Legislation Details

File #: HIST-979    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 8/22/2005 Final action: 8/22/2005
Title: Approve final plans and specifications and authorize advertising for bids for the Sewer Improvement Project, P-839, 840, 841, & 842.
Attachments: 1. 05-08-22Sewer Improvement Project C-5.doc, 2. Sewer Improvement C-5.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends that the City Council approve the final plans and specifications and authorize advertising for bids for the Eveward Road, Drakewood Avenue, Whitburn Street, and Flaxton Street Sewer Improvement Projects (Sewer Improvement Project), P-839, 840, 841, & 842. BACKGROUND/ DISCUSSION: In 1999, a Citywide Sewer Video Analysis and Condition Assessment Study (Study) began and for the next four years, about 20 miles of sewer line was videotaped and inspected every year. The Study was completed in June 2004. Approximately 85 miles of the City’s sewer lines were video inspected. The Study categorized the City’s sewer main lines into four groups; A, B, C, and D. Group A represents the highest priority ranking for replacement and Group D represents the lowest. The ranking was based on conditions such as severity of cracks, root intrusion, offset joints, and other variables. Based on the Study, the existing 8 inch Vitrified Clay Pipe (VCP) sewer mains along the following streets were classified as Group A, the highest priority requiring replacement: 1. Eveward Road from Bernardo Road to Ranch Road; 315 linear feet. 2. Drakewood Avenue from Ranch Road to Flaxton Avenue; 775 linear feet. 3. Flaxton Avenue from Overland Avenue to Drakewood Avenue; 1660 linear feet. Meeting Date: 8/22/05 Item Number: C-5 AGENDA ITEM: Consideration to Approve the Final Plans and Specifications and Authorize Advertising for Bids for the Eveward Road, Drakewood Avenue, Whitburn Street, and Flaxton Street Sewer Improvement Projects Contact Person/Dept.: Lee Torres/Public Works Phone Number: 310.253.5623 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [X] Attachments: [X] Public Notification: Master Notification List via email on August 17 th and all immediately affected residents of project site (113 total) and Paller-Roberts Engineering, Inc. via First Class Postcard on August 12 th Department Approval: Charles D. Herbertson 8/11/05 CAO Approval: Jerry Fulwood 8/17/05 City Controller Approval: Marlee Chang 8/15/05City of Culver City, California City Council Agenda Item Report 4. Whitburn Avenue from Overland Avenue to Drakewood Avenue; 810 linear feet. The scope of work consists of the removal of the existing 8 inch VCP and constructing new 8” Polyvinyl Chloride (PVC) sewer mains located at the above mentioned streets within the said limits. As part of the improvements, all sewer laterals will be replaced with 6” PVC to the back of the sidewalks. The work will also include minor pavement repairs. Due to the proximity of the streets and similar scope of work for each project, Engineering Staff decided to combine the four sewer improvement projects to obtain more favorable proposals for engineering civil design and bids for construction. Engineering Staff decided to delay the start of construction of the Sewer Improvement Project until March, 2006, in order to minimize the construction impacts to the residents during the holidays and the winter season and to provide advance notice to pipeline construction companies of this project by advertisements in construction newspapers, so they can effectively anticipate future projects and provide very competitive bids. A reason for concern is that there have been few contractors bidding our recent sewer projects due to the extraordinary amount of underground pipeline projects in the Southern California region. Therefore, the project will be bid in December 2005, and the award of the construction contract will occur in February 2006. Under Engineering Division staff supervision, Paller-Roberts Engineering, Inc. prepared the construction plans and specifications for this project under the general civil engineering agreement for design at a cost of $60,000. Public Notification All Eveward Road, Drakewood Avenue, Whitburn Street, and Flaxton Street residents directly affected by the project were mailed a postcard on August 12, 2005, amounting to a total of 113 at a cost of $ 25.99. The postcard is attached for your reference. FISCAL ANALYSIS: Based upon the engineer’s estimate for the construction cost of this project, sufficient funds were allocated for this project in the Capital Improvement Program Budget with Sewer Enterprise Funds and Gas Tax Funds. Gas Tax Funds will be used to place a slurry seal coat on the affected streets after the completion of the sewer installation work.City of Culver City, California City Council Agenda Item Report ATTACHMENTS:  Location Map MOTIONS: That the City Council: 1. Approve the plans and specifications for Eveward Road, Drakewood Avenue, Whitburn Street, and Flaxton Street Sewer improvement Project, P-839, 840, 841, & 842 and 2. Authorize advertising for bids for the Eveward Road, Drakewood Avenue, Whitburn Street, and Flaxton Street Sewer Improvement Project, P-839, 840, 841, & 842. MEETING DATE August 22, 2005 AGENDA ITEM Consideration to Approve the Final Plans and Specifications and Authorize Advertising for Bids for the Eveward Road Drakewood Avenue Whitburn Street and Flaxton Street Sewer Improvement Projects ATTACHMENTS Pages|109| Location Map 1|109| Postcard dated 8/11/05 2PUBLIC WORKS DEPARTMENT CITY OF CULVER CITY PO Box 507 9770 CULVER BOULEVARD CULVER CITY CA 90232 0507 NOTIFICATION OF IMPORTANT CITY COUNCIL AGENDA ITEM Sewer Improvement Project ettetteit, CITY PUBLIC WORKS DEPARTMENT NOTIFICATION OF IMPORTANT AGENDA ITEM AT A FUTURE COUNCIL MEETING The City Council will consider the following agenda item at their meeting of August 22 2005 Time 7 00 pm The City Council will consider approving the Final Plans Specifications, and Authorize Staff to Advertise for Bids for Eveward Road Drakewood Avenue Whitburn Street & Flaxton Street Sewer Improvement Project For more information contact Lee Torres Project Manager 310 253 5623 Location City Hall Mike Ballcman Council Chambers 9770 Culver Boulevard Culver City CA 90232 City Council/Agency meetings can be viewed live on Channel 35 by most Comcast subscribers Meetings are also broadcast on the City s Radio Station AM 1690 Visit the Culver City Website at Clth ei city org or send your ques Pons or comments to the City at aief administrationa cub, ercitv org To view the Council meetings on line please visit http ww culk tscitv on,' v,ebcast To add your name to the City s email list to receive agenda reports and news of City issues please call (310) 253 6000 or complete an online request at http /v,ww cut\ ercitv orgicirs,ao n public notifkation html