Legislation Details

File #: HIST-12620    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 10/19/2009 Final action: 10/19/2009
Title: Approval of an Amendment to the Existing Professional Services Agreement with Iteris, Inc. for Configuration and Project Management Services for the Fox Hills Area Traffic Signal Synchronization Project, Acquisition of a Traffic Control System P-852.
Attachments: 1. Approval of an Amendment to the Existing Professio - C-6__09-10-19__PWD__CITY COUNCIL__Augment_Iteris_Contract_P852_Project_Management - FINAL.doc, 2. Approval of an Amendment to the Existing Professio - 09-10-12__PW-Eng__CITY COUNCIL__Augment Iteris Contract - P852__Attachment with cover.pdf
Created by Neevia Document Converter trial version City of Culver City, California Agenda Item Report Meeting Date: 10/19/2009 Item Number: C-6 CITY COUNCIL AGENDA ITEM: Approval of an Amendment to the Existing Professional Services Agreement with Iteris, Inc. for Configuration and Project Management Services for the Fox Hills Area Traffic Signal Synchronization Project, Acquisition of a Traffic Control System P-852. Contact Person/Dept.: Elaine Jeng/PW Phone Number: 310-253-5621 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: Meetings and Agendas – City Council (10/14/09); Iteris, Inc. via email on October 6, 2009 Department Approval: Charles D. Herbertson (10/01/09) City Attorney Approval: Carol Schwab (by H. Baker) (10/09/09) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (10/14/09) City Manager Approval: Mark Scott (10/14/09) RECOMMENDATION: Staff recommends the City Council approve an amendment to the existing professional services agreement with Iteris, Inc. to extend the configuration and project management services for the Fox Hills Area Traffic Signal Synchronization Project, acquisition of a Traffic Control System (TCS), P-852 BACKGROUND: Staff submitted the Fox Hills Area Traffic Signal Synchronization Project to the Los Angeles County Metropolitan Authority (Metro) 2001 Call for Projects program for funding. The application proposed multiple components of work comprised of upgrading 12 traffic signals within the Fox Hills area, switching existing traffic signal data transmission from copper wire interconnection to the City’s existing fiber optic network, providing mutual video CCTV camera surveillance capability between Culver City and Los Angeles Department of Transportation (LADOT), certifying the City’s existing traffic signal communication infrastructure and acquiring a citywide Traffic Control System. On May 21, 2007, Council awarded a contract to Iteris, Inc. to provide configuration and project management services for the traffic control system component of the project. DISCUSSION: Traffic Control System Project Oversight: Created by Neevia Document Converter trial version http://www.neevia.com City of Culver City, California Agenda Item Report In December 2008 Kimley-Horn Associates (KHA) was selected to install and integrate their commercial off-the-shelf traffic control system, KITS. Iteris, who was already working for the City to assist with the procurement of traffic control system, had an existing contract that also provided for technical oversight of the traffic control system installation by KHA and management support to the City. The traffic control system installation was anticipated to be completed by June 30, 2009. However, because the traffic controller firmware needed to be developed to integrate a new citywide Bus Priority protocol, coupled with reconciliation of the communication between KITS and the local traffic signal controllers (data transmission/response time parameters), full operation of the traffic control system is presently delayed by approximately 8 months. Metro approved a project extension of one year to June 30, 2010. As of September 2009, Iteris exhausted the available monies in their existing contract. To continue their technical oversight and management services, Iteris’ contract needs to be extended. Using Iteris’ initial cost proposal as a benchmark, staff is recommending increasing the technical oversight and management services by $40,000. Traffic Control Center design: The Fox Hills Area Traffic Signal Synchronization project has many components of work that needed to be sequentially completely. With this constraint, it was difficult to plan for the latter work components as they are dependent upon the available budget remaining from the initial components. The Traffic Control Center is one such component. With the project in its entirety nearing completion, staff has a more precise assessment of the current project budget and found it to be sufficient to support the additional work associated with construction of a Traffic Control Center in City Hall. Therefore, staff recommends that Iteris’ scope of work be expanded to provide for design and project management of the housing of the Traffic Control Center. The Traffic Control Center is to be hosted in available office space on the 2 nd Floor of City Hall. Under this expanded scope, Iteris will provide the architectural design, the preparation of a construction bid package to include room modifications, and procurement of equipment and system integration upon completion of construction. Based on Iteris’ space analysis, staff is recommending an allocation of $50,000 to Iteris’ for this effort. It is anticipated that Iteris will be completing the architectural design and construction bid package by January 2010. At that time the City Council will be asked to approve the bid package and authorize the advertisement of bids for construction of the Traffic Control Center. Created by Neevia Document Converter trial version http://www.neevia.com City of Culver City, California Agenda Item Report FISCAL ANALYSIS: The total project budget is $2,036,100 (including grant and matching funds). The local match, comprised of developer mitigation funds and Gas Tax funds, is $414,275. Funding Sources: Prop C – Discretionary (42300852) $876,000 Prop C – Discretionary (42300852) $607,000 Prop C – Transfer in to Gen Fund Capital (42000852) $138,825 Crown WaterRidge Mitigation Funds (55093504) $189,665 Gas Tax (41800852) $224,610 Total Funding $2,036,100 Expenditure and Contract Commitment To Date Signal Design $154,500 Signal Upgrade $806,079 Mutual Video/Copper to Fiber $69,758 Server Room Design $10,000 Server Room Construction $24,500 Configuration Management $84,140 Traffic Control System Installation $473,516* Communication Survey $100,000* Proposed Contract Increase w/ Contingency $99,000 Total Expenditures and Commitments $1,821,493 *Contract amount, not expended amount ATTACHMENTS: 1. Iteris Space Analysis MOTION: 1) Approve an amendment to the existing professional services agreement with Iteris, Inc. to increase Task 2 by $40,000; and, 2) Approve an amendment to the existing professional services agreement with Iteris, Inc. to add Task 4, design of housing for the traffic control system, with a not-to-exceed fee of $50,000; and, Created by Neevia Document Converter trial version http://www.neevia.com City of Culver City, California Agenda Item Report 3) Authorize the City Manager to approve change orders in the amount not-to- exceed $9,000, if necessary; and, 4) Authorize the City Attorney to review/prepare the necessary documents; and, 5) Authorize the City Manager to execute such documents on behalf of the City Created by Neevia Document Converter trial version http://www.neevia.com 10/19/09 Approve Contract Amendment with Iteris, Inc. for Configuration and Project Management Services for the Fox Hills Area Traffic Signal Synchronization Project, Acquisition of a Traffic Control System P-852 M EETI NG DATE: AGENDA ITEM: ATTACHMENTS Pages|109| !tens Space Analysis 1-5.;$o çlytrfllot; . . •:, gt:r. T4F.t,5; • : City of Culver City Traffic Management Center (TMC) Design & integration Scope of Work Scope of Work A traffic management center (TMC) is the center of traffic operations. A TMC requires design elements with both form and function for effective traffic operations and an appealing layout that can be displayed as a technological focus. The City of Culver City TMC is proposed to be located in an existing office space in City Hall. Primarily the TMC will house the traffic control system (KITS) workstations. To accommodate the operations of the traffic control system, two closets will be removed on the east side of the room. This modification to the TMC room will provide more space to house a new console table designed for the limited space and layout of the modified room, along with a video wall on the rebuilt east wall. Figure 1 displays the proposed layout of the new TMC. To accomplish the successful design and integration of the Culver City TMC, the following tasks are proposed. Task 1: Develop Spatial & Facility Requirements The City desires to build a fully functional TMC within the existing room. In embarking on any such TMC design activities it is important to follow a systematic approach in the design and upgrade process. A critical element includes detailed documentation of existing systems and infrastructure, user requirements definition, logistics and spatial planning and construction oversight. ITERIS Page 1City of Culver City Traffic Management Center (TMC) Design & integration Scope of Work The lteris Team will perform varying tasks to result in the identification of spatial requirements and plans. These will include: Subtask 1.1 Review of Existing Infrastructure As part of this sub-task, a detailed inventory of the existing infrastructure will be done in support of the TMC. The review of the existing infrastructure will include identification of: • Existing Fiber Optics cable that enters the room. • The path of the fiber optic cable • Spare fibers from the basement server room to the 2 nd floor communications room • Capacity of existing video hardware. • Identify existing conduit in ceiling or under floor • Identify existing phone connections in the room • Identify existing data (Ethernet) connections in the room. Subtask 1.2 identification of Spatial Requirements The lteris Team shall perform the following tasks to result in the identification of spatial requirements. • Identify overall operating requirements for each of the above spaces considering factors such as: o Basic function of each space. o Number and type of staff to be housed in each space, and duties to be performed (both near and long term staffing requirements will be performed). o General types of equipment required for performing the identified functions. o Equipment needs for each space will be defined. These will include items such as Equipment racks, communications backboard(s), UPS, FIVAC, Storage and work areas. o Required interaction among staff and equipment. o Future expandability. • Based on the operating requirements identified above, describe the spatial requirements for each space. For each space the distinct operational areas will be highlighted and described. For example, the control room may include the surveillance area (e.g. video wall), operator area (and console requirements and size), supervisor area, storage requirements, map area etc. • ltens shall identify overall environment requirements of the spaces. This information will be used to help compare location options in the following task. Environmental requirements investigated will include: o Lighting o Acoustics o Cable Management: o Electrical/mechanical requirements o Mechanical • Identify operating relationships between the spaces (e.g. relationship of the viewing area to the control area, etc.) o Iteris shall identify overall environment requirements of the TMC space. Environmental requirements investigated will include: ITERIS Page I 2 2.City of Culver City Traffic Management Center (TM C) Design & integration Scope of Work o Lighting: Often overlooked, lighting is an important feature of any TMC. o Acoustics: Noise control should be provided. This is particularly important for the Control Room where a quiet environment is required for efficient operation. o Cable Management: Cable management through ceiling, through floor, and console furniture so that a clutter free design. The major considerations; concealment, accessibility, expandability, and cost should all be investigated. o Electrical/mechanical requirements: As part of a detailed design an electrical loading assessment shall be conducted. Equipment rack grounding should also be addressed during design. o Mechanical: The key mechanical considerations that are unique to the TMC are the FIVAC and fire suppression components. Task 1.3 Define Building System Issues The Iteris Team shall meet with the City personnel to discuss building systems issues and needs for the TMC. The following will be discussed: • Power supply, including requirements for back-up. • Heating, ventilation and air conditioning (HVAC). • Fire protection. • Communications (LAN, telephone systems relocations). All of these considerations will result in the preparation of Plans, Specifications and Estimates for the TMC deployment. The plans will be stamped by a licensed architect. Task 2 Detail Design Studio Architects will be engaged to perform the final design and design development of the lteris and Culver City concept for the TMC tenant improvements that pertain to the shell of the TMC space. It shall be performed in two basic sub-tasks described as follows: Task 2.1 As-Built Development As-built plans will be prepared under this contract using city's records to be provided for a TMC TI design development in existing City Hall at existing TMC space to be enlarged and remodeled. Task 2.2 Detail Design Plan Development Studio Architects will prepare Construction Plans to obtain clearance from the city's Building and Safety Department for appropriate permits, respond to contractor R.F.I's and assist in the bid process; visit job site (twice), and perform a final review for final coordination with build teams. It is assumed that alternate bids/re-bids and changes to work proposed are not included. It is also assumed that the existing HVAC and units shall be re-used as required, as the city reported this room (#B242) housed computer serves. Therefore, the plans will not include Mechanical and Plumbing, and any other incidental engineering. Page I 3 h Ems 3City of Culver City • Traffic Management Center (TMC) Design & integration Scope of Work Task 3 Integration Integration Services will encompass a variety of activates as shown below. These activates include: • Installation and final connections of TMC monitors (monitors to be provided by City or contractor) • Install TMC communications cabling and interface equipment required for the operation of the TMC systems deployed. This includes the video multiplexing equipment, expansion of the video matrix hardware, and hardware used for remote switching and control of video system. The following assumptions are taken in developing the cost estimate to complete this item: o All equipment and necessary cabling will have be purchased by the City (or contractor) o lteris will purchase the fiber optic cable that will connect the TMC to the server room in the basement. • Develop and conduct an Acceptance Test Plan of the TMC • Generate a draft and final Test Report as a result of the acceptance tests, to include those actions, results, failures, and corrective or preventative measures taken with respect to the hardware and configuration installed with this project. • Develop an operations manual based on the delivered system and to include a description of the operation of the system (hardware, software, and communications equipment) as it relates to the user's tasks. • Generate an architectural map of the TMC systems installed. Schedule and Budget It is estimated that the design component of the project (Tasks 1 and 2) will be completed within two months from notice-to-proceed. The final task, Integration, (Task 3) will commence as the construction phase of the project is nearing completion and will take approximately three weeks. The table below provides a summary of the proposed project budget to complete the tasks identified above. Page I 4Iteris The Studio Group Crosstown g 1:1 Ow .g , `" .8. . 04 c c ICE LL 2.|1010|a 8. - U 0 0|1010|< 0•0 ,c13 e5 e E Ow Efi je) D2 III 4Z.|1010|Total Hours .43 Total Cost : 12 : 4 0: 0 18: 22 1 :go 12,920 : : 40: $ 4,600 4,742: 25,370: 4 16 24 • :2;000:: 58 46 84 22 22 14 304 48,270 246 58 ODC 1,730 TASK Tas k 1,0 Task 20 DetailDesign Task 44 . E . : .poeuipen401oei : "" • ' •":. " : ' • : : Page 1 5 DERN City of Culver City Traffic Management Center (TMC) Design & integration Scope of Work sOrrsi: