File #: HIST-17591    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 8/8/2011 Final action: 8/8/2011
Title: Approval of Final Plans and Specifications and Authorization to Publish Notice Inviting Bids for the Washington Boulevard/Boise Avenue Pedestrian Crossing Signal Project, P-934.
Attachments: 1. Approval of Final Plans and Specifications and Aut - C-7__11-08-08__PW-Eng__CITY COUNCIL__Washington-Boise Pedestrian Crossing_PSE Approval - FINAL.docx, 2. Approval of Final Plans and Specifications and Aut - 11-08-08__PW-Eng__CITY COUNCIL__Washington-Boise Pedestrian Crossing_PSE Approval__Attachment with cover.pdf
City of Culver City, California Agenda Item Report Meeting Date: 08/08/11 Item Number: C-7 CITY COUNCIL AGENDA ITEM: Approval of Final Plans and Specifications and Authorization to Publish Notice Inviting Bids for the Washington Boulevard/Boise Avenue Pedestrian Crossing Signal Project,P-934 Contact Person/Dept.: Sammy Romo/PW Phone Number: (310) 253-5619 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (08/03/11); (Mail) Property Owners, Residents, and Businesses within 500 feet of Location of Project (07/22/11) Department Approval: Charles D. Herbertson (7/28/11) City Attorney Approval: Carol Schwab (by H. Baker) (08/03/11) Chief Financial Officer Approval: Jeff Muir (by M. Noller) (08/03/11) City Manager Approval: John M. Nachbar (08/03/11) RECOMMENDATION: Staff recommends the City Council approve the final plans and specifications and authorize the publication of a notice inviting bids for the Washington Boulevard/Boise Avenue Pedestrian Crossing Signal Project, P-934. BACKGROUND: The length between the signalized intersections of Washington Boulevard/Zanja Street and Washington Boulevard/Centinela Avenue is approximately 1,800 feet. The proposed pedestrian crossing signal across Washington Boulevard at Boise Avenue will nearly bisect this 1,800 length in order to create a shorter distance between signalized crossings along this section of Washington Boulevard. The long walking distance between the existing signalized intersections, coupled with the recent development in the area, increase the need for the proposed pedestrian crossing signal. DISCUSSION: Under the general on-call traffic engineering services contract with the City, Infrastructure Engineers, formerly known as AAE, Inc., completed the design and preparation of the plans and specifications for the Washington Boulevard/Boise Avenue pedestrian crossing installation. The design includes two overhead signals with 2 flashing yellow lights in each direction of travel along Washington Boulevard. These flashing yellow lights can be activated by pedestrians through a push button on either side of Washington Boulevard. City of Culver City, California Agenda Item Report Should the City Council approve tonight’s actions and ultimately award a contract, such award is anticipated to occur in September 2011. Should the City Council ultimately award a constriction contract, a Request for Proposals (RFP) will be issued to consultants on the City’s on-call general civil engineering list for construction inspection. FISCAL ANALYSIS: Proposed Project Budget Funding Source Amount P-934CDBG-R(42800934) $42,853 P-940 Gas Tax (41800940) $75,000 Redevelopment Funds (48695100) $57,000 Total $174,853 Estimated Project Expenses Construction, Washington/Boise Pedestrian Crossing Signal, P-934 $147,450 Construction Inspection Services $15,000 Subtotal $162,450 7.6% Project Contingency $12,403 Total Estimated Project Expenses $174,853 ATTACHMENT: 1. Project Plans MOTIONS: 1. Approve the final plans and specifications for theWashington Boulevard/Boise Avenue Pedestrian Crossing Signal Project, P-934; and 2. Authorize publication of notice inviting bids for construction of the Washington Boulevard/Boise Avenue Pedestrian Crossing Signal Project, P-934. MEETING DATE: 08/08/11 AGENDA ITEM: Approval of Final Plans and Specifications and Authorization to Advertise Bids for the Washington Boulevard/Boise Avenue Pedestrian Crossing Signal Project, P-934 ATTACHMENTS Pages 1 Location Map 1 LOCATION MAP LOCATION OF PEDESTRIAN CROSSING ZANJA ST NOT TO SCALE WASHINGTON BLVD/ BOISE AVENUE PEDESTRIAN CROSSING SIGNAL PROJECT, P-934 ( CDBG #REC092-10)