Legislation Details

File #: HIST-4310    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 2/5/2007 Final action: 2/5/2007
Title: Authorization to Release a Request for Proposals for the Rehabilitation of Sewer Manholes throughout Culver City.
Attachments: 1. C-2__07-02-05_PW_SewerManholeRehab_RFP Release - FINAL.doc, 2. C-2__07-02-05_PWD_Sewer Mahole Project.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends that the City Council authorize the Public Works Department to release a Request for Proposals (RFP) for the rehabilitation of approximately 125 sewer manholes throughout Culver City. BACKGROUND: Public Works Staff has identified approximately 125 sewer manholes throughout the City in need of rehabilitation. The sewer manhole is the access way from the manhole lid on the surface of the street leading down to the sewer main. The rehabilitation will include the rehabilitation of existing concrete or brick sanitary sewer manholes to rebuild strength and eliminate possible infiltration, outflow, root intrusion, and future deterioration of the concrete and brick due to the sewer environment. DISCUSSION: Sewer manholes deteriorate for a variety of reasons. The constant stress of traffic causes subsidence and shear cracks, which progressively weaken these structures. Additionally, disintegrated mortar joints become primary entry points for ground-water infiltration, washing out supporting back fill and causing manhole walls to collapse. Corrosive sewer gases found in sewer lines attack concrete walls deteriorating the concrete and causing structural failures. The combination of hydrogen sulfide and water vapor creates dilute sulfuric acid that attacks conventional cement walls and mortar joints. When this occurs it can seriously endanger the street surface above as it could ultimately lead to a collapse of the manhole and the corresponding development of a sinkhole in the street. Additionally, a severely deteriorated manhole may eventually collapse into the sewer main and block the flow of the sewer pipeline. Meeting Date: February 05, 2007 Item Number: C-2 AGENDA ITEM: Authorization to Release a Request for Proposals for the Rehabilitation of Sewer Manholes throughout Culver City. Contact Person/Dept.: Eric Mirzaian Public Works-Maintenance Operations Phone Number: (310) 253-6410 Fiscal Impact: Yes [x] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [] Attachments: [X] Public Notification: Master Notification List on (01/31/2007) Department Approval: Charles D. Herbertson (01/23/07) City Attorney Approval: Heather Iker (01/29/2007) City Controller Approval: Marlee Chang (01/30/2007) City Manager Approval: Jerry B. Fulwood (01/30/2007)City of Culver City, California City Council Agenda Item Report Should the City Council approve the release of the RFP, the following table includes the timeline for the project: Task Time Frame RFP Approval by City Council February 12, 2007 Release of Notice Inviting Proposals February 13, 2007 Pre-proposal Meeting February 22, 2007 at 9:00 AM Deadline for Receipt of Proposals March 15, 2007 at 2:00 PM Consideration of Award of Contract April 9, 2007 Data Gathering and Study Preparation N/A Presentation of Study to Council N/A FISCAL ANALYSIS: The total estimated annual cost for the rehabilitation of approximately 125 sewer manholes is $250,000. The project will be accomplished over a five year period with approximately 25 manholes rehabilitated each year. The annual funding has been allocated into the following Sewer Enterprise Fund account: 20466100.619800 (Wastewater Maintenance – Other Contractual Service) ATTACHMENTS:  Copy of the Request for Proposal  Spreadsheet (Manhole Dimensions) MOTION: That the City Council: Authorize staff to release the Request for Proposal for the rehabilitation of approximately 125 sewer manholes throughout the City. MEETING DATE: February 05, 2007 AGENDA ITEM: Authorization to Release a Request for Proposals for the Rehabilitation of Sewer Manholes throughout Culver City. ATTACHMENTS Pages Request for Proposals 1-9 2. Manhole Dimensions 10-13PU6 C ik.KS E A TIVII E T REQUEST FOR PROPOSALS SEWER MANHOLE REHABILITATIONGENERAL INFORMATION Project Summary The City of Culver City is soliciting proposals from qualified firms to provide the rehabilitation of approximately 125 existing concrete or brick sanitary sewer manholes to rebuild strength and eliminate possible infiltration, outflow, root intrusion and future deterioration of the concrete due to the sewer environment. It is the intent of this Request for Proposal (RFP) to cover all aspects of rehabilitation of these manholes including types of repair, methods of repair, materials and equipment. The average diameter on these manholes is approximately 5 feet and the depth ranges between 5 feet to 20 feet. Scope of Work The scope of work shall include the lining and rehabilitation of sanitary sewer manholes at various locations as directed by the Public Works Director or his designee with the use of a cured-in-place laminated composite comprised of five layers of an epoxy-fiberglass with an impervious PVC inner membrane combination. The liner system shall be a Poly-Triplex liner system or a pre-approved equivalent substitute. Work may also involve the rehabilitation of the channels directing the flow of the sewer main, as well as, the replacement of certain manhole lids/seals. Work Summary 1. It shall be the responsibility of the Contractor to make sure that the Cured In Place Manhole (CIPM) liner completely seals the manhole, shelf, pipe inlet and outlets, and the lid ring frame in a monolithic method, as required, and that no holes, cracks, or seams in the liner are left unsealed, which would allow gases or fluids to flow behind the CIPM liner, 2. Furnish all labor, materials, equipment, and incidentals required to supply and install a protective CIPM liner as required. 3. The CIPM liner shall be designed and installed to protect concrete, brick, and other manhole surfaces from corrosion. The C1PM liner product shall be designed to stop infiltration, root intrusion, and further deterioration in the manhole. The interior surfaces to be protected shall include the walls, shelves, pipe junctions and the lid ring frame. 4. Omission of a specific item or component obviously necessary for the proper installation and functioning of the system shall not relieve the Contractor from the responsibility of supplying that specific item or component at no additional expense to the City. References The CIPM liner system shall be manufactured and installed as to be in compliance with the minimum value recommended by the manufacturer's standards and or applicable ASTM testing requirements. ASTM D-638 Tensile Strength and Tensile Modulus ASTM D-695 Compressive Strength ASTM D-790 Flexural Strength and Flexural Modulus ASTM D-2240 HardnessTERMS AND PRICING The term of the agreement shall be a total of five years, with an average of approximately 25 manholes rehabilitated each year. The actual number of manholes to be rehabilitated will be determined ahead of time by City Staff and given to the selected Contractor for completion each year. Either party may terminate the agreement without cause with a thirty-day (30-day) written notification. The attached sewer manhole locations and dimensions are approximations and are to be used as a guide in preparing a cost estimate to complete the entire project, though the work will be completed over a multi-year term in accordance with annual budgetary constraints. The contract unit prices shall be paid for as stated in the proposal and shall include furnishing all traffic control, tools, materials and equipment necessary for a complete rehabilitation of each manhole per the specifications, and no additional compensation will be allowed therefore. PROPOSAL SUBMITTAL TIMELINE 1. Pre-proposal Meeting Interested proposers must attend a mandatory pre-proposal meeting. The meeting is scheduled for February 22, 2007 at 9:00 am. The location of the meeting will be at the Public Works Maintenance Yard, 9505 W. Jefferson Blvd., Culver City, CA 90232. 2. Proposal Due Date Proposals shall be delivered in one (1) original and two (2) photocopies in an envelope marked "Sewer Manhole Rehabilitation" to the contact person indicated below by no later than 2:00 pm March 15, 2007. 3. The City of Culver City reserves the right to reject any and all proposals, to waive any informality or technical defects in any proposal, to award all or any individual part/item of the proposal and to make an award in the best interest of the City. Proposals will not be accepted after the proposal due date and time stated above. Incomplete proposals that do not conform to the requirements specified herein may not be considered. 4. Contact Person Eric Mirzaian Sr. Management Analyst Public Works Department 9505 W. Jefferson Blvd. Culver City, CA 90232 Tel: (310) 253-6410 Fax: (310) 253-6430 eric.mirzaian@culvercity.orq SCOPE OF WORK All work shall comply with Section 500-2 (Manhole and Structure Rehabilitation) of the 2006 edition of the Standard Specifications for Public Works Construction (SSPWC) "GREEN BOOK".Work will involve the rehabilitation of existing concrete or brick sanitary sewer manholes to rebuild strength and eliminate possible infiltration, outflow„ root intrusion, and future deterioration of the concrete due to the sewer environment. A. Traffic Control Contractor must follow Work Area Traffic Control Handbook (WATCH) manual procedures to ensure safe traffic control practices are followed during the performance of their work. Selected Contractor will be required to submit a traffic control plan for approval durinq the contract certification process of the project. B. Field Measurement and Inspection of Manholes The Contractor shall field measure and inspect manholes before ordering materials. The Contractor shall submit a copy of the written measurements to the Public Works Director or his designee. If the Contractor notices any unusual conditions that would require a heavier weight liner material than specified in the table below (Section F-Liner Bag), this shall be indicated to the Public Works Director or his designee for approval. A change order will be initiated before the ordering of materials with each change order form including the physical street address of each manhole. C. Surface Preparation Contractor shall remove all manhole maintenance steps flush with the structure wall before lining. Contractor shall clean manhole walls and base with high pressure water prior to the installation of the liner. Contractor shall engage in the mechanical removal (pneumatic chisels, jack hammers or other approved mechanical means) of hard calcium deposits that cannot be removed with high pressure water blasting. All active structure infiltration must be eliminated completely prior to liner application. All grouting shall be completed in accordance with current applicable National Association of Sewer Service Companies (NASSCO) specifications. Contractor shall be responsible for removal and disposal of all debris removed during the rehabilitation process. The Contractor shall comply with all Federal, State, and Local regulations regarding disposal of debris. D. Flow Control Any flow control or bypass pumping necessary to perform manhole rehabilitation shall be the responsibility of the Contractor. E. Concrete Mortar Replacement Concrete replacement to build the wall up to within one inch of the nominal inside diameter of the structure shall be air or manual placed concrete per "GREENBOOK" Section 500-2.4.3, 500-2.4.4 & 500-2.4.5. F. Liner Bag The liner bag shall be composed of five layers composed of E glass fiberglass, polyester felt, and a flexible non-porous PVC water and gas shield membrane. The flexible non-porous PVC water and gas shield shall be embedded between the structural layers of epoxy-fiberglass to guard against nicks, tears and damage to the gas protection membrane. The pre-saturated weight of the liner bag materials shall conform to the table below: MH Depth in Feet Outside Fiberglass Weight Inside Felt PVC Inner Barrier Inside Felt Inside Fiberglass Weight Min. Total Composite Weight > 10 12 oz. 20 oz. 12 oz. 44 oz. >15 18 oz. 20 oz. 18 oz. 56 oz. >20 24 oz. 200z. 24 oz. 68 oz. >35 48 oz. 20 oz. 48 oz. 116 oz. The design table above is intended as a general manhole guide for the minimum weights of the liner bag materials at various depths. This is not intended to limit the liner manufacturer's and authorized installer's judgment to recommend the use of a heavier weight fiberglass liner material for unusual conditions identified in the structure during the pre-manufacturing measurement and inspection. Any recommended increase in the liner thickness approved by the Public Works Director or his designee will not affect the warranty requirement. The increased cost for the thicker liner shall be paid for by a change order. The angle point between the manhole wall and base shall be reinforced with extra layers of fiberglass and shall have a minimum completed composite thickness of six layers of fiberglass each with a minimum weight as specified in the table above. The CIPM liner shall be constructed in such way the non-porous inner flexible PVC membrane is protected from damage by the use of an epoxy-fiberglass layer. This inside surface protective layer is to protect the CIPM liner from impact damage (nicks from rodders and root cutters, hydro-vac nozzles, inspection cameras, survey equipment and construction techniques used in pipeline rehabilitation). The importance of this protection layer cannot be over-emphasized to protect the manhole from sulfides and other gases penetrating through nicks and cuts in an unprotected membrane. This CIPM liner must be impervious and without holes that will allow hidden corrosion on the concrete behind the liner, which can cause the eventual failure of the liner and the manhole. This inner liner may be installed with multiple installations. G. Epoxy Resin The modified epoxy resin shall be a two component 100% solid, non-VOC style resin. The resin shall bond to the existing manhole brick or concrete substrate and each layer of the fiberglass, polyester felt, and flexible PVC inner liner. H. Repair of Installed Liner The finished lining must be repairable at any time during the life of the structure. The lining shall be flexible, and have an elongation sufficient to bridge up to a 1/4-inch settling crack, without damage to the lining. The liner shall be able to bridge expansion cracks that may occur.I. Safety The Contractor shall comply with all Federal, State, Local and CAL/OSHA safety regulations. The Contractor's personnel shall be certified for confined space entry. J. Installation and Field Inspection Plywood and protective plastic shall be used around the maintenance hole to isolate the street surface from the resin. Good housekeeping measures shall be employed and any spilled resin shall be cleaned up at the Contractor's expense. A flow control device shall be installed to maintain the normal flow and isolate the bottom of the liner from the flow during installation of the liner. The Public Works Director or his designee shall inspect each dry liner bag before installation to verify that the inspection tag, installation address, and the liner materials comply with the table in Section F. Both the inside and outside layers of the dry fiberglass liner shall be wet out separately with a 100% solid, non-VOC modified epoxy. There shall be no dry spots in either of the fiberglass liners. The wet out liner, bottom, and six layer reinforced angle section shall be installed per the manufacturer's standards. The wet out liner shall be inflated, heat cured with steam, and cooled with air per the manufacturer's standards. The cured liner shall be cut out over the pipe channel leaving a slight flared edge. The top of the liner shall be cut off even with the top of the riser ring. Any fins in the liner at the top of the rings shall be cut in a tapered fashion to allow a full 24-inch access to the manhole. The top and bottom of the cuts shall be sealed. A cured flat sample of the liner to be installed and six layer reinforced angle section shall be provided to the Public Works Director or his designee prior to each installation for testing. K. Testing and Quality Control A spark test shall be performed on each installed liner at a minimum of 15,000 volts per "GREENBOOK" section 500-2.4.8. A chemical resistance test ("Pickle Jar Test") shall be performed per "GREENBOOK" section 210-2.3.3. The cured sample shall be visually inspected by the Public Works Director or his designee to confirm that the PVC barrier was installed between the layers of fiberglass and that a minimum of six layers of fiberglass was installed and cured at the bottom of the manhole.The Public Works Director or his designee may elect to have the City's Public Works Inspector involved in all inspection phases throughout the duration of the project. WARRANTY The manufacturer of the CIPM lining material shall furnish an affidavit attesting to a minimum period of 10 years successful use of its materials as a lining for concrete and brick structures in wastewater conditions recognized as corrosive or otherwise detrimental to concrete. Manufacturer shall warrant the performance of the CIPM liner for 10 years. The installation Contractor shall include a 5-year warranty for materials and labor to repair or replace any failing conditions of the liner in the structure. CONTRACTOR RESPONSIBILITIES 1. Should the Contractor or its employees cause any damage to public or private property, the Contractor will be required to make repairs immediately. The City may however, elect to make repairs or replacements of damaged property and deduct the cost of such from payments due to the Contractor under the contract. The Contractor shall not be responsible for any damages caused by sewer stoppages unless caused by their gross negligence. The Contractor is responsible for any damages caused by sewer stoppages if they are caused by their gross negligence. 2. Contractors must follow Work Area Traffic Control Handbook (WATCH) manual procedures to ensure safe traffic control practices are followed during the performance of their work. 3. The Contractor shall adhere to all the City's National Elimination Pollution Discharge Elimination System (NPDES) Permit requirements. 4. The Contractor shall comply with all Federal, State, and Local laws, with special attention to those laws that pertain to the handling, transportation, and use of any hazardous materials and pertaining to the type of work specified herein. 5. The Contractor shall clean all job sites when work is completed, including the removal of all tools and materials used during work. Each day's scheduled work shall be completed and cleaned up and under no circumstance shall any manhole equipment, contractor's tools/equipment and trucks be left on the street overnight. The Contractor shall be responsible for the protection of all improvements adjacent to the work areas, including but not limited to, curbs, gutters, street paving, sidewalks, traffic control signage/equipment, etc. located on either public or private property. SCHEDULING 1. The Contractor will be required to commence work after a "Notice to Proceed" has been issued by the City. The Contractor shall, prior to commencing, submit and gain approval of a weekly work schedule indicating the order and location of work. 2. The general hours of operation shall be 8:00 AM to 5:00 PM. The days of operations shall be Monday through Friday. No work shall be performed on Saturday or Sunday.PROPOSAL REQUIREMENT & FORMAT 1. Company Profile: Identify the legal name, address, telephone and fax number of your firm. 2. Qualifications: At a minimum, eligible proposers will have qualifications in the rehabilitation of sewer manholes and knowledge of applying Cured In Place Manhole (C1PM) rehabilitation. Proposers must hold an active State of California Contractor's License at time of proposal submittal. Proposers must submit current OSHA and other applicable certifications relevant to this project. 3. Scope of Services: Describe the recommended scope of service to be performed by your firm that clearly displays an understanding of the project as described in the 'Scope of Work' section of this RFP. Additionally, specific items that will not be maintained by proposers shall be clearly indicated in the proposal. 4. References: Provide a minimum of five (5) references the City may contact concerning your performance on other similar sewer manhole rehabilitation contracts, preferably in the Southern California area. 5. Claim History: Provide information on any legal judgments or claim settlements your firm and any individual has had in the past five years against any public or private entity for whom it provides service, with an explanation of their disposition. 6. Schedule of Fees: The measurement and payment for cured-in-place manhole liner sewer manhole rehabilitation as described in this RFP shall be made at the contract unit price per each manhole. The above contract price and payment shall be considered as full compensation for furnishing all labor, materials, tools, equipment, transportation and incidentals and for doing all the work involved and necessary to repair existing sanitary sewer manholes and shall include lining, manhole rehabilitation, manhole sealing and water tightness, complete in place, including field measurements of all manholes, protection and restoration of existing public and private facilities, control of surface and subsurface water, disposal of concrete and extraneous and surplus excavated materials, and all other features as necessary to complete this work as specified in the Standard Specifications for Public Works Construction "GREENBOOK" 2006 edition, these special provisions, and as directed by the Public Works Director or his designee. 7. Proof of the Following Insurance Coverage: • General Liability including coverage of premises, products and complete operations, independent contractors/vendors, personal injury and contractual obligations with combined single limits of coverage of at least $1,000,000 per occurrence. • Automobile Liability, including owned, non-owned and hired vehicle of at least the following limits: a. Primary bodily injury with limits of at least $500,000 per person; $500,000 per occurrence; and b. Primary property damage of at least $500,000 per occurrence; orc. Combined single limits of $500,000 per occurrence. • Worker's Compensation insurance as required by the Labor Code of the State of California. • Proof that if selected, your insurance carrier will execute the attached City of Culver City Special Endorsement. If an additional fee will be charged by your insurance carrier, then you must include that in your fee based proposal. Any changes in the scope of work resulting in a contract increase or decrease in fee shall be approved by the Public Works Director in writing prior to commencement of actual change in work. No fee adjustment will be allowed unless said prior approval is authorized exclusively in writing by the City, without explanation.ATTACHMENT-Sewer Manhole Dimensions LOCATION LOCATION NOTES LENGTH (ft) WIDTH (ft) 1 5933 Slauson Ave 10 4 2 5933 Slauson Ave 8 6 3 5933 Slauson Ave 6 6 4 10733 Ranch Rd 5 4 5 10733 Ranch Rd 5 4 6 10803 Stever St 10 4 7 10889 Stever St 7 4 8 10954 Stever St 9 4 9 10954 Stever St side driveway 7 4 10 5710 Sawtelle Blvd 8 4 11 5680 Sawtelle Blvd 11 4 12 5327 Kinston 6 4 13 5451-57 Kinston 5 4 14 5539-45 Kinston 4 4 15 5551-57 Kinston 4 4 16 10890 Whitburn 4 4 17 Mesmer Pump Station driveway apron 14 5 18 Mesmer Pump Station middle manhole 13 4 19 Mesmer Pump Station adjacent to fence 13 4 20 Slauson b/w Segrell & Culver Pk Dr 13 4 21 Slauson at Segrell 13 4 22 Slauson at Jefferson Alley b/w Buffalo & Firestone 12 4 23 Jefferson Alley north of slauson 11 4 24 Jefferson Alley further north 11 4 25 Jefferson Alley further north 11 4 26 Jefferson Alley further north 11 4 27 Jefferson Alley further north 11 4 28 Berryman Ave (north of Sepulveda) behind FS#3 10 4 29 Alley b/w Berryman & Sawtelle behind Batteries Plus 11 4 30 Alley b/w Berryman & Sawtelle next King's Cafe 11 4 31 Alley b/w Janison & Sawtelle next to PetCo 11 4 32 Alley b/w Janison & Sawtelle behind US Bank 11 4 33 Alley b/w Janison & Sawtelle behind motel 11 4 34 5433 Janison 9 4 35 5387 Cote 4 4 36 Cote & Pickford 4 4 37 Cote b/w Fairbanks & Pickford 6 4 38 Cote & Fairbanks 6 4 LID/COVERS39 Cote b/w Fairbanks & Westwood 7 4 40 Coto & Westwood 7 5 41 Cota b/w Westwood & Rhoda 7 4 42 Cota & Rhoda 7 4 43 Cote & Ocean near driveway 7 4 44 Cote & Ocean middle of street 6 4 45 Cola & Ocean near house 7 4 46 Cola & Ocean 8 4 New ring 47 11063 Ocean 1st mh east of Cola 7 4 48 11023 Ocean 6 4 49 10943 Ocean 7 4 50 10821 Ocean 7 4 New lid 51 Ocean & Westwood 6 4 52 Ocean & Fairbanks 5 4 53 Ocean & Pickford 5 4 54 Ocean & Overland Alley 8 4 55 4520 Sepulveda next to Pep Boys 11 4 56 4460 Sepulveda next to YMCA 13 4 57 4436 Sepulveda at Braddock 15 4 58 4406 Sepulveda at Barman 15 4 New lid 59 4338 Sepulveda at Lindblade 13 4 New lid 60 4300 Sepulveda south of Culver 15 3 61 4246 Sepulveda north of Culver 13 3 62 4204 Sepulveda 13 3 New lid 63 Sepulveda (south of Wash Blvd) next to Chevy dealer 13|1010|64 Sepulveda (north of Wash Blvd) next to Arco 15 3 65 Sepulveda (south of Wash PI) next to Anderson 15 3 66 Sepulveda (north of Wash PI) next to Chevron 16 3 67 3940 Sepulveda Sea Aisle Apartments 16 3 68 Reid St. (dead end) driveway 5 4 69 Reid St. (dead end) street 5 3 70 Mesmer b/w Beatrice & Jefferson north of wash 15 4 71 4311 Jackson private property 72 4315 Jackson private property 73 National bike trail manhole at driveway 19 3 74 Syd Kroenthal Park west of baseball field 7 5 New lid 75 Syd Kroenthal Park behind 2nd ball field 7 4 New [id 76 Syd Kroenthal Park Fay & National 12 4 New lid 77 Syd Kroenthal Park Fay & National (next to fence) 11 4 New lid 78 Syd Kroenthal Park Fay Ave cul-de-sac (behind bushes) 10 3 New lid 79 5880 Adams Blvd Hajoca Plumbing Supplies 9 3 New ringCulver City Animal Hospital Pizza Hut (sidewalk) sidewalk north of Washington Blvd north of Washington Blvd north of Washington Blvd north of Washington Blvd north of Washington Blvd 80 Alexander Machinery 81 5830 VVashington Blvd 82 Wash Blvd & Hines Ave 83 Adams Blvd & Hines Ave 84 5811 David Ave 85 5819 Ernest Ave 86 5865 Dauphin Ave 87 5919 Comey Ave 88 S/W corner of Wash & La Cienega 89 N/E corner Culver & Madison 90 Washington Blvd & Madison Ave 91 Washington Blvd & Duquesne Ave 92 9727 Washington Blvd 93 Culver Blvd & Lafayette PL 94 9546 Washington Blvd 95 9516 Washington Blvd 96 9400 Washington Blvd 97 3859 Cardiff Ave 98 Cardiff Alley 99 9543 Watseka Ave 100 Madison Ave & Culver Blvd 101 Madison Ave & Culver Blvd 102 3815 Culver Center 103 3851 Culver Center 104 3864 Culver Center 105 3880 Culver Center 106 10885 Washington Blvd 107 10915 Washington Blvd 108 4064 Colonial Ave 109 Alley b/w Colonial & Wasatch 110 4048 Wasatch Ave 111 4034 Boise Ave 112 4034 Boise Ave 113 12565 Washington Blvd 114 3989 Meier St 115 3988 Moore St 116 Alley b/w Beethoven & Lyceum 117 Alley b/w Lyceum & Alla 118 Alley b/w Alla & Michael 119 Alley b/w Michael & Tivoli 120 3964 Redwood Ave|10 9| 3 a 3|10 9| 3|10 9| 3|109| 3|109| 3|109| 3|109| 3|109| 3|109| 4|109| 3|109| 3|109| 3 27"|109| 3 27" 27"|109| 3|109| 3|109| 3|109| 4|109| 3 14 3 13 3 10 2|109| 2 13 3 12 3 11 3 12 3 12 3 12 3|109| 3 13 3 12 3 13 3 14 3 13 3 13 3 13 3 11 3 S&W Diner Santa Maria BBQ Daphne's Greek Cuisine Culver Hotel Tokyo 77 Watseka Parking Structure north of Culver south of Culver CPK ASAP Cingular Kragen Auto Parts Best Buy at Elenda La Ballona Elementary School north of Washington Blvd New ring & channel New ring New ring New ring & channel New ring & channel New channel New ring & channel New ring New ring Ring only Ring only Ring only New ring121 Alley b/w Redwood & VValgrove 122 Alley b/w Walgrove & Glencoe 123 4019 Michael Ave 124 4015 Alla Rd 125 4011 Lyceum Ave north of Washington Blvd north of Washington Blvd south of Washington Blvd south of Washington Blvd south of Washington Blvd 11 3 New channel 10 3 12 3 11 3 11 3