File #: HIST-4703    Version: 1 Subject:
Type: Historical Status: Action Item
In control: City Council Meeting Agenda
On agenda: 4/9/2007 Final action: 4/9/2007
Title: 1) Award a Construction Contract to DLSB, Inc., for the Eveward Road, Drakewood Avenue, Whitburn Avenue, Flaxton Street, Blackwelder Street, Smiley Drive, Northgate Street, Cranks Road, Commonwealth Alley, and Carson Street Sewer Improvement Projects; and 2) Approve a Professional Services Agreement with APD Consultants, Inc. for Construction Management and Inspection Services.
Attachments: 1. 1) Award a Construction Contract to DLSB, Inc., fo - A-3__07-04-09_PW-Eng_Sewer Improvement Contract Award - FINAL.doc, 2. 1) Award a Construction Contract to DLSB, Inc., fo - A-3__Sewer Construction Contract Award.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends the City Council: (1) award a construction contract to DLSB, Inc. as the lowest responsive and responsible bidder to complete the necessary work for the Eveward Road, Drakewood Avenue, Whitburn Avenue, Flaxton Street, Blackwelder Street, Smiley Drive, Northgate Street, Cranks Road, Commonwealth Alley, and Carson Street Sewer Improvement Projects (P-839, 840, 841, 842, 854, 855, 773, & 860)-;, and (2) approve a professional services agreement with APD Consultants, Inc. for Construction Management and Inspection Services. BACKGROUND: The plans and specifications and the authorization for advertising for bids for the aforementioned sewer improvement projects were approved by the City Council on the following dates: 1. Eveward Road, Drakewood Avenue, Whitburn Avenue, & Flaxton Street Sewer Improvement Projects, P-839, 840, 841, & 842 (August 22, 2005). 2. Blackwelder Street and Smiley Drive Sewer Improvement Projects, P-854 (August 14, 2006). 3. Northgate St and Cranks Rd Sewer Improvement Projects, P-855 (August 14, 2006). Date: 4/09/07 Item Number: A-3 AGENDA ITEM: 1) Award a Construction Contract to DLSB, Inc., for the Eveward Road, Drakewood Avenue, Whitburn Avenue, Flaxton Street, Blackwelder Street, Smiley Drive, Northgate Street, Cranks Road, Commonwealth Alley, and Carson Street Sewer Improvement Projects; and 2) Approve a Professional Services Agreement with APD Consultants, Inc. for Construction Management and Inspection Services Contact Person/Dept.: Lee Torres/ Public Works Phone Number: (310) 253-5623 Fiscal Impact: Yes [X] No [ ] General Fund: Yes [ ] No [X] Public Hearing: [ ] Action Item: [X] Attachments: [X] Public Notification: Master Notification List via email on April 4 th and all immediately affected residents and business owners of project site (800 total), DLSB, Inc., and APD Consultants via First Class Postcard on March 30 th . Department Approval: Charles D. Herbertson (03/21/2007) City Attorney Approval: Carol Schwab (by H. Iker) (04/02/2007) City Controller Approval: Marlee Chang (04/04/2007) City Manager Approval: Jerry B. Fulwood (04/04/2007) City of Culver City, California City Council Agenda Item Report 4. Commonwealth Alley Sewer Improvement Projects, P-773 (September 11, 2006). 5. Carson Street Sewer Improvement Projects, P-860 (January 8, 2007). On May 22, 2006, the City Council rejected the bids received for Eveward Road, Drakewood Avenue, Whitburn Avenue, and Flaxton Street Sewer Improvement Projects, P-839, 840, 841, & 842 due to bid results that greatly exceeded the budget. The City Council was informed that staff will re-evaluate the Sewer Improvement Project to determine the best possible cost savings. Also, in order to obtain more favorable bids for construction, it was recommended to the City Council that the project be advertised with other upcoming sewer improvement projects that were currently in the design phase in order to generate a higher interest and greater economy of scale. Upon careful review of the project plans, it was determined that the reduction of the length of the sewer laterals and usage of alternative backfill material were changes that did not compromise the construction standards and diminish the quality of the sewer improvement project. These design changes resulted in approximately a $400,000 reduction in construction cost based on the revised engineer’s estimate. Scope of Work The scope of work for sewer improvements projects consist of the following: On August 20, 2001, a Citywide Sewer Video Analysis and Condition Assessment Study was conducted. This study was recently updated on June 29, 2004. Approximately 85 miles of the City’s sewer lines were video inspected. The Condition Assessment Study categorized the City’s sewer main lines into four groups; “A”, “B”, “C”, & “D”. Group “A” represents the highest priority ranking for replacement and Group “D” represents the lowest. Based on the Conditions Assessment Study, the existing 6”, 8”, 10”, & 12” Vitrified Clay Pipe (VCP) sewer mains along the following streets were classified as Group “A”, the highest priority requiring replacement: 1. Eveward Road from Bernardo Road to Ranch Road; (8” VCP, 315 lf) 2. Drakewood Avenue from Ranch Road to Flaxton Avenue; (8” VCP, 775 lf) 3. Flaxton Avenue from Overland Avenue to Drakewood Avenue; (8” VCP, 1660 lf) 4. Whitburn Avenue from Overland Avenue to Drakewood Avenue; (8” VCP, 810 lf) 5. Blackwelder Street from La Cienega Blvd to Ballona Creek, (8” VCP; 1040 lf) 6. Smiley Drive from Fairfax Avenue of Ballona Creek, (10” VCP ; 860 lf) 7. Northgate Street from Overland Avenue to Drakewood Avenue, (8” VCP; 990 lf) 8. Cranks Road from Hill Road north to Cul-de-sac, (8” VCP; 915 lf) 9. Commonwealth Alley from Culver Blvd to end of Commonwealth Alley, (12” & 8”, City of Culver City, California City Council Agenda Item Report 1200 lf) 10. Carson Street from Ince Blvd to Higuera Street; 610 feet of the existing 6” The scope of work consists of the removal of the existing 6”, 8”, 10”, and 12” vitrified clay pipe (VCP) and constructing new 8”, 10”, and 12” Polyvinyl Chloride (PVC) sewer mains located at the above mentioned streets within the said limits. As part of the improvements, all sewer laterals will be replaced with 6” PVC to the street curb and minor pavement repairs will also be included. In street segments where no street curbs exist, sewer laterals will extend up to the property line. DISCUSSION: On March 2, 2007, the Deputy City Clerk publicly opened bids. There were a total of twenty-six (26) bid holders, with eleven (11) contractors responding with the following bid amounts: CONTRACTOR BID AMOUNTS 1 DLSB, Inc.; Fontana, CA $2,501,084.20 2 Palp, Inc. dba Excel Paving; Long Beach, Ca $2,656,938.00 3 Garcia Juarez Construction Co.; Brea, CA $2,778,002.00 4 Vasilj, Inc.; Irwindale, Ca $2,855,043.00 5 Zondiros Corp.; Torrance, CA $2,930,296.99 6 Steve Bubalo Construction Co.; Monrovia, CA $3,420,093.00 7 Mike Prlich and Sons, Inc.; South El Monte, CA $3,581,113.00 8 Colich & Sons, L.P.; Gardena, CA $3,612,433.00 9 Mike Bubalo Construction Co.; Baldwin Park, CA $3,881,463.00 10 Clarke Construction Corp.; Lawndale, CA $4,034,986.70 11 Blois Construction, Inc.; Oxnard, CA $5,635,928.00 Staff reviewed the lowest bidder’s bid proposal (DLSB, Inc.) and found the bid documents complete. The bonding information, contractor eligibility, and Worker’s Compensation Insurance was reviewed and determined to meet City requirements. DLSB, Inc. is a new company, but has completed several projects for other municipal and county agencies, such as the City of Pico Rivera, Los Angeles County Department of Public Works and Riverside County Flood Control & Water Conservation District. A representative from the City of Pico Rivera indicated that the Company performed in a professional manner, was very responsive and highly City of Culver City, California City Council Agenda Item Report recommended them for future projects. Also the personnel in the company have many years of experience with pipeline construction working for other companies. Based on a careful review of DLSB’s bid documents, reference checks, personnel experience, and bonding and insurance requirements, staff is recommending awarding the construction contract to DSLB, Inc. Cost Savings due to Combined Bid Combining the ten (10) sewer improvement projects in one bid resulted in a significant cost savings to the City. The original bid, for example, for the Eveward Road, Drakewood Avenue, Whitburn Avenue, and Flaxton Street Sewer Improvement Project received in March 22, 2006 was in the amount of $1,827,810. Based on the changes made to the project plans in April, 2006 and if the same unit prices were used from the bid received, the new bid amount should have been $1,427,810. The current bid received from DLSB, Inc. for Eveward Road, Drakewood Avenue, Whitburn Avenue, and Flaxton Street Sewer Improvement Project received was in the amount of $941,069.20. Therefore, the combining of the several sewer replacement projects further reduced the construction cost by another $486,741 for this project. The result of the combined project in general reduced the unit prices for the majority of the costly bid items on the project, for example, 1. 8” PVC sewer main – approximately 68% less per linear foot 2. 6” PVC sewer lateral – approximately 45% less per linear foot 3. Asphalt – approximately 25% less per ton Construction Management and Inspection Services Under the Engineering Division’s supervision and project management, staff is recommending that the construction management and construction inspection be performed by APD Consultants, Inc (APD) at a not to exceed cost of $185,670. A Request for Proposal was sent to the following consulting civil engineering firms with experience in construction management and inspection of pipeline construction: 1. Nickerson Company, Manhattan Beach, CA 2. CBM Consulting, Inc.; Gardena, CA 3. Bureau Veritas North America; Santa Ana, CA 4. APD Consulting, Inc.; Huntington Beach, CA City of Culver City, California City Council Agenda Item Report Based on the proposals received, staff believes APD can provide the best service at the lowest hourly rate. Although a new company, their construction management and inspection team has extensive working experience on municipal pipeline projects. Staff from the City of Cypress and the City of Diamond Bar spoke favorably of the proposed construction management and inspection team and would recommend them for future projects. The geotechnical construction services will be conducted by PSI Consultants, Inc. for the construction observation, compaction testing, and roadway pavement resurfacing testing under the approved general geotechnical services agreement with the City. It is estimated that the cost will be about $85,860. The start of construction will begin in May 2007 and is expected to be completed in October 2007. All City Department and affected residents will be notified. FISCAL ANALYSIS: Current Project Budget PROJECT AMOUNT Eveward Road Sewer Improvement Project, P-839 $104,054 Drakewood Avenue Sewer Improvement Project, P-840 $499,764 Whitburn Avenue Sewer Improvement Project, P-841 $206,895 Flaxton Street Sewer Improvement Project, P-842 $221,586 Blackwelder Street and Smiley Drive Sewer Improvement Projects, P-854 $496,920 Northgate St and Cranks Rd Sewer Improvement Projects, P-855 $552,138 Commonwealth Alley Sewer Improvement Projects, P-773 $412,318 Carson Street Sewer Improvement Projects, P-860 $339,541 Total Project Budget $2,833,216 Proposed Bid PROJECT AMOUNT Eveward Rd, Drakewood Av, Whitburn Av, & Flaxton St Sewer Improvement Project, P-839, 840, 841, & 842. $941, 069.20 Blackwelder Street and Smiley Drive Sewer Improvement Projects, P-854 $405,460 Northgate St and Cranks Rd Sewer Improvement Projects, P-855 $456,950 City of Culver City, California City Council Agenda Item Report Commonwealth Alley Sewer Improvement Projects, P-773 $473,185 Carson Street Sewer Improvement Projects, P-860 $224,420 Total Project Budget $ 2,501,084.20 ESTIMATED PROPOSED PROJECT EXPENSES Combined Sewer Improvement Project $2,501,084.20 Construction Management/ Inspection (7%) $185,670.00 Geotechnical Services (3%) $85,860.00 Total Estimated Project Cost $2,772,614.20 Contingency (6%) $150,000.00 Total Estimated Project Cost (w/ Contingency) $2,922,614.20 An additional $89,400 would be required to sufficiently fund the contingency of the construction project. Pursuant to the City Council adopted Budget Resolution, the City Manager can, should the City Council award the contract as recommended, approve a budget transfer in the amount of $89,400 from the Farragut and Elenda Sewer Improvement Project, P-872 (20400872) to the project budget to adequately fund the contingency. Funds not expended after the construction phase will be returned to the Farragut and Elenda Sewer Improvement Project, P-872. The Farragut and Elenda project has sufficient budget to cover the transfer. The breakdown of the funds for the Capital Improvement Budget for Fiscal Year 2005/06 and 2006/07 for the Combined Sewer Improvement Project is as follows, Funding Source Business Unit Amount Sewer Enterprise Fund 20400839 $104,054 20400840 $499,764 20400841 $206,895 20400842 $201,586 20400854 $496,920 20400855 $532,138 20400860 $339,541 20400773 $412,318 Special Gas Tax 41800855 $20,000 41800842 $20,000 Total Project Budget $2,833,216 City of Culver City, California City Council Agenda Item Report ATTACHMENTS: 1. Location Maps 2. APD Consultant Proposal 3. CBM Consulting Proposal 4. Nickerson Company Proposal MOTION: That the City Council: 1) Award a construction contract to DLSB, Inc. for the Sewer Improvement Projects (P-839, 840, 841, 842, 854, 855, 773, & 860), based on its bid amount of $2,501,084.20; 2) Authorize the Public Works Director/City Engineer to approve change orders, if necessary, in an amount not-to-exceed $150,000.00; and 3) Authorize the City Attorney to prepare the necessary documents and authorize the City Manager to execute the documents on behalf of the City. MEETING DATE : 04/09/07 AGENDA ITEM: Award a Construction Contract to DLSB, Inc., for the Eveward Road, Drakewood Avenue, Whitburn Avenue, Flaxton Street, Blackwelder Street, Smiley Drive, Northgate Street, Cranks Road, Commonwealth Alley, and Carson Street, Sewer Improvement Projects; and Award a Professional Services Contract to APD Consultants, Inc. for Construction Management and Inspection Services ATTACHMENTS Pages 1 Location Maps 1-5 2 APD Consultant Proposal 6-28 3 CBM Consulting Proposal 29-57 4 Nickerson Company Proposal 58-75Sewer Improvement Project P-839, 840, 841, & 842 LOCATION MAP Proposed Sewer Main Replacementt*4 Sewer Improvement Project P-854 LOCATION MAP Proposed Sewer Main ReplacementSewer Improvement Project P-855 LOCATION MAP Proposed Sewer Main ReplacementSewer Improvement Project P-860 LOCATION MAP Proposed Sewer Main Replacement excellent(,V^- Sewer Improvement Project P-773 LOCATION MAP Proposed Sewer Main Replacement|10 10|I 1CONSULTANTS, INC. Proposal for Construction Management and Inspection Services For Sewer Replacement ProjectAV,^ CONSULTANTS, INC. March 14, 2007 Mr. Lee Torres Project Manager City of Culver City Engineering Division; 2d Floor 9770 Culver Boulevard Culver City, CA 90232 P-07036 Subject: Proposal for Construction Management and Inspection Services for Sewer Replacement Project Dear Mr. Torres: APD Consultants, Inc. (APD) is very pleased to have the opportunity to submit a proposal for the Construction Management and Inspection Services for the Sewer Replacement Project. APD Consultants, Inc. (APD) is a civil engineering firm providing consulting and construction management services for public and private sector clients in Southern California. APD is a certified Small Business Enterprise (SBE) company with a coalition of Southern California Public Agencies. APD provides extensive experience in preparation of street, sewer, water and storm drain plans, preparation of specifications and cost estimates, plan check consulting, on-call services, hydrologic and hydraulic analysis, water quality management , construction management and inspection services. The day to day involvement of the principal in the company ensures a high level of quality assurance/quality control (QA/QC) in all products prepared by the company. APD will protect, defend, indemnify, and hold harmless the City from any and all liability, claims, or expenses whatsoever incurred by APD in the preparation of its response to this RFP. Should you have any questions, please do not hesitate to call me at your convenience. Sincerely, APD Consultants, Inc. Robbie Mahmood, P.E. Principal|1010|18351 Beach Blvd. Suite F, Huntington Beach, CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comciI CITY OF CULVER CITY SEWER REPLACEMENT PROJECTS C exce&-nce :1 CONSTRUCTION MANAGEMENT & CONSULTANTS, INC. 04 INSPECTION SERVICES FEE SUMMARY TASK DESCRIPTION CONSTRUCTION MANAGER CONSTRUCTION INSPECTOR ADMIN TOTAL HOURS AMOUNT $125 $85 $55 CONSTRUCTION MANAGEMENT & INSPECTION SERVICES 1. Construction Management (Office) 148 180 328 $28,400.00 2. Construction Management (Field) 230 230 $28,750.00 3. Inspection Services (See Note 3 below) 1512 1512 $128,520.00 TOTAL 378 1512 180 2070 $185,670.00 Note : 1) Cost of printing, mileage, telephone, mailing and other expenses are incidental to the main items of the Engineering Services included in the hourly rate and no additional charges will be requested by APD Consultants, Inc. 2) The hourly rates for weekends and/or night work will be the same rates as the regular rates, and no additional charges will be requested by APD 3) As requested by the City for the purposes of this proposal, the construction duration was assumed to be 180 calendar days, which is 126 business days (126 days x 8 hrs/day = 1008 hrs) taken into consideration Memorial day, 4th of July, and Labor day holidays. Additional 504 hrs were estimated for another inspector performing inspection work, if needed, should the construction schedule requires that the contractor conduct any construction work in two different places simultaneously. All estimates of billable hours were based upon this duration.APE)^;o CONSULTANTS, INC. TABLE OF CONTENTS Section 1 Scope of Services Project Description Scope of Services Section 2 Company / Team Qualifications Organizational Chart Team Members Bios Relevant Experience Project Team Resumes Section 3 Schedule of Current and Future APD Projects Section 4 Sample Field Report 18351 Beach Blvd. Suite F, Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805 , www.apdcon.comAV.,-^ CONSULTANTS, INC. SECTION 1 Project Description The work consists of removing the existing 8", 10", and 12" VCP and constructing a new 8", 10" and 12" PVC sewer main along the following streets, 1. Flaxton Street from Overland Avenue to Youngworth Road (8"; 1660 lf) 2. Whitbum Street from Overland Avenue to Drakewood Avenue (8"; 810 If) 3. Drakewood Avenue from Ranch Road to Flaxton Street (8"; 7751f) 4. Eveward Road from Bernardo Road to Ranch Road (8"; 315 If) 5. Blackwelder Street from La Cienega Blvd to Ballona Creek, (8"; 1040 If) 6. Smiley Drive from Fairfax Avenue to Ballona Creek (10"8601f) 7. Northgate Street from Overland Avenue to Drakewood Ave, (8"; 990 If) 8. Cranks Road from Hill Road North to Cul-de-sac, (8"; 9151f) 9. Commonwealth Alley from southerly end to northerly end and to include a section between Culver Blvd. to end of Arvee Street (8" & 12"; 655 if & 660 If) 10. Carson Street from Ince Blvd. to Higuera Street (8"; 660 If) The scope of work also includes , but is not limited to, the construction of house laterals, manholes, roadway pavement, sidewalk, curb and gutter, and replacement of traffic pavement markings as specified in the attached plans and specifications. The construction of sewer improvement project is anticipated to begin May 1, 2007 with construction duration of 180 calendar days. Project Observations APD has reviewed the Plans and Specifications of the project and observed the followings: • Water and Gas laterals generally not shown on the plans. Inspector and contractor will need copy of utility companies sewer, water and gas atlas. Dig Alert (USA) required to mark the field. • Traffic Control - It appears the contractor will be required to obtain a public works encroachment permit prior to beginning work in the public right-of-way. It would be desirable to refer to this item in the Specifications and include estimated permit fees and draft permit requirements in the Appendix. Permit requirements could address items such as: 1) Temporary road closures if allowed during construction operations. 2) Detour requirements 3) If temporary storage or equipments and material in streets are allowed or not. 4) Lane closure - Specifying if and how many traffic lanes must remain open during construction at all times. 5) Address who pays for traffic signal loop detector replacements. 18351 Beach Blvd. Suite F, Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAPZ)__-^7 CONSULTANTS, INC. Scope of Services APD, in addition to all the items mentioned below, will: • Prepare Public Notice Forms for distribution to inform local residents of the project and its duration. • Perform video and picture survey prior to job construction. • Maintain project construction records in a 3-ring binder report and submit to the City at the end of the project. • APD inspector will also conduct labor compliance interviews of contractor and sub-contractors workers under the Construction Manager's supervision • Respond to residents/publics inquiries and complaints • Prepare Weekly Construction Manager's Report • Recommend final acceptance of the project APD Consultants, Inc. (APD) will be an extension to the City Staff and act as the City's representative and will be accountable and responsible for successful completion of the project . As requested by the City for the purposes of this proposal, the construction duration was assumed to be 180 calendar days, which is 126 business days taken into consideration Memorial day, 4th of July, and Labor day holidays. All estimates of billable hours were based upon this duration. A. CONSTRUCTION PHASE 1) Conduct Pre-construction meeting with the General Contractor (GC). An agenda shall be prepared by APD as approved by the City's Project Manager. 2) Conduct weekly coordination meetings with the GC. 3) Conduct daily site visits, observations, and supervise general inspection of construction activity. APD's Construction Manager will have a complete set of Plans, Specifications, Greenbook, and APWA Standard Plans at all times. 4) APD' s inspector will perform field inspections and coordinate geotechnical testing during construction to insure compliance with plans, specifications, and applicable standards. APD 's inspector will have a complete set of construction plans, Specifications , Greenbook, and APWA Standard Plans at all times. 5) APD's inspector will coordinate testing requirements, review and approve material and design mix submittals prior to placement. All tickets must be retained and submitted to City's Project Manager by end of each work week. 11 18351 Beach Blvd. Suite F, Huntington Beach, CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAPI):^^o CONSULTANTS, INC. ISO 6) APD's inspector will conduct weekly progress meetings with GC and the City's Project Manager, and resolve any job site difficulties in the City's best interest. Prepare and distribute meeting minutes the following business day. 7) Prepare Daily Construction Reports (DCR's). These DCR's will include a detailed description of the day-to-day operations, including on-site labor, personnel, weather, materials and equipment and include times of arrival and departure. Please see attached a sample APD Daily Construction Report in this proposal. 8) APD's inspector will document work progress on a regular basis by means of digital photographs properly labeled and dated. 9) Review the GC's construction schedule (weekly) with respect to the progress and any potential delays. 10) Coordinate with other City Departments as necessary. 11) Process and track Request for Information (RFI's) 12) Administer and negotiate changes to the work. 13) Maintain a log of RFI's and change order requests. 14) Coordinate the flow of information between all parties. 15) Review and provide recommendations for GC payments. 16) Provide weekly status reports and submit DCR's and construction photos at the end of each week to the City's Project Manager. 17) Provide coordination necessary to assure that ADA requirements are satisfied during construction progress and upon completion. 18) Coordinate invoicing and payment process with the City Project manager. 19) Ensure utility coordination throughout the construction phase of the project is performed by the GC. 20) Administer the lien wavier process and review all conditional and unconditional releases for consistency with all payments made. 21) Work with adjacent property owners ' and residents' to resolve their concerns, review potential accessibility issues, and ensure installation of traffic control devices per WATCH manual and as directed by City officials. 18351 Beach Blvd. Suite F, Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAV^ CONSULTANTS, INC. B. CONSTRUCTION CLOSE OUT PHASE 1) Administer final inspections. 2) Coordinate fmal walk through inspection, prepare final punch list items, and ensure all corrections items are completed by fmal close-out letter. 3) Verify removal, recordation notes, and replacement of all survey monumentation. 4) Resolve any outstanding payment issues and stop payment orders, if any. 5) Make recommendation for the release of retention. 6) Coordination any close-out activities required by the City. 7) Review and make recommendations as to adequacy of as-built plans. 13 18351 Beach Blvd. Suite F, Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comSECTION 2 Organizational Chart excellence Construction Manager Robbie Mahmood, P.E. Construction Insaection Les Brooks , P.E., P.L.S. Inspector Hamid Nourian Backup Inspector 14AV,-^ CONSULTANTS, INC. Team Members Bios Robbie Mahmood , P.E. - Construction Manager Mr. Mahmood will serve as the Construction Manager and primary contact on this project. Mr. Mahmood has a Master of Science Degree in Civil Engineering from the University of Toledo, Ohio and over 20 years experience in managing public works projects in Southern California. Mr. Mahmood is a Professional Licensed Civil Engineer in California # 60421, and has a Project Management Certificate from the University of California at Irvine (UCI). He has strong construction management skills and can prove to be invaluable to any project. Mr. Mahmood is an active member in the APWA Engineering and Technology Committee, Southern California Chapter, and in the ASCE Orange County Chapter. Mr. Mahmood is a hands on manager leading projects in the public work sector as well as the private sector in Southern California. Les Brooks, P.E., P.L.S. - Inspector Mr. Brooks has over 40 years of experience in the civil engineering and construction inspection fields. As an employee of the California Department of Transportation (Caltrans) for 38 years, Mr. Brooks was involved in the design and construction of numerous State Highway improvement projects in Southern California. He is also familiar with labor compliance requirements, and will conduct labor compliance interviews of contractor and sub-contractors workers under the Construction Manager's supervision. Mr. Brooks is very familiar with the construction of sewer projects, as well as current design and construction practices. He has experience in construction management, contract administration, project management, project development, project design, and coordination with public agencies/utilities including railroads, cities, counties, local transportation authorities, federal highways, the Corp of Engineers, beaches and parks, and flood control. Hamid Nourian - Inspector Mr. Nourian will be a backup inspector for Mr. Brooks, when and if needed, due to construction schedule and activities of the contractor on site. Mr. Hamid Nourian has over 25 years of experience and has a B.S. in Civil Engineering. Mr. Nourian's experience includes: Construction inspection of sewer and water projects in addition to laboratory testing of soils, concrete, and asphalt. Mr. Nourian's project experience includes inspection of the new Huntington Beach Lifeguard Headquarters and other beach facilities, new park facilities for the City of Riverside and various reservoirs for the City of Huntington Beach. He has attended numerous construction inspection-training courses of concrete and rubberized asphalt pavement.|1010|18351 Beach Blvd. Suite F, Huntington Beach, CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAPD^ CONSULTANTS, INC. Relevant Experience J 3- I(o 1- Cerritos/ Florence Sewer Improvement City of Cypress As part of their Capital Improvement Projects Program, The City of Cypress modified the sewer system along Florence Street and at the intersection of Cerritos Avenue with Florence Street. The project was to prevent the odor and the sewer backflow by revising the sewer line slopes, eliminating the sharp turns, and decreasing the number of confluences. Connection of the sewer line to the existing OCSD manhole was required. Construction Manager: Robbie Mahmood, P.E. ^' Client Contact: Kamran Dadbeh, P.E. - Assistant City Engineer City of Cypress, (714) 229 - 6756 2-10th Street/ Gardenia Ave Trunk Sewer Relief Project Long Beach Water Department The existing sewer system has structural deficiencies including moderate to severe cracks , infiltration, and existing manholes to be rehabilitated . The sewer lines were placed with the same size , 10" VCP, as no flow capacity deficiencies were observed in the Sewer Master Plan update. Project Manager: Robbie Mahmood, P.E. Client Contact : Bob Swain, P.E. - Division Engineer Long Beach Water Department , (562) 570 - 2337 Jeronimo/Rollingwood Road Intersection Improvements City of Lake Forest The scope of services provided included field surveying, street widening design, right-of-way services, minor geotechnical engineering, and construction management & inspection. The project objective was to provide a left turn pocket for southeasterly bound traffic on Jeronimo Road to northeasterly bound traffic on Rollingwood Road. This "T" intersection is located near the Serrano intermediate school on the southwesterly side of Jeronimo Road. Left turning vehicles into the residential area served by Rollingwood Road are delayed and obstructed pedestrian and auto traffic at the school. The proposed project did remedy this situation. Construction Manager: Robbie Mahmood, P.E. Client Contact : Gene Foster, Civil Engineering Associate City of Lake Forest, (949) 461-3490 18351 Beach Blvd. Suite F, Huntington Beach, CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAV,,-D^ CONSULTANTS, INC. 34- Target Store at Grand Ave & Golden Springs Drive, City of Diamond Bar Site grading, construction of sewer lines, storm drains, utilities, parking lot, streets, and lighting for Target store. Duties included Construction Management and inspection of approx. 8001f of 8- inch VCP sewer line, approx. 1500 LF of 24", 30" & 36" storm drain pipes, drainage inlets & manholes, general site grading, placing asphalt concrete pavement, curbs & street lighting for parking lots and streets, review contractor's installation of NPDES Best Management practices. Prepare daily reports of work performed and men & equipment used, attend weekly status meetings and prepare Minutes of Meeting Construction Manager/Inspection: Robbie Mahmood, P.E./Leslie Brooks, P.E.' Year of Completion: 2006 Client Contact: Fred Alamolhoda, Senior Engineer City of Diamond Bar (909) 374-2840 5- 12-inch VCP Sewer Main in Kellogg Drive, Yorba Linda Water District Construction inspection for 3600 LF of inch VCP sewer main, two siphons, manholes, excavation & backfill of 3600' long trench approximately 5-ft to 15-ft deep. Supervised placing crushed rock for pipe bedding, placing 12-inch thick aggregate base material & 5-inch thick asphalt concrete trench resurfacing, in addition to re-striping the roadway, and coordinating geotechnical ' materials sampling. Duties also included testing, recommending contract change orders, reviewing contractor's request for progress pay, attending bi-weekly meetings & preparing meeting minutes, preparing daily reports for work performed and men & equipment used, monitoring traffic control and trying to work with the public to maintain good public relations for the project. Construction Manager/Inspector: Leslie Brooks, P.E. Year of Completion: 2005 Client Contact: Scott Moulton Yorba Linda Water District (714) 777-3018 6- Pioneer Road Park, City of Tustin Construction Management and Inspection for 5-acre Park. Work included general site grading, installation of approx. 600 LF of 6-inch SDR 35 sewer main, approx. 1000 LF of 12-inch PVC storm drain pipe, area drains, irrigation & landscaping, on-site lighting, parking lot construction, pathway & sidewalk construction, restroom building, picnic building, water play area, basketball court, and children play areas. Responsibilities included preparation of contract change orders, reviewed and approved contractors material submittals, certified weekly payrolls & request for progress pay, coordinated work with utility companies, attended weekly progress meetings and prepared meeting minutes, monitored traffic control & contractors NPDES Best Management practices, prepared daily report for work performed and men & and equipment used, verified compliance with plans & specifications and interfaced with local residents to maintain good public relations for the project. 1*1 18351 Beach Blvd. Suite F, Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAXD^^ CONSULTANTS, INC. Construction Manager/Inspector: Leslie Brooks, P.E. Year of Completion: 2005 Client Contact: Patrick Sanchez, Director of Parks and Recreation City of Tustin, (714) 573-3331 7- Flow Control Valve and Concrete Vault Improvement (LB-4 & LB-8) Long Beach Water Department Responsibilities included construction management and inspection services of demolishing existing concrete vaults and replacing them with new reinforced concrete vaults (20'x14'), upgrading existing piping and valves on MWD Turnouts, and upgrading the existing telemetry and electrical equipment. Construction Manager: Robbie Mahmood, P.E. Year of Completion: 2003 Client Contact: Bob Swain, P.E. - Division Engineer Long Beach water Department. (562) 570 - 2337 8- Alley Water Conversion Projects Long Beach Water Department LBWD has initiated a program in replacing all the old asbestos (ACP) potable water lines in the City's alleys with an AWWA approved PVC lines. The scope of work included construction management and inspection services and collecting data and inventory of the existing water main connections for each house, removal of old water meters, abandoning existing water lines in the alleys, and connecting on-site new water systems. Construction Manager: Robbie Mahmood, P.E. Year of Completion: 2006 Client Contact: Isaac Pai, P.E. - Director of Engineering, Chief Engineer Long Beach Water Department. (562) 570 - 2336 9- Kaiser Permanente Health Center Diamond Bar, CA APD Consultants, Inc. (APD) has been retained by the Architect (WBSA) to prepare precise grading and drainage, sewer, water, erosion control and area drain plans, in addition to preparation of hydrology and hydraulic analysis, SWPPP, and SUSMP reports. The scope included the design of sewer lines, domestic water lines and fire sprinkler system. The development in this six acre site include medical office buildings and parking lots located south of Copley Drive and east of Bridge Gate Drive in the City of Diamond Bar. Project Manager: Robbie Mahmood, P.E., Year of Completion: In-Progress Client Contact: Michael Swain, AIA, Principal WBSA Architects, (949) 552-2061 18351 Beach Blvd. Suite F , Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805, www.apdcon.comAPD Consultants, Inc. Robbie Mahmood, P.E. Construction Manager Education & Registrations Professional Licensed Civil Engineer, 1999- California - #60421 University of Toledo, Ohio, M.S. - Civil Engineering, 1987 University of Toledo, Ohio, B.S. - Civil Engineering, 1984 UCI, Irvine CA -- Project Management Certificate, 2005 Professional Experience Mr. Mahmood has more than 20 years of experience in civil engineering design, and construction management. His expertise includes management and design of sewer, water, roadways, drainage, grading, and construction management. Project Experience Cerritos/ Florence Sewer Improvement, City of Cypress As part of their Capital Improvement Projects Program, The City of Cypress modified the sewer system along Florence Street and at the intersection of Cerritos Avenue with Florence Street. The project was to prevent the odor and the sewer backflow by revising the sewer line slopes, eliminating the sharp turns, and decreasing the number of confluences. Connection of the sewer line to the existing OCSD manhole was required. 10th Street/ Gardenia Ave Trunk Sewer Relief Project, Long Beach Water Department The existing sewer system has structural deficiencies including moderate to severe cracks, infiltration, and existing manholes to be rehabilitated. The sewer lines were placed with the same size, 10" VCP, as no flow capacity deficiencies were observed in the Sewer Master Plan update. Jeronimo/Rollingwood Road Intersection Improvements, City of Lake Forest The scope of services provided included field surveying, street widening design, right-of- way services, minor geotechnical engineering, and construction management & inspection. The project objective was to provide a left turn pocket for southeasterly bound traffic on Jeronimo Road to northeasterly bound traffic on Rollingwood Road. This "T" intersection is located near the Serrano intermediate school on the southwesterly side of Jeronimo Road. Left turning vehicles into the residential area served by Rollingwood Road are delayed and obstructed pedestrian and auto traffic at the school. The proposed project did remedy this situation. Flow Control Valve and Concrete Vault Improvement (LB-4 & LB-8), Long Beach Water Department Responsibilities included construction management and inspection services of demolishing existing concrete vaults and replacing them with new reinforced concrete Iqvaults (20'x14'), upgrading existing piping and valves on MWD Turnouts, and upgrading the existing telemetry and electrical equipment. Alley Water Conversion Projects, Long Beach Water Department LBWD has initiated a program in replacing all the old asbestos (ACP) potable water lines in the City's alleys with an AWWA approved PVC lines. The scope of work included, in addition to construction management and inspection, collecting data and inventory of the existing water main connections for each house, removal of old water meters, abandoning existing water lines in the alleys, and connecting on-site new water systems. Covenant Hills Force Main, Santa Margarita Water District As part of Ladera Ranch, Covenant Hills, Master Plan Development in Orange County, a 10" Force main was required to carry the sewer flow from Horno Lift Station to a gravity sewer line along Covenant Hills Road for distance of 5200 Ft. The Project required Coordination with the developer Rancho Mission Viejo, and with Santa Margarita Water District engineers. Kaiser Permanente Health Center, City of Diamond Bar Project includes preparation of precise grading and drainage, sewer, water, erosion control and area drain plans, in addition to preparation of hydrology and hydraulic analysis and SUSMP report. The development in this six acre site include medical office buildings and parking lots located south of Copley Drive and east of Bridge Gate Drive in the City of Diamond Bar. Chase Drive, Phase III Street Improvements , City of Corona Project includes widening Chase Drive from Garrettson Avenue to Sonrisa Drive (1700 Feet). Improvements include removal and replacement of AC pavement and existing driveways, and the construction of new curbs and gutters, driveways, storm drain system, relocation of existing electrical poles and design of bike path. Skyline Drive Street Reconstruction , County of Orange Preparation of final plans, specifications, and estimates for 0.50 mile portion of Skyline Drive in Lemon Heights, in the Unincorporated Orange County. Improvements included the addition of 78" RCP storm drain line, AC removal and replacement, addition of curbs and gutters, hydrology and hydraulic analysis, design of catch basins, preparation of traffic control plans, and close coordination with affected utility agencies. Carbon Canyon Road (SR142), City of Brea Reconstruction of one mile Carbon Canyon Road through Caltrans encroachment permit process for four phases of construction with separate permits. The project includes complete new roadway construction with curb & gutter, drainage, large cut slopes, hazardous utility crossing, 18" domestic water main, and traffic signals. Responsibility includes coordination and processing with the army crops of engineers for construction within the carbon canyon Dam reservoir. The estimated construction cost is $4 million.APD Consultants, Inc. Leslie Brooks, P.E., P.L.S Inspector Mr. Brooks has over 40 yrs of experience in civil and transportation engineering fields. As an employee of California Department of Transportation (Caltrans) for 38 yrs, Mr. Brooks was involved in the design and construction of numerous State Highway improvement projects in Southern California. He is very familiar Caltrans Standards, Procedures, and Requirements, as well as current design and construction practices. He has experience in construction management, contract administration, project management, project development, project design, and coordination with public agencies, including, cities, counties, local transportation authorities, federal highways, corps of engineers, forest services, fish & game, beaches & parks, flood control and utilities such as telephone, electric, cable, gas, oil, water, sewer, pipelines, etc. Registration • Professional Land Surveyor, State of California, 1983, No. L5255 • Professional Engineer, Civil, State of California, 1987, No. C041830 Relevant Experience Mr. Brooks is an experienced civil engineer who recently retired from the California Department of Transportation as a senior transportation engineer with 38 yrs of State service involved in the planning, management , design, and construction of improvement projects on state highways throughout Orange, Los Angeles, and Ventura Counties. Target Store at Grand Ave & Golden Springs Drive, City of Diamond Bar Site grading, construction of sewer lines, storm drains, utilities, parking lot, streets, and lighting for Target store. Duties: Construction inspector for approx. 800 if of 8-inch VCP sewer line, approx. 1500 LF of 24", 30" & 36" storm drain pipes, drainage inlets & manholes, general site grading, placing asphalt concrete pavement, curbs & street lighting for parking lots and streets, review contractor's installation of NPDES Best Management practices. Prepare daily reports of work performed and men & equipment used, attend weekly status meetings and prepare Minutes of Meeting. 12-inch VCP Sewer Main in Kellogg Drive, Yorba Linda Water District Construction inspection for 3600 LF of inch VCP sewer main, two siphons, manholes, excavation & backfill of 3600' long trench approximately 5-ft to 15-ft deep. Supervised placing crushed rock for pipe bedding, placing 12-inch thick aggregate base material & 5- inch thick asphalt concrete trench resurfacing, in addition to re-striping the roadway, and coordinating geotechnical materials sampling. Duties also included testing, recommending contract change orders, reviewing contractor's request for progress pay, 21attending bi-weekly meetings & preparing meeting minutes, preparing daily reports for work performed and men & equipment used, monitoring traffic control and trying to work with the public to maintain good public relations for the project. Pioneer Road Park, City of Tustin Construction Manager and Construction Inspector for 5-acre park. Work included general site grading, installation of approx. 600 LF of 6-inch SDR 35 sewer main, approx 1000 LF of 12-inch PVC storm drain pipe, area drains, irrigation & landscaping, site lighting, parking lot construction, pathway & sidewalk construction, restroom building, picnic building, water play area, basket ball court, and children play areas. Prepared contract change orders, reviewed and approved contractors material submittals, certified weekly payrolls & request for progress pay, coordinated work with utility companies, attended weekly progress meetings and prepared meeting minutes, monitored traffic control & contractors NPDES Best Management practices, prepared daily report for work performed and men & and equipment used, verified compliance with plans & specifications and interfaced with local residents to maintain good public relations for the project. Water Main Granada St., City of Ontario Project included installation of new 12-inch ductile pipe water main, services, fire hydrants, and place asphalt concrete overlay existing asphalt concrete pavement. Duties: Construction inspection for installing 6000 LF of 12-inch ductile iron pipe water main, installing new valves, fire hydrants & laterals and 175 new 1-inch copper services, backfilling 6000 LF 5-foot deep trench & placing 4-inch thick asphalt concrete trench resurfacing, jacking & boring 120 LF 18-inch steel casing under State highway, cold planning 4000 SY of existing asphalt concrete pavement, and placing 4000 tons of 2- inch thick asphalt concrete overlay, coordinating geotechnical sampling & testing, review & approval of contractors material submittals, verifying materials used comply with plans & specifications, recommend contract change. Duties also included review contractor's certified weekly payroll reports and requests for progress payment, attend meetings, prepare weekly working day statement, prepare daily report of work performed and men and equipment used, observe disinfection, dewatering, & pressure testing of completed pipe sections, monitor traffic control & public notification of shutdowns, and work to establish and maintain good public relations for the project. 2*zAPD Consultants, Inc. Hamid Nourian Inspector Hamid Nourian is a senior inspector with over 28 yrs of experience in field inspection of sewer and water projects, and in laboratory testing of soils, concrete, and asphalt. Mr. Nourian's experience also includes performing inspection services for steel reinforcement, welding, and foundation (shallow and deep). Mr. Hamid maintains the quality assurance program for inspection and testing service. He is proficient in the use of equipment and methods that are required by ASTM, AASHTO, ACI, and Caltrans. Professional Expertise • Field inspector for street repair and sewer line replacement for several miles of sewer in Huntington Beach, California. Performed inspection and testing of asphalt, base material and subgrade. Communicated test results with the City and contractor on a daily basis. • Performed inspection and testing for new beach construction in Huntington Beach, California Project included new construction of lifeguard station, restrooms, concessions, bike paths, new roadway and parking. Performed all necessary laboratory testing of concrete and soil. Produced reports on a daily basis. • Performed inspection and testing for street improvements in Montebello, California. Project included new subgrade and asphalt paving for several miles of roadway. Performed compaction testing of subgrade and base prior to the laying of asphalt. Tested placement of the asphalt. • Logged and sampled boreholes for preliminary geotechnical investigation for several projects for governmental and municipal agencies including, the Lakewood sheriff station, the 210 Freeway for the MTA/ Caltrans, and several sites for Alhambra and Covina school districts. Education B.S. in Civil Engineering, University of Lamar, Beaumont, Texas, 1976 Professional Certifications • ACI Concrete Field Testing Technician - Grade I • ACI Concrete laboratory Testing Technician - Grade I • ACIA Certificate for Rubberized Asphalt Plant Inspection • CALTRANS Certificate of Proficiency for Testing & Inspection 23AVD^^o CONSULTANTS, INC. SECTION 3 Construction Management & Inspection Proiects As of the date of this proposal, APD does not have any current or outstanding Construction Management and Inspection Services projects under contract. APD inspectors are available for performing inspection duties immediately should the City elect to award the project to APD. 21 18351 Beach Blvd. Suite F, Huntington Beach , CA 92648. Tel: (714)375-9700, Fax: (714)375-0805 , www.apdcon.comCONSULTANTS, INC. FIELD REPORT Daily Construction Report Project Number APD-JOB# 07036 Project BID-1345 SEWER REPLACEMENT Report Number P-860, SECT D Owner/Developer : CULVER CITY Contractors: PULTE COSTRUCTION GREENS M.H. Clear X BILLS SWEEPING WEATHER Cloudy Contractor SEE PAGE 3 OF 3 Rainy 50 TEMP 60 MANPOWER Non-Manual 7:00-5:00 WIND Gusty High Construction Activity CONTRACTORS HOURS FIELD INSPECTORS HOURS GEOTECHNICAL TESTING BY PSI ATTENDED WEEKLY PROGRESS MEETING AT CITY HALL Date JUNE 6, 2007 M T W X T HUMIDITY Mild X Severe EQUIPMENT F S 7:00-5:00 7:00-5:00 8:00-4:00 8:00-9:00 S PULTE CONST. CLOSED CARSON STREET TO THROUGH TRAFFIC BETWEEN INCE ST. AND HIGUERA ST. FOR SEWER CONSTRUCTION STA 1+00 TO 4+30 PER WATCH MANUAL Prepared By: LES BROOKS Page 1 of 3 APD CONSULTANTS, INC. CULVER CITY LEE TORRES, ASSOC ENG 2MA5 310-253-5623 18351 Beach Blvd . Suite F, Huntington Beach, CA 92648 . Tel (714) 375-9700. Fax (714 ) 375-0805. 70 X 85+ Manual Mild XFIELD REPORT (Cont.) DATE : JUNE 6, 2007 â PULTE COSTRUCTION INSTALLED TEMPORARY 4-INCH SEWER BYPASS ALONG NORTH CURB OF CARSON ST. STA 1+00 TO 7+10 AND INSTALLED TEMP LIFT STATIONS AT 7+10 AND EXSITING SEWER LATERALS TO RESIDENCES 7:00-9:00 â PULTE CONSTRUCTION REMOVED EXISTING AC PAVING, EXCAVATED, REMOVED EXSITING SEWER PIPE, LAYED NEW 8-INCH PVC SDR-35 SEWER MAIN& WYES, BACKFILLED & REPLACED TEMPORARY AC TRENCH RESURFACING FROM STA 1+00 AND 4+30 9:00-5:00 â REMOVED EXSITING SEWER MH AT STA 4+05 AND INSTALLED TEMP STEEL TRENCH PLATES 1:00-4:OOPM â GREEN'S MH CONSTRUCTED PCC BASE FOR NEW SEWER MH AT STA 4+05 3:00-4:OOPM â CONCUT CO SAWCUT FOR TRENCH 4+06 TO 7+05 BILLS SWEEPING ON PROJECT 1:00-5:00PM â CONTRACTOR BROKE AND REPAIRED EXSITING WATER SERVICES STA 2+50 10:00AM +/- Prepared By: LES BROOKS Page 2 of 3 APD CONSULTANTS, INC. CULVER CITY LEE TORRES, ASSOC ENG 310-253-5623 18351 Beach Blvd . Suite F, Huntington Beach , CA 92648. Tel (714) 375-9700. Fax (714) 375-0805.FIELD REPORT (Cont.) DATE : JUNE 6, 2007 CONTRACTOR MEN/ EQUIP HOURS REMARKS PULTE CONSTRUCTION FOREMAN &P.U. 10 BRIAN HARRIS 2 CAT EXCAVATORS & OP 10 EACH 960 CATLOADERS & OP 10 2 JD 400 BACKHOES & OP 3 SEMI DUMPTR & DRIVER 8 EACH RENTAL 250 M GALLONS WATER TR & DRIVER 10 RENTAL 3 PIPE LAYERS 10 EACH 2 LABORERS 10 EACH GREENS MH FOREMAN &P.U. 4 SAM GREEN I TON EQUIPMENT TRUCK 4 2 LABORERS 4 EACH BILLS SWEEPING NOBILE SWEEPER & OP 4 RENTAL CONCUT SAWING FOREMAN 4 RENTAL I TON EQUIPMENT TRUCK 4 LABORER 4 Prepared By: LES BROOKS Page 3 of 3 APD CONSULTANTS, INC. CULVER CITY LEE TORRES, ASSOC ENG 310-253-5623 21 18351 Beach Blvd. Suite F, Huntington Beach, CA 92648 . Tel (714) 375-9700 . Fax (714) 375-0805.,oject Name: Pro L j jr e f ct o : D rlt at Report No.: Location: ... j. V D l n"0 ^? f 13, r Author: -ID 6 Day: (circle one M T W( F S S Client: Superintendent: Contractor: F eman: Soil Engineer: T Z Geologist: '-7T) Weather: (circle one) unny Overcast Rainy Other: Observation/Testing of: k, I Ajo,2 (circle one) - Mass Grading Precise Grading Postgrading ^V- the^^ 2 Equipment Working: I Dozer 3 Loader I Sheeps Foot Roller Technician j t ,. E 2 Srra,; -9r I B kCi kh Grid Roller T h C t Hours o rac ac Rubber Tire Tractor renc ompac or r IA d Today's Estimated Yardage: Steel Wheel Tractor Water Truck Note: Yardage estimate based upon information by others. Equipment working based upon limited observation. Information not to be used for payment purposes. Summary: ` r he _ rr r iA I gee r k 1^ t' J - et^f xc w ! how 4 jp/ r, 4 f 5,4 2 -t J(D T A ii A' y 114 24--f-O '5r4 - 7 6 TA 4 co 6,0 : 15' A A `C ea ' T4 z 00 f\//• ? . 4p 4 + a 1 t 11 €? 5TA 14- q0 4a -A 4 00 5r4 14- 16 tp TA FF S'b Page __ of DAILY FIELD REPORT Re db LAWSON & ASSOCIATES p'rin r^/ c GEOTECHNICAL CONSULTING INC. White - File Copy Yellow - Client Copy Pink - Field Copy Gold - Client/Agency CopyCBM Consulting, Inc . Building the Future Project Management ? Construction Management ? Civil Engineering March 14, 2007 Lee Torres Project Manager City of Culver City 9770 Culver Boulevard Culver City, CA 90232 RE: FEE PROPOSAL FOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR SEWER REPLACEMENT PROJECTS Dear Mr. Torres: CBM Consulting, Inc. is pleased to submit our qualifications to the City of Culver City for your consideration. We are committed to working seamlessly with your staff and project team to ensure the successful delivery of this project. The CBM Consulting team, our project systems, and our entire management structure are geared to providing flexible services to agencies such as yours. We are intimately familiar with projects and the scope of services requested. Our specialty is providing services, similar to those requested in your Request for Proposals, to public agencies. We offer flexible, responsive and economically competitive services. This proposal has been prepared according to the requirements set forth in the RFP. CBM maintains close attention of the commitments to our clients by tracking our contract budgets and schedules on a weekly basis. We maintain a six-month look-ahead by project and personnel, in order to proactively identify resource needs and availability. We assure that our key personnel will be assigned to the project for its duration and will not be removed or replaced by us without concurrence from the City of Culver City. Every member of our proposed team is available to be committed to the projects assigned to us beginning May 1, 2007. Thank you for this opportunity to offer our services to the City of Culver City. Should you have questions during the selection process, please contact me at (310) 329-0102. Respectfully, CBM Consulting, Inc. Chuck Stephan, P.E. (CA RCE C50481) President 2`|1010|Headquarters: Los Angeles ? 17601 South Denver Avenue. Gardena, CA 90248 ? Tel: (310) 329-0102 ? Fax: (310) 329-1021 Branch Office: Orange County ? Tel: (714) 565-0648 www.ebmconsulting.comFEE PROPOSAL CBM CONSULTING INC. City of Culver City Construction Management and Inspection Services for Sewer Replacement Projects 30 U TOTAL HOURS PER WEEK: 20 60 5 RATE : $125 $88 $55 $2,000 COST PER WEEK : $2,500 $5,280 $275 $77 $8,132 PHASE SUBTOTAL - COST OVER 26 WEEKS : $65,000 $137 ,280 $7,150 $2,000 $211,430 TASK HOU RS PER WEEK COST AMOUNT CONSTRUCTION PHASE - 26 WEEKS Conduct pre-construction and weekly progress meetings. Address RFI's, Change Orders, and 4 4 1 Construction Schedule. $907 Conduct daily site visit and field inspection 6 15 $2,070 Coordinate testing, approve mix designs 2 5 $690 Prepare Daily Construction Report 5 1 $495 Photo documentation 3 $264 Coordinate the flow of information between the Contractor and other City De partments $305 Prepare Weekly Report. Including DCR's and 2 1 photos. $305 Review payment applications, lien waivers, and|1010|releases. Make recommendations. $125 Ensure the Contractor is coordinating with utility companies and following ADA guidelines during 1 construction $125 Ensure that adjacent property owners are well 2 8 1 informed and live in a safe construction zone. $1,009 Supplemental Inspection to cover multiple sites. 20 $1,760 OTHER DIRECT COSTS I Material, Travel, Office Supplies, Equipment $2,000 $2,000 TOTAL HOURS PER WEEK: 11 17 5 RATE: $125 $88 $55 $0 COST PER WEEK : $1,375 $1,496 $275 $3,146 PHASE SUBTOTAL - COST OVER 4 WEEKS : $5,500 $5,984 $1,100 $0 $12,584 TOTAL PROJECT COST: $224,014 CLOSE OUT PHASE - 4 WEEKS Administer Final Inspections 1 10 Prepare Punch List and ensure items are closed- 1 2 1 out. Verify removal, recordation notes, and replacement 1 2 1 of all survey monumentation. Resolve outstanding payment and stop payment 2 1 1 issues. Make recommendation for release of retention 2 Coordinate close out activities 2 1 1 Review as-built drawings 2 1 1 $393 March 14, 2007CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS ORGANIZATION CHART AND KEY PERSONNEL ................................................................ 3 CONSTRUCTION MANAGEMENT & INSPECTION ............................................................... 11 PROJECT UNDERSTANDING .............................................................................................. 12 APPROACH .......................................................................................................................... 12 SCOPE OF SERVICES ........................................................................................................... 15 CRITICAL ISSUES ................................................................................................................ 23 SCHEDULE ............................................................................................................................. 27 RATES & FEE ......................................................................................................................... 28 31 CBM Consulting, Inc. Page 2r CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS ORGANIZATION CHART AND KEY PERSONNEL CITY OF CULVER CITY PIC CBM Chuck Stephan, P.E. CONSTRUCTION MANAGER-QA/QC CBM PART TIME Alan Braatvedt CONSTRUCTION INSPECTOR CBM FULL TIME CONSTRUCTION INSPECTOR CBM PART TIME Tom White Jamie Meager ALAN BRAATVEDT TITLE: Construction Manager - QA/QC Part Time EDUCATION: Diploma in Civil Engineering, Kwa Zulu Natal Technicon, South Africa YEARS OF EXPERIENCE: 30 CONSTRUCTION MANAGEMENT ? North & Central Health ADA Improvements , Long Beach , CA: Construction Manager for ADA improvements of health clinics at two locations. ? Admiral Kidd Park , Long Beach , CA: Construction Manager for new soccer field and parking lot. Project valued at $1 million. ? Homeland Cultural Center, Long Beach , CA: Construction Manager for $1.5 million project to construct new cultural center addition and tenant improvement of existing facilities. ? Houghton Skate Park , Long Beach , CA: Construction Manager for new skate park valued at $450,000. Project encountered asbestos pipe that required abatement, removal and proper hauling and manifest to appropriate landfill. ? El Dorado Park Senior Center, Long Beach , CA: Construction Manager for $150,000 asbestos abatement and tenant improvement of the City's Senior Center facility. S Z U -i? CBM Consulting, Inc. Page 3CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS ? Cesar Chavez Amphitheater and Aquatic Park , Long Beach , CA: Construction Manager Construction Manager for two separate park improvement projects, valued at approximately $1 million. Amphitheater for outdoor performances has extensive landscaping, seating , stage, lighting, security, walkways for outdoor performances. Involved fairly extensive grading. Value engineered to save 45% on bid amount. Aquatic Park consists of interactive water fountains for children to play in, ticket booths, and restroom facilities. ? City Health Facility Laboratory Upgrade, Long Beach, CA: CBM will upgrade and convert the existing lab facilities, install new equipment, demo and erect new walls, construction will happen under operating conditions requiring night shifts. HVAC extraction system, negative pressure in the building. ? Computer Bindery Room, Long Beach, CA: CBM will install a dedicated power supply from the central City Hall and main switch board to the computer room. ? Emergency Generator Replace and Upgrade for City Hall, Long Beach, CA: Upgrading the entire stand-by electrical generation system. Replacing some generators. ? Coast Highway Sidewalk Improvements , Laguna Beach , CA: Construction Manager for high retaining walls and new sidewalks to close gap in pedestrian route. Included extensive coordination with Caltrans for structural review and encroachment permit processing. ? Louise Street Storm Drain , Laguna Beach , CA: Installation of an 18-inch storm drain with associated velocity rings, catch basins, fossil filters in lanes along the Caltrans right of way on Pacific Coast Highway. ? Pavement Overlay and Slurry Seal Project , Chino Hills , CA: Construction Manager. Responsible for contractor coordination, documentation and controls including preliminary notices, invoicing, submittals, certified payrolls, releases , etc. Also conducted and documented regular meetings and dealt with the numerous public relations issues . Closed out the project and filed the Notice of Completion. ? Canyon Acres Storm Drain Project : Laguna Beach , CA: This $3 million project involves the relocation of a water main and the installation of a 60 inch storm drain line along the full length of Canyon Acres drive. The project is extremely challenging project because of it is one road with no outlet feeding 60 houses and many of the utilities in the middle of the street need to be relocated. PROJECT MANAGEMENT ? Point Vicente Interpretive Center, Rancho Palos Verdes , CA: Construction Manager for a whale watching/ interpretive center located above the sea cliffs at Point Vicente on the Palos Verdes Peninsular. There was an existing center that was closed several years ago, which is being remodeled as part of the project and will be incorporated into the new center. The existing building is 2,300ft and the new building 7,500. The structure is a combination of structural steel and wood construction and includes an IT room. (Value $5M) ? Towne Park Redevelopment , Culver City Redevelopment Agency , CA: CBM facilitated and project managed the redevelopment of the park into an open air pedestrian mall. Design included water features, landscaping, lighting elements, decorative paving. T U^ ? CBM Consulting, Inc. 5:5 Page 4CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS ? Public Works Staff Assistance , La Canada Flintridge , CA: Project Manager. Assisted City staff over a period of approximately one year for implementation of the annual overlay/slurry seal program, annual sidewalk replacement program and new bus shelter program. Performed Public Works Inspection and Public Relations to coordinate resident concerns on City projects. ? Verdugo Boulevard Realignment & Widening , La Canada Flintridge , CA: Project Management, design and Construction Management for re-alignment and widening of Verdugo Blvd., including relocation of 3 storm drain lines and appurtenant catch basins, maintenance holes, etc. Acted as the main interface for community outreach and public relations for the project. ? Jessen Drive Re-alignment, La Canada Flintridge , CA: Project Management, design and Construction Management . Coordinated and conducted public interviews with affected residents, a public meeting. Compiled construction documents, managed the bid process and construction administration and closeout of the project. ? Angels Crest Road Median Improvements Project , La Canada Flintridge , CA: Project Manager for proposed median improvements at abandoned truck escape pockets. Coordinated with 3 water companies to consider relocation of water utilities , coordinated with Caltrans, performed planning commission presentation and presentation to La Canada Valley Beautiful community group. ? Off-Site Pedestrian and Traffic Improvements , Culver City Redevelopment Agency, CA: Project Manager. Represented Agency in developing concepts, dealing with problem solving, reconstructing roads including Ince Blvd., and widening Washington Blvd. to accommodate the changing traffic patterns due to Ince parking structure, and undertaking the construction management with a large number of contractors involved. Project included new sidewalks, ADA compliant ramps, landscape median islands, new traffic signals, relocating utilities, repaving sidewalk enhancements, curb extensions, new crosswalks, traffic calming measures , and NTMP work in the neighborhood. ? Utility Relocation and Contract Coordination , Culver City Redevelopment Agency, CA: Project Manager. Facilitated and coordinated utility relocation projects for two high-profile projects in Downtown Culver City. Successfully negotiated participation by the utility companies without cost to the public agencies. Negotiated scheduling and coordination of the construction phase to facilitate a new auto dealership and a new multi-block commercial development as part of the City's redevelopment program. ? Pedestrian and Crosswalk Improvements Phase II: Broadway , Wilshire, Ocean Park and Santa Monica Blvd., Santa Monica , CA: Project Manager. Involved from inception of the project, coordinating the aerial survey for the base maps, design input, PS&E checks. The project is currently under construction and will be completed in mid 2003. The $5 million project is basically streetscape improvements, with curb extensions and median construction with the associated drainage modifications necessary. It also includes striping, general landscaping, lighting upgrade and traffic light installation. There have been considerable negotiations with various departments within the city and dealing with the design engineers and their sub-consultants. ? Pedestrian and Crosswalk Improvements Phase I : Ocean , Montana and Neilson, Santa Monica , CA: Project Manager. Involved in two projects of similar nature from design input, through plan checks to the coordination and inspection of the work. Project involved streetscape improvements, median and general landscaping, lighting upgrade, traffic light installation and U^ ? CBM Consulting, Inc. 344 T Page 54 CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS asphalt overlay. Civil and drainage modifications were made and extensive striping undertaken. Projects required considerable negotiations with various departments within the city, dealing with the design engineers and their sub-consultants and contracting with the various contractors. ? Parking Lot 9, Santa Monica , CA: Project Manager. Involved in design input, plan checks the coordination and inspection of the work and commercial issues. The project involved a major revamp and enlarging of an existing parking lot with civil and drainage modifications made and striping done. The project required dealings with various departments within the city, the design engineers and their sub-consultants and contracting with the contractor. ? Willat I Hoke Business Triangle Streetscape , Culver City Redevelopment Agency, CA: Project Manager. Involved with the concept design for the upgrade of the area and the specific streetscape design involving the installation of streetlights, landscaping, sidewalk replacement and street print of newly laid asphalt. Prepared the specifications, obtained approval from the Redevelopment Agency, managed the inspection, and received bids to do the work. CBM Consulting, Inc. Page 6CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS TOM WHITE TITLE: Inspector - Full Time EDUCATION : B.A., Univ. of Vermont Certificate in Construction Management , CA State YEARS OF EXPERIENCE: 27 Mr. White is experienced providing inspection services to various clients including public agencies on local, state and federal projects . He has performed inspection services for many local Southern California Municipal Agencies , including the County of Los Angeles . Mr. White has devoted his career to providing inspection services , construction management , and project engineering to A/E consulting firms, cities , agencies , and general contractors on public , private , and federal construction contracts. Prior duties have consisted of multiple tasks including : onsite inspections to monitor contractors' compliance with project plans , specifications , safety orders , and labor laws ; project record keeping and correspondence ; interfacing with designers , utility personnel , outside agency representatives , and the public; change order/claims documentation and review ; progress payment generation ; submittal review; directing the activities of other inspectors , surveyors , and material technicians ; schedule review; fair cost estimates ; and various other administrative tasks . Projects he has been associated with include: CONSTRUCTION OBSERVATION ? Myrtle Area Street Improvement , Hermosa Beach , CA: Construction Observer. The project consisted of the following: the cold milling and AC overlay of the 10 streets in the Myrtle area, construction of gutters, construction of sidewalk ramps, construction of new sewer manholes on the existing sewer lines, installation of sewer lining in the existing sewer system. The project involved a substantial amount of coordination with the City's Departments, residents and the local school, which was executed very successfully resulting in minimal inconvenience to the public during the construction operation. Cost: $427,000 ? Department of Public Works , Santa Monica , CA: Inspector. Provided construction observation, preparation of daily reports, coordination with the public, residents and businesses which are affected by the work, reporting to the Public Works Department, measuring quantities of work completed, review of payment applications, etc. ? Medians on Pacific Coast Highway from Rosecrans to LAX, El Segundo , CA: Inspector. Provided construction observation, preparation of daily reports, coordination with the public, residents and businesses which are affected by the work, reporting to the Public Works Department, measuring quantities of work completed, review of payment applications, etc. ? Pump Station 16 , El Segundo, CA: Inspector. Provided construction observation, preparation of daily reports, coordination with the public, residents and businesses which are affected by the work, reporting to the Public Works Department, measuring quantities of work completed, review of payment applications, etc. ? FAU, CDBG, & Capital Improvement Projects : Inspector for streets , pipelines, and utilities in Bell, Commerce, Cudahy, El Segundo, Maywood, and Santa Monica ($200K to $2M). Ttbl. CBM Consulting, Inc. 342 Page 7CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS ? Alameda Transportation Corridor Agency (ACTA): Permit inspection on the Alameda Transportation Corridor for LA County DPW. ? Reinforced Concrete Box Storm Drain Installations , Los Angeles , CA: Inspector for installation of concrete box storm drains on Beverly Boulevard, Fairfax Avenue, Third Street and Hollyhills with a total value of $33M. ? South County Pipeline , Mission Viejo CA: Inspector. Valued at $22M ? Amtrak/Metrolink Commuter Rail Station , City of Commerce, CA: Inspector. Valued at $1.5M ? Rehabilitation of Rte. 204, CALTRANS, Bakersfield , CA: Inspector for this $2.5M roadway rehab. Project. ? Metro, 7 th & Flower, City of Los Angeles , CA: Inspector for stage I I I construction valued at $21 M. ? Phase III , Golden Mall, Burbank , CA: Inspector. $2.5M ? Lazben Hotel and Convention Center , Compton , CA: Inspector. $35M ? Tierra Engineering Co. of Tarzana , CA: Inspector on public works projects for LA County Flood Control District, LA County Road Dept., and the Culver City Redevelopment Agency ($100K to $2M). ? Field Engineer/Project Supervisor : Worked on interstate highway projects, wastewater treatment plants, and commercial building construction throughout northern New England. Employers included Perini Corporation of Framingham, MA and H.E. Sargent Construction Co. of Stillwater, ME. FDR Projects: 1) Colorado Blvd, between 14th St. and 20th St., in the City of Santa Monica. The project was completed in 1990, project value $1.5m. 2) Atlantic Blvd in the City of Cudahy. FDR on I mile section of Atlantic Blvd. The project was completed in 1998, project value $2.5m. 3) Ferguson Ave. in the City of Commerce. FDR on 0.5 mile section of Ferguson Ave. The project was completed in 1995, project value $0.7m. 4) Elizabeth St. in the City of Cudahy. FDR on 0.5 mile section of Elizabeth St. The project was completed in 1985, project value $0.5m. 5) Catalina Ave. in the City of Newport Beach. FDR on 0.5 mile section of Catalina Ave. The project was completed in 2001, project value $1.5m. ii. CBM Consulting, Inc. Page 8CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS 38 JAMIE MEAGER TITLE: Construction Inspector - Part Time TRAINING : APWA Introduction to Construction Inspection 3 day workshop. YEARS OF EXPERIENCE: 2 CONSTRUCTION OBSERVATION ? Long Beach Plymouth and Elm Park : Construction Observer. CBM provided construction management and observation for construction of a new park and community gardens at Plymouth & Elm Streets in the City of Long Beach. The park consists of a playground area with rubberized surface and playground equipment, pathways, picnic facilities and a landscaped park. The community gardens provide individual serviced plots for use by the local community. ? Gundry Reservoir: Signal Hill, CA: Project management , construction management, and construction observation for the renovation of the Gundry Reservoir and Sand Basin in the City of Signal Hill. This project involves recoating the interior of the 5 million gallon potable drinking water reservoir and sand basin with an NSF standard 61 coating. The inlet water pipe distribution system is being redesigned and installed. Also a new 34,000 square foot steel roof is being constructed. ? Long Beach City Hall Generator Upgrade : Construction Observer. Upgrading the entire stand-by electrical generation system. Replacing some generators. ? West Hollywood Parking Projects : Orangegrove : Construction Observer. Prepare plans, specifications, and estimate for construction of a public parking lot in the City of West Hollywood, including permeable asphalt pavement, sound walls, gated entrance, and striping. ? 20th and Walnut Storm Drain Pollution Trap Improvement Project , Long Beach, CA: Construction observation and survey control for the installation of a CDS Technologies, Inc. pollution trap and appurtenant components and improvements at the intersection of 20th Street and Walnut Avenue. ? Spring Street Revitalization Corridor , Signal Hill, CA: CM inspection. The project consists of widening, a full removal and reconstruction of the roadway, lowering the grade crest, parkway improvements, intersection improvements, traffic signal upgrades and new installations, and relocating existing gas, oil, water, sewer and other utility lines. ? BP Arco Gas Line, Signal Hill, CA: Construction Observer. ? 800 Pacific, Long Beach, CA Construction Observer for renovation of 20 condo units and selected common area improvements targeted at increasing the sale price of condominium units in this 48 unit, 100 year old apartment building, recently converted to condominiums. Also included were the following infrastructure improvements: Electrical upgrade in the common areas and in each condominium, Upgrade of existing passenger and goods elevators, Upgrade of the roofing system, including new skylights over the stairwells (Budget $1,185,000) CBM Consulting, Inc. Page 9CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS ? 460 & 462 Rosecrans , 461 & 463 38th Place , Manhattan Beach , CA: Conversion of 4 units from apartments to condos. Management of property as rentals through phased renovation. Coordinated contractors entry and inspection of completed work. CONSTRUCTION AND MANAGEMENT ? Rehabilitation Projects , Mitech Industries, LLC: Several apartment buildings were purchased and rehabilitated and then sold at varying times. Property manager for five buildings (20) units. Handled tenants complaints, handy work, maintained property, renovated upon moving out, tenant screening, credit reports, rent collection, serving notices, evictions, scheduled contractors for carpet and paint. ? Highlander Laundry , Montebello, CA: Manage money collection, security, maintenance, and repairs. ? Larson 's Deli, Hermosa Beach , CA: Plumbing, tile work, installed speaker system and sign installation. ? Synergized Properties , Vernon , CA: Coordinated demolition and concrete for loading dock. ? Parking lot, Culver City, CA: Rebuilt wall surrounding parking lot. 39 CBM Consulting, Inc. Page 10CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal 40 CONSTRUCTION MANAGEMENT & INSPECTION Construction Management CBM's construction managers apply many years of experience on Caltrans, municipal, utility and private construction projects. Our team allows your agency access to some of the most practical Construction Managers and Technicians available. CBM provides all parties with up to the minute information, and is sensitive to the special needs of the community. Construction Observation CBM provides construction observation services for many types of projects. CBM construction observers have experience with bridges, highways, heavy civil projects, roadways, utilities, transportation projects, rail, wharf and port facilities, federally funded projects, and virtually any other type of municipal or public projects. Our construction inspectors bring many years of accrued skills in dealing with contractors and keeping the projects on track for timely completion. SERVICES AVAILABLE Contract Administration Cost Estimating and Budgeting Projected vs. Actual Budget Tracking Scheduling, Monitoring and Tracking Change Order Evaluation & Negotiation Airports Document Controls Submittal, Shop Drawing & RFI processing Construction Observation Materials Inspection Specialty Inspection As-Built Documentation Federal Fund Requirements Administration Public Relations for Fire & Police Department Projects Storm Water Prevention Plan Monitoring Hazmat Abatement Admin. & Coordination Warranty, O&M Manuals and Training Claims Avoidance Full Time Daily Public Works Inspection Daily and Weekly Reports Quality Assurance Photo and Video Documentation Field Change Coordination Quantity Measurement and Verification Manpower and Equipment Tracking As-Built Documentation Contract Time Monitoring PROJECT TYPES Multi-Prime Projects Streets & Highways Building Construction Marina, Port & Wharf Projects Municipal Pool Projects Parking Structures and Lots Storm Drains & Sewer Systems Building Renovations Natural Gas Pipelines Railroad Grade Separations Sound Walls & Guard Rails School Projects Park Projects Municipal Building Construction Earthquake Repairs CBM Consulting, Inc. Page 11CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal PROJECT UNDERSTANDING The City of Culver City is seeking the services of a professional Construction Management and Inspection services firm to complete sewer improvements consisting of replacing the existing VCP sewer main and constructing a new PVC pipe sewer main such at multiple sites throughout the city. The scope of work includes the reconstruction of house laterals, manholes, roadway pavement, sidewalk, curb and gutter, and replacement of traffic markings as specified in the plans and specifications. Construction duration is expected to begin May 1, 2007 and run for 180 calendar days. APPROACH The CBM team firmly believes that the key to a successful project is more than just performing tasks outlined in a scope of work. Any competent team can follow a set of written guidelines. The key to a successful project is performing each task with a realistic and clear understanding of what the real intent of the project is and constructing the final product with a "win-win" attitude. Management of any construction project requires a proactive approach with talented staff. CBM owes the successful completion of over 400 projects, with no unresolved claims, to our ability to find and maintain excellent professional staff, and our dedication to organization, documentation and the proactive management of the construction process. Our keen understanding of, and experience with the public process and the public construction contract administration also results in a smoother project experience. Our team's experience and our proactive approach enable CBM to stay ahead of the contractor and maintain the project on track for successful completion, on time and within budget. A successful project is built by fostering good relationships and trust between the design team, client agencies and the Contractor. Before our team can begin to accomplish its goals, we must first understand the viewpoints of not only the involved agencies, but also the viewpoints of the Designers, Contractors, the general public and other affected project stakeholders. We must have the ability to analyze critical situations from all viewpoints and work with the Project Team to develop the best solution. The CBM team understands these varying viewpoints because we have worked for and/or managed design consultants, contractors and several public agencies. CBM Consulting, Inc. has devoted over 15 years to providing project and construction management exclusively to public agencies. Our construction management, budget and schedule tracking systems, and our entire organizational structure are geared to providing flexible services to our clients. We have extensive experience in construction management of public projects, and we understand the unique and important differences between public and private projects. CBM managers are well known to our clients as "solution makers", we proactively identify the important issues - then work with the team to expeditiously implement solutions most beneficial to the project. Management Approach The CBM Approach starts with the end in mind. The end being a quality project delivered on time and within budget. The CBM process begins with the development of the main project elements: master project schedule, master project budget and the comprehensive scope of work. These elements are not developed in a vacuum, but rather with all project stakeholders to ensure that no surprises are encountered during the project. This provides a sense of order among project stakeholders and project team such that the entire team is focused on the same goals. CBM Consulting, Inc. Page 12CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal CBM uses a wide range of systems, depending on the client's project need and budget. From simple, time-tested forms and procedures to the state of the art in CM and web-based systems, CBM delivers small and large projects on-time and under budget, while keeping our Client up to date on a "real-time" basis. Potential Construction Challenges Safety: First and foremost, CBM always considers safety the most important issue on any construction project. CBM will recommend key safety provisions to require the contractor to have competent safety personnel and site specific safety programs employed on the project at all times. CBM will monitor the Contractor's operations for compliance with the project safety requirements. Protocol and Communication: Timely and concise communications are essential to the successful completion of any construction project. CBM will be the primary point of communications. All communications and correspondence will be handled in a professional and respectful manner. Typically, all project documentation will be scanned and digitized for expeditious distribution via email). All correspondence is logged and tracked, and linked to its respective issues for quick retrieval. CBM also offers set-up and maintenance of a project web-site for regular project status updates, as an additional optional scope item. Project Phasing: The specifications require specific phasing be implemented. CBM has extensive experience working with contractors to facilitate critical phasing requirements on complex projects. Temporary and Permanent Utilities: Early and continuous coordination with utilities is imperative to ensure timely availability of temporary and permanent services. CBM has extensive experience assisting contractors in dealing with local utilities on complex utility coordination projects. Storm Water Pollution Prevention Plan: The CBM team is well versed at verifying best management practices and monitoring establishment, maintenance and modification of SWPPP measures on complex multi-phase projects. Substitutions and Submittals: Timely procurement of materials and equipment for any building construction project is imperative. By submitting its bid, the Contractor is indicating it can successfully procure and construct the necessary components within the allotted time. CBM will establish a detailed, subsection by subsection submittal log at the beginning of the project and work with the Contractor to tie all submittals and procurement of materials and equipment into the schedule. CBM will continuously monitor that the contractor submits each item in a timely manner and that the review and approval of each item is not unnecessarily delayed by the City and/or A/E review process. Responses will be clearly documented to note the contractor's failure to meet specification requirements, thereby maintaining the contractor's responsibility to meet the contract completion deadline. Any substitution requests will only be processed for consideration if the item is considered equal or a substantial savings can be identified with little or no degradation to the quality or function intended for the specified item. Requests for Information (RFIs): CBM will receive review, and process responses to contractor RFIs. Contractors typically utilize the RFI process to initiate changes on construction contracts. CBM will review all RFls and clearly document that responses are clarification and that no additional cost or time "Ti CBM Consulting, Inc. Page 13CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal will be considered. Should a response to an RFI appear to potentially impact cost or time, CBM will identify and recommend the most cost and quality effective alternatives to the City and expedite implementation with the Contractor. Change Management / Claims resolution: CBM will implement its time tested claims management process to minimize changes to the project and avoid claims such that the project can be quickly and successfully closed out. CBM has done so on over 400 public projects valued and approximately $1 billion with no unresolved claims. The basis for CBM procedures is a well organized documentation system, a keen understanding of the construction process, exceptionally qualified staff and fair and firm negotiations. CBM will not defer difficult issues and will process only change issues that have been analyzed and determined to have merit. Those items will only be recommended for consideration when the most reasonable cost and time has been negotiated and all alternatives to avoid the impact have been resolved. Quality Control The primary objective of CBM's quality control program is to ensure that quality work is performed consistent with the Owner's expectations, in accordance with contract drawings and specifications, and in compliance with applicable regulations and restrictions. CBM utilizes the state-of-the-art in computerized contract administration systems. CBM has made a substantial investment to customize industry proven, off the shelf computer programs for utilization on public projects in Southern California. CBM has successfully used this system on several large public projects in Southern California. Part of the customization of the contract administration database utilizes quality control reports to verify that documents control procedures are implemented and maintained correctly. CBM's monthly CM quality control checklist includes, but is not limited to the following: 3 Adherence to budget (Review change log, Trend, changes processed, status of open items) 3 Adherence to Schedule (review baseline, latest update, related correspondence) 3 Safety Monitoring (review site, safety correspondences) 3 Quality Monitoring (review daily reports, as-built drawings, inspection and test reports) 3 Progress reporting (Review latest report, compare to project data) 3 Documentation control (review QC reports, spot check module links) 3 CM budget (review contract balance, burn rate, staff activities/level of effort - make adjustments necessary) 3 Moral check (check in with project participants, CM staff, client, contractor, stakeholders - how are they doing? (Address any "high temperature" areas professionally; the project takes precedence over personalities!!) Our construction management team regularly implements quality control programs for our projects, including: 3 Constructability and Coordination reviews of the drawings and specifications during design development 3 Obtaining subcontractor input regarding materials, means and methods CBM Consulting, Inc. Page 14CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal|1010|Prequalification of bidders and personnel|1010|Management of contract documents to assure that only the most current documents are used for construction 3 Coordination of testing and inspection services 3 Pre-construction meetings with designers and contractors for key features of the work 3 Management of submittals and approvals to ensure complete contract compliance 3 Management of samples and all associated approvals to ensure contract compliance|1010|Verification of site conditions to ensure that all preparatory work required to be performed is complete and that the work areas are safe 3 Monitoring of all contract work in progress to ensure that standards of quality are consistent with contract documents|1010|Documentation of quality procedures, checklists, test and inspections 3 Project commissioning including punch-list corrections, equipment start-up, facility personnel training and turnover of equipment operation and maintenance manuals. CBM enjoys a successful track record and plans to keep it. We recognize quality control as the cornerstone to continued success in our industry. SCOPE OF SERVICES CBM will serve as the City's representative and liaison with the City Project Manager and City Engineer, as well as, the Contractor during the construction of the project. Prior to the pre-construction meeting, CBM will review and be knowledgeable of the contract documents, as well as, be knowledgeable of existing site and conditions. Particular attention will be given to value engineering, CBM will review the construction documentation and identify any potential cost saving alternatives for the project. Additionally, after the pre-construction meeting , CBM will review and coordinate an analysis of the Contractor's submittals with the design team, as well as comment of the Contractor's schedule if necessary. Constructability Review of Bid Documents: CBM will review the plans for bidability and constructability and identify potential value engineering solutions, ambiguities, conflicts and/or omissions apparent during its review. The Bid documents and technical specifications will also be reviewed for potential duplication/overlap of clauses, conflicts, proper placement of critical requirements within the order and precedence of documents. Preconstruction Conference: CBM will coordinate and conduct the Pre-Construction Meeting including notification to contractor, utility agencies, and other stakeholders, and prepare the meeting agenda and minutes. The agenda and minutes will include the following items, at a minimum: • Introductions of key personnel • City responsibilities • Safety • Project Overview • Confirmation of fully-executed Contract Documents and Notice to Proceed • Establishment of Contract Time and Completion Date 4A CBM Consulting, Inc. Page 15CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal • Review of Working Day definition and holiday schedule • Common overall project goals will be identified • Chain of communication & key contacts • Public Relations • The scope will be discussed and clearly defined • Critical design elements, schedule and cost factors will be discussed • Experience and key roles in the project will be discussed • Past project experiences will be discussed to identify potential pitfalls • Jurisdictional agencies and the Contractor • Discussion of Master Schedule • Sub-contracts • Integration of utility coordination activities into schedule • Documentation and tracking controls • Change order procedures • Scope, schedule and cost change administration, notification requirements & controls • Submittal and RFI Process • Identify long lead and any substitution and or-equal items • Testing - review call-out requirements and deputy/special & testing requirements • Review survey for consistency with the design • Progress payment procedures • Labor compliance • Rights-of-way • Easements and special access considerations • Placement of signs • Questions and answers • Action item assignments CBM considers the pre-construction meeting as progress meeting #1. All items discussed are designated as "open" or "closed". All open items are carried forward to subsequent progress meetings until resolved and closed. Action items are assigned a specific responsible party and a deadline for resolution. Each progress meeting is clearly minuted and distributed to all attendees and affected coordination parties. CBM will also conduct all site meetings. Pre-construction meeting and site meeting minutes will be distributed via fax and / or email to meeting participants and to courtesy recipients identified by the City. Daily Construction Observation Reports: CBM and/or its deputy inspection subconsultant will compile daily observation reports documenting the contractor's workforce, material and equipment used, a summary of construction activities, field problems, disputes or claims, resolutions of issues and directions given to the contractor. Completed daily reports will be transmitted to the City on a weekly basis. Periodic Progress Reports: If desired by the City, CBM will cooperatively develop, with the Project Stakeholders, the format and information required for reports that may be required during the construction phase. These reports are typically compiled every other month and include the following information: CBM Consulting, Inc. Page 16CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal • Summarized report of construction activities including significant events and accomplished goals • Construction observation reports • Description of progress with photos to enhance the descriptions • Description of equipment used • Comparison of Actual vs. Planned Progress, in narrative form and bar graph form • The latest detailed 4 Week Look Ahead Schedule submitted by the Contractor and reviewed by CBM • Identification and discussion of current problems or pending change orders and actions taken or planned to resolve such issues • A discussion of new short and long term goals for the project • A comparison of Actual vs. Planned budget expenditures • A Master Trend Log detailing potential and approved changes • Report of progress payments made to date and invoices in process • Labor Compliance Reports for Contractor and Subcontractor employees (if required) • A QA/QC section prepared by the Team addressing testing and regulatory compliance issues • An analysis of change order impacts or potential problems on schedule and budget Submittal Processing: CBM will track all correspondence and submittals on this project. CBM will receive all Contractor submittals and review them for completeness and general conformance with the contract documents. All shop drawings, samples and other submittals received from the Contractor will be logged in and routed to the City and the Architect. Responses will be logged in and transmitted to the Contractor. Submittals will be tracked throughout the project to ensure timely response in order to avoid Contractor claims for delay. All Submittals will be expedited utilizing electronic delivery whenever possible (except for shop drawings, large format documents, etc.). Additionally, CBM will recommend key contractual requirements for the Contractor to clearly indicate submittal processing requirements in the project schedule. Submittal comments will be monitored to identify potential impacts to quality, cost or schedule, with recommended alternatives and/or solutions. RFI's: Upon receipt, CBM will log, distribute and respond to each Request for Information (RFI) as required. It is anticipated that most will be handled upon receipt. However, in the event that the design engineer or the City staff are required to answer questions, the project manager will coordinate a timely resolution. CBM will identify potential impacts to cost or time that may result due to issues identified in RFIs, with recommended alternatives or solutions to mitigate the potential impacts. Weekly Statement of Working Days: CBM will prepare a weekly statement of working days documenting the construction progress, time of completion, delays and time extensions, and submit to Contractor and the City on a weekly basis. The weekly statement of working days is typically discussed and agreed upon at each progress meeting and transmitted as an attachment to the minutes. Problems and Solutions: CBM'S proactive approach serves to anticipate and expeditiously resolve field problems. Our team is well trained in problem solving. All issues are processed with a sense of urgency and presented to the City with suggested alternatives, cost and schedule impacts and recommended solutions. CBM will quickly implement the alternative, which suits the best interests of the project and the City. 16 CBM Consulting, Inc. 4 Page 17CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal CBM will effectively and expeditiously communicate with City staff, Design Consultants and the Contractor to identify conflicts construction problems, coordination issues, and will obtain the needed action and response to submittals and RFI's. Document Tracking System: Complete and current project files shall be kept at the job site, or at a location agreeable to the City, and shall be available to the City at all times. These files will consist of the contract, correspondence relating to or modifying the contract, proposal requests, clarifications, permits, logs, reports, RFI's, field orders, change orders, claims inspection reports, test reports, etc. CBM has a detailed file indexing system for all project hard files, and a contract administration database customized for public works agency construction management for management of digital data and scanned documents. CBM has already developed customized forms, reports database structure, and work breakdown structure, well suited for this project. We will adapt our system to the specific needs of the project, to monitor, track and control the project. This detailed tracking system will enable us to provide an accurate assessment of the progress to the City with recommendations to maintain or improve adherence to the approved project schedule. Schedule Review: CBM is intimately familiar with all of the main stream scheduling software utilized by the public works contracting industry, including, but not limited to Primavera P3® Suretrak® and Microsoft Project®. CBM will review the baseline construction schedule, including activity sequences and duration, schedule of submittals and schedule of delivery for products with long lead-times. The CBM team will evaluate the baseline project schedule for the following: • Consistency with the contract schedule (completion within the contract time) • Accurate start dates, completion dates, other dates detailed in the contract • Any impacts of weather and change orders • Sufficient detail - including submittal process and procurement requirements • Sequence of construction and correct schedule logic • Identification of the critical path and project float The schedule will not be approved as the baseline until all discrepancies are resolved. Schedule Control: During the progress of construction, CBM 131 ' will compare the contractor s monthly schedule updates to the baseline schedule and any approved time extensions, t h i '""''"U' J rt d it d t k i no e any s o com ngs an mon or an rac correct ons by - _ ` ' ' " the Contractor to keep the Project Schedule on track . A 4 look ahead will be required from the contractor, updated weekly and presented at the weekly construction progress meetings. This tool will keep the entire team looking one-month ahead of the project and will facilitate proactive handling of project activities and issues. If necessary, CBM will negotiate time extensions due to change orders or other delays. Photographs: Prepare and maintain an electronic photo journal documenting the construction progress. Photos shall be taken before construction begins, during construction and upon completion of the project. CBM Consulting, Inc. Page 18 4iCULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposa l Contract Conformance: CBM's Construction Observer will be full time on site the normal working hours and when critical activities require to verify construction progress and to verify that all work conforms to contract requirements. Deputy and special inspection and materials sampling and testing will be coordinated and provided as required by the final plans and specifications. CBM's will reject work that does not conform to the requirements of the contract documents and will promptly report unacceptable work to the City and contractor. Rejected work will be thoroughly documented, photographed, and tracked until repaired or replaced to the satisfaction of the City. Coordination with City: CBM will monitor closely the work of the contractor. The contractor will be required to submit a 4-week look ahead schedule at the weekly meetings. This is a very effective tool in helping to coordinate the construction operation, particularly in relation any interface operations with the City's activities. CBM will assist the City to minimize disruption to both City and construction operations. Safe Conditions: CBM will monitor project work and adjacent areas for unsafe conditions, promptly require corrective measures to be addressed by the Contractor in compliance with the contract documents and report such issues and corrective measures taken to the City. SWPPP: CBM will enforce all provisions of the Storm Water Pollution Prevention Plan. At a minimum SWPPP requirements will be monitored and a specific SWPPP Checklist will be compiled. Any deficiencies noted will be addressed with the contractor for immediate remedy. Upon a weather report of 40% (or higher) expectancy of rain, a site walk will be conducted to ensure that SWPPP measures are in place and well maintained. Materials and Workmanship: CBM will recommend approval of materials and workmanship that meet the contract requirements, in coordination with the authority of the consulting engineer, architect, fire inspector, deputy inspector, or other authorized representative or regulatory authorities having jurisdiction. Documentation Interpretation & Technical Assistance: CBM will perform the coordination and expediting between the contractor, design team and City Staff to clarify any questions for interpretation of the construction documents. Timely, firm and fair determinations will be processed to minimize cost and time impacts to the project. QA/QC: CBM will enforce the quality assurance plan, in conformance with the City' s Quality Assurance Manual . CBM will coordinate QA/QC activities on a daily basis and review activities as they happen, to make sure that QA/QC procedures are followed and deficiencies are resolved in a timely and efficient manner. The CM will maintain a chronological log of all records. Special, Deputy and Soils Inspection and Materials Testing: CBM has a working relationship with most of the local soils, deputy inspection and material testing firms. Upon determination of the specific special, deputy and soils inspection and testing requirements, CBM will develop the required scope of services engage the necessary services for the QC on the project. An allowance for special, deputy and soils inspection and testing services is recommended in the proposed fee. The actual amount will be coordinated and determined upon completion of the plans and CBM Consulting, Inc. 4 6 TUt. Page 19CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal specifications, and coordination with building and safety for determination of the final requirements for the project. Testing and Observations: CBM will coordinate laboratory, jobsite, offsite testing of construction materials and required observations per construction documents, construction codes, and Jurisdictional Agencies. CBM will implement established procedures for testing as required per the construction documents. CBM will monitor testing services, track documentation and record testing results in weekly construction progress meetings. When necessary, CBM will require and track that corrective measures are implemented and re-inspected to verify acceptable completion. Change Orders: CBM will establish, implement and coordinate systems for processing all contract change orders. Each issue , which is identified as a potential change to the design, scope, cost or contract time will generate change notice. CBM will determine whether or not a change notice should be considered. The plans and specifications will be reviewed against the change notice. If the issue does not appear to be included in the plans or specifications, a Request for Quotation (RFQ) will be sent to the Contractor. Any credits for work deleted as a result of the change will be required at this time as well. The contractor's response to the RFQ will be evaluated for reasonableness and completeness. CBM will maintain a Trend Log, listing potential changes as identified, either formally or informally. This Trend Log shall be used such that potential change items are not overlooked or deferred until the end of the job. CBM will prepare independent cost estimates as required for contract change orders. Upon approval by the City, CBM will prepare, log and process change orders for full execution, and administer their implementation. Once fully executed, CBM will review the timely completion of the work and coordinate inclusion of the change order in the appropriate payment application. Change Management/Claims resolution: CBM will implement its time tested claims management process to minimize changes to the project and avoid claims such that the project can be quickly and successfully closed out. CBM has done so on over 400 public projects valued at approximately $1 billion with no unresolved claims. The basis for CBM procedures is a well organized documentation system, a keen understanding of the construction process, exceptionally qualified staff and fair and firm negotiations. CBM will not defer difficult issues and will process only change issues that have been analyzed and determined to have merit. Those items will only be recommended for consideration when the most reasonable cost and time has been negotiated and all alternatives to avoid the impact have been resolved. Daily Extra Work Reports: CBM will verify and sign contractor's daily extra work reports documenting force account (time & materials) work. In particular, CBM will monitor that only appropriate worker classifications necessary for approved time and materials work is included on extra work reports. Any inappropriate workforce and/or equipment charges will be promptly rejected and removed from extra work reports. Progress Payment Processing: A cost control system, based on the Contractor's schedule of values, approved change orders and the contract amount shall be developed and implemented to monitor progress costs. Monthly cost reports will be submitted to the City as a component of the Monthly Progress Report. CBM will review the payment applications submitted by the contractor and determine whether the amount requested reflects the progress of the contractor's work. Appropriate adjustments to each X CBM Consulting, Inc. Page 20 49CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal payment application will be required by the contractor. When the payment application is acceptable and all backup documentation is verified (certified payrolls , lien releases , etc.), CBM will prepare and forward to the City a Progress Payment Report. The Report shall state the total contract price, payments to date, current payment requested, retainage and actual amounts owed for the current period. The CBM team is experienced evaluating complex pay applications. It is critical to the City's best interest that payment application review be performed accurately and prudently to maintain the prime and subcontractor incentives to perform on the projects. Construction Meetings , Schedule and Conduct Field Meetings: The following meetings will be held on site: Periodic Progress Meetings with agencies, design team and staff to discuss all data included in the monthly progress reports and focus on the following items: • Progress during the period • Major decisions made • Planned vs. actual schedule • Upcoming work schedule • Current or unresolved problems • Anticipated or pending change orders • Impacts of problems or change orders on schedule and budget • Discussion of new goals • Planned vs. actual budget analysis • Scheduled concurrent with a weekly meeting to save time and cost Weekly Progress Meetings will be mandatory for the Contractor and staff, and optional or on an as needed basis for City and design team staff. All parties are always invited to attend in person or via remote. Meeting minutes are distributed to all team members whether in attendance or not. Discussions will focus on the following items: • Contractor's detailed 4 week look-ahead schedule • Progress and major decisions during the last week • Update of unresolved items from previous meetings • Status of submittals and change orders Special Meetings will be scheduled as needed to discuss important issues or which require detailed discussion or review of plans and specifications. These meetings will follow the weekly meeting to reduce trips, if issues are not urgent. Written Instruction: CBM will Issue written instructions to contractor regarding routine matters and/or follow-up of verbal instructions as necessary to properly document project issues. Plans, Specs and As-Builts: At a minimum, CBM will periodically review the Contractor's as-built updates on the approved job plan set, identify missing items and require the Contractor to keep as-built records up to date throughout the project. At the City's option CBM will keep its own set of as-built plans which will note the location of subsurface utilities encountered and / or installed, identify where any design or field changes were required (utilizing the corresponding RFI and / or change order numbers) and note the location of critical building components that are covered by finish work. At the end of the project the final as-built plans are submitted the City within thirty days of construction completion. CBM Consulting, Inc. Page 21CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal Pre-Final Inspection: The Construction Manager and Construction Observer will perform the final job walk and prepare the punchlist (deficiency list). CBM will coordinate and observe completion of required corrections. Should the Contractor lag on a portion of the completion of project work, CBM will estimate the value of the incomplete items and recommend specific retainage in accordance with the contract to preserve the City's interest. If necessary, a change order will be recommended for approval for completion of the remaining work such that the City may file the notice of completion and start the time after which stop notices and/or claims are no longer valid. CBM will schedule and perform quality assurance materials testing to verify compliance of the work with the contract documents. We will review test reports submitted by others to substantiate compliance and ensure that Certificates of Compliance or source release tags are furnished by the Contractor along with the applicable delivered materials at the project site. Final Inspection: All corrections must be made before CBM recommends processing of the "Notice of Completion". CBM is noted for our attention to detail. Not only have we excelled at closing out our own projects, but we have been requested to and successfully closed out problem client projects where our services were not initially utilized. Upon completion of the punchlist and final sign off by all project stakeholders, CBM will make recommendation to City regarding Contractors final progress payment request and prepare final progress payment report for submission to City. Delivery of As-Builts and close -out documents : CBM will review "as-constructed " plans and prepare "as-constructed " reports . CBM will assist the Contractor in maintaining a field set of "as-constructed" plans to be updated daily and delivered to the City upon project completion . CBM will continually document changed field conditions and not rely on the Contractor to document "as-constructed" conditions . The will report and photograph field condition changes . The CM will document and keep these "as-constructed" conditions on plans in his office . CBM will review the Contractor 's submittal of "as-constructed " conditions and compare this submittal to CBM's own documentation . Discrepancies will be discussed , resolved and recorded . Completed "as-constructed " plans will be submitted to the City. CBM will enforce the provisions of the specifications to require the Contractor to submit well coordinated operations and maintenance manuals, warrantees & guarantees, bonds, extra stock and/or other items required by the contract documents such that a timely close-out of the project is implemented. CBM will perform closeout duties including final organization of project files and submit to the City for final approval, and assist with the filing of the notice of completion and release of retention. ADA Requirements : CBM will provide coordination necessary to assure that ADA requirements are satisfied during construction progress and upon completion. Utility Coordination: CBM will ensure utility coordination throughout the construction phase of the project is performed by the GC. CBM Consulting, Inc. Page 22 !5 1CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal Lien Waivers: CBM will administer the lien waiver process and review all conditional and unconditional releases for consistency with all payments made. Coordination with Residents and Property : CBM will work with adjacent property owners ' and residents' to resolve their concerns, review potential accessibility issues , and ensure installation of traffic control devices per approved traffic control plans . This is a key element in any construction effort and will be especially important as residents will be impacted by periodic closures. Monumentation CBM will verify removal , recordation notes , and replacement of all monumentation. Review construction traffic control CBM will review construction traffic control to ensure the optimum situation with regard to the following: Protection of the public both pedestrian and vehicular, during the construction operation. Arrange the traffic control so that there is minimal disruption to traffic and access to local business operations. Provide safe access for pedestrians and vehicles during the construction operation. Provide for the optimal phasing of the traffic control to facilitate the efficient completion of the construction operation. CRITICAL ISSUES The plans and specifications have been reviewed by CBM staff to identify the critical issues for each work zone . These items are of particular interest and will be given special attention during construction. It goes without saying that safety is the number one critical issue in any construction zone, and it will be the first and foremost concern in all of these areas. All of these new lines are being installed in dense residential and industrial neighborhoods. Coordination with residents and business owners will be a key construction mitigation measure. The sewer will be replaced on its existing alignment in many areas . Special care shall be taken to ensure that service to the residents is uninterrupted. 67W CBM Consulting, Inc. Page 23P. r 1. Proposal 2. The sewer installation trench will exceed 11' deep in some areas . Shoring installation and inspection will of high importance. 3. The street and sewer line exceeds 5 % slope in some areas . Special safety measures shall be taken. Northaate Street 1. 2. The sewer installation trench will exceed 14' deep in some areas. Shoring installation and inspection will of high importance. 3. Large beautiful trees are planted on the parkway of this street. Depending on the level of growth prior to construction, it may be necessary to trim the trees back to make room for large construction equipment. The deeper the trench, the more overhead clearance required. 4. The Northgate sewer connects at Overland. Efficient and safe traffic control will be important. CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS The sewer will be replaced on its existing alignment in many areas. Special care shall be taken to ensure that service to the residents is uninterrupted. The sewer will be replaced on its existing alignment in many areas. Special care shall be taken to ensure that service to the businesses is uninterrupted. The sewer installation trench will exceed 16' deep at the tie in at La Cienega. Shoring installation and inspection will of high importance. "T CBM Consulting, Inc. Page 24 53CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal 574 3. The Blackwelder sewer connects at La Cienega. Efficient and safe traffic control will be important. 4. The pipe slope in Smiley Dr. is a very flat 0.3% in some areas. Special care will be taken with construction controls to ensure proper flow. Commonwealth Ave The sewer pipe has very minimal slope, 0.15%, for very long stretches. Construction controls will be of utmost importance to ensure proper flow. 2. A 20" high pressure gas line will be crossed in two locations. Coordination with So. Cal. Gas will help to ensure a safe work zone. 3. A sewer bypass system must be maintained 24 hours a day across Commonwealth Ave. 4. Traffic control across Culver Blvd will require regular inspection. Carson St The sewer will be replaced on its existing alignment. Special care shall be taken to ensure that service to the residents is uninterrupted. 2. Large beautiful trees are planted on the parkway of this street. Depending on the level of growth prior to construction, it may be necessary to trim the trees back to make room for large construction equipment. The deeper the trench, the more overhead clearance required. 1. CBM Consulting, Inc. Page 25CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Proposal Whitburn St, Everward Road, Flaxton St and Drakewood Ave There are multiple tie in points at Overland Blvd. Special attention shall be paid to traffic control. 2. The street and sewer line exceeds 9% slope in some areas . Special safety measures shall be taken. 3. There are several areas where the sewer will be installed more than 13' deep. The top end of Everward is especially deep at nearly 18'. Excavations will be closely monitored and shoring will be strictly enforced. 4. The sewer on Drakewood is especially flat at 0.20%. Construction controls will be especially tight in this area. CBM Consulting, Inc. Page 26CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Schedule SCHEDULE OF CURRENT AND FUTURE PROJECTS ®Alan n Tom b Jamie 5(v|1010|Workload Committments 2 3 2007 Quarterly Breakdown|1010|CBM Consulting, Inc. Page 27CULVER CITY CM AND INSPECTION FOR SEWER REPLACEMENT PROJECTS Rates & Fee RATES & FEE ASSUMPTIONS: 1. The level of effort and fee estimate detailed above is based on CBM's proposed scope of services delivered over the contract time set forth in the construction bid documents. The tasks outlined in the fee reflect the requirements in the Request For Proposals. 2. The fee assumes that construction phase services begin and end within the contract completion time. 3. Additional scope of services not listed in the proposal or extended schedule for reasons outside of CBM's control would require additional effort and fee. Over time and weekend rates will be billed at time-and-a-half. 4. Soils inspection and testing , deputy and special inspection and testing , and/or QA/control surveying are excluded from the fee proposal . CBM will coordinate these services performed by others unless otherwise desired by the City. 5. The fee estimate assumes CBM will perform CM activities from CBM headquarters office in Gardena with requisite site visits. No onsite facilities, furniture, utilities or equipment are included in the fee. 6. Project expenses are billed at cost plus 10%. Project expenses include: Non-commuter automobile mileage (at $.50 per mile), postage and special courier expenses, subsistence, reproduction, project related telephone, subcontractor services and other direct project expenses as requested by the client. Should the client desire, phone and mileage may be included in an hourly rate, which shall be negotiated and slightly higher than the billable rates indicated above. CONFIDENTIALITY This proposal is submitted in good faith in an effort to solicit work and to offer professional services to the addressee. This Proposal is confidential and intended for use only by the addressee and not for public consumption. The addressee may make copies for their own use internally. However, dissemination of this document to others outside your Agency may only occur with the express written consent of CBM Consulting, Inc. Thank you for honoring this confidentiality. CBM Consulting, Inc. Page 28 SO/I THE NICKERSON COMPANY CONSTRUCTION MANAGEMENT & INSPECTION SERVICES COMPANY BACKGROUND The Nickerson Company is a California Corporation, established in September, 2001. The firm provides construction management, and inspection service for public and private agencies. Vernon Nickerson the principal-in-charge is a former Culver City Public Works Inspection Supervisor who successfully served the City for nearly 18 years before his service retirement in 2001. Since much of his experience is within the boundaries of Culver City, he is a credible and familiar face to the local residents, City departments, and utility companies. His unique experience in working in the Public Works Department benefits the City in developing a comprehensive and successful approach to the project. The Nickerson Company will act as an extension of the City's staff. The project will be structured so as to maintain open communication with the City, design engineers, contractor, and pertinent regulating agencies. Our services will be personally directed by the principal-in-charge who has superior knowledge and experience in the project areas with the excavation issues and with local residents. We will anticipate and keep ahead of key issues with intent to ease the impact of construction on local residents and will minimize down time by anticipating problems/change conditions and present solutions to the city in a timely manner. The Nickerson Company applies value analysis/engineering to the project in a systematic approach to obtain optimum value for every dollar spent. The objective of this approach is to lower total costs, including life cycle costs, without affecting performance and reliability. 68I THE NICKERSON COMPANY CONSTRNC1ION MANAGEMENT & INSPECTION SERVICES Cost Proposal Culver City Sewer Replacement Project March 13, 2007 2007 Hourly Charge Rate Schedule Title Name Hours Per Week Rate Per Hour Duration Extension Principle in Charge Vernon Nickerson 10 $ 175.00 26 $ 45,500.00 Construction Manager David Tiberi 10 $ 155.00 26 $ 40,300.00 Construction Inspector Jacob Bondar 40 $ 110.00 26 $114,400.00 Administrative Assistant Clancy Reedy 10 $ 74.00 26 $ 19,240.00 Total $219,440.00 Total fees as indicated are based upon the estimated time requirements for a construction period of 180 days with one full-time Construction Inspector plus one part-time Construction Manager. These fully burdened rates include all vehicle, cell phone, computer, and inspection equipment charges. Field office space and furnishings are to be provided by others. Material testing and construction staking are not included. The standard hourly rates shown above includes payment of prevailing wages for inspection as required by law, and Certified Payrolls will be provided upon request. The hourly rate for overtime inspection (nights and weekends) is 1.35 times the standard rate. Construction Management overtime is provided at the same hourly rate as shown above. There will be no additional charges for "reimbursables" such as mileage or travel time. Invoicing of fees will be based on the level of effort actually required to properly administer and inspect the project. If the level of effort is less than the estimate, the City will be invoiced accordingly. Should additional services be required to accomplish project objectives, said services will be provided following prior notification of and approval by the Nickerson Company and Culver City. This is a "Not-to-Exceed" cost proposal as requested in the Request for Proposal from Culver City dated February 22, 2007. 6elI THE NICKERSON COMPANY CONSTRUCTION MANAGEMENT & INSPECTION SERVICES PROJECT TEAM AND RESUMES Principal-In-Charge Vernon L. Nickerson Construction Manager David Tiberi, P.E., CCM Construction Inspector Jacob Bondar Construction Inspector Azam Azimi The high quality of The Nickerson Company's work reflects the capabilities of its individual employees and the blending of their talents to meet the requirements of each project. To assure this quality, it is our company policy to staff each project with those professionals who have the requisite interest, time and skills. To proposed team members have worked together on several similar projects in the last 5 years. Detailed resumes of the team are provided in this section.THE NICKERSON COMPANY W A CONSTRUCTION MANAGEMENT & INSPECTION SERVICES Sewer Replacement Project Eveward Road , Drakewood Avenue , Whitburn Street, Flaxton Street, Blackwelder Street, Smiley Drive, Northgate Street , Cranks Road, Carson Street, & Commonwealth Valley Wednesday , March 14, 2007 Vernon Nickerson Principle In Charge Administrative Support Staff David Tiberi Construction Manager Jacob Bondar Construction Inspector Azam Azimi Construction Inspector Backup CA GENERAL "A " LICENSE #807217 (0|1010|8921 S. Sepulveda Boulevard, Suite 107 n Los Angeles, California 90045 n www.thenickersoncompany.com phone: 310.338.0809 n fax: 310.338.0822THE NICKERSON COMPANY CONSTRUCTION MANAGEMENT & INSPECTION SERVICES Vernon L . Nickerson General Contractor/Construction Manager YEARS OF EXPERIENCE: 35 years EDUCATION: University of California, Los Angeles, 1993/1999 West Texas A&M University, 1971-1975 Certified Construction Manager, 1992 PROFESSIONAL MEMBERSHIPS: American Public Works Association, Southern California Chapter American Construction Inspectors Association, Professional Member, Los Angeles Chapter PROFESSIONAL QUALIFICATIONS: Vernon Nickerson has over 30 years professional experience as an operating engineer tradesman, foreman, superintendent and contractor on all types of excavation, roadway and pipeline projects. Mr. Nickerson is a licensed general engineering contractor, a certified construction manager, and a retired Senior Public Works Inspector for the City of Culver City following 17 years of service. He has expertise in multiple facets of the industry and has been an active member of the Los Angeles Chapter of the American Inspectors Association for more than 15 years. His background includes construction supervision with general engineering construction management and inspections. Mr. Nickerson's broad range of completed projects has provided him with exposure to the associated problems and a variety of solutions for addressing the numerous constraints potentially affecting project developments. RELATED EXPERIENCE: THE NICKERSON COMPANY, INC., Los ANGELES, CA Construction Manager/Owner • Provide construction management and inspection services to public and private sector clients. Plan, direct, and coordinate a wide variety of construction projects including all site activities for general engineering and capital improvement projects. Schedule, monitor and inspect all work from conceptual development stage to project completion. CITY OF CULVER CITY, PUBLIC WORKS DEPARTMENT, CULVER CITY, CA Senior Public Works Inspector 1995 - 2001 • Developed work schedules for public works inspectors, established priorities, reviewed and adjusted schedules to meet requirements and emergency conditions. Assisted in the administrating of contracts for public works projects by reviewing progress payments, requests for change orders, material quality control testing and contractor's claims of final qualities. Accountable for all activities from start to completion of project; reviewed completed work for accuracy and timeliness of results. Public Works Inspector 1986 - 1995 • Inspected all types of public works construction projects such as streets, sidewalks , storm drains , utility excavations , sewer mains, parks and park facilities to ensure compliance with the engineering plans, specifications , contracts and agreements. LICENSES AND TECHNICAL TRAINING: General Engineering Contractor, License No. 807217, State of California • Construction Storm Water Compliance, Building Industry Association of Southern California • Confined Space Training, City of Culver City • Soil Compaction Techniques, Budinger & Associates, • Federal Emergency Management Exercise Design, FEMA • Competent Person Training, American Water Works Association • Professional Development Certification, Asphalt Institute (PZTHE NICKERSON COMPANY CONSTRUCTION MANASEMENT & INSPECTION SERVICES David Tiberi , P.E. CCM Construction Manager YEARS OF EXPERIENCE: 19 EDUCATION (DEGREE AND SPECIALIZATION) CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Master of Science / Structural Engineering 1992 / CA / Professional Engineer / No. 49796 , exp. 9/2008 Bachelor of Science / Civil Engineering 1995 / NV / Professional Engineer / No. 011733 Caltrans Resident Engineer Academy, 1995 1997 / CO / Professional Engineer / No. 33105 Caltrans Bridge Academy , 1992 1997 / WA / Professional Engineer / No. 35414 Certified Construction Manager (CCM), 2003 1997 / AZ / Professional Engineer / No. 32929 1997 / UT / Professional Engineer / No. 363071-2202 2007 /OR /Professional Engineer / No. 78801 PE OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Tiberi provides providing construction management and inspection services to public agencies on bridge , highway , public building , and municipal public works projects . He is an experienced Project Manager , Resident Engineer , and Structure Representative for bridges, highways , earthwork, drainage , traffic signals , landscaping , asphalt concrete and PCC paving, concrete structures , buildings , and municipal/county public works construction. Duties include shop drawing reviews ; constructability reviews ; supervision of surveying , construction inspection , and testing ; contract administration; schedule reviews and monitoring progress ; community outreach ; dispute resolution and claims analysis . Project Manager for on-call inspection services contracts . Liaison between owner , designer , and contractor for field, design , and legal issues . Received the Caltrans "Superior Accomplishment Award" for work performed as a Caltrans District 7 employee during the Northridge Earthquake emergency bridge reconstruction projects . Active member of the Construction Management Association of America (CMAA), the Management Practices in Construction (MPIC) Committee of the American Society of Civil Engineers (ASCE), the Womens' Transportation Seminar (WTS), the American Segmental Bridge Institute (ASBI), the Society of American Military Engineers (SAME), and the Dispute Review Board Foundation (DRBF). TITLE AND LOCATION 190`" Street Improvements , Torrance , California - 2002 DESCRIPTION AND SPECIFIC ROLE Served as Construction Manager for the City of Torrance on this roadway rehabilitation and widening project. The project covered approximately 1.5 miles of 190th Street with pavement rehabilitation , roadway widening , landscaped median construction , traffic signal modifications , water line replacements , plus new curbs , gutters , and sidewalks . Construction required extensive temporary traffic controls for phased construction. As Construction Manager, provided full contract administration services to the City of Torrance, including contractor progress payments , contract change orders , dispute resolution assistance , submittal reviews , schedule reviews , conducting weekly job meetings , and supervision of material testing requirements for federal funding compliance . Supervised full-time field inspection of all construction . All work was in conformance to City standards plus the "Green Book" and Standard Plans for Public Works Construction, including ADA compliant access ramps. TITLE AND LOCATION Main Street Improvements , Carson , CA - 2003 DESCRIPTION AND SPECIFIC ROLE Served as Construction Manager for the City of Carson on this roadway rehabilitation and widening project . The project included approximately 2.5 miles of roadway widening , pavement replacements, overlays , slurry seals , concrete sidewalk and curb & gutter replacements, street lighting, traffic signal installations , raised landscape median construction , and NPDES compliance . The project was constructed to the standards of the City of Carson, APWA, Los Angeles County, and Caltrans . As Construction Manager , provided full contract administration services including conducting weekly progress meetings, reviewing progress schedules , and ensuring compliance with federal funding requirements . Supervised full- time inspection and coordinated material testing . Wrote change orders for City approval, and monitored the project budget. Issued monthly progress payment to the Contractor . Issued a final punch list , and ensured punch list completion to the City's satisfaction . Resolved many plan discrepancies , including incomplete plans for private property modifications adjacent to the roadway widening and survey discrepancies related to grading and drainage. TITLE AND LOCATION Trunk Sewer Replacements , Pomona, CA - 2000 DESCRIPTION AND SPECIFIC ROLE Served as Project Manager for the City of Pomona for this project to construct 25,850 of sewer lines, including 8,100 feet of 42" diameter trunk sewer from the intersection of Hamilton Avenue and Phillips Boulevard to the Los Angeles County Sanitation District 's Human Way Treatment Plant. All inspections were accomplished according to Los Angeles Sanitation District and City of Pomona standards . The project also included two major siphon crossings under State Route 71 and Mission Boulevard plus extensive utility coordination . Responsibilities included oversight and logistical support to the Construction Manager and full-time inspector and dispute resolution assistance to the City. (0')THE NICKERSON COMP ANY CONSTRUCTION MANAGEMENT & INSPECTION SERVICES (04 Azam Azimi Construction Inspector Years of Experience: 25 EDUCATION Ph.D. Civil/Structural Engineering CURRENT PROFESSIONAL REGISTRATION North Carolina, Civil Engineering / No. 022555 OTHER PROFESSIONAL QUALIFICATIONS Construction Inspector for highway and bridge construction and municipal public works. Expert knowledge of construction materials for highway and bridge construction, including high performance concrete. TITLE AND LOCATION Structure and Highway Inspector , US 101/ Kanan Rd Interchange Improvements , Agoura Hills, CA BRIEF DESCRIPTION AND SPECIFIC ROLE Bridge Inspection for the US 101/Kanan Interchange for compliance with PS&E documents per Caltrans standards . Approximately $10 million in construction . Project includes a bridge widening and interchange improvements to increase traffic flow. Responsibilities: • Bridge widening inspection • Retaining Wall inspection • Utility relocation inspection • Inspection of drainage improvements , landscaping , curb, gutters , and sidewalks , and roadway/ramp construction • Maintained all documentation per Caltrans Construction Manual TITLE AND LOCATION Various Commercial Structures , Raleigh North Carolina - 2006 BRIEF DESCRIPTION AND SPECIFIC ROLE Projects included various commercial buildings, mainly retail stores. Responsibilities: • Designed and inspected building foundations as an independent consultant TITLE AND LOCATION Field Inspector, 1-440 and 1-485 Widening , North Carolina Dept of Transportation, Raleigh , North Carolina - 2005 BRIEF DESCRIPTION AND SPECIFIC ROLE Projects included 1-440 Widening in Raleigh , 1-485 in Charolette, and US 70 bypass in Johnston County as part of the state 's $1 Billion annual construction program . Worked on project elements including various structures , such as concrete and steel bridges , culverts, retaining walls. Responsibilities: • Inspected construction for compliance with plans, specifications, and special provisions • Monitored projects to compare short and long term performance of new, specialized materials such as high performance concrete • Performed value engineering reviews for cost savings on structures as mandated by FHWA TITLE AND LOCATION Field Inspector , 1-93 and 1-95, Massachusetts Depart . Of Transportation , Boston, Massachusetts - 1985 BRIEF DESCRIPTION AND SPECIFIC ROLE Responsibilities: • Bridge inspection for compliance with plans and specifications and other contract documents TITLE AND LOCATION Field Engineer , Universal Testing Services, Stoneham, Massachusetts - 1984 BRIEF DESCRIPTION AND SPECIFIC ROLE Projects included precast bridges for highway projects and commercial buildings. Responsibilities: • Inspected pre-cast elements for the projects, including material reviews and testingTHE NICKERSON COMPANY CDNSTNUCTION MANAGEMENT & INSPECTION SERVICES Jacob M. Bondar Construction Inspector Years of Experience: 25 EDUCATION (DEGREE AND SPECIALIZATION) ACI Certification/Sampling and Testing of Concrete (ASTM); OPS Field Construction Inspector/As-Built Drawing Profile; Environmental Compliance Awareness ; Regulatory Awareness and Competence/Construction; DOT HM 126 Transportation/ Hazardous Material ; OSHA Construction Safety Trained; Caltrans Safety OTHER PROFESSIONAL QUALIFICATIONS Mr. Bondar has over twenty years of Caltrans and other agency field inspector experience . Possesses excellent written and oral communication skills. He has extensive experience in all phases of highway construction , including , safety , SWPPP issues , and environmental requirements including hazardous waste operations , plus office engineering work such as estimates , reports , change orders , QCQA and claims. TITLE AND LOCATION Construction Inspector , City of Whittier , La Puente , Yorba Linda , Baldwin Park and Montebello , CA - Present BRIEF DESCRIPTION AND SPECIFIC ROLE Multiple City construction projects including: clearing and grubbing, cold mill asphalt, concrete, pavement, pavement fabric, AC overlay and slurry, remove and replace sidewalks, curbs and gutters, access ramps, manhole/valve frame and cover to grade, loop detectors, remove and replace pavement markers and markings, reset survey monuments, storm drains, sewer lines, street widening, parking lots, irrigation and water supply, street lights, underground boring, water mains and laterals, traffic control, and public safety. Responsibilities: • Roadway construction inspection, including daily reports and change orders that were performed and contractors progress reports. TITLE AND LOCATION Construction Inspector , City of Baldwin Park , CA - 2003 BRIEF DESCRIPTION AND SPECIFIC ROLE Multiple City construction projects including: Baldwin Park Blvd. Storm Drain Project (Appox. 25,000 LF), including excavation of Main Line Trench 22'deep x 17'wide ),Shoring, Reinforced Concrete Pipe for Main Line range from 48" to 78" in diameter, construction of Manholes, Laterals, Laterals and House Connectors, Pipe Support Across Trenches, Concrete Collar and Pipe Anchors, Catch Basins, Best Management Practices (BMPS), Backfill and Compaction, and Construct Asphalt Concrete Pavement, Traffic Markings Signing and Striping, Restoration of Existing Improvements, Traffic Control and Public Safety. Responsibilities: • Construction inspection, daily reports, extra work bills, and monthly progress reports with photographs TITLE AND LOCATION Construction Inspector, State Highway 99, Merced County, Caltrans District 10 - 2002 BRIEF DESCRIPTION AND SPECIFIC ROLE State Highway 99 in Merced County, with work including: Construction Area Signs, Water Pollution Control, Traffic Control System, Temporary Traffic Stripe, Reconstruct Three Beam Barrier, Clearing and Grubbing, Roadway Excavation, Imported Borrow, Remove and Install Crash Cushion (sand filled), Concrete Barrier (Type k), Shoulder Widening. Responsibilities: • Roadway Inspection for Caltrans TITLE AND LOCATION Construction Inspector/Safety Office BRIEF DESCRIPTION AND SPECIFIC ROLE Level (3) Communication long haul project. Responsibilities: • Ensured all sub-contractors comply with all applicable federal, state, ROW, owner, project and local rules/ regulations governing the safety of personnel, property and all environmental issues during boring, trenching and plowing operations on Cal-Trans, Union Pacific Railroad, County Roads and Bureau of Land Management properties. • Held daily safety / hazard analysis meetings, made sure proper traffic control was set-up, all mandatory permits are on site and up to date • Maintained daily construction/inspection and quantity reports and photographed the site on a regular basis. • Verified depths of all utilities, wetlands, railroad tracks and road crossings in compliance with Construction Action List) and specifications TITLE AND LOCATION Transportation Coordinator, Caltrans, District 07, Los Angeles, CA - 1997 BRIEF DESCRIPTION AND SPECIFIC ROLE Caltrans Century 105-Freeway Project in Los Angeles , Ca. plus over 15 other Super Fund remediation projects Responsibilities: (015 • Construction Safety Officer during loading of hazardous waste into gondola railcars/ 50 plus personnel on a daily operation.I THE NICKERSON COMPANY CONSTRUCTION MANAGEMENT & INSPECTION SERVICES PROJECT UNDERSTANDING/SCOPE OF SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES The work consists of removing the existing 8", 10", and 12" VCP and constructing a new 8", 10" and 12" PVC sewer main along the following streets: • Flaxton Street from Overland Avenue to Youngworth Road • Whitbum Street from Overland Avenue to Drakewood Avenue • Drakewood Avenue from Ranch Road to Flaxton Street • Eveward Road from Bernardo Road to Ranch Road • Blackwelder Street from La Cienega Blvd to Ballona Creek • Smiley Drive from Fairfax Avenue to Ballona Creek • Northgate Street from Overland Avenue to Drakewood Avenue • Cranks Road from Hill Road north to Cul-de-sac • Commonwealth Alley from southerly end to northerly end and to include a section between Culver Boulevard to end of Arvee Street • Carson Street from Ince Boulevard to Higuera Street The scope of work also includes , but is not limited to, the reconstruction of house laterals, manholes , roadway pavement , sidewalk, curb and gutter, and replacement of traffic pavement markings as specified in the plans and specifications. The construction of the sewer improvement project is anticipated to begin May 1 , 2007 with a construction duration of 180 calendar days.THE NICKERSON COMPANY, INC. Scope of Services Construction Management and Inspection for Culver City Sewer Replacements Pre-Construction Phase ITEM DESCRIPTION BENEFITS DELIVERABLE DELIVERED BY Coordinate with Meet with all utility companies that will be Promotes understanding of Meeting agenda and Construction Manager Utility Companies responsible for relocating their own lines responsibilities for the project minutes and/or equipment. Follow-up on relocation schedule activities until complete Photograph and Take Pre-Construction photos and video Documents existing conditions in Photos, dated, with labels, Inspectors Video the Site the event of site damage or other and a video tape. issue with claims potential Mobilize Field Provide a fully equipped field office, with Allows all management functions Equipped trailer Project Manager, Office (Upon utilities , furniture , computers , telephones , fax, to be performed at the job site, Construction Manager & Request) all project files, and a room for meetings minimizing travel time Inspectors Partnering (Upon Arrange a formal partnering meeting Establishes project goals and a Partnering Agreement All Team Members Request) dispute resolution mechanism Pre-Construction Arrange a Pre-Construction Meeting . Invite all Addresses all concens before the Meeting agenda and Construction Manager, Conference project stakeholders , and address all start of construction to avoid minutes with Inspectors Attending concerns . Review contract administration conflicts after starting work items. Permits and Assist the City in obtaining any required Allows construction to begin on Permits and easements Construction Manager Easements permits or easements schedule Construction Phase , Administration ITEM DESCRIPTION BENEFITS DELIVERABLE DELIVERED BY Weekly Progress Conduct weekly meetings to discuss the Maintains effective Meeting agenda and Construction Manager and Schedule schedule, change orders, new issues , communications among all minutes Meetings submittal status , RFI's, safety, deficiencies, stakeholders, with an official etc. record Deficiency Log Maintain a log of all items of work that do not Reminds all parties of rejected Deficiency Log Construction Manager comply with the contract documents . Issue work Field Correction Notices to the Contractor for deficient items of work, especially failed matieral tests. Process/Review & Review all submittals for completeness and Ensures that submittals are Submittal Approval Log Construction Manager Approve constructability. Track the designers' approved in a timely manner Submittals progress in reviewing and approving submittals, or the progress of any other agency reviewing the submittals. Includes review of Traffic Handling Plan Submittals and Mix Design Submittals Track Quantities Track quantities of completed work for Provides a permanent record of List of Quantities for Construction Manager and payment. Track "force account" (time and work in place Payment Inspectors materials) work, and "Extra Work Bills". Process Requests Answer the Contractor's Requests for Maintains effective RFI Replies and Log Construction Manager for Information Information (RFI's), ensure that the designer communications, ensures that all (RFI's) answers design RFI's questions are answered and documented Review Contract Review CCO's proposed by the Contractor. Ensures that only necessary Logs of Potential and Construction Manager Change Orders Recommend needed CCO's. Track cash flow CCO's are issued , eliminating Issued CCO's, CCO's for (CCO's) for CCO's. Write CCO's. unnecessary costs . City Approval Weekly Statement Issue a Weekly Statement of Calendar Days, Provides an agreed upon record Weekly Statement of Construction Manager of Calendar Days showing days, remaining , rain days, etc. of all working days, eliminating Calendar Days disputes over working days Environmental Monitor for compliance with the applicable Ensures compliance with Approved SWPPP, Construction Manager, Compliance environmental regulations and contract environmental laws and SWPPP Inspection Reports Inspectors requirements, such as SWPPP regulations Labor Compliance Monitor for compliance with the applicable Ensures compliance with labor Verified Certified Payrolls, Construction Manager and labor laws and contract requirements, such laws. Employee Wage Interviews Inspectors as prevailing wage requirements. Follow Chapter 16 of the Caltans Local Assistance Procedures Manual for information. Progress Review contractor's payment requests , verify Ensures contractor is paid only for Certified Payment Request Construction Manager Payments completed quantities completed, acceptable work (01THE NICKERSON COMPANY, INC. Scope of Services Construction Management and Inspection for Culver City Sewer Replacements Construction Phase Administration Continued ITEM DESCRIPTION BENEFITS DELIVERABLE DELIVERED BY Project Maintain a filing system for organizing and Meets the needs of oversight Electronic files, project Construction Manager Documentation tracking all project documentation , including agencies . Eases retrieval of files/logs correspondence , submittals, progress documents for dispute resolution payments , photos , videos , and material testing reports . Review all inspection reports and photos Project Schedule Review the contractor 's baseline , monthly, Ensures on-time completion . Progress Schedules , Construction Manager and "look-ahead" submittals . Notify all Provides documentation for schedule correspondence parties of deviations from the schedule . dispute resolution ITEM DESCRIPTION BENEFITS DELIVERABLE DELIVERED BY Permits & Continuations of these pre-construction Ensures completion of these Permits , easements , and Construction Manager Easements , activities items. Promotes an on-time relocated utilities Utility Relocations project completion Public Relations Be available to answer questions from the Assists the City with public Answers to questions from Construction Manager public about the project . Work with adjacent relations the public property owners and residents to resolve their concerns. Partnering and Review the effectiveness of the partnering Ensures compliance with the Weekly or Monthly reports Construction Manager Project agreement . Serve as primary project point-of partnering agreement. Provides on partnering effectiveness Coordination contact for the City between the Contractor , coordination among multiple and miscellaneous meeting Utility Companies , Survey, Material Testers, project stakeholders agendas/minutes and all other Project Stakeholders. Report potential disputes to the City. Safety Review the jobsite for compliance with all Ensures a safe work site for the Correspondence Construction Manager applicable safety requirements . Notify the City , Contractor, and Public Contractor of all deficiencies . Coordinate with OSHA or other regulatory agencies for enforcement. (PSTHE NICKERSON COMPANY, INC. Scope of Services Construction Management and Inspection for Culver City Sewer Replacements Construction Phase, Inspection ITEM DESCRIPTION BENEFITS DELIVERABLE DELIVERED BY Quality Assurance inspect the work to ensure compliance with Ensures that all work is in Daily Inspection Reports, Inspectors Inspection the contract documents . Reject compliance with the contract and including work in progress, unacceptable work in writing , using the applicable Codes , with proper weather , and labor force. Deficiency Log. Observe the work of special documentation as proof. Notices of Noncompliance inspectors when required . Check line and and the Deficiency Log. grade for roadway projects , trench backfill, formwork, etc. Ensure compliance with all applicable contract documents , including the "Green Book", APWA Standard Plans, City standards, and the contract plans and specifications. Progress Photos Continue to take regular job progress photos Provides proper project Pictures, labeled,with a log Inspectors and Videos and videos . Progress photos shall be taken documentation in the event of a daily and provided to the City electronically. dispute Materials Testing Have all materials tested for compliance with Satisfies oversight agency Files of material test Construction Manger and the contract documents . Receive and file requirements . Ensures that reports and certificates of Inspectors required Certificates of Compliance . materials comply with the contract compliance Coordinate with Cattrans for testing on projects within Caltrans ROW regarding material releases and other testing requirements. Ensure that testers maintain applicable certifications Public Relations Ensure that the Contractor complies with the Ensures that the project is a Documentation on working Construction Manger and and Inter-Agency noise level, dust mitigation, and working hour "good neighbor", and minimizes hours and noise levels . Inspectors Coordination requirements of the contract. Coordinate complaints . Satisfies Notes in Daily Reports on with Inspectors from other jurisdictions . requirements of other jurisdictions coordination with other who are project stakeholders agencies Traffic Control Inspect the Contractor's traffic control Ensures safe traffic control in Daily Inspection Reports, Inspectors systems . Verify that they meet the compliance with the contract photographs requirements of the contract document , documents . Provides which may include the WATCH Manual, documentation that will be needed contract plans , contractor submittals , and the in the event of an accident. Manual of Uniform Traffic Control Devices . Satisfies oversight agencies Review detours daily, and document the detour in Daily Reports and photos. Pre-cover Inspect the underground and overhead Reduces maintenance service Report & photos Construction Manager & Inspection utilities with Maintenance & Service costs Inspector Personnel before they are covered (09THE NICKERSON COMPANY, INC. Scope of Services Construction Management and Inspection for Culver City Sewer Replacements Post Construction Phase ITEM DESCRIPTION BENEFITS DELIVERABLE DELIVERED BY Final Inspection Conduct a final inspection/walk through Ensures that all work is in Punchlists and Notice of Construction Manager and including maintenace & service personnel . compliance with the contract , with Completion Inspector Issue a preliminary and a final punchlist , with proper documentation as proof. a schedule for punchlist completion. Final sign off of required permits Notice of Assist in filing the Notice of Completion and a Establishes the lien period and Controls costs Construcxtion Manager & Completion Project Final Report for projects within the payment retention period Inspector Caltrans ROW. "As-Built" Maintain red line drawings , submit them to Provides documentation for "As-Built" red line drawings Construction Manager & Drawings the designer, reviews completed as-builts changes to the plans , a Inspectors permanent record. Operation Receive all required project completion Ensures contract requirements Manuals , warrantees , lien Construction Manager Manuals , documentation from the Contractor . This are met for these close -out releases, etc. Warranties , Lien includes lien waivers and required releases . submittals . Identifies extended Releases, equipment warranties Guarantees, Affidavits, Waivers Final Payment Process the contractor 's final payment Provides proper documentation of Final payment request, Construction Manager Request, request, issue a Certificate of Completion , project completion . Certificate of Completion, Certificate of and a Project Final Report Final Project Report Completion, Project Report Dispute As requested , provide assistance in resolving Ensures that claims are resolved Claims briefs, negotiation Construction Manager Resolution any outstanding disputes . This includes quickly and fairly and litigation/arbitration claims documentation , negotiations , and support litigation support Project Files I Deliver all project files including photographs Provides a permanent project Project files , including Construction Manager record , electronically and in files electronic files. 10Project=No. DAILY REPORT P- 843 Report No.: 5 Date: 9/20/2006 M T W T F S S Shift hrs: Start 7:30 To : 17:00 Contractor. Shawnan (S) Subcontractor(s): Traffic Systems (TS) & Sawcutting Tech (ST) Location : Washington bet. Sepulveda to Center Description of Operation : Constructing forms for C/G & DWY Apron; Preparing subgrade for long gutter. Ram Personnel Bid Item No. / Hours Worked Weather 65 Pnme/Sub Name <•, o _ _ gasification (i.e Laborer/Operator/Foreman) Prime Dan Howard 8 Foreman (S) Jeff First 8 Operator (S) John Second 8 Laborer (S) " Alex Third 8 Laborer (S) Mike Fourth 2 2 4 Apprentice Subl Kobe Bryant Foreman (TS) Alan Iverson Laborer (TS) Sub2 Shaq Oneil Foreman (ST) Dwayne Wade Laborer (ST) Additional Personnel: None Bid Item No. 10,11, & 12 14|1010|Quantity Traffic Control: Description/Special Notes Constructed Form at Center Street Compacted subgrade. Not finished. Raised median at Washington BI & Washington PI. Right lane closed EB from Sepulveda to Center St at 9:00 a; opened right lane at 3:00 Notified Foreman of missing construction ahead signs and lane closed ahead signs- Miscellaneous: Accident westbound Washington @ Huron at 10:00 a. p- I worked: 8. 0 Signature: Vem NickersonTHE NICKERSON COMPANY CONSTRUCTION MANAGEMENT & INSPECTION SERVICES CLAIM HISTORY The Nickerson Company, Inc. has had no claims during the last five (5) years. -I2i I m ;-1 i rn860-277-0111 ACORD 3/14/2007 6:25:13 PM PAGE 002/00`2 Fax Server CERTIFICATE OF LIABILITY INSURANCE DATE(M IDDmYY) M^ PRODUCER PAYCHEXC AGENCY 150 SAWGRASS DRIVE ROCHESTER, NY 14520 Phone (877) 362-6725 THIS CERTEICAIE IS ISSUED AS A MATTER OF MFORMATION ONLY AND CONFERS NO RIGH TS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICES BELOW. Fax (277) 6774447 INSURER AFFORDING COVERAGE NAIC5 INSURED INSURER A: Travelers Indenmily Co d CT NICKERSON COMPANY INC. INSURER B: 8921 S. SEPULVEDA ILVD INSURER C: LOS ANGELES, CA 90045 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED . NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS , E) LUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD1- POLICY EFFECTPM DATE POU CT IS ATOM VTR INSgd TYPE OF HSURANCE POLICY NUMBER pnM" DDATEppgp" LNNTS GENERALLIABLITY EACH OCCURRENCE $ DAMAGE TO RENTED S q COMMERCIAL GENERAL LIABILITY PREMISES o ence) q CLAIMS MADE q OCCUR MED EXP one person) S PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ ENt AGGREGATE LIMIT APPLIES PER- 0 POLICY O PROJECT q LOC COMBINED SINGLE LIMIT $ AUTOMOBILE LIABILITY dd ac e q ANYAUTO BODILY INJURY $ q ALL OWNED AUTOS ( Perperso) q SCHEDULED AUTOS q HIRED AUTOS BODILY INJURY $ q NON-OWNED AUTOS (Peracddenq 0 PROPERTY DAMAGE $ D (Perasddent) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT T. q ANYAUTO OTHERTHAN EAACC $ El AUTO ONLY AGG $ EXCESSAAIBRELLA UAERITY EACH OCCURRENCE $ q OCCUR q CLAIMS MADE AGGREGATE $ S 0 DEDUCTIBLE $ RETENTION 5 $ A WORKERS COMPENSATION AND UB5750C934 0793/2005 07/03/1007 WC STATU- q OTHER EMPLOYERS' UABAJTY TORY OMITS ANY PROPRIETOR/PARTNER EXECUTIVE FF L EACH ACCIDENT 5100000 Y O ICERAEMBEREXCLUDED' e clsWb d n DISEASE - EA EMPLOYEE $100000 es -% e un er Y SPECIAL PROLUSIONS belae DISEASE - POLICY LIMIT $500000 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDOIRSEIfdNT I SPECIAL PROVISIONS NICKERSON- VERNON IS AN EXCLUDED OFFICER ON THIS WORKERS' COMPENSATION POLICY. RE: SEWER REPLACEMENT PROJECTS CERTIFICATE HOLDER CITY OF CULVER CITY ATTN. MR. LEE TORRES ENGINEERING DEPARTMENT 9770 CULVER BOULEVARD CULVER CITY, CA 90232 CANCELLATION SHOT D ANY OF THE ABOVE DESCRIBED POLICIES BE CANC ELLED BEFORE THE EXPSRATION DATE TRU MM, THE ISSUING INSURER WILL ENDEAVOR TO MAR 30 DAYS WRITTEN NOTICE TO TM CERTIFIC ATE HOLDER LTAI® TO TIM LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABIL ITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE: KARA MOORE ACORD 25 (2001108} 0 ACORD CORPORATION 1998 75