Legislation Details

File #: 26-928    Version: 1 Subject: Award of Construction Contract to CJ Concrete Construction in the Amount of $289,366 for Sidewalk, Curb Ramp, and Driveway Approach Improvement Project, PZ-428
Type: Minute Order Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 6/22/2026 Final action:
Title: CC - CONSENT ITEM: (1) Award of Construction Contract to CJ Concrete Construction, Inc. as the Lowest Responsive and Responsible Bidder, in the Amount of $289,366.00 for Sidewalk, Curb Ramp, and Driveway Approach Improvement Project, PZ-428; and (2) Authorization for the Public Works Director to Approve Change Orders to the Contract in an Amount Not-to-Exceed $72,341.00 to Cover Contingency Costs (25%).
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

CC - CONSENT ITEM: (1) Award of Construction Contract to CJ Concrete Construction, Inc. as the Lowest Responsive and Responsible Bidder, in the Amount of $289,366.00 for Sidewalk, Curb Ramp, and Driveway Approach Improvement Project, PZ-428; and (2) Authorization for the Public Works Director to Approve Change Orders to the Contract in an Amount Not-to-Exceed $72,341.00 to Cover Contingency Costs (25%).

 

body

Meeting Date:                      June 22, 2026

 

Contact/Dept:                     David Nauta/Public Works, Engineering

 

Phone Number:                     (310) 253-5606

 

Fiscal Impact:                     Yes [X]     No [  ]                     General Fund:                     Yes [X]     No [ ]

 

Attachments:                     Yes [  ]     No [X]

 

Public Notification:                     E-Mail: Meetings and Agendas - City Council (06/17/2026)

 

Dept Approval:                     Yanni Demitri, Public Works Director/City Engineer (06/03/2026)

_____________________________________________________________________

 

 

RECOMMENDATION

 

Staff recommends the City Council (1) award a construction contract to CJ Concrete Construction, Inc. as the lowest responsive and responsible bidder, in the amount of $289,366.00 for the Sidewalk, Curb Ramp, and Driveway Approach Improvement Project, PZ-428 (Project); and (2) authorize the Public Works Director to approve change orders to the contract in an amount not-to-exceed $72,341.00 to cover contingency costs (25%).

 

 

BACKGROUND

 

The City receives maintenance requests from the public for broken and uplifted concrete sidewalks, curb ramps, driveway approaches and street sections. Public Works staff compiles resident requests and investigates them to assess the damage and potential hazard to pedestrians. In addition to the ongoing repairs completed by Public Works Maintenance and Operations Staff, the Engineering Division regularly manages projects that can address many locations at once, prioritizing locations based on factors such as severity, budget constraints, and previous maintenance measures.

 

Since sidewalk uplift is mainly attributed to parkway tree root intrusion, tree root trimming is also part of the scope of sidewalk projects. The City Arborist provides guidance throughout the duration of the project.

 

Sidewalk, Curb Ramp, and Driveway Approach Improvement Project Details

 

Summary Totals

                     Total Sidewalk Removal & Replacement: 8,431 SF - 0.38 miles

                     Total Curb Work: 98 LF

                     Total Driveway (DWY) Work: 1,208 SF

                     Total Curb ramps: 2

                     Total Cross Gutter: 282 SF

 

Locations (68)

                     3318 Helms Ave: Sidewalk: 4' x 44' = 176 SF | Driveway: 63 SF

                     9025 Lucerne Ave: Sidewalk: 4' x 64' = 256 SF

                     4137 Duquesne Ave: Sidewalk: 4' x 45' = 180 SF

                     4017 Lincoln Ave: Sidewalk: 5' x 27' = 135 SF

                     4023 Lincoln Ave: Sidewalk: 5' x 23' = 115 SF

                     4077 Lincoln Ave: Sidewalk: 5' x 10' = 50 SF

                     9929 Braddock Dr: Sidewalk: 4' x 17' = 68 SF

                     9999 Braddock Dr: Sidewalk: 5' x 35' = 175 SF

                     4125 Madison Ave: Sidewalk: 5' x 10' = 50 SF

                     4131 Madison Ave: Sidewalk: 5' x 5' = 25 SF

                     4234 Madison Ave: Sidewalk: 5' x 30' = 150 SF

                     4240 Madison Ave: Sidewalk: 5' x 13' = 65 SF

                     4224 Madison Ave: Sidewalk: 5' x 13' = 65 SF

                     4385 Mentone Ave: Sidewalk: 4' x 44' = 176 SF | Driveway: 91 SF

                     4391 Mentone Ave: Sidewalk: 4' x 53' = 212 SF | Driveway: 91 SF

                     4397 Mentone Ave: Sidewalk: 4' x 54' = 216 SF | Driveway: 91 SF

                     4401 Mentone Ave: Sidewalk: 4' x 40' = 160 SF

                     10728 Oregon Ave: Sidewalk: 4' x 20' = 80 SF

                     10731 Oregon Ave: Sidewalk: 4' x 32' = 128 SF

                     10737 Oregon Ave: Sidewalk: 4' x 23' = 92 SF

                     10740 Oregon Ave: Sidewalk: 4' x 5' = 20 SF

                     5175 Jordan Way: Sidewalk: 5' x 10' = 50 SF

                     3864 Girard Ave: Sidewalk: 4' x 30' = 120 SF

                     3873 Girard Ave: Sidewalk: 5' x 29' = 145 SF

                     3872 Huron Ave: Sidewalk: 5' x 23' = 115 SF

                     3911 Huron Ave: Sidewalk: 5' x 9' = 45 SF

                     11116 Matteson Ave: Sidewalk: 4' x 26' = 104 SF | Curb: 10 LF

                     11051 Matteson Ave: Sidewalk: 4' x 33' = 132 SF

                     3944 Tuller Ave: Sidewalk: 4' x 44' = 176 SF

                     3938 Tuller Ave: Sidewalk: 4' x 19' = 76 SF

                     3934 Tuller Ave: Sidewalk: 4' x 39' = 156 SF

                     11049 Barman Ave: Sidewalk: 5' x 35' = 175 SF | Curb: 53 LF | Dwy: 140 SF

                     4178 Center St: Sidewalk: 4' x 25' = 100 SF

                     4182 Center St: Sidewalk: 4' x 5' = 20 SF

                     4046 Minerva Ave: Sidewalk: 4' x 18' = 72 SF

                     4253 Coolidge Ave: Sidewalk: 4' x 18' = 72 SF

                     4248 Coolidge Ave: Sidewalk: 4' x 13' = 52 SF

                     4252 Coolidge Ave: Sidewalk: 4' x 23' = 92 SF

                     11231 Braddock Dr: Sidewalk: 5' x 28' = 140 SF

                     11224 Braddock Dr: Sidewalk: 5' x 12' = 60 SF

                     11266 Garfield Ave: Sidewalk: 4' x 28' = 112 SF

                     11210 Huntley Pl: Sidewalk: 4' x 31' = 124 SF | Driveway: 82 SF

                     11214 Huntley Pl: Sidewalk: 4' x 17' = 68 SF | Driveway: 46 SF

                     11216 Huntley Pl: Sidewalk: 4' x 9' = 36 SF | Driveway: 46 SF

                     11213 Huntley Pl: Sidewalk: 4' x 13' = 52 SF

                     11215 Huntley Pl: Sidewalk: 4' x 31' = 124 SF

                     11225 Huntley Pl: Sidewalk: 4' x 26' = 104 SF

                     11245 Huntley Pl: Sidewalk: 4' x 35' = 140 SF

                     11115 McDonald St: Sidewalk: 4' x 26' = 104 SF

                     11131 McDonald St: Sidewalk: 4' x 8' = 32 SF

                     11207 Culver Park Dr: Sidewalk: 4' x 11' = 44 SF

                     11219 Patom Dr: Sidewalk: 4' x 33' = 132 SF | Driveway: 45 SF

                     11220 Patom Dr: Sidewalk: 4' x 20' = 80 SF

                     11225 Patom Dr: Sidewalk: 4' x 35' = 140 SF | Driveway: 126 SF

                     11226 Patom Dr: Driveway: 72 SF (No Sidewalk)

                     11231 Patom Dr: Sidewalk: 4' x 8' = 32 SF | Driveway: 42 SF

                     5450 Diller Ave: Sidewalk: 4' x 46' = 184 SF

                     11453 Patom Dr: Sidewalk: 4' x 8' = 32 SF

                     11493 Patom Dr: Sidewalk: 4' x 38' = 152 SF

                     11505 Patom Dr: Sidewalk: 4' x 61' = 244 SF

                     11219 McDonald St: Sidewalk: 4' x 33' = 132 SF

                     11266 McDonald St: Sidewalk: 4' x 42' = 168 SF

                     11273 McDonald St: Sidewalk: 4' x 32' = 128 SF

                     5140 Purdue Ave: Sidewalk: 4' x 35' = 140 SF

                     11659 McDonald St: Sidewalk: 4' x 60' = 240 SF | Curb: 35 LF | Dwy: 273 SF

                     5427 Emporia Ave: Sidewalk: 4' x 49' = 196 SF

                     6400 Green Valley: Sidewalk: 5' x 199' = 995 SF

                     6001 Centinela Ave: 2 Curb ramps, Cross Gutter & Spandrel

 

Construction Bids

 

On April 13, 2026, the City Council approved the specifications, and authorized staff to publish a notice inviting bids for the Project. The Notice Inviting Bids was published on the Culver City PlanetBids website on May 5, 2026. The bid opening date was May 28, 2026. Nine contractors responded. The three lowest bid amounts are listed below.

 

Contractor                     Bid Amount

 

CJ Concrete Construction, Inc                     $289,366.00

Kalban, Inc.                     $321,333.50

Van Engineering                     $351,935.00

 

Staff reviewed the contractors’ bid documents and CJ Concrete Construction, Inc. submitted the lowest responsive bid. CJ Concrete Construction, Inc.’s bond, contractor’s license, and worker’s compensation insurance were reviewed and determined to meet City requirements. Staff contacted CJ Concrete Construction, Inc.’s references and found them to be satisfactory and CJ Concrete Construction, Inc. has completed similar projects for the City.

 

A proposed construction contingency amount of $72,341 (25%) is requested for unforeseen conditions during construction and to allow additional sidewalk repairs as identified by the City. The Public Works Department Engineering Division staff will perform the construction management and construction inspection.

 

 

FISCAL ANALYSIS

 

The Project is funded in the City’s Fiscal Year 2025-2026 with a combination of funds. The Adopted Budget for Fiscal Year 2025-2026 includes sufficient funding in the amount of $361,707.00 (base contract plus contingency) for the proposed contract with CJ Concrete Construction, Inc. in CIP PZ428 Curb, Gutter, Sidewalk Replacement, source funding from Fund 418 - Special Gas Tax and Fund 420 - General Fund, which can be found on page 530 and 531 in the Budget Book, respectively.

 

Estimated Expenditures                     Amount

 

Construction Contract Amount                     $289,366.00

Construction Contingency (25%)                     $  72,341.00

Total                     $361,707.00

 

Funding Sources                     Amount

 

General Funds 420.CP.80000.730100.PZ428                     $  78,844.22

Special Gas Tax 418.CP.80000.730100.PZ428                     $444,519.96

 

 

ATTACHMENTS

 

None.

 

 

recommended action

MOTIONS

 

That the City Council:

                     

1.                     Award a construction contract to CJ Concrete Construction, Inc. as the lowest responsive and responsible bidder, in the Amount of $289,366.00 for the Sidewalk, Curb Ramp, and Driveway Approach Project, PZ-428; and

 

2.                     Authorize the Public Works Director to Approve Change Orders to the Contract in an Amount Not-to-Exceed $72,341.00 to Cover Contingency Costs (25%); and

 

3.                     Authorize the City Attorney to review/prepare the necessary documents; and

 

4.                     Authorize the City Manager to execute such documents on behalf of the City.