Title:
|
Approval of a Professional Services Agreement with Bellur Devaraj to provide General City Engineering support for the Engineering Division related to the Exposition Light Rail Transit Project.
|
City of Culver City, California
Redevelopment Agency Agenda Item Report
RECOMMENDATION:
Staff recommends the Culver City Redevelopment Agency (“The Agency”) approve
a professional services agreement with Bellur Devaraj, P.E., with a not-to-exceed
fee of $30,000 to provide on an as-needed basis engineering support for the
Engineering Division’s review of the Exposition Light Rail Transit Project
BACKGROUND:
The Metropolitan Transportation Authority (Metro) has proposed to construct a 9.6-
mile light rail transit line to run along the Metro-owned Exposition Right-of-Way from
the existing Metro Light Rail Transit (LRT) station at 7th/Metro Center in downtown
Los Angeles to Venice/Washington in Culver City. This is known as Phase 1 of the
project.
The Exposition Metro Line Construction Authority (Authority) was created by the
California State Legislature to oversee the final design and construction of the
Exposition Light Rail Transit (Expo LRT). Phase 1 of the Expo LRT, which consists of
3 segments (A, B, and C), is currently under construction or in the process of design.
The groundbreaking for Phase 1 occurred in early 2006. Segment “C” is the Culver
City portion of the project and is currently in review at the 60% design stage.
DISCUSSION:
The Agency has taken actions to ensure that design and development of the Expo
LRT project is accomplished to mitigate the impacts to the community and public
facilities.
Meeting Date: December 17, 2007 Item Number: A-1
AGENDA ITEM: Approval of a Professional Services Agreement with Bellur
Devaraj to provide General City Engineering support for the Engineering Division
related to the Exposition Light Rail Transit Project.
Contact Person/Dept.:
Charles D. Herbertson / PWD
Phone Number: (310) 253-5635
Fiscal Impact: Yes [x] No [] General Fund: Yes [] No [x]
Public Hearing: [] Action Item: [x] Attachments: []
Public Notification: Bellur Devaraj and Master Notification List were notified via e-mail on
December 12, 2007
Department Approval:
Charles D. Herbertson, 12/05/07
Executive Director Approval:
Jerry B. Fulwood (12/12/07)
Fiscal Impact Review:
Jeff Muir (by N. Kimball)(12/11/07)
City of Culver City, California
Redevelopment Agency Agenda Item Report
As part of the Agency’s strategy regarding the Expo LRT project, the Agency has
retained consultants to provide specialized expertise and services. In order to
determine if the project related improvements affecting the public rights-of-way are
adequate to address the anticipated impacts, detailed civil engineering review of the
proposed design plans needs to be completed. Due to City civil engineering staff
work load on other projects, we believe it is necessary to rely on consultant
assistance. Our belief is based on the complexities of the project and the need to
meet the project’s design schedule requiring timely and quick review turn-around.
Mr. Bellur Devaraj, P.E., is currently under contract with the City to provide part-time
general engineering support to the Engineering Division at a not-to-exceed fee of
$20,000 and at an hourly rate of $90. (This general engineering support service is
about to end as the Engineering Division has obtained a full staffing level with the
hiring of Hong Wang as Senior Engineer.) Bellur Devaraj, P.E., is a retired
registered civil engineer. He was the City Engineer for the City of El Segundo from
1988 to 2004. Since his retirement in 2004, Mr. Devaraj worked as a consultant for
the City of El Segundo. Mr. Devaraj has extensive experience with city engineering
and has experience with light rail projects, having worked on the Metro Green Line
Light Rail Project while he was with El Segundo.
FISCAL ANALYSIS:
As stated above, Mr. Devaraj is currently under contract with the City to provide part-
time general engineering support to the Engineering Division at an hourly rate of
$90. Staff proposes a separate Agency contract with Mr. Devaraj’s for the $90
hourly rate not to exceed $30,000, in order to pay on an as-needed basis for the
work he performs reviewing the Expo LRT. There are sufficient funds in Account
Number 59190400.612100 (Engineering Services) to fund the $30,000 contract with
Mr. Devaraj.
ATTACHMENTS:
None
MOTION:
That the Agency:
1) Enter into a Professional Services Agreement with Bellur Devaraj to provide as-
needed civil engineering support for the Engineering Division’s review of the
Exposition Light Rail Transit Project at a not-to-exceed fee of $30,000, and,
2) Authorize the Agency General Consul to review/prepare the necessary
documents and authorize the Executive Director to execute those documents on
behalf of the Agency. .