CITY COUNCIL AGENDA ITEM: (1) Award of a Contract to All American Asphalt, as
the Lowest Responsive and Responsible Bidder, for the Construction of the 2010
Pavement Overlay Project, P-863, P-903, P-921 and (2) Approval of Related Budget
Amendments (Four-Fifths Vote Requirement);
Contact Person/Dept.: Sammy Romo/PW Phone Number: 310-253-5619
Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No []
Public Hearing: [] Action Item: [] Attachments: [X]
Commission Action Required: Yes [] No [X] Date: _______________
Public Notification: (E-Mail) Meetings and Agendas – City Council (07/22/10); (E-Mail) -
All American Asphalt, Excel Paving, Imperial Paving Co., Silvia Construction, Inc., Sully-
Miller Contracting Co. (07/21/10)
Department Approval:
Charles D. Herbertson (07/19/10)
City Attorney Approval:
Carol Schwab (by H. Baker) (07/21/10)
Chief Financial Officer Approval:
Jeff Muir (by N. Kimball) (07/21/10)
City Manager Approval:
P. Lamont Ewell (07/22/10)
RECOMMENDATION:
Staff recommends the City Council:
1) Approve a budget amendment to appropriate $606,427 in Prop 1B funds
(42900903); and,
2) Award a contract to All American Asphalt as the lowest responsive and
responsible bidder for the construction of the 2010 Pavement Overlay Project,
P-863, P-903, P-921; and,
3) Authorize the Public Works Director/City Engineer to increase the construction
contract with All American Asphalt in an amount not to exceed $184,824 (25%
of base bid) for additional street resurfacing work.
A budget amendment requires a 4/5ths vote.
BACKGROUND:
Per the pavement management system and visual observation, several streets have
been selected to be re-paved. The scope of work consists of removing and replacing
two to three inches of deteriorated asphalt concrete with new rubberized asphalt
concrete. Additionally, curb and gutter will be replaced where necessary, and the
parking lot in Fire Station #2 will be re-paved as well. The streets to be re-paved
are: City of Culver City, California
Agenda Item Report
1. Adams Boulevard: Washington Blvd. to 140 feet west of Hines Ave.
2. Barman Avenue: Coombs Avenue to Overland Avenue
3. Corryne Place: Slauson Avenue to cul-de-sac
4. East Boulevard: Washington Boulevard to City Limit
5. Eastham Drive: Higuera Street to Steller Drive
6. Girard Avenue: Washington Place to Venice Boulevard
7. Hubbard Street: Ince Boulevard to cul-de-sac
8. Jean Place: Washington Boulevard to cul-de-sac
9. Lenawee Avenue: Ivy Way to City limit
10. Motor Avenue: Braddock Drive to Culver Boulevard
11. Pearson Street: Jefferson Boulevard to cul-de-sac
12. Perry Avenue: La Cienega Boulevard to Fairfax Avenue
13. Poinsettia Court: 370 feet west of Higuera Street to Ince Boulevard
14. Sawtelle Boulevard: Matteson Avenue to Venice Boulevard
15. Washington Place: Sawtelle Blvd to Sepulveda Blvd.
16. Washington Place/Grandview Blvd. Intersection
17. Washington Place: Albright Avenue to Sawtelle Blvd.
DISCUSSION:
On July 15, 2010, the City Clerk’s Office staff publicly opened the bids. Five
contractors responded with the following bid amounts:
CONTRACTOR BID AMOUNTS
1 All American Asphalt $739,296
2 Excel Paving Company $768,341
3 Imperial Paving Company $769,873
4 Silvia Construction, Inc. $810,382
5 Sully-Miller Contracting Company $854,860
Staff reviewed the five sets of contractor bid documents and determined All
American Asphalt submitted the lowest total base bid. Staff reviewed the bid
proposal from All American Asphalt and found the bid documents responsive and
complete. Its bid bond, contractor’s license, and worker’s compensation insurance
were reviewed and determined to meet City requirements. All American Asphalt has
completed several similar projects for the City of Culver City recently such as the
2007 Residential Overlay Project and the 2009 Residential Overlay Project with
satisfactory performance. Staff recommends awarding the construction contract to
All American Asphalt, as the lowest responsive and responsible bidder, for the
construction of the 2010 Pavement Overlay Project, P-863, P-903, and P-921.
City of Culver City, California
Agenda Item Report
Due to the favorable low unit prices in All American Asphalt’s bid and a sufficient
available budget, it is recommended that the following street segments be added to
the scope of work:
• LeBourget Ave: Culver Boulevard to Braddock Drive
• Motor Avenue: Park Avenue to Braddock Drive
• Park Avenue: Motor Avenue to Le Bourget Avenue
The construction management of the project will be conducted by Public Works
Department/Engineering Division staff.
Both construction inspection services and material testing services will be procured
through competitive Request for Proposal (RFP) process, to be selected from a list
of firms pre-approved by the City Council. After the RFP’s are received, staff will
review and select the consultant. The costs for these services are expected to be
approximately $20,000 and $10,000, respectively.
The proposed construction project will begin in September 2010 and is expected to
be substantially completed by November 2010.
Public Notification
Approximately two weeks prior to construction activity, the adjacent businesses and
residences will be provided with written information on the project schedule and
contact information for questions and/or concerns regarding the project.
FISCAL ANALYSIS:
In late May 2010, the City received its second allocation of Prop 1B funds from the
State of California in the amount of $606,427. Due to the uncertainty of the receipt
of these funds, they were not included in the Adopted FY 2010/2011 Budget.
Consequently, a budget amendment is needed to appropriate these funds. The
following tables identify the funding sources and uses for the proposed project,
which include the aforementioned Prop 1B allocation:
Proposed Project Budget
Funding Source Amount
P-863 Proposition 42 (43000863) $70,498
P-903 Proposition 1B (42900903) $606,427
P-921 General Funds (Fire Stn. Pkg. Lot)
(42000921)
$10,000
P-863 General Funds (42000863) $362,607
Total $1,049,532
City of Culver City, California
Agenda Item Report
Estimated Project Expenses
2010 Pavement Overlay Project, P-
863, P-903, P-921 Construction
Contract
$739,296
Increase Contract Amount by 25% $184,824
Construction Inspection Services $20,000
Geotechnical Construction Services
(Observation & Testing)
$10,000
Subtotal $954,120
10% project contingency $95,412
Total Estimated Project Expenses $1,049,532
ATTACHMENTS:
1. Location Map
MOTIONS:
That the City Council:
1) Approve a budget amendment to appropriate $606,427 in Prop 1B funds
(42900903); and,
2) Award a contract to All American Asphalt, as the lowest responsive and
responsible bidder, for the 2010 Pavement Overlay Project, P-863, P-903, P-921,
in the amount of $739,296, based on its base bid; and,
3) Authorize the Public Works Director/City Engineer to increase the construction
contract with All American Asphalt in an amount not to exceed $184,824 (25% of
base bid) for additional street resurfacing; and,
4) Authorize the Public Works Director/City Engineer to approve change orders in
the amount not-to-exceed $95,412, if necessary; and,
5) Authorize the City Attorney to review/prepare the necessary documents; and,
6) Authorize the City Manager to execute such documents on behalf of the City.
7/26/10
Award of a Contract to All American Asphalt, as the
Lowest Responsive and Responsible Bidder, for the
Construction of the 2010 Pavement Overlay Project,
P-863, P-903, P-921
MEETING DATE:
AGENDA ITEM:
ATTAC HM E NTS
Pages|109| Location Maps 1-4Sawtelle Blvd
From Matteson Ave To Venice Blvd
Length 750, Width 28
Area (SF): 21,000
Public Works Departmon.
Engineering Division
ce|10 10|Washington P1
Pavement Conditia
Map
Area 1
From Westerly City Limit Adjacent
To Albright Ave To 130 West of
Sawtelle Ave
East BI
From Washington BI To CITY LIMITS
Length 300, Width 40
Area (SF): 12,000
Legend
Construction
1"" • •
City Eouredsry
I
sS
, ..
•P
n '.9.'•
%
.,._..„,,,,..0,;.
viLirtgt0 1 . --;. -_-:-----
Washington P1
mr-pRnocHnE
FA1.175,FST
Sgn LEVE
V.11,1,4,419FFET
UNITSFEET
11.11ehner
Washin ton PI/Grandview Blvd Intersection THE CITY OF CULVER CITV
From Sawtelle EN To Sepulveda 13I
Length 900, Width 38
Area (SF): 34200
Lenght 75ft, Width 40ft
Area (SF): 3000
0 255510 1,020 1,530 2,040
Feet
INFORMATION TECHNOLOGY DEP-ARTY
GEOGRAPHIC INFoRmATICIP SYSTEM
9770 CALVES BOULEVARD
CULVER CITY, Cl 90232
310.251407R
Scale 1:12,850 JUNE 2010Girard Ave
From Washington BI To Venice BI
Length 1,200, Width 33
(SF): 39,600
0 0 J'
On.
141,
/ 7 7A
JUNS ScaN 1:12,880
\/.
Jean PI
Higuere
Pearson St
From Jefferson BL To END NORTH
Length 450, Width 46
Area (SF): 20,700
From Washington BiTo WEST END
Length 226, Width 18
Area (SF): 4,628
4"e"
•
* t.
o
From Braddock Dr To Culver BI
Length 920, Width 27
Area (SF): 24,840
Motor Ave
40,6,
••,:e
Q.|10 10|Construction
V
0 .1.=
City Boundary
-N,
4/
Barman Ave
From Coombs Ave To Overland BI
Length 690, Width 24
Area (SF): 22,770
Q, ^
e% "-- ->wo.,Y
oh
A, 0|10 10|From Culver Blvd To Braddock Dr
Length 900, Width 30
Area (SF): 27,000
UNT/STEE'r
ZUWID C., PO
NAV', DEGREEIrl,PILTCP
• 4•TIV. ...51.1.7E rdr,r,Fs YEE"
AVER, E ar.q. FrETI.A.1./,
RE -4,11,,F.1.7E 1.1, 419 rgur
THE CITY OF CULVER CIT
V/ FOR MATION TECHNOLOW OEPARTr
GEC/GRA/41PC INFORMAT/ON SYSTE!
anaCLILVFRIADULEVARD
CULVER CITY, CA K232
TEL:310.251-5970
From Braddock Dr To ParkAve
Length 545, Width 30
Area (SF): 13,620
Motor Ave
375 750 1,500 2,250 3,000
Feet
\\I
711E21________j
.11
45
.40
\ ,44
Le Bourget Ave
Public iNorks Dopartmer
Englnearing Division
Artier —
Pavement Conditic
Map
Area 2
Legend
Park Ave
From Le Bourget Ave To Motor Ave
Length 265, Width 30
Area (SF): 7,950
tc,0From Warner Dr To Stellar Dr
Length 690, Width 48
Area (SF): 33,120
Eastham Dr
Adams Blvd
Public Works Departrnerr
Engineering Division
Pavement Conditia
Map
Area 3
Eastham Dr
•
From 65' East of
Washington Blvd To
140' West of Hines Ave
Length 75, Width 245
Area (SF): 18,246
From Higuera St To Warner Dr
Length 487, Width 48
Area (SF): 23,376
ammempuql.
0.0
Hubbard St
Legend Perry Dr
From Higuera St to End of
cul-de-sac
Length 812, Width 28
Area (SF): 23,236
From La Cienega BI TO Farifax Ave
Length 540, Width 37
Area (SF): 17,480
EN
Construction
A City Boundary
.
Steller
Watner
Lanawee Ave
From Ivy Wy To NORTH CITY LIMIT
Length 165, Width 32
Area (SF): 5,280
Poinsetta Ct
Z-V n EY nvEJ
0.,571,2an 1 01-
11,./D35.9
DECIA1A90,r Geo. : DEA E 111,r1,ES F
YEAR Jay la, Kap
nNrILVI.CI.NGE
AV...7E EVO.T/DN 57' FEET .19,F £1.,
FLEIA7I0A RANGE 1,0 119 FEFr
From 370' WEST OF
HIGEURA ST
aimme
To INCE BLVD
Length 337, Width 20
mi Area (SF): 6,740 t
:
Blairstone-J THE CITY OF CULVER CM
Stoneview--|10 9| 375 750 1,500
INFORMATION TECHNOLOGY DEPARTM
. GEOGRAPHIC INFORMATIOR SYSTEM|10 10|9770 CULVER BOULEVARD
CULVER CITY, CA90222
TEL : $10-253-5978
Scale 1;12,880 June, 29154:40‘
Pavement Conditio
Map
Area 4
Corryne PI
41,N5a! gcTre,c.Fosup 517,E.
THE CITY OF CULVER CM
0 125 250 500 750 1,000
Feet
01„
Public Works Departmen1
Engineering Division
'4D
Legend
Construction
MI • 111
City Boundary
c
From END SOUTH To Slauson Ave
Length 405, Width 28
Area (SF): 11,940
n'AUZIP17P-2
EUFFOID.IRRNI
10.1.4710. F11,,,FS E
AVEVgraV71.2r1 . i '7W4E S9k47851 LEVEL
ELEVPTIC(1 RF, re,. FEET
A S
4=‘*‘
NFORMATION TECHNOLOGY DEPART M
GEOGRAPHIC INFORMATION SYSTEM
@
9770 CULVER BOULEVARD
SALVER CITY, CA 50232
TEL .1.10-253-5975
Scale 1:5,350 JUtE 231t