File #: HIST-14553    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 8/9/2010 Final action: 8/9/2010
Title: Award of a Construction Contract to SRD Engineering Inc., as the Lowest Responsive and Responsible Bidder, for the Potholing and Inspection of an Abandoned 10" Sewer Force Main on Braddock Drive, P-521.
Attachments: 1. Award of a Construction Contract to SRD Engineerin - C-3__10-08-09__PW-Eng__CITY COUNCIL__10- inch FM Potholing and Inspection_Award - FINAL.doc
City of Culver City, California Agenda Item Report RECOMMENDATION: Staff recommends the City Council award a construction contract to SRD Engineering Inc., as the lowest responsive and responsible bidder for the Potholing and Inspection of an Abandoned 10" Sewer Force Main on Braddock Drive, P-521 BACKGROUND: The Braddock Sewer Pump Station is located at the northeast corner of the intersection of Braddock Drive and Sawtelle Boulevard. Sewage flows from a 720- acre area of Culver City and abutting portions of the City of Los Angeles to the Braddock Station from which it is pumped into a force main in Braddock Drive to the City of Los Angeles’ West Los Angeles Interceptor sewer in Overland Avenue. Approximately 1,500,000 gallons of sewage flow daily to the station. In 1988, an 18” diameter force main was constructed to replace a 10” diameter force main that was constructed in the 1940’s. The California State Water Resources Control Board (SWRCB) adopted a General Waste Discharge Requirement (WDR) for all publicly owned sanitary sewer collection systems in California. The goal of the WDR is to provide a consistent statewide approach for reducing Sanitary Sewer Overflows (SSOs). It is the City’s responsibility to maintain the reliability of the sewer collection system and prevent overflow or spill. A redundant force main will provide the City with a secondary discharge sewer main in case the existing 18” diameter line along Braddock Drive is not available due to any unforeseen circumstances. Before spending a considerable Meeting Date: 08/09/2010 Item Number: C-3 CITY COUNCIL AGENDA ITEM: Award of a Construction Contract to SRD Engineering Inc., as the Lowest Responsive and Responsible Bidder, for the Potholing and Inspection of an Abandoned 10" Sewer Force Main on Braddock Drive, P-521 Contact Person/Dept.: Hong Wang/PW Phone Number: 310-253-5604 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [ ] Attachments: [ ] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (08/05/10) and all three bidders (08/04/10); (Telephone) Department Approval: Charles D. Herbertson (07/29/10) City Attorney Approval: Carol Schwab (by H. Baker) (08/02/10) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (08/04/10) City Manager Approval: Martin R. Cole (08/05/10) City of Culver City, California Agenda Item Report amount of funds to construct a new force main, staff recommends to pothole and evaluate the feasibility of re-activating (with re-configuration and rehabilitation) the abandoned 10” force main. Hydraulic calculations have indicated the size of pipe is still sufficient as a temporary backup for the main force main. This potholing and inspection will determine the structural integrity of the 10” cast iron pipe. DISCUSSION: On July 22, 2010, the City Clerk’s Office publicly opened the bids. Three (3) contractors responded with the following bid amounts: CONTRACTOR BID AMOUNTS SRD Engineering Inc., Anaheim, CA $62,037.50 John T. Malloy, Inc., Los Angeles, CA $72,000.00 Newtech Engineering & Constr. Inc., Glendale, CA $86,225.00 Staff reviewed the bid proposal of the apparent lowest bidder, SRD Engineering Inc., and found the bid documents responsive and complete. Its bid bond, contractor’s license, and worker’s compensation insurance were reviewed and determined to meet City requirements. SRD Engineering Inc. has completed various utility projects with other municipal agencies in the local region, including Caltrans and the City of Industry. All references checked have yielded positive feedback. Staff recommends that the City Council authorize the Public Works Director/City Engineer authority to approve change orders in the amount not-to-exceed $9,312.50 (15%), as necessary for unforeseen conditions. Construction management and inspection services will be provided by Public Works engineering staff. If the contract is awarded by the City Council, the project will begin in late September 2010 and is expected to be completed in October 2010. City of Culver City, California Agenda Item Report FISCAL ANALYSIS: Proposed Project Budget Pump Stations Improvements, P-521 $802,396 Available Funds $802,396 Estimated Project Expenses Construction contract $62,037.50 15% contingency $9,300.00 Total Estimated Project Expenses $71,337.50 The remaining project balance has been budgeted for various improvements to the City’s seven sewer lift stations and discharging force mains. MOTIONS: That the City Council: 1) Award a contract to SRD Engineering Inc., as the lowest responsive and responsible bidder, for the Potholing and Inspection of Abandoned 10" Sewer Force Main on Braddock Drive, P-521, in the amount of $62,037.50, based on its base bid; and, 3) Authorize the Public Works Director/City Engineer to approve change orders in an amount not-to-exceed $9,300 if necessary; and, 4) Authorize the City Attorney to review/prepare the necessary documents; and, 5) Authorize the City Manager to execute such documents on behalf of the City.