CITY COUNCIL AGENDA ITEM: Award of a Contract to Williams Pipeline
Contractors, Inc. as the Lowest Responsive and Responsible Bidder for the
Construction of Kerr Way Sewer Project, P-230
Contact Person/Dept.: Sammy Romo/PW Phone Number: 310-253-5619
Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X]
Public Hearing: [] Action Item: [] Attachments: [X]
Commission Action Required: Yes [] No [X] Date: _______________
Public Notification: (E-Mail) Meetings and Agendas – City Council (12/07/12); (E-Mail)
All Bidders (12/05/12); (E-Mail) Residents of Kerr Way (12/05/12)
Department Approval:
Charles D. Herbertson (11/29/12)
City Attorney Approval:
Carol Schwab (by H. Baker) (12/06/12)
Chief Financial Officer Approval:
Jeff Muir (by K. Marsden) (12/06/12)
City Manager Approval:
John M. Nachbar (12/07/12)
RECOMMENDATION:
Staff recommends the City Council:
1) Award a contract to Williams Pipeline Contractors, Inc., as the lowest responsive
and responsible bidder, in the amount of $38,900, for the construction of the
Kerr Way Sewer Replacement Project, P-230; and,
2) Authorize the Public Works Director/City Engineer to increase the construction
contract with Williams Pipeline Contractors, Inc. in an amount not to exceed
$3,890 (10% of base bid) for construction contingencies.
BACKGROUND/ DISCUSSION:
The existing sewer main pipe on Kerr Way was video inspected and determined to
need replacement with a new pipe. A new eight-inch diameter sewer main and
sewer laterals were designed by Staff. There are six properties on Kerr Way and
their sewer laterals will be reconnected at the property lines. The existing street
surface consists of large pieces of concrete and it will be restored to its present
condition.
Staff mailed a survey to the six adjacent residents requesting their input if the City
should replace the existing roadway surface with asphalt or to leave the street
surface as is. The residents were equally split on the issue.
City of Culver City, California
Agenda Item Report
The Director of Public Works/City Engineer administratively approved this project be
advertised for bids since the engineer’s estimate is less than the $75,000 threshold
requiring City Council approval.
On November 15, 2012, the City Clerk publicly opened the bids. Five contractors
responded with the following bid amounts:
CONTRACTOR BID AMOUNTS
1 Williams Pipeline Contractors, Inc. $38,900
2 GRFCO, Inc. $39,600
3 F.S. Construction $41,700
4 The Richards Group $43,600
5 Vasily Company, Inc. $47,000
Staff reviewed the five sets of contractor bid documents and determined Williams
Pipeline Contractors, Inc. submitted the lowest total base bid. Staff reviewed the bid
proposal from Williams Pipeline Contractors, Inc. and found their bid documents
responsive and complete. Williams’ bid bond, contractor’s license, and worker’s
compensation insurance were reviewed and determined to meet City requirements.
Williams Pipeline Contractors, Inc. has completed several similar projects for other
cities in the area. Also, Williams successfully completed the Tellefson Sewer
Replacement Project for Culver City in 2003. Staff contacted the other agencies
listed as references in the bid documents and determined that Williams’ received
favorable comments.
Staff recommends awarding the construction contract to Williams Pipeline
Contractors, Inc., as the lowest responsive and responsible bidder, for the
construction of the Kerr Way Sewer Project, P-230, in the contract amount of
$38,900.
The construction management and inspection of the project will be conducted by the
Public Works Department Engineering Division staff.
The proposed construction project will begin in January 2013 and is expected to be
completed by February 2013, weather permitting.
Public Notification
Approximately 2 weeks prior to construction activity, the adjacent residences will be
provided with written information on the project schedule and contact information for
questions and/or concerns regarding the project.
City of Culver City, California
Agenda Item Report
FISCAL ANALYSIS:
Project Budget
Funding Source Amount
P-230 Sewer Enterprise Fund
(20480000.PZ230)
$150,000
Total = $150,000
Estimated Project Expenses
Construction, Kerr Way Sewer Project,
P-230
$38,900
Subtotal $38,900
10% project contingency $3,890
Total Estimated Project Expenses $42,790
ATTACHMENT:
1. Vicinity Map
MOTIONS:
That the City Council:
1) Award a contract to Williams Pipeline Contractors, Inc., as the lowest responsive
and responsible bidder, for the Kerr Way Sewer Project, P-230, in the amount of
$38,900, based on its base bid; and,
2) Authorize the Public Works Director/City Engineer to approve change orders in
the amount not-to-exceed $3,890, if necessary; and,
3) Authorize the City Attorney to review/prepare the necessary documents; and,
4) Authorize the City Manager to execute such documents on behalf of the City.
MEETING DATE: 12/10/12
AGENDA ITEM:
Award of a Contract to Williams Pipeline Contractors, Inc. as
the Lowest Responsive and Responsible Bidder, for the
Construction of Kerr Way Sewer Project, P-230
ATTACHMENTS
Pages
1 Vicinity Map 1 Attachment No. 1
VICINITY MAP
KERR WAY SEWER REPLACEMENT PROJECT, P-230
‘7 Source: PUBLIC
Map Created: 11/27/2012
Meeting Date:
THE CITY OF
CULVER CITY
INFORMATION TECHNOLOGY DEPARTMENT
GEOGRAPHIC INFORMATION SYSTEMS
9770 CULVER BLVD
CULVER CITY, CA 90232
TEL: 310-253-5976
Scale: 1:2,940
122.49 245.0 Feet
7