Legislation Details

File #: HIST-18456    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 1/9/2012 Final action: 1/9/2012
Title: Approval of a Professional Services Agreement with Land Images Landscape Architects for Landscape Architecture Services Related to the West Washington Area Improvement Plan, Phase IV (Median Design).
Attachments: 1. Approval of a Professional Services Agreement with - C-4__12-01-09_CDD__CITY COUNCIL))AIP Phase IV Design Services - FINAL.doc, 2. Approval of a Professional Services Agreement with - 12-01-09_ATT_CDD_AIP Phase IV RFP.pdf
City of Culver City, California Agenda Item Report Meeting Date: 01/09/12 Item Number: C-4 CITY COUNCIL AGENDA ITEM: Approval of a Professional Services Agreement with Land Images Landscape Architects for Landscape Architecture Services Related to the West Washington Area Improvement Plan, Phase IV (Median Design). Contact Person/Dept.: Elaine Warner Phone Number: 310.253.5777 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (01/06/12); Letter to Property Owners (10/10/11) Department Approval: Sol Blumenfeld: (01/05/12) City Attorney Approval: Carol Schwab (by H. Baker) (01/06/12) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (01/05/12) City Manager: John Nachbar (01/06/12) RECOMMENDATION: Staff recommends the City Council approve a professional services agreement with Land Images Landscape Architects for landscape architecture services related to the West Washington Area Improvement Plan “AIP” Phase IV in an amount not to exceed $119,000. BACKGROUND: In December 2007, the Culver City Redevelopment Agency approved a multi- phased Area Improvement Plan (AIP) along West Washington Boulevard to improve the physical and economic quality of the area. A key component of this AIP involves the installation of landscaped medians funded by the Culver City Redevelopment Agency. While the City has proposed to fund construction of the improvements, it has decided to fund on-going maintenance through an assessment district. The assessment district will require approximately four months to establish. In the event the assessment district is not formed, the construction contract will not be issued and the construction project will not go forward. Staff believes that an assessment district will be formed because property owners in the project area have indicated their support in a petition (Attachment No. 3). The maintenance costs will be nominal due to drought tolerant and low maintenance landscaping. Both Phase I and Phase II project areas have successfully formed assessment districts and completed construction. Phase III construction drawings, for the replanting of six medians near Washington Boulevard and Wade, is currently underway. City of Culver City, California Agenda Item Report DISCUSSION: Staff issued a Request for Proposal (RFP) (Attachment No.1) to six landscape architecture firms in November 2011 for the design of landscaped medians in the center of Washington Boulevard between Walnut Avenue and Beethoven as well as a gateway element treatment. Four firms responded and were interviewed in December 2011. The interview panel was comprised of staff from Redevelopment, Public Works, Parks, Recreation and Community Services and Community Development Administration. The Candidates/Proposals were rated on the following criteria: o Concept Design = Vision, elements, functionality -- (30%) o Experience/Knowledge = Previous successes, managing challenges, applying smart strategy -- (30%) o Cost Rationale = Value, competitive -- (20%) o Presentation = Written submittal and verbal interview -- (20%) In considering the rating results and cost analysis, Land Images are the recommended Landscape Architect for the Phase IV AIP project. They were selected not only for their breadth of experience over the last 30 years but also for their unique design sensibility and ability to create distinct and dynamic streetscapes. A copy of their qualifications (Attachment No. 2) has been provided for review. The proposal includes considerations related to concept development, design, probable cost estimates, construction documents, specifications and construction management. FISCAL ANALYSIS: The proposed cost is approximately $119,000 and represents the lowest cost among the other RFP finalists. There are sufficient tax exempt bond funds (former agency funds) appropriated in Fiscal Year 2011/2012 in program 48892695 – Washington Blvd. AIP Phase IV to fund this contract. The contract amount encompasses fees for civil and electrical engineering, detailed survey of the area and design fees for conceptual design and construction documents. Given the deadlines required by the State relative to redevelopment law, it will be necessary to complete the construction documents prior to the official formation of the assessment district. Staff recommends that the bid documents include a contingency to allow for price changes in labor and materials that may occur from contract award to notice to proceed. This will ensure that the awarded contract City of Culver City, California Agenda Item Report includes an allowance for the period of time required to form the assessment district. ATTACHMENTS: Attachment 1 – AIP Phase III RFP Attachment 2 – Land Images Statement of Qualifications Attachment 3 – West Washington Business Owner Petition MOTION: That the Culver City City Council: 1. Approve a professional services agreement with Land Images Landscape Architecture Services for landscape architecture services related to the West Washington Area Improvement Plan “AIP” Phase IV in an amount not to exceed $119,000 from program 48892695; and, 2. Authorize the City Attorney to review/prepare the necessary documents; and, 3. Authorize the City Manager to execute such documents on behalf of the City. MEETING DATE: 12.01.09 AGENDA ITEM: Approval of a Contract with Land Images Landscape Architects for Landscape Architecture Services Related to the West Washington Area Improvement Plan, Phase IV (Median Design) ATTACHMENTS Pages 1. Land Images Statement of Qualifications 1-4 2. AIP Phase III RFP 5-19 3. West Washington Blvd. Petition 20-29 W est Washington West Washington Area Improvment Plan Phase IV REQUEST FOR PROPOSAL ATTACHMENT 1 1The Culver City Redevelopment Agency (“Agency”) is seeking proposals for landscape design services for landscaped medians along a nine block stretch of the West Washington Boulevard com- mercial corridor designated as the “West Washington Area Improvement Plan—Phase IV” . This is the fourth phase of a multi-phase project which includes commercial facade rehabiliation grant program, graphic identity banner, and green zone incentive program. The project involves the installation of landscaped medians in the center of Washington Blvd. The objective of the Area Improvement Plan is to coordinate public and private reinvestment in the area. Phase I and Phase II have been completed and construction documents are currently being prepared for Phase III. LOCATION The Area Improvement Plan is generally located on Washington Blvd., West of the 405, and East of Lincoln Blvd. in Culver City. Specifically, Phase IV is bounded by Walnut Avenue on the West and Beethoven Street to the East. Phase IV Detail Area Improvement Plan|10101010|PHASE|10101010|ATTACHMENT 1 2SCOPE OF WORK - PHASE IV The scope of work involves the continuation of streetscape median programming developed in Phase I and Phase II. The work includes the preparation of plans and designs for multiple medians within the Phase IV Improvement Plan Area. The median planting must be drought tolerant and low maintenance, complement the median designs for Phase I and Phase II and comply with local traffic and engineering guidelines. Queen palm tree planting is a requirement in the project plant palette due to traffic circula- tion considerations. Additionally, the scope shall include the development of a gateway element that compliments the Phase III planting design at the intersection of Washington Blvd. and Wade Street. All medians will include uplighting to illuminate planting. The goal of the median design is to create a connection between AIP phases, beautify the area and complement ongoing redevelopment efforts. The selected firm will prepare design plans and construction documents and specifications for the proj- ect as well as participate in three community meetings. In addition, they will coordinate design work with the Public Works Department, the City’s Traffic Engineer and provide construction management services. Phase I and Phase II Medians - Illustration Phase III Illustration ATTACHMENT 1 3PROPOSAL FORMAT All proposals must be on company letterhead, signed by a company officer, and include ALL of the following information: A summarized Scope of Work as provided above, with schedule for deliverables related to design, construction document preparation, survey work, removal of trees, lighting, utility research, striping (to include bike lane consideration), opinion of probable cost for construction and maintenance, and construction management and administration. List of all staff with related work experience who will work on the project and their level of involvement. Illustrative materials that represent the design intent. Proposed schedule for work. A not-to-exceed fee for all items in Scope of Work as well as an hourly fee for extra work as requested by the Agency, both during and outside of normal business hours. Three references, including a contact name, phone number and associated project. Proposals received no later than Monday, December 9, 2011. Interviews will be conducted on Wednesday, December 14, 2011. Contract Award slated for Monday, January 9, 2012 If you have any questions or would like further information regarding this request please call Elaine Gerety Warner at 310.253. 5777. SCOPE OF WORK (continued) Phase III Gateway Medians at Wade Avenue and Washington Blvd. ATTACHMENT 1 4LAND IMAGES LANDSCAPE ARCHITECTS since 1977 ProPosal in response to Culver City request for Proposal West Washington area Improvement Plan Phase IV December 9, 2011 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net ATTACHMENT 2 5ProPosal 2 - 5 resUmes 6 - 9 ProJeCt DesCrIPtIoNs 10 - 13 releV aNt ProJeCts 14 table of contents 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net ATTACHMENT 2 6 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net December 9, 2011 Culver City redevelopment agency 9770 Culver Blvd. Culver City, Ca 90232 attn: ms. elaine gerety Warner re: West Washington area Improvement Plan Phase III Dear ms. Warner, land Images is pleased to submit this proposal to provide design and construction administration services for this project. It has been a pleasure working with you and the City on Phase III of the West Washington Area Improvement Plan. The final design is the product of many drafts and valuable City input. We look forward to seeing the project to completion and appreciate this opportunity to continue the process further down the Boulevard. Land Images is a landscape architecture firm with over 30 years experience in public and private sector site planning and design. We understand the scope of work for Phase IV to include preliminary research, concept development, schematic design, presentation of schematic design and probable cost estimate for City approval. Following that approval, construction documents and specifications will be provided for the construction of new median islands and creation of a gateway element as described in the rFP. these documents will be based upon a site survey, also provided as a part of this proposal. The construction scope reflected in the design documents includes demolition, construction of curbed islands and gateway element, utility provision, soil and grading, ornamental lighting, irrigation and planting, striping and signage. land Images will provide comprehensive and coordinated surveying, engineering and design for all work. land Images personnel allocated for this project and their respective roles are listed below. More extensive resumes of each are also attached for your information. |1010|ATTACHMENT 2 7 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net Diane Fazio, Project manager and Consultant Coordinator Diane has served as project manager for numerous City of los angeles parks, laUsD projects and co-managed the spring and main median project in the downtown Fashion District, as well as Phase 3 of the West Washington area Improvement plan. mike Williams, Partner senior landscape architect and Director of Project Development mike coordinates and oversees all aspects of design, document production and construction administration. susan Powell, landscape architect susan played a key role in both the Vermont t ransit avenida project and the Spring and Main Median. Susan brings to our team valuable experience specific to this project. additionally, she will be primarily responsible for the horticultural aspects of the project. thomas a. lockett , Principal-In-Charge tom will be the Principal-In-Charge of the project and will be most actively involved at the planning and design stages. Approach and Design Intent as is the case with every land Images project, we will approach this commission by first developing a full understanding of the goals of the City, the project context and the issues seen as critical to the project’s success. this will necessarily involve a complete review of the existing conditions as well as meetings with City agencies and Traffic Engineers. We anticipate numerous sketched concepts for the total corridor and gateway element for City input. an agreed upon concept will be rendered for final presentation to the Community and City Council including cost estimates for construction and maintenance. Upon approval of the schematic plan and issuance of a notice to proceed, assembly of construction documents will commence. these will consist of demolition, layout and staking, grading, utilities, planting, irrigation, lighting, striping and signage. the following drawings are not anticipated to be required and are therefore not a part of this proposal: 1. Any modification to sidewalks or parkways. 2. Civil engineer profiles of the street. |1010|ATTACHMENT 2 8 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net The enclosed photographs of three existing median projects provide a glimpse of possibilities for design, providing visual relief from expanses of paving without creating obstacles to the sightlines so necessary on busy thoroughfares. We estimate that this project will have a duration of approximately 62 weeks. We have made assumptions about the timing of approvals, permits, inspections and sign-offs based on our experience on Phase III. Of course, it must be recognized that Land Images has no control over the actions of those agencies. rest assured, however, that we will do everything possible to cooperate with and assist them. Estimated Project Schedule Fee Schedule Land Images not to exceed fees for to provide the services will be: site survey $15,500 research and Conceptual Design $ 5,000 schematic Plans and estimates $10,000 Construction Documents and Specifications $56,000 Construction administration and management $32,000 grand t otal $118,500|1010|Culver City West Washington Area Improvement Plan Phase IV Estimated Project Schedule LAND IMAGES 501 N. LARCHMONT BLVD LOS ANGELES, CA 90004 1 2 3 4 5 6 7 8 9 10 11 12 wk 13 - 24 wk 25 - 36 37 38 39 40 41 42 43 wk 42-59 60 61 62 RESEARCH AND CONCEPT DEVELOPMENT SURVEY AND BASE SHEET PREPARATION SCHEMATIC DESIGN PRESENTATION OF SCHEMATIC DESIGN CITY APPROVAL OF SCHEMATIC DESIGN & NTP FOR CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS AND PROJECT MANUAL CITY APPROVALS OF CONSTRUCTION DOCUMENTS AND PROJECT MANUAL BIDDING AND AWARD CONSTRUCTION PERIOD SERVICES CLOSE-OUT CALENDAR WEEKS ATTACHMENT 2 9 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net Changes any changes in the scope of work, or in previously approved design, requested by the City will be considered to be an extra service. Time expended to modify Drawings or Specifications to conform with said changes will be billed according to our hourly fee schedule which follows. Hourly Fee Schedule Principal $170.00 per hour Project landscape architect $140.00 per hour Project manager $110.00 per hour CaD $ 95.00 per hour administrative $ 85.00 per hour References City of Los Angeles Sepulveda Basin Sports Complex Bureau of engineering Delano Park Natural turf soccer Fields 200 N. Spring St., Rm. 2305 Griffith Park Synthetic Turf Soccer Fields los angeles, Ca 90012 ms. Cathie santo Domingo (213) 473-5895 City of los angeles Vermont transit avenida Improvements Department of transportation spring and main median Bureau of Capital Improvement 100 s. main st., 9th Floor los angeles, Ca 90012 mr. Carlos rios (213) 473-5895 ehrlich architects east la College student Center 10865 Washington Boulevard Pomona College North Dormitory Culver City, CA EATM Exotic Animal Training Facility, mr. Charles “Duke” oakley, FaIa moorpark College (310) 838-7900 thank you for the opportunity to share our Proposal. respectfully, thomas a. lockett, F asla|1010|ATTACHMENT 2 10 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net|1010|Diane fazio ProJeCt maNager aND CoNsUltaNt CoorDINator Experience: ms. Fazio has been a project manager and consultant coordinator at Land Images since she joined the firm. She has managed projects from the initial proposal through conceptual design, construction documents, consultant coordination and construction observation. she has participated in the full range of projects at land Images: campus design, recreational projects, urban design, and civic park projects, with special emphasis on sustainable design. Prior to entering the field of Landscape Architecture, Diane was an animation, Visual effects and Children’s television Producer. her entertainment industry experience working with large creative teams enhances her management approach to working with clients and multi-disciplinary consultants. Notable Projects: West Washington area Improvement Plan - Phase III • east los angeles College Campus student Center • Bel air Bar and grill • renovation luther Burbank middle school – open space and t eaching • gardens el Cariso regional Park – Universally accessible Playground • Delano Park – synthetic t urf soccer Field – Van Nuys • spring and main median Island, City of los angeles • el Camino real high school - los angeles • Ford hotel – los angeles • Pershing apartments – los angeles • West marshall Condominiums – san gabriel • Vineyard shopping Plaza – ontario • renato Village - los angeles • santa ana river Vision Plan -- City of anaheim • Professional Certificate landscape architecture, University of California, los angeles Bachelor of arts, studio art, english, Boston College mFa Program, Painting, Pratt Institute organizations: american society of landscape architects (asla) Women in architecture Zen Center of los angeles Campus sustainability Working group theodore Payne Foundation awards: UCla landscape Architecture Excellence in Design award – alta 101: From Chasm to Crossroads asla student Community service award – gorman Wildlife Preserve (group project) UCla landscape architecture Design achievement award – melnitz stairs ATTACHMENT 2 11 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net|1010|Michael c. WilliaMs seNIor laNDsCaPe arChIteCt aND DIreCtor oF ProJeCt DeVeloPmeNt landscape architect California - No. 1436 education: Bachelor of science landscape architecture California Polytechnic University organizations: Council of landscape architectural registraion Boards (ClarB) No. 1070 mr. Williams has been the principal in charge of project development since joining the firm in 1979. Experience: With over 30 years experience, Mr. Williams responsibilities include con- ceptual and detail site work design, consultant coordination, oversight of all construction documentation and monitoring of construction in- stallation. Notable Projects: athletics master Plan - California lutheran University • Facility master Plan - the masters College • historical site Work Design - the Village green • housing and recreation Design - loyola marymount University • student housing Concept Design - California state University, • Channel Islands Sepulveda Basin Sports Complex - City of Los Angeles • Campus open space master Planning and site Work Design • California Institute of technology Crenshaw high school t rack and synthetic t urf athletic Field • Los Angeles Unified School District John marshall high school t rack and synthetic t urf athletic Field • Los Angeles Unified School District Belmont High School Track and Field - Los Angeles Unified School • District Fremont high school t rack and synthetic t urf athletic Field • Los Angeles Unified School District El Camino Real High School Track and Field - Los Angeles Unified • school District ATTACHMENT 2 12susan poWell, asla laNDsCaPe arChIteCt landscape architect California - No. 4630 master of arts University of California santa Barbara Professional Certificate landscape architecture University of California los angeles organizations: american society of landscape architects (asla) theodore Payne Foundation California Native Plant society With over 15 years experience, Susan has an extensive background in landscape architecture, fine arts and horticulture allowing her to develop landscape designs which are truly interdisciplinary. Since joining the firm in 1998, Susan has overseen a wide range of projects from conception through construction installation. she brings to Land Images a strong commitment to creation of site-specific landscapes which emphasize the role of plant materials in supporting the intellectual intention of the landscape. Notable Projects: Vermont transit avenida Improvements, City of los angeles • spring and main median Island, City of los angeles • south Campus Parking structure and athletic Field, Pomona • College Peter stanley academic Quadrangle, Pomona College • harvard Westlake school, los angeles • marlborough school, los angeles • California Club, los angeles • hesse Park trails, City of rancho Palos Verdes • tongva memorial, loyola marymount University • 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net|1010|ATTACHMENT 2 13ThoMas a. lockeTT, fasla PrINCIP al-IN-Charge oF PlaNNINg aND DesIgN landscape architect California - No. 1551 Bachelor of science landscape architecture California Polytechnic University organizations: american society of landscape architects, Fellow (Fasla) Council of landscape architectural registration Boards (ClarB) No. 1089 mr. lockett has been the owner and principal partner of land Images landscape architects since 1977. With over 30 years experience, Mr. Lockett has been responsible for coordination of planning, design, construction documentation, and construction services for a diverse array of projects ranging in scope and scale from regional parks and universities to historical renovations, urban design and transportation corridors. Notable Projects: West Washington area Improvement Plan-Phase III • Vermont transit avenida Improvements, City of los angeles • spring and main median Island, City of los angeles • glendale municipal service Building, City of glendale • Sepulveda Basin Sports Complex, City of Los Angeles • master landscape architect - Pomona College • master landscape architect - California Institute of t echnology • master landscape architect - loyola marymount University • master landscape architect - Cal Poly slo • master landscape architect - loyola law school • the Village green historic rehabilitation - los angeles • Design awards: • City of Claremont - Stanley Academic Quadrangle los angeles Beautiful - hospital of the good samaritan • • Los Angeles Beautiful - Century City Towers • Progressive Architecture Magazine - Loyola Law School • Los Angeles Beautiful - Olive Ave Park, Burbank • Pasadena Beautiful - Moore Hall, Caltech, Pasadena ClCa - Beckman Institute, Caltech, Pasadena • City of Claremont - Pomona College greek theatre • honor awards: • American Society of Landscape Architects - Historical Renovation of Dabney garden, Caltech, Pasadena • Society of American Registered Architects - Child Care Center, long Beach • Grounds Maintenance Magazine Professional Campus management - Caltech, Pasadena Land Images 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net|10 10|ATTACHMENT 2 14WesT WashinGTon phase iii cenTRal MeDians the Central medians of the West Washington Improvement Plan form an important link and focal point at the main intersection along the corridor. the plan replaces overgrown palms with a line of signature Queen Palms and stately Coral trees. the larger medians feature unifying curved steel pieces that both describe and celebrate the functional curves and junctions at the location. Project manager: Diane Fazio Client: Culver City redevelopment agency Client Contact: ms. elaine gerety Warner senior management analyst 310-253-5777 Rendering 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net 10 Plan ATTACHMENT 2 15spRinG anD Main MeDian this unique and vibrant median island sits at the busy intersection of spring, main and 9th streets, at the edge of downtown los angeles’ Fashion District. recycled, tumbled glass domes sparkle in the sunlight and glow softly at night. the domes are surrounded by neon pink ice plants and sheltered beneath large Floss silk trees. Project manager: susan Powell, asla Client: City of los angeles Department of transportation Client Contact: mr. Carlos rios, transportation engineer (213) 972-4963 Illuminated at night 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net 11 ATTACHMENT 2 16VeRMonT TRansiT aVeniDa iMpRoVeMenTs From martin luther King Boulevard to Jefferson Boulevard, an enriched pedestrian corridor, landscaped and art-enhanced vehicle separation, and warm, human scale lighting make this busy urban transit avenida an exciting place to be. Project managers: tom lockett, F asla susan Powell, asla Client: City of los angeles Department of transportation Client Contact: mr. Carlos rios, t ransportation engineer (213) 972-4963 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net 12 ATTACHMENT 2 17enTRY RoaD - MeDian sTRip - founTain the fountain marks the lincoln Boulevard entrance to loyola marymount University. a tiered, 60 -foot high geyser is visible for over one mile, and illuminated at night and provides a source of light along the busy boulevard. Opposite the fountain, a sign wall identifies the campus as well as providing a balanced sense of arrival. Project manager: tom lockett, F asla Client: loyola marymount University Client Contact: Fr. richard robin, s.J., assistant to the President (310) 338-4543 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net 13 ATTACHMENT 2 18 501 N larChmoNt, los aNgeles, Ca 90004 telePhoNe: 323-466-4707 FaCsImIle: 323-466-4797 emaIl: INFo@laNDImages.Net 14 paRTial lisT ReleVanT pRoJecTs Urban Design Century Plaza shopping Center, los angeles, Ca Century Plaza towers, los angeles, Ca Fresno metropolitan museum, Fresno, Ca hospital of the good samaritan, los angeles, Ca Hospital of the Good Samaritan & Office Building, Los Angeles, CA hospital of the good samaritan Intensive Care Unit addition, los angeles, Ca entry road and median lmU, los angeles, Ca loyola law school, los angeles, Ca Nissan in america Corporation, los angeles, Ca Norton simon art museum, Pasadena, Ca rancho mirage Civic Center, rancho mirage, Ca saban Center, motion Picture television Fund, Woodland hills, Ca spring and main median, los angeles, Ca st John’s hospital Child study Center, santa monica, Ca the California Club site renovations, los angeles, Ca Vermont Avenue Mixed Use Development, Los Angeles, CA Vermont avenue transit avenida & Pedestrian Zone, los angeles, Ca West Washington Improvement Plan - Phase III, Culver City, Ca Wisconsin avenue Community housing Phases I/II/III, los angeles, Ca Parks and Recreation Bassett Park soccer Field, los angeles, Ca Belvedere Park soccer Field, los angeles, Ca Burns recreation and aquatics Center - lmU Crenshaw high school t rack and Field, laUsD – los angeles, Ca Carver middle school synthetic t urf Delano Park synthetic t urf soccer Field - los angeles, Ca Fred hesse trails, rancho Palos Verdes, Ca george P. Fading and morris a. Pivaroff t ennis Courts - lmU Griffith Park Soccer Field, Los Angeles, CA hahn Park, los angeles, Ca hannon recreation lawn - lmU lannan Poetry garden, Playa del rey, Ca Leavey Campus Parking Structure/Playfield – LMU marshall high school t rack and Field, laUsD – los angeles, Ca olive a venue Park (hank riggio Playground), Burbank, Ca rancho Park golf Course Irrigation evaluation, los angeles, Ca roosevelt Park soccer Field, los angeles, Ca Sepulveda Basin Sports Complex, Los Angeles, CA sepulveda Dam Basin recreation lake, los angeles, Ca tournament Park – Caltech ATTACHMENT 2 19ATTACHMENT 3 20ATTACHMENT 3 21ATTACHMENT 3 22ATTACHMENT 3 23ATTACHMENT 3 24ATTACHMENT 3 25ATTACHMENT 3 26ATTACHMENT 3 27ATTACHMENT 3 28ATTACHMENT 3 29