File #: HIST-18719    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: Parking Authority Board
On agenda: 2/6/2012 Final action: 2/6/2012
Title: JOINT CITY COUNCIL AND PARKING AUTHORITY AGENDA ITEM: Award of a Contract to American Lighting Supply as the Lowest Responsive and Responsible Bidder for the Lighting Upgrade Project at the City Hall and Cardiff Parking Structures as Part of the City’s Energy Efficiency and Conservation Block Grant Administered by the Federal Department of Energy.
Attachments: 1. JOINT CITY COUNCIL AND PARKING AUTHORITY AGENDA IT - JC-1__12-02-06__PW Maint Ops__CITY COUNCIL AND PA__EECBG Project Award of Contract - FINAL.pdf, 2. JOINT CITY COUNCIL AND PARKING AUTHORITY AGENDA IT - C-X__12-02-06__PW-Maint Ops__CITY COUNCIL__EECBG Lighting Upgrade Project Contract Award__Attachment with cover.pdf
City of Culver City, California Agenda Item Report Meeting Date: 2/6/2012 Item Number: JC-1 JOINT CITY COUNCIL AND PARKING AUTHORITY AGENDA ITEM: Award of a Contract to American Lighting Supply as the Lowest Responsive and Responsible Bidder for the Lighting Upgrade Project at the City Hall and Cardiff Parking Structures as Part of the City’s Energy Efficiency and Conservation Block Grant Administered by the Federal Department of Energy. Contact Person/Dept.: Eric Mirzaian/PW Phone Number: (310) 253-6410 Fiscal Impact: Yes [] No [X] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification (E-mail) Meetings and Agendas-City Council (02/03/12); American Lighting Supply; GA Technical Services; Element Power Group; Sylvania Lighting Services; Baker Electric; Summit Electric; and Hoffman Management via letter on 1/30/2012. Department Approval: Charles D. Herbertson (02/01/12) City Attorney Approval: Carol Schwab (by H. Baker) (02/01/12) Chief Financial Officer Approval: Jeff Muir (02/01/12) City Manager Approval: John M. Nachbar (02/03/12) RECOMMENDATION: Staff recommends the City Council and Parking Authority Board (Authority Board) award a tri-party contract to American Lighting Supply (ALS) as the lowest responsive and responsible bidder for the lighting upgrade project at the City Hall and Cardiff Parking Structures as part of the City’s Energy Efficiency and Conservation Block Grant (EECBG) administered by the Federal Department of Energy (DOE). BACKGROUND: On February 17, 2009, President Barack Obama signed into law the American Reinvestment and Recovery Act (ARRA and Stimulus Funds). This $787 billion economic stimulus package includes $3.2 billion in funding for energy efficiency and fossil fuel reductions. Based on residential and daytime population for all cities and counties nationwide, Culver City has been allocated $194,900 from the EECBG. The EECBG is being administered by the Department of Energy (DOE). Eligible projects include any strategy to reduce fossil fuel emissions, total energy use, and improve energy efficiency in all sectors. City of Culver City, California Agenda Item Report On January 24, 2011, the City Council approved a budget amendment to accept the grant funding and approved a professional services agreement with EFM Solutions for management of the City’s EECBG and to provide project management assistance with the lighting upgrade project. DISCUSSION: On October 24, 2011, the City Council authorized the release of a Notice Inviting Bids (NIB) to qualified contractors to perform the lighting upgrade project. The project will consist of replacing the existing high pressure sodium (HPS), metal halide and fluorescent lighting at the Cardiff and City Hall parking structures with more energy efficient Light Emitting Diode (LED), induction lighting units, or other efficient lighting technologies. On December 1, 2011, seven firms responded to the NIB and the results were as follows: American Lighting Supply………$74,706.18 GA Technical Services……………$97,808.90 Element Power Group…………….$113,061.62 Sylvania Lighting Services……….$117,601.00 Baker Electric………………………$171,923.21 Summit Electric…………………….$174,170.00 Hoffman Management……………$185,816.40 Based on a review of company profile, qualifications and references, Staff feels American Lighting Supply (ALS) demonstrated the best understanding of the NIB requirements in addition to providing the lowest responsive and responsible bid. Reference checks have indicated that ALS has the knowledge and ability to satisfactorily perform the project. FISCAL ANALYSIS: This project will not require any matching funds from the City. The City contribution is limited to in-kind staff services administering the project. Funding for this project has already been appropriated into the following business unit: 42300935 – EECBG Lighting Retrofit. In addition to the bid amount of $74,706.18, staff is requesting authorization for the Director of Public Works/City Engineer to approve change orders in the amount of $11,206.00. ATTACHMENTS: 1. Copy of ALS’s bid (schedule of fees only) City of Culver City, California Agenda Item Report MOTION: That the City Council and Parking Authority Board: 1. Award a contract to American Lighting Supply as the lowest responsive and responsible bidder in the amount of $74,706.18 for the lighting upgrade project at the City Hall and Cardiff Parking Structures; and, 2. Authorize the Director of Public Works/City Engineer to approve change orders in an amount not-to-exceed $11,206.00; and, 3. Authorize the City Attorney/Parking Authority Counsel to review/prepare the necessary documents; and 4. Authorize the City Manager/Executive Director to execute such documents on behalf of the City and Parking Authority, respectively. MEETING DATE: 02/06/12 AGENDA ITEM: Award of a Contract to American Lighting Supply for the Lighting Upgrade Project at the City Hall and Cardiff Parking Structures as Part of the City's Energy Efficiency and Conservation Block Grant Administered by the Department of Energy. ATTACHMENTS Pages 1 American Lighting Supply Pricing Sheet E' 47,0 FACTO - 1.2 1.2 0.77 "U IN LU 4/iJC > 50000 BO OR > N RATE 6 , ,p ETYERAibVAGEN 0111>101< r.:1 ` EAN I F 4-101JI't51 VOLTAGE OW ED LIPX - 100,000 277 100,000 , : . . . . P RICF. 2122.:60 • 1,374.pp :: -7q 6 52;oiiin • TOTAL 1N5T1LLE 5 :P11.|1010|E : :• 732:24 940 CO 5000K Induction Fixture 60 BULB E.;"•4 'JEuV OR ;'1F CC:, ifTE ,VATTAGE RE;aul.R -Fylti -E w AR REf 5;0 F 1 RED OR GREEN LED EXITSIGNS 8 YES 5 YEAR OR > NEW SIGN FLUORESCENT LAMPS CARDIFF GARAGE 6 60W CFL - RECESSED WALLPACK BALLASTS FOR FLOC RESCENT LAMPS 051Y.Org.1,ths-t's WATTS 107 2-lamp 74 or < 223 1-Imp 38 or< VOLTAGE D MULL 120121 INSTANT 1.2 MULTI 120/277 INSTANT 1.2 mTAIJNETALLEO 115105 : g : g 0112.50 9,931.50 LAM PS46:1491 -1E 0,1Er- 0 1LeE - LEV.EJTH CF I ' 1<1E:AN n .G EN ERATO N' 1,14N ELEI.HD'ELLC,VDTAr1E RATED L' 7 PTAI# INSTALEP PRICE INDUCTION LAMPS E 5 .r0E EON RE-WIRE .OR CONTROLS 150- 1E5 _HOE BOX 80 OR > 50000 8800 100,000 277 100,000 1 2,219.2.0 . 1(:-'1Nigt'PlkOJEC7 FLESLAIPTION PROCESS OF RE-WIRING SUCH THAT ALL PERIMETER LIGHTS ARE ON THE SAME CIRCUIT. THIS CIRCUIT WILL THEN BE CONTROLLED BY A MECHANICAL TIMER, THIS APPLIES TO FLOORS. 3,4,5, AND 6 INSTALL MECHANICAL TIMER (INCLUDE PRICE FOR TIMER) GRAND FOR C17 HALL GARAG E 1-0'4 44 51- .04EP:PRIt;E gm, w vw, war w w Tv w w INymtvlsWgir "FIEF WAIF WW 1., WW 1' INVIWW, VAV CITY HAIL GARAGE FLUORESCENT1 - TS " Cn F . . _ • , E 10 F.AL T ' ilLFLFItkagfq''' — iKLVIN) F iTRI.11 r Ar-i i" [LLOU 4 15 18 LINEAR FLOURESCENT 32 4 FOOT TB SO OR > 5000K 3000 1.2 40,000 OR > 1 5 18 LINEAR FLOURESCENT 32 4 FOOT T8 80 OR > 5009K 3000 1.2 40,000 OR > 1 56 T8 LINEAR FLOURESCENT 37 4 FOOT T8 80 OR > 50000 3000 0.77 40,000 OR > BALLASTS FOR FLOURESCENT LAMPS 30 2-lamp 5 1-lamp 56 1-lamp IN PUT,WATI 74 or 38 or< 38 or< =10111±E y91;fAcir,,: MULTI 120/077 INSTANT MULTI 120/277 INSTANT MULTI 120/277 INSTANT INDUCTION LAMPS 49.r1:: f : IXMFOIXTURL u -7,' [1 : FIXL.LAFS'1:1: , TiFE ',',7LEEEFE/L4MR:!ii, s' Z E - LENGTH . . 1 163 INDUCTION LAMP - PENDANT FIX 80-85 PENLIAN I EXIT SIGNS F TIll CDTY ,-71-I III 1 113 -18 LINEAR FLUORESCENT 1 100 78 LINEAR FLOURESCENT 1 107 T8 LINEAR FLOURESCENT 1 10 T8 LINEAR FLOURESCENT GRANEViraTAkkOR.Cirt HALL .GARAGE ,.0t ., -,pR l';FIAL F6,1T0tIFE' nh , 0171 .= .r 0 I f 17 EN b 41_ L L ST ILLOOMF1s; WAT15/1.41 .1,P SIZE 5±Nr,. T H ' ` -, 'ZE- P I 11.10704 :IP, I (70, n .,,r,) 0 LfTP L I rACE1 E , I,', 4400.1i5,M1 32 4 FOOT 1-8 80 OR > 5000K 3000 1 2 40,000 OR > 32 4 FOOT TS 130 OR > 5090K 5000 1.2 40,000 OR > 32 4 FOOT T8 80 OR > 5090K 3000 1.2 40,000 OR > 32 4 FOOT T8 BOOR > 5000K 3000 1.2 40,000 OR >