Legislation Details

File #: HIST-1352    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 11/14/2005 Final action: 11/14/2005
Title: Resolution appealing the Planning Commission's adoption of a Mitigated Negative Declaration for the Hampton Inn and Suites Development located at 3954 Sepulveda Boulevard.
Attachments: 1. Pages from GS 111405 sire-PH3.pdf, 2. PH3-Pt1a.pdf, 3. PH3-Pt1b.pdf, 4. PH3-Pt2a.pdf, 5. PH3-Pt2b.pdf
City of Culver City, California City Council Agenda Item Report Meeting Date: 11/14/05 Item Number: PH-3 AGENDA ITEM: Appeal of the Planning Commission’s Adoption of a Mitigated Negative Declaration for the Hampton Inn and Suites Development, Located at 3954 Sepulveda Boulevard (This is a Continued Item). Contact Person/Dept.: Jose Mendivil Phone Number: (310) 253-5757 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [X] Action Item: [] Attachments: [X] Public Notification: Notices were mailed on September 19, 2005 to all property owners and occupants within a 300 foot radius of the site, extended to end of city block; on September 19, 2005, the site was posted; courtesy notices were mailed on September 19, 2005, to the City Council, Planning Commission, Cultural Affairs Commission, Culver City Homeowners Association, Culver City Chamber of Commerce, CAO, and Department Heads; Master Notification List e-mailed by the CAO's office on 11/10/05. Additional courtesy notices were sent to only the property owners, businesses, and occupants on Bentley Avenue, Pigott Drive and Sepulveda Boulevard on November 1, 2005. Department Approval: Susan Evans 10/31/05 CAO Approval: Jerry Fulwood 11/9/05 City Controller Approval: Marlee Chang 11/9/05 RECOMMENDATION: That the City Council deny the appeal and uphold the Planning Commission’s December 8, 2004 finding of a Mitigated Negative Declaration that was adopted in conjunction with the approval of Site Plan Review, SPR P-2004126, that allows the construction of a 4-story, 77-room, 35,104-square foot Hampton Inn and Suites Hotel at 3954 Sepulveda Boulevard but with additional mitigations to address concerns raised during the appeal process. BACKGROUND: On December 8, 2004, the Planning Commission approved a Site Plan Review to construct on a vacant lot, a 4-story, 77-room, 35,104 square foot Hampton Inn and Suites Hotel with some subterranean parking. In conjunction with the Site Plan Review approval and pursuant to the California Environmental Quality Act (CEQA) guidelines, the Commission adopted a Mitigated Negative Declaration (MND) after finding that the proposed hotel project will require mitigation measures to reduce certain impacts on the environment. On January 11, 2005, Emily Fisher (the “Appellant”) filed an appeal on the adoption of the MND following a discussion with staff regarding alternative types of appeal. 8 City of Culver City, California City Council Agenda Item Report 9 The appellant was informed that if she appealed only the CEQA determination, and not the Site Plan Review, the Council could only consider the adoption of the MND and not the merits of the Site Plan Review. The appellant decided to challenge just the MND. No appeals were filed for the Site Plan Review. The Site Plan Review resolution (Attachment No. 6) and the Planning Commission staff report for the Site Plan Review (Attachment No. 7) are presented in this agenda report for information purposes only. On March 28, 2005, the City Council held the appeal meeting for the Hampton Inn MND. After hearing testimony from the appellant and several members of the Bentley Avenue community, the Council decided to continue the meeting to a date uncertain. They asked for the following: preparation of a traffic study, preparation of a shade and shadow study, and staff facilitation of a meeting between the applicant, the appellant, and the Bentley Avenue community. The technical studies were completed and there was a community meeting. Staff returned to the City Council on October 10, 2005, with additional discussion on the studies and with a final recommendation. At that meeting, the Council voted to continue the item to November 14, 2005. They requested that the Applicant, Appellant, and Bentley/Pigott community meet one more time to determine if a compromise could be achieved with regard to shade and traffic issues. That meeting was held on October 20, 2005 and is summarized in this report. For a full background on the October 10 th City Council appeal meeting please refer to the October 10, 2005, City Council Agenda Item Report (Attachment No. 13). All attachments to the October 10 th report are included in this current report and in their original order except that the original Attachment No. 13 (the Traffic Study, Shade and Shadow Study, and Phase 1 Environmental Report) is now Attachment No. 14. Please note that Attachment No. 14 was transmitted to the Council under separate cover on August 31, 2005. DISCUSSION: Summary of October 20, 2005, Meeting Approximately 16 people attended the meeting and included the Appellant, Applicant, members of the surrounding community, and Council members Corlin and Rose. In addition, one staff person and a City consultant acting as mediator/moderator were present. The moderator first gave an opportunity for the appellant to speak and specifically asked that she list the most important issues she feels most impact the community. Her list included: City of Culver City, California City Council Agenda Item Report 10 1. The shape, size, and height of the proposed hotel; the placement of the windows and their effect on privacy; the overall aesthetics of the hotel structure; 2. Construction impacts such as dust, noise, and exhaust and potential disturbance of pesticides and fertilizers that could have been deposited from previous uses; 3. Impacts caused by use of the hotel parking lot such as noise (car alarms, engines, screeching tires) and fumes; 4. Traffic impacts on Bentley Avenue, Pigott Drive, and Sepulveda Boulevard and further impacts created by the delineators required to restrict left turn movements; 5. Spillover parking onto local streets; 6. Short distance of trash enclosure to neighboring residential properties, and related odors and noise during pickup; 7. 24-hour activity of the proposed hotel which could increase overall noise and traffic and the cumulative effects of 24-hour activity when combined with pre- existing hotels in the immediate vicinity; this concern juxtaposed with the nearby residential area; and, 8. Noise caused by individual air conditioning units for each of the hotel rooms. The Applicant was then given an opportunity to speak. He presented different versions of conceptual plans that he had shown to Planning staff prior to submitting his application. Originally he was proposing a 5-story hotel with approximately 120 rooms. He reduced its massing and proposed a caretaker apartment unit; this was further revised on the plan the Planning Commission approved. Issues/comments that were raised by the Applicant included: 1. A hotel franchise such as Hampton Inn or Holiday Inn requires at least 70 to 75 rooms; 2. The project approved by the Planning Commission is reduced from the Applicant’s original concept; 3. The long and narrow lot shape is difficult to work with in regards to placement of structures, parking areas, drive/fire access aisles, and underground parking; City of Culver City, California City Council Agenda Item Report 11 4. The applicant is most familiar with the hotel industry and does not engage in other types of business; and, 5. Placement of the trash enclosure off the alley makes most sense due to limitations by the City’s Sanitation Division (if the trash enclosure was placed in the middle of the lot, there could be difficulties in accessing the trash bins). The Appellant discussed the possibility of a different use all together. Mixed use with residential condominiums was brought up as an example by the Appellant’s representative. The moderator asked the applicant if he would consider developing a use other than a hotel. The applicant stated that he was in the hotel business and that he had no desire to develop another kind of use for the project site. He stated that he would be willing to sell the property for another use if an acceptable offer was made. The moderator asked if the Appellant was willing to discuss solutions assuming a hotel use for the site. The Appellant stated she would like to talk about other uses but was not opposed to hearing about potential revisions for the hotel use. The Applicant presented a rough draft of a scaled down hotel plan which generated a discussion on various options. These included: 1. A reduction down to three stories but with the building footprint moved closer to the rear property line in order to accommodate the rooms lost from the fourth story; 2. An increase of up to five stories in the front portion of the building accompanied by a decrease down to three stories toward the rear; 3. A reduction in the height of the parapet wall; 4. An increase in the subterranean parking area; 5. An increase in landscaping that incorporates trees for screening purposes; 6. Relocation of the access ramp for the subterranean parking towards the front. The Applicant did not commit to these revisions but stated he would review his resources to determine the practicality of making such changes. The Appellant’s representative asked if he could locate all parking underneath by increasing the subterranean parking area. The Applicant estimated it would cost about one million additional dollars for full subterranean parking. Further, parking spaces would be lost because not all the parking currently proposed for the project can be accommodated underground. Foundation walls and columns, the pool located at City of Culver City, California City Council Agenda Item Report 12 natural grade, and the elevator shafts would all limit the number of underground parking spaces to less than what is currently proposed. Another point raised by the Applicant is that if the hotel is scaled down and less rooms (or smaller rooms) are planned, a potential hotel franchise may be lost. He explained that various franchises have minimum standards, some more stringent than others. He wishes to build and operate a franchise hotel with higher standards instead of an independent hotel with reduced standards. The moderator asked if the Appellant and the Applicant would be willing to meet one more time after the Applicant has had time to study the feasibility (in terms of both cost and compliance with Zoning Code regulations) of the scaled down hotel and increased subterranean parking options. Both parties did not object, however the Appellant felt that there was no discussion on potential solutions to many of the issues she listed at the beginning of the meeting. Staff told both parties that they would be contacting them for potential meeting dates after the Applicant has had time to research the feasibility of carrying out the options. The meeting was then adjourned. Follow-Up after the October 20, 2005, Meeting The following week staff contacted both parties. The Applicant stated that he would not make any revision to the site plan as approved by the Planning Commission but would be willing to meet with the Appellant to discuss the various issue points listed by the Appellant. The Appellant did not see a reason to meet again since the Applicant was not willing to consider any of the scaled down hotel and/or full subterranean parking options. With that, staff did not attempt to schedule any further meetings. Staff believes that given the record of public testimony, the inability to arrive at a compromise after two community meetings, and very informal discussions between both parties outside of the City Hall setting, any further attempts to resolve conflicts in a community meeting setting will not lead to an outcome that both parties can accept. With some revisions to the MND and proposed additional mitigations discussed below, staff recommends that the City Council should at this time decide on whether to uphold the MND or uphold the appeal. Revised MND Discussion Following the public review period, the Planning Commission approved the Initial Study/Mitigated Negative Declaration (IS/MND) and Site Plan Review for the proposed project. The approval of the MND was then appealed to the City Council. After hearing public comments, the City Council directed that a shade/shadow City of Culver City, California City Council Agenda Item Report 13 analysis and a traffic study be prepared to provide additional information regarding these issues. These studies were completed and have been included as appendices to the IS/MND. Revisions to the draft IS/MND have also been made in response to public comments and to reflect the additional technical studies. Changes to the IS/MND text are indicated with strikeout and italics notation. Two additional mitigation measures have been added under Section VII. - Hazards and Hazardous Materials and Section XI. - Noise. The new technical studies, analysis and mitigation measures do not raise any significant new issues that would require recirculation of the MND under CEQA Guidelines Section 15073.5, but only clarify or add requirements to the project to provide additional protection to adjacent residents from potential environmental impacts. The changes to the IS/MND are described below. Shade/Shadow Analysis. A shade and shadow study was prepared to determine the extent to which the project would block sunlight to adjacent properties. The study concluded that the proposed project would not shadow any adjacent single-family residence roof at any time throughout the year, that the apartments to the north would be partially shaded at the Winter Solstice, that there would be minor shading of the roof of the apartments at other times of year, and that there would be minor shading of the motel to the south in the late afternoon in the spring and summer. These impacts are considered less than significant. This additional information is contained in Section I – Aesthetics of the Revised MND. Pesticides and Fertilizers. Neighbors raised the concern that residual contamination from pesticides and fertilizers, including DDT, could be present in the soil as a result of the site’s prior use as a commercial nursery. The Phase I Environmental Assessment Report for a Vacant Lot 3948-3954 Sepulveda Boulevard, Culver City, CA prepared by ACS Associates, August 22, 2005 concluded that there was no evidence of hazardous materials or waste at the site, or in governmental records, and that no further investigations were recommended. Although the Phase I Environmental Site Assessment found no evidence of contaminated soil, the following mitigation measure is recommended to provide additional assurance that this potential impact is addressed prior to grading or construction. MITIGATION MEASURE H-1 a) Prior to issuance of a grading or building permit, the applicant shall demonstrate to the Building Official that sub-surface soils testing has been conducted by a qualified professional to determine whether any residual pesticide or fertilizer contamination is present at the site in quantities that could present a health hazard either to construction workers or occupants of surrounding properties. City of Culver City, California City Council Agenda Item Report 14 b) If contamination is found, it shall be remediated pursuant to applicable city, state or federal law prior to commencement of grading or construction, in a manner meeting the approval of the Building Official. Noise. The appellant raised a concern that the site is impacted by high ambient traffic noise from Sepulveda Boulevard and the 405 Freeway, and that this could adversely affect occupants of the hotel. According to the Noise Element of the General Plan, the site is impacted by traffic noise levels of approximately 65-70 dB CNEL. The Noise Element also provides policy direction for development in noise impacted areas. Acceptable noise levels for hotels are 65 dB CNEL exterior and 45 dB CNEL for interior noise. The site is located in the 65-70 dB contour, which is Zone B. Hotel use in this zone is considered “compatible with mitigation.” The Noise Element states as follows: “New construction should be undertaken only after detailed analysis of the noise reduction requirements are made and needed noise insulation features in the design are determined. Conventional construction with closed windows and fresh air supply systems or air conditioning will normally suffice.” (Table N-4) The following mitigation measure would require the project proponent to ensure that the structure is designed to mitigate noise levels in compliance with this policy and other applicable laws and codes. MITIGATION MEASURE N-1 a) Prior to issuance of a building permit the applicant shall provide evidence acceptable to the Building Official that the structure has been designed such that interior and exterior noise levels will comply with the City’s Noise Element and all laws and codes applicable to hotel uses. b) If determined necessary by the Building Official, prior to issuance of an occupancy certificate, the applicant shall provide a noise study confirming that noise levels meet all applicable policies, laws and codes. Traffic. During the initial application review process, the proposed project was reviewed by the City’s Traffic Engineering Manager and it was determined that local and regional traffic and parking would not be significantly impacted by the project. The morning peak hour trip generation was calculated to be 43 and the afternoon peak hour trip generation was calculated to be 47. The project peak hour trip generation was calculated to be 55 and determined to occur on Saturday only. Although the City does not typically require traffic studies for projects generating up to 49 trips in any one hour, following the public review period and in response to public concerns, a formal traffic study was prepared at the direction of the City City of Culver City, California City Council Agenda Item Report 15 Council. The traffic study is provided as Appendix 2 to the MND. The study found that although several intersections in the vicinity are projected to operate below an acceptable level of service, the proposed project would not significantly impact any intersection or roadway segment. The project is also consistent with the General Plan Land Use Element, therefore no general traffic improvements or additional mitigation measures are warranted in connection with this project. CONCLUSION Public participation is an important component of CEQA. A draft Initial Study/Mitigated Negative Declaration was prepared for the proposed hotel and circulated for public review. Following the approval of the MND and Site Plan Review by the Planning Commission, the MND was appealed to the City Council. In considering the appeal, the Council directed staff to conduct a more thorough analysis of shade/shadow and traffic issues. In addition, staff reviewed other issues raised by the appellant, including potential toxic contamination from pesticides and noise impacts. The new technical studies, analysis and mitigation measures contained in the Revised IS/MND do not raise any significant new issues that would require recirculation of the MND under CEQA Guidelines Section 15073.5, but only clarify or add requirements to the project to provide additional protection to adjacent residents from potential environmental impacts. If the Council concurs with this assessment, the Revised MND should be approved and the appeal denied. However, if the Council believes that there are potentially significant impacts that could occur with the proposed project, then staff should be directed to prepare an EIR. FISCAL ANALYSIS: There is no immediate fiscal impact resulting from this item. However, during the appeal process the Site Plan Review is on hold and no construction can occur. If the Council determines that the impacts of the project are potentially significant (regardless of the mitigations included in the MND) and that an EIR should have been prepared, the Site Plan Review would no longer be in effect. Should the project applicant then choose to proceed with the project, an EIR would have to be prepared and the EIR and Site Plan Review be acted upon by the Planning Commission. A delay in the project could result in the project not being built. If this is the case, any potential increase in City revenues from the development of the vacant lot will not occur. City of Culver City, California City Council Agenda Item Report 16 ATTACHMENTS: 1. Draft City Council Resolution No.__ Denying the Appeal and Upholding the Planning Commission’s Adoption of the Mitigated Negative Declaration (MND). 2. Appellant’s January 11, 2005, appeal letter. 3. Summary of Appellant’s Argument (January 11 letter) and Staff Response. 4. REVISED Mitigated Negative Declaration (MND) without attached studies. 5. Interdepartmental Memorandum Regarding Trip Generation. 6. December 8, 2004, Planning Commission Resolution No. 2004-P014 Approving Site Plan Review, SPR P-2004126. 7. December 8, 2004, Planning Commission Staff Report with attachments except the MND. 8. Minute excerpts for the December 8, 2004, Planning Commission meeting. 9. Caltrans Letter. 10. March 28, 2005 City Council Staff Report (without attachments). 11. Staff response to Appellant Appeal Addendum filed on March 23, 2005 by Lake & Lake Consultant, Inc., and March 23, 2005 Appeal Addendum. 12. General comments/responses to May 31, 2005 Community Meeting. 13. October 10, 2005 City Council Staff Report (without attachments). 14. Traffic Study, Shade and Shadow Study, and Phase 1 Report (transmitted under separate cover on August 31, 2005). MOTION: That the City Council: Adopt Resolution No. 2005-R__denying the appeal and adopt the Planning Commission’s Revised Mitigated Negative Declaration for the Hampton Inn and Suites development at 3954 Sepulveda Boulevard with additional mitigations pertaining to Soils and Noise. OR, Adopt Resolution No. 2005-R__denying the appeal and adopt the Planning Commission’s Mitigated Negative Declaration for the Hampton Inn and Suites development at 3954 Sepulveda Boulevard with no additional mitigations. OR, Overturn the Planning Commission’s adoption of a Mitigated Negative Declaration for the Hampton Inn and Suites development and request an Environmental Impact Report be prepared for review prior to the effective date of the Site Plan Review. MEETING DATE 11/14/05 AGENDA ITEM Appeal of the Planning Commission's Adoption of a Mitigated Negative Declaration for the Hampton Inn and Suites Development, Located at 3954 Sepulveda Boulevard (This is a Continued Item) ATTACHMENTS Pages|109| Draft City Council Resolution No 2005- 1-3b|109| Appellant's January 11, 2005, Appeal Letter 4-5|109| Summary of Appellant's Argument and Staff Response 6-9|109| REVISED Mitigated Negative Declaration (MND) 10-25b|109| Interdepartmental Memorandum Regarding Trip Generation 26-37|109| December 8, 2004, Planning Commission Resolution No 2004-P014 38-47|109| December 8, 2004, Planning Commission Staff Report w/Attachments 48-89 Except MND|1010| December 8, 2004, Plamung Commission Minute Excerpts|10 10| Caltrans Letter 10 March 28, 2005 City Council Staff Report including minute excerpts for that meeting (without attachments) 11 Staff response to Appellant Appeal Addendum and March 23, 2005 Appeal Addendum 12 General comments/responses to May 31, 2005 Commumty Meeting and Agenda for May 31, Community Meeting 13 October 10, 2005 City Council Staff Report without attachments 14 Traffic Study, Shade and Shadow Study, and Phase 1 Report (transmitted under separate cover on August 31, 2005) 90-95 96-97 98-105 106-134 135-138 139-144Attachment No 1 RESOLUTION NO 2005-R A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CULVER CITY, CALIFORNIA, UPHOLDING THE PLANNING COMMISSION S ADOPTION OF A MITIGATED NEGATIVE DECLARATION (MND) WITH ADDITIONAL MITIGATION MEASURES FOR THE HAMPTON INN AND SUITES DEVELOPMENT AT 3954 SEPULVEDA BOULEVARD IN THE LIMITED COMMERCIAL (C-1) COMMERICIAL (C-3), AND COMMERCIAL SETBACK OVERLAY (CSO) ZONES WHEREAS, on December 8, 2004, the City of Culver City (' City ) Planning Commission (' Planning Commission"), by Resolution No 2004-P014, considered and conditionally approved Site Plan Review, SPR P-2004126, that permitted the construction of a four-story, 77-room, 35,104-square foot Hampton Inn and Suites hotel (the ' Project ) at 3954 Sepulveda Boulevard, being that partition of the Pedro Talamantes 120 71 acre allotment of the Rancho La Ballona 0 68 acre being (Except of the Street) southeast 100 feet of Lot 13, in the Limited Commercial (C-1), Commercial (C-3), and Commercial Setback Overlay (CSO) Zones, and, WHEREAS, on December 8, 2004, in accordance with the California Environmental Quality Act (CEQA), the Planning Commission, upon review of the Initial Study, public comments, the record before the Planning Commission and after the City provided public notice of the intent to adopt a Mitigated Negative Declaration (the ' MND ) in accordance with CEQA determined that the Project will not have a significant adverse impact on the environment provided certain mitigation measures are implemented and, WHEREAS on January 11, 2005, a local resident submitted an appeal of the Planning Commission's adoption of the MND ("Appellant"), claiming that the MND I|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28was inadequate and requested that the adoption of the MND, as presented to the Planning Commission, be overturned and that a more in depth environmental analysis be conducted and, WHEREAS, on March 28, 2005 at a duly noticed public hearing the City Council after hearing testimony from the Appellant and several members of the Bentley Avenue community, decided to continue the hearing to a date uncertain and requested preparation of a traffic study, preparation of a shade and shadow study, and staff facilitation of a meeting between the Applicant, the Appellant, and the local community and WHEREAS, the Applicant prepared the traffic study and shade and shadow study, City staff facilitated a meeting between the Applicant the Appellant and the local community, and after review of the studies and comments from the community meeting staff returned to the City Council on October 10, 2005, and, WHEREAS, on October 10 2005, at a duly noticed public hearing, the City Council after considering all public testimony requested that staff facilitate another meeting between the Applicant Appellant, and community to discuss a potential compromise with regard to traffic and shade and shadow issues and continued the hearing to November 14 2005 and WHEREAS, on October 20, 2005 the requested meeting between the Applicant, Appellant and the community, was held and no definitive compromise was reached, and, I|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 -2-1|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, after the October 20, 2005 community meeting staff reviewed the MND and determined that based on discussions at the meeting, certain mitigation measures should be added to the MND that further protect the community and WHEREAS, on November 14, 2005, at a duly noticed continued public hearing, the City Council after considering all public testimony and at the conclusion of its deliberation, voted to uphold the Planning Commission's adoption of the MND for Site Plan Review, SPR P-2004126 subject to additional proposed mitigation measures which only provide further clarification NOW THEREFORE, the City Council of the City of Culver City DOES HEREBY RESOLVE as follows Based on the facts and analysis presented in the staff reports, additional technical studies, public testimony, file of review, and CEQA review that was part of this Agenda Item, the City Council determines that 1 The Planning Commission adopted an MND for the Project and found that the Project will not have a significant adverse impact on the environment, provided certain mitigation measures are implemented 2 Since Planning Commission adoption of the MND for the Project, the subsequent analysis of issues raised in the appeal including traffic shade/shadow, hazardous materials and noise does not require substantial revisions to the MND as defined by CEQA Guidelines Section 15073 5(b) because no new avoidable significant environmental effects were identified in the appeal and the proposed mitigation measures will reduce any potential effects to less than significant and thereby not necessitating further environmental analysis -3- 33 The Appellant has not demonstrated substantial evidence in light of the whole record that the Project may have a significant effect on the environment and warrants a more in depth environmental analysis thereby requiring preparation of an Environmental Impact Report 4 A revised MND has been prepared incorporating the additional environmental information made available since Planning Commission adoption of the MND including the shade and shadow study and traffic study and this additional information has been included in the MND, which merely clarifies and amplifies the MND and does not create new avoidable significant environmental effects and is not necessary to mitigate an avoidable significant effect, as described in CEQA Guidelines Section 15073 5(c)(2) 5 The Appellant, through meetings with the Applicant and City staff has demonstrated that the implementation of certain mitigation measures are warranted to further protect the community 6 Based on the foregoing, the City Council does hereby require the addition of the following mitigation measures to the MND set forth below which merely clarify and amplify and make insignificant modifications to the MND but are not required by CEQA as provided by CEQA Guidelines Section 15073 5(c) Hazards and Hazardous Materials Mitigation Measure H-1 a) Prior to issuance of a grading or building permit, the applicant shall demonstrate to the Building Official that sub-surface soils testing has been conducted by a qualified professional to determine whether any residual pesticide or fertilizer contamination is present at the site in quantities that could present a health hazard either to construction workers or occupants of surrounding properties 3a, -4-|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28b) If contamination is found, it shall be remediated pursuant to applicable city state or federal law prior to commencement of grading or construction in a manner meeting the approval of the Building Official Noise Mitigation Measure N-1 a) Prior to issuance of a building permit the applicant shall provide evidence acceptable to the Building Official that the structure has been designed such that interior and exterior noise levels will comply with the City s Noise Element and all city, state and federal laws applicable to hotel uses b) If determined necessary by the Building Official, prior to issuance of an occupancy certificate, the applicant shall provide a noise study confirming that noise levels meet all applicable city policies and city state and federal laws 7 Based on the foregoing, the City Council does hereby uphold the MND as approved by the Planning Commission, with the addition of the mitigation measures stated above APPROVED and ADOPTED this day of 2005 ALBERT VERA, MAYOR City of Culver City California ATTEST APPROVED AS TO FORM CHRISTOPHER ARMENTA, CAROL A SCHWAB, City Clerk City Attorney -5- I|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28RECE WED Attachment No 2 JAN 1 1 2005 v v (_,- 7 40 .6,--t6 Divizi,, ft 1 n 51?(A. 6'1/ - 14-1-C (.7 -4:- 1-5. -- c7 ( /L //( 3--- ) I- I 1 I - I l' it-ii k Lm /2 (=- (71 et(4/cL olt-- ,7 , /()A- ( 7 1 4) -yr / (--- c''' I -111(z, --zdi,._,-)e o 77 Z -1 (-I |1010|7 / // ( fi (7-- 627(-t---6, Pe 7 6? 7% (i e__-_ oil--76 r - ---#___ / Val / p--(w -- Z / 7 74 / °r- s '- -"---1) r je c i/J-- - 76 ( ,3 7 q ,s- -zti z- --'-- -72(__, (vt- 9,9/ ce . e. Po e_, -,74 ,4 _;1_6_,(e_ iViZ_:, 4 e ' / v r o, fr / t2W7(a_ //e7/ b:3,--Ced d e- C/5104 a (id_ ,--1-ked-,1-ke e 7-- -ec .,1-- p -)---- - c: cl i - -- 5- / —I ( co4 -l— )--).ea l-li - - - - 1jr' k 5 -0 I-- - I 9 I v -L-f/ 7e s( (1-e4is --A . --7-14--- 1/0 e c_ 1/ /' ti e 51- 7 o y ? --i- -P y-- / br rn a a_ U s ed /-0 d-e (-e rhe V/ e, •-/-be_- . -1--r a ff/ u a od //),-) 00 wayok_ /,-)43 co,riCidera p et!) ,, ,h --/-"r t 6 - gi,o,q y eX pa _ . I 0/1 C_2()21,firy,tcli di .) w6 (C-6 k(A/7 47--0-(4C - 4 0d (- -iv er re 1 c -74--/ + 'FA a 71— -er2 -7L- 71-e - ive 0 vd c o 17' r - i do r --kr I./ ers- --/-c-) (-, w-o_ _ ,) 177(-2_ /t) (-Jr e,-It5---2 pa (A - - - i oi4 -fr o ri . ( ,5- .-11.--i,(c/-707? v e_ 6 ( - (; ( 1 (140-- c I: e/ ,-)/, L 1 efej po 1,6)e i re ; 1 / fi'd 42 -,"/--go-4/1 6-7 41 ( a - * I (2, 1/ / ,/ 171 ( ( 1/ 11 0 C ( -I" 0 I --C- (Zie e - 7 lf/V KO W eirOM CO-4(y c ,k? 1/ L 1 1 I I 1 ( -"(-) r (7 Ka 1 1 2 cf._ 41-7-E_ 8o-ft K .4 - _, ---- 1 eci7 (>0 I .; 7 c) 70 0) ,,i 1,70 , ,,i __/-,, ) _e ),/,, |1010|to //e P21 c _', LYS ilk e (A/id- 7 ? ,-- 1 k c, ( I, (AO t vic-s ///q)-__=,,- 7 1 ---fhi-S () I D e- - c--(- .- . e (A ( () e_j v /-' F (;/-) AA)/ -tk) i - )0 ( yid ,cep/,( 1 1/-d, ( - 6 /i/,- _• . i_z-- rld-1 -- (3 11 )ly 1/61( I ()(iq c __ --,02(--4ki-- 2,/-0 (.;,/--- )7,(--,m_ ri)c77 hdV ( 1 F- '--- 1/j- Jr / / % ( I 01C 1)/1 6 - )7(, _- _ I / _D h (fry,/ ---)/ ( 7 .64- 0e. 67( v()_ - c - : _ks eii ?. r ii (;" , id 461V-0-I, / ifil I i i,.7-e yff_A;ibi-_-_,_c_c y h J Iv 2 k Oa c dt}(7-- r? --1-kk. da l, (.11)0(/ A7-)h-(- (5e_pue ( ved p t( ) I k'd -/(26-(___;- a rd tc- 4/ f1 a 1 74- z /- 71coLc_ --710- luoi----(k _co0 7 -_- _,'(--,1,-(6c , a r2d /3(0 1y/L 7 gry -/-h e_ INA s- r-n2g 1 ill ,Ir g7-' 2- il- 1 c___ q r (/6 ,11 L/ q"6"je Ci" ----C L)-(2 1 17 c)-(— /e1 7- II e ( 5), -. (2 K7 c-- r i _ ti , |1010|a/5 ai r__sc_|1010|4 4-0 0-i-her -7-7-le_s 01 utAu/rci w;(7 ( 19 e - n4x6 ia1721 af-d also 12 C4 40/Lc-Az/I- a il C? (/6/ 6( IS . 2) 4 e 1 a bve(ii rqac.:71 --- (2 i I ea Id eY) IL`,) e ,;(- . 6 (--7 //:(2,|1010| b a a ---/l/i k- S/ %-(a_ ai7v 0), i 1 -e re_ 4-ey z r -/-17 e (=e-r e 2 ,o(r ( . 5 I Aver 04,, _ -20 ko ,,0 u.2,4 n/ p0-s-L -\ ( ( b 1 j 0) -(1 ( F - 0 ( 0/ -43 -Il l / c L- Ci '/--e13 01 - h-e7- P O 1 3 I / __c , V& 7le -'- ' I I -I-her-J2_or(-2_ (10-ws/derble___ h ea (" 1 4 (20 d w .e. ill ar _, ._ 6.04 (I{ (#6--e7/i-if 07 L - 1f-fe_ ii-c5-136,3 ---kal--- haw_ nT-IL-- h ce.enti tor --r 1 6( ,i,,=7S-_(--r, 19 //!--, ,/ /2, (/' / (Attachment No 3 Summary of Appellant's Argument and Staff Response The following is a summary of the issues raised by the appellant in her January 11 2005 letter appealing the Planning Commission adoption of a Mitigated Negative Declaration (MND) for the Hampton Inn and Suites Hotel development After each issue is a response by staff The referenced attachment numbers refer to the attachments to the agenda item report Traffic|109| A request for the methodology used to calculate the proiected trip generation As stated on Page 13 of 16 of the MND, the Transportation/Traffic section, the project s projected peak hour morning and afternoon vehicle trips are expected to be 43 and 47 respectively The project peak hour vehicle trip generation is estimated to be 55 and expected to occur on Saturdays In 1987, the City Council adopted criteria for requiring traffic impact studies A project estimated to generate 49 trips or less during any one hour period does not require a study, the City Engineer and Planning Manager may require a study for a project estimated to generate 50 to 99 trips during any one hour period, the City Engineer and Planning Manager shall require a study for a project estimated to generate 100 trips or more during any one hour period This project is below the threshold of 50 except for the projected project peak hour (55 trips), however, this is expected to occur on Saturdays when overall traffic is less No traffic study was required for this project The trip generation numbers were calculated using the Trip Generation Manual of the Institute of Transportation Engineers, 6 th Edition The land use that was considered in the trip generation calculation is Hotel (See Attachment No 5) After the appellant asked why the City had not used the more up-to-date 7 th Edition in calculating estimated vehicle trips staff calculated new trip generation numbers using the 7 th Edition At the time of the original calculation prior to the Planning Commission public hearing the City did not have the 7th Edition survey sheets for hotels The new calculations resulted in trip generation numbers that were either the same or less than those calculated using the 6 th Edition|109| The trip generation calculation does not take into account the construction of the freeway expansion The Trip Generation Manual does not take into account surrounding traffic conditions it considers the estimated number of trips the use will typically generate irrespective of the immediate area Freeway expansion construction (or the absence of such construction) will not affect how many trips the hotel generates, freeway construction is typically not a hotel generating use|109| Freeway expansion and hotel construction will_greatly impact Sepulveda Boulevard The freeway expansion project will ultimately add One carpool lane in each direction on the San Diego Freeway If anything this could improve traffic conditions on Sepulveda Page 1 of 4Boulevard As with any construction project, the construction of the hotel will temporarily impact the traffic on Sepulveda Boulevard It is unknown at this time as to whether or not the construction scheduling for the hotel will coincide with that of the freeway expansion The applicant will be required to abide by existing City regulations that govern haul routes and times of construction|109| Traffic along Sepulveda Boulevard between Venice Boulevard and Washington Boulevard will be slowed down greatly It is accurate to say that Sepulveda Boulevard is congested in morning and evening peak hours However the estimated trips that the hotel is expected to generate are below the threshold for requiring a traffic impact study that could review effects on Sepulveda Boulevard The morning and afternoon peak hour vehicle trips noted above will not create a significant impact on an already congested corridor The Saturday vehicle trip generation of 55 trips will occur during a period when street traffic is expected to be less because of the absence of people traveling to or from work 5 The mitigation prohibiting left turn movements onto the site or onto Sepulveda Boulevard should not be allowed as it will create traffic congestion, even during non peak-hour periods Right turns are typically easier to manage than left turns, because of fewer vehicle conflicts In congested conditions, it will be difficult for motorists to turn left out of the driveway onto southbound Sepulveda Boulevard The same is true for turning left into the driveway from southbound Sepulveda Boulevard Also this prohibition is seen as a way to prevent the backing up of traffic that may occur behind someone waiting to turn left into the site For these reasons left turns in and out of the hotel are restricted, thereby alleviating potential traffic hazards and congestion The prohibition of left turn movements is the only traffic related mitigation (Page 13 of 16 of the MND, Attachment No 4) 6 For a hotel of the size proposed, guests will be entering/exiting in large numbers, multiple times, during the day and night, furthering negative Impacts on the surrounding area According to the Trip Generation manual, Hotels are places of lodging that provide sleeping accommodations restaurants cocktail lounges meeting and banquet rooms or convention facilities, and other retail and service shops This project will not provide any of these amenities except lodging and continental breakfast Therefore, it is unlikely that large numbers of guests will be accessing the hotel at any one time Also one cannot predict the traffic patterns of the future hotel patrons nor can a prediction be made that patrons will be entering and exiting in large numbers, all the time These are unknown variables, what can be estimated is the potential number of vehicles trips based on the number of hotel rooms (Attachment No 5) As already stated the projected number of trips is small enough that no traffic impact analysis is warranted Page 2 of 4 77 Sepulveda Boulevard, as an alternate north/south freeway route, could be lost if the hotel is built As mentioned earlier the addition of carpool lanes on the 405 Freeway in each direction could improve the operation of Sepulveda Boulevard Additionally the use of this corridor as an alternate freeway route will not be affected by a hotel consisting of 77 rooms Staff Conclusion to Traffic Section Overall, this portion of Sepulveda Boulevard is overloaded during peak traffic periods and any addition of trips to the street system, no matter how small, will add to these pre-existing overloaded conditions If the thresholds for requiring traffic impact studies were not in place, all projects would require at least some traffic analysis This would hinder the ability to develop small to mid-size projects such as the proposed hotel and could result in an increase of underdeveloped and/or vacant lots Pollution There will be an increase in pollution, traffic, and congestion, because of construction vehicles (almost all of which are powered by diesel fuel) Air Quality is discussed on Page 10 of 16 of the MND New construction of any size, in any area of Culver City will contribute to pollutant emissions over the existing non-attainment conditions for Southern California However, the project is consistent with the City's General Plan and Zoning Code which means that the hotel use is considered to be factored into the South Coast Air Quality Management District s (AQMD) regional air quality models In other words potential emissions due to the hotel use are considered to be compliant with the AQMD air quality thresholds (for a hotel) In addition, per the AQMD CEQA Handbook, the thresholds for requiring an in depth environmental analysis for construction of a hotel are the construction of 213 or more rooms, and the disturbance of 177 acres, or more The hotel proposes to have a maximum of 77 rooms on a site of 0 68 acres Air quality impacts resulting from construction of the hotel will be below these thresholds and therefore no additional environmental analysis is required Because the project's operations are factored into regional air quality models and air quality impacts due to construction are below the AQMD s thresholds, the cumulative air quality impacts are not significant The applicant will be required to control fugitive dust during construction and will also be subject to City standards regarding haul routes and times of construction Traffic and congestion are discussed in the Traffic section above Aesthetics, Massing (Land Use/Planning), and Noise|109| The size/scope of the hotel compared to other buildings in Culver City, will be larger and noisier, negatively impacting Bentley Avenue Aesthetics Land Use/Planning and Noise are discussed on Pages 10 11 and 12 of 16 of the MND The current site is a blighted vacant lot the architecture of the hotel and overall development of the site will enhance the visual character of the immediate vicinity Because the site will be transformed from a vacant lot to a four-story structure with surface parking Page 3 of 4there will be a new source of light and glare However, the development will be required to conform to City zoning standards and design guidelines that include prohibitions of excessive and obtrusive lighting Therefore there are no significant aesthetic impacts The proposed hotel design, massing and location within the lot are consistent with the General Corridor General Plan Land Use Designation The hotel s height, setbacks and parking are in conformance with the Zoning Code development standards for the Limited Commercial (C-1) and Commercial (0-3) Zones Furthermore, the proposed rear setback adjacent to the alley that separates the site from the rear of the Bentley Avenue properties exceeds the minimum code required setback There are no significant land use and planning impacts A hotel use is not typically associated with significant levels of noise Although use of the swimming pool may create noise, as semi-enclosed nature screening with the perimeter wall and distance from the homes along Bentley Avenue, will dampen such noise Further the existing noise created by the surrounding urbanized area with high traffic volumes will serve to obscure noise created by the hotel use There will be temporary increases in noise levels during the construction of the vacant site However, all construction activities will be conducted at the times and days specified by the Municipal Code During construction and operation of the hotel, the site will be subject to the City s nuisance ordinance There are no significant noise impacts|109| The hotel does not conform to other buildings in the immediate area because it is lamer than these other buildings This point in the appellant s argument is not an environmental issue to be addressed in the MND However, staff has provided a response for your information The fact that a proposed structure, if built could be larger than existing buildings within the vicinity of the project site does not indicate that the proposed structure is not in conformance with the Zoning Code The Zoning Code does not require new buildings to conform to existing structures that may be smaller than what the Code allows Such a requirement could lead to new structures that are nonconforming to the present code, as surrounding buildings were erected at different time periods with different development standards, and to underdeveloped properties New buildings are required to be in conformance with design guidelines that address screening and architectural standards The proposed hotel is in compliance with design guidelines and the Zoning Code (as stated above) , Page 4 of 4 c3(310) 253 5710 FAX (310) 253 5721 PLANNING DIVISION Attachment No 4 greP S*, 9770 CULVER BOULEVARD CULVER CITY CALIFORNIA 90232 0507 FINAL INITIAL STUDY ENVIRONMENTAL CHECKLIST FORM AND ENVIRONMENTAL DETERMINATION Project Title Site Plan Review SPR P-2004126 Hampton Inn and Suites Hotel Lead Agency Name & Address City of Culver City, Planning Division 9770 Culver Blvd , Culver City CA 90232 Contact Person & Phone No Jose Mendivil, Associate Planner (310) 253 5757 Project Location/Address 3954 Sepulveda Boulevard Nearest Cross Street Pigott Road APN 4213-017-026 Project Sponsor's Name & Vinny Patel Address 3900 Sepulveda Boulevard Culver City, CA 90230 Attn Vinny Patel (Phone # 310-486-1303) General Plan Designation General Corridor Zoning Limited Commercial (C-1) Commercial (C-3) Redevelopment Project Area Component Area No 4 Overlay Zone/Special District Commercial Setback Overlay (CSO) Project Description and Requested Action Proposed construction of a 4-story 77-room 35 104-square foot hotel on a vacant lot The proposed project will include 67 parking stalls Twenty spaces will be located in a subterranean parking area and 47 spaces will be located on a surface level parking area Surface level parking spaces will be located to the side rear, and underneath the second story of the hotel The hotel will have a partially enclosed swimming pool exercise room lobby area and continental breakfast area for its guests There will be no meeting rooms made available for non-guests and no units will contain kitchen facilities Public improvements such as full width sidewalks street trees and alley resurfacing will be incorporated into the project Existing Conditions of the Project Site Flat vacant lot with some paving and vegetation overgrowth Surrounding Land Uses and Setting West One and Two Story Retail Buildings East One Story Single Family Dwellings and a Two Story Multiple Family Dwelling North Two Story Apartment Building and Surface Parking South Two Story Motel Alley and One and Two Story Single Family Dwellings Other public agencies whose approval is required (e g permits financing approval or participation agreement) Culver City Redevelopment Agency 10 Form Updated 3/16/04Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED The environmental factors checked below would be potentially affected by this project involving at least one impact that is a Potentially Significant Impact as indicated by the checklist on the following pages O Aesthetics LI Mineral Resources El Agriculture Resources 111 Noise O Air Quality 0 Population / Housing O Biological Resources 0 Public Services O Cultural Resources 111 Recreation O Geology /Soils El Transportation/Traffic ri Hazards & Hazardous Materials III Utilities / Service Systems 0 Hydrology / Water Quality 1 0 Mandatory Findings of Significance 111 Land Use / Planning ENVIRONMENTAL DETERMINATION On the basis of this initial evaluation O I find that the proposed project COULD NOT have a significant effect on the environment and a NEGATIVE DECLARATION will be prepared X I find that although the proposed project could have a significant effect on the environment there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent A MITIGATED NEGATIVE DECLARATION will be prepared O I find that the proposed project MAY have a significant effect on the environment and an ENVIRONMENTAL IMPACT REPORT is required 0 I find that the proposed project MAY have a potentially significant impact or potentially significant unless mitigated impact on the environment but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets An ENVIRONMENTAL IMPACT REPORT is required but it must analyze only the effects that remain to be addressed 0 I find that although the proposed project could have a significant effect on the environment because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION including revisions or mitigation measures that are imposed upon the proposed project nothing further is required FISH AND GAME FEE (AB 3158) X I find that the proposed project WILL NOT have an impact on fish or wildlife resources or habitat upon which fish and wildlife depend I find that the proposed project IS EXEMPT from the Fish and Game fee A Certificate of Fee Exemption will be prepared for this project 111 I find that the proposed proje IS NOT EXEMPT from the Fish and Game fee October 26 2005 Associate Planner Printed Name Title V It S ature Jose Mendivil il Form Updated 3/16/04 Page 2 of 18X X Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 EVALUATION OF ENVIRONMENTAL IMPACTS I. AESTHETICS -- Would the project: a) Have a substantial adverse effect on a scenic vista'? b) Substantially damage scenic resources including but not limited to trees rock outcroppings and historic buildings within a state scenic highway'? c) Substantially degrade the existing visual character or quality of the site and its surroundings'? d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area'? Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated 1=1 1=1 1=1 1=1 1=1 El 0 Less Than Significant Impact E El No Impact II. AGRICULTURE RESOURCES: In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project. a) Convert Prime Farmland Unique Farmland or Farmland of El El El X Statewide Importance (Farmland) as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency to non agricultural use'? b) Conflict with existing zoning for agricultural use or a Williamson Act contract'? c) Involve other changes in the existing environment which due to their location or nature could result in conversion of Farmland to non agricultural use'? III. AIR QUALITY -- Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable LI X El air quality plan'? b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation'? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to substantial pollutant concentrations'? e) Create objectionable odors affecting a substantial number of people'? Form Updated 3/16/04 Page 3 of 18EVALUATION OF ENVIRONMENTAL IMPACTS IV. BIOLOGICAL RESOURCES -- Would the project: Have a substantial adverse effect either directly or through habitat modifications on any species identified as a candidate sensitive or special status species in local or regional plans policies or regulations or by the California Department of Fish and Game or U S Fish and Wildlife Service? Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans policies regulations or by the California Department of Fish and Game or US Fish and Wildlife Service'? Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including but not limited to marsh vernal pool coastal etc ) through direct removal filling hydrological interruption or other means? Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors or impede the use of native wildlife nursery sites'? Conflict with any local policies or ordinances protecting biological resources such as a tree preservation policy or ordinance? Conflict with the provisions of an adopted Habitat Conservation Plan Natural Community Conservation Plan or other approved local regional or state habitat conservation plan'? . CULTURAL RESOURCES -- Would the project: Cause a substantial adverse change in the significance of a historical resource as defined in 15064 5? Cause a substantial adverse change in the significance of an archaeological resource pursuant to 15064 5? Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature'? Disturb any human remains including those interred outside of formal cemeteries'? Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 Potentially Significant Impact Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact Li Li Li X|109| 0 0 X|109| CI 0 X|109| 0 0 X Li X Li X X Form Updated 3/16/04 Page 4 of 18 13Potentially EVALUATION OF ENVIRONMENTAL IMPACTS Potentially Significant Impact Significant Impact Unless Mitigation Less Than Significant Impact No Impact Incorporated Expose people or structures to potential substantial adverse effects including the risk of loss injury or death involving i) Rupture of a known earthquake fault as delineated on the E E X most recent Alquist Pnolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42 ii) Strong seismic ground shaking? iii) Seismic related ground failure including liquefaction? El El X iv) Landslides? 0 fl X b) Result in substantial soil erosion or the loss of topsoil? El El 0 c) Be located on a geologic unit or soil that is unstable or that El El X would become unstable as a result of the project and potentially result in on or off site landslide lateral spreading subsidence liquefaction or collapse? Be located on expansive soil as defined in Table 18 1 B of the Uniform Building Code (1994) creating substantial risks to life or property? Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? VI. GEOLOGY AND SOILS -- Would the project: Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 VII HAZARDS AND HAZARDOUS MATERIALS --Would the project: Create a significant hazard to the public or the environment through the routine transport use or disposal of hazardous materials? Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Emit hazardous emissions or handle hazardous or acutely hazardous materials substances or waste within one quarter mile of an existing or proposed school?? Be located on a site which is included on a list of El El El X hazardous materials sites compiled pursuant to Government Code Section 65962 5 and as a result would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or 0 X where such a plan has not been adopted within two miles of a public airport or public use airport would the project result in a safety hazard for people residing or working in the project area? 1({ Form Updated 3/16104 Page 5 of 18Potentially Potentially EVALUATION OF ENVIRONMENTAL IMPACTS Significant Impact Significant Impact Unless Mitigation Less Than Significant Impact No Impact Incorporated VII HAZARDS AND HAZARDOUS MATERIALS (continue) For a project within the vicinity of a private airstrip would the project result in a safety hazard for people residing or working in the project area? Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Expose people or structures to a significant risk of loss injury or death involving midland fires including where midlands are adjacent to urbanized areas or where residences are intermixed with midlands? El El El El El CI Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 VIII. HYDROLOGY AND WATER QUALITY — Would the project: a) Violate any water quality standards or waste discharge requirements? b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e g the production rate of pre existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? Substantially alter the existing drainage pattern of the site or area including through the alteration of the course of a stream or river in a manner which would result in substantial erosion or siltation on or off site? Substantially alter the existing drainage pattern of the site or area including through the alteration of the course of a stream or river or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on or off site? Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade water quality? g) Place housing within a 100 year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? Place within a 100 year flood hazard area structures which would impede or redirect flood flows? Expose people or structures to a significant risk of loss injury or death involving flooding including flooding as a result of the failure of a levee or dam? El El El El El El X El X X El El El El El El El Inundation by seiche tsunami or mudflow? El El El X Form Updated 3/16/04 Page 6 of 18a) Physically divide an established community'? b) Conflict with any applicable land use plan policy or regulation of an agency with jurisdiction over the project (including but not limited to the general plan specific plan local coastal program or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect'? c) Conflict with any applicable habitat conservation plan or natural community conservation plan'? LI 1=1 X 1=1 LI 1:1 X LI X a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state'? b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan specific plan or other land use plan'? 1=1 1=1 a) Exposure of persons to or generation of noise levels in 0 excess of standards established in the local general plan or noise ordinance or applicable standards of other agencies'? b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels'? c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project'? d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project'? e) For a project located within an airport land use plan or where such a plan has not been adopted within two miles of a public airport or public use airport would the project expose people residing or working in the project area to excessive noise levels'? f) For a project within the vicinity of a private airstrip would the project expose people residing or working in the project area to excessive noise levels'? LI 111 LI 0 X a) Induce substantial population growth in an area either directly (for example by proposing new homes and businesses) or indirectly (for example through extension of roads or other infrastructure)'? X Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 Potentially Significant Impact EVALUATION OF ENVIRONMENTAL IMPACTS Potentially Significant Impact Unless Mitigation Incorporated Less Than Significant Impact No Impact X. LAND USE AND PLANNING - Would the project. X. MINERAL RESOURCES -- Would the project. XL NOISE —Would the project result tn. XII. POPULATION AND HOUSING -- Would the project: it Form Updated 3/16/04 Page 7 of 18X X Potentially EVALUATION OF ENVIRONMENTAL IMPACTS Potentially Significant Impact Significant Impact Unless Mitigation Less Than Significant Impact No Impact Incorporated XII POPULATION AND HOUSING (continued) Displace substantial numbers of existing housing necessitating the construction of replacement housing elsewhere'? Displace substantial numbers of people necessitating the construction of replacement housing elsewhere'? XM. PUBLIC SERVICES Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities need for new or physically altered governmental facilities the construction of which could cause significant environmental impacts in order to maintain acceptable service ratios response times or other performance objectives for any of the public services Fire protection'? Police protection'? Schools'? Parks'? Other public facilities'? XIV RECREATION — Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated'? Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment'? El El El El El I=1 El El X Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 XV. TRANSPORTATION/TRAFFIC -- Would the project: Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system e result in a substantial increase in either the number of vehicle trips the volume to capacity ratio on roads or congestion at intersections)? Exceed either individually or cumulatively a level of 0 El 0 x service standard established by the county congestion management agency for designated roads or highways'? Result in a change in air traffic patterns including either an 0 El 0 x increase in traffic levels or a change in location that results in substantial safety risks'? Substantially increase hazards due to a design feature 0 x El Ci (e g sharp curves or dangerous intersections) or incompatible uses (e g farm equipment)? e) Result in inadequate emergency access'? 0 0 CI X f) Result in inadequate parking capacity'? 0 0 El X g) Conflict with adopted policies plans or programs 0 El El x supporting alternative transportation (e g bus turnouts bicycle racks)?|1010|Form Updated 3/16/04 Page 8 of 18X X X XVII. MANDATORY FINDINGS OF SIGNIFICANCE — Potentially EVALUATION OF ENVIRONMENTAL IMPACTS Potentially Significant Impact Significant Impact Unless Mitigation Less Than Significant Impact No Impact Incorporated XVI. UTILITIES AND SERVICE SYSTEMS --Would the project: Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board'? Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities the construction of which could cause significant environmental effects? Require or result in the construction of new storm water drainage facilities or expansion of existing facilities the construction of which could cause significant environmental effects? Have sufficient water supplies available to serve the project from existing entitlements and resources or are new or expanded entitlements needed'? Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the projects projected demand in addition to the provider s existing commitments'? Be served by a landfill with sufficient permitted capacity to accommodate the project s solid waste disposal needs'? Comply with federal state and local statutes and regulations related to solid waste'? X X Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 Does the project have the potential to degrade the quality of the environment substantially reduce the habitat of a fish or wildlife species cause a fish or wildlife population to drop below self sustaining levels threaten to eliminate a plant or animal community reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory'? Does the project have impacts that are individually limited but cumulatively considerable? ( Cumulatively considerable means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects the effects of other current projects and the effects of probable future projects)? Does the project have environmental effects which will LI X cause substantial adverse effects on human beings either directly or indirectly'? Form Updated 3/16/04 Page 9 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 XVIII EARLIER ANALYSES N/A XIX DISCUSSION Discussion of Initial Study Checklist responses NOTE Following the public review period, the Planning Commission approved the Initial Study/Mitigated Negative Declaration (MND) and Site Plan Review for the proposed project The approval of the MND was then appealed to the City Council After hearing public comments, the City Council directed that a shade/shadow analysis and a traffic study be prepared These studies are included as appendices to this document Revisions to the draft IS/MND have also been made in response to public comments and to reflect the additional technical studies Changes to the text are indicated with striir cep4t,and ,/talics notation Two additional mitigation measures have been added under Section VII Hazards and Hazardous Materials and Section Xl - Noise The new technical studies, analysis and mitigation measures do not raise any significant new issues that would reqiiire , recirculation of the MND under CEQA Guidelines Section 15073 5 1 but only clarify or add requirements to the project to provide additional protection to adjacent residents from potential environmental impacts AESTHETICS After the circulation and review of the proposed Initial Study/Mitigated Negative Declaration by the Planning Commission the IS/MND was appealed to the City Council As part of its review the Council directed that a shade/shadow analysis be prepared to evaluate the impacts of the proposed hotel on adjacent properties That analysis is provided as Attachment 1 (Solargy Inc Shade and Shadow Study, 3954 Sepulveda Boulevard, Culver City, CA, June 8 2005) No Impact There are no scenic vistas or resources in the vicinity of the project site that is located in a fully developed a) through c) urbanized area No significant adverse impacts relative to scenic vistas and resources will occur because of the proposed project Less Than Development of the site which is currently vacant will create a new source of light and glare However Significant the development will conform to all applicable City zoning standards and design guidelines that include a Impact requirement that all lighting not project onto or create a nuisance for adjacent public rights of—way and d) private properties Through these code and design requirements the impact will be less than significant A shade and shadow study was also prepared to determine the extent to which the project would block sunlight to adjacent properties The study concluded that the proposed project would not shadow any adjacent single family residence roof at any time throughout the year that the apartments to the north would be partially shaded at the Winter Solstice that there would be minor shading of the roof of the apartments at other times of year and that there would be minor shading of the motel to the south in the late afternoon in the spnng and summer These impacts are considered less than significant MITIGATION MEASURE(S) No mitigations are required AGRICULTURE RESOURCES: No Impact The project site is not located on land identified utilized or zoned for agricultural purposes and there is a) through c) no known Williamson Act contract in effect on the project site MITIGATION MEASURE(S) No mitigations are required Vi Form Updated 3/16/04 Page 10 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 HI. AIR QUALITY: Less Than Significant Impact a) through e) Future new development in any portion of Culver City will contribute both at the project level and cumulatively to pollutant emissions over existing non attainment conditions due to both construction and operation of individual projects This hotel project does not require a traffic study due to the projected number of trips as determined by using the Institute of Transportation Engineers Trip Generation Manuel 6 th Edition Volume 1 of 3 If a proposed project is consistent with the city s General Plan and Zoning Code the project s operational impacts are considered to be factored into the SCAQMD s regional air quality models This project as proposed is consistent with Culver City s General Plan and Zoning Code Per the SCAQMD CEQA Handbook the thresholds of significance for construction of a hotel are the construction of 213 rooms or more and the disturbance of 177 acres or more The hotel proposes to have a maximum of 77 rooms and the site is 0 68 acres Therefore air quality impacts resulting from construction of the hotel will be below the threshold of significance Additionally because the project s operations are factored into regional air quality models and air quality impacts due to construction are less than significant the cumulative air quality impacts are less than significant The project applicant will be required to comply with SCAQMD Rule 403 which provides specific control actions to be implemented during construction activities to control fugitive dust MITIGATION MEASURE(S) No mitigations are required IV. BIOLOGICAL RESOURCES: No Impact a) through f) The project site is located in an urbanized area surrounded by existing disturbed land and development Information on existing conditions of the project site submitted by the applicant with project application materials indicates no identified biological resources as identified by the California Department of Fish and Game or US Fish and Wildlife Service or federally protected wetlands as defined by the Clean Water Act exist on site MITIGATION MEASURE(S) No mitigations are required V. CULTURAL RESOURCES. No Impact a) through d) The project site is located in an urbanized area surrounded by existing disturbed land and development Information on existing conditions of the project site submitted by the applicant with project application materials indicates no identified cultural resources exist on site and no significant adverse impacts relative to cultural resources are associated with the project MITIGATION MEASURE(S) No mitigations are required Vi GEOLOGY AND SOILS: No Impact a) through e) The project site is located in an urbanized area surrounded by existing disturbed land and development The building will be constructed to meet all Uniform Building Code requirements The building is required to comply with City and state seismic standards MITIGATION MEASURE(S) No mitigations are required 2-0 Form Updated 3/16/04 Page 11 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 VII. HAZARDS AND HAZARDOUS MATERIALS: Environmental information submitted by the applicant with the project plans and application materials indicates that no hazardous materials will be utilized on the project site Further the Phase I Environmental Assessment Report for a Vacant Lot 3948 3954 Sepulveda Boulevard, Culver City, CA prepared by ACS Associates August 22 2005 concluded that there was no evidence of hazardous material and waste containing facility at the site or in governmental records and that no further investigations were recommended Adverse impacts relative to health hazards are expected to be less than significant Any future use of hazardous materials will be required to obtain the necessary approvals from the Culver City Fire Department in compliance with applicable Fire Code regulations Dunng the public review process some residents raised a concern that since the site had previously been used as a commercial nursery fertilizers and pesticides including DDT could be present in the soil due to previous spills Although the Phase I Environmental Site Assessment found no evidence of contaminated soil the following mitigation measure would ensure that this potential impact is reduced to a level that is less than significant MITIGATION MEASURE(S) No-m-itigatiens-ar-e-r-equir-ed a) Prior to issuance of a grading or building permit the applicant shall demonstrate to the Building Official that sub surface soils testing has been conducted by a qualified professional to determine whether any residual pesticide or fertilizer contamination is present at the site in quantities that could present a health hazard either to construction workers or occupants of surrounding properties b) If contamination is found it shall be remediated pursuant to applicable city state or federal law pnor to commencement of grading or construction in a manner meeting the approval of the Building Official Less Than Significant Impact With Mitigation a) No Impact b) through h) VIII. HYDROLOGY AND WATER QUALITY: No Impact a) through h) and 0 Less Than Significant Impact i) Grading and building plans will be reviewed and approved by the City s Building and Engineering Divisions to assure that on and off site drainage will not create significant impacts to drainage facilities groundwater quality and quantity An erosion control plan will be required by the City Engineer to ensure compliance with the Los Angeles County Stormwater Quality Management Program NPDES Permit No CAS614001 The erosion control plan must include the design and placement of recommended Best Management Practices (BMPs) to effectively prohibit the entry of pollutants from the construction site into the public street of storm drain system The construction contractor will be required to comply with the California Storm Water Best Management Practice Handbook The project site is located within the Stone Canyon Dam Inundation Zone Should the darn fail the project site might be exposed to significant loss and/or damage The dam is managed by another government entity with the responsibility of maintaining it No information has been presented that indicates the dam is subject to eminent failure MITIGATION MEASURE(S) No mitigations are required IX. LAND USE AND PLANNING: No Impact a) through c) The proposed use is consistent with the General Corridor General Plan Land Use designation and is permitted in the Limited Commercial (C-1) and Commercial (C-3) Zones Upon the City s review and approval of the application the project will be consistent with the City s Zoning Code Future uses will also be reviewed for consistency and compliance with Zoning and General Plan requirements MITIGATION MEASURE(S) No mitigations are required X. MINERAL RESOURCES: No Impact Materials submitted with the application and also City Staff site review of the project shows that mineral a) & b) resources have not been identified on or within the project site MITIGATION MEASURE(S) No mitigations are required Form Updated 3/16/04 Page 12 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 XI. NOISE: Less Than The site is located within an urbanized area with high traffic volumes that account for existing noise levels Significant According to the General Plan the site is impacted by traffic noise levels of approximately 70 dB CNEL Impact With The mitigation measure listed below would require the project proponent to ensure that the structure is Mitigation designed to mitigate noise levels in compliance with applicable laws and codes a) The proposed hotel project is not expected to generate significant noise levels and all grading and construction activities will be conducted during the appropriate hours as allowed by the Culver City No Impact Municipal Code Both applicant and City contact information will be posted on the project site to direct b) through c) residents wishing to report noise and other construction activity complaints Also during construction of e) and f) the site and operations of the hotel the site will be subject to the City s nuisance ordinance There will be temporary increases in noise levels during the construction of the site which is currently Less Than vacant However all grading and construction activities will be conducted during the appropriate hours as Significant allowed by the Culver City Municipal Code Both applicant and City contact information will be posted on Impact the project site to direct residents wishing to report noise and other construction activity complaints Also d) during construction of the site and operations of the hotel the site will be subject to the City s nuisance ordinance MITIGATION MEASURE(S) Ne-Fn+tiefatielas-aFe-rectulfed a) Pnor to issuance of a building permit the applicant shall provide evidence acceptable to the Building Official that the structure has been designed such that interior and exterior noise levels will comply with the City s Noise Element and all city, state and federal laws applicable to hotel uses b) If determined necessary by the Building Official prior to issuance of an occupancy certificate, the a pplicant shall provide a noise study confirming that noise levels meet all applicable city policies and city, state, and federal laws XII POPULATION AND HOUSING: No Impact The proposed project is a hotel facility that will accommodate a transient population and will not include a) through c) permanent housing The site is currently vacant and no existing housing will be removed as a result of construction No significant adverse impacts to population or housing are associated with the project MITIGATION MEASURE(S) No miti gations are required XIII. PU LIC SERVICES: No Impact The hotel project will comply with all applicable California Building and Fire Codes Impacts to fire a) protection are expected to be less than significant No impacts to schools are expected to result from the hotel project Maintenance of public facilities and requirements for other public services associated with the project are expected to be incidental and no significant adverse impacts are expected The Police Department did not state that there would be significant impacts to response times as a result of the hotel project MITIGATION MEASURE(S) No mitigations are required XIV. RECREATION: No Impact The proposed project is a hotel that will accommodate a transient population No significant adverse a) & b) impacts relative to recreation are associated with the project MITIGATION MEASURE(S) No mitigations are required Form Updated 3/16/04 Page 13 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 XV. TRANSPORTATION/TRAFFIC: During the application review process the proposed project has-been was reviewed by the City s Traffic Engineering Manager and +ssues-relative-to-ina-pasts-OR it was determined that local and regional traffic and parking will not be significantly impacted The morning peak hour trip generation was calculated to be 43 and the afternoon peak hour trip generation was calculated to be 47 The project peak hour trip generation was calculated to be 55 and determined to occur on Saturday only Threugh-petisy-adepted-by Although the City does not typically require traffic studies for projects generating up to 49 trips in any one hour ancl-with-dissFeten—may expoctod to occur on Saturdays only following the public review penod and in response to public concerns a formal traffic study was prepared at the direction of the City Council The traffic study is provided as Appendix 2 The study found that although several intersections are projected to operate blow an acceptable level of service the proposed project would not significantly impact any intersection or roadway segment Therefore no general traffic improvements are warranted in connection with this project Please refer to Appendix 2 for further details of the traffic analysts Both the Police Department and the City s Traffic Engineering Manager reviewed the potential impacts on circulation and determined that there is an increased hazard if vehicles attempt left turn movements (crossing over Sepulveda Boulevard) to access or leave the site As such a condition will be imposed as a mitigation with this mitigation the impact will be reduced to less than significant MITIGATION MEASURE(S) Less Than Significant Impact a) No Impact b) c) and e) through g) Potentially Significant Impact Unless Mitigations are incorporated d) • - - •• • ... : - e e 1 A raised median or some other obstruction shall be installed along Sepulveda Boulevard to prevent left turn movements into or out of the project site The raised median or obstruction shall be designed to the satisfaction of the City Engineer A right turn only sign shall be installed at the project s driveway accessing Sepulveda Boulevard XVI. UTILITIES AND SERVICE SYSTEMS. No Impact The proposed project will connect to existing utilities available to the project site No significant adverse a) through g) impacts to utilities are expected from project implementation MITIGATION MEASURE(S) No mitigations are required 2,3 Form Updated 3/16/04 Page 14 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 XVII MANDATORY FINDINGS OF SIGNIFICANCE: The project will not have significant impacts to any plant or animal wildlife species or cause substantial cumulative impacts The proposed hotel may cause environmental effects which could result in substantial adverse effects on human beings (both directly and indirectly) These adverse effects if not addressed could result in an overall degradation of the public safety and urban environment surrounding the site (indirectly affecting the community) The following mitigation measures will reduce this impact to a level that is less than significant MITIGATION MEASURE(S) 1 Access to the alley located along the projects easterly boundary shall be restricted to emergency access only A wrought iron gate or other material as approved by the Planning Division shall be installed at the entrance to the alley A Knox Box shall be installed to the satisfaction of the Fire Department for emergency access 2 The hotel operator shall ensure all graffiti is removed on a continuous basis within forty eight (48) hours after its application 3 Litter shall be removed daily from the project site including all parking areas and adjacent public sidewalks the portion of the alley at the rear that abuts the project site shall be swept or cleaned either mechanically or manually on a weekly basis to control debris 4 Privacy coverings such as shades draperies or blinds shall be appropriately hung to cover all windows Exterior window glass shall be without cracks chips or holes Peeling and deteriorated paint of exterior walls must be repainted within reasonable time 5 The exterior of the property including adjacent public sidewalks and parking lots under the control of the operator shall be illuminated during all hours of darkness during which the property is open for business in a manner so persons standing in those areas at night are identifiable from the street However the required illumination shall be placed so as to minimize interference with nearby residents and their properties 6 All areas on the property designated for landscaping including but not limited to lawns planter beds and other open surfaces without hardscape shall be maintained with properly trimmed living plant materials and without litter or debris 7 Directional signs shall be posted as appropriate to ensure emergency personnel can find guest rooms in a timely manner 8 All containers used for the storage of trash garbage or recycled materials and placed on the exterior of the hotel shall be maintained in a locked and screened trash enclosure approved by the City No Impact a) and b) Potentially Significant Impact Unless Mitigations are incorporated c) Form Updated 3/16/04 Page 15 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 MITIGATION MONITORING PROGRAM The following environmental mitigation measures shall be incorporated into the project development as conditions of approval The project applicant shall secure a signed verification for each of the mitigation measures which indicates that mitigation measures have been complied with and implemented and fulfills the City environmental and other requirements (Public Resources Code Section 21081 6) Final clearance shall require all applicable verification as included in the following table The City of Culver City will have primary responsibility for monitoring and reporting the implementation of the mitigation measures unless otherwise indicated The mitigation measures have been identified by impact category and numbered for ease of reference MITIGATION MONITORING PROGRAM Site Plan Review SPR P-2004126 Hampton Inn and Suites Hotel MITIGATION MEASURE TIMING VERIFICATION OF COMPLIANCE DEPT:: SIGNATURE. DATE: HAZARDS AND HAZARDOUS MATERIALS H 1 a) Prior to issuance of a grading or building permit the applicant shall demonstrate to the Building Official that sub surface soils testing has been conducted by a qualified professional to determine whether any residual pesticide or fertilizer contamination is present at the site in quantities that could present a health hazard either to construction workers or occupants of surrounding properties b) If contamination is found it shall be remediated pursuant to applicable city state or federal law prior to commencement of grading or construction in a manner meeting the approval of the Building Official Prior to issuance of a grading or building permit Building NOISE N 1 a) Prior to issuance of a building permit the applicant shall provide evidence acceptable to the Building Official that the structure has been designed such that interior and exterior noise levels will comply with the City s Noise Element and all city state and federal laws applicable to hotel uses b) If determined necessary by the Building Official prior to issuance of an occupancy certificate the applicant shall provide a noise study confirming that noise levels meet all applicable city policies and city state and federal laws Prior to issuance of a building permit prior to issuance of an occupancy certificate Building TRANSPORTATION/TRAFFIC T 1 A raised median or some other obstruction shall be installed along Sepulveda Boulevard to prevent left turn movements into or out of the project site The raised median or obstruction shall be designed to the satisfaction of the City Engineer A right turn only sign shall be installed at the project s driveway accessing Sepulveda Boulevard Prior to issuance of Certificate of Occupancy (CO) Engineering Form Updated 3/16/04 Page 16 of 18Site Plan Review SPR P-2004126/Hampton Inn and Suites Hotel October 26 2005 MITIGATION MONITORING PROGRAM Site Plan Review SPR P-2004126 Hampton Inn and Suites Hotel / ' \ MITIGATION MEASURE _ ,A TIMING = VERIFICATION OF COMPLIANCE DEPT. SIGNATURE: DATE|1010|MANDATORY FINDINGS OF SIGNIFICANCE M 1 Access to the alley located along the projects easterly boundary shall be restricted to emergency access only A wrought iron gate or other matenal as approved by the Planning Division shall be installed at the entrance to the alley A Knox Box shall be installed to the satisfaction of the Fire Department for emergency access M 2 The hotel operator shall ensure all graffiti is removed on a continuous basis within forty eight (48) hours after its application M 3 Litter shall be removed daily from the project site including all parking areas and adjacent public sidewalks the portion of the alley at the rear that abuts the project site shall be swept or cleaned either mechanically or manually on a weekly basis to control debris M 4 Privacy coverings such as shades draperies or blinds shall be appropriately hung to cover all windows Exterior window glass shall be without cracks chips or holes Peeling and deteriorated paint of exterior walls must be repainted within reasonable time M 5 The exterior of the property including adjacent public sidewalks and parking lots under the control of the operator shall be illuminated during all hours of darkness during which the property is open for business in a manner so persons standing in those areas at night are identifiable from the street However the required illumination shall be placed so as to minimize interference with nearby residents and their properties M 6 All areas on the property designated for landscaping including but not limited to lawns planter beds and other open surfaces without hardscape shall be maintained with properly trimmed living plant materials and without litter or debris M 7 Directional signs shall be posted as appropriate to ensure emergency personnel can find guest rooms in a timely manner ):53 Prior to issuance of CO Prior to CO & Periodic Monitoring Prior to CO & Periodic Monitoring Prior to CO & Periodic Monitoring Prior to CO and Periodic Monitoring Prior to CO and Periodic Monitoring Prior to CO and Periodic Monitoring Fire Prevention Engineering Planning Code Enforcement Code Enforcement Code Enforcement Planning Planning Planning Code Enforcement Fire Prevention Form Updated 3/16/04 Page 17 of 18Site Plan Review SPR P 2004126/Hampton Inn and Suites Hotel October 26 2005 MITIGATION MONITORING PROGRAM Site Plan Review SPR P-2004126 Hampton Inn and Suites Hotel 4.fr '. MITIGATION MEASURE TIMING`;' , VERIFICATION OF COMPLIANCE , DEPT : e _ SIGNATURE: DATE,|109| - , M 8 All containers used for the storage of trash garbage or recycled materials and placed on the exterior of the hotel shall be maintained in a locked and screened trash enclosure approved by the City _ Prior to CO and Periodic Monitoring Planning Code Enforcement . Appendices made a part of this document Appendix 1 Shade and Shadow Study Appendix 2 Traffic Study References Utilized 1 Trip Generation, 6' Edition, Volume 1 of 3 — Institute of Transportation Engineers Form Updated 3/16/04 Page 18 of 18TRAFFIC GENERA FION 24 Hauls Morning Peak Hour Afterilon Peak Hour Projea Peak Hour (If different from above) EntermF ThotinE 317(30 3/Lcilq) ( I -4.0 7 09 zs- (zt) 60 Net Tohl Increue 33 (t29) 41- 7 ) (q3) 47 (5) Total Existing .61 (5 Lt ditoV) - — - New Vehicle Trips-- CITY or CULVER CITY Attachment No 5 INTERDEPARTMENTAL MEMORANDUM Date I C*05- ' 10 Ft our Subject 5- 61 RC' I'll 6 Traffic EnLineer, Engineering ( L./ 05 ei I di I TRAFFIC AND PARKING ASSESSMENT Review for Trip Generation, Traffic Impact Study, and Parking Demand Study The following proposal has been submitted to the Planning Division for review cldv ado )3 /vd (Vc4Ccui+- 1-0-n Address 3 q Proposal 7 7 og ooli /joie/ 3 57, / 0 'tt Sy-61- Uses Square Feet of Floor Area/11 of Units 7-7 AO s 3 5, it, cr Planiung Commission Level of/Review Administrative Please review the attached materials to determine|109| Trip Generation for peak hour of use|109| If a Traffic Impact Study is required or recommended pursuant to adopted City critena|109| If a Parking Demand Study is recommended|109| Relationship and impact of project on CMP network.|109| Are any on site or off-site parking and circulation issues raised, such as driveway locations? PLEASE PROVIDE INFORMA rioN REQUES1ED BELOW AND ON PAGE 2 If additional mformation is needed, please telephone me at 5-7 S-7 Please forward your comments to me withinjlii, or by (it) ea(' ID ii3/1) 1i- -r 11 e —1- 1r F, 6;1.5 )1 shell be/t ii \r) OC a lit Pr col 1-1.1 -11 -7o e 9--) 50 E /14a 1.14/, .7-11 e 7-/-A „p ryi r eki esis Thank you for your cooperation Attached|101010|3LEVEL OF IMPACT Is the project 1 On a site or within an area with a past history of sensitive traffic issues Comment lef (|1010|IV eda Pivot/ 2 On a site or within an area where current parking or traffic "5( problems exist Comment 4 Adjacent to arterial street or primary collector/secondary arterial street carrying 10 000 vehicles per day or more Se" (4 v* cf /a Comment 5 Within 1/4 mile of the intersection of two arterial streets or of one arterial street and a primary collector/secondary arterial street br a shikl) ef re 14 ce vol5 J r) wri )19 F14 pro' k /Nutt( Comment 3 In the vicinity of an environmentally sensitive area including a low density residential neighborhood Comment TRAFFIC FNGINEER RECOMMENDATION YES Traffic Impact Study is required If yes is there existing data that may be used? Cost estimate $ paricinu Demand Study is required If yes is there existing data that may be used? Cost estimate $ CMP Network Is this project on the CMP network requiring additional analysis? Driveway Location Comments "K 9 A-fr- „fi/y (1 / 4 /- 0,-/2 ve Was/ ; C e ebt 1 42_16 / (Traffic Engineer) / (Date) ••n•n•• n••n•••.. TRAFFIC IMPACT STUDY CRITERIA (See 9/14/87 Council Adopted Criteria) 1 Fewer than 50 trips total in any one hour 2 Total of 50 to 99 trips in any one hour 3 Total of 100 or more trips in any one hour YES NO/NA (5,(1--t411e4y) X PARKING DEMAND YES NQ Is this an unusual use for which the parking demand cannot be readily determined through application of existing Code requirements? APPROVAL OF RECOMMENDATION (City Engineer/Date) (City Planner/Date)ENCLOSURE NO 1 CULVER CITY CRITERIA FOR REQUIRENTG 'TRAFFIC IMPACT STUDIES FOR PROPOSED DEVELOPMENTS In response to a request for a aiscretionary approval action of the Planning Division or the Planning Commission for a proposed development, the City Engineer will estimate the potential traffic generation of the proposed development Such estimates will be based on generation factors published m accepted sources, such as Trip Generation by the Institute of Transportation Engineers, and on pertinent information about the development presented by the applicant If there is an existing development on the site, the estimated traffic of the =sting development will be subtracted to determine the net increase in traffic generation For purposes of these criteria, "proposed development" shall mclude new construction, a building addition, change or intensification of use, and recommencement of any use of property or improvements where not used for more than one year If it is estimated that the proposed development will generate a net increase of less than 50 vehicle trips total entering and muting the development during any one hour period of any day, a traffic impact study will not be required, unless the City Engineer and the City Planner determine extraordinary circumstances are presented by the proposed development If it is estimated that the proposed development will generate a net increase of between 50 and 99 vehicle trips total entenng and exiting the development during any one hour period of any day, the City Engineer and the City Planner may determine that a traffic impact study shall be prepared and submitted for City review and approval Such determinations will be based on criteria including, but not limited to, the following|109| The proposed development site is adjacent to a General Plan design arterial street or primary collector / secondary arterial street carrying 10,000 vehicles or more per day 2 The proposed development site is within one-quarter of a mile of an intersection of two General Plan designated arterial streets or one arterial street and a primary collector / secondary arterial street 3 The proposed development site is in the vicinity of an environmentally sensitive area, such as an area immediately bordering a low density residential neighborhood, as determined by the City Council, the Planning Commission, the Community Development Director, the City Engineer, or the City Planner If n is determined that the proposed development will generate a net increase of 100 vehicle trips or more total entering and exiting the development during any one hour period of any day, the City Engineer and the City Planner shall require that a traffic impact study be prepared and submitted for City review and approval If a traffic impact study is required, data in previous traffic impact studies may be used in the required traffic impact study if the City Engineer determines such data is appropriate for such use A decision of the City Engineer and the City Planner to require a traffic impact study may be appealed pursuant to Section 37-120 of the Culver City Municipal Code Recommended by the Planning Commission Approved and adopted by the City Council August 12, 1987, for approval September 14, 1987Land Use. 310 Hotel Description Hotels are places of lodging that provide sleeping accommodations restaurants, cocktail lounges, meeting and banquet rooms or convention facilities, and other retail and service shops Some of the sites included in this land use category are actually large motels providing the facilities of a hotel noted above Additional Data Studies of hotel employment density indicate that, on the average, a hotel will employ 0 9 employees per room 1 Thirty studies provided information on occupancy rates at the time the studies were conducted The average occupancy rate for these studies was approximately 83 percent The hotels surveyed were primarily located outside central business districts in suburban areas The sites were surveyed from the late 1960s to the 1990s throughout the United States For all lodging uses, it is important to collect data on occupied rooms as well as total rooms in order to accurately predict trip generation characteristics for the site Source Numbers 4,5 12 13 18 55 72 170, 187, 254 260 262,277 280,301 306 357 422 436 ' ' Buttice, Carl H , Unpublished studies of building employment densities Portland Oregon ' Tnp Generation 6th Edition 502 Institute of Transportation Engineersi . 1 . i|109| . 1 . 1 . 1 1 . 1 1 . 1 ' 100 200 300 400 500 600 700 800 900 1000 1100 X = Number of Rooms X Actual Data Points Fitted Curve Average Rate Fitted Curve Equation T = 8 946(X) 368 112 R2 = 0 98 18 000 17 000 — 16 000 — 15 000 — 14 000 — 13 000 — 12 000 — 11 000 — 10 000 — 9 000 — 8 000 — 7 000 — 6 000 —. 5 000 — 4 000 —, 3 000 — . 2 000 — - X- 1 000 —, , Y 0 'I X „ r,|109| 1.1.1.1|1010|1200 1300 1400 1500 1600 1700 1800 1900 x Hotel (310) Average Vehicle Trip Ends vs Rooms On a Weekday 2L/ lictifr; g A3 /77= u Number of Studies 9 ) F1" Average Number of Rooms 516 Directional Distribution 50% entering, 50% exiting Trip Generation per Room 'Average Rate Range of Rates Standard I-Int/toil/19 823 347 9 58 338 Data Plot and Equation ' Trip Generation 6th Edition 512 Institute of Transportation Engineers 3 ti 181400 17 006 - is Dos ODD 14 — 13 000 - 12400 — 11 006 70 046 7 9 MO =- 8000 =- 7 COO 7 6 000 5 000 = 4 000 — 3 000 2000 1 000 — a 02-01-05 I0 10 FROM-TRARS/PUBLICKS/MEDIASVCS +040837800T T-181 P 12/Z0 F-300 Hotel (310) /1-L-1 -611 Average Vehicle Trip Ends vs gOtMla On a Weekday Sor7 772 Number of Studies 10 Average Number of Rooms 476 Directional Distnbution 50% entering, 50% exiting Trip Generation per Roorn Average Rata Range of Rates Standard Deviation 817 347 - 958 338 Data Piot and Equation ' 1 I I ' 1, ' I 1 I 100 200 300 400 SOD 600 700 BOO 900 1330 1103 1200 1300 1400 7500 7600 7700 1800 1e00 X Numoar of Rooms Y Actual Date Paints Fleets Curve -- Average Rate Rted Curve Equation T = E 95(X) 373 18 0_911 Tap Generation 7tti Ealuon 551 inseam of Transponation EngineersX = Number of Rooms Fitted Curve X Actual Data Points Average Rate Fitted Curve Equation Ln(T) = 1 240 Ln(X) 1 998 R2 = 0 75 I Data Plot and Equation 0 100 200 300 500 400 Trip Gen eration 6th Edition 513 Institute of Transportation Engineers Hotel (310) Average Vehicle Trip Ends vs Rooms On a Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a m mar ni tt) 6 1, CI e/ III— Number of Studies 20 Average Number of Rooms 240 Directional Distribution 61% entering, 39% exiting Trip Generation per Room Average Rate Range of Rates Standard Deviation 0 56 020 103 07802-01-05 10 10 FROM-TRANS/PUBLICWKS/MEDIASVC3 +0408370007 T-181 P 13/29 F-300 Hotel (310) aak ari)(77:43 p Fp? Average Vehicle Trip Ends vs Rooms On a Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a m Number of Studies 20 Average Number of ROoms 240 Directional Distribution el% antenng, 39% exibng Trip Generation per Room Average Rate Range of FieMS S1andart1 Deviation 0 56 020 - 103 078 Data Plot and Equation co S|1010|300 — 200 — pC MCI X 100 200 X R.^:tual Daze PoInTic 300 X = rlurnoer of Rooms Finsa Cunra 400 500 AvantEst Ralz Merl Curve Equation 1.n(T) .15 1 24 l-n(X) ZOO 11721075 ••n••n111, Top Generauon Ttn Eamon 552 I nsuEme of Transportation Engineers 3Average Rate Panrum nf Rota1c m U I-1- um LJCVIctLIUH 400 300 200 Hotel (310) p,ak C41 >e 7= 91 Average Vehicle Trip Ends vs Rooms On a Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p m Number of Studies 22 Average Number of Rooms 240 Directional Distribution 53% entering, 47% exiting Trip Generation per Room 0 61 021 103 0 81 Data Plot and Equation 100 X X - 0 100 200 300 400 500 X = Number of Rooms X Actual Data Points Fitted Curve Average Rate Fitted Curve Equation Ln(T) = 1 212 Ln(X) 1 763 R2 = 0 70 514 Institute of Transportation Engineers Trip Generation 6th EditionData Piot nd Equation 500 X 403— T7 Ga Ti 1! Ga PI/ X 300 - 200 100 - - X X X X X X|1010|ACTWEli 100 P1 Palms X Numner of Rooms 300 400 Average' REMO Fined Curve Equation Not given 500 OZ-01-05 10 19 FROM-TRANS/PUBLICWS/MEDIASVC5 +94983T8007 T-181 P 14/Z9 F-300 Hotel (310) 44ernrefri Peak rti 7Z.- Yr ,AF Average Vehicle Trip Ends vs Rooms On a Weekday, Peak Hour of Adjacent Street Traffic, One Hour astween 4 and 6 p in -Number of Studies 25 Average Number of Rooms 224 Directional Distribution 53% entering 47% emting Trip Generation per Room Average Rate Range of Rates Standard Deviation 059 021 - 103 090 Tnp Gi:vteranon Mt Edition 553 Institute of Transportation Engineersi X Actual Data Points 100 200 300 X = Number of Rooms Fitted Curve Average Pate 400 Fitted Curve Equation T = 0 694(X) + 4 319 F12 = 0 80 Trip Generation 6th Edition 518 Institute of Tiansportation Engineers Hotel (310) Average Vehicle Trip Ends vs Rooms 17; u)C4- qiak:Mbir On a Saturday, ci,7A,X7 7-7 IC Peak Hour of Generator Number of Studies 9 Average Number of Rooms 194 Directional Distribution 56% entering, 44% exiting Trip Generation per Room - _ Average Rate Range of Rates Standard rtrammi . or, 0 72 049 123 0 87 3(9, , , 02-01-05 10 20 FROM-TRANS/PUBLICIES/MEDIANCS +0408378007 T-181 P 18/20 F-300 Hotel (310) Ti c'1 3 :'6 F pefiem-Lit a 7e 7.%)< 7 7= 7 cc- "A" Average Vehicle Trip Ends vs Rooms On a Saturday, Peak Hour of Generator Number of Stuclies 9 Average Number of Rooms 194 Directional Distribution 56% entering 44% exiting Trip Generation per Room Average Rate Range of Rates Stannani Deviation 072 049 123 087 Data Piot and Equation Tnp Gonoravon 7T1, anon 557 institute of Transportation Enginavr3 37Attachment 6 i|1010101010|RESOLUTION NO 2004-P014 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CULVER CITY, CALIFORNIA, APPROVING SITE PLAN REVIEW, SPR P-2004126 FOR THE CONSTRUCTION OF A FOUR-STORY 77-ROOM 35,104-SQUARE FOOT HOTEL AT 3954 SEPULVEDA BOULEVARD IN THE LIMITED COMMERCIAL (C-1), COMMERCIAL (C-3), AND COMMERCIAL SETBACK OVERLAY (CSO) ZONES|10101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Site Plan Review SPR P-2004126) WHEREAS on September 30, 2004 an application was filed Tor a Site Plan Review for the construction of a four-story, 77-room, 35 104-square foot Hampton Inn and Suites hotel at 3954 Sepulveda Boulevard, being that partition of the Pedro Talamantes 120 71 acre allotment of the Rancho La Ballona 0 68 acre being (Except of the Street) southeast 100 feet of Lot 13, in the Limited Commercial (C-1), Commercial (C-3), and Commercial Setback Overlay (CSO) Zones and, WHEREAS on December 8, 2004 the Planning Commission conducted a duly noticed public hearing on this application, considering the application, plans, staff report environmental information and all testimony presented, and WHEREAS in accordance with the California Environmental Quality Act, the City provided public notice of the intent to adopt a Mitigated Negative Declaration for this project and based upon the initial study, public comments and the record before the Planning Commission the project will not have a significant adverse impact on the environment provided certain mitigations are required and the Planning Commission hereby adopted a Mitigated Negative Declaration and WHEREAS following conclusion of the public discussion and thorough deliberation of the subject matter the Planning Commission determined by a vote of five to zero that Site Plan Review, SPR P-2004126 should be conditionally approved as set forth herein below Page 1 2004-P014 0NOW, THEREFORE THE PLANNING COMMISSION OF THE CITY OF CULVER CITY CALIFORNIA RESOLVES AS FOLLOWS SECTION 1 Pursuant to the foregoing recitations and the provisions of Culver City Municipal Code (CCMC) Title 17, Section 37-76 7, and subject to the Conditions of Approval herein, the following findings are hereby made 1 The proposed project is in the best interest of the public health, safety, and general welfare It is consistent with the General Plan Land Use Element discussion on General Corridor that allows medium scale commercial uses The project acts to revitalize the physical character and economic well being of this section orSepulveda Boulevard, as called for in Objectives 6 by converting a vacant, blighted lot into a hotel commercial use The project is consistent with Objective 8 Fiscal Health, because it fosters business growth, thereby increasing City revenue, by promoting an attractive, quality hotel on a site that is currently vacant The project is consistent with Policy 16 E that encourages motel uses near freeway off-ramps along Sepulveda Boulevard Although this project is a hotel its use is similar to a motel use and located near the 405 freeway on/off-ramp By allowing the vacant lot to be developed as a hotel, the project enhances business and visitor serving uses along Sepulveda Boulevard north of Culver Boulevard, as stated in Objective 29 of the Northern-Central Sub-Area The prohibition of left turn movements across Sepulveda Boulevard enhances traffic safety and is in the best interest of the public health, safety, and general welfare The project, as designed, is consistent with the Zoning Code The horizontal staggering of the front setback at the upper levels is consistent with the overall spirit and purpose of the Commercial Setback Overlay (CSO) Zone because it helps to achieve the CSO purpose of preserving and reinforcing a traditional cityscape and creating a pedestrian oriented environment The proposed design brings portions of the building close to the front while still providing articulation through varying setbacks 2 The general layout and design of the site improvements such as the massing of the building building articulation parapet architectural features distance of hotel room windows to residential and commercial structures, the layout of the surface and subterranean parking the perimeter block wall, and the landscaping have been designed to harmonize with the neighbonng motel apartment building, and nearby residential and commercial uses The hotel structure is situated in a manner that provides more than the lequired side and rear setbacks, distancing the structure from abutting properties The semi-enclosed swimming pool provides privacy for both hotel patrons and adjacent residences Its semi-enclosure- design provides noise abatement Exterior earth colors soften the massing of the structure The project does not contain exterior balconies or walkways, providing privacy to both hotel patrons and abutting properties The alley at the rear of the site shall only be accessible for emergency vehicles thereby eliminating the use of the alley by hotel patrons Parking beyond municipal code requirements is provided Parking demand generated by the.hotel can be accommodated on-site 3q Page 2 2004 P014|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29i 3 Building articulation, parapet architectural features stucco finish, and a perimeter block wall combined with landscaping are consistent with existing commercial and hotel/motel buildings near the project site All mechanical equipment and parking will be screened and security exterior lighting that is not obtrusive will be installed The design of the hotel will act to improve the overall look of the immediate vicinity that is characterized by a vacant lot and older structures Earthen colors including bone sunrise and terra cotta will also add to the definition of the site and soften the massing of the building that will abut both residential and commercial properties The design of the hotel is compatible with the General Corridor General Plan Land Use Designation and conforms to the Primary Retail, Design and Physical Development Plan (DPDP) standards 4 The proposed three foot landscape overhang along the perimeter walls within the parking area and the landscaping at the front and rear that include flowering plants, grass and trees will enhance the exterior portions of the project and reduce the perception of over- massing The landscaping compliments the architecture of the proposed hotel and softens the structure for adjacent properties The landscaping and irrigation is designed to conform to the Primary Retail, DPDP standards, and conserve energy, ensure visual relief, reduce heat-gain from paved areas, and provide an attractive environment for the enjoyment of the general public, hotel patrons, and nearby residents Additionally, a full width commercial sidewalk with street trees will enhance the pedestrian experience along the public right-of-way fronting the hotel site 5 The existing and proposed public service facilities necessary to accommodate the project such as the width and pavement of Sepulveda Boulevard, traffic control devices, sewers, storm drains, proposed sidewalks, street lights, proposed street trees, fire protection devices, and public utilities are provided for adequately as confirmed by the City agencies that reviewed the project during the interdepartmental review process SECTION 2 Pursuant to the foregoing recitations and findings, the Planning Commission of the City of Culver City, California, hereby approves Site Plan Review, SPR P-2004126 subject to the following conditions General Conditions/Planning 1 The final working drawings shall conform to the preliminary development plans file dated October 26 2004, except as noted below and otherwise noted during the City permit review process 7 The Conditions of Approval for this Site Plan Review shall be referenced on the cover sheet and repeated in full on the cover sheetpr attached as additional sheet(s) of the final working drawings|109| The project and its operations shall comply with all applicable codes standards and regulations including but not limited to Building Safety Fire Department Planning , 1.0 Page 3 2004-P014|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 991|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 95 26 27 -- 28 29 and Public Works code requirements and it shall comply with all applicable comments and code requirements as determined during the City's internal review process 4 All applicable development standards and requirements in Planning Commission Resolution No 92-P001, Comprehensive Site Plan Review Development Standaids and Conditions of Approval, except as otherwise required herein, shall be met These standards as well as other conditions required in this approval shall be reflected on the plans submitted for building plan check 5 The applicant shall actively advertise all opportunities for employment, contract services, and purchasing of materials to Culver City businesses and residents The applicant shall use reasonable best efforts to solicit , and utilize economical and qualified service from Culver City-based employees and businesses The applicant shall also require the construction contractor(s) and subcontractors related to the project to advertise all construction opportunities to Culver City businesses and residents 6 The applicant shall provide the construction contractor(s) and each subcontractor related to the project a copy of the final project conditions of approval The applicant and the City agree that these conditions shall be enforceable through all legal and equitable remedies, including the imposition of fines against each and every person who conducts any activity on behalf of the applicant on or near the project site The applicant property owner, and general construction contractor are ultimately responsible for all actions or omissions of a subcontractor 7 The City reserves the right to periodically inspect the premises without prior notification, to ensure ongoing compliance with all conditions of approval 8 Minor modifications to building siting or design may be approved by the Planning Manager in keeping with the general design and content of the project approval 9 This Site Plan Review will expire if not used within one year after the date it becomes effective unless the applicant submits an extension request and is granted the extension by the Planning Manager, Planning Commission, or City Council 10 A certificate of occupancy for the approved project will be issued only upon completion of all applicable conditions of approval and required site improvements 11 The applicant and contractors shall use all reasonable efforts to reuse and recycle construction and demolition debris, to use environmentally friendly materials and to provide energy efficient buildings equipment and systems 12 Conditions of approval herein shall apply to the applicant any lessees and any successor business that may legally assume benefit of this entitlement , LH Page 4 2004 P01413 This Site Plan Review shall not become effective until the Redevelopment Agency has approved predevelopment plans 14 The applicant shall comply with the City s Art in Public Places requirement pi ior to issuance of the Certificate of Occupancy 15 Prior to installation of landscaping, the applicant shall provide the Planning Division three sets of detailed landscape and irrigation plans for review The Planning Manager and the Environmental Maintenance Manager shall approve the plans prior to the installation of landscaping and irrigation 16 There shall be no renting of hotel rooms at hourly rates or any increment less than one full day's room rental occupancy of all hotel rocims shall be limited to no more - than thirty (30) days for any one occupant 17 There shall be no kitchen facilities in the hotel rooms and there shall be no permanent residence on the project site 18 There shall be no drop off or pick up of hotel patrons and/or luggage on the curb fronting Sepulveda Boulevard 19 The Community Development Director or his/her designee, or any police or, code enforcement officer, or fire inspector of the City, may at all times, inspect all hotel rooms and facilities, and may inspect the guest register and other records necessary to determine compliance with all applicable regulations, including but not limited to building safety, fire, and health standards, and to verify collection and payment to the City of all taxes owed 20 All hotel patrons and hotel employees shall park on-site and shall not park on nearby residential streets 21 The hotel operator shall ensure that hotel patrons abide by all City ordinances including the nuisance ordinance and shall ensure that hotel patrons do not create excessive noise that may affect neighbonng properties 22 The hotel operator shall ensure all graffiti is removed on a continuous basis within forty-eight (48) hours after its application 23 Litter shall be removed daily from the project site including all parking areas and adjacent public sidewalks the portion of the alley at the -rear that abuts the p roject site shall be swept or cleaned, either mechanically or manually on a weekly basis to control debris , , 24 Privacy coverings such as shades- draperies, or blinds shall be appropriately hung to cover all windows Exterior window glass shall be without cracks, chips, or holes 4)4' Page 5 2004-P014|1010101010101010|a|10 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 291|1010101010101010 10 10|11 12 13 14 15 • 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Peeling and deteriorated paint of exterior walls must be repainted within reasonable time 25 The exterior of the property including adjacent public sidewalks and parking lots under the control of the operator, shall be illuminated during all hours of darkness during which the property is open for business in a manner so persons standing in those areas at night are identifiable from the street However, the required illumination shall be placed so as to minimize interference with nearby residents and their properties 26 An exterior light plan that conforms to Condition No 25 above shall be submitted to the Planning Manager for approval prior to building permit issuance 27 All areas on the property designated for landscaping, including, but not limited to, lawns, planter beds, and other open surfaces without hardscape, shall be maintained with properly trimmed living plant materials and without litter or debris 28 All containers used for the storage of trash, garbage, or recycled materials and placed on the exterior of the hotel shall be maintained in a locked and screened trash enclosure approved by the City 29 During all phases of construction (including rough grading), information that includes contact names and telephone numbers for the applicant, contractor, and City, shall be posted at the project site These contact information postings shall be placed along the Sepulveda Boulevard frontage the alley along the south property line and the alley at the rear, the postings shall be visible to the public 30 During all phases of construction (including rough grading) the applicant shall provide all construction workers and contractors the ability to park on-site and all construction workers and contractors shall not park in residential areas 31 Subject to approval by the Planning Manager and the Environmental Maintenance Manager the applicant shall plant trees within the three-foot landscape 9verhang along the project site s south property line and along the east property line 32 The perimeter wall shall be eight-feet in height along the east and south property lines The Planning Manager shall approve the transition design of the wall from eight-feet to six-feet at the north property line unless the applicant chooses to continue the wall at eight-feet in height along the north property line Public Works/Engineering Conditions 33 A site improvement plan prepared by a civil engineer licensed in the State of California shall be submitted to the Engineering Division for review approval and permitting This plan shall show drainage c:1 • the site indicated by contours or spot elevations '|1010|Page 6 2004-P014building pad elevations, and the design of onsite and offsite improvements with sufficient dimensions and details to allow for proper construction 34 The applicant shall provide a geotechnical report from a State licensed geotechnical engineer reporting on the suitability of the onsite soils to support the proposed construction and shall include a liquefaction analysis The report shall also identify any special considerations necessary to satisfy California Building Code requirements 35 Upon completion of rough grading, the geotechnical and civil engineers shall submit certifications and final reports in accordance with Appendix Chapter 23 of the California Building Code These certifications and reports shall be submitted to the Engineering Division for review prior to the issuance of any building permits 36 Concurrent with the submittal of the site improvement plan, a Standard Urban Stormwater Mitigation Plan (SUSMP) shall be submitted to the Engineering Division for review and approval The SUSMP shall be prepared in accordance with requirements of the Culver City Municipal Code, Chapter 5 05 The first 1/4 of rainfall shall be treated or filtered prior to draining from the site 37 Concurrent with the submittal of the site improvement plan, an erosion control plan shall be submitted for review and approval by the City Engineer The erosion control plan shall be developed and implemented in accordance with the requirements of the Los Angeles County Stormwater Quality Management Program, NPDES Permit No CAS614001 The plan shall include the design and placement of recommended Best Management Practices (BMPs) to effectively prohibit the entry of pollutants from the construction site into the public street and/or storm drain system The improvement plans shall note that the contractor shall comply with the 'California Storm Water Best Management Practice Handbook' 38 A raised median, or some other obstruction shall be installed along Sepulveda Boulevard to prevent left turn movements into or out of the project site The raised median or obstruction, shall be designed to the satisfaction of the City Engineer A right turn only sign shall be installed at the project's driveway accessing Sepulveda Boulevard 39 The applicant shall reconstruct the entire width of the adjacent alley located along the project s easterly boundary This work shall consist of milling the existing asphalt and repaving with a minimum of two inches of new asphalt pavement and reconstruction of the concrete gutter 40 Access to the alley located along the project's easterly boundary shall be restricted to emergency access only A wrought iron gate or other material as approved by the Planning Division shall be installed at the entrance to the alley A Knox Box shall be installed, to the satisfaction of the Fire Department, for emergency access , ,|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 44 Page 7 2004-P01441 The existing utility poles on the project site shall be removed or relocated to the satisfaction of the City Engineer New utility services to the proposed project shall be placed underground 4 9 The applicant shall install a trash enclosure to the satisfaction of the City's Sanitation Division Manager The enclosure shall be redesigned to allow direct trash pickup from the alley The walls of the trash enclosure shall be finished or painted to match the walls of the proposed building 43 The parking area shall be designed in accordance with City Council Resolution No 87-R100, Parking Design and Layout Guidelines, and City Council Resolution No CS- 6486, Adopted Standards and Specifications for Off-Street Parking Areas The applicant shall reconstruct the existing drive approach to a width of 25'-4" per Culver City Standard Plan CC-101-2 2 Case 1, Driveway Approach Special Use 44 Parking lot drainage devices, concrete curb, sidewalk, and driveway shall be designed to the latest edition of the American Public Works Association (APWA) Standard Plans 45 The project s frontage along Sepulveda Boulevard shall be reconstructed with full width sidewalk 46 Street trees, tree wells, and irrigation shall be installed along Sepulveda Boulevard to the satisfaction of the City's Street Tree Maintenance Supervisor 47 The drive ramp leading to the basement parking shall have a maximum slope of 10% extending a minimum of 12 feet at the beginning and ending of the ramp The rest of the ramp shall have a maximum slope of 20% 48 The applicant shall be responsible for the expense to repair or replace any damage to the public right-of-way caused by the construction of the proposed project Such repair or replacement shall be completed to the satisfaction of the City Engineer 49 Dirt hauling and construction material deliveries or removal are prohibited during the morning (7 00 A M to 9 00 A M) and afternoon (4 00 P M to 6 00 P M) peak traffic periods 50 During construction dust shall be controlled by regular watering and as directed by the City inspector The applicant shall comply with SCAQMD Rule 403, which requires specific control actions during construction activities to control fugitive dust 51 All staging and storage of construction equipment and materials; including the construction dumpster shall be on-site only The applicant shall obtain written permission from adjacent property owners for any construction staging occurring on adjacent property '15- Page 8 2004-P01452 The construction contractor shall advise the Public Works inspector of the schedule and shall meet with the inspector prior to commencement of work 53 Due to the change of use and increased density, this project is subject to the City s Sewer Facility Charge This charge shall be paid prior to the issuance of any permit 54 Per Culver City Municipal Code 501 010 Ordinance No 2001-011 Solid Waste Management, the Culver City Sanitation Division has the exclusive franchise for all solid and recyclable waste material handling within the City limits Fire Prevention Conditions 55 A KNOX Box shall be required for the building and KNOX key switches shall be required to open all security gates and driveway gates 56 Location of the Fire Department Connectioh and Double Detector Check Assembly shall be reviewed and approved by the Fire Marshal and Planning Manager 57 The applicant shall locate the building address such that it is viewable and legible from the public right-of-way 58 All parapets over five feet shall have catwalks as approved by the Fire Marshal 59 All fascia and tops of exterior walls and parapets shall be constructed of hard materials and shall be approved by the Fire Marshal 60 The applicant shall provide a Class Ill combined standpipe system with 2 1/2 inch hose valves and 1 1/2 inch reducing caps and covers as required in the 2001 California Fire Code, Table 1004-A 61 Prior to issuance of a Certificate of Occupancy, the applicant shall provide the Culver City Fire Department (CCFD) a pre-fire plan 62 All stairs common doors and rooms shall be appropriately signed per the 2001 California Fire Code and CCFD requirements Directional signs shall be posted as appropriate to ensure emergency personnel can find guest rooms in a timely manner 63 Duct smoke detectors shall comply with CCFD regulations and shall provide supervisory alarms only 64 Prior to issuance of a Certificate of Occupancy the applicant shall provide the CCFD Hazardous Materials Specialist a hazardous materials disclosure package 65 Prior to issuance of a Certificate of Occupancy the applicant shall provide the CCF-D an emergency evacuation plan and employee training program for CCFD review 4/5 Page 9 2004 P014|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 291|1010|66 Pnor to the issuance of a Certificate of Occupancy, the applicant shall provide the CCFD for review and approval, a permanent emergency exit floor plan for the entire hotel that indicates location of fire extinguishers Posting of the emergency exit floc)i plan on the hotel premises shall be required per CCFD instructions|101010|67 The project shall comply with all applicable 2001 California Building, Fire, Mechanical and Electrical codes and shall comply with Culver City Municipal Code Section-9 02|1010101010 10|68 The applicant shall provide a smoke exhaust system, controlled by the site s fire alarm system, in the subterranean parking area The exhaust system shall be started by water flow activation within the subterranean parking area 69 All CCFD notes, as directed by the Fire Marshal shall be placed on the final working drawings 10 APPROVED and ADOPTED this 8 th day of December, 2004 11 12 13 14 15 D SCOTT MA SIN, CHAIRPERSON PLANNING COMMISSION CITY OF CULVER CITY, CALIFORNIA 16 17 Attested by 18 20 ',) 1 1-2 11.-ii jir )e f)fr—ii i Sherry Jordair/ /7 21 Senior Planner 19 22 23 24 25 26 27 28 29 N. 47 Page 10 2004-P014At tachment No 7 Agenda Item No 5 December 8 2004 Staff Report SITE PLAN REVIEW, SPR P-2004126 3954 Sepulveda Boulevard Hampton Inn and Suites Hotel REQUEST An application for a Site Plan Review to develop a four-story, 77 room, 35,104 square foot Hampton Inn and Suites Hotel in the Limited Commercial (C-1), Commercial (C-3), and Commercial Setback Overlay (CSO) Zones PROCEDURE 1 Chair seeks motion to receive and file affidavit of mailing of notices 2 Chair calls on staff for a brief staff report and Commission poses questions to staff as desired 3 Chair opens the public hearing, providing the applicant the first opportunity to speak followed by the general public 4 Chair seeks a motion to close the public hearing after all testimony has been presented 5 Commission thoroughly discusses the matter and arrives at its decision RECOMMENDATION That the Planning Commission 1 Adopt a Mitigated Negative Declaration finding that the project will not have a significant adverse impact on the environment provided certain mitigations are required (Attachment No 4) and 2 Approve Site Plan Review, SPR P-2004126 subject to the Conditions of Approval as stated in Resolution No 2004-P014 (Attachment No 5) , , itsAgenua Item No 5 December 8 2004 Page 2 of 12|109| GENERAL INFORMATION See Attachment No 1 Project Summary BACKGROUND The proposed project consists of a 37 foot high building (four stories) containing 77 hotel rooms totaling 35,104 square feet There are 67 parking spaces proposed (20 spaces will be located in the subterranean parking area and 47 will be located on a surface level parking area) Public access will be from Sepulveda Blvd The hotel will have a semi-enclosed swimming pool exercise room, lobby area, and continental breakfast area for its guests There will be no meeting rooms for non-guests and no units with kitchen facilities The Culver City Municipal Code (CCMC) requires that the Planning Commission approve Site Plan Reviews for projects totaling 15,000 square feet or more Hotels, as a use, are currently allowed by right and without discretion City staff is currently working on a municipal code text amendment that will require operational standards and regulations for all new hotels/motels these standards and regulations will be retroactive for existing hotels/motels Staff, in reviewing the proposed Hampton Inn and Suites project incorporated some of these standards and regulations to mitigate potential impacts and ensure a high quality hotel If the hotel/motel ordinance is adopted several other standards/regulations not included in the Conditions of Approval for this project will become retroactive for this site The applicant is aware of and receptive to the proposed hotel/motel standards Existing Conditions The project site is located on the eastside of Sepulveda Boulevard between Venice Blvd and Pigott Road north of Washington Place The site was used as a plant nursery It is currently an undeveloped vacant lot with overgrown shrubbery and some paving for what was once a parking lot The portion of Sepulveda Blvd that the project site is located on is a heavily traversed commercial area and contains various Retail establishments, hotels and motels, office buildings a plant nursery, Lt-fAgenda Item No 5 December 8 2004 Page 3 of 12 and fast food restaurants Surrounding areas include a mixture of one and two-story retail buildings to the west a two-story apartment building to the north and a two-story motel and one and two story single family dwellings to the south At the rear of the site (to the east) a 17-foot, 3-inch alley separates the commercial strip from a mixed single family and multi family neighborhood that is zoned for medium density, multi-family dwellings This neighborhood to the rear of the site is undergoing a transition from single family homes to condominium and apartment complexes , _ ANALYSIS Architectural Design and Landscaping The project, as designed, complies with the Primary Retail, Design and Physical Development Plan (DPDP) standards The terra cotta and stucco finished structure will be articulated along the Sepulveda Boulevard frontage with parapet architectural features and street level windows to enhance the pedestrian experience Both sides of the building will also be articulated with parapet architectural features The single structure hotel will have a three-toned earth color scheme with a brown terra cotta base, sunrise (light yellow) painted walls, and bone colored parapet walls This color arrangement is typical for Hampton Inn and Suites hotels The hotel will not have balconies or exterior hallways All mechanical equipment will be screened and the parking area, as well as exterior walls, will include lighting to enhance the overall look of the hotel 1 and provide security Exterior lighting will be designed such that it does not create a nuisance for adjacent properties and public rights- of-way The public right-of-way along Sepulveda Boulevard will be improved to full width sidewalk with street trees as approved by the Engineering Division Within the parking area, along the north and south perimeter walls and at the rear, the applicant will install flowering plants with some ground cover This proposed landscaping IS consistent wiih DIPDP design guidelines and enhances the hotel Neighborhood Compatibility Privacy for both the hotel patrons and sun ounding properties will be achieved through the followingAgenda Item No 5 December 8 2004 Page 4 of 12 O Distance There is substantial separation between the hotel structure and neighboring buildings Along the south side of the building, the distance from the hotel room windows to the nearest dwelling structure is approximately 60 feet Along the north side of the building the distance is approximately 15 feet At the rear of the property, the distance from the hotel structure to the nearest property line of the residential neighborhood is approximately 88 feet (includes the width of the alley) O Windows The hotel windows are not aligned with the windows of the neighboring structures Towards the front of both sides of the building, there are no windows designed There are no guest room windows along the hotel s rear wall, only windows for hotel offices hallways and utility/storage rooms O Privacy Covennqs A condition of this project will require the applicant to install privacy coverings such as shades draperies or blinds over all the windows and • Screening Wall A six foot high masonry wall will be installed along the sides and rear of the property The wall will provide parking lot screening and privacy for both hotel patrons and surrounding businesses and residences This block wall will serve to screen the portion of the swimming pool that is open to the sky (Attachment No 7) Safety is a significant concern to the residents to the east of the project site, across the alley The residents expressed there is trash along the alley, transients and illegal activity occurring in the alley The residents attribute these problems to the existing hotels and motels in the area Staff is pioposing conditions of approval that adaress botn security and maintenance of the site These conditions include the following . The alley at the rear along the project's easterly boundary will be restricted to emergency access only and access to the hotel will only occur off of Sepulveda Boulevard, O A wrought iron fence and emergency gate along with a block wall will provide a buffer between the alley and the project site ciAgenda Item No 5 December 8 2004 Page 5 of 12 o During evening hours the applicant will be required to properly illuminate exterior portions of the building the hotel parking lot and adjacent public right-of-ways • The applicant will be required to remove graffiti on a regular basis within forty-eight (48) hours after its application • Directional signs will be posted to ensure emergency personnel can find guest rooms in a timely manner and • There will be no hourly rates and renting of hotel rooms have to be for at least one full day Maintenance of the site will be achieved through daily litter removal of the project site including parking areas and adjacent public sidewalks weekly cleaning of the portion of the alley abutting the rear of the project site regular maintenance of exterior walls and windows trimming and litter remova.I of all landscape areas and proper storage of garbage and recycled materials within a trash enclosure Commercial Setback Overlay (CSO) Zone The CSO Zone requires a first story zero-setback along Sepulveda Boulevard For the upper levels, the front setback requirement is either zero or at least 10 feet The CSO regulations contain a provision to allow an exception to the required first floor zero-setback in order to accommodate pedestrian amenities such as hardscape or landscaping and public art A varying front yard setback of two to eight feet is proposed to accommodate flowering plants and trees to soften the Sepulveda Boulevard frontage Art work is proposed south of the driveway entrance to fulfill the Art in Public Places requirement The CSO regulations provide for minor variations to setback requirements for upper levels provided findings are made that are . consistent with the overall spirit and purpose of the CSO zone The second third and fourth stories are not setback at least 10 feet in - the front However the front of the building is staggered horizontally with varying setbacks (2 to 8 feet) Staff believes the proposed setback is consistent with overall spirit and purpose of the CSO Zone 'Rql_iiring the full depth of a 10 foot setback would not achieve a traditional cityscape or pedestrian oriented environmentAgenda Item No 5 December 8 2004 Page 6 of 12 The current design brings portions of the building close to the front while still providing articulation through varying setbacks Traffic and Circulation The proposed project was reviewed by the City s Traffic Engineer According to the Institute of Transportation Engineers Trip Generation Manual, 6 th Edition, the morning and afternoon peak hour trip generations were calculated at less than 50 trips (43 and 47 respectively) The project peak hour trip generation was calculated to be 55 This peak would occur only on Saturdays The City does not require traffic studies for projects generating up to 49 trips in any one hour and may require (or not require) studies for projects generating 50 to 99 trips in any one hour Based on this City policy and the trip generation determinations, a hotel of the size proposed by the applicant will not generate significant ti affic impacts Further, the project peak hour trip generation of 55 is expected to occur on Saturdays when less traffic is expected The Police Department and the City s Traffic Engineer determined there would be an increased hazard if vehicles attempted left turn movements (crossing over Sepulveda Boulevard) to access or leave the site A condition is proposed to prohibit left turn movements across Sepulveda Boulevard by requiring the applicant to install a barrier along the middle of Sepulveda Boulevard Further, a right turn' only sign will be required at the project s driveway accessing Sepulveda Boulevard Environmental Determination Pursuant to the California Environmental Quality Act (CEQA) guidelines, this project has been determined to have no impacts on the community provided certain mitigations are incorporated, a mitigated negative declaration has been prepaied Specifically potential hazards due to left turn movements across Sepulveda Boulevard and direct and indirect adverse effects on human beings and the surrounding commumty were identified as potentially significant unless mitigated Several mitigations have been proposed as conditions of approval, Attachment No 4 identifies the specific mitigation measures \ , 5-3Agenda Item No 5 December 8 2004 Page 7 of 12 Comments Received During Public Comment Period On November 14 2004 24 residents living on Bentley Avenue submitted a letter stating various concerns (Attachment No 6) Highlights of their concerns include O Requests for an environmental impact report, a traffic study and a noise study and O Concerns regarding privacy spillover parking, security and the number of days. one can stay at the hotel FIR Staffs California Environmental Quality Act (CEQA) analysis determined that the project's impacts can be mitigated to less than significant No environmental factors were identified to be potentially significant therefore a Mitigated Negative Declaration was prepared (and no other studies are required) Traffic Study As discussed in the Traffic section of this report, the project will not create significant trip generations thereby not requiring the applicant to prepare a traffic study Because the expected morning and afternoon peak trip generation for the site is expected to be low, hotel traffic entering and exiting Interstate 405 will not be significant Construction trucks for the 405 Freeway widening project will be utilizing the on/off ramps at Sepulveda Boulevard near the project site However, trip generation from the proposed hotel is expected to be low thereby minimally impacting traffic during the widening of the freeway At this time it cannot be determined if freeway construction will coincide with hotel construction In the event that hotel construction coincides with freeway construction the City has in place regulations that govern haul routes, times of construction, and traffic control at construction sites Noise Study The swimming pool will be fully enclosed with the exception of a small portion of the pool fronting the north property line that is exposed to the sky This portion is screened with a perimeter SlY foot high wall Given this enclosuie screening and distance to the nearest residential area noise will be dissipated to a less than significant impact The concern over loud parties can be addressed by the City's nuisance ordinance police enforcement, and inlernal controls on patrons imposed by the applicant A conclitiOn of approval for the site plan includes language that , , 511Agenda Item No 5 December 8 2004 Page 8 of 12 requires the applicant to maintain a generally peaceful atmosphere and prohibits the creation of excessive noise by patrons Street Parking The site meets its on-site parking requirement and there will be a condition that requires patrons and employees to park on-site Because the site exceeds the required number of parking spaces by 25 spaces, demand for street parking is not expected to occur Prohibited alley access for the hotel will further discourage patrons from parking in residential streets, securing privacy for the local community , LEGAL STANDARDS FOR DECISION / PROJECT FINDINGS CCMC Title 17 Zoning, Section 37-767 requires certain findings must be made before an application for a Site Plan Review can be approved Staff believes these findings can be made for Site Plan Review SPR P-2004126, if approved subject to the Recommended Conditions found in proposed Resolution No 2004-P014 (Attachment No 5) 1 The approval of the site plan review is in the best interest of the public health, safety and general welfare, is consistent with the objectives of the General Plan, and is in conformity with zoning and other applicable Municipal Code development standards The proposed project is in the best interest of the public health, safety, and general welfare It is consistent with the General Plan Land Use Element discussion on General Corridor that allows medium scale commercial uses The project acts to i evitalize the physical character and economic well being of this section of Sepulveda Boulevard, as called for in Objectives 6 by converting a vacant blighted lot into a hotel commercial use The project is consistent with Objective 8, Fiscal Health, because it fosters business growth, thereby increasing City revenue by promoting an attractive, quality hotel on a site that is currently vacant The project is consistent with Policy 16 E that encourages motel uses near freeway off-ramps along Sepulveda Boulevard Although this project is a hotel its use is similar to a motel use and located near the 405 freeway on/off-ramp By allowing the vacant lot to be developed as a hotel the project enhances business and visitor serving uses along Sepulveda - Boulevard north of Culver Boulevard, as stated in Objective 29 of , , crAgenda Item No 5 December 8 2004 Page 9 of 12 the Northern-Central Sub-Area The prohibition of left turn movements across Sepulveda Boulevard enhances traffic safety and is in the best interest of the public health safety, and general welfare The project as designed is consistent with the Zoning Code The horizontal staggering of the rront setback at the upper levels is consistent with the overall spirit and purpose of the Commercial Setback Overlay (CSO) Zone because it helps to achieve the CSO purpose of preserving and reinforcing a traditional cityscape and creating a pedestrian oriented environment The proposed design brings portions of the building close to the front while still providing articulation through varying setbacks 2 The general layout of site improvements, including but not limited to, orientation and location of buildings and open space, vehicular and pedestnan access and circulation, vehicular parking and loading facilities, building setbacks and heights, wall, fence, landscaping, refuse and equipment storage facilities and similar appurtenant site improvements, have been designed to harmonize with existing conforming and potential new uses and developments, and with the natural landform, and to provide a safe desirable environment on the site and to minimize impacts on the adjacent area The general layout and design of the site improvements such as the massing of the building, building articulation parapet architectural features, distance of hotel room windows to residential and commercial structures the layout of the surface and subterranean parking, the perimeter block wall, and the landscaping have been designed to harmonize with the neighboring motel, apartment building and nearby iesidential and commercial uses The hotel structure is situated in a manner that provides more than the required side and rear setbacks, distancing the structure from abutting properties The semi-enclosed swimming pool provides privacy for both hotel patrons and adjacent residences Its semi-enclosure design provides noise abatement Exterior earth colors soften the massing of the structure The project does not contain exterior balconies or walkways providing pnvacy' to both hotel patrons and abutting properties The alley at the rear of the site shall only be accessible for emergency vehicles thereby eliminating the use of the alley by hotel patrons Parking beyond municipal cAgenda Item No 5 December 8 2004 Page 10 of 12 code requirements is provided Parking demand generated by the hotel can be accommodated on-site 3 The architectuie of buildings, including but not limited to, the character, scale, quality of the design, relationship with the site and adjacent conforming development, building matenals, screening of exterior appurtenances, exterior lighting, and signs have been designed to insure the compatibility of the development with the City's Architectural Design District Standards, and with the character of adjacent conforming development Building articulation, parapet architectural features, stucco finish and a perimeter block wall combined with landscaping, are consistent with existing commercial and hotel/motel buildings near the project site All mechanical equipment and parking will be screened and security exterior lighting that is not obtrusive will be installed The design of the hotel will act to improve the overall look of the immediate vicinity that is characterized by a vacant lot and older structures Earthen colors including bone, sunrise, and terra cotta will also add to the definition of the site and soften the massing of the building that will abut both residential and commercial properties The design of the hotel is compatible with the General Corridor General Plan Land Use Designation and conforms to the Primary Retail, Design and Physical Development Plan (DPDP) standards 4 The landscaping, including but not limited to the location, type, size, quantity and coverage of plant material, and the provision for irrigation, maintenance, and protection of landscaped areas, has been designed to be compatible with the City's Architectural Design District Standards, to complement buildings and structures on me site, to help conserve energy, to insure visual relief, to help reduce heat- gain from paved areas, and to provide an attractive environment for the enjoyment of the public As used herein, landscaping shall include hardscaped pedestrian areas, and appurtenant site improvements within landscaped areas, such as but not limited to lighting, benches and fountains ' The proposed three foot landscape overhang along the - perimeter walls within the parking area and the landscaping the front and rear that include flowering plants, grass and trees c7Agenda Item No 5 December 8 2004 Page 11 of 12 will enhance the exterior portions of the project and reduce the perception of over-massing The landscaping compliments the architecture of the proposed hotel and softens the structure for adjacent properties The landscaping and irrigation is designed to conform to the Primary Retail, DPDP standards, and conserve energy, ensure visual relief reduce heat-gain from paved areas, and provide an attractive environment for the enjoyment of the general public hotel patrons, and nearby residents Additionally, a full width commercial sidewalk with street trees will enhance the pedestrian expenence along the public right-of-way fronting the hotel site 5 The existing or proposed public service facilities necessary to accommodate the project, including but not limited to, the width and pavement of adjoining streets and alleys, traffic control devices, sewers, storm drains, parkways, sidewalks, street lights, street trees, fire protection devices and public utilities ale or can be provided for adequately The existing and proposed public service facilities necessary to accommodate the project such as the width and pavement of Sepulveda Boulevard, traffic control devices, sewers, storm drains, proposed sidewalks, street lights, proposed street trees, fire protection devices, and public utilities are provided for adequately as confirmed by the City agencies that reviewed the project during the interdepartmental review process ALTERNATIVE OPTIONS Using the development plans (Attachment No 8) as reference, the following alternatives may be considered by the Planning Commission 1 Adopt a mitigated negative declaration finding and approve the application with the recommended conditions of approval if the application is deemed to meet the required findings 2 Adopt a mitigated negative declaration finding and approve the application with additional or different conditions of approval if deemed necessary to meet the required findings and mitigate any new project impacts identified at the meeting SiAgenda Item No 5 December 8 2004 Page 12 of 12 3 Disapprove the application if it does not meet the required findings and not adopt a mitigated negative declaration finding Prepared by ri "7,1 I) a/ , ,P.AA/VI 6 6 1 1 - I ita„ Vjlr' Z() nel L Jose Mendivil Sherry Jorde 0 Assistant Planner Senior Planner (310) 253-5757 (310) 253-5746 Approved by ( ~\ t\\|109| % . ,„ ,)\ 2_ , ( ii, ,, I) Mark Wardlaw Deputy Community Development Director (310) 253-5706 Attachments 1 Project Summary 2 Area Map 3 Aerial Photo of Area 4 Mitigated Negative Declaration 5 Resolution No 2004-P014 6 Residents Letter dated November 14, 2004 7 Detail of Swimming Pool Section 8 Plans dated October 26, 2004 (Date Received) 9 Colored Elevations Available at Meeting n n 1 c-IfALLaUf1111Uill PROJECT SUl MARY APPLICATION TITLE & CASE NO Site Plan Review SPR P-2004126 Hampton Inn and Suites Hotel Site Plan Review for a new four-story 77 room 35 104 square foot hotel (on a vacant lot) with some subterranean parking and surface parking PROJECT ADDRESS/LOCATION APPLICANT INFORMATION 3954 Sepulveda Boulevard Vinny Patel 3900 Sepulveda Boulevard Culver City CA 90230 (310) 486-1303 PERMIT/APPLICATION TYPE H Administrative Use Permit Tentative Parcel Map ri Conditional Use Pei mit E Tentative Tract Map n Administrative Site Plan Review Lot Line Adjustment X Site Plan Review fl Zoning Code Amendment - Text H Administrative Variance fl Zoning Code Amendment -Map Variance General Plan Amendment - Text ri Master Sign Program U General Plan Amendment - Map n Certificate of Appropriateness fl Planned Unit Development H Certificate of Exemption 1-1 Specific Plan ri DO B I UjOther APPROVAL BODY X Public Hearing U Public Meeting DAdministratuve Administrative X Planning Commission|109| I City Council X Redevelopment Agency LII Other ENVIRONMENTAL DETERMINATION AND NOTICING CEQA Ij Categorical Exemption Determination Negative Declaration or X Mitigated Environmental Impact Report Type Negative Declaration CEQA Noticing Notice of Exemption (w/in 5 days of decision) X Notice of Intent to Adopt (21 days prior to decision) X Notice of Determination (w/in 5 days of decision) X Fish & Game Certificate of Fee Exemption (w/in 5 days of decision) Notice of Preparation 7 Notice of Availability 7 Notice of Completeness PUBLIC. NOTIFICATION Mailing Date 11/16/04 7 Property Owners E Occupants X Adjacent Pi operty Owners & Occupants w/in 300 foot radius X w/in 300 foot radius! Extended n Other Posting 11/15/04 X Onsite ri Offsite 11 Other Publication Date N/A H Culver City News ] Other . Courtesy Date 11/16/04 X City Council X Commissions X Master Notification List ri Culver City Website ri Cable Crawler ,, H Pi ess Release X HOA /Neighb-oi hood Groups X Culver City Organizations X Other Cultural Affairs Commission CAO Department Heads Culver City News (not an add) and Culver City Observer (not an add) Updated 11/19/2004 Page 1 of 2 Project Summary— Attachment 1PROJECT SUMMARY GENERAL INFORMATION General Plan General Corridor Zoning Limited Commercial (C 1)/Commercial (C-3) Redevelopment Plan Component Area #4 Overlay Zone Commercial Setback Overlay (CSO) Legal Description Partition of Pedro Talamantes 120 71 acre allotment of the Rancho La Ballona 068 acre being (Except of the Street) SE 100 Ft of Lot 13 Existing Land Use Vacant lot ADJACENT ZONING AND LAND USES Location Zonmq Land Use North South East West Prolect Data C 1/C 3 R 4/C-3 R4 C3 Existing 2 Story Apartment Bldg & Surface Parking 2-Story Motel/Alley/1- & 2 Story Single Family Dwellings 1-Story Single Family Dwellings & a 2- Story Multiple Family Dwelling 1- & 2 Story Retail Buildings Proposed Required Vacant Lot Vacant Lot 29,529 Sq Ft Vacant Lot Building Coverage Landscaped Area Total Site Gross Floor Area Parking Standard Standard Blocked Handicapped Compact Compact Blocked Loading Total 'Any standard space Building Height Building Setbacks Front Rear Side (North) Side (South) Abutting C-3 Side (South) Abutting R-4 Private S ace 7 219 Sq Ft 1,224 Sq Ft No Change 30 (3 extra)|1010|35 (22 extra)|1010|1* 67 (25 extra) 1 5 to 8 Ft 71 Ft 0 to 10 Ft 0 to 38 Ft 41 Ft USa Ft No Requirement No Min/Landscaping Rqred No Requirement 27 No Requirement|1010|13 Maximum No Requirement 1* 42 0 Ft (Setback Allowed for Landscaping/Amenities) 4 55 Ft Minimum No Requirement No Requirement 21 8 Ft Minimum No Reciumrement 35,104 Sq Ft No Requirement can double as a loading space Vacant Lot 37 Ft 43 Ft (C-1) & 56 Ft (C 3) ESTIMATED FEES V Niew Development Impact Estimated at $30 104 I I In Lieu Parkland . — School District X Plan Check TBD-plan check X Sewer TBD-plan check X Art Art Piece On Site INTERDEPARTMENTAL REVIEW Planning Engineering Building Safety Fire Redevelopment and City Attorney ART IN PUBLIC PLACES Proposed Art Piece On Site Updated 11/19/2004 Page 2 of 2 Ploject Summary - Attachment 1 /0 2 Miles 0 1 0 0 1 3954 Sepulveda Boulevard SPR P-2004126 Parcels Tellefson Palk Attachment No 2 Hampton Inn & Suites HotelAttachment No 5 , -1 RESOLUTION NO 2004-P014 ,.|1010101010|A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CULVER CITY CALIFORNIA, APPROVING SITE PLAN REVIEW, SPR P-2004126 FOR THE CONSTRUCTION OF A FOUR-STORY 77-ROOM 35,104-SQUARE FOOT HOTEL AT 3954 SEPULVEDA BOULEVARD IN THE LIMITED COMMERCIAL (C-1), COMMERCIAL (C-3), AND COMMERCIAL SETBACK OVERLAY (CSO) ZONES|10101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 26 (Site Plan Review, SPR P-2004126) WHEREAS on September 30, 2004, an application was filed for a Site Plan Review for the construction of a four-story, 77-room 35,104-square foot Hampton Inn and Suites hotel at 3954 Sepulveda Boulevard, being that partition of the Pedro Talamantes 120 71 acre allotment of the Rancho La Ballona 0 68 acre being (Except of the Street) southeast 100 feet of Lot 13, in the Limited Commercial (C-1) Commercial (C-3), and Commercial Setback Overlay (CSO) Zones and, WHEREAS, on December 8, 2004, the Planning Commission conducted a duly noticed public hearing on this application, considering the application, plans, staff report environmental information and all testimony presented and, WHEREAS, in accordance with the California Environmental Quality Act, the City provided public notice of the intent to adopt a Mitigated Negative Declaration for this project and based upon the initial study, public comments, and the record before the Planning Commission the project will not have a significant adverse impact on the environment provided certain mitigations are required, and the Planning Commission hereby adopted a e WHEREAS following conclusion of the public discussion and thorough deliberation of 24 25 Mitigated Negative Declaration, and, , 27 28 the subject matter the Planning Commission determined by a vote of to that Site Plan 29 Review SPR P-2064126 should be conditionally approved as set forth herein below 4 if Page 1 2004-P0141|101010|NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF CULVER CITY CALIFORNIA RESOLVES AS FOLLOWS SECTION 1 Pursuant to the foregoing recitations and the provisions of Culver City Municipal Code (CCMC) Title 17, Section 37-76 7 and subject to the Conditions of Approval herein the following findings are hereby made 1 The proposed project is in the best interest of the public health, safety, and general welfare it is consistent with the General Plan Land Use Element discussion on General Corridor that allows medium scale commercial uses The project acts to revitalize the , physical character and economic well being of this section of Sepulveda Boulevard as called for in Objectives 6, by converting a vacant, blighted lot into a hotel commercial use The project is consistent with Objective 8, Fiscal Health because it fosters business growth, thereby increasing City revenue, by promoting an attractive, quality hotel on a site that is currently vacant The project is consistent with Policy 16 E that encourages motel uses near freeway off-ramps along Sepulveda Boulevard Although this project is a hotel, its use is similar to a motel use and located near the 405 freeway on/off-ramp By allowing the vacant lot to be developed as a hotel, the project enhances business and visitor serving uses along Sepulveda Boulevard north of Culver Boulevard, as stated in Objective 29 of the Northern-Central Sub-Area The prohibition of left turn movements across Sepulveda Boulevard enhances traffic safety and is in the best interest of the public health, safety, and general welfare The project as designed is consistent with the Zoning Code The horizontal staggering of the front setback at the upper levels is consistent with the overall spirit and purpose of the Commercial Setback Overlay (CSO) Zone because it helps to achieve the CSO purpose of preserving and reinforcing a traditional cityscape and creating a pedestrian oriented environment The proposed design brings portions of the building close to the front while still providing articulation through varying setbacks 19 20 2 The general layout and design of the site improvements such as the massing of the building, building articulation, parapet architectural features distance of hotel room 21 windows to residential and commercial structures, the layout of the surface and subterranean parking, the perimeter block wall, and the landscaping have been designed 22 to harmonize with the neighboring motel, apartment building, and nearby residential and 23 commercial uses The hotel structure is situated in a manner that provides more than the required side and rear setbacks, distancing the structure from abutting properties The 24 semi-enclosed swimming pool provides privacy for both hotel patrons and adjacent residences Its semi-enclosure design provides noise abatement Exterior earth colors 25 soften the massing of the structure The project does not contain exterior balconies or 26 walkways, providing privacy to both hotel patrons and abutting i)roperties The alley at the rear of the site shall only be accessible for emergency vehicles thereby eliminating the 27 use of the alley by hotel patrons Parking beyond municipal code requirements is provided Parking demand generated by the hotel can be accommodated on-site 29 65- Page 2 2004-P014|101010101010 10 10|11 12 13 14 15 16 17 18 281|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3 Building articulation, parapet architectural features, stucco finish, and a perimeter block wall combined with landscaping, are consistent with existing commercial and hotel/motel buildings near the project site All mechanical equipment and parking will be screened and security exterior lighting that is not obtrusive will be installed The design of the hotel will act to improve the overall look of the immediate vicinity that is characterized by a vacant lot and older structures Earthen colors including bone, sunrise, and terra cotta will also add to the definition of the site and soften the massing of the building that will abut both residential and commercial properties The design of the hotel is compatible with the General Corridor General Plan Land Use Designation and conforms to the Primary Retail, Design and Physical Development Plan (DPDP) standards 4 The proposed three foot landscape overhang along the perimeter walls 'withinthe parking area and the landscaping at the front and rear that include flowering plants, grass and trees will enhance the exterior portions of the project and reduce the perception of over- massing The landscaping compliments the architecture of the proposed hotel and softens the structure for adjacent properties The landscaping and irrigation is designed to conform to the Primary Retail, DPDP standards, and conserve energy, ensure visual relief, reduce heat-gain from paved areas, and provide an attractive environment for the enjoyment of the general public, hotel patrons, and nearby residents Additionally, a full width commercial sidewalk with street trees will enhance the pedestrian experience along the public right-of-way fronting the hotel site 5 The existing and proposed public service facilities necessary to accommodate the project such as the width and pavement of Sepulveda Boulevard, traffic control devices, sewers, storm drains, proposed sidewalks, street lights, proposed street trees, fire protection devices, and public utilities are provided for adequately as confirmed by the City agencies that reviewed the project during the interdepartmental review process SECTION 2 Pursuant to the foregoing recitations and findings, the Planning Commission of the City of Culver City, California, hereby approves Site Plan Review, SPR P-2004126, subject to the following conditions General Conditions/Planning 1 The final working drawings shall conform to the preliminary development plans file dated, October 26, 2004, except as noted below and otherwise noted during the City permit review process ' 2 The Conditions of Approval for this Site Plan Review shall be referenced on the cover sheet and repeated in full on the cover sheet or attached as additional sheet(s) of the final working drawings ,|109| The project and its operations shall comply with all applicable codes, standards, and regulations, including, but not limited to, Building Safety, Fire Department, Planning, A Page 3 2004-P0141|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29|1010|and Public Works code requirements and it shall comply with all applicable comments and code requirements as determined during the City s internal review process 4 All applicable development standards and requirements in Planning Commission Resolution No, 92-P001, Comprehensive Site Plan Review Development Standards and Conditions of Approval except as otherwise required herein shall be met These standards as well as other conditions required in this approval shall be reflected on the plans submitted for building plan check 5 The applicant shall actively advertise all opportunities for employment, contract services, and purchasing of materials to Culver City businesses and residents The applicant shall use reasonable best efforts to solicit and utilize economical and qualified services from Culver City-based employees and businesses The applicant shall also require the construction contractor(s) and subcontractors related to the project to advertise all construction opportunities to Culver City businesses and residents 6 The applicant shall provide the construction contractor(s) and each subcontractor related to the project a copy of the final project conditions of approval The applicant and the City agree that these conditions shall be enforceable through all legal and equitable remedies, including the imposition of fines against each and every person who conducts any activity on behalf of the applicant on or near the project site The applicant, property owner, and general construction contractor are ultimately responsible for all actions or omissions of a subcontractor 7 The City reserves the right to periodically inspect the premises without prior notification, to ensure ongoing compliance with all conditions of approval 8 Minor modifications to building siting or design may be approved by the Planning Manager in keeping with the general design and content of the project approval 9 This Site Plan Review will expire if not used within one year after the date it becomes effective unless the applicant submits an extension request and is granted the extension by the Planning Manager, Planning Commission, or City Council 10 A certificate of occupancy for the approved project will be issued only upon completion of all applicable conditions of approval and required site improvements 11 The applicant and contractors shall use all reasonable efforts to reuse and recycle construction and demolition debris, to use environmentally friendly materials, and to provide energy efficient buildings, equipment and systems . 12 Conditions of approval herein shall apply to the applicant, any lessees, and any successor business that may legally assume benefit of this entitlement ' 6 7 Page 4 2004-P014 ,13 This Site Plan Review shall not become effective until the Redevelopment Agency has approved predevelopment plans n N 14 The applicant shall comply with the City s Art in Public Places requirement prior to issuance of the Certificate of Occupancy 15 Prior to installation of landscaping, the applicant shall provide the Planning Division three sets of detailed landscape and irrigation plans for review The Planning Manager and the Environmental Maintenance Manager shall approve the plans prior to the installation of landscaping and irrigation 16 There shall be no renting of hotel rooms af hourly rates or any increment less than one full day s room rental, occupancy of all hotel rooms shall be limited to no more than thirty (30) days for any one occupant 17 There shall be no kitchen facilities in the hotel rooms and there shall be no permanent residence on the project site 18 There shall be no drop off or pick up of hotel patrons and/or luggage on the curb fronting Sepulveda Boulevard 19 The Community Development Director or his/her designee, or any police or, code enforcement officer, or fire inspector of the City, may at all times, inspect all hotel rooms and facilities, and may inspect the guest register and other records necessary to determine compliance with all applicable regulations including but not limited to, building safety fire, and health standards, and to verify collection and payment to the City of all taxes owed 20 All hotel patrons and hotel employees shall park on-site and shall not park on neai by residential streets 21 The hotel operator shall ensure that hotel patrons abide by all City ordinances including the nuisance ordinance and shall ensure that hotel patrons do not create excessive noise that may affect neighboring properties 22 The hotel operator shall ensure all graffiti is removed on a continuous basis within forty-eight (48) hours after its application 23 Litter shall be removed daily from the project site including all parking areas and adjacent public sidewalks, the portion of the alley at the rear that abuts the project site shalt be swept or cleaned either mechanically or manually, on a weekly basis to control debris 24 Privacy coverings such as shades, draperies, or blinds shall be appropriately hung to cover all windows Exterior window glass shall be without cracks chips, or holes 6 g Page 5 2004-P014|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29i|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Peeling and deteriorated paint of exterior walls must be repainted within reasonable time 25 The exterior of the property, including adjacent public sidewalks and parking lots under the control of the operator, shall be illuminated during all hours of darkness during which the property is open for business in a manner so persons standing in those areas at night are identifiable from the street However, the required illumination shall be placed so as to minimize interference with nearby residents and their properties 26 An exterior light plan that conforms to Condition No 25 above shall be submitted to the Planning Manager for approval prior to building permit issuance 27 All areas on the property designated for landscaping, including, but not limited to, lawns, planter beds, and other open surfaces without hardscape, shall be maintained with properly trimmed living plant materials and without litter or debris 28 All containers used for the storage of trash garbage, or recycled materials and placed on the exterior of the hotel shall be maintained in a locked and screened trash enclosure approved by the City 29 During all phases of construction (including rough grading), information that includes contact names and telephone numbers for the applicant, contractor, and City, shall be posted at the project site These contact information postings shall be placed along the Sepulveda Boulevard frontage, the alley along the south property line, and the alley at the rear, the postings shall be visible to the public Public Works/Engineenng Conditions 30 A site improvement plan prepared by a civil engineer licensed in the State of California shall be submitted to the Engineering Division for review, approval and permitting This plan shall show drainage of the site indicated by contours or spot elevations, building pad elevations, and the design of onsite and offsite improvements with sufficient dimensions and details to allow for proper construction 31 The applicant shall provide a geotechnical report from a State licensed geotechnical engineer reporting on the suitability of the onsite soils to support the proposed construction and shall include a liquefaction analysis The report shall also identify any special considerations necessary to satisfy California Building Code requirements 32 Upon completion of rough grading the geotechnical and civil engineers shall submit certifications and final reports in accordance with Appendix Chapter 23 of the California Building Code These certifications and reports shall be submitted to the Engineering Division for review prior to the issuance of any building permits , 6g Page 6 2004-P01433 Concurrent with the submittal of the site improvement plan, a Standard Urban Stormwater Wigation Plan (SUSMP) shall be submitted to the Engineering Division for review and approval The SUSMP shall be prepared in accordance with requirements of the Culver City Municipal Code, Chapter 5 05 The first 3/4 of rainfall shall be treated or filtered prior to draining from the site 34 Concurrent with the submittal of the site improvement plan, an erosion control plan shall be submitted for review and approval by the City Engineer The erosion control plan shall be developed and implemented in accordance with the requirements of the Los Angeles County Stormwater Quality Management Program NPDES Permit No CAS614001 The plan shall include the design and placement of recommended Best Management Practices (BMPs) to effectively prohibit the entry of pollutants from the construction site into the public street and/or storm drain system The improvement plans shall note that the contractor shall comply with the 'California Storm Water Best Management Practice Handbook' 35 A raised median, or some other obstruction, shall be installed along Sepulveda Boulevard to prevent left turn movements into or out of the project site The raised median, or obstruction, shall be designed to the satisfaction of the City Engineer A right turn' only sign shall be installed at the project's driveway accessing Sepulveda Boulevard 36 The applicant shall reconstruct the entire width of the adjacent alley located along the project's easterly boundary This work shall consist of milling the existing asphalt and repaving with a minimum of two inches of new asphalt pavement and reconstruction of the concrete gutter 37 Access to the alley located along the project's easterly boundary shall be restricted to emergency access only A wrought iron gate, or other material as approved by the Planning Division shall be installed at the entrance to the alley A Knox Box shall be installed, to the satisfaction of the Fire Department, for emergency access 38 The existing utility poles on the project site shall be removed or relocated to the satisfaction of the City Engineer New utility sen,ices to the proposed project shall be placed underground 39 The applicant shall install a trash enclosure to the satisfaction of the City s Sanitation Division Manager The enclosure shall be redesigned to allow direct trash pickup from the alley The walls of the trash enclosure shall be finished or painted to match the walls of the proposed building 40 The parking area shall be designed in accordance with City Council Resolution No 87-R100, Parking Design and Layout Guidelines and City Council Resolution No CS- 6486 Adopted Standards and Specifications for Off-Street Parking Areas The applicant shall reconstruct the existing drive approach to a width of 25 -4' per Culver City Standard Plan 00-101-2 2 Case 1, Driveway Apploach Special Use 70 Page 7 2004-P01441 Parking lot drainage devices, concrete curb sidewalk and driveway shall be designed to the latest edition of the American Public Works Association (APWA) Standard Plans 42 The project s frontage along Sepulveda Boulevard shall be reconstructed with full width sidewalk 43 Street trees, tree wells, and irrigation shall be installed along Sepulveda Boulevard to the satisfaction of the City s Street Tree Maintenance Supervisor 44 The drive ramp leading to the basement parking shall haVe a maximum slope of 10% extending a minimum of 12 feet, at the beginning and ending of the ramp The rest of the ramp shall have a maximum slope of 20% 45 The applicant shall be responsible for the expense to repair or replace any damage to the public right-of-way caused by the construction of the proposed project Such repair or replacement shall be completed to the satisfaction of the City Engineer 46 Dirt hauling and construction material deliveries or removal are prohibited during the morning (7 00 A M to 9 00 A M) and afternoon (4 00 P M to 6 00 P M ) peak traffic periods 47 During construction, dust shall be controlled by regular watering and as directed by the City inspector The applicant shall comply with SCAQMD Rule 403, which requires specific control actions during construction activities to control fugitive dust 48 All staging and storage of construction equipment and materials, including the construction dumpster, shall be on-site only The applicant shall obtain written permission from adjacent property owners for any construction staging occurring on adjacent property 49 The construction contractor shall advise the Public Works inspector of the schedule and shall meet with the inspector prior to commencement of work n 50 Due to the change of use and increased density, this project is subject to the City s Sewer Facility Charge This charge shall be paid prior to the issuance of any permit 51 Per Culver City Municipal Code 5 01 010, Ordinance No 2001-011 Solid Waste Management, the Culver City Sanitation Division has the exclusive franchise for all solid and recyclable waste material handling within the City limits Fire Prevention Condiuons \ 52 A KNOX Box shall be required for the building and KNOX key switches shall be required to open al1 security gates and driveway gates 71 Page 8 2004-P014|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 |101010101010101010 10|53 Location of the Fire Department Connection and Double Detector Check Assembly shall be reviewed and approved by the Fire Marshal and Planning Manager 54 The applicant shall locate the building address such that it is viewable and legible from the public right-of-way 55 All parapets over five feet shall have catwalks as approved by the Fire Marshal 56 All fascia and tops of exterior walls and parapets shall be constructed of hard materials and shall be approved by the Fire Marshal 57 The applicant shall provide a Class Ill combined standpipe system with 2 1/ 2 inch hose valves and 1 1/2 inch reducing caps and covers as required in the 2001 California Fire Code, Table 1004-A 10 11 58 Prior to issuance of a Certificate of Occupancy, the applicant shall provide the Culver City Fire Department (CCFD) a pre-fire plan 12 13 14 15 59 All stairs, common doors and rooms shall be appropriately signed per the 2001 California Fire Code and CCFD requirements Directional signs shall be posted as appropriate to ensure emergency personnel can find guest rooms in a timely manner 60 Duct smoke detectors shall comply with CCFD regulations and shall provide supervisory alarms only 16 17 61 Prior to issuance of a Certificate of Occupancy, the applicant shall provide the CCFD Hazardous Materials Specialist a hazardous materials disclosure package 18 19 62 Prior to issuance of a Certificate of Occupancy, the applicant shall provide the CCFD an emergency evacuation plan and employee training program for CCFD review 20 21 22 63 Prior to the issuance of a Certificate of Occupancy, the applicant shall provide the CCFD for review and approval, a permanent emergency exit floor plan for the entire hotel that indicates location of fire extinguishers Posting of the emergency exit floor plan on the hotel premises shall be required per CCFD instructions 23 24 25 26 27 28 64 The project shall comply with all applicable 2001 California Building, Fire, Mechanical and Electrical codes and shall comply with Culver City Municipal Code Section 9 02 65 The applicant shall provide a smoke exhaust system controlled by the site's fire alarm system, in the subterranean parking area The exhaust system shall be started by water flow activation within the subterranean parking area N. III III III 29 Page 9 2004-P0141 66 All CCFD notes, as directed by the File Marshal shall be placed on the final working drawings , -,|101010|APPROVED and ADOPTED this 8 th day of December 2004|101010101010|D SCOTT MALSIN, CHAIRPERSON PLANNING COMMISSION CITY OF CULVER CITY, CALIFORNIA|10 10 10|11 12 Attested by 13 Sherry Jordan Senior Planner 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 73 Page 10 2004-P014Attachment No 6 -wry .1,71 Nov 14, 2004 Vinney Patel Culver City Planning Division P 0 Box 507 Culver City, CA 90232 1)1 s- 0E3 ii—on Dear Mr Patel, This letter explains the concerns we have for the proposed construction of the Hampton Inn at 3954 Sepulveda Blvd We would like the following points to be considered 1 request that the following studies be performed a environmental impact report b traffic impact report 1) effects of the ongoing freeway construction 2) effects of traffic entering and exiting the freeway to and from hotel 3) no entrance from back alley 4) impact on the flow of traffic on Sepulveda during rush hour c noise impact report 1) noise by those using the s imming pool 2) loud parties 2 privacy a bac% windows overlooking back yards of adjacent homes 3 parking a prevent hotel occupants or guests from parking on nearby residential streets 4 security a limit the number of days one can stay Signatures to this report appear on page 2 edRi-c-S(i e i_r ) E7- a -71? C- M lit" L g- 63/) es (e qs--0. 1PRINT NAME STREET ADDRESS SIGNATURE (n4 )YL.t41,47_. C) 6:1 Lief ,-- (7c)--/41,-ia ( Ltler 3 5 5- 1-3 e &i• , ALi t - p 1_20_2, (r 1: A e IL 6 I Id vt.-- 11 cc Cs's•-• )( edt- e '0\0 4- 5-610 ku t_optt- cy (Ai;72. ti.277) L /(-7 / r, (-/ r)\(0_, , 3 ( -- t 2 • - -/ LJ (c.,-2_-5 1 '( 9 /g/-=(6)..._1-y 3 .> c.Jul ,c,12 G /1 2( I (/-n C 4PAGE 2 CONTINUED PRINT NAME SIGN PURE STREET ADDRESS cv U evaby---Lz-- c) ol-fN f/-1-04//r1A,‘ 3Ci ( ) ( C. IA- • 30|1010|_a C:3 h.3 g c7 Cl, i|1010|75|1010|= , n 3Attachment No 7 = n=3::azzzta==0,1 .000.0•n•••••• n=1, sour) st_oc‘i .-edort-L- 6' QA-11_ 17) F-04C.E. - (7'0 1 1416 I4 M INI TERASSE /|109| I C>PEN s14.L.),|109| • • UILDIM6c IWA-LL A RIE-- -A "BLD6 LtNle —et SWIMMING POOL KIXA t3WLItCç WA-11._ 13v (0 IA a kAilAtis:4:o4 A PH 4213-017-029 Preliminary Project Requirements Fire Department Notes 5reeo rad 70 07,0 3- atm. an en de ler potent Coded dad cede MC. d en anal so. The ee aly. so 5000 Gele bu- Ind dem= nee.. a regd. a. act ann. ...an k RR. 010 oh =Mao-bane a bon svello a ciao a• na ataa. a ea., a N..N.., 01. 20) WildeI kiir On as mere. 000 05404 end FRG O oda. RI re -ORMI •. .-0•77 nd Ova eery oath_ Inote he ocra Gana pfto bkrehal ate Oho Mae a Maly or CO Mad. seeped... rade beas en Malabo Ma vicnisis led lodal- fro peak oy rand RA 000 ago era 10 5acc7 7c, 17R1 T17 a N ono oolue .0 .114 a aka conmet C. Mal te '10 .1 Al I.0 ad tors al decm. abb. meta .141 14 castructes I of acemab b ro lean or met ar-a) Cat Co la* for al. oarta rode Ara a G. wend Ow.= br day =try bot and or ',arty rode am el Oa *A tor day a a *read MIN* ea CO CA he =Is hbla 104-A monde elaas o mth 2 In... 17 cdueng on and onne. Pm10 are de qr "boo, 4ec h CUD pro to hoot kr shbote er, mama, ea an Cl Rocha 17 I 25 -00 kw 'mynah AI tan, can doom and roma Oall be slocal ce 200 G Cods and COO rescarea Mot CA ma b. AM reywerudn ansol neyymtbd.14 ntagn enn dake alye. roan ram Oran cot be mamas ea um a an aro lar elm* end "sews. nowdeetten lor be. .11 Elo mon Mama Oall neet WatMlaha regyarenenta elcd. by wady t. C113 rcy tuns end pad angry are oy 0415=0 an not red.re by CO•0 5404 lAchand Cod Os en MI moos actea a ahem aptem Noma Rena as owe nay bc lobo but ono leo hi otos co a be pad aya Mona O hear.* edam ebncleturc pabbge pny.yy rguydt lot tcyc ,dtc cempaby rarlac CCM Ilaz 5pecalett 0 01 5- toreema yureA Ohe rye15 an agate, ataa 575 55 " la al bcr . c *ebbe= renew ttle Fey* err yadely ndsbeti amospney sat be Mad Mad na moon o ncoemo an. a and ea. set and an' ana Pre' on nary Project Requ eme ts 5u Id IDepartme t Notes mac aro ral Carenens ha a *norm th yarlaramoler tOci. Inatiand.Y.0 34 lc no Iron te ',red /C. -5 VP. ACm onban canoed ma Par Al 000 ler O. onellem 100 (114 Awed rec and hc 05 co roared repe hes o714510 unity baing Al dd. -tam an properq Inq le *at_ ea pena ? Ind prey ben dtb.dtddt. RR oda. h .m lor scam. 5,4 be nono. /GC 5-A1 100 700 any ma h he ea cl epulreela 500 A% omen cam, oil munbeN Memo In mho. lacesh. enor Raga a ha 05C C-A1 cncider. 31 oymanye Cr, 031 al_ en had a 11.11 nada anima pa .1.11,n, Von. Nome o an a anl• a Ma as aOa ort art M Ay.* kr oh ads oh. peer arl, Ind MS law the int Om. ao laa (5 07.1 et prom ma. -0 a tba real i•vel