Legislation Details

File #: HIST-12796    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 11/16/2009 Final action: 11/16/2009
Title: Adoption of a Resolution Initiating Proceedings for the Formation of Benefit Assessment District Washington Boulevard No. 2 , the Levy of Annual Assessments Therein and Ordering the Preparation of an Assessment Engineer’s Report, in Relation to the West Washington Area Improvement Plan, Phase II Demonstration Project.
Attachments: 1. Adoption of a Resolution Initiating Proceedings fo - PH-1__09-11-16__CDD__CITY COUNCIL__AIP Assessment District - Resolution of Inititation 11 16 09 - FINAL.doc, 2. Adoption of a Resolution Initiating Proceedings fo - 09-11-16 ATT AIP Phase II.pdf
City of Culver City, California Agenda Item Report RECOMMENDATION: Staff recommends that the City Council adopt a Resolution initiating proceedings for the formation of benefit assessment district Washington Boulevard No. 2 , the levy of annual assessments therein and ordering the preparation of an assessment engineer’s report, in relation to the West Washington Area Improvement Plan, Phase II Demonstration Project. PROCEDURE: 1. Mayor calls on staff for a brief staff report. 2. Mayor seeks a motion to open the public hearing. 3. The City Council receives comment from public. 4. Mayor seeks a motion to close the public hearing after all testimony has been presented. 5. The City Council discusses the matter and arrives at its decision. BACKGROUND: In December 2007, the City Council approved an Area Improvement Plan along West Washington Boulevard generally between Wade Street and Beethoven Street (Attachment No. 1). A detailed boundary map is provided in Attachment No. 2. This plan is the first in a multi-phase project that will enhance the Washington Boulevard Meeting Date: 11/16/09 Item Number: PH-1 CITY COUNCIL AGENDA ITEM: Adoption of a Resolution Initiating Proceedings for the Formation of Benefit Assessment District Washington Boulevard No. 2 , the Levy of Annual Assessments Therein and Ordering the Preparation of an Assessment Engineer’s Report, in Relation to the West Washington Area Improvement Plan, Phase II Demonstration Project. Contact Person/Dept.: Elaine Warner Phone Number: 310.253.5777 Fiscal Impact: Yes [] No [] General Fund: Yes [] No [] Public Hearing: [X] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: Public Notification: (E-Mail) Meetings and Agendas – City Council (11/11/09), (USPS) Letters to Property Owners within AIP (10/28/09) Department Approval: Sol Blumenfeld (10/28/09) City Attorney Approval Carol Schwab (by H. Baker) (11/11/09) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (11/11/09) City Manager Approval: Mark Scott (11/11/09) City of Culver City, California Agenda Item Report corridor and stimulate private reinvestment to the area. A key component of this Area Improvement Plan involves the installation of streetscape medians funded by the Culver City Redevelopment Agency. These medians will be used strategically to “seed” the area for change with relatively low cost, but high visual impact medians. On May 1, 2008, staff held a meeting for property owners within the Area Improvement Demonstration boundaries who favorably considered the concept of an AIP and the potential assessment district creation. While the Agency has proposed to fund the improvements, it will only do so if the on-going median maintenance is carried out through a property based assessment district. DISCUSSION: To begin this process, the City must initiate the creation of an assessment district through a Resolution of Initiation. A Resolution of Initiation identifies the need and benefits for a prescribed area and affirms the Council’s desire to further study the annual maintenance costs and assessments for potential improvement through the preparation of an Assessment Engineer’s Report. To determine these costs, the Redevelopment Agency is currently working with a landscape architect to develop conceptual plans for streetscape medians with drought tolerant and low maintenance planting to ensure that costs are held to a minimum. Once completed these plans will be presented to the community and to the Redevelopment Agency for comment and approval. A Resolution of Intent will then be presented to the Council which will set the time and place for the official Public Hearing to form the assessment district. Ballots will be sent out prior to this time for property owners pass/fail vote to establish an assessment district. It is anticipated that this process will take approximately four months from initiation to completion. The anticipated benefits of this assessment district will include beautification of the commercial corridor, increased commercial/retail interest in the area and introduction of sustainable plantings and practices. FISCAL ANALYSIS: In September, 2009, the Redevelopment Agency authorized an agreement with NBS consultants for assistance in developing an assessment district for the Phase II area. NBS will provide guidance in developing the assessment calculations, annual budget, ballot creation and recordation with the County. Sufficient funding to cover the contract with NBS has been included in the FY 2009-10 Adopted Redevelopment Agency Budget. City of Culver City, California Agenda Item Report If the assessment district passes, the City will have some nominal recordation fees with the County to file the annual assessments. These costs, however, can be included in the assessment to the property owners. ATTACHMENTS: 1. Culver City Redevelopment Agency – 09.08.08 Staff Report 2. Area Improvement Plan Boundaries 3. Proposed Resolution MOTION: That the City Council: Adopt a Resolution initiating proceedings for the formation of benefit assessment district Washington Boulevard No. 2 , the levy of annual assessments therein and ordering the preparation of an assessment engineer’s report in relation to the West Washington Area Improvement Plan, Phase II Demonstration Project. MEETING DATE: 11.16.09 AGENDA ITEM: Adoption of a Resolution of Initiation for Establishment Of a Benefit Assessment District for the West Washington Area Improvement Plan, Phase It Demonstration Project and Ordering the Preparation of An Assessment Engineer's Report. ATTACHMENTS Pages 1. Culver City Redevelopment Agency — 09.08.08 1-3 Staff report. 2. Area Improvement Plan Boundaries 4 3. Draft Resolution of Initiation 5-6ATTACHMENT 1 City of Culver City, California City Council Agenda Item Report • • moong Date: 09/08/08 Item Number: A,1 .AGENDA ITEM: Adoption of a Resolution Initiating Proceedings for the FOrna . 104 of Benefit Assessment District West Washington Boulevard No 'I, the Levy of Annual Assessments therein and Ordering the Preparation Of an AsSeSSitierit ,!.Erigineer's Report. • , rbritaet Person/Dept.: Elaine Gerety Phone Number: 010.253.5777 Warner Fisc;a1 Impact: Yes V] No p General Fund: Yo, fl No LO.,i, k ,Heariog; ri Action !tern: [Xj Attactiltightst . "Pub14.:Notification: Master E-Mail Notification List (93.05), Letters '45 propertycicgiOW: WRnin AIP (8.2-1.08) 'Department •Approval: Sol Blumenfeld (09/02108) City Attorney APproVal: . Carol Schwab (by 14: Baker) (09102/0 _ Chief Financial Officer Review: ,Jeff Muir (by N. Kimball) (02/03/08) City Manager Approvat: Jerry B. FUlwodd (09/68/08) . ... — RECOMMENDATION: a Resolution initiating the formation of Boulevard MI 1 and ordering the Report in accordance with the provisions of 1501.060. an Area Improvement Plan (AIP) along Wade Street and Beethoven Street map is provided as Attachment No 2. that will enhance the Washington in the area. A key component medians funded by the Culver City will be used strategically to 'seed" the high visual impact medians. property owners within the AIP boundaries. the concept of an AIR and the potential While the Agency has proposed to fund intent was to do so only if the on- a property based assessment district. Staff recommends the City Council adopt Benefit Assessment District West Washington preparation of an Assessment Engineer's Culver City Municipal Code (CCMC) Section BACKGROUND: . ' In December 2007, the Council approved West Washington Boulevard generally between (Attachment No. 1). A detailed boundary This AIP is the first in a multi-phase project Boulevard corridor and stimulate private reinvestment of this AIP involves the installation of streetscape Redevelopment Agency. These medians area for change with relatively low cost, but On May 1, 2008, staff held a meeting for Those in attendance favorably considered creation of a related assessment district. construction of the improvements, the Agency's going median maintenance is funded throughATTACHMENT I City of Cutvor City, California City Council Agenda Item Report DISCUSSION: To begin this process, the City must initiate the creation of an assessment district through a Resolution of Initiation. A Resolution of initiation identifies the need and benefits for a prescribed area and affirms the Council's desire to further study the annual maintenance costs and assessments for potential improvement through the preparation of an Assessment Engineer's Report. To determine these costs, the Agency is currently working with a landscape architect to develop conceptual plans for streetscape medians with sustainable, drought tolerant and low maintenance landscaping to ensure that ongoing maintenance costs are minimized. Once completed these plans will be presented to the Community and to the Agency for comment and approval. Should the City Council adopt the Resolution of Initiation this evening a Resolution of Intent will then be presented to the Council at a future Council meeting which will set the time and place for the Official Public Hearing to form the assessment district. Ballots will be sent out prior to this time for property owners to vote to establish an assessment district. It is anticipated that this process will take approximately four months from initiation to completion. The anticipated benefits of this assessment district will include beautification of the commercial corridor, increased commercial/retail interest in the area and introduction of sustainable plantings and practices. FISCAL ANALYSIS: Consistent with the general direction provided by the Agency on December 3, 2007, staff has executed an administrative contract in the amount of $8,500 with NBS consultants for assistance in developing an assessment district for the Phase I area. NBS will guide the City in developing the assessment calculations, annual budget, ballot creation and assessment filing with the County if the assessment passes. The costs associated with forming an assessment district have been included in the adopted FY 2008-09 Agency budget (Washington Blvd AIP Phase I - 55392670). If the assessment district passes, annual costs for filing with the County would be programmed into the assessment district administrative fund and paid for directly by the assessment district. 2ATTACHMENT I City of Culver City, California City Council Agenda Item Report ATTACHMENTS: 1.Culver City Redevelopment Agency — 12.3.07 Staff Report 2.Area Improvement Plan Boundaries 3. Draft Resolution of Initiation 4. Meeting Notice Letter — Property Owners MOTION: That the City Council:. Adopt a Resolution initiating the proceedings for the formation of Benefit Assessment District West Washington No. 1, the levy of annual assessments therein and ordering the preparation of an Assessment Enaineer's Report. |109| 33,ATTACHMENT 3 RESOLUTION NO. 2009-R A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CULVER CITY, CALIFORNIA, INITIATING PROCEEDINGS FOR THE FORMATION OF BENEFIT ASSESSMENT DISTRICT WEST WASHINGTON BOULEVARD NO. 2, THE LEVY OF ANNUAL ASSESSMENTS THEREIN AND ORDERING THE PREPARATION OF AN ASSESSMENT ENGINEER'S REPORT WHEREAS, the City Council desires to conduct proceedings for the formation of a benefit assessment district, entitled Benefit Assessment District West Washington Boulevard No. 2 (the 'District), pursuant to the provisions of Section 15.0t060 of the Culver City Municipal Code ("CCMC"); and WHEREAS, these proceedings for the annual levy of assessments shall relate to the fiscal year commencing July 1, 2010 and ending June 30, 2011; and WHEREAS, the City Council has determined that the property owners will receive special benefit from the improvements within the proposed District; and WHEREAS, the City Council has retained the consulting firm of NBS for the purpose of assisting with the formation and annual levy of assessments and the preparation of an Assessment Engineer's Report relating to the proposed formation of the District and the levy and collection of assessments for the fiscal year commencing July 1, 2010 and ending June 30, 2011 (the "Engineer's Report"), to be filed with the City Clerk in accordance with CCMC Section 15.01.055. NOW, THEREFORE, the City Council of the City of Culver City, DOES HEREBY RESOLVE as follows:|1010101010101010 10 10|11 12 13 14 15 15 17 18 19 20 21 22 23 24 25 26 27 28 5-2-|1010|ATTEST: APPRO/ED AS TO FORM: • Mitsfal- d ."11 A n' A CI-11/V MARTIN R. COLE, City Clerk AC9-00399 ty Attorney ATTACHMENT 3 I_ The City Council hereby proposes the formation of the District and the levy and collection of assessments for said District. 2. The proposed improvements within the District may include, but are not limited to: landscaping, planting, shrubbery, trees, turf, irrigation systems, hardscapes, wails, street lighting and appurtenant facilities including, but not limited to, public right-of- way, easements, drainage sites and medians, and any other improvements and services authorized by the CCMC within the boundaries of said District. Services provided include all necessary service, operations, administration and maintenance required to keep the improvements in a healthy, vigorous and satisfactory condition. The Engineer's Report shall describe all improvements. 3_ The proposed District is designated as; Benefit Assessment District West Washington Boulevard No. 2. 4_ The City Council hereby orders the preparation of the Engineer's Report in accordance with the requirements of CCMC Section 15.01.055, to be filed with the City Clerk for submission to the City Council. The Engineer's Report shall be prepared by NBS and approved by the City Engineer prior to filing with the City Clerk. APPROVED AND ADOPTED this day of 2009. ANDREW WEISSMAN, Mayor City of Culver City, California|101010101010101010 10 10|11 12 13 14 15 16 17 is 19 20 21 22 23 24 25 26 27 28