Legislation Details

File #: HIST-13136    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 1/4/2010 Final action: 1/4/2010
Title: (1) Acceptance of Work Performed by All American Asphalt, (2) Authorization to File a Notice of Completion, and (3) Authorization to Release the Retention Payment for the 2009 Residential Overlay Project, P-863.
Attachments: 1. (1) Acceptance of Work Performed by All American A - C-4__10-01-04__PW-Eng__CITY COUNCIL__2009 Residential Overlay_Accept Work - FINAL.doc
City of Culver City, California Agenda Item Report Meeting Date: 01/04/10 Item Number: C-4 CITY COUNCIL AGENDA ITEM: (1) Acceptance of Work Performed by All American Asphalt, (2) Authorization to File a Notice of Completion, and (3) Authorization to Release the Retention Payment for the 2009 Residential Overlay Project, P-863. Contact Person/Dept.: Sammy Romo/ Public Works Department Phone Number: (310) 253-5619 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [] Attachments: [] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (12/30/09), (E-Mail) All American Asphalt (12/31/09) Department Approval: Charles D. Herbertson (12/23/09) City Attorney Approval: Carol Schwab (by H. Baker) (12/28/09) Chief Financial Officer Approval: Mark Scott (by N. Kimball) (12/28/09) City Manager Approval: Mark Scott (12/30/09) RECOMMENDATION: Staff recommends that the City Council: (1) accept the work performed by All American Asphalt, (2) authorize the filing a Notice of Completion for the 2009 Residential Overlay Project, P-863; and (3) authorize the release of $67,683.88 in retention funds to All American Asphalt after the thirty-five day lien period has expired. BACKGROUND/DISCUSSION: On May 11, 2009, the City Council approved a construction contract with All American Asphalt. The project consisted of grinding 2 inches of existing asphalt concrete (AC) pavement and replacing it with 2 inches of new rubberized asphalt concrete hot-mix pavement on the following street segments: 1. Blanco Way - Sawtelle Boulevard to Sawtelle Boulevard 2. Dawes Avenue - McDonald Street to Port Road 3. Emporia Avenue - Emporia Place to Port Road 4. Emporia Avenue - McDonald Street to Port Road 5. Etheldo Avenue - Hammack to cul-de-sac 6. Hammack Avenue - Etheldo Avenue to City Limit 7. Janisann Avenue - Sepulveda Boulevard to Orville Street 8. Kalein Drive - Janisann Avenue to Orville Street 9. McDonald Street - Emporia Avenue to Sawtelle Boulevard 10. McDonald Street - Orville Street to Sawtelle Boulevard 11. Orville Street - Purdue Avenue to Sawtelle Boulevard 12. Orville Street - Sawtelle Boulevard to cul-de-sac City of Culver City, California Agenda Item Report 13. Ryandale Drive - Sawtelle Boulevard to Berryman Avenue 14. Selmaraine Drive - McDonald Street to Port Road 15. Slauson Avenue - McDonald Street to cul-de-sac Because the lowest bid amount was significantly less than the engineer’s estimate, a 25% increase to the contract amount was approved by the City Council. As such, the following streets were added to the scope of work: 1. Woolford Street - Purdue Avenue to Sawtelle Boulevard 2. Woolford Street - Sawtelle Boulevard to McDonald Street 3. Patom Drive – Diller Avenue to Slauson Avenue 4. Purdue Avenue – McDonald Street to Port Road 5. Etheldo Avenue – Port Road to westerly city limit Also, the scope of work included manhole adjustment, re-striping of pavement markings with thermoplastic paint, and the installation of raised pavement markers. All American Asphalt successfully completed the work as required in the executed contract dated June 15, 2009. There is a one year warranty on the work product for any potential defects. The construction management was performed by staff, and construction inspection was performed by The Nickerson Company through the on- call general civil engineering contract. Construction geotechnical service was performed by PSI, Inc., through the on-call general geotechnical engineering contract. FISCAL ANALYSIS: The approved contract amount was $742,096. However, the final construction expenditure amount was $676,839. Project Budget Funding Source Amount Flexible Metro Funds (Fund 423) $698,321 State of California Prop 42 (Fund 430) $162,935 Sewer Funds (Fund 20400863) $10,000 Total $871,256 Final Project Expenses Construction of Residential Overlay Project, P-863 $676,839 Construction Inspection Services $19,765 Geotechnical Construction Services (Observation & Testing) $11,417 Total $708,021 City of Culver City, California Agenda Item Report Of the funding sources identified above, the entire amount of Flexible Metro Funds were utilized and the Prop 42 funds were used to cover the amount in excess of the Metro funds. The remaining balance of $163,235 will be utilized to fund future Residential Overlay projects. To ensure that the use of outside funding is maximized, remaining Prop 42 funds will be used first in funding future Residential Overlay projects. MOTION: That the City Council: 1) Accept the work performed by the contractor, All American Asphalt, for the work performed on the 2009 Residential Overlay Project, P-863; and, 2) Authorize the City Manager to execute the Notice of Completion and submit it to the Los Angeles County Recorder’s office for recordation; and, 3) Authorize the City Manager to release $67,683.88 in retention funds to All American Asphalt following the expiration of the thirty-five day lien period.