File #: HIST-13833    Version: 1 Subject:
Type: Historical Status: Joint Consent
In control: City Council Meeting Agenda
On agenda: 5/3/2010 Final action: 5/3/2010
Title: JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGENDA ITEM: (1) Adoption of City Council and Agency Resolutions Making Certain Findings Relative to the Proposed West Washington Phase I Streetscape Median Project Pursuant to Health and Safety Code Section 33445, and (2) Reject the Bid by Josh General Engineering, Inc. and (3) Award of a Construction Contract to Jeff Tracy Inc., dba: Land Forms Landscape Construction for Construction of the West Washington Phase I Streetscape Median Project.
Attachments: 1. JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGEN - ATT_10_05_03_West Washington AIP_Phase II.pdf, 2. JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGEN - J-3 Staff Report.pdf
MEETING DATE: 05.03.10 AGENDA ITEM: Consideration and Approval of Streetscape Median Plans for the West Washington Phase II the Area Improvement Plan. ATTACHMENTS Pages 1. AIP Phase Map 1 1. Conceptual Plans – New Medians 2-3 2. Existing Striping and Bollards at Kenyon 4-5 3. Phase I Concept Illustrations 6 4. Assessment District Creation Timeline 7 5. Estimated Construction Costs 8-10 AREA IMPROVEMENT PLAN PHASES Baldwin Project Washington Centinela ATTACHMENT 1 1ATTACHMENT 2 2ATTACHMENT 2 3Phase II – Existing Striping ATTACHMENT 3 4Phase II – Bollards at Kenyon ATTACHMENT 3 5Concept Illustration ATTACHMENT 4 6ATTACHMENT 5 7Culver City, California 3 New Medians Prepared by: Troller Mayer Associates, Inc. Landscape Architects 1403 Kenneth Road, Suite B, Glendale, CA 91201 Tel: (818) 956-8101 Fax: (818) 956-0120 March 31, 2010 481,177 $ DEMOLITION AND PREPARATION ITEM QUANT. UNIT UNIT PRICE TOTAL sawcut ex. concrete paving 950 l.f. $4.00 $3,800 remove and dispose ex. concrete (permitted) 2,706 s.f. $4.00 $10,824 remove subsoil (18" of soil below ex. concrete) 85 c.y. $40.00 $3,400 import & place class A topsoil (inc. 6" mound) 110 c.y. $55.00 $6,050 fine grading 6" mound (compaction + mound) 1,340 s.f. $0.50 $670 scarify 6" of subsoil & till in topsoil for 50-50 mix 1,340 s.f. $0.25 $335 soil tests 1 of ex. and 1 of imported soil 4 each $200.00 $800 traffic plan and control allow $7,500.00 $7,500 SUBTOTAL DEMOLITION & PREPARATION ITEM 33,379 $ HARDSCAPE QUANT. UNIT UNIT PRICE TOTAL new concrete curbing 922 l.f. $35.00 $32,270 patch and repair concrete 225 s.f. $8.00 $1,800 base under new curb and concrete 80 ton $50.00 $4,000 new striping 3,500 l.f. $18.00 $63,000 signage 6 each $250.00 $1,500 reflective paint on median noses 32 l.f. $20.00 $640 SUBTOTAL HARDSCAPE 103,210 $ PLANTING ITEM QUANT. UNIT UNIT PRICE TOTAL Queen Palm - 14' brown trunk 24 ea. $2,000.00 $48,000 Queen Palm Shipping 1 ea. $1,800.00 $1,800 15 gallon New Zealand Flax 115 ea. $100.00 $11,500 1 gallon Tulbaghia violacea 'Silver Lace' 640 ea. $12.00 $7,680 1 gallon Festuca Helictotrichon 40 ea. $12.00 $480 1 gallon Hemerocallis Sp. 154 ea. $12.00 $1,848 12" x 6' deep Augered Sump 48 ea. $300.00 $14,400 3" mulch cover - bark 1,340 s.f. $0.55 $737 Preliminary Opinion of Landscape Construction Costs: West Washington Boulevard Improvement Area COST OPINION OF LANDSCAPE: Page 1 ATTACHMENT 6 8SUBTOTAL PLANTING 86,445 $ IRRIGATION ITEM QUANT. UNIT UNIT PRICE TMA TOTAL irrigation 1,340 s.f. $4.50 $6,030 sawcut ex. concrete 495 l.f. $4.00 $1,980 remove and dispose ex. concrete (permitted) 495 s.f. $4.00 $1,980 patch and repair concrete 495 s.f. $8.00 $3,960 solar controller and rain sensor 1 ea. $2,000.00 $2,000 back flow preventer/pressure reducer (incl. cert's.) 1 ea. $1,000.00 $1,000 water meter 1 ea. $2,500.00 $2,500 extra programmer for controller allow $950.00 $950 SUBTOTAL IRRIGATION 20,400 $ LIGHTING ITEM QUANT. UNIT UNIT PRICE TOTAL elect. company point of connection allow $13,000.00 $13,000 uplight-2 per palm tree 48 ea $1,500.00 $72,000 concrete light bases 48 ea $500.00 $24,000 main underground feeder conduit, wiring, cutting, trenching, backfill, patching from utility P.O.C, to lighting power and control cabinet (approx.300') allow $21,000.00 $21,000 lighting power and control distribution cabinet (main, branch circuit panel board, lighting controls, grounding system and pad) allow $22,000.00 $22,000 underground branch circuit conduit, wiring, cutting trenching and patching, hand holes, pull boxes and routed from lighting power and control distribution cabinet to tree lighting fixtures (approx. 1000') allow $42,000.00 $42,000 SUBTOTAL LIGHTING 194,000 $ SUBTOTAL 437,434 $ Contingency @ 10% 43,743.40 $ GRAND TOTAL-CONSTRUCTION COSTS 481,177 $ LANDSCAPE MAINTENANCE ITEM QUANT. UNIT UNIT PRICE TOTAL maintenance cost per year (maintained twice a month) allow $7,000.00 $7,000.00 water use for irrigation (units per year based on .13/linear foot) allow $950.00 $985 electrical use for lighting (kilowatts per hour) allow $3,000.00 $3,000 replenishing mulch (once per year) allow $850.00 $850.00 plant replacement (does not include palms) allow $2,500.00 $2,500.00 irrigation replacement allow $1,000.00 $1,000.00 SUBTOTAL LANDSCAPE MAINTENANCE 15,335 $ GRAND TOTAL-MAINTENANCE COSTS 15,335 $ Page 2 ATTACHMENT 6 9Notes: (Following items to be researched further) 1. City plan checks, permits, fees. 2. Electrical utility costs. 4. Fees for dumping of demolition materials. 5. Additional field surveying and construction staking. 3. Crosswalk (zebra) striping. Page 3 ATTACHMENT 6 10 Phone Number: 310.253.5777 310.253.5602 DePOrtrnent,ApproVal.. SO! Blumenfeld (04/26/10) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (04/28/10) City Attorney Approval: Carol Schwab (04/28/10) Agency General Counsel Approval: Murray Kane (04/27/10) City mignageilaecuthie Director Approval: iLarribrit :EWell:(04/28/10) City of Culver City, California Agenda Item Report Meeting Date 05/03/10 Item Numbe JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGENDA ITEM: (1) Adoption of City Council and Agency Resolutions Making Certain Findings Relative to the Proposed West Washington Phase I Streetscape Median Project Pursuant to Health and Safety Code Section 33445, and (2) Reject the Bid by Josh General Engineering, Inc. and (3) Award of a Construction Contract to Jeff Tracy Inc., dba: Land Forms Landscape Construction for Construction of the West Washington Phase I Streetscape Median Project Contact•Person/Dept.: Elaine Warner. Mate Gaspar Fiscal Impact: Yes [X] No [1 General Fund: Yes [1 No [X] Public Hearing: 0 Action Item: [X] Attachments: [X] Commission Action Required: Yes 0 No pq Date: Public Notification: (E-Mail) Agenda and Meetings Redevelopment Agency (04/28/10); (E-Mail) JOSH Engineering and Jeff Tracy Inc., dba Land Forms Landscape Construction (04/26/10)(Mail) Property Owners in West Washington Assessment District Number 1. (04/22/10) RECOMMENDATION Staff recommends the City Council adopt a resolution making certain findings and consenting to the proposed West Washington Phase I Streetscape Median Project (Project) pursuant to Health and Safety Code Section 33445 AND Staff recommends the Redevelopment Agency Board (Board) (1) approve a resolution making certain findings relative to the proposed West Washington Phase I Streetscape Median Project pursuant to Health and Safety Code Section 33445 and (2) reject the bid by Josh General Engineering, Inc. due to its bid being non- responsive and (3) award a construction contract to Jeff Tracy Inc., dba: Land Forms Landscape Construction (" LFL Construction"), as the lowest responsive and responsible bidder, to complete the necessary work for the West Washington Phase I Streetscape median Project.City of Culver City, California Agenda Item Report BACKGROUND In December 2007, the City Council approved an Area Improvement Plan along West Washington Boulevard generally between Wade Street and Beethoven Street (Attachment 1). A key component of this Area Improvement Plan involves the installation of landscape medians funded by the Culver City Redevelopment Agency. In April 2009, the Board approved conceptual plans for this area after several public outreach meetings. While the Agency proposed to fund the capital improvements, it required that on-going median maintenance be carried out through a property based assessment district that covered the area from Beethoven Street to Wade Street. In June 2009, the City Council approved formation of the Assessment District in the Phase I Area to fund the Project's ongoing maintenance costs. As designed, the Project consists of the construction of five new landscaped medians between Rosabell Avenue and Beethoven Street along West Washington Boulevard. The medians are four feet wide and vary in length from 51' to 125'. The medians will be located in the center of the right-of-way with off sets that are aligned with the left hand turning lanes to minimize traffic impacts. DISCUSSION: In March 2010, the final plans and specification were approved by the Board. The notice inviting bids was advertised on the City's website, in the Culver City News and construction trade publications, and directly to contractors with streetscape construction expertise, who were recommended by Troller Mayer Associates, the Agency's Landscape Architect for this Project. Twenty-six (26) bid packages were purchased. On April 8, 2010, the bid opening occurred. A total of eleven (11) bids were received. The following table summarizes the bid results: Bidder Base Bid Josh General Engineering $238,851.75 Land Form Landscape Construction $266,277.04 FS Construction $275,379.00 Nobest Inc. $289,000.00 YAKAR $301,104.00 America West Landscape, Inc. $322,792.57 Mariposa Landscapes $327,736.03 MG Construction and Dev. Inc. $355,143.00 Tal Cal Engineering Inc. $361,741.00 All American Asphalt $425,000.00 Griffin Enterprise $507,921.75City of Culver City, California Agenda Item Report The initial results of the bid opening indicated the apparent lowest bidder was JOSH Engineering. Staff reviewed JOSH Engineering's bid proposal and found the bid documents non-responsive. There were numerous omissions and errors and JOSH Engineering lacked the experience to conduct the Project. JOSH Engineering has requested to withdraw their bid. With the withdrawal of the JOSH Engineering bid, the apparent lowest responsive and responsible bidder is Jeff Tracy Inc., dba: Land Forms Landscape Construction (Land Forms Landscape). Land Forms Landscape's bid documents were determined to be accurate and complete. Their bid bond, contractor's license and worker's compensation all meet Agency requirements. Staff reviewed and consulted with their listed references and found that they performed satisfactorily in other jurisdictions for similar work. Should the Agency award the contract, construction is slated to commence in June 2010 and expected to be completed by September 2010. Approximately two weeks prior to construction activity, the adjacent business owners will be notified and provided with contact information for questions regarding the project. The medians will benefit the Redevelopment Project Area and the immediate neighborhood in which the Project is located by eliminating blight, attracting private investment to the area and enhancing the pedestrian, vehicular and bicycle environment. Prior to awarding this contract, the City Council and Board need to make certain determinations regarding the expenditures of Redevelopment Agency funds for these public improvements pursuant to Health and Safety Code Section 33445. Proposed resolutions containing those findings are attached. FISCAL ANALYSIS: The Agency allocated $450,000 in tax exempt bond funds for the construction of the five new medians. Funds for this expenditure are available in the Washington Blvd AIP — Phase I Program budget (55392670). ATTACHMENTS: I. Phase I Area Improvement Plan Boundaries 2. Protest Letter from Landscape Construction 3. JOSH Engineering withdrawal letter dated April 26, 2010 4. Resolution of the City Council Making Certain Findings Relative to HSCS 33445 5. Resolution of the Redevelopment Agency Making Certain Findings Relative to HSCS 33445City of Culver City, California Agenda Item Report MOTIONS: That the City Council: Adopt a Resolution Making Certain Findin gs and Consenting to the West Washington Streetscape Project Pursuant to Health and Safety Code Section 33445 AND That the Redevelopment Agency Board: (1) Adopt a Resolution Making Certain Findings about the West Washington Streetscape Project Pursuant to Health and Safety Code Section 33445; and, (2) Reject the Bid submitted by JOSH General Engineering, Inc. due to its bid being non-responsive and the fact that the bidder has requested its bid be withdrawn; and, (3) Award a construction contract to Jeff Tracy Inc., dba: Land Forms Landscape Construction for a not-to-exceed amount of $266,277.04; and, (4) Authorize the Community Development Director to approve change orders totaling a not-to-exceed amount of $30,000; and, (5) Authorize the Agency General Counsel to review/prepare the necessary Documents; and, (6) Authorize the Executive Director to execute such documents on behalf of the Agency. ,