Legislation Details

File #: HIST-7019    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 12/10/2007 Final action: 12/10/2007
Title: Award a Construction Contract to PALP Inc., dba Excel Paving for the 2007 Residential Overlay Project, Phase 2, P-863 and Approve a Related Budget Amendment.
Attachments: 1. Award a Construction Contract to PALP Inc., dba Ex - C-5___07-12-10_PW-Eng_2007 Residential Overlay Phase 2 Contract Award-FINAL.doc, 2. Award a Construction Contract to PALP Inc., dba Ex - 07_12_10.Res.Overlay.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends the City Council (1) authorize the award of a construction contract to PALP Inc., dba Excel Paving to conduct the necessary work for the Residential Overlay Project, Phase 2, P-863, and (2) approve a budget amendment to transfer $143,390 from the Gas Tax Fund balance to the Residential Overlay Project, P-863. A 4/5 th vote is required to approve the budget amendment. BACKGROUND: Per recommendations from the pavement management system program, field reports from the Public Works Street Maintenance staff, and requests from residents, staff has reviewed and selected residential streets for resurfacing. The bids for the 2007 Residential Overlay Project Phase 1 - which construction contract was awarded by the City Council on October 8, 2007 - were well below the engineer’s estimate. Because of the unexpected savings, staff has formulated a second residential street overlay project. This Residential Overlay Project Phase 2 was advertised for construction bids on November 8, 2007. Construction on Phase 1 is currently underway having begun on December 3, 2007. The scope of work for the project consists of grinding two inches (2”) existing asphalt concrete (AC) pavement and replacing it with new 2 inches of conventional asphalt concrete hot-mix pavement on the following street segments: Date: 12/10/07 Item Number: _C-5__ AGENDA ITEM: Award a Construction Contract to PALP Inc., dba Excel Paving for the 2007 Residential Overlay Project, Phase 2, P-863 and Approve a Related Budget Amendment Contact Person/Dept.: Sammy Romo/ Public Works Phone Number: (310) 253-5619 Fiscal Impact: Yes [X] No [ ] General Fund: Yes [X] No [ ] Public Hearing: [ ] Action Item: [X] Attachments: [X] Public Notification: Master Notification List via email on December 5, 2007, All-American Asphalt, Sully-Miller, Excel Paving, Imperial Paving Company, and Ruiz Engineering Company , via e-mail on December 5, 2007, 2007. Department Head Approval: Charles D. Herbertson 11/30/07 City Attorney Approval: Carol Schwab (by H. Iker) (12/05/07) Fiscal Impact Review: Marlee Chang (12/05/07) City Manager Approval: Jerry B. Fulwood (12/05/07) City of Culver City, California City Council Agenda Item Report 1. Grand View Boulevard – Washington Boulevard to Northerly City Limit 2. Drakewood Avenue – Ranch Road to Flaxton Street (uphill portion) 3. Galvin Street – Overland Avenue to Flaxton Street 4. Lindblade Street – Higuera Street to End of cul-de-sac 5. Atlantic Avenue – 6. Steller Drive – Eastham Drive to Hayden Avenue 7. Clarmon Place – Overland Avenue to End of Cul-de-sac 8. Rudman Drive – Sawtelle Boulevard to End of cul-de-sac 9. Malat Way – Sawtelle Boulevard to End of cul-de-sac 10. Whitburn Street – Overland Avenue to Drakewood Avenue 11. Irving Place – Lucerne Avenue to Braddock Drive 12. Krueger Street – Ince Boulevard to End of cul-de-sac 13. Wrightcrest – Wright Terrace to End 14. Lincoln Avenue – Braddock Drive to Culver Boulevard Also, the scope of work includes the removal and the replacement of severely damaged roadway pavement with up to 12 inches of new asphalt concrete hot-mix based on inspection after the 2 inches of grinding, manhole adjustment, re-striping of pavement markings with thermoplastic, and the installation of raised pavement markers. DISCUSSION: On November 29, 2007, the City Clerk Department staff publicly opened the bids. Five (5) contractors responded with the following bid amounts: CONTRACTOR BID AMOUNTS 1 Excel Paving Base Bid Amount $465,707 Add Alternate #1 (Paving Fabric) $58,050 Add Alternate #2 (Twelve inches of reconstruction) $117,600 Add Alternate #3 (Replace Traffic Loop Detectors) $3,120 Total Bid $644,477 2 All American Asphalt Base Bid Amount $484,000 Add Alternate #1 $51,600 Add Alternate #2 $105,000 Add Alternate #3 $2,850 Total Bid $643,450 City of Culver City, California City Council Agenda Item Report 3 Sully-Miller Base Bid Amount $478,590 Add Alternate #1 $55,900 Add Alternate #2 $119,000 Add Alternate #3 $3,300 Total Bid $656,790 4 Imperial Paving Base Bid Amount $498,890 Add Alternate #1 $54,610 Add Alternate #2 $102,900 Add Alternate #3 $4,680 Total Bid $661,080 5 Ruiz Engineering Company Base Bid Amount $599,635 Add Alternate #1 $46,010 Add Alternate #2 $112,000 Add Alternate #3 $5,700 Total Bid $763,345 Staff reviewed the five (5) sets of contractor bid documents. All the bid documents were found to be responsive and complete. Per the project specifications, the lowest bid is determined by the lowest total base bid. Excel Paving has the lowest total base bid. Therefore, staff proposes to award the construction contract to Excel Paving. Excel Paving completed several major street resurfacing projects for Culver City on Jefferson Boulevard, Overland Avenue, and Washington Boulevard in the past 7 years. Excel Paving completed all of these projects in a satisfactory and professional manner. Construction management and inspection The construction management will be performed by Engineering Division staff. For construction inspection services, a RFP was mailed to APD Consultants, Inc., City of Culver City, California City Council Agenda Item Report Psomas, CBM Consulting, Inc., Norris-Repke, and The Nickerson Company. These companies were pre-approved by Council on July 23, 2007 to perform construction inspection services as well as other general civil engineering related services. After the RFP’s are received, staff will review and determine the best proposal (not necessarily the lowest fee), and the total cost amount is not expected to exceed $50,000. Also RFP’s for geotechnical services on the project for compaction testing and observation were mailed to Group Delta Consultants, Zeiser-Kling Consulting, Inc., and Professional Services Industries, Inc. These companies were pre-approved by Council on January 10, 2005 to perform on-call geotechnical engineering consulting services for the City’s capital improvement projects. After the RFP’s are received, staff will review and determine the best proposal (not necessarily the lowest fee), and the total cost amount is not expected to exceed $20,000. The construction work will begin in January 2008 and is expected to be substantially completed in late March 2008. Public Notification Approximately two weeks prior to construction activity, the businesses and residences adjacent to the projects will be provided with written information on the project schedule and contact information to address questions and/or concerns. FISCAL ANALYSIS: The current project budget is listed below: Current Project Budget Funding Source Amount Sewer Enterprise Funds (20400863) $270,000 Proposition C (Approved by Council on 3/26/07) $50,000 State of California Proposition 42 (42300863) $299,000 07/08 CIP New Funding Allocation, P-863 $160,000 06/07 CIP Carryover from Prior Year, P-863 $545,700 Additional Gas Tax Funds* (Budget Amendment Required) $143,390 Total = $1,468,090 Estimated Project Expenses City of Culver City, California City Council Agenda Item Report Phase 1 (Contract awarded on October 8, 2007) Expenses for Residential Overlay Project (Phase 1), P-863 Construction Contract, Inspection, and Geotechnical Services (Construction estimated to be completed by late January 2008) - $700,400 Subtotal $700,400 Phase 2 (Contract being considered tonight) Residential Overlay Project, Phase 2, P-863 Construction Contract $644,500 Construction Inspection Services $50,000 Geotechnical Construction Services (Observation & Testing) $20,000 7.5% Project Contingency $53,190 Subtotal $767,690 Total Estimated Project Expenses $1,468,090 *An additional $143,390 would be required to sufficiently fund the construction of the project. On November 26, 2007, City Council approved substituting $143,390 of allocated Gas Tax funds with developer mitigation funds for the Fox Hills Traffic Synchronization Project (P-852). Staff is recommending that $143,390 is now allocated from Gas Tax to the Residential Overlay Project (41800863) to adequately fund Phase 2 of the 2007 Residential Overlay Project (P-863). ATTACHMENT: 1. Location Maps MOTIONS: That the City Council: City of Culver City, California City Council Agenda Item Report 1) Approve a budget amendment to appropriate $143,390 from Gas Tax to the Residential Overlay Project, P-863 (41800863.730100) (A 4/5 th vote is required to approve the budget amendment.); 2) Award a construction contract to PALP Inc., dba Excel Paving for the 2007 Residential Overlay Project, Phase 2 (P-863), in the amount of $644,500;, 3) Authorize the Public Works Director/City Engineer authority to approve change orders in an amount not-to-exceed $54,270, and 4) Authorize the City Attorney to review/prepare the necessary documents and authorize the City Manager to execute said documents on behalf of the City.