Legislation Details

File #: HIST-15809    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 2/7/2011 Final action: 2/7/2011
Title: Approval of Final Plans and Specifications and Authorization to Advertise Bids for the 2011 Residential Overlay Project, P-863, P-903.
Attachments: 1. Approval of Final Plans and Specifications and Aut - C-3__11-02-07__PW-Eng__CITY COUNCIL__2011 Residential Overlay_Approval of PSE - FINAL.docx, 2. Approval of Final Plans and Specifications and Aut - 11-02-07__PW-Eng__CITY COUNCIL__2011 Residential Overlay_Approval of PSE_Attachment with cover.pdf
City of Culver City, California Agenda Item Report Meeting Date: 02/07/11 Item Number: C-3 CITY COUNCIL AGENDA ITEM: Approval of Final Plans and Specifications and Authorization to Advertise Bids for the 2011 Residential Overlay Project, P-863, P- 903 Contact Person/Dept.: Sammy Romo/PW Phone Number: (310) 253-5619 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (02/02/11) Department Approval: Charles D. Herbertson(01/27/11) City Attorney Approval: Carol Schwab (by H. Baker) (02/01/11) Chief Financial Officer Approval: Jeff Muir (by K. Marsden) (02/02/11) City Manager Approval: John M. Nachbar (02/02/11) RECOMMENDATION: Staff recommends the City Council approve the final plans and specifications and authorize advertising for bids for the Residential Overlay Project, P-863, P-903. BACKGROUND/DISCUSSION: Per the pavement management system and visual observation, several streets are in need of repairs and have been selected to be re-paved with new asphalt. The scope of work consists of replacing two inches of asphalt concrete with new rubberized asphalt concrete. Additionally, curb and gutter will be replaced where necessary. The following streets are scheduled for resurfacing: 1. Farragut Drive: Jasmine Avenue to 100 feet west of Motor Avenue 2. Vinton Avenue: Farragut Drive to Braddock Drive 3. Ocean Drive: Cota Street to Rhoda Way 4. Piggot Drive: Sepulveda Boulevard to Bentley Avenue 5. Matteson Avenue: Bentley Avenue to east cul-de-sac 6. Bentley Avenue: Washington Place to Venice Boulevard 7. Segrell Way: Sawtelle Boulevard to Slauson Avenue 8. Dobson Way: Steven Circle to Jefferson Boulevard 9. Steven Circle 10. Hayter Avenue: Sawtelle Boulevard to Port Road 11. Jasmine Avenue: Farragut Drive to Culver Boulevard 12. Kinston Avenue: Jefferson Boulevard to Rhoda Way City of Culver City, California Agenda Item Report The construction contract award is expected to be presented to the City Council for consideration in March 2011. Should the City Council award the contract, the construction of the project is slated to commence in April 2011 and to be completed by June 2011. Staff will solicit for construction and geotechnical inspection services from the City Council approved on-call general civil engineering and geotechnical engineering firms lists. FISCAL ANALYSIS: Proposed Project Budget Funding Source Amount P-863 Proposition 42 (43000863) $66,213 P-863 General Funds (42000863) $201,204 P-863 General Funds (42000863) $500,000 P-863 Measure R (43100863) $599,000 P-903 Proposition 1B (42900903) $180,343 P-903 Proposition 1B (42300903) $10,603 Total $1,557,363 Estimated Project Expenses Construction, 2011 Pavement Overlay Project, P-863, P-903 $1,358,000 Construction Inspection Services $30,000 Geotechnical Construction Services (Observation and Testing) $10,000 Subtotal $1,398,000 10% Project Contingency $138,800 Total Estimated Project Expenses $1,536,800 ATTACHMENT: 1. Location Map MOTIONS: That the City Council: approve the final plans and specifications and authorize advertising for bids for construction for the 2011 Residential Overlay Project, P-863, P-903 MEETING DATE: 2/07/11 AGENDA ITEM: (1) Approval of Final Plans and Specifications and Authorization to Advertise Bids for the 2011 Residential Overlay Project, P-863, P-903 ATTACHMENTS Pages 1 Location Maps 1-3 JASMINE AVE FROM FARRAGUT DR TO CULVER BL Public Works Department Engineering Division Location Map 1 2011 Residential Overlay Project Legend • Culver City Boundary • City Block M Resurfacing VINTON AVE FROM FARRAGUT DR TO BRADDOCK DR FARRAGUT DR FROM 100' WEST OF MOTOR AVE TO JASMINE AVE 0 125 250 500 Feet asdann r THE CITY OF CULVER CITY ORMATiON TECHNOLOGY REFARTMENT OEOGRAPRICINFORmlalm sYSYR,IR JANUARY -31, 2011 elditElt Public Works Department Engineering Division Location Map 2 2011 Residential Overlay Project BENTLEY AVE FROM MATTESON AVE TO VENICE BL Legend I—. Culver City Boundary nIn • City Block EN Resurfacing BENTLEY AVE FROM WASHINGTON PL TO MATTESON AVE MATTESON AVE FROM BENTLEY AVE TO EAST END PIGOTT DR FROM SEPULVEDA BLVD TO BENTLEY AVE 0 125 250 500 Feet C1.1211M. THE CITY OF CULVER CITY INFORMATKA TENNOLOGY OVA R7MENT 130.001011,142NroRmanar3S,72,13 9 nn ••• JAUURRY 31, 2011 • • °O CD T 0 I- . 14 co 0 0 0 6d \ -t s' Cj ,e,& A.\ _...,•/ \ 6 ct. \ <9 e./. 0 4 1,14/ 'c g- o xIP 9 0 qL. \ .„ <)., 4 . a N *, . 6° / . 0 .q- ' 411 , i .,, / 1 -> Iti a. —01, L9,10/ '''' it ,t..s t ' 7& 411i, •.: • / < -10 BUSH WY CO ev 14. ?AU Nvorami 2:1C1 39012:1AVUO 0), ,sou-rH ocl• 6 '< so I. . — b 4 0 Q-.,L- ,.. Sv 0 .cz. -..., .4. 0 q .- N A. 4z_ 4, CD \' ,S4 d- 0 6c''' • ./ HAYTER AVE FROM SAWTELLE AVE TO PORT RD 405 Public Works Department EngineerIng Division Location Map 3 2011 Residential Overlay Project Legend • Culver City Boundary City Block Resurfacing 250 500 1100 Feet THE CITY OF CULVER CITY INFORMATION TECHNOLDGY DEPARTMERT .3E0CRAPHPC INFCAM411011 SYSTEMS (§), JRN LIAM' SI. 2011