Legislation Details

File #: 27-158    Version: 1 Subject: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Annual Street Pavement & Concrete Rehabilitation Project - FY 26-27, PS-005.
Type: Minute Order Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 8/10/2026 Final action:
Title: CC - CONSENT ITEM: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Annual Street Pavement and Concrete Rehabilitation Project - FY 26-27, PS-005.
Attachments: 1. 2026-08-10-ATT1 - Alley Exhibits, 2. 2026-08-10-ATT2-2027 Residential Streets_Specs NFC, 3. 2026-08-10-ATT3- PS005 — Location Exhibit
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

CC - CONSENT ITEM:  Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Annual Street Pavement and Concrete Rehabilitation Project - FY 26-27, PS-005.

 

body

Meeting Date:                     August 10, 2026

 

Contact/Dept.:                     Diana Szymanski/Public Works, Engineering

 

Phone Number:                     (310) 253-5623

 

Fiscal Impact:                     Yes [X]     No [  ]                     General Fund:                     Yes [  ]     No [X]

 

Attachments:                     Yes [X]     No [  ]

 

Public Notification:                      E-Mail: Meetings and Agendas - City Council (08/05/2026)

 

Dept Approval:                      Yanni Demitri, Public Works Director/City Engineer (07/22/2026)

_____________________________________________________________________

 

 

RECOMMENDATION

 

Staff recommends the City Council approve the final plans and specification and authorize the publication of a notice inviting bids for, Annual Street Pavement and Concrete Rehabilitation Project - FY 26-27 (PS-005).

 

 

BACKGROUND / DISCUSSION

 

Per the pavement management system recommendation and visual observation, City staff have selected streets to be resurfaced in FY 26-27. The scope of work generally consists of replacing two inches of deteriorated asphalt concrete with rubberized asphalt concrete. In areas of extensive pavement failure, the asphalt section will be removed and replaced with full depth asphalt pavement. The following residential streets are scheduled for resurfacing in FY26-27:

 

                     Playa Ct from South End to Playa St

                     Corryne Pl from South End to Slauson Ave

                     Jordan Way from Jefferson Blvd to Virginia Ave

                     Cattaraugus Ave from Washington Blvd to City Limits

                     Hutchinson Ave from Washington Blvd to City Limits

                     Lindblade St from Ince Blvd to Higuera St

                     Vinton Ave from Braddock Ave to Culver Blvd

                     Albright Ave from Washington Blvd to Washington Pl

                     Galvin St from Northgate St to End

                     Ver Halen Ct from West End to Ivy Wy

                     Berryman Ave from Washington Blvd to Washington Pl

                     Coolidge Ave from Washington Blvd to Washington Pl

                     Coombs Ave from South End to Farragut Dr

                     Globe Abe from South End to Venice Blvd

                     Keystone Ave from Farragut Dr to Braddock Dr

                     Westwood Blvd from Washington Blvd to Venice Blvd

                     Hargis St from Washington Blvd to City Limits

                     Braddock Dr from Sepulveda Blvd (at PCC Limit) to Harter Ave

                     Farragut Dr from Mentone Ave to Jasmine Ave

                     Vicstone Ct from City Limits to Lenawee Ave

                     Lenawee Ave from Stoneview Dr to City Limits

                     Perham Dr from Wrightcrest Dr to Ivy Wy

 

In addition, the following alley reconstruction (PZ295) will be listed in the bid schedule as additive bids to be paved:

                     Alley north of Elenda Street, between Farragut Drive and Franklin Street.

                     Alley north of Elenda Street, between Garfield Avenue and Braddock Drive.

                     Alley north of Washington Boulevard, between Dauphine Avenue and Comey Avenue.

 

In January 2026, the City Council approved specifications and gave authorization to bid the Veterans Memorial Park Parking Lot Resurfacing Project, PA-008. Staff will be including the parking lot resurfacing project in the Annual Street Pavement bid package to maximize the economy of scale and coordinate with the PRCS Department event calendar and activities.

 

City Engineering staff prepared specifications, exhibits and bid documents. Staff recommends the City Council approve the plans and specifications and authorize the advertisement of construction bids for the Annual Street Pavement & Concrete Rehabilitation Project - FY 26-27 (PS-005). Construction is scheduled to start November 2026 and be substantially completed by March 2027, weather permitting.

 

 

FISCAL ANALYSIS

 

Total Estimated Project Costs                       Amount                     

Street Repaving Costs                     $2,300,000

Construction Inspection Services                     $   150,000

Material Testing & Surbey Monument Preservation                     $   100,000

25% Construction Contingency                     $   575,000

TOTAL                     $3,215,000

 

The Adopted Budget for Fiscal Year 2026-2027 includes $4,656,000 in new allocation and approximately $3,754,000 in carry-over funds available for PS005 (Annual Street Pavement & Concrete Rehabilitation Project - FY 26-27).  An additional $250,000 is available for Alley Reconstruction Project PZ295.  Approximately $3,000,000 is set aside for the paving of the several arterial streets as part of the Safer Fox Hills Project. 

Based on estimated project costs, there is sufficient funding in this project to cover the planned work.  Staff will provide the full budget fiscal impact once bids are received and the contract is brought to City Council for consideration of award.

 

 

ATTACHMENTS

 

                     2026-08-10-ATT1-Project Specifications

                     2026-08-10-ATT2-Alley Exhibits

                     2026-08-10-ATT3- PS 005 Location Map

 

 

recommended action

MOTION(S)

 

That the City Council:

                     

Approve the final plans and specifications and authorize the publication of a notice inviting bids for the construction of the Annual Street Pavement & Concrete Rehabilitation Project - FY 26-27, PS-005.