Legislation Details

File #: HIST-20562    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 9/10/2012 Final action: 9/10/2012
Title: Consideration of an Appeal of Planning Commission Denial of Conditional Use Permit Modification (CUP/M 2011-175) to Allow the Addition of 200 Students to The Help Group Private School Facility at 12095-12101 Washington Boulevard.
Attachments: 1. Consideration of an Appeal of Planning Commission - PH-2__12-09-10_CDD_CITY COUNCIL__Planning_Help Group - FINAL.pdf, 2. Consideration of an Appeal of Planning Commission - 12-09-10_ATT_Help Group Appeal.pdf
City of Culver City, California Agenda Item Report RECOMMENDATION: Staff recommends the City Council consider the appeal of the Planning Commission’s denial of Conditional Use Permit Modification, CUP/M 2011-175, to allow the addition of 200 students to The Help Group private school facility at 12095- 12101 Washington Boulevard and either: 1. Deny the appeal and affirm the Planning Commission’s denial of CUP/M 2011- 175. OR 2. Grant the appeal and (i) reverse the Planning Commission’s denial of CUP/M 2011-175 and (ii) approve CUP/M 2011-175. PROCEDURE: 1. Mayor calls on staff for a brief staff report and the City Council poses questions to staff as desired. 2. Mayor opens the public hearing, providing the applicant the first opportunity to speak, followed by the general public. 3. Mayor seeks a motion to close the public hearing after all testimony has been presented. Meeting Date: 9/10/2012 Item Number: PH-2 CITY COUNCIL AGENDA ITEM: PUBLIC HEARING – Consideration of an Appeal of Planning Commission Denial of Conditional Use Permit Modification (CUP/M 2011-175) to Allow the Addition of 200 Students to The Help Group Private School Facility at 12095-12101 Washington Boulevard. Contact Person/Dept.: Thomas Gorham, CDD Joshua Williams, CDD Phone Number: (310) 253-5710 (310) 253-5706 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [X ] Action Item: [] Attachments: [X] Commission Action Required: Yes [X] No [] Date: 06/20/12_______________ Public Notification: Notices mailed to all property owners and occupants within a 500- foot radius of the project site (8/20/12); Meetings and Agendas – City Council (9/5/12); Applicant and property owner (8/20/12). Department Approval: Sol Blumenfeld: (08/29/12) City Attorney Approval: Carol Schwab (by H. Baker) (08/29/12) Chief Financial Officer Approval: Jeff Muir (09/05/12) City Manager Approval: John Nachbar (09/05/12) City of Culver City, California Agenda Item Report 4. The City Council discusses the matter and arrives at its decision. BACKGROUND: Appeal On June 20, 2012 the Planning Commission adopted Resolution No. P2012-005 (Attachment No. 1) denying a Conditional Use Permit/Modification (CUP/M) request by The Help Group school to increase its enrollment by 200 students. On July 5, 2012, a timely appeal was filed pursuant to Culver City Municipal Code (CCMC) Section 17.640.030 by Jeffer Mangels Butler & Mitchell, LLP (representing The Help Group) regarding the Planning Commission’s CUP/M denial. The basis for the appeal is summarized as follows: • The Planning Commission’s finding (Finding “C”) that the project will result in negative impacts related to noise and traffic is unsubstantiated by the evidence in the record including the project noise analysis and traffic study. • The Planning Commission’s finding (Finding “D”) that the substantial increase in student enrollment is not compatible with the existing site configuration and means of access is unsubstantiated by evidence in the record including the project’s Traffic Management Plan. • The Planning Commission’s finding (Finding “D”) that the project will result in noise and traffic impacts that are detrimental to the public interest, health, safety or general welfare is unsubstantiated by the evidence in the record including the project noise analysis and Traffic Management Plan. • The Planning Commission considered a policy issue related to the presence of non-profit schools in the City that denied The Help Group due consideration of its specific application to increase student enrollment. A copy of the entire appeal is included as Attachment No. 2 – Appeal Document, dated July 5, 2012. Project On December 13, 2011, The Help Group school (the “Applicant”), located at 12095- 12101 Washington Boulevard, submitted an application to modify its existing Conditional Use Permit (CUP) in order to add 250 students, thereby increasing student enrollment from 400 students to 650 students. The request has since been modified to add 200 students for a total of 600 students. The Help Group was originally established through the approval of a Conditional Use Permit in 1999 to operate a 400 student private school at the subject location, and all of the buildings City of Culver City, California Agenda Item Report on the site are approved for school uses. The school operations have not been modified for thirteen years. The Help Group campus is occupied by two separate private school facilities, Summit View School and Village Glen School, both under The Help Group umbrella organization. The Summit View School serves approximately 100 students with specific learning disabilities, from grades 1 through 12. The Village Glen School serves approximately 300 students with social and communicative disabilities, including Asperger’s Disorder, high-functioning autism, and nonverbal learning disabilities, from grades Pre-K through 12. In order to accommodate the 200 student increase, The Help Group proposes to convert the building at 12095 Washington Boulevard from medical offices, a pharmacy and a second hand clothing store operated by the school into classrooms, staff offices, a multi-purpose room, and support facilities (See Attachment No. 3 – Project Plans). The rooftop of the building will also be converted to play area as provided under the prior 1999 CUP approval. The CUP Modification request is only for the additional 200 students. On April 11, 2012, the Planning Commission held a duly noticed public hearing to consider the applicant’s request for Conditional Use Permit Modification (CUP/M) P- 2011175 and determined to continue the item to May 9, 2012, with a request that staff and the applicant address the following: 1) identify business tax revenues generated by the uses at 12095 Washington Boulevard between 2000 to the present; 2) clarify the methodology used for the project’s traffic study from the City’s traffic engineer; 3) provide a letter from the project acoustical engineer identifying potential noise impacts from the proposed rooftop play area; and 4) provide an updated Staff Report and Environmental document clarifying that the analysis includes the overall impacts of 650 students, not just the additional 250 students. At the continued hearing on May 9, 2012, the Planning Commission considered the supplementary information and voted 3-2 to deny the project and the related Negative Declaration. On May 23, 2012, following receipt of new information from the applicant and prior to adoption of the Resolution denying the application, the Planning Commission, by a vote of 3-2, approved a motion to reconsider its denial of the CUP Modification and disapproval of the related Negative Declaration. On June 20, 2012, the Planning Commission held a duly noticed public hearing to reconsider the Help Group’s application. Prior to the hearing, the applicant revised its application in order to address concerns the Commission presented as reasons for its original denial. Project changes and voluntary conditions of approval included the following: City of Culver City, California Agenda Item Report • Student Enrollment: In order to address concerns from the Commission regarding potential traffic and circulation impacts, the applicant proposed to reduce the total enrollment increase from 250 students to 200 students. The applicant further explained that the 200 student addition would not occur all at once. An increase in enrollment would occur over at least a three year period, allowing them to modify on-site circulation over time if issues were identified. The reduction in student enrollment would result in a decrease in trips to and from the school each day by bus, taxi vans and parent transportation. • Noise: In order to address concerns about noise from neighbors and the Commission, the applicant also agreed to build a 14-foot high wall along the shared property line with residential properties located in the City of Los Angeles, which abut the school’s central play area. The applicant agreed to work with its neighbors regarding a design for the wall, before seeking approval for the higher wall from the City of Los Angeles (the portion of the school campus where the play area and wall are located is in the jurisdiction of the City of Los Angeles). The applicant’s acoustical consultant identified that the increase in wall height will result in a reduction of 10 decibels in noise impacts from pick-up and drop-off activities and playground usage at the school. After construction of the higher wall, noise levels will be a minimum of 15 decibels lower than the allowable noise levels identified in the City’s Noise Element of the General Plan. • Financial Contribution: The Help Group has volunteered to compensate the City for lost revenues due to the conversion of the building at 12095 Washington Boulevard from medical offices and a school operated retail store to school facilities. As part of their proposal to the Planning Commission, The Help Group voluntarily offered to pay an amount of $14,650 annually to reimburse the City for lost property tax and business tax revenue ($11,650) from the building that will be converted into classroom use. This figure is based on the amount of annual property tax the City would have received from the property if it was not non-profit exempt and the amount of annual business tax the City is losing by the building no longer being used for medical offices. The additional amount ($3,000) is to cover cost for emergency services. The Fire Department has reported 96 calls to The Help Group campus since 2002. The Fire Department does charge for transport and at the current billing rates a total of $34,900 was charged for those calls for an average of $1,586 per call. The remaining 74 calls out of the 96 total had no charges. The Fire Chief has provided an estimate of what the cost for services for those calls was to the City. The costs are based on the number of units responding and the actual time committed per incident based on an hourly rate. Of the 74 calls, 9 calls were handled by a single unit response City of Culver City, California Agenda Item Report and 65 were handled by 3 units. Based on the Chief’s estimate, the 9 single unit response cost to the City was $885.37 and the 65 three unit responses cost to the City was $19,183.09 for a total cost of $20,068.46 over the 10 year period for an average annual cost for emergency services incurred over a 10 year period of $2,000. The Help Group has proposed to add an additional $1,000 to account for the increase of 200 students for a total of $3,000 per year. The Help Group has proposed to augment their voluntary financial contribution by $2,400 per year to account for police calls to the school campus. Since the Police Department does not currently assign a cost to police calls, this number has been extrapolated from the Fire Department’s 10-year cost of unreimbursed fire/paramedic calls on a per unit basis for The Help Group (see below). Calls # of Vehicles Cost Cost per Vehicle 9 1 $885.00 $98.33 65 3 $19,183.00 $98.37 The CCPD reports 164 police calls over the past ten year period. Using a rounded up cost of $100 per call for the average of 16 calls per year, the estimated cost for emergency service would equate to $1,600.00. In keeping with The Help Group’s voluntary contribution for unreimbursed fire/paramedic calls, an additional 50% ($800) would be added to reflect the 200 student enrollment increase. With this augmentation, The Help Group proposes a total annual payment of $17,050. As noted above, the Help Group has agreed to this voluntarily financial contribution as a Project condition in order to make the City whole. • Circulation: The project’s traffic analysis, reviewed and accepted by the City’s traffic engineer, identified that the project will not result in any significant impacts at any of the studied intersections. As part of the traffic analysis, the applicant submitted a Traffic Management Program (TMP) which identified the methods the school will use to conduct an orderly drop-off and pick-up of students from the campus using a combination of buses, contracted taxi-vans and parents’ private vehicles. The TMP included a suggestion (provided by the City’s traffic engineer) to restrict five metered parking spaces on Washington Boulevard during the morning drop-off and afternoon pick-up periods only if the queuing of vehicles entering the site began to block traffic on Washington Boulevard. The Planning Commission requested the removal City of Culver City, California Agenda Item Report of this suggestion, citing the potential lost revenue from on-street parking meters. • Future Development: The Help Group has volunteered a condition of approval to waive its right to file for any future increase in the number of students beyond the requested 600 student enrollment for the properties included in the CUP. The Planning Commission considered the above information and determined that it could not support the proposed expansion and adopted a motion (3 to 2) to deny the project and the related Negative Declaration, finding that the increase in student enrollment would create noise and traffic impacts. (See Attachment No.1). Response to Appeal Traffic Impacts The project’s traffic analysis, reviewed and accepted by the City’s traffic engineer, identified that the project will not result in any significant impacts at any of the studied intersections. As part of the traffic analysis, the applicant submitted a Traffic Management Program (TMP) which identified the methods the school will use to conduct an orderly drop-off and pick-up of students from the campus using a combination of buses, contracted taxi-vans, and parents’ private vehicles. The TMP implements a staggered drop-off and pick-up of students so that all activities take place on campus. The reduction in the requested student enrollment from 250 students to 200 students reduces the number of busses transporting students from 11 to 9 and the number of cabs transporting students from 47 to 43. Culver City’s traffic study criteria are similar to the traffic study criteria used throughout Los Angeles County, statewide and nationwide. Culver City’s traffic study criteria state, “The traffic study shall assess the ability of the transportation system to accommodate additional traffic generated by the related projects and the subject project.” All traffic studies consider the incremental increase in traffic caused by the subject development, and the traffic generated by existing school use is included in the traffic counts. The project’s traffic study correctly calculated the increase in traffic generated by the project based on 250 additional special education students. There are 400 special education students currently enrolled in the school. The traffic counts were taken on a day when school was in session. Therefore, the traffic counts recorded all the traffic on the highway system, including the traffic generated by the 400 students presently attending the school and the resulting traffic was determined not to result in any significant impacts at any of the studied intersections. City of Culver City, California Agenda Item Report Noise As noted above, the applicant has agreed to build a 14-foot high wall along the shared property line with residential properties located in the City of Los Angeles, which abut the school’s central play area. The applicant agreed to work with its neighbors regarding a design for the wall, before seeking approval for the higher wall from the City of Los Angeles (the portion of the school campus where the play area and wall are located is in the jurisdiction of the City of Los Angeles). The applicant’s acoustical consultant identified that the increase in wall height will result in a reduction of 10 decibels in noise impacts from pick-up and drop-off activities and playground usage at the school. After construction of the higher wall, noise levels will be a minimum of 15 decibels lower than the allowable noise levels identified in the City’s Noise Element of the General Plan. Further, the noise at this playground location is not expected to increase from the additional 200 students. The additional 200 students will be located in the 12095 Washington Boulevard building with a playground for those students located on the building’s rooftop. The location of the building is not directly adjacent to residential neighbors to the north and is buffered by the adjacent existing 4–story building. Further, the rooftop playground will be enclosed on three sides by a 10-foot high parapet wall. The noise analysis concludes that the noise emanating from this playground will be approximately 15-20 decibels below the current ambient levels. Special Conditions of Approval The proposed conditions of approval for the Conditional Use Permit Modification (See Attachment No. 6 – Exhibit A) that mitigate project impacts are as follows: • The Project shall provide up to a 14-foot high wall along the shared property line between the school’s playground and the abutting residential properties (12028 to 12042 Sylvester Street) in the City of Los Angeles. Plans for the wall shall be provided to the Culver City Planning Division and abutting property owners for review and comment prior to submittal to the City of Los Angeles. • Follow-up review reports on the operation of the Traffic Management Program (TMP) shall be submitted to the Planning Division after six months and after one year of full operation. The Applicant shall enter into a Memorandum of Understanding (MOU) with the City which outlines the scope and content of the reports. If it is determined by the Planning Manager and the City’s Traffic Engineer that the goals of the TMP are not achieved, additional requirements may be imposed as determined by the Planning Manager and the City’s Traffic Engineer. • The maximum number of students for the combined Village Glen School and Summit View School shall not exceed 600. A letter verifying the student City of Culver City, California Agenda Item Report enrollment shall be submitted annually to the Planning Manager no more than 30 days after the commencement of the school year. • No more than 15 permits shall be issued for students to drive to the Summit View School. • The maximum number of staff for the combined Village Glen School and Summit View School shall not exceed 177. A list of all staff shall be submitted to the Planning Manager annually 14 days prior to the commencement of the school year. • Transports dropping-off and picking-up students in the Grand View Boulevard parking lot and drop area (adjacent to the Washington Boulevard and Grand View Boulevard intersection) shall be permitted to exit the area using a left turn or right turn onto Grand View Boulevard. • Metered street parking shall not be used for a queuing area to the site. No School-operated vehicles shall use the metered street parking at any time. • The Applicant has voluntarily agreed that it shall waive its right to request any future increase in the number of students beyond the 600 students permitted by this Conditional Use Permit Modification. • To alleviate the financial impact on City resources due to its non-profit status, and to help ensure the public health, safety and welfare are provided, the Applicant, on behalf of itself and each of its successors and assigns, has voluntarily agreed, for as long as the Applicant and any non-profit successor or assign takes benefit of this Conditional Use Permit, to reimburse the City for lost property tax and business tax revenue, and cost for emergency services, in the amount of $17,050 annually. Applicant shall make said payment to the City’s General Fund on or before June 30 of each year. The payment shall be increased annually based on the Bureau of Labor Statistics Consumer Price Index (CPI) for the Los Angeles-Riverside-Orange County Metropolitan Area published in June of each year. Required Findings in Support of the Project Approval Zoning Code Chapter 17.530 – “Administrative Use Permits and Conditional Use Permits” outlines procedures for reviewing AUP and CUP applications that are intended to allow for specified uses as identified in the various zoning districts, whose effect on surrounding area cannot be determined before being proposed for a particular location. A. The proposed use is allowed within the subject zoning district with the approval of an Administrative Use Permit or Conditional Use Permit and complies with all other applicable provisions of this Title and the CCMC. City of Culver City, California Agenda Item Report B. The proposed use is consistent with the General Plan and any applicable Specific Plan. C. The design, location, size, and operating characteristics of the proposed use are compatible with the existing and future land uses in the vicinity of the subject site. D. The subject site is physically suitable for the type and intensity of use being proposed, including access, compatibility with adjoining land uses, shape, size, provision of utilities, and the absence of physical constraints. E. The establishment, maintenance or operation of the proposed use will not be detrimental to the public interest, health, safety, or general welfare, or injurious to persons, property, or improvements in the vicinity and zoning district in which the property is located. The Planning Commission determined that there was insufficient evidence in the record to make findings C, D and E and, therefore, denied the CUP Modification and disapproved the related Negative Declaration. Environmental Determination: Pursuant to the California Environmental Quality Act (CEQA) guidelines, a Negative Declaration has been prepared; the project has been determined to have less than significant impacts on the community (Attachment No. 3). If the City Council grants the applicant’s appeal and approves the CUP Modification, it must also take action to approve the Negative Declaration. City Council Review Authority: The City Council’s consideration of the appeal is “de novo.” In essence, this means the City Council is holding a new hearing. In that regard, the City Council is not solely limited to considering the record that was before the Planning Commission. The City Council’s review authority for this appeal is governed by CCMC Section 17.640.030.D, which provides that the City Council may consider any issue involving the matter that is the subject of the appeal in addition to the specific grounds that form the basis of the appeal. In its consideration of this matter, the City Council may take the following actions: • Affirm, affirm in part, or reverse the Planning Commission’s decision. City of Culver City, California Agenda Item Report • Amend or adopt additional conditions of approval that may address issues or concerns regarding the Project (regardless of whether they were raised in the appeal). • If new or different evidence is presented on appeal, the City Council may, but is not required to, refer the matter back to the Planning Commission for further consideration. CONCLUSION: The applicant has attempted to address all of the questions and concerns raised during public testimony received at four public hearings regarding the project. The concerns addressed included: 1.) Noise impacts, addressed by the construction of a 14 foot high wall along the property line abutting residential neighbors to the north; 2.) Traffic impacts, addressed by the reduction of the student enrollment from 250 to 200 thereby reducing bus and cab trips to the campus; 3.) Traffic study accuracy questions, addressed by the City’s traffic engineer who concluded that the project’s traffic study is accurate and that the 600 student school enrollment will not result in any significant traffic impacts and that the traffic management plan is acceptable and adequate to mitigate any potential traffic impacts from student transport activities. Further, the use is permitted in the zone subject to conditions to mitigate any significant impacts, and special conditions have been prepared to address any potential project impacts. FISCAL IMPACT: This is a private venture project with no City funding for the project. If the appeal is denied and the Planning Commission’s denial is upheld, then there would be no fiscal impact on the City other than cost for emergency services. If the appeal is approved and the Planning Commission’s denial is overturned, then the City would receive an annual payment of $17,050 that The Help Group has volunteered as a condition of approval to reimburse the City for estimated foregone property and business tax revenue and to compensate the City for emergency service response to the school. ATTACHMENTS: 1. Resolution No 2012-P005, Denying Approval of the Conditional Use Permit Modification, CUP/M P-2011175, to allow for a 600 student private school for special needs students at 12095-12101 Washington Boulevard in the Commercial General (CG) zone, dated June 20, 2012. City of Culver City, California Agenda Item Report 2. Letter of Appeal for CUP/M P-2011175, dated July 5, 2012 3. Project Plans 4. Written Correspondences 5. Initial Study/Negative Declaration 6. Draft Resolution No. 2012-R___ Denying the Appeal 7. Draft Resolution No. 2012-R___ Granting the Appeal 8. Planning Commission Minutes April 11, May 9, May 23, and June 13, 2012 9. Additional Correspondence MOTION: That the Council: 1. Adopt Resolution No. 2012-R____, denying the appeal and affirming the decision of the Planning Commission to deny the Conditional Use Permit Modification for the increase in enrollment of The Help Group school and disapprove the related Negative Declaration. OR 2.A. Adopt a Negative Declaration, in accordance with the California Environmental Quality Act (CEQA), finding the Project will have less than significant impacts on the environment; AND 2.B. Adopt Resolution No. 2012-R______, granting the appeal and (i) reversing the Planning Commission’s denial of the Conditional Use Permit Modification for the increase in enrollment of The Help Group school and (ii) approving Conditional Use Permit Modification CUP/M 2011-175. MEETING DATE: 09.10.12 AGENDA ITEM: PUBLIC HEARING: APPEAL OF THE DENIAL OF A CONDITIONAL USE PERMIT MODIFICATION (CUP/M 2011-175) TO ALLOW THE ADDI TION OF 200 STUDENTS TO THE HELP GROUP PRIVATE SCHOOL FACILITY At 12095-12101 WASHINGTON BOULEVARD. ATTACHMENTS Pages 1. Resolution No 2012-P005, Denying Approval of the Conditional Use Permit Modification, CUP/M P-2011175, to allow for a 600 student private school for special needs students at 12095-12101 Washington Boulevard in the Commercial General (CG) zone, dated June 20, 2012 1-4 2. Letter of Appeal for CUP/M P-2011175, dated July 5, 2012 5-11 3. Project Plans 12-20 4. Written Correspondences 21-37 5. Initial Study/Negative Declaration 38-63 6. Draft Resolution No. 2012-R___ Denying the Appeal 64-67 7. Draft Resolution No. 2012-R___ Granting the Appeal 68-89 8. Planning Commission Minutes April 11, May 9, May 23, and June 13, 2012 90-111 9. Additional Correspondence 112-126ATTACHMENT 1 1 ATTACHMENT 1 2 3 ATTACHMENT 2 ATTACHMENT 2 ATTACHMENT 2 ATTACHMENT 2 ATTACHMENT 2 ATTACHMENT 2 ATTACHMENT 2 CH ATTA ATTA 17 ATTA ATTACHMENT 4 21 22 ATTACHMENT 4 23 ATTACHMENT 4 24 ATTACHMENT 4 25 ATTACHMENT 4 26 ATTACHMENT 4 27 ATTACHMENT 4 28 ATTACHMENT 4 29 ATTACHMENT 4 30 ATTACHMENT 4 31 ATTACHMENT 4 32 ATTACHMENT 4 33 ATTACHMENT 4 34 ATTACHMENT 4 35 36 ATTACHMENT 4 ATTACHMENT 4 37 (310) 253-5710 ? FAX (310) 253-5721 9770 CULVER BOULEVARD, CULVER CITY, CALIFORNIA 90232-0507 Form Updated 2/22/10 INITIAL STUDY ENVIRONMENTAL CHECKLIST FORM AND ENVIRONMENTAL DETERMINATION Project Title: The Help Group CUP/M-P2011175 Lead Agency Name & Address: City of Culver City, Planning Division 9770 Culver Blvd., Culver City, CA 90232 Contact Person & Phone No.: Joshua Williams, Associate Planner (310) 253-5706 Project Location/Address: 12095 Washington Boulevard Nearest Cross Street: Washington Boulevard and Grand View Boulevard, Washington Boulevard and Inglewood Boulevard APN: 4232-004-033, 4232-004-084, 4232-004-021, 4232-004-086 Project Sponsor’s Name & Address: The Help Group 13130 Burbank Boulevard Sherman Oaks, CA 91401 General Plan Designation: General Corridor Zoning: Commercial General (CG) Redevelopment Project Area: Component Area No. 4 Overlay Zone/Special District: Commercial Zero Setback Project Description and Requested Action: (Describe the whole action involved, including but not limited to later phases of the project, and any secondary, support, or off-site features necessary for its implementation. Attach additional sheets if necessary) The Help Group (the “Applicant”) is requesting a Modification to an existing Conditional Use Permit (CUP P1999-017). The Help Group provides educational, counseling and therapeutic services to children and families with special needs. The Help Group comprises two schools, Village Glen and Summit View, serving 400-students grades K through 12. A conditional use permit to operate The Help Group was approved in 1999 for the property located at 12095-12101 Washington Boulevard, converting the former Washington Ho spital Medical Center property into a private school facility. The requested modification will permit the addition of 250 students to the 400 student school, bringing the total school population to 650 students (200 students in Summit View School and 450 students at Village Glen School). The project will include the conversion of a 20,090 square foot medical office building, previously approved for school uses under Conditional Use Permit CUP P1999-017, into classrooms, offices and related facilities for the school. The project will also result in the addition of 67 new full and part-time staff, bringing the total staff from 110 (existing) to 177 (proposed). As part of the project, a new traffic management program will be instituted to allow for the efficient movement of vehicles during the drop-off and pick-up of students. ATTACHMENT 5 38The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 2 of 26 Existing Conditions of the Project Site: The project involves the conversion of an existi ng two-story, 20,090 square foot medical office building into facilities for a school use. Presently the building is fifty percent occupied, with approximately 10,045 square feet of space used for offices and a retail store operated by the school as part of their education program. The building is located in the center of the Help Group campus, adjacent to a three level parking structur e serving the Kaiser Permanent medical office facility located at the corner of Inglewood Boulevard and Washington Boulevard. To the north of the building is a four story office building with three levels occupied by school offices and the on floor occupied by medical offices and a two level parking structure, which provides parking for Help Group facility staff and the medical offices. The primary campus structure, located on the western portion of the project site, is located adjac ent to the intersection of Grand View Boulevard and Washington Boulevard, and is comprised of a one story, 61,108 sq. ft. structure. Surrounding Land Uses and Setting: (Briefly describe the project’s surrounding) West: The property to the west, across Grand View Boulevard, is zoned for Commercial General (CG) land uses and is developed with a one story commercial office building. East: The property abutting to the east is developed with Kaiser Permanente’s Culver Marina Medical Offices, located in the CG Zone/ North: The properties to the north of the school are located in the City of Los Angeles and are zoned R3-1 “Multiple Dwelling.” The properties are presently developed with multi-family residential developments. South: The properties to the south of the project site, across Washington Boulevard, are located in the CG Zone and are generally developed with small commercial uses, including offices, restaurant and retail, and service uses. Other public agencies whose approval is required: (e.g., permits, financing approval, or participation agreement) None ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a ‘Potentially Significant Impact’ as indicated by the checklist on the following pages: Aesthetics Land Use / Planning Agriculture and Forestry Resources Mineral Resources Air Quality Noise Biological Resources Population / Housing Cultural Resources Public Services Geology /Soils Recreation Greenhouse Gas Emissions Transportation/Traffic Hazards & Hazardous Materials Utilities / Service Systems Hydrology / Water Quality Mandatory Findings of Significance ENVIRONMENTAL DETERMINATION: On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. ATTACHMENT 5 39The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 3 of 26 I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a ‘potentially significant impact’ or ‘potentially significant unless mitigated’ impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applic able legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyz e only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Joshua Williams, Associate Planner Date ATTACHMENT 5 40The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 4 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact I. AESTHETICS -- Would the project: a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or quality of the site and its surroundings? d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Responses: a) – d) No Impact. The project will not result in any aesthetic impacts. The project includes the conversion of a 20,090 square foot medical office building on the Help Group campus into classrooms, offices and related facilities for the school. There are no scenic vistas or resources in the vicinity of the subject property. The project site is presently developed with multiple buildings, a parking structure and surface parking lots occupied by the school campus. The exterior of the existing medical office building will be remodeled to include new accent features, including wrought iron grilles along the roof parapet, exterior plaster panels, new storefront doors and windows wi th dark bronze frames, and a slate accent band feature. The project is not proposing any new source s of light on the exterior of the building. However, any new exterior lighting shall be shielded, pursuant to the Culver City Municipal Code, to limit light intrusion onto abutting properties. Mitigation Measure(s): None Required II. AGRICULTURE RESOURCES AND FOREST RESOURCES: In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whethe r impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refe r to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? ATTACHMENT 5 41The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 5 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact d) Result in the loss of forest land or conversion of forest land to non-forest use? e) Involve other changes in t he existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use? Responses: a) - e) No Impact. The project site is located in area predominant ly urbanized with commercial storefronts, a hospital use, surface and multi-level parking lots, and single family residential uses. The Culver City General Plan Land Use Element map identifies no agricultural land or uses within the city boundaries. Abutting zoning in the City of Los Angeles is designated for Low and Low Medium Residential uses. The project area is not identified, utilized, or zoned for agricultural purposes, and there is no known Williamson Act contract in effect on the project site. In addition, the project will not result in the loss or conversion of farmland or forestland into another use, as the project site is located in a fully developed urbanized area. Therefore, no impact will result from the project. Mitigation Measure(s): None Required III. AIR QUALITY -- Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? b) Violate any air quality sta ndard or contribute substantially to an existing or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non- attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of people? Responses: a) Less Than Significant Impact. The entire South Coast Air Basin (which includes Culver City) does not meet National Ambient Air Quality Standards. Future new development (or redevelopment) in any portion of Culver City will contribute, both at the project level and cu mulatively, to pollutant emissions over this existing non-attainment area (at both construction and operation phases). For projects proposed within Culver City or elsewhere in the So uth Coast Air Basin, the applicable plan is the 2007 Air Quality Management Plan (AQMP), which is prepared by the South Coast Air Management District (SCAQMD). The SCAQMD is the agency principally responsible for comprehensive air pollution control in the South Coast Air Basin. SCAQMD develop s rules and regulations, establishes permitting requirements, inspects emissions sources, an d enforces such measures through educational ATTACHMENT 5 42The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 6 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact programs, or fines, when necessary. Projects that do not exceed or are consistent with the projections of employment and population forecasts identified in the Growth Management Chapter of the Regional Comprehensive Plan and Guide (RCPG) are considered consistent with AQMP growth projections, since the Growth Management Chapter forms the basis of the land use and transportation control portion of the AQMP. Since SCAG’s regional growth forecasts are based upon, among other things, land uses specified in city general plans, a project that is consistent with the land-use designated in a city’s general plan would also be consistent with SCAG’s regional forecast projections. Subsequently, a project that is consistent with SCAG’s regional fore cast projections would then also be consistent with the AQMP growth projections. As noted above, the project is subject to SC AQMD’s Air Quality Management Plan (AQMP). The AQMP promulgates policies, programs, and measures to achieve Federal and State standards for criteria pollutants and other smog-forming gases, as we ll as to reduce emissions of toxic air pollutants. These programs include measures such as balancing jobs and housing within the region, promoting infill development close to existing infrastructure and public transit, and a variety of other measures designed to reduce vehicular travel. The project will adapt an existing 20,900 square foot buildin g, previously approved for use as school facilities under CUP P1999-017, into classrooms and offices for The Help Group. The project will also result in the addition of up to 250 more students to the campus, increasing the population of the school from 400 students to 650 students. Thestudents. The increase in student population would serve the existing need for school services and employment in the project region. The project will not conflict with or obstruct implementation of the applicable air quality plan. b) and c) Less Than Significant Impact. A project may have significant impacts where project-related emissions would exceed federal, state, or r egional standards or thresholds, or where project-related emissions would substantially contribute to an existing or projected air quality violation. Greenhouse Gas Emissions from existing operations are generated by the consumpti on of fossil fuels necessary to produce electricity, provide heating and hot wate r for the on-site land uses, propel landscaping equipment, and convey, transport and treat water. Fuel is also consumed by on-road mobile vehicles associated with the existing uses of the project site. Construction Emissions: The proposed project will generate pollutant emissions from the following construction activities: 1) demolition; 2) travel to a nd from the project site by construction workers; 3) delivery and hauling of construction supplies and debris to and from the project site; 4) the fuel combustion by onsite construction equipment; and 5) building construction, including the application of architectural coatings. It is antici pated that the above construction ac tivities will result in temporary emissions of dust, fumes, exhaust and other air cont aminants. Construction activities involving site preparation would primarily generate PM 10 emissions. Mobile source emissions (use of diesel-fueled equipment on-site) and traveling to and from the pr oject site) would primarily generate nitrogen oxide emissions (NO x). The amount of emissions generated on a daily basis would vary, depending on the amount and types of construction activities occurr ing at the same time. As part of the project, appropriate dust control measures will be implemented during each phase of development, as required by SCAQMD Rule 403 – Fugitive Dust. Rule 403 requires that water is sufficiently added to the construction site to prevent the generation of visible dust plumes; that soil binders are applied to uncovered areas; and that ground cover is reestabl ished as quickly as possible. In addition, a wheel and undercarriage washing system are required to remove bulk material from vehicles leaving the construction site. The amount of emissions generat ed by construction activities on-site are not expected to exceed current SCAQMD thresholds, base d on an analysis of peak construction days for each of the construction activities. Therefore, project impacts will be less than significant. Operational Emissions. Operational emissions generated by both st ationary and mobile sources will result from normal day-to-day activities on the pr oject site after occupation. Stationary emission sources would be generated from school operations (primarily natural gas consumption) and landscape maintenance. Mobile emission will be generated by v ehicles travelling to and from the project site. The amount of emissions generated by operational activities for the 650 student school will not exceed ATTACHMENT 5 43The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 7 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact SCAQMD thresholds for any phase of development. T herefore, impacts associated with operational emissions from the project will be less than significant. SCAQMD states that if an individual development pr oject generates less than significant construction or operational emissions, then the development project would not generate a cumulatively considerable increase in emissions for those pollutants for which the Basin is in nonattainment. The proposed project will not generate emissions from construction or operational activities in excess of SCAQMD thresholds. Therefore, the project will not result in a cumulatively considerable increase in emissions. Cumulative impacts will be less that si gnificant with the implementation of recommended measures per SCAQMD – Rule 403. d) Less Than Significant Impact. A sensitive receptor, as defined by AQMD, is a person in the population who is particularly susceptible to health effects due to exposure to an air contaminant. The following are land uses (sensitive sites) where sensitive re ceptors are typically locate d: schools, playgrounds, and child care centers; long-term health care facilit ies; rehabilitation facilities; convalescent centers; hospitals; retirement homes; and residences. Analysis of project emissions identified that the potential for exposing sensitive receptors to a pollutants is less than significant. At both the construction and operational phase of the project, pollutant levels will be below thresholds set by the SCAQMD. Therefore, impacts will be less than significant. e) Less Than Significant Impact. The project is not anticipated to result in the generation of any objectionable odors. During the construction phase, building materials, including paint and adhesives, may produce discernible odors typical of most cons truction sites. These odors would be temporary in nature and will not result in a si gnificant environmental impact. Theref ore, the impact of objectionable odors in the project vicinity will be less than significant. Mitigation Measure(s): None Required. IV. BIOLOGICAL RESOURCES -- Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural communi ty identified in local or regional plans, policies, regul ations or by the California Department of Fish and Game or US Fish and Wildlife Service? c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? ATTACHMENT 5 44The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 8 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? Responses: a) – f) No Impact. The project site is located in an urbanized area and is surrounded by existing disturbed land and development. The area around the project site is located in the Commercial General zone in the City of Culver City and in the Medium Residential (R-3) zone in the City of Los Angeles. The Neither the increase in student population from 400 to 650 students, nor the expansion of school classrooms and facilities into the existing two-story, 20,095 square foot medical office building will not result in a substantial effect on habitat for any protected species, will not result in a substantially adverse effect on protected wetlands, nor or conflict with any local policies, ordinances, or plans protecting biological resources. Therefore, no impacts will result. Mitigation Measure(s): None Required. V. CULTURAL RESOURCES -- Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in 15064.5? b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to 15064.5? c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? d) Disturb any human remains, including those interred outside of formal cemeteries? Responses: a) – d) No Impact. The project site is presently developed and used for a private school use. No buildings on the project site have been identified for designation as a landmark at the national, state or local level, nor have they been identified as being potentially significant in any historic resource survey for the area. The subject building proposed for conversion from medical offices to school related uses is not identified as being a historical resource, therefore no impact will result. ATTACHMENT 5 45The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 9 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact While the project will result in the interior remode l of the medical office building for conversion into school uses, disturbance of subsurface soil will be minimal. Preliminary architectural plans have identified that some new pad footings will be built by underpinning and widening existing footings. A new elevator pit will be constructed and the low area fo r the existing elevator pit will be raised by filling in with compacted soil. No significant grading or site grade changes are proposed. Due to the limited scope of development, no impacts are anticipated to potential archaeological, paleontological, or human remains on the project site. Mitigation Measure(s): None Required VI. GEOLOGY AND SOILS -- Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquak e fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii) Strong seismic ground shaking? iii) Seismic-related ground failure, including liquefaction? iv) Landslides? b) Result in substantial soil erosion or the loss of topsoil? c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1 994), creating substantial risks to life or property? e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? Responses: a) i. No Impact. The project site is not located on a known fault line, as depicted in the City of Culver City Alquist-Priolo Earthquake Fault Zone map (2007). Therefore, no impacts will result. ii. Less Than Significant Impact. The conversion of the existing medical office building to uses for school facilities, including classrooms and offices, shall require that the building be structurally upgraded to the current 2010 California Building Code. In addition, per Building & Safety requirements, an outside structural review is required. Therefore, project impacts will be less than significant. iii. Less Than Significant Impact. Liquefaction is defined as a loss of strength of saturated cohesionlesscohesion less soil caused by seismic shaking. A Preliminary Geotechnical Engineering Report prepared by Earth Systems Southern California (dated September 14, 2011) identified that the ATTACHMENT 5 46The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 10 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact project is not located within a defined liquefaction haza rd zone, but it is very close to the edge of the zone. Based on liquefaction analyses, soils beneath the site are not expected to liquefy in the event of a significant nearby earthquake during a period of high groundwater. iv. No Impact. The subject property is not located in a lands lide zone (Culver City Seismic Hazards Map, February 2007). The project site is mostly flat and is not near a slope that may be prone to landslides. Therefore, there is no impact from landslides. b) No Impact. The project will result in minimal disturbance to top soil on the subject property, specifically through changes to on-site landscaping and the elevator pit. Therefore, there will be no impact. c) Less Than Significant Impact. The project site is not located within a liquefaction zone, and is not located on or near a slope that may be prone to lands lides nor is it located within any known landslide zones. The conversion of the exis ting medical office building at 12095 Washington Blvd to uses for school facilities, including classrooms and offices, shall require that the building be structurally upgraded to the current 2010 California Building Code. In addition, per Building & Safety requirements, an outside structural review is required. Therefore, project impacts will be less than significant. d) Less Than Significant Impact. Based upon results of the Expansi on Index (EI) Tests (ASTM D 4829), conducted for this investigation, and presented in the Preliminary Geotechnical Engineering Report prepared by Earth Systems Southe rn California (dated September 14, 2011), the upper on-site soils are considered to have a medium expansion potent ial. The foundation and slab-on-grade design recommendations, presented in the report, include generally used guidelines in the Los Angeles area for foundation design for soils with the indicated degree of expansiveness. As noted in the Preliminary Geotechnical Engineering Report, design recommendations included in the report are minimums and comply with normally accepted geotechnical engineering practices. However, actual foundation and slab-on-grade construction reinforcement should be determined by the structural engineer based upon site specific conditions such as foundation loading and engineering characteristics of the subgrade so ils. Compliance with recommendations will therefore result in a less than significant impact. e) No Impact. The project will not utilize septic tanks or alte rnative wastewater disposal systems. It will be served by the City of Culver City wastewater services. Therefore, there will be no impacts. Mitigation Measure(s): None Required. VII. GREENHOUSE GAS EMISSIONS --Would the project: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? Responses: a) - b) Less Than Significant Impact. The Greenhouse Gas Emissions Analysis (July 2011) prepared by CAJA Environmental Services identified that greenhou se gas emissions associated with the proposed project, the 650 student school and improvements to the building at 12095 Washington Boulevard, will be less than significant. In addition, the project w ill not conflict with any applicable plan, policy or regulation adopted for the purpose of reducing emissions of greenhouse gases. ATTACHMENT 5 47The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 11 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact The emissions generated by Tthe Help Group project (and any project) are too small to influence global climate change individually. Even if an individual project’s greenhouse gas (GHG) emissions were large enough to influence global climate change, the significance of the impact of a single project on the global climate cannot be determined at this time. Fi rst, no guidance exists to indicate what level of GHG emissions would be considered substantial enoug h to result in a significant impact on global climate. Second, global climate change models are not sensitive enough to be able to predict the effect of a single project on global temperatures and the re sultant effect on climate; therefore they cannot be used to evaluate the significance of a project’s impact. In addition, there are currently no adopted thresholds or guidance adopted by the SCAQMD or other agencies in California to assess the significance of potential impacts associated with Gr eenhouse Gases. In the absence of established GHG thresholds, the Governor’s Office of Planning and Research (OPR) recommends in its 2008 technical advisory that lead agencies should make a go od faith effort to calculate, model, or estimate the amount of CO2 and other GHG emissions from a [project. In an effort to calculate, model, or estimate the amount of CO2 and other GHG emissions from a project. In response to the Governor’s Executive Order (S-3-05) to reduce statewide GHG emissions to targeted levels (specifically to reduce GHG emissions to 80 percent below 1990 levels by 2050), the Secretary of Cal/EPA created the Climate Action Team (CAT), which in March 2006, published the Climate Action Team report to Governor Schwarzenegger and the Legislature (t he “2006 CAT Report”). The 2006 CAT Report identifies a recommended list of strategies that could be implemented by various State agencies to ensure that the Governor’s targets are met and ca n be met within the existing authority of State agencies. In analyzing potential impacts related to construction and operation of the project, the report notes that in the absence of regulatory guidance, evaluation of the project’s impacts associated with GHG emissions is done qualitatively by determining cons istency of the project to any of the emission reduction strategies identified by the CAT Report and by the California Air Resources Board (ARB). If the project is consistent with the guidelines established by the CAT Report and by the ARB, project specific impacts related to GHG emissions would be less than significant, and the project’s contribution to any potential cumulative impact related to GHG emissions would not be considerable. The project’s impacts from GHG emissions will be less than significant due to improved sustainability of modern construction and design compared to the ex isting building. It is anticipated that greenhouse gas emissions will be reduced by the following sust ainable design and construction features integrated into the project: ? Insulation of all interior and exterior walls; ? Use of duro-last vinyl roofing material (87 percent reflective); ? Installation of 14 SEER heating, venting and air conditioning (HVAC) units; ? Replacement of existing fluorescent lighting with LED lighting throughout the building; ? Installation of dual-glazed bronze anodized doors and windows throughout the building; ? Installation of motion-sensor restroom light switches; ? Replacement of existing toilets with auto-flush toilets; ? Replacement of existing urinals with waterless urinals; ? Installation of hands-free faucets; ? Installation of high-efficiency water heaters In addition, the project will be subject to the City of Culver City’s Mandatory Green Building Program. Projects under 49,999 sq. ft. ar e required to comply with Cate gory 1 Requirements of the Green Building Program. By complying with the City’s Mandatory Green Building Program and employing the sustainable design features ident ified above, impacts from Greenhouse Gases will be less than significant. Mitigation Measure(s): None Required ATTACHMENT 5 48The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 12 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact VIII. HAZARDS AND HAZARDOUS MATERIALS --Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one- quarter mile of an existing or proposed school?? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? h) Expose people or structures to a significant risk of loss, injury or death involving w ildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? Responses: a) - b) Less Than Significant Impact. The project will utilize potentially hazardous materials as part of its construction and operation, including solvents, paints, petroleum products and pesticides. All potentially hazardous materials will be contained, stored, and used in accordance with manufacturers’ instructions and handled in compliance with applicable standards and regulations. The use and transport of these materials, typically sold as consumer goods, will not pose a significant hazard to the public or the environment. Therefore project impacts related to the routine transport, use or disposal of hazardous materials will be less than significant. In addition, the project will not result in an impact nor contribute to a significant hazard through reasonab ly foreseeable upset and accident conditions involving the release of hazardous materials into the environment. c) Less Than Significant Impact. The proposed project will involve t he increase in st udent population from 400 students to 650 students and the convert conversion of an existing two-story medical office building into school facilities for the existing Help Group campus. The operation and maintenance of the proposed school facilities are not considered to be sources of hazardous emissions and are not ATTACHMENT 5 49The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 13 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact expected to result in the handling of hazardous or acutely hazardous materials., substances, odors, or, or waste and would not require the daily us e of chemicals outside of the day-to-day cleaning materials. Therefore, the project is not expected to result in emissions of hazardous materials within the proximity of the existing school facilities. d) No Impact. The school is not located on a site which is included on a list of hazardous material sites pursuant to Government Code Section 65962.5. Therefore, there is no impact. e) No Impact. The project site is not located within an airport land use plan or within two miles of any airport. Therefore, there is no impact. f) No Impact. The project site is not located within the vicini ty of a private airstrip. Therefore, there is no impact. g) No Impact. The project will not inhibit access to hos pitals, emergency response centers, school locations, communication facilities, highways and bri dges, or airports. The adjacent Culver Marina Medical Offices operated by Kaiser Permanente do not provide “emergency services” or “urgent care services.” Services at the facility include diagnostic imaging (mammography), family medicine, internal medicine, podiatry, physical therapy and a phar macy. Therefore, the project will not impair implementation of or physically interfere with an adopted emergency response or evacuation plan, and no impact will occur. h) No Impact. The project is located in a highly urbanized area of Culver City where the possibility of wild land fires is remote. Implementation of the project w ill not result in any increase in exposure of people or structures to wildfire dangers, therefore there is no impact. Mitigation Measure(s): None Required. IX. HYDROLOGY AND WATER QUALITY -- Would the project: a) Violate any water quality standards or waste discharge requirements? b) Substantially deplete ground water supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existi ng drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? d) Substantially alter the existi ng drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substant ial additional sources of polluted runoff? f) Otherwise substantially degrade water quality? ATTACHMENT 5 50The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 14 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact g) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? h) Place within a 100-year flood hazard area structures which would impede or redirect flood flows? i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or mudflow? Responses: a) No Impact. The project does not propose any long-term activi ties that will result in regular discharge into surface water bodies. The project will conform to all requirements of the Regional Water Quality Control Board (RWQCB) and Municipal Code and will not result in unpermitted discharges into the sanitary sewer and storm water systems. Therefore, implementation of the project will not result in any impacts related to the issue. b) No Impact. The project site is fully developed and cover ed almost entirely by impervious surfaces in the form of buildings, drive aisles and parking lots . Presently, stormwater does not infiltrate into the ground, but sheetflows across the site to the local stormdrain system. The site is not a significant source or area for groundwater recharge. The proj ect will not result in any change to lot coverage or create new impediments to water flow. Therefore, the project will have no impacts. c) – e) No Impact. The project will result in the conversion of an existing medical office building into school facilities. The project will not result in new floor area or a change in the footprint of the building, nor will the project result in an increase of impervious surfaces on the site, therefore the project will not result in a substantial change to the existing drainage pattern on site. The project will not result in a change in the existing drainage pattern that would result in s ubstantial erosion or siltation either on- or off-site. In addition, the project will not result in any increase in runoff to local storm drains. Therefore, the project will have no impacts. f) Less than Significant Impact. The applicant shall be required to prepare and implement a Stormwater Pollution Prevention Plan (SWPPP), which details the construction activities, materials, and wastes and lists the best management practices (BMPs) to control pollutant discharge during construction. Preparation of the SWPPP and compliance with the City’s Minimum Storm Water Protection Requirements would ensure that the project will not violate any water quality standards. Therefore, the project impacts related to water quality will be less than significant. g) – h) No Impact. The project site does not include any housing nor is it located within a 100 year flood hazard area. Therefore, there will be no impacts. i) Less than Significant Impact. The project site is located wi thin the Stone Canyon Dam Inundation Zone. The project will not impede escape routes or access of emergency vehi cles in the event of major flood incident. The project will adhere to all emergency procedures to minimize impacts to building occupants. j) No Impact. The project impact is not located within an area subject to tsunami and seismic sea waves pursuant to the Culver City Tsunami Map (dated April 22, 2010). Therefore, there are no impacts. Mitigation Measure(s): None Required X. LAND USE AND PLANNING - Would the project: a) Physically divide an established community? ATTACHMENT 5 51The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 15 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to t he general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? c) Conflict with any applicable habitat conservation plan or natural community conservation plan? Responses: a) No Impact. The project site is currently developed with two existing scho ol facilities under Tthe Help Group umbrella – Summit View School and Village Glen School. The project will result in the increase in student population from 400 students to 650 stud ents and the conversion of an existing medical office building into school facilities. No additional st ructures or floor area is proposed, and the use will be consistent with existing uses on adjoining properties. Therefore the project will not physically divide an established community. There will be no impact. b) No Impact. The project will not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project. Private school uses are a permitted use in the Commercial General (CG) Zone with a conditional use permit. The private school use was permitted on the project site, including all four buildings addressed 12095-12101 Washington Boulevard, under Conditional Use Permit No. P1999-017. The project will r equire a Conditional Use Permit Modification, a requirement for expansion an increase of the priv ate school’s operations enrollment.in the CG Zone. Because the use is permitted under existing entitlements and within the CG Zone and the General Plan, there will be no impact. c) No Impact. The project site is developed and is located in a highly urbanized area that is not known to support any non-avian candidat e, sensitive, or special status spec ies. The project will not involve the removal of any habitat areas, as the project work will primarily result in tenant improvements to the existing structure. Mitigation Measure(s): None required. XI. MINERAL RESOURCES -- Would the project: a) Result in the loss of av ailability of a known mineral resource that would be of value to the region and the residents of the state? b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? Responses: a) No Impacts. There is no knowledge of the presence of mineral resources that would be of value to the region and the residents of the State on the project site, therefore the project is not expected to result in the loss of availability of said mineral resource s. The project area is predominantly urbanized, and the project site occupies a site that has previously been disturbed for construction of the existing buildings on Tthe Help Group campus and the abutting Kaiser Permanente facilities. The project site is located adjacent to residential uses, commercial retail and office, and medical office uses, and is therefore not likely to be a suitable site for drilling or mining. Therefore, the no impacts are anticipated. b) No Impacts. The City does not identify the availability of a locally-important mineral resource at the project site in any land use plan. The project site is not identified in the City’s General Plan, any specific plan, nor any other land use plan as a lo cally-important mineral resource recovery site. Therefore, no impacts are anticipated. ATTACHMENT 5 52The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 16 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact Mitigation Measure(s): None Required. XII. NOISE --Would the project result in: 6 a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or app licable standards of other agencies? b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? Responses: a) Less Than Significant Impact. Impacts related to the generation of noise levels in excess of community standards are analyzed separately, as part of construction and school operation activities. The Culver City Noise Ordinance (Chapter 9, Section 9.07.035 “Construction”) exempts noise sources associated with construction when performed bet ween the hours of 8:00 AM and 8:00 PM on weekdays, 9:00 AM and 7:00 PM on Saturdays, an d 10:00 AM and 7:00 PM on Sundays. The project will require the use of equipment for demolition on the inside of the building, as part of tenant improvements. During the demolition and construction, activities will not be co nstant. A different mix ofThe equipment operating and noise levels will va ry based on the amount of equipment in operation at any given time and the location of each activity on the project site. Land uses on the properties surrounding the project site are primarily developed with commercial retail and office, multi-family residential, and medical office uses. Due to the use of construction equipment during the construction phase, the projec t will expose nearby residents, and students and staff associated with the school to increased ambi ent exterior noise levels, typical of any tenant improvement activities in nearby businesses. The pr oject applicant will notify surrounding residential neighbors in advance of construction activities, and both the Applicant’s and City’s contact information will be posted on the project site to direct residents wishing to report noise and other construction activity complaints. Through compliance with the City’s Noise Ordinance, temporary ATTACHMENT 5 53The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 17 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact noise levels associated with construction activities will be less than significant. During the ongoing operation of the project, on-site operational noise on-site operational noise will typically be generated by heating, ventilation, and air conditioning (HVAC) equipment. Through the use of Code required screening and adherence to Title 24 of the California Code of Regulations, which requires interior noise levels not to exceed 45 dBA, occupants of the school and adjoining uses will not be exposed to excessive interior noise levels. Additional noise will be generated by the project from use of the playground facilities. The Culver City Noise Ordinance (Chapter 9, Section 9.07.060.C) provides that “permitted activities conducted on public playgrounds and public or private school ground s, including but not limited to school athletic and entertainment events” are exempted from the Noise Ordinance provisions. The school’s playgrounds have staggered use sche duled, meaning that not all 650 students will be using the three playground areas (1. located adjacent to Grand View Boulevard; 2. at the center of the property partially within the City of Los Angeles; and 3. as proposed, atop the two-story building located at 12095 Washington Boulevard) at the same time. Nor will the additional 250 students be located into one playground at one time. Students are rotated into the play areas during various times throughout the day to avoid having students of differing ages sharing the same play area (i.e., high school students would not utilize the same areas as elementary school students during the same time). However, as part of the project review, a nois e impact study was submitted on June 6, 2011 by Veneklasen Associates on behalf of the Applicant. T he purpose of the noise study was to assess the existing impact of the sound produced at Tthe He lp Group’s playgrounds on the adjacent residential area to the east of the project site in response to comments from residential neighbors abutting the playground area. The Help Group agreed to conduct the noise impact study to determine if additional mitigations were needed to immediately address a noise problem caused by school activities on the playground. The acoustical engineer took Nnoise measurements were perfor med at the playground areas during periods when there were no activities. These measurements represent the in order to determine ambient conditions at this location. Measurements were also performed during typical activities in the playground. The ambient noise le vel in this area is controlled by general urban activities and also by the street traffic around the fa cility. When activities are in progress, the ambient noise levels are impacted at the adjacent areas to the playground. The general ambient noise levels at the playground area were measured as approximatelyabout 53 dBA. During activities in the playground, the noise level increased to between 63 and 65 dBA. The existing ambient levels at the residential area are estimated at 46 dBA which is in creased to 54 dBA during playground activities, a slight rise comparable to noise generated by street traffic. The Help Group submitted a letter from Veneklasen Associates, dated April 17, 2012, which discussed potential noise impacts from the rooftop playground area above the two-story building at 12095 Washington Boulevard. The acoustical en gineer examined noise impacts on residential properties located in the City of Los Angeles to the north and on the sidewalk along Washington Boulevard in front of the schoo l. Based upon the maximum occupanc y for the rooftop playground of 185 people, noise levels at the residential properties are anticipated to be below 30 dBA. Noise levels at the sidewalk level on Washington Boulevard are anticipated to be 40.5 dBA. Both noise levels fall below the 65 dBA exterior noise level and 45 dBA interior noise level identified by the Noise Element (adopted 1995) of the City’s General Plan for residential and commercial uses. The acoustical engineer also determined that the noise generate d from the rooftop play area will not have any additive impact on noise levels at the ground level play areas or at the nearby residential properties. Based on the noise study and compliance with the City’s Nnoise Ordinance for on-site activities, noise impacts will be less than significant. b) Less Than Significant Impact. During construction of the project, the use of machinery including trucks, drills, etc. will be typical. The amount of gro undborne vibrations that is created by the use of equipment during the construction of the project will not be excessive. As noted previously, ATTACHMENT 5 54The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 18 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact construction will primarily be internal to the existing struct ure, with no exterior demolition or major construction activities. In regards to the operation of the project, school facilities do not generally generate significant groundborne vibrations or ground borne noise. Therefore, the project will result in less than significant impacts. c) – d) Less Than Significant Impact. The project will result in the addition of 250increase of student enrollment from 400 to 650 students. The increase in students and faculty on-site will be accommodated who will occupy in existing structur es and in the two story building located at 12095 Washington Boulevard previously utilized for medical offices and non-school functions The additional students will use existing play area s that are presently utilized by cu rrent students of the school. In addition, a new playground area on top of the two-story building will serve all students of the school, allowing for dispersal of students between the three playgrounds. As noted previously (see Response XII.a), use of the play areas will also be co nducted on a stagger ed schedule, meaning not all 650 students will be using the play areas at one time. In addition, the noise generated by the use of the new playground area will not result in an additive impac t to noise at existing play areas or residential properties due to the location of the play area cl ose to Washington Boulevard, separated from the residential buildings by a four story building, and th e presence of 10-foot high parapet walls along three sides of the play area. While the addition of students may result in an increase in the use of the playground facilities, the staggered scheduling of play area usage and the addition of a new play area will reduce potential noise impacts. The the ambien t noise level is not ex pected to substantially increase from the usage on a permanent or tempor ary basis. Therefore, impacts will be less than significant. e) –f) No Impact. The project is not located within an adopted airp ort land use plan or within two miles of an airport. Nor is the project located within the vicini ty of a private airstrip. The project will not expose people in the project area to excessive noise levels, therefore there is no impact. Mitigation Measure(s): None Required. XIII. POPULATION AND HOUSING -- Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? Responses: a) Less Than Significant Impact. The project includes the expansion of school operations and facilities to accommodate the addition of 250 students inan incr ease in student enrollment from 400 students to 650 students at an existing private school facility. The project includes the conversion of a medical office building, previously approved for private sc hool uses under CUP P-1999017, to classrooms, a multi-purpose room, and support facilities for t he school. an existing struct ure on the Help Group campus. While the project does not involve the addition or removal of housing, the addition of school facilitiesenrollment capacity may induce population growth in the areas near the school site. However, as this is a private school, attendance is not limited by geographic boundary. Students attending the school may live outside of Culver City in a neighb oring jurisdiction. The school’s present operations and proposed operations utilize buses, private vehicl es and taxi cabs to transport students to the school from other locations, which may be outside of Culver City. In addition, Tthe Help Group provides three other campus locations in the Los Angeles region, including facilities in Sherman Oaks, Valley Glen, and Van Nuys, which provides opportunities for students to attend school at the facility ATTACHMENT 5 55The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 19 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact closest to them. The project is not anticipated to result in substantial population growth, therefore impacts are less than significant. b) – c) No Impact. The project will not result in the displacement of any housing units or people. Therefore, there will be no impacts. Mitigation Measure(s): None Required XIV. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated wi th the provision of new or physically altered governmental facilities, need fo r new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? Police protection? Schools? Parks? Other public facilities? Responses: a) Less Than Significant Impact. During internal staff review of the project, neither the Culver City Police Department nor the Culver City Fire Department i dentified impacts related to their response times. Further, neither agency identified impacts to their ability to provide adequate services. Therefore, impacts related to fire and police protection will be less than significant. The project will result in the expansion of facilitie s and student population at a private school facility serving special needs students. While the project will result in an increase in the number of staff on- site, it is anticipated that given the nature of t he jobs to be filled, employ ees would be residents of communities in the area. As such, implementation of the project will not generate a direct or indirect increase in the permanent population of the area. Therefore, the project would not result in an increase in the generation of students and the projec t would not result in substantial adverse physical impacts with regard to schools. The Help Group does not presently use any parkland in Culver City for school activities, either during or after school hours. The school campus provides two outdoor playgrounds and an indoor gym. For other sports activities, including baseball and soccer, the schools utilize park facilities in the City of Los Angeles or opposing team fields for away games. As part of the project, an additional rooftop play area will be provided atop the two-story, former medical office building for use by students. The project does not propose any significant increa se in population density that would generate the need to require new roads, additional infrastructure, or other governmental services. Mitigation Measure(s): None Required XV. RECREATION -- a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical det erioration of the facility would occur or be accelerated? ATTACHMENT 5 56The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 20 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact b) Does the project include recreational facilities or require the construction or ex pansion of recreational facilities which might have an adverse physical effect on the environment? Responses: a) Less Than Significant Impact. The project is not proposing a significant increase in population density that would cause or accelerate a substantia l physical deterioration of existing neighborhood and regional parks or other recreational facilities. The use of off-site parks and facilities in the region by the school requires the approval of usag e by the agencies operat ing the park facilities, similar to what is required by the Culver City Parks & Recreation De partment, in order to avoid the overcrowding and overuse of facilities. b) Less Than Significant Impact. The project will include new recreational facilities atop the converted, two story medical office building. The approximat ely 8,000 square foot space has been designated as a “roof deck playground.” In addition, the Help Group campus will continue to maintain two on-site playgrounds and one gym. The new recreational playgr ound would not result in a significant adverse physical effect on the environment,. As noted in Response XII.a, the applicant’s acoustical engineer determined that the noise generated by students using the new rooftop play area will not exceed noise standards identified in the Noise Element of the City’s General Plan, therefore impacts will be less than significant. Mitigation Measure(s): None Required. XVI. TRANSPORTATION/TRAFFIC -- Would the project: a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulating system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? b) Conflict with an applicable congestion management program, including but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways? c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? e) Result in inadequate emergency access? f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pede strian facilities, or otherwise decrease the performance or safety of such facilities? ATTACHMENT 5 57The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 21 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact Responses: a) – b) Less Than Significant Impact. This analysis is based on the following report: The Help Group – Culver City Campus, Traffic Impact Analysis, Urban Crossroads, November 7, 2011. As part of its analysis for the project, the Applicant’s consultant in concert with City staff selected six intersections for study: 1. Centinela Avenue and Washington Boulevard 2. Grand View Boulevard and Washington Boulev ard (in the City of Los Angeles and City of Culver City) 3. Project Driveway 1 and Washington Boulevard 4. Inglewood Boulevard and Project Driveway 2 5. Inglewood Boulevard and Project Driveway 3 6. Inglewood Boulevard and Washington Boulevard (in the City of Los Angeles) The trip generation for the project has been estimated based upon the specific land uses that exist at the site (medical office) and that have been planned for the site (special education school facilities). Based upon the review of the existing and proposed uses, the study identified that the existing medical office uses (comprising approximately 10,045 sq ft of floor area) generates a total of 363 daily trip ends, with 23 trips occurring during the AM peak hour (18 inbound and 5 outbound) and 34 trips during the PM peak hour (9 inbound and 25 outbound). The proposed use (school facilities) are anticipated to generate a total of 372 daily trip ends, with 114 trips occurring during the AM peak hour (68 inbound and 46 outbound) and 36 trips during the PM peak hour (17 inbound and 19 outbound). Therefore, the project will result in 9 additional da ily trip ends with 91 additional trips occurring during the AM peak hour (50 inbound and 41 outbound) and 2 additional trips during the PM peak hour (8 inbound and -6 outbound). In order to determine the significance of impacts related to traffic generated by the project (the increase in student enrollment from 400 to 650 students and the conversion of a medical office building to private school uses), the study examined the six previously identified intersections, comparing future conditions with and without the project. The volume of future traffic without the project looks at existing conditions plus ambient gr owth (estimated to be 1% per year) plus traffic generated by related projects (lists provided by the City of Culver City and City of Los Angeles). The volume of future traffic with the project takes into account existing conditions plus ambient growth plus traffic generated by related projects plus the propo sed project’s traffic. Please note, the “existing conditions” includes the existing population of the school, including staff and students. The analysis of future traffic conditions with and without the pr oject found no anticipated sign ificant impacts at the study area intersections due to the additional project traffic. During its review of the project’s on-site circulati on, City staff provided requirements to ensure safe ingress and egress from the project site via its mu ltiple driveways, limiti ng turn-in and turn-out movements from Washington Boulevard and Inglewood Boulevard. c) Less Than Significant Impact. The project site is not located near any airports, nor will it include any characteristics that would result in the alteration of air traffic patterns. Ther efore, impacts will be less than significant. d) Less Than Significant Impact. The project will not alter the street configuration iIn the area. In addition, as part of the mitigations to reduce potential conflicts between traffic entering and exiting the site with normal circulation on surrounding streets, the projec t will restrict movements into and out of the property and restrict on-street parking during mo rning and afternoon hours in order to provide additional queuing space as vehicles enter the site on Washington Boulevard. e) No Impact. The design and construction of the project will be required to incorporate all applicable City standards related to emergency access to ensure that the emergency ac cess would be adequate. Therefore, implementation of the project will not result in any impacts. ATTACHMENT 5 58The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 22 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact f) No Impact. The project site is located in an urbanized po rtion of the City. As proposed, the project will not conflict with any public transit, bicycle or pedestr ian facilities. In addition, the project will not affect the performance or safety of any alternative modes of transportation. Therefore, there is no impact. Mitigation Measure(s): None Required. XVII. UTILITIES AND SERVICE SYSTEMS --Would the project: a) Exceed wastewater trea tment requirements of the applicable Regional Water Quality Control Board? b) Require or result in the construction of new water or wastewater treatment facilitie s or expansion of existing facilities, the construction of which could cause significant environmental effects? c) Require or result in the co nstruction of new storm water drainage facilities or expansion of exis ting facilities, the construction of which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments? f) Be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs? g) Comply with federal, st ate, and local statutes and regulations related to solid waste? Responses: a) Less Than Significant Impact. The project will connect to the City ’s existing wast ewater treatment system. The proposed project is not expected to resu lt in a substantial increase beyond the projected development potential, residential population and empl oyment population for that area as permitted under the General Plan. Therefore, the project is un likely to result in development which exceeds the current wastewater treatment loads established by the Regional Water Quality Control Board. b) Less Than Significant Impact. Water treatment needs of the City are accommodated by the Metropolitan Water District’s (MWD) Joseph Jensen Tr eatment Plant in the City of Los Angeles. Due to the change of use of the building, the project is subject to the City’s Sewer Facility Charge. Pursuant to requirements from the Public Works De partment, the charge shall be paid prior to the issuance of any permit and will go towards infrastr ucture improvements related to the cumulative use of City infrastructure. In addition, pursuant to t he City’s Green Building Program, and as proposed by the Applicant, the project will include water saving pl umbing features, including the use of waterless urinals, auto flush toilets, and hands free faucets. Through the use of these features and the payment of sewer facility fees, the project impacts on the water system will be less than significant. c) Less Than Significant Impact. The project site is developed and is generally covered with impervious surfaces. The project site is located within an area that includes existing and adequate storm drainage facilities. A substantial change in surface water runoff patterns is not expected. Therefore, impacts will be less than significant. d) Less Than Significant Impact. The project, including the conversion of an existing medical office ATTACHMENT 5 59The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 23 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact building into school facilities and the addition of 250 students to theincrease in enrollment from 400 to 650 students on The Help Group campus, will not result in the requirement for new water resources or entitlements for water resources. As previously noted, the project will incorporate water saving features intended to reduce the impact of the project on water resources. e) Less Than Significant Impact. Existing wastewater treatment facilities will be able to accommodate anticipated wastewater demands of the project in addition to the provider’s existing commitments. f) Less Than Significant Impact. The City of Culver City operates a transfer station at 9255 Jefferson Boulevard. The transfer station receives a maximu m of 500 tons of solid waste per day, with an average of 250 tons of solid waste per day. Solid waste from the transfer station is sent to Puente Hills Landfill, Chiquita Canyon Landfill, or the Southeast Resource Recovery Facility (SERRF). Existing uses at the project site generate approximately 0.29 tons of solid waste per day. In compliance with the City’s Green Building Program, and best practi ces, the Applicant will institute a campus wide recycling and composting service to significantly re duce the amount of solid waste produced from the site. Based on existing conditions, both Chiqui ta Canyon Landfill and Puente Hills Landfill have adequate capacity to accommodate the disposal needs of the facilities. With implementation of waste reduction programs, identified above, impacts on the landfills will be reduced with the project. Therefore, impacts will be less than significant. g) No Impact. The project will comply with all federal, stat e, and local statutes and regulations related to solid waste. Therefore, implementation of the project will not result in any impacts. Mitigation Measure(s): None Required. XVIII. MANDATORY FINDINGS OF SIGNIFICANCE – a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impact s that are individually limited, but cumulatively considerable? (‘Cumulatively considerable’ means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? Responses: a) Less Than Significant Impact. With implementation of the mitigation measures identified in this initial study, the project will protect against the potential degradation of the quality of the environment and the potential of impacting traffic in the immediate vicinity of the project site. In addition, through adherence to the recommendations from the Geotechnical Report, the project will protect occupants of the structure from potential harm during seismic events. b) Less Than Significant Impact. The project will not result in any impacts that are cumulatively ATTACHMENT 5 60The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 24 of 26 EVALUATION OF ENVIRONMENTAL IMPACTS: Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact considerable. As noted, traffic impacts from the project when considered in light of other developments in the vicinity remain below the threshold of significance. Any potential cumulative impacts will be substantially reduced to less than significance due to standard code requirements and conditions of approval. c) Less Than Significant Impact. The project will not cause substantially adverse effects on human beings with the incorporation of the mitigations identified in the document. Impacts related to the project will be less than significant. Mitigation Measure(s): None Required ATTACHMENT 5 61The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 25 of 26 XVIII. EARLIER ANALYSES: None. ATTACHMENT 5 62The Help Group Revised April 30, 2012 March 15, 2012 Form Updated 2/22/10 Page 26 of 26 References Utilized: Cortese List, Hazardous Waste and Substances Site List, accessed March 5, 2012. http://www.dtsc.ca.gov/SiteCleanup/Cortese_List.cfm City of Culver City Alquist-Priolo Earthquake Fault Zone Map (2007). Greenhouse Gas Emissions Analysis, prepared by CAJA Environmental Services, July 2011. Noise Impact Study for School Playground, prepared by Veneklasen Associates, June 2011. Preliminary Geotechnical Engineering Report, pr epared by Earth System s Southern California, September 2011. Traffic Impact Analysis, prepared by Urban Crossroads, December 12, 2011 (revised) Letter from Veneklasen Associates to The Help Group regarding Noise Impact Study for the Roof Deck Playground, dated April 17, 2012. ATTACHMENT 5 63ATTACHMENT 6 64 ATTACHMENT 6 65 ATTACHMENT 6 66 ATTACHMENT 6 67 ATTACHMENT 7 68 ATTACHMENT 7 69 ATTACHMENT 7 70 ATTACHMENT 7 71 ATTACHMENT 7 72 EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 1 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 1. These Conditions of Approval are being imposed on a 600 student private school for special needs student s and the concurrent conversion of an exis ting two-story medical office/retail building into school facilities (the “Project”), for the pr operty located at 12095 Washington Boulevard (the “Property”). All Standard 2. A copy of the Resoluti on approving the Project, and a copy of these Conditions of Approval, shall be printed on the plans submitted as part of any building permit application for the Project. Planning Standard 3. All building permit applications for the Project shall include sufficient information and detail to clearly reflect compliance with all applicable requirements of the Culv er City Municipal Code (the “CCMC”) and with these Conditions of Approval. Planning Standard 4. The land use permit to which these Conditions of Approval apply (the “Land Use Permit’) shall expire one year from the date of final approval of said Land Use Permit, if the use has not been exercised. As provided in CCMC Section 15.595.030 –“Time Limits and Extensions”, an applicant may request an extension of said expiration date by fili ng a written request with the Planning Division prior to the expiration of the land use permit. Planning Standard 5. The Project shall be developed pursuant to CCMC Chapter 17.300 – “G eneral Property Development and Use Standards”. Planning Standard ATTACHMENT 7 73EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 2 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 6. All planted areas on t he Property shall be landscaped and irrigated pursuant to CCMC Chapter 17.310 - “Landscaping”. Planning Standard 7. All parking areas on t he Property shall be developed pursuant to CCMC Chapter 17.320 - “Off-Street Parking and Loading”. Planning Standard 8. Signs proposed for the Project shall meet all applicable requirement s of CCMC Chapter 17.330 - “Signs”. All signs require a separate permit and approval. Planning Standard 9. All permits and licenses required in connection with the development or us e of the Project shall be applied for and obtained separately. All Standard 10. All work within the public right-of-way (including but not limited to curb, gutter, sidewalk, and driveways) shall be designed and completed to the satisfaction of the City Engineer. Public Works Standard 11. Drainage devices, concrete curbs and gutters, sidewalks, drive approaches, and roadway pavement shall be designed in conformity with all provisions of the latest edition of the American Public Works Association Standard Plans (“APWA Standards”). Public Works Standard ATTACHMENT 7 74EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 3 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 12. At the sole cost and expense of the Property Owner, any broken or damaged curbs, gutters, sidewalks, and street pav ement resulting from construction of the Project shall be repaired and reconstructed in conformity with APWA Standards. Public Works Standard 13. Trash enclosures shall be provided and shall each have a minimum insi de dimension of 10 feet x 12 feet, a gated open ing that is at least 8 feet wide, and a 6 inch high by 6 inch wide concrete curb along the inside perimeter wall. Each enclosure shall also have at least a 6 inch thick concrete slab that drains at a one percent gradient out of the enclosu re. Final approval for the size, location, and type of equipment needed for the adequate storage and disposal of all solid and recyclable waste generat ed by the Project shall be obtained from the City’s Environmental Programs and Operations Manager. A fire suppression sprinkler system shall be provided within any covered trash enclosure area as required by the Fire Marshal. All refuse containers assigned to or otherwise used by the Project shall be stored on-site in the trash enclosures. Public Works/ Fire/ Planning Standard 14. All Project related so lid and recyclable waste material handling sha ll be in accordance with CCMC Section 5.01.010 – “Solid Waste Management”, which outlines the Sanitation Division’s exclusive franchise for this service. Public Works Standard ATTACHMENT 7 75EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 4 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 15. All buildings and structures to be constructed as part of the Project s hall be designed and constructed in accordance with all applicable regulations and standards of the City’s Building Code, Fire Code and any related codes as determined by the Buildi ng Official and Fire Marshal; and all other applicable provisions of the CCMC which are adopted and in effect at the time of issuance of a building permit. Building/ Fire Standard 16. Any new utilities shall be placed underground or enclosed within the build ing construction; no new overhead utilities shall be permitted. Building/ Planning Standard 17. The Project shall comply with all applicable requirement of the Culv er City Green Building Program as set forth in CCMC Section 15.02.1100, et.seq. Building Standard 18. The Project shall comply with the all applicable requirements relating to solar photovoltaic requirements as set forth in CCMC Section 15.02.100, et. seq. Building Standard 19. Changes to the Project or use approved as part of the Land Use Permit may only be made in accordance with the provisions of CCMC Section 17.595.035 – “Changes to an Approved Project”. Planning Standard 20. The Project shall provi de up to a 14-foot high wall along the shared pr operty line between the school’s playground and the abutting residential properties (12028 to 12042 Sylvester Street) in the City of Los A ngeles. Plans for the wall shall be provided to the Culver City Planning Division and abutting property owners for review and comment prior to submi ttal to the City of Los Angeles. Planning Special ATTACHMENT 7 76EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 5 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 21. A covenant and agreement, on a form provided by the Planning Division and in form and substance acceptable to the City Attorney, acknowledging and agreeing to comply with all terms and conditions established herein, shall be signed by the Property Owner and recorded in the County Recorder’s Office. The covenant and agreement shall run with the land and shall be binding on any subsequent owners, and tenants or occupants of the Property. After recordation, a certified copy bearing the Recorder’s number and date shall be provided to the Planning Division. Planning/ City Attorney Standard 22. The Applicant and Property Owner shall indemnify and agree to defend (at the Applicant’s and Property Owner’s sole expense, with legal counsel appr oved by the City) and hold harmless the City, and its elected and appointed officials, officers, employees, agents, contractors and consult ants from and against any and all loss, damages, injuries, costs, expenses, liabilities, claims, demands, lawsuits, attorneys’ fees and judgments, arising from or in any manner connected to any third party challenge to the City's approval of the Project. The obligations required by this Condition shall be set forth in a written instrument in form and substance acceptable to the City Attorney and signed by the Applicant and the Property Owner. City Attorney Standard 23. A minimum of three sets of final landscaping and irrigation plans (separ ate from the plans submitted for the build ing permit) shall be submitted to the Planning Division for review and approval. Planning/ Parks & Rec. Standard ATTACHMENT 7 77EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 6 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 24. A Construction Managem ent Plan prepared by the construction contractor, which identifies the areas of construction staging, temporary power, portable toilet, and trash and material storage locations, shall be submitted to and approved by the Building Official. Prior to commencement of work the construction contractor shall advise the Public Works Inspector and the Building Inspector (‘Inspectors”) of the construction schedule and shall meet with the Inspectors. Building/ Public Works Standard 25. A Pedestrian Protection Pl an shall be submitted to and approved by the Building Official. Such plan shall identify all areas of pedestrian protection and indicate the method of pedestrian protection or pedestrian diversion when required. When pedestrian diversion is required, the Pedestrian Protection Plan must also be approved by the Public Works Director. Building/ Public Works Standard 26. Plans submitted as part of the building permit application shall include a schedule of the special inspections anticipated, the firm proposed for the special inspections, and the resumes of all proposed special inspectors. The Building Official reserves the right to reject any special inspector at any time for the duration of the Project. All specia l inspection reports shall be made available to the Building Official and to any Culver City Building Safety inspector as required by the Building Official No work shall be covered without a Culver City Building Safety inspection, whether or not a special inspection was performed on such work. Building Standard ATTACHMENT 7 78EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 7 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 27. A Construction Traffic Management Plan shall be prepared by a traffic or civil engineer registered in the State of California. The Construction Traffic Management Plan shall be submitted to the City Engineer and Planning Manager for review and approval prior to the issuance of any Project demolition, grading, or excavation permit. The Construction Traffic Management Plan shall al so be reviewed and approved by the City’s Fire and Police Departments. The City Engineer and Planning Manager reserve the right to reject any engineer at any time and to require that the Plan be prepared by a different engineer. The Construction Traffic Management Plan shall contain, but not be limited to, the following: A. The name and telephone number of a contact person who can be reached 24 hours a day regarding construction traffic complaints or emergency situations. B. An up-to-date list of local police, fire, and emergency response organizations and procedures for the continuous coordination of construction activity, potential delays, and any alerts related to unanticipated road conditions or delays, wit h local police, fire, and emergency response agencies. Coordination shall include the assessment of any alternative access r outes that might be required through the Property, and maps showing access to and within the Property and to adjacent properties. C. Procedures for the tr aining and certification of the flag persons used in implementation of the Construction Traffic Management Plan. D. The location, times, and estimated duration of any roadway closures , traffic detours, use of protective devices, warning signs, and staging or queuing areas. E. The location and travel routes of off-site staging and parking locations. Planning/ Public Works Standard ATTACHMENT 7 79EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 8 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 28. Reasonable efforts shall be used to reuse and recycle construction and demolition debris, to use environmentally friendl y materials, and to provide energy efficient buildings, equipment and systems. A Demolition Debris Recycling Plan that indicates where select demolition debris is to be sent shall be provided to the Building Official prior to the issuance of a demolition permit. The Plan shall list the material to be recycled and the name, address, and phone number of the facility of organization accepting the materials. Building Standard 29. A vector/pest control abatement plan prepared by a pest control specialist licensed or certified by the State of Californi a shall be submitted for review and approval by the Planning Manager and the Building Official. Said plan shall outline all steps to be taken pr ior to the commencement of any demolition or construction activity in order to ensure that any and all pests (including, but not limited to, rodents, bees, ants and mosquitoes) that may populate the Property do not relocate to or impact adjoining properties. Building/ Planning Standard 30. Prior to issuance of a building permit, notice of the Project construction schedule shall be provided to all abutting property owners and occupants. Evidence of such notification shall be provided to the Buildi ng Division. The notice shall identify the co mmencement date and proposed timing for all construction phases (demolition, grading, excavation/shoring, foundation, rough frame, plumbing, roofing, mechanical and electrical, and exterior finish). Building Standard 31. The building shall be structurally upgraded to the current, 2010 California Building Code. An outside structural review will be required at an additional cost to the Applicant. Building Special ATTACHMENT 7 80EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 9 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 32. During all phases of construction, a “Construction Rules Sign” that includes contact names and telephone number s of the Applicant, Property Owner, construction contractor(s), and the City, shall be posted on the Property in a location that is visible to the public. These names and telephone numbers shall also be made available to adjacent property owners and occupants to the satisfaction of the Planning Manager and Building Official. Building/ Planning Standard 33. The Property shall be maintained daily so that it is free of trash and litter. Building Standard 34. During construction, dust shall be controlled by regular watering or other methods as determined by the Building inspector. Building Standard 35. The Building Division may apply administrative assessments and/ or pos t general stop work notices for any violations of the Conditions of Approval for the Project, and any violations of the CCMC. Building Standard 36. During all phases of construction, best efforts shall be used to ensure that all construction workers, contractors and others involved with the Project park on the Property or at designated offsite locations approved by the City, and not in the surrounding neighborhood. Building Standard 37. When foundation shoring and/or foundation piles will be part of the Projec t, the engineer of record shall use noise dampening measures such as the drilling of shorin g supports and piles as determined by the Building Official and Planning Manager. Building/ Planning Standard ATTACHMENT 7 81EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 10 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 38. Prior to the commencement of any excavation, a temporary construction f ence shall be installed around the site. The height and fence material is subject to approval by the City Engineer and the Planning Manager. Building/ Planning/ Public Works Standard 39. Hours of construction sh all be limited to the following: 8:00 AM to 8:00 PM Monday through Friday; 9:00 AM to 7:00 PM Saturday; and 10:00 AM to 7:00 PM Sunday and National holidays. Dirt hauling and construction material deliveries or removal are prohibited during the morning (7:00 AM to 9:00 AM) and afternoon (4:00 PM to 6:00 PM) peak traffic periods. All construction workers shall be respectful of the surrounding neighborhood and keep non-construction related noise to a minimum prio r to, during, and after permissible construction hours. Building/ Public Works Standard 40. All staging and storage of construction equipment and materials, including the construction dumpster, shall be on-site only. The Property Owner must obtain written permission from adjacent property owners for any construction staging occurring on adjacent property. Building/ Public Works Standard ATTACHMENT 7 82EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 11 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 41. Compliance with the following noise standards shall be required with at all times: A. No construction equipment shall be operated without an exhaust muffler, and all such equipment shall have mufflers and sound control devices (i.e., intake silencers and noise shrouds) that are no less effective than those provided on the original equipment; B. All construction equipment shall be properly maintained to minimize noise emissions; C. If any construction vehicles are serviced at a location onsite, the vehicle(s) shall be setback from any street and other property lines so as to maintain the greatest distance from the public right-of- way and from Noise Sensitive Receptors; D. Noise impacts from stationary sources (i.e., mechanical equipment, ventilators, and air conditioning units) shall be minimized by proper selection of equipment and the installation of acoustical shielding as approved by the Planning Manager and the Building Official in order to comply with the City’s Noise Regulations and Standards as set forth in CCMC Chapter 9.07; and E. Stationary source equipment (i.e., compressors) shall be located so as to maintain the greatest distance from the public right-of-way and from Noise Sensitive Receptors. Building/ Planning Standard ATTACHMENT 7 83EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 12 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 42. In the event three citations are issued in connection with the Projec t for violations of these Conditions of A pproval or for other violations of the CCMC , Project construction shall be stopped until such time that it is determined to the satisf action of the Community Development Director, that causes of such violations have been eliminated or corrected and that the Project will be able to proceed in full compliance with these Conditions of Approval and the CCMC. Building/ Planning Standard 43. Flag persons with certified training shall be provided for work site tra ffic control to minimize impacts to traffic flow and to ensure the safe movement of vehicles into and out of the Property. Building/ Public Works Standard 44. During construction, trucks and other vehicles in loading and unloading queues must be parked with their engines off to reduce vehicle emissions. Construction deliveries shall be phased and scheduled to avoid emissions peaks as determined by the Building Official and discontinued during second-stage smog alerts. Building Standard 45. Construction vehicles s hall not be permitted to stage or queue where they would interfere with vehicular and pedestrian traffic or block access to adjacent properties. Off-site staging shall be at locations approved by the City Engineer and shall be of sufficient length to accommodate large trucks without being unduly disruptive to traffic operations. The drivers of these trucks shall be in radio or phone communication with on-site personnel who shal l advise the drivers when to proceed from the staging location to the Property. Construction-related vehicles shall not be permitted to park on public streets. Building/ Public Works Standard ATTACHMENT 7 84EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 13 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 46. All provisions, and requirements set forth in these Conditions of Approval, in the Resolution approving the project, in the CCMC, or in any applicable written comments as provided by City representatives on January 5, 2012 at the Project Review Committee meeting on the Land Use Permit application, shall be fulfilled and satisfied to the satisfaction of all City departments before the us e may be established or the Project occupied. All Standard 47. All requirements of the City’s Art in Public Places Program, as set forth in CCMC Section 15.06.100, et. seq., shall be fully satisfied prior to the issuance of a certificate of occupancy; provided, that if such requirements will be satisfied by the payment of the public art in-lieu fee, the same shall be paid prior to the issuance of a building permit. Cultural Affairs Standard ATTACHMENT 7 85EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 14 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 48. All onsite and offsite improvements and all conditions of approval ex cept those which are deferred pursuant to a bond or letter of credit as determined and approved by the Building Official, Fire Marshal, Pl anning Manager, and/or City Engineer shall be completed prior to issuance of any certificate of occupancy. Prior to issuance of any certificate of occupancy the following shall be provided to and approved by the City: A. Five full sets of as-built plans that shall include at a minimum the site plan, grading and utility plan, landscape and irrigation plan, floor plan for each level of the Project, parking st ructure plan, roof plan with all mechanical equipment identified as to purpose and source and all offsite improvements; and B. One set of as-built plans as described above in a digital format compatible with the City’s computer system. All Standard 49. The existing drive approach on Washington Boulevard west of Inglewood Boulevard shall be removed and replaced with an ADA compliant, high-speed drive approach. Obtain a separate permit form from the Engineering Division. Public Works Special ON-GOING 50. The use and development of the Property shall be in substantial conf ormance with the plans and materials submitted with the application for the Land Use Permit as reviewed by the City Council at its meeting on September 10, 2012, excepted as modified by these Conditions of Approval. Planning Standard ATTACHMENT 7 86EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 15 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 51. Pursuant to CCMC Section 17.650.020 - “Inspection”, the Property Owner and Applicant shall allow authorized City officials, or their designees, access to t he Property where there is reasonable cause to believe the Property is not in compliance with these Conditions of Approval or other requirements of the CCMC. All Standard 52. Follow-up review reports on the operation of the Traffic Management Progr am (TMP) shall be submitted to the Planning Division after six months and after one year of full operation. The Applicant shall enter into a Memorandum of Understanding (MOU) wit h City which outlines the scope and content of the reports. If it is determined by the Planning Manager and the City’s Traffic Engineer that the goals of the TMP are not achieved, addi tional requirements may be imposed as determined by the Planning Manager and the City’s Traffic Engineer. Planning/ Public Works Special 53. The maximum number of students for the combined Village Glen School and Summit View School shall not exceed 600. A letter verifying the student enrollment shall be submitted annually to the Planning Manager no more than 30 days after the commenc ement of the school year. Planning Special 54. No more than 15 permits shall be issued for students to drive to the Summit View School. Planning Special 55. The maximum number of staff for the combined Village Glen School and Summit View School shall not exceed 177. A lis t of all staff shall be submitted to the Plan ning Manager annually 14 days prior to the comm encement of the school year. Planning Special 56. Transports dropping-off and picking-up students in the Grand View Boulevard parking lot and drop area (adjacent to the Washington Boulevard and Grand View Boulevard intersection) shall be permitted to exit the area using a left turn or right turn onto Grand View Boulevard. Planning Special ATTACHMENT 7 87EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 16 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 57. Transports dropping-off and picking-up students in the Grand View Boulevard parking lot and drop area (adjacent to the Washington Boulevard and Grand View Boulevard intersection) shall be permitted to exit the area using a left turn or right turn onto Grand View Boulevard. Planning Special 58. Metered street parking s hall not be used for a queuing area to the site. No School-operated vehicles shall use the metered street parking at any time. Public Works Special 59. The Applicant has voluntarily agreed that it shall waive its right to request any future increase in the number of students beyond the 600 students permitted by this Conditional Use Permit Modification. Planning Special 60. To alleviate the fi nancial impact on City resources due to its non-profit status, and to help ensure the public health, safety and welfare are provided, the Applicant, on behalf of itself and each of its successors and assigns, has voluntarily agreed, for as long as the Applicant and any non-profit succe ssor or assign takes benefit of this Conditi onal Use Permit, to reimburse the City for lost property tax and business tax revenue, and cost for emergency services, in the amount of $17,050 annually. Applicant shall make said payment to the City’s General Fund on or bef ore June 30 of each year. The payment shall be increased annually based on the Bureau of Labor Statistics Consumer Price Index (CPI) for the Los Angeles-Riverside-Orange County Metropolitan Area published in June of each year. Planning Special ATTACHMENT 7 88EXHIBIT A RESOLUTION NO. 2012-R-____ Case No. CUP/M P-2011175 12095-12101 Washington Boulevard Page 17 of 17 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 61. The use and development of the Property shall comply with these Conditions of Approval and all applicable local, special district or authority, county, state and feder al statutes, codes, standards, and regulations including, but not limited to, Building Divis ion, Fire Department, Planning Division and Public Works Department requirements, and shall comply with all applicable CCMC requirements and all comments made during the City’s building permit plan check review process. Failure to comply with said Conditions, statutes, codes, standards, and regulations may result in reconstruction work, dem olition, stop work orders, withholding of cert ificate of occupancy, revocation of land use permit approval and/or any other lawful action the City might deem reasonable and appropriate to bring about compliance. All Standard 62. All graffiti shall be re moved from the Property within 48 hours of its application. Building/ Planning/ Public Works Standard 63. The Property Owner shall maintain all street trees along the property frontage at his/her sole cost and expense. Public Works Standard 64. All mitigation measures set forth in any environmental document rela ting to the Project (including any reports of the type contemplated by the California Envir onmental Quality Act) shall be completed as specified therein. Planning Standard ATTACHMENT 7 89ATTACHMENT 8 90 T 8 91 ATTACHMENT 8 92 93 T 8 94 ATTACHMENT 8 95 ATTACHMENT 8 96 ATTACHMENT 8 97 T 8 98 T 8 99 8 100 NT 8 101 NT 8 102 ATTACHMENT 8 103 ATTACHMENT 8 104 REGULAR MEETING June 20, 2012 OF THE PLANNING COMMISSION 7:00 p.m. CITY OF CULVER CITY, CALIFORNIA Call to Order & Roll Call The meeting of the Planning Commission was called to order at 7:01 p.m. Present: Anthony Pleskow, Chair (via teleconference) Scott Wyant, Vice Chair John Kuechle, Commissioner Linda Smith Frost, Commissioner Marcus Tiggs, Commissioner o0o Pledge of Allegiance Thomas Gorham, Planning Manager, led the Pledge of Allegiance. o0o Comments for Items NOT on the Agenda Heather Baker, Assistant City Attorney, discussed Brown Act issues noting that all requirements had been met; she clarified that the hearing had been continued; and she discussed proper public hearing noticing procedures. Commissioner Kuechle received clarification regarding notice regarding the continuation of the meeting. Vice Chair Wyant invited public participation. No cards were received and no speakers came forward. o0o ATTACHMENT 8 105Planning Commission Minutes June 20, 2012 Page 2 of 7 Public Hearing Item PH-1 Reconsideration of Denial of Conditional Use Permit Modification (CUP/M 2011-175) – to permit the addition of 200 students to an existing private school located at 12095-12101 Washington Boulevard Thomas Gorham, Planning Manager, provided a brief summary of the material of record. Discussion ensued between staff and Commissioners regarding annual payments and adjustments; reimbursement for the cost of police and fire calls; and lost property and business tax revenue. Vice Chair Wyant opened the public hearing and invited public comment. Thomas Gorham, Planning Manager, read a written statement submitted by Alan Corlin. The following member of the audience addressed the Commission: Carlene Brown provided background on herself and expressed support for The Help Group. Dr. Barbara Firestone, The Help Group, expressed appreciation to the Commission for its reconsideration of the item; summarized proposed mitigations; and noted that the student population would be gradually increased. MOVED BY COMMISSIONER KUECHLE, SECONDED BY COMMISSIONER TIGGS AND UNANIMOUSLY CARRIED, THAT THE PLANNING COMMISSION CLOSE THE PUBLIC HEARING. Discussion ensued between staff and Commissioners regarding a belief that the project should go before the City Council for their consideration; best interests of the City; negative impacts of numerous schools in the City that consume resources but do not pay property taxes; analyzing relevant policy issues; the offer of annual payments to offset certain losses; the last minute offer by The Help Group; careful consideration of proposals; whether the estimate of tax losses is adequate; clarification that the ATTACHMENT 8 106Planning Commission Minutes June 20, 2012 Page 3 of 7 site is zoned for commercial use; clarification that the tax reimbursement figure is only for the additional students; the need for a full and complete legal analysis; power of the Commission; legal risks of imposing a property tax recovery fee; the Emerald Estates lawsuit; whether the Commission can make the findings called for by the zoning code; the sound study; noise levels of the outdoor graduation ceremonies; noise impacts of the project after mitigation; the noise element of the Culver City General Plan; the true traffic impact of the project; incremental increases; clarification that The Help Group studied only the increase rather than the entire project; language regarding conflicts between vehicles; original concerns; concern that The Help Group obscures facts to give their project a better chance; The Help Group assertion that they would waive any future right to increase the number of students; appearing to give concessions without doing so; the purchase of adjacent property for future expansion; and a suggestion to adopt the denial resolution and add language regarding noise concerns. Additional discussion between Commissioners and staff ensued regarding rumors; making the necessary findings; appreciation to the Help Group for their concessions; City Council changes regarding non—profits; support for the project; the Emerald Estates matter; public parking spaces; the established land use; time necessary to consider the issues; the need for long-term planning; traffic and parking concerns; the five on-street parking spaces; reevaluation of the flow of traffic and parking; the need to observe the situation; additional mitigation measures; street impacts; the City threshold for significant impact; the location of waiting vehicles; alerting parents that they are not to arrive more than 10 minutes early for pick up; students picked up by other than parents; and regulating pick up procedures. Discussion continued between Commissioners, staff and Help Group representatives regarding where buses and cabs wait for pick up; space within campus to accommodate all vehicles; clarification that buses and cabs currently wait all over the neighborhood; concern with getting the cars in and out in an efficient manner; a previous condition that cabs and buses not park in metered parking; the current plan vs. the future plan; the three story parking structure; and when the new parking plan would be implemented. ATTACHMENT 8 107Planning Commission Minutes June 20, 2012 Page 4 of 7 Further discussion ensued between staff and Commissioners regarding concern that the decision is a City Council level decision but Commissioners are being called upon to decide anyway; concern with causing undue burden for the Help Group; the importance of the matter; concern with being asked to make a judgment without being able to ask all the questions; concern with setting a precedent; policy issues vs. the specific project; concern with denying the project to make a broader point; the response of the Help Group to mitigate issues; imposition of fees vs. voluntary agreement; concern with legal issues; and the 6-month and 12-month evaluation periods for circulation. MOVED BY COMMISSIONER TIGGS AND SECONDED BY CHAIR PLESKOW THAT THE PLANNING COMMISSION APPROVE THE CUP/M P-2011175 TO ALLOW FOR A 600-STUDENT PRIVATE SCHOOL FOR SPECIAL NEEDS STUDENTS AT 12095-12101 WASHINGTON BOULEVARD IN THE COMMERCIAL GENERAL (CG) ZONE SUBJECT TO THE CONDITIONS OF APPROVAL SET FORTH IN EXHIBIT A, AND APPROVAL OF THE NEGATIVE DECLARATION. THE MOTION FAILED BY THE FOLLOWING ROLL CALL VOTE: AYES: PLESKOW, TIGGS NOES: KUECHLE, SMITH FROST, WYANT ABSENT: NONE ABSTAIN: NONE Commissioner Kuechle added language regarding being unable to make the findings with regard to noise for the Denial Resolution which included: on page 3 of the resolution on the first line where it says ‘related to traffic’ inserting the words ‘noise on abutting residential neighborhoods and’ before the word traffic; and in the second line of the finding in paragraph E add ‘and increased noise’ after ‘increased traffic around the school site’. MOVED BY COMMISSIONER KUECHLE AND SECONDED BY VICE CHAIR WYANT TO ADOPT RESOLUTION 2012-P0015 WITH THE CHANGES DESCRIBED ABOVE. AYES: KUECHLE, SMITH FROST, WYANT NOES: PLESKOW, TIGGS ABSENT: NONE ABSTAIN: NONE ATTACHMENT 8 108Planning Commission Minutes June 20, 2012 Page 5 of 7 Thomas Gorham, Planning Manager, explained appeal procedures. o0o Consent Calendar Item C-1 Secretary’s Report Thomas Gorham, Planning Manager, read the Secretary’s Report and noted that it was no longer required that the Planning Commission receive and file them anymore. MOVED BY COMMISSIONER TIGGS, SECONDED BY VICE CHAIR WYANT AND UNANIMOUSLY CARRIED, THAT THE PLANNING COMMISSION RECEIVE AND FILE THE REPORT OF THE SECRETARY REGARDING THE POSTING OF THE AGENDA FOR THIS MEETING. o0o Item C-2 Meeting Minutes – May 9, 2012 and May 23, 2012 A discussion ensued between staff and Commissioners regarding a statement in the May 23, 2012 meeting minutes indicating that a portion of the meeting was inaudible; whether a recording of that portion of the meeting exists; providing coverage in the minutes for that portion of the meeting; and agreement to bring back revised minutes with the missing portion of the meeting included. MOVED BY COMMISSIONER SMITH FROST, SECONDED BY COMMISSIONER TIGGS AND UNANIMOUSLY CARRIED, THAT THE PLANNING COMMISSION APPROVE THE MINUTES OF MAY 9, 2012. o0o Items from Staff Thomas Gorham, Planning Manager, discussed upcoming meetings and agenda items. o0o ATTACHMENT 8 109Planning Commission Minutes June 20, 2012 Page 6 of 7 Items from Planning Commissioners Commissioners thanked fellow Commissioner Tiggs for his service to the Commission as this was his last meeting. Commissioner Tiggs thanked his fellow Commissioners, staff and the City Council for the chance to serve. Thomas Gorham, Planning Manager indicated plans to honor Commissioner Tiggs before the July 11, 2012 Commission meeting. o0o Adjournment There being no further business, at 8:24 p.m. the Culver City Planning Commission adjourned to the next regular meeting on Wednesday, July 11, 2012, at 7:00 p.m. in the Mike Balkman Council Chambers. o0o YVONNE D. HUNT SECRETARY of the CULVER CITY PLANNING COMMISSION APPROVED ____________________ SCOTT WYANT VICE CHAIR of the CULVER CITY PLANNING COMMISSION City of Culver City, California ATTACHMENT 8 110Planning Commission Minutes June 20, 2012 Page 7 of 7 I declare under penalty of perjury under the laws of the State of California that, on the date below written, these minutes were filed in the Office of the City Clerk, City of Culver City, California and constitute the Official Minutes of said meeting. _________________________ _________________________ Martin R. Cole Date CITY CLERK ATTACHMENT 8 111ATTACHMENT 9 112 ATTACHMENT 9 113 STATE CAPITOL P.O. BOX 942849 SACRAMENTO, CA 94249-0047 (916) 319-2047 FAX (916) 319-2147 DISTRICT OFFICE 300 CORPORATE POINTE SUITE 380 CULVER CITY, CA 90230 (310) 342-1070 FAX (310) 342-1078 HOLLY J. MITCHELL ASSEMBLYMEMBER, FORTY-SEVENTH DISTRICT COMMITTEES Committee on Accountability and Administrative Review Committee on Appropriations Committee on Budget Committee on Health Committee on Public Safety Joint Legislative Budget August 20, 2012 Culver City Council 9770 Culver Boulevard Culver City, CA 90232 Dear City Council Members: It is my privilege to represent The Help Group in my Assembly district. Since its founding in 1975, The Help Group has been at the forefront of creating innovative programs for children with special needs related to autism spectrum disorders, learning disabilities, ADHD, developmental delays, and valued mental health services that address abuse and emotional challenges. As the Chair of the Assembly’s Budget Sub-committee on Health & Human Services, I know the importance of providing high-quality programs to children with special needs and their families. The Help Group’s programs have contributed greatly to the health, well-being, and education of children with autism and other special needs in California, and I strongly support their application for increased enrollment at their Culver City campus. In light of the ever-growing number of children affected by autism and other mental health needs, The Help Group’s work in this area has never been more important. Sincerely, Holly J. Mitchell Assemblymember 47th District ATTACHMENT 9 114 August 21, 2012 Culver City Council 9770 Culver City Boulevard Culver City, CA 90232 Dear Members of the City Council: The welfare of individuals with special needs has always been a passion and focus of my public service. I became familiar with The Help Group through their sponsorship of the Senate Joint Resolution that established the California Legislative Blue Ribbon Commission on Autism. After this legislation was passed with strong bipartisan support, I had the privilege to serve as its Chair. Dr. Barbara Firestone, President and CEO of The Help Group, served as the Vice-Chair. More recently, I was pleased to appoint Dr. Firestone as Chair, Statewide Coordinating Council of Autism Taskforces for the Senate Select Committee on Autism & Related Disorders. The Help Group is at the forefront of efforts to improve the quality of life for children with autism and is proactive in its endeavors to help address the demand for services created by the increasing number of children identified with autism spectrum disorders. Their innovative programs have contributed greatly to the well-being of children with autism in our state. I wholeheartedly support the important work of The Help Group and their proposed Culver City expansion. These new facilities will enable 200 children to receive crucial educational services. Thank you for your consideration of their application for increased enrollment at their Culver City campus. Sincerely, DARRELL STEINBERG President pro Tempore DS:kd ATTACHMENT 9 115CURREN D. PRICE, JR. 26 th SENATE DISTRICT August 23, 2012 Culver City Council 9770 Culver Boulevard Culver City, CA 90232 Dear Members of the City Council: I am honored to represent The Help Group, a dynamic and vibrant nonprofit organization, whose Culver City campus is located in my 26th Senate District. The Help Group is at the leading edge of providing evidence-based treatments and educational programs for children with special needs related to autism spectrum disorders, learning disabilities, ADHD, developmental delays, abuse and emotional problems. The well-being of children is of special importance to me. As a member of the California Senate Select Committee on Autism & Related Disorders, I have become very familiar with the issues and struggles faced by families who have a child with developmental disabilities. The need for autism programs is immense. The Help Group’s great breadth and depth allow them to provide a seamless range of services including early education, therapy, day schools for pre-K through high school students, as well as vocational education and transition planning to prepare students for increasing levels of independence. I recently had the pleasure of touring The Help Group’s Culver City campus and meeting some of the children they serve. The Help Group’s many contributions to our community are truly invaluable, and I am proud to support their application for increased enrollment in their Culver City schools Given that the rate of autism has increased yet again to 1 in every 88 children, the work of The Help Group has never been more vital, and I thank you for your careful consideration of their application. Sincerely, CURREN D. PRICE, JR. 26TH SENATE DISTRICT ATTACHMENT 9 116117 ATTACHMENT 9 ATTACHMENT 9 118           Scott Malsin            4237 Neosho Ave.            Los Angeles, CA 90066               The Honorable Mayor and Members of the City Council  City of Culver City  9770 Culver Blvd.  Culver City, CA 90232    Monday, August 27, 2012      Dear Mayor Weissman and Councilmembers,    I am writing in support of the application by The Help Group to increase the enrollment at their Culver  City campus.    It goes without saying that The Help Group provides important services to children in our community.  For reasons that are not well understood, an increasing number of children are afflicted by autism. The  Help Group is a highly-regarded service provider, assisting children who need more than our public  school system can offer.    As a west side resident, I am familiar with the school’s operations. I’ve had the opportunity to review  the improvements they will make in conjunction with the increased student population. I believe they  will make a good neighbor even better. Particularly:    1) The revised drop-off/pick-up plan will entirely eliminate the occasional and minor traffic  backups that have occurred in the past;  2) The increased height of the property wall will reduce any noise spill-over generated by activity  on campus; and  3) The pedestrian bridge from the second floor of the parking structure will provide more  convenient access to the existing medical offices on the property, which should ensure the long- term success of that portion of the site programming.    I encourage you to contact me in the event you have any questions.    Thank You,        Scott Malsin  Former Mayor, City of Culver City  ATTACHMENT 9 119Diana Hauptman 8925 Carson Street Culver City, CA 90232 310-839-0862 dianahauptman@yahoo.com City of Culver City - City Hall 9770 Culver Blvd. Culver City, CA 90232 August 19, 2012 Honorable Mayor Distinguished City Council Members We advocate your support for the Help Group to develop the adjoining building on their property to accomodate 200 more students. We appreciate the work of the Help Group and the necessary services it provides for children with disabilities. As co-presidents of the Friends of the Culver City Y outh Health Center we share similar values and know how important it is for children to have the opportunities they need for their deveplopment into functioning members of our society. It benefits everyone when children are healthy in mind and body and able to achieve. We believe the Help Group is an asset to our community and would like to see their work acknowledged by your positive vote. Sincerely, Diana Hauptman Andy Alexander ATTACHMENT 9 121122 ATTACHMENT 9 123 ATTACHMENT 9 125