THE ANNUAL LEVY 2010-2011 SEWER USER'S SERVICE CHARGE