Title:
|
(1) Acceptance of Work Performed by All American Asphalt; (2) Authorization to File a Notice of Completion; and (3) Authorization to Release the Retention Payment of $37,822.20 after Expiration of the 35-Day Lien Period for the Washington Place and Sawtelle Boulevard Resurfacing Project, PZ-942, Federal Aid No. STPL 5240 (031).
|
City of Culver City, California
Agenda Item Report
Meeting Date: 07/27/2015 Item Number: C-3
CITY COUNCIL AGENDA ITEM: (1) Acceptance of Work Performed by All
American Asphalt; (2) Authorization to File a Notice of Completion; and (3)
Authorization to Release the Retention Payment of $37,822.20 after Expiration of
the 35-Day Lien Period for the Washington Place and Sawtelle Boulevard
Resurfacing Project, PZ-942, Federal Aid No. STPL 5240 (031).
Contact Person/Dept.: Hong Wang/PW Phone Number: 310-253-5604
Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No []
Public Hearing: [] Action Item: [] Attachments: []
Commission Action Required: Yes [] No [X] Date: _______________
Public Notification: (E-Mail) Agenda and Meetings – City Council (07/22/15); (E-Mail)
All American Asphalt bidders (07/22/15)
Department Approval:
Charles D. Herbertson (07/16/15)
City Attorney Approval:
Carol Schwab (by H. Baker) (07/20/15)
Chief Financial Officer Approval:
Jeff Muir (07/22/15)
City Manager Approval:
John M. Nachbar (07/22/15)
RECOMMENDATION:
Staff recommends the City Council: (1) accept the work performed by All American
Asphalt; (2) authorize the filing a Notice of Completion; and (3) authorize release of
the retention payment of $37,822.20 after expiration of the 35-day lien period for the
Washington Place and Sawtelle Boulevard Resurfacing Project, PZ-942, Federal Aid
No. STPL 5240 (031).
BACKGROUND/DISCUSSION:
On October 13, 2014 the City Council awarded the construction contract to All
American Asphalt for the Washington Place and Sawtelle Boulevard, PZ-942,
Federal Aid No. STPL 5240 (031). The project included the resurfacing of
Washington Place between Zanja Street and Rosabell Street, Sawtelle Boulevard
between Braddock Drive and Culver Boulevard and between Washington Boulevard
and Washington Place. In addition, Washington Place from Grand View Boulevard
and Rosabell Street was restriped to include bike lanes.
All American Asphalt successfully completed the project. Two change orders were
issued in the total amount of $23,459.53 for additional survey of existing street flow
line grades on Sawtelle Boulevard and traffic striping modifications on a portion of
Washington Place and dedicated bike lanes along Sawtelle Boulevard between
Culver Boulevard and Braddock Drive.
City of Culver City, California
Agenda Item Report
Construction management and inspection was provided by Interwest Consulting,
Inc., and material testing services were provided by Geo-Environmental Inc., both
selected through the list of on-call consultant firms pre-approved by the City Council.
FISCAL ANALYSIS:
Project Budget
Federal Highway STPL Funds
(42380000.730100.PZ942)
$672,000
PZ-965 (Fund 418) Washington Place Re-
Striping Project
$54,000
PZ-684 (Fund 418) Streetlight Improvement $16,000
PZ-428 (Fund 418) Curb, Gutter, and Sidewalk
Reconstruction
$49,000
PZ-942 (Fund 417) Sawtelle Boulevard
Resurfacing
$30,000
PZ-554 (Fund 420) Minor Pavement and
Concrete Improvement
$10,000
Available Funds $831,000
Final Project Expenses
Construction Contract (Base Bid + Additive Bid) $732,984.46
Change Order $ 23,459.53
Subtotal $ 756,443.99
Construction Management and Inspection
Services (Estimated)
$47,000.00
Material Testing Services $21,500
Total Final Project Expenses
$824,943.99
ATTACHMENT:
None
MOTIONS:
That the City Council:
City of Culver City, California
Agenda Item Report
1) Accept the work performed by All American Asphalt for the Washington Place
and Sawtelle Boulevard Resurfacing Project, PZ-942, Federal Aid No. STPL
5240 (031); and,
2) Authorize the Public Works Director/City Engineer to execute the Notice of
Completion and submit it to the Los Angeles County Recorder’s office for
recordation; and,
3) Authorize the release of $37,822.20 in retention funds to All American Asphalt
following the expiration of the 35-day lien period.