RECOMMENDATION:
Staff recommends the City Council (1) approve a budget amendment in the
amount of $200,000 from the Playa Vista Development Fund; and (2) approve a
professional services agreement with Willdan for engineering design services for
the Sepulveda Boulevard Widening Project (Playa Street /Jefferson Boulevard
intersection to Green Valley Circle), P-881, for a not-to-exceed amount of
$409,985.
A Budget Amendment requires a 4/5ths vote.
BACKGROUND:
The Sepulveda Boulevard corridor is classified as a Principal Arterial in the City.
Currently, within the project limits, there are three (3) travel lanes northbound and
two (2) travel lanes southbound between Playa Street/Jefferson Boulevard and
Green Valley Circle. This project will provide for three (3) continuous lanes in the
south bound direction without requiring additional right of way (R/W). The proposed
work will include utility relocation, street widening, landscape median modification,
traffic signal modification, red light enforcement camera relocation, and roadway
resurfacing. The existing Southern California Edison transmission power poles will
either be relocated or undergrounded to accommodate the new southbound lane.
In addition, Sepulveda Boulevard from Sawtelle Boulevard to Playa
Street/Jefferson Boulevard will be re-striped to add a third southbound lane during
peak traffic hours within the existing street width.
Meeting Date: 06/09/08 Item Number: A-3
AGENDA ITEM: FOUR-FIFTHS VOTE REQUIREMENT: Approval of (1) a Budget
Amendment in the Amount of $200,000 from the Playa Vista Development Fund;
and (2) a Professional Services Agreement with Willdan for Engineering Design
Services for the Sepulveda Boulevard Widening Project (Playa Street /Jefferson
Boulevard Intersection to Green Valley Circle), P-881
Contact Person/Dept.: Hong Wang/PW Phone Number: 310.253.5604
Fiscal Impact: Yes [x] No [] General Fund: Yes [x] No []
Public Hearing: [] Action Item: [X] Attachments: [x]
Public Notification: Master E-Mail Notification List (06/04/08); AAE Inc, David Evans
Associates, Dean Ryan, Diamond West, E. W. Moon Inc., Hunsaker Associates, KPFF,
KOA, Paller-Roberts, R A. Smith National, Willdan by e-mail on (06/02/08)
Department Approval:
Charles D. Herbertson (05/29/08)
City Attorney Approval:
Carol Schwab (by H. Baker) (06/02/08)
Fiscal Impact Review:
Jeff Muir (by M. Noller) (06/03/08)
City Manager Approval:
Jerry B. Fulwood (06/04/08) City of Culver City, California
City Council Agenda Item Report
On December 11, 2006, the Council approved the payment by Playa Capital
Company, LLC of $300,000 for use by the City of Culver City for the design and
construction of the Sepulveda Boulevard Widening Project as a substitute
improvement for the Playa Vista Drive Bridge pursuant to the Third Amendment to
Agreement between the City Of Culver City (City) and Playa Vista (Playa Capital
Company, LLC).
On January 28, 2008, the City Council authorized staff to solicit proposals for the
engineering design services for the Sepulveda Boulevard Widening Project (Playa
Street /Jefferson Boulevard intersection to Green Valley Circle), P-881.
DISCUSSION:
The Request for Proposals were published on the City‘s website and mailed to
several engineering firms. Proposals were due on March 6, 2008.
The following eleven (11) engineering firms responded to the proposal:
AAE Inc
David Evans Associates
Dean Ryan
Diamond West
E. W. Moon Inc.
Hunsaker Associates
KPFF
KOA
Paller-Roberts
R A. Smith National
Willdan
The Public Works Director/City Engineer, Engineering Services Manager, Senior
Civil Engineer, and Traffic Engineer consultant, reviewed the proposals and
subsequently conducted interviews of four short listed firms. It was unanimously
determined that Willdan’s proposal and interview results showed that they are the
most responsive and best qualified firm to provide engineering design services on
this project. Willdan has extensive design experience for street widening projects
in southern California.
After the tentative selection, Staff negotiated the total design fees with Willdan.
During the design process, if the existing asphalt concrete pavement surface is
recommended to be replaced with Portland Cement Concrete (PCC) within the City of Culver City, California
City Council Agenda Item Report
existing budget, the total proposed design fee is $409,985. If the project budget
can not accommodate PCC pavement, then the surface will be replaced with
asphalt. In this case, the proposed design fee was negotiated to be $362,475.
There is more detailed engineering work required when designing the concrete
pavement surface. Although more expensive, PCC pavement can last much
longer than asphalt.
It is Staff’s recommendation that the proposal from Willdan be accepted since they
have demonstrated by their proposal and during the interview process that they are
the most qualified proposer while also offering a price that is fair, reasonable and
extremely competitive. The design will take about eight months to one year to
complete depending on if an asphalt or concrete roadway surface design is
utilized. Upon completion and review by the City Engineer, the design will be
presented to the City Council for consideration.
Construction is tentatively scheduled in Fiscal Year 2009/2010.
FISCAL ANALYSIS:
The adopted Fiscal Year 2007/2008 CIP budget includes $300,000 of Playa Vista
Developer funds (42000881) for the design of the project. To adequately fund the
not-to-exceed contract amount (including the 10% change order authority) and
other project administration related cost, staff recommends that an additional
$200,000 be transferred from Playa Vista Developer Funds to P-881 (42000881).
Other project administration related cost includes environmental reviews and
studies, utility potholing to identify potential design conflicts, and other
miscellaneous project administration related expenses. There are sufficient funds
available in the Playa Vista Developer Funds.
ATTACHMENTS:
1. Copy of Willdan’s proposal
2. Location map
MOTIONS:
That the City Council: City of Culver City, California
City Council Agenda Item Report
1. Authorize a budget amendment to appropriate Playa Vista Mitigation Funds in
the amount of $200,000 to the Project and transfer $200,000 to project expenditure
line item 4200881.720100; and;
2. Approve a professional services agreement with Willdan for the for engineering
and design services for the Sepulveda Boulevard Widening Project (Playa Street
/Jefferson Boulevard intersection to Green Valley Circle), P-881 for a not-to-
exceed fee amount of $409,985,
3. Authorize the Public Works Director/City Engineer to approve change orders, if
necessary, for an amount not-to-exceed $40,999 (10% of $409,985), and
4.,Authorize the City Attorney to review/prepare the necessary documents and
5. Authorize the City Manager to execute such documents on behalf of the City.
MEETING DATE: 06/09/08
AGENDA ITEM: Approval of a Professional Services Agreement with
Willdan for Engineering Design Services for the
Sepulveda Boulevard Widening Project (Playa Street
/Jefferson Boulevard intersection to Green Valley Circle),
P-881
ATTACHMENTS
Pages|109| Willdan's proposal 1-43|109| Location Map 44Proposal to the City of Culver City
Engineering Design Services for the
Sepulveda Boulevard Widening Project
(Playa Street/Jefferson Boulevard to Green
Valley Circle), P-881
13191 Crossroads Parkway North, Suite 405
Industry, CA 91746 Nrjr WILLDAN
(562) 908-6200 1 www.willdan.com Serving Public AgenciesServinu
131t)1 Crossroads Parkwa y North, Suite 405
industry. California 9'1746-3497
562/908-6200 fax 562/695-21?0
March 20, 2008
Mr. Hong Wang, RE.
Senior Civil Engineer
Culver City Public Works Department
Engineering Division, City Hall 2' Floor
9770 Culver Boulevard
Culver City, CA 90232-0507
Subject: Proposal to Provide Engineering Design Services for the Sepulveda
Boulevard Widening Project (Playa Street/Jefferson Boulevard to Green
Valley Circle), P-881
Revised as of April 28, 2008.
Dear Mr. Wang:
Willdan is pleased to submit this proposal in response to your Request for Proposal
(RFP) to provide engineering design services for the City's Sepulveda Boulevard
Widening Project (Playa Street/Jefferson Boulevard to Green Valley Circle). This
proposal was prepared in accordance with the City's RFP dated January 29, 2008.
We believe that we are highly qualified to undertake this assignment for the following
reasons:
• As a municipal consulting firm, with many of the principals and key staff members
being former public works officials, we are fully aware of the City's needs and
desires in undertaking of this type of project.
• The firm has provided engineering services for the design and construction
management of numerous roadway widenings, resurfacing, pavement
rehabilitation, and concrete repair projects, both locally and federally funded,
throughout Southern California. The project team is familiar with all of the design
and construction methods that could be selected to minimize costs and maximize
pavement life.
• We propose to provide the required services for the project from our Los Angeles
Regional office located in the City of Industry. The proximity of our office to the
City of Culver City will ensure timely response to the City as questions may arise
during the design. Willdan has in-house pavement engineering staff specializingMarch 20, 2008
Page 2
in preparation of deflection study analysis, structural overlay section development
and pavement reports.
. Our firm previously served as City Traffic Engineer for Culver City and our traffic
traffic engineering staff have a prior working relationship with City staff providing
traffic engineering support services for traffic study review. Therefore, we are
familiar with City's procedures and needs.
• Due to Willdan's exclusive public sector orientation and position as contract city
engineer in many Los Angeles County cities, our staff members have special
insight into the issues and challenges facing the City. Specifically, we have had
the unique opportunity to monitor the performance of virtually every pavement
strategy from design to construction, and 15 to 20 years into the life of the
improvements. Thus, we are well versed in what to expect from any pavement
rehabilitation strategy.
As a multidisciplinary firm, we have a full complement of resources in-house to provide
accurate and complete professional engineering services for every phase of your
Sepulveda Boulevard Widening Project.
The services requested by the City include project design management services,
pavement engineering, utility coordination, survey, landscaping, traffic engineering, and
preparation of plans and specifications for the Sepulveda Boulevard Widening Project
as listed in the City's RFP.
Willdan understands the City of Culver City is seeking proposals from qualified
engineering design firms that can undertake the project management, conceptual
design, preparation of construction drawings and technical specifications for a major
street widening project on Sepulveda Boulevard from Playa Street / Jefferson Boulevard
to Green Valley Circle. Sepulveda Boulevard is a major north/south arterial corridor
with an average daily traffic count of 50,000 vehicles. Sepulveda Boulevard parallels
the San Diego Freeway (I-405) through Culver City and is a major alternative route
taken by commuters to access Los Angeles International Airport. This project is being
done to alleviate an existing bottle-neck and provide for a third southbound lane within
the existing right-of-way on this segment of Sepulveda Boulevard within the project
limits. A portion of this project on Sepulveda Boulevard is within the City of Los
Angeles.
Project Understanding
Willdan understands this is a two-phase project. Phase 1 includes the research, survey,
utility coordination, preparation of the conceptual/preliminary plans, and presentations
exhibits at community and City Council meetings. Phase 2 would be the final design
and construction drawings, specifications, and bid documents. The City intends to
award the contract for design services by spring 2008.March 20, 2008
Page 3
The services for this project include civil design, traffic engineering, survey, utility
coordination, and preparation of technical specifications for the project.
Roadway Improvements
To gain the necessary roadway width to accommodate the third southbound lane, the
roadway cross section will need to be widened throughout the project limits, except
between Playa Street/Jefferson Boulevard to Sawtelle Boulevard the roadway will be
restriped only to add a third southbound lane. Roadway widening from Playa
Street/Jefferson Boulevard to Green Valley Circle will be accommodated by narrowing
sidewalk and the landscape median as follows:
• Playa Street/Jefferson Boulevard to Slauson Avenue: west and east sidewalk (1
foot each side), entire to partial median removal
• Slauson Avenue to Fwy. 90: west and east sidewalk (up to three 3 feet), entire to
partial median removal
• Fwy. 90 to Green Valley Circle: west and/or east side of median, west and/or west
of sidewalk, as deemed necessary.
The widening will require relocation of storm drain catch basins and overhead utilities.
Handicap access ramps between Playa Street/Jefferson Boulevard to Green Valley
Circle will be assessed and upgraded to meet current ADA standards if required.
Modifications to the Fox Hills Mall's entrance is anticipated to be completed by
November 2008. Proposed modifications include relocating the existing mall entrance
300 feet to the north. The modifications to the traffic signal, roadway and median will be
incorporated into the design as existing improvements. Details to join and match this
work will be included in the plans for Sepulveda Boulevard accordingly.
The existing pavement will be rehabilitated or replaced with new concrete (PCC)
pavement.
Landscape Improvements
As part of the improvements, the City would like to increase turning and travel way
lanes thus resulting in the modification of existing medians at various locations. It is
anticipated that some of the mature trees must be removed to accommodate for the
new alignments. As an option, those trees identified to be removed (except Eucalyptus)
could be boxed up and relocated somewhere within the modified medians. In addition,
it is understood that irrigation modifications will be implemented to align with the
renovated medians.
Another important aspect to this project will be the preservation of mature trees as they
exist in place. Willdan understands the importance of tree stability when specific rootsMarch 20, 2008
Page 4
are severed due to curb re-alignments/modification. In some cases the possibility of
cutting major tree roots (structural and/or feeder roots) becomes high when the modified
curb median creeps closer to the tree root crown.
Traffic and Street Lighting Improvements
The traffic improvements of this project will include traffic signal modifications, street
lighting, traffic control, signing and striping improvements from Playa Street/Jefferson
Boulevard to Green Valley Circle. Specifically, the project will include the preparation of
signing and striping plans to include an additional 3rd travel lane in the southbound
direction on Sepulveda Boulevard from Sawtelle Boulevard to Green Valley Circle. The
signing and striping plans will include loop replacements at signalized intersections,
where traffic signal modifications are not required. Traffic signal modification plans will
be required at the intersections of Sepulveda at Jefferson/Playa, Sepulveda at Slauson,
Sepulveda at the Sizzler driveway, and Sepulveda at Green Valley. It is our
understanding that the relocation of the red light camera system for the intersection of
Sepulveda at Slauson will be performed by others. The existing city owned street
lighting standards will be relocated in the areas where Sepulveda Boulevard will be
widened to accommodate for the six lanes of travel. It is anticipated that the limits of the
street lighting relocation will be from Playa Street/Jefferson Boulevard to Green Valley
Circle. Traffic control plans will be prepared for the construction of project for the street
widening and median reconstruction portion of the project.
We appreciate the opportunity to submit this proposal and look forward to discussing
your needs and our qualifications. If you have any questions or need additional
information, please contact Adel M. Freij at (562) 908-6262.
Respectfully submitted,
WILLDAN
dle-6
Adel M. Freij, P.E. William C. Pagett, P.E.
Vice President Senior Vice President
KR:mh
95610-08106-1401P08-071R1CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
TABLE OF CONTENTS
Page
PROJECT TEAM 1
SUBCONSULTANTS 7
RESOURCE MATRIX 9
APPROACH 10
EXPERIENCE 28
WORKLOAD 32
PROJECT TIMELINE 33
FEE SCHEDULE 35
REFERENCES 36
COPIES OF DESIGN PLAN & PHOTOS OF TWO PROJECTS 37
FEE PROPOSAL (Submitted in separate envelope.)
APPENDIX
• Resumes
• Agreement RevisionsCITY OF CULVER CM'
SEPULVEDA BOULEVARD WIDENING PROJECT
PROJECT TEAM
A very talented and experienced project team has been selected to ensure the City's
goals, both in quality and project schedule, will be met. As with any project, a project
manager will be required to direct the project to successful completion. Willdan has
selected a highly qualified individual for this role.
PROJECT MANAGER
Mr., Adel Freij, P.E., Vice President/Manager of Program and Construction
Management Services, has been designated as the Project Manager for the project.
Mr. Freij will work closely with the City staff and Willdan staff in order that project
commitments are fulfilled. Mr. Freij has overseen the design and construction
management of many municipal public works and street reconstruction and
rehabilitation projects. He will ensure that Willdan's staff is efficiently utilized and
dedicated to fulfilling the terms of any agreement entered into with the City. Mr. Freij
has over 20 years of civil engineering experience.
Mr. Tom Kirk, P.E., Senior Engineer, will serve as Deputy Project Manager. Mr. Kirk
is an accomplished Project Manager for public works design and construction projects,
known for providing innovative quality engineering services and meeting clients' needs
in every circumstance. As a senior Engineer, he has more than 27 years of
project/construction management and design experience, including roadway widening
and street reconstruction and rehabilitations; traffic signals improvements; flood control
and drainage; bridges; infrastructure improvements; and right-of-way acquisition.
TEAM MEMBERS
CIVIL ENGINEERING DESIGN
Willdan has assembled the following team of highly qualified civil engineering design
specialists:
Mr. Tom Kirk, P.E., Senior Engineer, will also serve as Project Engineer/Pavement
Engineer and will be responsible for overseeing development of the plans,
specifications and estimates, and pavement related analyses to determine structural
sections and other elements of pavement design and materials required for the project.
Mr. Kirk has 27 years experience on similar projects throughout California. Mr. Kirk was
instrumental in developing Willdan's Pavement Management System (PMS) and has
provided pavement engineering for over 200 projects. Mr. Kirk will personally prepare
the technical specifications and design the cross sections for PCC pavement and AC
joiner strips, and provide PCC joint design, including impacts of joints demanded by the
_IAN
Page 1CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
traffic control plan and ultimate wheel path alignments on the overall structural integrity
of the pavement slabs. He is highly experienced with Ca!trans' latest rehabilitation
overlay design manual and has innovative overlay thickness evaluation software
conforming to those guidelines, which provide for various interlayer treatments to limit
overlay thickness; something that will be crucial to this project. He routinely performs
value engineering analysis for all of his clients based on numerous options.
Mr. Abner Catig, Senior Design Manager, will be the Lead Design Engineer on the
project. Mr. Catig will be responsible for the design and preparation of plans, technical
specifications, and estimates (PS&E) for the project. He has more than 27 years
experience in public works design, including design of street widenings, reconstruction
and streetscape improvements, flood control and drainage improvements, grading and
site plans, hydrology studies, sewer improvements and storm drains. He possesses
extensive knowledge of California Department of Transportation (Caltrans), and Los
Angeles County Department of Public Works (LACDPW) design criteria and guidelines.
Mr. Catig works closely with drafters and technicians to develop a comprehensive and
accurate product.
Mr. Calvin Catig, Senior Design Manager, will assist Mr. Abner Catig in the
preparation of civil design plans. His duties include preparing plans, specifications and
estimates (PS&E) for public works projects. His experience encompasses grading and
site plans, flood control and drainage improvements, highways, hydrology studies,
streets, sewers systems, storm drains, and water systems_ Mr. Catig has over 21 years
of civil engineering experience.
Utility coordination will be provided by Mr. Edward Cox, Utility Coordinator. Mr. Cox
has provided full utility coordination on projects for Willdan, including many similar types
as the City's Sepulveda Boulevard Widening Project. He has developed an excellent
reputation with the utility company representatives at various levels of their
organizations, and is extremely capable in developing and arranging special
coordination procedures. Mr. Cox has over 28 years of public works experience.
TRAFFIC ENGINEERING DESIGN
Leading the Traffic Engineering section for the project will be Mr. Lew Gluesing, P.E,
T.E., P.T.O.E. Mr. Gluesing supervises engineers and technicians, providing traffic
engineering services throughout California and in support of our Arizona and Nevada
offices. Mr. Gluesing has 41 years of experience in traffic and transportation
engineering, including state highway, neighborhood traffic management, traffic
circulation, impact and parking studies, design and operations, municipal engineering,
and operational analyses. To date, Mr. Gluesing has supervised the completion of
more than 8,000 projects, for a variety of larger and smaller-scaled projects_ He has
personally designed more than 700 new and modified traffic signal installations, as well
_DAN
Page 2Se:
W _F-)AN
Page 3
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
=M:.=2EEE M
as two traffic signal master computer systems, employing various interconnect and
communication facilities_
Ms. Vanessa Mutioz, P.E, T.E., P.T.O.E., Supervising Engineer, will serve as the
Lead Design Engineer for preparation of the traffic design elements of the project. Ms.
Muiloz has more than 11 years of experience in the traffic and transportation field, with
specialization in the preparation of traffic design plans, specifications, and estimates,
and traffic analyses. Her area of expertise includes traffic signals design and
modification, signing and striping, and street lighting. She has designed over 300
signalized intersections for local cities, outside agencies, and Caltrans projects, and has
managed a variety of projects covering street improvements and traffic design.
Mr. Bob Burch, Senior Design Manager, will assist Ms. Munoz in the traffic
engineering design for the project. Mr. Burch offers 15 years of design and traffic-
related experience. Mr. Burch has experience with both AutoCAD and MicroStation.
Specifically, his experience relates to preparing PS&Es for traffic signals, signing and
striping, street lighting, traffic control, and stage construction projects. During this time,
Mr. Burch has prepared numerous PS&E projects utilizing the Ca!trans Standards.
Mr. Jeffrey Lau, E.I.T., Design Engineer II, will provide technical support for the
project. Mr. Lau offers 3 years of traffic-related experienced and is proficient in both
MicroStation and AutoCAD. Mr. Lau has provided fieldwork and GADD design service
for street lighting, traffic signals, signing and striping plans.
Mr. Juan Avila, Design Engineer I, will provide technical support for the project. Mr.
Avila possesses over 3 years of traffic engineering experience and has assisted with
field work and drafting on a variety of traffic engineering projects ranging from design to
traffic studies. Mr. Avila is proficient in software programs such as MicroStation,
AutoCAD.
SURVEYING
Mr. David O. Knell, P.L.S. (Lead Survey/ROW Engineer) Vice President/Division
Manager of the Surveying and Mapping Division, has over 37 years of public land
surveying experience. Mr. Knell has worked extensively with Southern California
counties and Caltrans preparing legal descriptions and maps used for right-of-way
acquisition and recordation. He will be responsible for the design cross-sectional
survey, aerial topography, and the preparation of right-of-way documents as necessary
for this project.
Ms. Susy Barrientos, Survey Analyst, will assist with survey services. Ms. Barrientos'
duties include CAD drafting for various projects, including right-of-way drawings,
subdivision maps, and other survey related drawings. Parcel maps, tract maps, and
surveys are some of the other items she has worked on.CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
Mr. William Coffman, Survey Party Chief, will perform field survey for the project. Mr.
Coffman has over 19 years experience in the survey field. He has worked on a variety
of jobs, including topographic, alignment, quantity, and boundary surveys.
LANDSCAPE ARCHITECTURE
Mr. John J. Hidalgo, R.L.A., Manager of the Landscape Architect Division, will be
responsible for design of the landscaping elements of the project. Mr. Hidalgo has more
than 21 years of diverse experience in urban streetscapes, park design and full range of
landscape architectural projects. Mr. Hidalgo will monitor the general progress of the
landscape architecture department's portion of the project and will thoroughly review all
major documents prior to submittal to the City and other agencies. Mr. Hidalgo's
experience extends from project planning and development to design, construction, and
maintenance.
Mr. Bryan Nguyen, R.L.A., Associate Landscape Architect, will assist in the
landscape design portion of the project and will be responsible for production of PS&E.
Mr. Nguyen will be responsible for administering the various tasks involved with the
landscape development. He has over 14 years of landscape and graphic design
experience. Mr. Nguyen's experience includes the development of conceptual
landscape plans and the preparation of construction documents, including specifications
and estimates.
Mr. David Hayes, R.L.A., Landscape Architect and Consulting Arborist, will be
responsible for arborist services. Mr. Hayes possesses more than 45 years of
professional experience in public and private practice, and also several years of
experience as a commercial arborist. His expertise encompasses park and recreation
planning and development, urban beautification through streetscape design and
highway planting, and urban forestry. Mr. Hayes' technical knowledge includes
irrigation system design, landscape planting, grading and drainage, sports and area
lighting, and arboriculture_ Additionally, Mr. Hayes is familiar with park accessibility
issues and program requirements at the local, state, and federal levels.
CONSTRUCTABILITY REVIEW
Mr. Jason Brown, R.C.I., Construction Review and Quality Control Manager, will be
responsible for constructability review and quality control of plans. Mr. Brown serves as
both a Construction Manager and Supervising Public Works Observer for Willdan; his
duties include the inspection and management of large-scale public works improvement
projects. His experience includes the construction administration and inspection of
subdivisions, traffic signals, storm drains, sanitary sewers, ARHM overlay, conventional
asphalt overlays, and street beautification projects. In addition, Mr. Brown has
I0
Page 4
UDA
Ac;enciesSer yjng Pubic
MEDAN
Page 5
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
experience with specially funded projects, such as ISTEA and CDBG. Mr. Brown has
over 18 years of public works observation experience.
QUALITY ASSURANCE/QUALITY CONTROL
Mr. Steven R. Leathers, P.E. is a Vice President and the Division Manager of
Infrastructure Engineering at Willdan will be responsible QA/QC for the project. He
has over 17 years engineering experience and 3 years of construction experience,
including inspection, estimating, and quality control. He is primarily responsible for the
management and design of transportation and public works projects, including water,
sewer, storm drain, and highway improvements. Mr. Leathers also manages our
design-build projects for the Department of Defense and performs constructability
reviews as part of our formal QA/QC program.
GEO TECHNICAL SERVICES
Mr. Vincent ip, P.E., G.E., Vice President and Principle Geotechnical Engineer of
Arroyo Geotechnical (part of Willdan Group, Inc.), will provide geotechnical services.
Mr. lp has more than 20 years of hands-on experience in the environmental and
geotechnical engineering fields. He has successfully managed and completed many
projects in both public and private sectors that included landfills, military base cleanup
and pollution abatement, water and wastewater facilities, grade separations, road
widening, commercial and industrial buildings, public schools, and essential service
buildings. He also has extensive experience in today's urban infill mixed-use
development projects that often consist of mid- and high-rise buildings with multi of
levels of basement. His area of technical expertise includes ground motion study,
liquefaction analysis, conventional shallow and deep foundation design and retrofit,
Load and Resistance Factor Design (LFRD) method for highway bridge substructures
design, shoring design, and ground improvement methods.
Resumes for the project team members are presented in the Appendix.
STAFF AVAILABILITY
:-. key Pers.orine
MATRIX
Availability
......... ,,.
iA Adel Freij, P.E.
Abner Catig 35%
Calvin Catig
35%
Tom Kirk, P.E. 40%
Lew Gluesing, P.E., T.E., P.T.O.E. 35%
Vanessa Munoz, P.E., T.E., P.T.O.E. 35%
Bob Burch 35%
Jeffrey Lau, ELT. 35%
Juan Avila 35%
Jason Brown, R.C.I. 35%
Ed Cox 35%MLLDA
Page 6
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
David Knell, P.L.S. 35%
Susy Barrientos
35%
William Coffman 35%
John Hidalgo, R.L.A. 35%
Bryan Nguyen, R.L.A.
35%
David Hayes, R.L.A. 35%
Steven Leathers, P.E. 35%
Vincent lp, RE., G.E.
35%
PAST EXPERIENCE OF TEAM
The Willdan team members have worked together on many street improvement
projects, some specific projects include the City of Carson's 223rd Street Improvements
Project, the City of Santa Clarita's Whites & Soledad Canyon Improvements Project, the
City of Indian Wells' Highway 111 Street Improvements Project, and the City of La
Canada Flintridge's Town Center Street Improvement Design Project, to name a few.
Full descriptions of these projects are presented in the Experience section of the
proposal.CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
410101•01lai SUBCONSULTANTS
Due to the technical nature of the engineering services required to complete plans,
specifications and construction cost estimate for the Sepulveda Boulevard Widening
Project, Willdan proposes to complete the work utilizing our existing in-house team of
experienced design professionals. Willdan will however, utilize Aero Tech Surveys, Inc.
to perform aerial surveys.
AERO TECH SURVEYS, INC.
6810 Airport Drive, Riverside, CA 92504
Phone: (951) 785-0160 Fax: (951) 785-0554
Aero Tech Surveys, Inc. is a full service photogrammetry corporation that has been
serving the needs of private engineering firms, as well as government agencies on the
local, state and federal level since 1975. The capability to perform all phases of a
photogrammetric project entirely within the jurisdiction of our office allows maximum
control over the quality and timing of the final product.
FLYING AND PHOTOGRAPHY
Aero Tech Surveys, Inc. operates its own turbo charged, multiengine aircraft and can
provide aerial photography from altitudes of 500 to 26,000 feet. Our state of the art
aerial camera systems provide us with a choice of focal lengths to suit the needs of any
photo assignment, and return consistent, high resolution, optically flat photography for
display purposes or aerial mapping.
PHOTOLAB SERVICES
Aero Tech Surveys, Inc. operates its own photolab facility. Services include processing
of aerial negatives, contact printing and production of glass and film diapositives. We
also furnish aerial photo enlargements, plan and profile sheets, duplication,
enlargement and reduction of line and photo mylars, with screening, tinting or half
toning.
MAPPING
Aero Tech Surveys, Inc. operates state of the art analytical and digitally converted
analog stereoplofting systems. All mapping is generated in digital format and can be
readily translated for use with many of the CADD/GIS/Design packages currently
utilized in the engineering profession. Computer plotted or scribed final mylars can also
be produced to suit client specifications.
Page 7 13Page 8
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
COMPUTER SERVICES
Aero Tech Surveys, Inc. maintains a full time staff of computer professionals. Our staff
can provide data translation and reduction, custom programming, media conversion,
contour generation/interpolation from field data or Raster Scan DTM's, 3D rotations,
volume computations and outside consulting services. We operate modem, high-speed
computers produced by Digital Equipment Corporation and I.B.M.
PERSONNEL
Aero Tech Surveys, Inc. employs a staff of dedicated professionals representing years
of experience and expertise in the fields of photogrammetry, surveying, engineering and
computer operations. Their high level of personal concern and ability to function as a
team allows us to deliver consistent, high quality products and services.CITY OF CULVER CITY
PROFESSIONAL ENGINEERING DESIGN SERVICES
fur the
SEPULVEDA BOULEVARD WIDENING PROJECT (PLAYA STREET/JEFFERSON BOULEVARD TO GREEN VALLEY CIRCLE
PAVEMENT OVERLAY REHABILITATION
TASK 1, 1JLASSIFiCATION
Adel CrIJ,
Project
Manager
Ab or Catlg,
Sen'or assign
Manager
Colorn Catig,
Senior D52 In
Manager
tew
O/umilng,
Tool Kirk. Ed Cox TrzFrie
Senior Pavement Jun Milo, Utility Divis on
Engineer Technician Senior Drafter Coordinator nogor
Panama
Munoz,
Supervising
Engineer
Bob Burch
Senior Design
Manage
err oy au
Deargn
Engineer S
Juan Avga
Deign
Engineer i
Da id Knell,
Survey
Division
Manager
Easy
Barriuntos,
Survey
Analyet
Two•Man
Survey Field
Party
Jo n FHA°
Landscape
Er4nlon
Manager
Bryan
Ng ye ,
Asaociate
Londecape
Archtect
Dave Hayes,
Arbotist
Jon Brown,
Sup, Fohio
Works
Observer
Steve
Luther.
Olv o'on Ward
Manager Processing
MEM
* • General
I I Kick-oH Meeting
MENIII
IMEIMIEMENIIIMIIIIIIIIIMIMINIMINIMIIIIE
IIIMMINIMINIIIIIIIIIMMINIIIMINIIIMINIIIIMI|109| 1111|109| IIMIIIMMIMISIIIMI
1.111111111.11111111111/11111
IMIEIIIIMIIIWIII 20
IIIII
,,
INIMIWIIII
MUM
44 111191111MINIMMIIIMINIIIIMI|109| IIII
1111111111111111111MIIMIIIMMI
IIIIIIIMNI
00 IMINIMII IIMINIII INIIIMIIIII 110111111M1•11 NISI
IREMINEMPI
2 • PrelimirrardConc.Ptu.100.9n
EIMMIn111111M111111111.
4 - Construction Support
42 Pre-blddin!
11111 11EMEIMIIMIIMIIIIIMIIIIIMII
11191EIMMINIIMINIIMIIIIIMI
...11111111EINIMIllrilliWill
20 IIIIIIIIIIII
11.111111111111=111
.
IMMEMIIIM 6
20
100
IIIIIIIMINIIMIll
NIIMIIMIIMIIMIII
IMINIRMIIIIEMOIMIll
MIIIMII
10 00
111111111n
111=11
MIIM1111.111111INI
MIN NMI
111111•11111111 . MENU
40 i „ MEM
1.11.111.1111 111111.1111
=III!
IMINIIIIIIIIMPINEEININNIII
NMI
1111NIMINIE
MEI
WM
v. 111•11•
. MIMI|1010|mo
IIIII
.i.|109| IIIMIINIMIIIIIMIIIIIIIIMINIIINIIIIIIMIIIII
NMI 14 NMI . IIIIMIWINIIIMINNI
111111.11111111.11/111.1111
NM
IMIIIININIMIE . Mr!11111M!!MlrIII 46
=NMI.
20 NM
• Aeia1 survey parkernedb Aero Tech $ur ys,
•-• inolude pmen1 roma!,iAc relref. and rab teal:mg_CITY OF CULVER CITY
PROFESSIONAL ENGINEERING DESIGN SERVICES
for the
SEPULVEDA BOULEVARD WIDENING PROJECT (PLAYA STREET/JEFFERSON BOULEVARD TO GREEN VALLEY CIRCLE
PCC PAVEMENT ALTERNATIVE
TASK./ CLASSIFICATION
Adel Frei, Abner Celia, Calvin Cold, Torn Kirk,
Project Sealer Deargn Senior Dos gn Senior
Me agar Manager Manager Engineer
Pavement
Technician
Jun Menlo,
Sersior Drew
Ed Coo,
Ut litY
Coordinator
Lew
Littrealnyi,
/raffle
Division
Yammer
barmen Dowd ilnell, &my
Munoz, Bolt Etti oh, Jeffrey Lau Juan Avrls Sreroey Bardentos,
Supervising Senior Design Deakin Design Divieion Survey
Engineer Manager Engineer II Engineer I Manager Analyst
Tone-Mon
Sunray Meld
Party
John Fil dolga,
Landecapo
O v Pon
Manager
Bryan
Nguyen,
Ammonite
Landacape
Arch. trot
Dave bayed,
Arborist
Javan Brown, Steve
Semi Pub re Leathers,
Work. Eilvirden
Observer MAndØur
MIIMIIIMII
IIIMMIIIIMINIIIIM
IIIM
IIIIIMIIIIM111111•111•11
Ward
Process/mg
IONE!|10 10|1 - General
LI Kick-off Meeting
111111111111111111E1 III 11.1111111111111111111111111 11111
reili
111121EREMNIMIIIIIIM
1111ME
IIIMPIIMIIIIII•111111•11111=1111M11111•11.
IIIIIMMIIMIIIMINIIIMIIIIMIMIIIMIIIIIIIMIll
11E111
20 MIMI|109| 1111M11111111MINIIMMINIIIIIIIMIIMIIIMIIIIIMMI
MIMI
02 WM
MI
20 NMI
NM
IIMINIIIMIIIIIMIIIIIIIIIIIMIIMIll
20
Mill MU M
11=1111MNIMIIMI
MIIIIMIIIIMIIIIIIIN Mill
MU
1111111•1=11111111111
00
MU
Id
IIIIIM
INN
111=11111ENIMI
MN 0
MIN
'NMI
IIIIIMMIIIIIMIll|10 10|INN
WM
20 MEI
2 , Preliminary/Conceptual Daalgn
4 • ConstmclIon Support
4 2 Pre-biddia .
MEIBMNIMIIIIMWEIN2111
li. a Or
IMIIIIIMIWINIIIIMIIMMENIIIIMMIIMINIMIIMIIM
0.0
50 WM 22 WIIIIIIIIIIIITIIII 202
MIMI
INN
NM 00
in
40 ISO •
1111111111•1111|109| IIIII 11111111111111111111111111•111
4 1.11 Eli
1111
jFOWIIr
2 MIN IIIIIIIIMMININII•11=111=1111 Mill . =MI 1111ERNIM 0
MN
.07,...4,ommemorm 155 ormIllEMIENIIIMII OnIIINNIIIIM 220 IEN Cd WINEINIMEIN 2
MN 20
• Aeri& survey ttatfarinocf by Auto lath Survays, lac
•• Inciudac Cosl of equipment rentaf. traffic canted, and tab 1.1419,CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
APPROACH
Willdan has served local cities for many years providing street widening, medians and
traffic signal upgrades along with pavement rehabilitation design and full construction
management services for over several hundred projects in the past 25 years. The
professionals selected for this project are highly experienced in civil design, traffic
design, pavement engineering, landscape architecture, and construction engineering.
Our experience in selecting and applying pavement rehabilitation methods in the most
cost-effective manner is extensive.
The following statements emphasize Wilidan's unique qualifications and project
approach:
1. Willdan as contract city engineer for a large number of cities over the last 40
years has almost continuously been involved in one or multiple major arterial
widening and/or median project at any given time. Many such projects were
engineered by Willdan for a multitude of other cities as well. Our experience
would be difficult to match, especially considering that key staff proposed for this
project have been with Willdan on such assignments for a minimum of 18 years
each.
2. The firm has provided engineering design and construction management
services for hundreds of roadway improvement, rehabilitation and resurfacing
projects throughout Southern California. The resurfacing of streets with medians
is a special challenge that Willdan deals with on a regular basis, usually with a
several projects underway at any given time. Our experience with asphalt-rubber
hot mix (ARHM) is unsurpassed, dating back to the first asphalt rubber project
bid in Southern California in 1989.
3. Our firm has the in-house capability to perform all of the work required for the
project, including pavement engineering staff to analyze deflection test data, and
develop structural overlay sections that precisely suit the needs of the City and
the unique demands of the site. At Willdan, the pavement report is developed
concurrently with the overlay design plans, to ensure that the recommendations
in the report meet the needs of the project.
Willdan has been at the forefront for many years in developing new and more cost-
effective approaches to upgrading pavement structures of deteriorated streets. During
this time, design specifications have been tested and refined for various processes
using methods and materials proven to be economical and effective in their application.
Research of rehabilitation strategies was the focus to establish a complete inventory of
rehabilitation techniques, and determine the precise value and applicability of each
technique. Members of the project team carry on this research with every project, and
WI DAN
S.ervng . Agencez.
Page 1 0 \1117VI?
W1LLDAN
S•r.Unu Public Agercils
Page 11
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
track the resultant pavement performance over decades. Willdan maintains a
comprehensive working library of the latest pavement rehabilitation methods. Members
of our staff strive to stay current with such developments and apply them to design
projects with minimum costs and maximum pavement life.
4. Due to the fact that we serve as the City Engineer in a number of communities
where many similar projects have been constructed, our staff members have the
benefit of continuous feedback about pavement design performance and
construction techniques.
5. Willdan has completed numerous streetscape projects within the last five years.
Most notable is the Richard Nixon Expressway in the City of Yorba Linda, CA. At
a cost of $28 million, this four-mile section of roadway, which combined a
freeway with a conventional highway, was relinquished by the State of California
Department of Transportation and turned control to the City of Yorba Linda. With
funds from federal, state and local agencies, the City improved the roadway as
part of the countywide "Street Smart" program administered through the Orange
County Transportation Authority. The project involved land acquisition for
roadway widening and sound attenuation walls. Since the City of Yorba Linda
presents itself as a semi-rural community, the landscape design that Willdan
successfully implemented included California natives plantings along with semi-
arid drought tolerant plant species. The general elements of the project included,
varied widths of parkways 10 to 40 feet wide, meandering sidewalks and 14 feet
wide street medians. Within the four-mile segment, included were recreational
trails that link up with the existing trails throughout the city. Willdan's tasks
included, landscape conceptual plans, schematic plans, construction drawings,
specifications, cost estimates, bidding assistances, construction support and
record drawings preparation.
6. The Los Angeles area Traffic and Transportation Division of Willdan specializes
in providing traffic engineering and transportation planning services to
governmental agencies in California. The Division's experience and expertise
covers nearly all facets of traffic and transportation engineering, from handling
citizen complaints to managing multi-million dollar capital improvement projects.
In addition to their independent projects, this division provides transportation
services to support the office's public works design services, planning services,
and contract administration services. The division also provides traffic and
transportation support for a variety of projects managed at the company's
corporate headquarters in Anaheim and offices located in Anaheim, Lancaster,
San Bernardino, Ventura, and Sacramento, California; Phoenix, Arizona; and Las
Vegas, Nevada.
7. Our role as City Engineer provides Wilidan's staff with design and construction
management experience that includes the full range of construction methods forJDAN
Page 12
SeTvilig
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
nearly every possible site condition. Willdan obtains direct and important
feedback, such as:
the most efficient construction method to implement on each type of
project;
the actual performance of the different rehabilitation methods over
extended periods; and
special field conditions to circumvent during construction through special
contract provisions.
8. It is Willdan's policy to maximize the resources that exist within our organization
to provide the highest quality product. In the area of design, one very effective
technique is that the final review of plans and specifications is performed
independently by our construction management group. A highly experienced
construction engineer will perform an independent review of the contract
documents to ensure the project is fully constructible and the contract is without
ambiguities.
In addition to our extensive design engineering experience, Willdan has the construction
experience to match every type of street condition. Our construction and design
professionals have worked together closely over the years to develop the highest quality
time tested construction procedures. Close attention to details such as crack
treatments, interlayer placement and removal area selections, are crucial to a durable
finished pavement.
PROJECT APPROACH
Willdan's approach to this assignment will be to first meet with the City to discuss and
obtain all project requirements and to !earn the City's and resident's precise goals and
needs. Preliminary research will then be performed to gather information regarding the
roadways, including existing as-built plans and survey information. This will also include
conducting utility investigations, contacting the utility companies to obtain record
drawings, and notifying them of the proposed project.
Aerial mapping and ground survey will be performed as well. Right-of-way will be
ascertained and survey markers that will be disturbed by the project will be identified
and ties set. Existing striping will be surveyed from Playa Vista Street/Jefferson
Boulevard to Sawtelle Boulevard.
The depth of substructures will be identified as necessary. However, the majority of the
street improvements will be on the surface, therefore, it is not anticipated that
underground substructures will be impacted. It was noted that waterlines may existCITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
close to the corners at Sepulveda Boulevard/Slauson Avenue. Willdan will work with
the water company to determine the specific locations of the water line and their depth
by measuring the valve stem.
Willdan will prepare a proposed geometric layout and submit it to the City for approval.
The project design team will study the site
closely to identify the best overall
alignment for Sepulveda Boulevard based
on constraints caused by existing
improvements. For example, based on
field reconnaissance, it was noted that a
directional freeway sign for 1-405 currently
exists in the median on the south side of
the street at Slauson Avenue. Street
widening at this intersection may need to
be increased by 1 foot on each side of the
street over that which is currently
proposed in order to maintain a 4-foot wide
median within which the sign post can
remain, otherwise a costly sign bridge
would need to be constructed. With a 4-
foot median, the sign can simply be
removed and then relocated to within the
new median, with foundations constructed
in accordance with Ca!trans standard
drawings.
Another key issue that will control the project schedule and perhaps increase project
costs more than anticipated is the Southern California Edison (SCE) utility pole
relocation or undergroundina that will be required due to the widening. Durin g the
course of developing the geometric layout all affected utility poles will be identified in an
attempt to mitigate a utility conflict if possible. Subsequently, after development of the
geometric layout, it will be prudent to meet with SCE in the very early in the plan
development stage to begin the process to either relocate or underground the poles.
This coordination can be handled by our Utility Coordinator.
Upon approval of the geometric layout, a complete set of plans and profiles
incorporating all aspects of the approved geometric alignment will be developed
accordingly, including cross-sections for the street improvements. Ail pertinent existing
and proposed information will be included. The plan set will include the completed title
sheet, typical sections and notes. Plan sheets will be prepared on City of Culver City
title block and include the required information outlined RFP.
I2fr
Serving Public Auencie
WILLDAN
s
Page 13CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
Our approach for pavement rehabilitation will begin with a thorough assessment of
options for a long-term rehabilitation, ideally 20 years. Sampling and testing of the
pavement and subsurface materials and deflection testing will be applied performed to
gather quantifiable data for analysis_ Due to past overlays of existing concrete
pavements, additional coring will be performed to verify existence of underlying PCC
pavements in suspect areas. These areas will be plotted on project base plans.
Next, options will be developed for rehabilitation design. A set of options will be
developed for overlay of existing AC pavement_ Reconstruction repairs will be provided
to minimize the overlay thicknesses to the most cost effective balance in AC areas
based on deflection analysis. Another set of options will be developed for overlay of
existing PCC pavement, where joint reflection is the governing factor rather than
deflections. A value engineering analysis spreadsheet of feasible options will be
developed for consultation with the City on preferences, including lifespan estimates.
The mix of PCC and AC pavements provide a
unique challenge on this project. Some of the PCC
is covered with AC also; a special area of
investigation. Rehab design for PCC slabs, and
AC overlay of both AC and PCC will be needed, all
working together.
Providing a long life structural section for the
AC pavement within the restrictions of grade
imposed by existing curb and gutter and
median will be another pavement engineering
challenge. Willdan deals with this problem
routinely and has developed highly innovative
strategies and analysis methods to resolve
these problems.
One key challenge will be geometric constraints of existing median curbs and curb and
gutters. Providing a viable overlay thickness under the latest more stringent Caltrans
guidelines for use of asphalt rubber is the key issue, but one which Willdan has faced
many times in the past with good success.
AN
Page 14 21\A/ I DAN
sepA.,„ pubk
Page 1 5
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
41111110010•11 A second evaluation will be performed for a concrete pavement in lieu of rehabilitation.
PCC pavements can easily be designed for 60-year lives or more, and so there is a built
in advantage if the cost factors can be overcome. The analysis will provide for the most
cost effective PCC structural section, and a full cost and lifespan comparison with
rehabilitation options for consultation, review and decision making by City staff.
A pavement design report will incorporate the findings, analysis, conclusions and
recommendations based on consultation with City staff on the various options.
One major advantage that Willdan provides is that the pavement design report evolves
as the project develops in design. Final structural sections are not written in final form
until the final street cross section is developed. Cold milling especially impacts overlay
thickness, along with a host of other late decisions that may be made during design
development. Our pavement engineer is in continuous communication with our civil
design engineers, and together they develop the structural section and the design plans
concurrently as governing parameters are determined.
Another advantage provided by our in-house pavement engineering staff is that our
pavement engineer assists in development of the typical cross sections for the
pavement structure, and also the constructability issues related to pavement joints, etc.
Our pavement engineer will provide a complete joint layout for PCC pavement as he
has on many other projects to avoid unstable slabs and difficulties during construction.
The joint pattern must coincide with the nature of the PC concrete material delivered to
the project, and again our pavement engineer will develop appropriate specifications for
short cure and corresponding joint pattern.
Our pavement engineer also personally prepares the special provisions for the contract
documents and provides a final proof of the project plans, including traffic control related
to construction of paving. In fact, he maintains close communication with our traffic
engineering staff to ensure that such things as construction joints for PCC pavement
correspond appropriately with traffic control delineation. These factors can make the
difference between straightforward construction with a beautiful pavement outcome, and
problematic construction with joints in the wheel path and some unstable slabs.
In addition to development of pavement rehabilitation strategies, wheelchair ramps will
be assessed for ADA compliance and locations where removal and repair of damaged
curb, gutter, sidewalk, and driveway approaches will be determined and presented to
the City for review and concurrence.
Plans and contract specifications will be prepared in accordance with the City's current
standards and the Standard Specifications for Public Works Construction (Green Book).
Willdan is prepared to provide project specific special provisions that amend or modify
the standard provisions.CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
AMMO Willdan will prepare quantity calculations and an engineer's estimate. Separate quantity
calculations for each sheet will be independently checked and separate calculations
submitted. Calculation sheets will be neat and orderly and include the name of the
engineer that prepared the calculations. Back-up calculations for lump sum bid items
and estimates to be separated for a particular jurisdiction can also be provided.
For the various submittal milestones, Willdan and its project team will prepare for and
facilitate a review conference with the appropriate review personnel from the City to
thoroughly understand each comment and clarify any design issues. Each comment
provided in writing and the comments shown on the plans will be addressed in a
"Response to Comment Memorandum".
Willdan will furnish preliminary and final construction cost estimates with quantities for
the roadway improvements as part of the submittal packages in a format acceptable to
the City.
Landscape Concept Development
The development of the landscape design for median modification areas will incorporate
all aspects of local and state water conservation standards. The tree, shrub and
groundcover palette will be comprised of California friendly, drought tolerant species
suitable for this particular site and complement the adjacent landscape theme.
Currently, the planting palette consists of trees and shrubs such as, Eucalyptus Lemon
Scented Gum, Canary Island Pine Trees, Indian Hawthorn, Fern Pines, Cast Iron Plant,
Lily of the Nile and Bronze loquat.
The irrigation design will be state-of-the-art automatic irrigation system, which would
deliver the highest efficiency. All plants will be selected based on low maintenance
requirements such as trimming/pruning cycles, fertilization needs, hardiness, and
reclaimed water adaptability, if required.
Since this is a street improvement project
involving landscape elements, visibility and
unobstructed views for both the pedestrian and
driver are major factors in properly locating trees
and shrubs within the parkways and medians.
Our landscape design work will include
coordination between the civil and traffic
engineers.
Modification to the medians may adversely
affect median trees as can be seen at left.
During the preliminary design phase, Willdan
will employ an ISA certified arborist to examine
and assess the amount of potential root damage
PagePage 1 7
LDA
Sersing PL;t:k: Apr6es
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDEIV1NG PROJECT
a specific tree will encounter because of the curb re-alignment In turn, this important
field assessment will help in determining the tree's viability once the tree's anchoring
system is compromised. Furthermore, this tree root assessment report will assist in the
preparation of the construction plans phase when determining tree preservation or tree
removal call-outs.
Quality Assurance/Quality Control
Willdan operates daily under a company-wide Quality Assurance/Quality Control
(QA/QC) Program. The key component of this plan is Willdan's QA/QC Manual. This
program has proven itself very effective and successful and is a continuous process that
occurs day-to-day.
All submittals will meet the objectives of the project in terms of schedule and accuracy.
They will be developed in compliance with all applicable standards and specifications in
the formats specified by the City and respective reviewing agencies. Prior to submittal,
each deliverable will undergo a quality control review by the Project Engineer, Deputy
Project Manager, and the Project Manager. Each discipline leader is responsible for
adhering to the QA/QC program and is held accountable for the quality of his/her
product.
In addition to the reviews performed by the direct project team as stated above, the
project will undergo a review by independent qualified staff not involved in day to day
development of the project plans and specifications.
SCOPE OF WORK
The City of Culver City, through its Department of Public Works, desires consulting
engineering services for the Sepulveda Boulevard Widening Project. The following is a
brief description of our proposed Scope of Work.
Project Design Management Services
1. Willdan's project management staff will report directly to the City's project
manager.
2. Provide project liaison between the City and utility companies and other
applicable governmental agencies in order accomplish project objectives.
3. Oversee scope of services, emphasizing a high quality project, completed in a
timely and professional manner, by maintaining a project schedule identifying the
critical path for expeditious project completion.CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
4. Conduct and attend the pre-design meeting with all stakeholders; and schedule
and conduct project design team meetings and other meetings as necessary;
prepare agendas and minutes, and distribute.
5. Conduct one community outreach meeting to present the conceptual design and
obtain feedback from the public.
6. Attend two City Council meetings to present the conceptual design and final
project plans.
7. Monitor project compliance with applicable Federal, State, and local
requirements.
8. Provide value engineering analysis.
9. Ensure that appropriate communication, correspondence, and reports are
completed on an ongoing basis in timely manner to the satisfaction of the City.
10. Arrange and participate in a detailed review of the 90% PS&E package, with in-
depth field review and constructability review, and claim avoidance emphasis.
Each comment provided in writing and the comments shown on the plans will be
addressed in a "Response to Comment Memorandum".
11. Coordinate stakeholder plan review and plan updates as necessary.
Preliminary Engineering
1. Attend a kick-off meeting to meet with City representatives to review the project
in detail and determine requirements and procedures for design, ongoing review,
coordination, and meetings. Items covered will include but not be limited to,
pavement rehabilitation strategies, ADA compliance, traffic design, and
landscape issues.
2. Assemble and review available information pertaining to the project, including
existing survey data, as-built improvement plans, traffic signal, signing and
striping plans, utility information, existing pavement section information, tax
assessor maps, and other available record data. This task includes performing
research at the City of Culver City, Ca!trans, City of Los Angeles and Los
Angeles County Department of Public Works.
3_ Perform preliminary field reconnaissance, including photography, for an overall
perspective on field conditions.
Serving :-
DAN
21
Page 18CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
4. Research all existing underground and overhead utilities which may be affected
by the improvement project. Fully coordinate with utility agencies regarding
accuracy of locations of utility lines, relocation, and protection.
Design Survey and Right-of-Way Mapping
Willdan will perform the following:
1. Research of Record Information
a. Obtain benchmarks, centerline ties, and other available survey data from
the City of Culver City.
b. Obtain information and mapping for record monuments, centerline, and
right-of-way information from the County Surveyor's office.
2_ Field Surveying
a Project Datum to be used
i. Horizontal: California State Plane Coordinates
ii. Vertical: City of Culver City GPS benchmark system
b. Aerial Topographic Survey (performed by Aero Tech Surveys, Inc.)
i. Limits: Topography of project limits extending 100' beyond right-of-
way.
ii. Collect standard topographic detail (hardscape, driveways, building
frontages, doorways, surface utilities, striping, traffic signal
appurtenances, etc.) of all features within project limits, including
traffic striping between Playa Vista Street/Jefferson Boulevard to
Sawtelle Boulevard.
c. Cross-Section Survey
i. Collect cross-sections at 50' intervals from right-of-way to right-of-
way (ultimate) plus 15 feet.
d. Other Field Surveying
i. Establish a minimum of two temporary benchmarks within project
limits.
ii. Collect top of cone and rim elevations of existing sewer and storm
drain manholes, and invert elevations of storm drain and sewer
structures, including catch basins, within project limits.
e. Right-of-way Mapping
-I. Research and ascertain right-of-way location.
3. Monument Perpetuation
a. Review plans and found record centerline monumentation to determine
said monumentation to be affected by proposed construction.
b. Tie out all centerline monumentation determined to be affected, damaged,
removed, or destroyed by proposed improvements.
-IP
Page 19
\i8kfl' ,_DAN •
...lic Aciencje.F-CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
Pavement Engineering
1. Perform a field investigation to gain strong familiarity with the site and specific
pavement conditions. The following items will be determined:
a. Potential reconstruction areas
b. Miscellaneous special problems that may require a form of pretreatment
prior to overlay
c. Identification and recordation of core locations.
d. Deflection test point alignments and preliminary sample segments
definition.
2. Provide deflection testing at 50-foot intervals in 2 lanes northbound and
southbound and 100-foot intervals on the number one lane northbound.
3. Perform coring and testing: 18 full section cores and moisture content tests, and
3 R-values at selected core locations, plus 8 additional exploratory partial depth
cores to check for existence of PCC pavement. Soil corrosivity will be tested for
soils on the site and soils will be classified.
4. Review test data and core samples to ascertain potential problems with specific
strategies, such as geometric constraints, widespread extreme deflection
readings indicating potential reconstruction, wet subgrade, thin pavement
sections, fabric interlayers affecting cold milling or delaminating, special base
materials, PCC section situation, etc.
5. Calculate overlay thickness deflection test results for AC pavement sections
using Ca!trans Test Method 376, and Caltrans Highway Design Manual. City will
provide the design TI.
6. Prepare materials report, includin g summary of existing conditions and complete
recommendations for rehabilitation, including special treatments needed, overlay
thickness calculations, and constructability considerations, with test
documentation attached. Random testing of PCC areas will be used to verify
slab stabilities and facilitate in determination of rehabilitation strategy for overlay
of PCC, though actual design of the rehab will be driven by joint reflection
considerations.
7. Evaluate strategies and special conditions for resurfacing that will alleviate
difficult circumstances on specific segments, and estimate the quantity of
removals for each strategy.
8. Determine in consultation with City staff the strategy to be applied to retard
reflection of joints and cracks in PCC pavement areas.
Page 2011111
VOLLDAN
Serving Public AgeriCesVil DAN
Se rvog '
Page 21
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
9. Calculate reconstruction structural sections for repairs and areas of
reconstruction and also calculate structural sections for PCC repairs pavement
repairs.
10. Develop a PCC pavement design in lieu of rehabilitation of existing pavement,
and develop cost comparisons for the various possible strategies for review by
the City, including lifespan calculations, and include this information in the
pavement design report.
11. Based on the City agreed strategies, incorporate project special conditions,
unique engineering and constructability considerations and concerns for overlay,
and City agreed preferences into a pavement geotechnical report, including a
brief summary of findings and recommendations and all test data, outlining the
specific elements to be implemented for pavement upgrade.
12. Based on the City agreed final strategy of PCC pavement or rehabilitation,
incorporate project special conditions, unique engineering and constructability
considerations, and City agreed preferences into the pavement design, and
prepare preliminary typical sections and special provisions, and coordinate
design of pavement rehabilitation.
13. Provide five copies of the draft pavement geotechnical report for review by City
staff, revise as appropriate and provide five copies of the final report.
14. Take design plans to the site and mark reconstruction and other repair areas in
the field conforming to overlay design limitations, and generally proof overlay
design aspects such as special conditions for cold milling, and other treatments
and coordinate for recording and plotting on plans.
15. For PCC pavement, mark areas of repair for destabilized slabs, including
marking and plotting outlines of areas of reconstruction that create new stable
slabs without destabilizing adjacent slabs.
16. Prepare PCC joint pattern layout definition and joint designs for PCC pavement.
17. Prepare special provisions for pavement related items and monitor inclusion of
the final details on the project plans, and proof estimates, details, cross sections
and construction notes, to ensure proper implementation at time of construction.
18. Coordinate final revisions and perform final constructability review of bid
documents.
19. Answer questions during bid period.CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
20. Provide review of pavement materials documentation at time of construction at
no cost to City.
Preliminary/Conceptual Design - Civil
1. Review compiled record data.
2. Develop base drawings at minimum scale of 1" = 20'
a. Plot survey data.
b. Identify and plot apparent substructures.
c. Conduct field verification of record data.
3. Develop proposed geometric layout for parkway and median curb. Design
alternatives will be identified and evaluated.
4. Develop typical cross sections for reconstruction areas.
5. Integrate design standards for Caltrans and the City of Los Angeles into the
design as required.
6. Coordinate and integrate design standards for transit agencies (Culver City Bus
and Metro Bus).
7. Develop preliminary cost estimates.
8. Attend coordination meetings with City personnel at various times during the
design stage to obtain additional input and review progress of the work.
9. Submit preliminary plans and estimates to the City of Culver City for review and
comment.
10. Respond to plan review comments.
Preliminary/Conceptual Design - Traffic
1. Upon completion of survey and preparation of base plans, perform a detailed
field review to verify and document existing traffic related topographic conditions_
The field review will include, but not limited to, existing signs, existing striping,
traffic signal equipment and any additional topographic information pertinent to
the project.
NvAIILLDAN,
Page 2
Serving Public Agercies
TeCif fr:CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
2. Coordinate with affected agencies and determine requirements for various
permits necessary for the project. Coordinate and integrate design standards for
Caltrans and the City of Los Angeles each of which has jurisdiction within a
portion of right-of-way for the project.
3. Prepare Traffic Management Plan (TMP) and traffic control concept plans.
4. Prepare and evaluate design concept plans.
5. Prepare preliminary cost estimates for each design alternative.
Preliminary/Conceptual Design — Landscape
1. Investigate landscape and irrigation requirements for the City of Culver City.
Obtain available record drawings. Verify known underground utilities to avoid
conflicts with proposed parkway trees and median trees plantings, and irrigation
mainline routing. Research available water source(s) and electrical sources for
the irrigation system and automatic irrigation controllers_
2. Field verify existing landscape and irrigation systems_ Work with City staff to
assess trees, shrubs and groundcover conditions and determine suitability.
Conduct a thorough irrigation audit to determine the performance of the existing
system and propose upgrades, if necessary.
3. Prepare one concept plan. Submit plan to the City and other pertinent
agencies/departments for review and comments. The plan will address:
• Planting palette suggestions (i.e., trees, shrubs, groundcover and vines)
• Irrigation systems (i.e., sprinkler equipment)
• Median hardscape treatment (i.e., stamped concrete, pavers)
e Renovation of existing landscaped areas
4. Upon the review and comments from the City, present a final concept plan for
final review and approval that addresses the comments from all parties. The
construction documents for landscape improvements will not commence until the
City and all other pertinent agencies have reviewed and approved the concept
plan.
Utility and Agency Coordination
1. Provide utility coordination throughout the design phase.
2. Willdan will prepare and send utility notifications via certified mail to the utility
companies and other agencies with facilities within the limits of the project on
30
WILLDAN
Servhn Public Arjer6s
Page 23CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
/MI City letterhead. Copies of available maps, plans and records and prior rights
information will be requested for any existing facilities within the project limits that
may be affected by the proposed improvements. These notices will be sent to
the contacts provided by the City. Each notice will contain a letter requesting
available atlases, as-builts, and proposed utilities within the project limits. The
requests will also include a copy of the Thomas Bros. Map pages with the project
area highlighted and a response sheet.
3. Willdan will maintain detailed records of correspondence with utility companies,
which will be made available to the City of Culver City upon request at the
completion of the work. Upon receipt of utility maps from the utility companies,
Willdan will prepare a digital master file in AutoCAD digital format depicting the
location of known underground and above-ground utilities within the project
limits. Municipal services such as water, storm drain, and sewer lines will also be
included in the master file plan. This master file will be referenced into the
drawings to identify potential utility conflicts with the proposed improvements.
High-risk facilities as defined by the Ca!trans Manual of High Risk Utilities will be
identified.
4. If required, Willdan will coordinate potholing performed by the utility companies in
order to determine depths of their facilities.
5. Preliminary costs estimates and schedules will be requested from each utility
company for which any utility relocation is required, including Southern California
Edison Company.
6. Coordinate with affected agencies and determine requirements for various
permits necessary for the project. Letters requesting information and transmitting
submittals will be on City letterhead.|109| Submit a set of the preliminary plans to each affected utility company for
comments.
8. Submit a set of final plans to each affected utility company and affected agency
with final notification for completion of utility work.
9. Provide the City a brief written summary of utility coordination status upon
delivery of final construction contract documents to the City.
Final Design (60%, 90%, & 100% PS&E)
1. Following the approval of preliminary plans, prepare final (60%, 90%, & 100%
stages) street rehabilitation, storm drain modification, median and parkway
Page 24WI _LDA.N
ServFlig3A IN
r- e,
Page 25
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
landscape and irrigation, traffic signal, traffic control, street lighting and signing
and striping plans.
2. Prepare civil design plans at scale of 1" = 20' horizontal and 1"=4" vertical.
Details will be prepared at large scale for clarity.
3. Define limits of curb and gutter, driveway and sidewalk removal and
reconstruction.
4. Define limits of pavement, grinding, and overlay if rehabilitation option is elected.
5. Define limits of pavement reconstruction and joint pattern, if PCC pavement
option is elected.
6. Define limits of pavement and concrete removal where required.
7. Prepare signing and striping plans at a scale of 1" = 20' along Sepulveda
Boulevard from Sawtelle Boulevard to Green Valley Circle. The signing and
striping plans will include loop replacements at signalized intersections, where
traffic signal modifications are not required. The design will conform to the latest
edition of the Caltrans Standard Plans and Specifications, MUTCD, and City
Standards.
8. Prepare traffic control plans at a scale of 1" = 20'. The traffic control plans will be
prepared for the street widening and the median reconstruction areas of the
project. It is not anticipated that traffic control plans will be required for roadway
concrete reconstruction or street resurfacing. The design will conform to the
latest edition of the Caftans Standard Plans and Specifications, MUTCD, and
City Standards.
9. Prepare street lighting plan at a scale of 1" = 20' from Playa Street/Jefferson to
Green Valley Circle. The street lighting system is City-owned, therefore the
design will conform to Los Angeles County and !ES standards.
10. Prepare traffic signal modification plans at a scale of 1" = 20". The intersections
include: Sepulveda at Jefferson/Playa, Sepulveda at Slauson, Sepulveda at the
Sizzler driveway, and Sepulveda at Green Valley. ft is our understanding that the
red light camera system for the intersection of Sepulveda at Slauson will be
relocated by others and will not be a part of the traffic signal modification plan.
The designs will conform to the latest edition of the Caltrans Standard Plans and
Specifications, MUTCD, and City Standards.
11. Prepare traffic signal interconnect plan at a scale of 1" = 20' from Playa
Street/Jefferson to Green Valley Circle. The traffic signal interconnect design willCITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
be the relocation of the City's CCTV fiber optic system. The designs will conform
to the latest edition of the Caltrans Standard Plans and Specifications and City
Standards.
12. Prepare traffic special provisions and final engineer's estimate to be incorporated
into bid documents.
13. Submit preliminary PS&E at 60%, 90% and 100% completion for City review.
Upon receipt of final City comments, revise PS&E and submit final PS&E with
plans on mylar, to the City for use in advertisement and bid.
14. Integrate design standards for Ca!trans and the City of Los Angeles into the
design as required.
15. Coordinate and integrate design standards for transit agencies (Culver City Bus
and Metro Bus).
16. Upon the approval of the conceptual plan for the median modifications, conduct a
field review of potential trees affected by the new curb alignments. This tree
assessment report will evaluate root shaving and/or root pruning impacts for
each tree affected by the modifications.
17. Prepare landscaping plans, specifications and estimates (PS&E) for the modified
medians and parkways. The PS&E will be prepared in conformance with the
approved concept plan. The plans will address proposed and existing landscape
and irrigation systems areas. The irrigation system design will be in accordance
with reclaimed water requirements and standards, if required. In addition, the
landscape construction plans package shall include landscape details;
construction costs estimates and special provisions specifications.
18. Plans will be prepared and delivered in the latest version of AutoCad format.
19. Prepare specifications and contract documents to conform to applicable
requirements of the City of Culver City.
20. Perform final constructability/quality control review.
21. Prepare final project cost estimates.
22. Coordinate with other agencies and utility companies as required in the
preparation of the plans, issuance of permits as required, and construction
clearance.
Page 2633
VVILLDAN
E ; e.rvirg Pubk:CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
23. Submit final 100% PS&E documents in accordance with the RFP, including mylar
and digital submittals.
24. Willdan will prepare a conceptual Storm Water Pollution Prevention Plan
(SWPPP) in accordance with either the General Construction Activity Permit.
Willdan will prepare the Notice of Intent (N01) and process the approval through
the City of Culver City and Regional Water Quality Control Board (RWQCB).
Construction Technical Support
1. Attend pre-bid meeting.
2. During advertisement period, prepare responses in writing for City staff to answer
written requests for clarification form prospective bidders.
3. Prepare and issue addenda as necessary.
4. Prepare record drawings based on redline drawings provided by the contractor
and prepare for submittal to the City wet stamped and signed mylars.
_L DA ‘,1
Page 27
v. Ag,:slisCITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
EXPERIENCE
The following is a list of representative projects accomplished by members of our
project team.
Project: 223rd Street Improvements (2008)
Client: City of Carson
Contact: Mr. Farrokh Abolfathi, Principal Engineer, (310) 830-7600
Willdan was retained to provide professional design services to prepare plans,
specifications, and cost estimate (PS&E) for the 223rd Street Improvements, Lucerne
Street to Alameda Street Project No. 1003. Services included developing a landscape
master plan to create an identity for Auto Row, and preparation of plans and
specifications, street widening and rehabilitation, landscape medians, signing and
striping and traffic control.
Project: Whites & Soledad Canyon Improvement (2008)
Client: City of Santa Clarita
Contact: Mr. Terry Brice, Assistant Engineer, (661) 259-2489
Willdan was retained to provide professional design services to prepare plans,
specifications, and cost estimate (PS&E) for the construction of a right-turn pocket at
Whites Canyon road and Soledad Canyon Road, Project No. C3010. Services included
developing and preparation of plans and specifications, street widening and
rehabilitation, relocate overhead utilities, signing and striping, street lighting and traffic
control.
Project: HVVY 111 Street Improvements (2007)
Client: City of Indian Wells
Contact: Mr. Tim Wassil, Director of Public Works, (760) 346-2489
Prepare plans, specification, and estimate (PS&E) for Highway 111 from west City limit
to east City limit (3 miles). Project consists in widening Highway 111 to add one thru
lane for the eastbound and westbound traffic, as well as landscape medians. Project
includes preparation of environmental impact report, street, storm drain, traffic signal
(8), interconnect, signing and striping plans, preparation of topographic survey,
geotechnical report, legal description and platts, right-of-way appraisal and acquisition,
coordination with adjacent developments and agencies for project transitions and utility
companies for substructure research and relocation. Project was completed in a timely
manner to meet the City's schedule
Page 2:1115
J_DAN
Polk: Apercie.::Page 29
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
Project: Town Center Street Improvement Design (2007)
Client: City of La Canada Flintridge
Contact: Mr. Ying Kwan, City Engineer, (818) 790-8882
Willdan prepared the plans, specifications, and estimate for the installation/modification
of three traffic signals, streetscape design, street resurfacing, raised center medians,
and center median landscaping associated with the La Canada Flintridge Town Center
development. Willdan also assisted with Caltrans Encroachment Permit processing to
obtain permit and performed utility coordination, right-of-way survey, pavement analysis,
and streetscape design.
Project: Norwalk Boulevard and Bloomfield Avenue Boulevard Resurfacing
(2007)
Client: City of Lakewood
Contact: Ms. Lisa Rapp, Director of Public Works, (562) 866-9771
Provided engineering design, pavement deflection testing and study, pavement
rehabilitation design, utility coordination, and preparation of bid documents for the
resurfacing Norwalk Boulevard and Bloomfield Avenue from City limit to City limit.
Project: California Avenue Street Rehabilitation Design FHWA Funded (2007)
Client: City of South Gate
Contact: Mr. Robert Dickey, Director of Public Works, (323) 563-9500
Willdan provided deflection testing, pavement report, pavement rehabilitation design,
utility coordination, and preparation of bid documents for this major arterial from City
limit to City Limit. Included installation of interconnect and new street light system.
Project: Alder/Randall and Alder/Merrill Improvements (2004)
Client: City of Fontana
Contact: Mr. Ricardo Sandoval, City Engineer, (909) 350-7613
Prepared street and traffic signal improvement plans, and engineering construction
estimate for the location of Alder Avenue/Merrill Avenue and Alder Avenue/Randall
Avenue. Services rendered consisted of preparation of plans for traffic signal, storm
drain, street, and signing and striping plans. Other services included utility coordination,
topographic survey, legal description with plat, potholing, and assistance during
advertisement and bidding. Project consisted of widening the intersection to ultimate
improvement for the traffic signal installation.CITY OF CULVER Cm'
SEPULVEDA BOULEVARD WIDENING PROJECT
Project: Garfield Avenue Street Rehabilitation Design FHWA funded (2004)
Client: City of South Gate
Contact: Mr. Robert Dickey, Director of Public Works, (323) 563-9500
Willdan provided deflection testing, pavement report, pavement rehabilitation design,
utility coordination, and preparation of bid documents for this major arterial from
Firestone to Imperial Highway. Included installation of interconnect and concrete
intersection pavement.
Project: Paramount Boulevard Rehabilitation Project FHWA Funded (2007)
Client: City of Pico Rivera
Contact: Mr. Michael Moore, Director of Public Works, (562) 942-2000
Willdan was retained by the City of Pico Rivera to provide professional engineering
services including preliminary engineering, survey, and design preparation of plans and
specifications for the Paramount Boulevard Rehabilitation Project. The roadway width
of Paramount Boulevard within the project limits of Washington Boulevard to Gallatin
Road varies from 58 feet to 72 feet wide. The services for this project included civil
design, traffic engineering, survey, utility coordination, and preparation of technical
specifications for the project.
Project: Rosecrans Boulevard Rehabilitation Project FHWA Funded (2007)
Client: City of Paramount
Contact: Mr. Chris Cash, Utilities & Infrastructure Assistant Director,
(562) 220-2020
Willdan was retained by the City of Paramount to provide professional engineering
services including preliminary engineering, survey, and design preparation of plans and
specifications for the Rosecrans Boulevard Rehabilitation Project. The services for this
project included civil design, pavement engineering, deflection testing and materials
report, traffic engineering, survey, utility coordination, and preparation of technical
specifications for the project.
Project: Larch Avenue Improvement FY 2006-07 (2007)
Client: City of Lawndale
Contact: Ms. Marlene Miyoshi, Director of Public Works, (310) 973-3265
Willdan has been retained to provide professional services for engineering design,
pavement engineering design, utility coordination, and preparation of bid documents for
the Larch Avenue from Manhattan Beach Boulevard to Marine Avenue improvement
Project, FY 2006-07.
Page 30111 ‘A/1 .! n . A Ni
S ,arving -". Aijencie$Page 31
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
Project: Hawthorne/Palos Verdes Drive West Overlay (2006)
Client: City of Rancho Palos Verdes
Contact: Ms. Bindu Vaish, Project Manager, (310) 544-5254
Provided design and pavement engineering services for the resurfacing of Hawthorne
Boulevard (Silver Spur/North City limit) and southbound Palos Verdes Drive West
(North City limit/Hawthorne) and slurry seal of northbound Palos Verdes Drive West
(400' south of Golden Cove/Hawthorne).
Project: Rosocrans Avenue Street Resurfacing (2005)
Client: City of Paramount
Contact: Mr. Chris Cash, Utilities & Infrastructure Assistant Director,
(562) 220-2020
Prepared plans and specifications and provided construction engineering and labor
compliance for the street resurfacing of Rosecrans Avenue from Garfield Avenue to
Century Boulevard including crosswalk replacement at Downey Avenue.
Project: Del Amo Boulevard Resurfacing (2005)
Client: City of Lakewood
Contact: Ms. Lisa Rapp, Director of Public Works, (562) 866-9771
Provided engineering design, pavement rehabilitation design, utility coordination, and
preparation of bid documents for the resurfacing Del Amo Boulevard between
Studebaker Road and the east City limit.
Project: 2004-2005 Asphalt Concrete Overlay (2004)
Client: City of Rolling Hills Estates
Contact: Mr. Sam Wise, Assistant City Manager, (310) 377-1577
Provided design, design survey, utility coordination, monument restoration, contract
administration, and construction observation services for the City's 2004-05 Asphalt
Concrete Overlay program.
Project: San Gabriel Boulevard Improvements (2003)
Client: Rosemead Community Development Commission
Contact: Mr. Oliver Chi, City Manager, (626) 569-2100
Provided civil and traffic engineering design, utility coordination, construction
management, construction observation, monument restoration, and federal labor
compliance services for street improvements on San Gabriel Boulevard from Hellman
Avenue to Rush Street. The project included street resurfacing with Asphalt-Rubber
Hot Mix (ARHM); removal and construction of all concrete sidewalk, driveways, and
curb ramps in compliance with ADA requirements; signing and striping; traffic loop
replacement; new parkway trees with grates; and street light with underground conduits.CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
WORKLOAD
The current and anticipated workload of the team members include the following:
CURRENT AND ANTICIPATED
eY Perithillel
Adel Freij, P.E.
WORKLOAD
Major Projects
No anticipated major projects.
Abner Catig No anticipated major projects.
Calvin Catig No anticipated major projects.
Tom Kirk, P.E. No anticipated major projects.
Lew Gluesing, RE., T.E., P.T.O.E. No anticipated major projects.
Vanessa Munoz, RE., T.E., P.T.O.E. No anticipated major projects.
Bob Burch No anticipated major projects.
Jeffrey Lau, E.I.T. No anticipated major projects.
Juan Avila No anticipated major projects.
Jason Brown, R.C.I. No anticipated major projects.
Ed Cox No anticipated major projects.
David Knell, P.L.S. No anticipated major projects.
Susy Barrientos No anticipated major protects.
William Coffman No anticipated major projects.
John Hidalgo, R.L.A. No anticipated major projects.
Bryan Nguyen, R.L.A. No anticipated major projects.
David Hayes, R.L.A. No anticipated major projects.
Steven Leathers, P.E. No anticipated major projects.
Vincent P. lp, P.E., G.E. No anticipated major projects.
All key personnel listed will be available for the duration of the project. Should a change
be required due to unforeseen circumstances, a person of equal stature and ability will
be offered for the position.
Page „31
kNiLLDAN
PutLic\N LLDAN
Servmg PLIE;4:r.: Agerces
Page 33
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
PROJECT TIMELINE
The attached schedule shows our plan as outlined in more detail in the Scope of Work
section how testing and other design work can be performed concurrently to minimize
the timeframe. Wilidan has the necessary personnel to devote to the project tasks
during this crucial period.CITY OF CULVER CITY
Sepulveda Boulevard Widening Project
PROJECT DESIGN SCHEDULE
ID Task Name Start Finish
2008
May I June 1 July August I eptembel October INovembe 'December
•_5tig
,
January IFebruary
1 Notice-to-Proceed (Assumed) Mon 5119108 Mon 5/19/08
2 General Fri 5/30108 Mon 219109 jp1M11111=1111•11111=111=11111.111n111=111M...............
3 Kick-Off Meeting Fri 5/30/08 Fri 5/30/08
5/30
4 Research Records/Field Review Mon 6/2/08 Fri 6/13/08
5 Survey Mon 6/2/08 Fri 6/13/08 '
6 Utility Coordination Mon 6/2/08 Mon 2/9/09
7 Pavement Engineering Mon 6/2/08 Fri 7/4/08
8 Conceptual Design Mon 8/16/08 Fri 9/12/08
9 Develop Base Plans Mon 6/16/08 Fri 7/4/08
Conceptual Design Design Phase Mon 7/7/08 Fri 9/12/08 10
L ::H::1:::::!, 777
11 60% PS&E Mon 9/15/08 Mon 11/10/08
12 Design Mon 9/15/08 Fri 10/24/08
13 60% Submittal Mon 10/27/08 Mon 10/27/08
10/27
14 City Review Tue 10/28/08 Mon 11/10/08
15 90% PS&E Tue 11/11/08 Mon 1/12/09
Lill immummip
16 Design Tue 11/11/08 Mon 12/22/08
17 90% Submittal Mon 12/22/08 Mon 12/22/08|1010|12/22
18 City Review Tue 12/23/08 Mon 1/12/09
111111
19 100% Final PS&E Tue 1/13/09 Mon 2/9/09
20 Final Design Tue 1/13/09 Mon 2/9/09
100% Final Submittal Mon 2/9/09 Mon 2/9/09 21
,
• 2/9
Date: Thu 3/20/08 Summary V
Task 1 Milestone • City Task
Page 1 of 1WILLDAN
Page 35
CITY OF CULVER CITY
SEPULVEDA BOULEVARD WIDENING PROJECT
FEE SCHEDULE
As requested in the City's RFP, the fee schedule is being submitted in a separate
sealed envelope.N L DA N
Serjric Punc Agenr::es
Page 36 101°3
CITY OF CULVER Cm'
SEPULVEDA BOULEVARD WIDENING PF?0,1ECT
REFERENCES
Client: City of Lakewood
5050 Clark Avenue, Lakewood, CA 90712
Contact: Ms. Lisa Rapp, Director of Public Works, (562) 866-9771,
Fax: (562) 866-0505
Client: City of Rolling Hills Estates
4045 Palos Verdes Drive North, Rolling Hills Estates, CA 90274
Contact: Mr. Sam Wise, Assistant City Manager/Director of Public Works,
(310) 377-1577, Fax: (310) 377-4468
Client: City of South Pasadena
1414 Mission Street, South Pasadena, CA 91030
Contact: Mr. Shin D. Furukawa, Deputy Public Works Director, (626) 403-7246,
Fax: (626) 403-7211
Client: City of Fontana
8353 Sierra Avenue, Fontana, CA 92335
Contact: Mr. Ricardo Sandoval, City Engineer, (909) 350-7613,
Fax: (909) 350-6613
Client: City of Paramount
16400 Colorado Avenue, Paramount, CA 90723-5012
Contact: Mr. Chris Cash, Public Works Director, (562) 220-2020
Fax: (562) 630-6731
Client: City of La Canada Flintridge
1327 Foothill Boulevard, La Cafiada-Flintridge, CA 91011
Contact: Mr. Ying Kwan, City Engineer, (818) 790-8882
Fax: (818) 790-75361{111 )1 M SAWTELLE BL
lix
IIIIMMI
0Nom
ix
Imo|10 10|tai
ix
Ui Li
Li
UJ
NNE
some
Imoni
N
„Imo
g
=MI
11111M100 Num
_4=
6%. n SOUTH
MEI
=MB
IMO
mo lIVO
BUSH WY
IN
MN
Lii
F-
11111
MI
BE R R YfitIAF/ AV
Cf)
rn
Et=
13
r-
IM
MEM
mom
MIN
AM M
OW
co|1010|AT
111
VW.
NM
MINIM
_miry
Po'
rn
.0
•
SEPULVEDA BOULEVARD
WIDENING PROJECT - P-881
LOCATION MAP
n
--r iavep
Lco,„
accereme:'
et
att