Legislation Details

File #: HIST-2532    Version: 1 Subject:
Type: Historical Status: Action Item
In control: City Council Meeting Agenda
On agenda: 5/22/2006 Final action: 5/22/2006
Title: Consideration to Approve a Budget Amendment and a Professional Services Agreement with Geo-Environmental, Inc. for the final design of slope repairs at the rear of the properties located at 10745, 10747, and 10751 Cranks Road and 5722 and 5724 Tellefson Road.
Attachments: 1. A-4__06-05-22_PW-Eng_CranksSlope.doc, 2. A-4 Cranks Rd.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends that the City Council approve a budget amendment of $44,904 and a professional services agreement with Geo-Environmental, Inc. for the final design of the slope repair behind the properties located at 10745, 10747, and 10751 Cranks Road and 5722 and 5724 Tellefson Road. A four-fifths affirmative vote is required to amend the budget. BACKGROUND: On February 12, 2005 a landslide occurred on the slope in the rear of the properties located at 10747 and 10751 Cranks Road and 5724 Tellefson Road. After consultation with a geotechnical firm, the Public Works Department and Building and Safety Division deemed five properties (including 10745 Cranks Road and 5722 Tellefson Road) to be unsafe for human habitation and all were ‘red-tagged.’ Also due to the imminent threat of further sliding, Tellefson Road was closed between Cranks Road and Bernardo Road. Portions of this slope were subjected to landslides in the 1960’s, 1978, late 1980’s, and in 1993. There have been several variations of repairs conducted throughout the years that were funded by the Federal Emergency Management Agency (FEMA) and the property owners. The most recent repairs to the slope occurred in 1993 when a soldier-beam pile system consisting of three walls, a series of terraces, and concrete gunite were installed. Meeting Date: 5/22/06 Item Number: A-4 AGENDA ITEM: Consideration to Approve a Budget Amendment and a Professional Services Agreement with Geo-Environmental, Inc. for the final design of slope repairs at the rear of the properties located at 10745, 10747, and 10751 Cranks Road and 5722 and 5724 Tellefson Road Contact Person/Dept.: Charles Herbertson/PW and Mate Gaspar/PW Phone Number: 310.253.5635 and 310.253.5602 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [] Action Item: [X] Attachments: [X] Public Notification: Master Notification List emailed on May 17 and residents of 10745, 10747, and 10751 Cranks Road and 5722 and 5724 Tellefson Road and their respective attorneys were notified by e-mail on May 17 Department Approval: Charles D. Herbertson 5/15/06 CAO Approval: Jerry Fulwood 5/18/06 City Controller Approval: Marlee Chang 5/16/06City of Culver City, California City Council Agenda Item Report The failure occurred under the concrete gunite that was placed in the rear properties at 10749 and 10751 Cranks Road and 5724 Tellefson Road. The slope further east at the rear properties of 10745 Cranks Road and 5722 Tellefson Road did not fail; however, it was the opinion of the City’s consulting geotechnical engineer that there was an imminent threat for a slide to occur there. March 2005 to June 2005 There were several meetings held with FEMA representatives and the property owners regarding repairing the slope. FEMA stated that the February 12, 2005 event was included under the federal emergency declaration of the January 2005 storms. Also, they recommended that an extension be filed to ensure that the window of receiving possible federal reimbursement for the repair work did not expire after the first 6 months following the date of the disaster declaration (August 4, 2005). Staff filed a twelve month extension to complete the repair work. At the same time it was determined that a geotechnical and geologic investigation of the slope should be conducted. On June 10, 2005, the City Council approved a budget amendment of $35,000 and a professional services agreement with Zeiser Kling Consultants, Inc. for the geotechnical and geologic investigation of the slope behind the five properties The work consisted of the following: 1. Research existing geotechnical reports, geologic maps and reports, aerial photographs, and meetings with staff. 2. Borings to a maximum depth of 80 feet. 3. Laboratory testing to determine pertinent engineering properties. 4. Engineering and geologic analyses to develop a geologic map and cross sections for input into slope stability analyses and develop design parameters for a soldier pile retaining system similar to existing walls. 5. Final Report and preparation of an RFP. June 2005 to November 2005 After two months of negotiations between the City and two property owners to allow the contractor access to their private properties, exploratory drilling was performed in August 2005 and a draft report was submitted to the City by its geotechnical City of Culver City, California City Council Agenda Item Report consultant on November 27, 2005. The report revealed that the main cause of the slope failure was loss of friction between soil strata as a result of percolation of large amounts of rain water during record storms in December 2004 and January 2005. The report recommended that a three soldier pile wall system be constructed, (similar to the system of walls constructed on the adjacent slope in 1993), and extended across the properties at 10745 Cranks Road and 5722 Tellefson Road. Meanwhile, staff continued to meet with FEMA and OES representatives regarding the subject matter. FEMA’s review of the draft geotechnical report resulted in questions regarding the reason for extending the repair across the slope where there was no failure. Since the initial slope failure, the slope has not failed, however, the Public Works Director/City Engineer and Building Official continue to keep these two properties red tagged due to a possibility of failure and as recommended by Zeiser- Kling. The response to FEMA was prepared by Zeiser-Kling and in summary stated that the adjacent slope experienced headward enlargement or escarpment due the adjacent slope failure, as evidenced by a growing widening cracks on the property line walls between 10743, 10745 and 10747 Cranks Road. Also, Zeiser Kling conducted a slope stability calculation and determined that the slope behind the properties at 10745 Cranks Road and 5722 Tellefson Road has a factor of safety of less than 1.5 and with an elevated groundwater level, would reduce to less than 1.0, similar to the condition of the adjacent slope prior to failure. In addition it was concluded that the slope is experiencing ongoing creep. December 2005 to May 2005 Staff requested Zeiser Kling to submit a proposal for the final design of the soldier pile system and submit a construction cost estimate. Zeiser-Kling, along with their civil engineering sub consultant, Fuscoe Engineering of Irvine, California, submitted a $425,000 cost proposal for the final design of slope repair. Also, they estimated that the slope repair will cost about $1 million. Because the proposal for design from Zeiser-Kling was much more costly than anticipated, staff decided to request multiple proposals and issued a Request for Proposal (RFP) to fifteen geotechnical design firms for the final design of the slope repair. Only two firms responded, David Lee Associates and Geo-Environmental, Inc. The other design firms were contacted and they declined to submit a proposal due to their current full workload. Upon review, David Lee Associate’s proposal was determined to be non-responsive because it did not include a final design of the repair and focused only on the geotechnical analysis. Geo-Environmental’s proposal was found to be responsive and complete and they provided a total cost proposal of $118,000. The proposal included material testing and inspection services during construction in the amount City of Culver City, California City Council Agenda Item Report of $30,080. Staff is recommending that this portion of the work be awarded at a later date to coincide with the actual construction of the repair. With this portion of the work removed from the contract, the final total cost proposal is $88,550. Under the current project worksheet approved by FEMA, the design is required to be completed by August 3, 2006. Therefore, it is important to move ahead and award a contract to complete the final design. FISCAL ANALYSIS: It is recommended that funding for this work be allocated from unreserved General Funds to Other Contractual Services 42300867. A 4/5 th vote is required to approve this budget allocation. FEMA has approved $82,150 as eligible reimbursement costs for design of the repair of the slope failure. FEMA will fund $61,613.00 or 75% of the eligible cost, and State OES will cover $15,403.00, approximately 19%. In addition to the reimbursements just discussed, FEMA and OES have already paid to the City $3,780.00 as an administrative allowance for the design process. The City has already expended $6,000 and $32,150 for the preliminary investigations and analysis by Group Delta Consultants and Zeiser-Kling, respectively. The remaining total of FEMA/OES eligible reimbursement funds available is $42,646. An additional $45,904.00 is required to fund the Geo- Environmental, Inc. contract. The City potentially would need to absorb this expenditure if an alternative source of funding is not identified. Staff will be working with FEMA and OES officials in an attempt to get the approved amount of funding for design services increased through an amendment to the FEMA approved Project Worksheet. Additionally, a future agreement with the affected homeowners may include provisions for paying for some or all of the shortfalls in funding for both design and construction of the repairs. Future Repair Costs: The construction of the repairs has also been approved by FEMA and OES for reimbursement in the amount of $885,413.00. FEMA/OES anticipated reimbursements, based on the percentages discussed above, are approximately $832,280.00. FEMA/OES have also already paid to the City $39,767.00 as an administrative allowance for the construction process. The City potentially would again need to absorb an additional expenditure if an alternative source of funding is not identified.City of Culver City, California City Council Agenda Item Report Also it should be noted that the actual cost of construction has not yet been identified and it is therefore possible that the construction costs will exceed the amount currently allocated by FEMA. Additionally, FEMA’s approved scope of work for the project currently differs from the scope of work that the City recommends. For both of these reasons, there exists the potential for a significant shortfall in funding for the construction phase. However, FEMA has left the door open for a future revision to the Project Worksheet for the repair work to both increase funding and to expand the scope of work. This will be discussed with FEMA following completion of the design as FEMA has indicated that they cannot make that determination without a completed design. Also, as stated earlier, in working out the agreement with the property owners, the possibility exists for the property owners to pay a portion of or the entire construction cost shortfall. ATTACHMENT: 1. Proposal from Geo-Environmental Inc. MOTION: That the City Council: 1. Approve a professional services agreement with Geo-Environmental, Inc. for the final design of the slope repair behind the properties located at 10745, 10749, and 10751 Cranks Road and 5722 and 5724 Tellefson Road, 2. Approve a budget amendment to transfer $45,904 from unreserved general funds to Other Contractual Services 10160500.619800. 3. Authorize the Public Works Director/City Engineer to approve an additional change order in the amount of $30,080 for material testing and inspection service to Geo-Environmental, Inc., during the time of construction. A 4/5-budget vote is required to approve the budget amendment. 05/22/06 Consideration to Approve a Budget Amendment and a Professional Services Agreement with Geo-Environmental, Inc for the final design of slope repairs at the rear of the properties located at 10745 10747 and 10751 Cranks Road and 5722 and 5724 Tellefson Road MEETING DATE AGENDA ITEM ATTACHMENTS Pages|1010| Proposal from Geo-Environmental Inc 1 - 39Wastewatei Treatment Plat it City of Corona PROPOSAL TO PROVIDE Final Design of Cranks / Tellefson Road Slope Repair Culver City Project No P-867 011 O OOOOOO OOOOO OO 000 •0 • • ••• • • • •00* •41 • • •00 •O • OO Landslide Repairs at Highland View City of Corona California Slope Stability Evaluation Shoresliff Golf Course San Clemente California Landslide Repairs at Eight Locations City of La Canada Flintridge California Prepared for Mr John Rivera Senior Management Analyst Culver City Public Works Department 9770 Culver Boulevard 2rKI Floor Culver City, CA 90232 0507 May 8 2006 GEI Proposal No 06 062 Caltrans Certified Soil Testing Laboratory Bip Montgoinery Slope Fallure Gay of Torrance California Groundwater Replenishment Systems Unit Ill Pipeline Orange County Water District Construction Supervision/Soils and Matenals Testing SR 134 Hollywood Way Ramps Improvements City of Burbank ** ****** * NMI GEO ENVIRONMENTAL INC OOOOOOOO 0************* OOOOO Coltrane Certified DBE Firm 1720 E Garry Avenue Suite 215 Santa Ana CA 92705 (949) 263 8334 (949) 263 8338 fax Email oeincorpeaol corn Website www q eo environmental corn n51 mow GEO-ENVIRONMENTAL INC Coltrane Certified OBE Firm May 8 2006 Mr John Rivera Senior Management Analyst Culver City Public Works Department 9770 Culver Boulevard 2nd Floor Culver City CA 90232 0507 Subject Proposal to Provide Final Design of Cranks / Tellefson Road Slide Slope Repair City Project No P 867 GEI Proposal No 06 062 Dear Mr Rivera Geo Environmental Inc is pleased to submit this Proposal or Professional Engineering Services for the final design of Cranks / Tellefson Road Slide Slope Repair We are confident that you will find Geo Environmental Inc and our team of subconsultants well qualified for this project Our contact information for this project is Farhat H Siddiqi Ph D P E Principal Engineer 1720E Garry Avenue Suite 215 Santa Ana CA 92705 Tel (949) 263 8334 extension 22 Fax (949) 263 8338 Geo Environmental Inc is headquartered in Santa Ana California We also operate branch offices in Riverside and San Diego California as well as Las Vegas Nevada Our Caltrans certified soils laboratory is located in Irvine California Enclosed are completed Standard Form 330 material for our project team of Geo Environmental Inc Wheeler & Gray Inc and Cabnnha & Hearn Associates Geo Environmental Inc has extensive recent experience with similar projects throughout Southern California We are committed to providing the City of Culver City with high quality responsive professional services Should you have any questions about our qualifications package please call me We look forward to hearing from you and providing the city our professional services Sincerely Geo Environmental Inc ,r- .try 1720 East Garry Avenue Suite 215 Santa Ana CA 92705 (949) 263 8334 (949) 263 8338 (fax) Farhat H Siddiqi Ph D P E Principal Engineer 2 Culver City Table of Contents Cranks / Tellefson Road Slide Slope Repairs PAGE Cover Letter Table of Contents Project Team Identification 1 Team Organization 2 Project Understanding and Approach 4 Geo Environmental Inc Geotechnical Investigation 6 Testing and Inspection Setvices 8 Wheeler & Gray Civil and Structural Engineenng 10 Master Design Schedule 11 Construction Estimate 11 Standard Form 330 Part I — Contract Specific Qualifications Section A D 12 Section E 13 Section F 22 Section G 26 Section H 27 Part II — General Qualifications 31 DBE Certificates Geo Environmental Inc 34 Cabnnha Hearn & Associates 36 Cost Proposal Attached as a Separate File GE! Proposal No 06 062 I Geo Environmental Inc 3Project Team Identification Culver City Cranks / Tellefson Road Slide Slope Repairs Prime Consultant Geo Environmental, Inc 1720 East Garry Avenue Suite 215 Santa Ana CA 92705 Tel (949) 263 8334 Fax (949) 263 8338 Email fsiddiqi@geo environmental com Geo Environmental Inc is a California C Corporation Subconsultants Wheeler & Gray Consulting Engineers 650 Sierra Madre Villa Avenue Suite 300 Pasadena CA 91107 Tel (626) 432 5850 Fax (626) 432 5858 Email jkelly@wheelerandgray com Wheeler & Gray is a California C Corporation Cabnnha Hearn & Associates Land Surveyors 408 South Rosemead Boulevard Pasadena CA 91107 Tel (626) 795 6926 Fax (626) 795 4180 Email clyde@cabnnhahearn corn Cabnnha Hearn is a California C Corporation GEI Proposal No 06 062 1 Geo Environmental Inc 4Team Organization Culver City Cranks / Tellefson Road Slide Slope Repairs CITY OF CULVER CITY PUBLIC WORKS DEPARTMENT Proposal to Provide Final Design of Cranks / Tellefson Road Slope Repair City Project No. P-867 CITY OF CU VER CITY PUBLIC WORKS DEPARTMENT Other City Departments! Other Utility Owners MOM simmi 1 GEO-ENVIRONMENTAL, INC Farhat H Sidclicii Ph D P E Caltrans Certified Project Management / Geotechnical Investigation DBE Firm|1010|IL11_09 WHEELER & GRAY CONSULTING ENGINEERS Mr John Kelly P E Mary Kinsler P E Project! Civil Engineering Project / Civil Engineering CAD Department CABRINHA HEARN St ASSOCIATES Clyde Cabnnha L S Land Surveying and Mapping Geo Environmental Inc 2 GEI Proposal No 06 062eeler & Gray, Inc Geo.Envitonmental, Inc.* Cabrinha Hearn & Associates John Kelly P E Mary Kinsler P E Farhat H Siddicp Ph D P E Project Manager / Pnmary Contact Clyde C Cabnnha Camden Cabnnha Field Observation / Laboraton) Testing Geology, Seismicity, and Environmental Issues Parviz Sheikhavandi B S Roberto Flores B S ** Michael Givens BS* Jun Cnstobal Jamal Siddiqi B S Farhat Siddiqi Ph D P E Richard Fragaszy Ph D P E Hossein Foroughi Ph D P E Franklin Fong MS PE GE L Fernando Aragon MS PE GE Frank Kresse C E G Sree Akkenapally MS REA Sheldon Medall MS CEG Mark Doerschlag C E G Geotechn i cat Engineering Culver City Team Organization Cranks / Tellefson Road Slide Slope Repairs Organization Chart We have assembled our project team of highly qualified professionals as shown in the Organization Chart below Detailed resumes of proposed staff members have also been included as an attachment for your review TEAM ORGANIZATION CHART City of Culver City Final Design of Cranks / Tellefson Road Slide Slope Repair City Project No P 867 City of Culver City Project Manager / Technical Review Richard J Fragaszy Ph D P E *Caltrans Certified DBE "Caltrans,Certified TeOhnician Geo Environmental Inc 3 GEI Proposal No 06 062Project Understanding and Approach Culver City Cranks / Tellefson Road Slide Slope Repairs PROJECT GOALS This project will provide repairs to the slope damage caused by the recent storms during the winter of 2004 2005 to the previously repaired slopes following damage in the 1980s and 1990s Geo Environmental, Inc in coordination with its subconsultants Wheeler & Gray Inc and Cabnnha Hearn & Associates will provide engineering and support services for the preparation of construction contract documents for public bidding for the projects The project site consists of a 30 to 75 foot slope between the City streets and residential lots located at 10743 through 10751 Cranks Road and 5722 and 5724 Tellefson Road The majonty of the proposed repair areas are owned by the private property owners Based on the recommendations of the City s previous Geotechnical Engineers the Construction project will involve the demolition of the remaining slope facing construction of a two tier Cantilever Soldier Pile retaining wall system backfill of the Soldier Pile wall reconstruction of slopes as geognd reinforced slopes construction of terrace drains repairs of the existing undermined and damaged terrace drains as well as repair of any damage to the existing Soldier Pile wall panel However the validity of the choice of the provision of the two tier Cantilever Soldier Pile retaining wall system as the most cost effective and prudent method of slope repair will be independently verified by Geo Environmental Inc CRITICAL ISSUES Critical issues for these projects are maintaining the construction budget within the available funds According to the City s RFP the project budget for the restoration and rehabilitation of the damaged slopes inclusive of all costs of design engineering construction permitting fees supervision and management is estimated to be $1 2 million The project site lies both within the City limits as well as private properties requiring polite interaction with the property owners PRELIMINARY SCHEDULE A preliminary schedule is attached at the end of this section ACCELERATION OF DESIGN AND CONSTRUCTION Acceleration of the project schedule is best handled during design by determining construction methods and techniques project phasing and project combinations that will serve to eliminate duplication of tasks down time for contractors crews and equipment and conflicts between critical path tasks during construction SCOPE OF SERVICES Geotechnical Engineering Geotechnical engineering will be conducted by Geo Environmental Inc This task will independently determine the cause or causes of failures with the purpose of designing repairs and restoration to eliminate to the extent feasible the possibility of a similar failure in the future In this process the recommendations made by the City s previous Geotechnical Engineer will either be validated or modified Environmental Documents It is expected that this project will be categorically exempt under California Environmental Quality Act (CEQA) and categorically excluded under the National Environmental Protection Act (NEPA) Our fees in the Cost Proposal GEI Proposal No 06 062 4 Geo Environmental Inc 4•1Culver City Project Understanding and Approach Cranks / Tellefson Road Slide Slope Repairs portion of this proposal are based on this assumption Engineering Survey Topographic Survey will be performed by our subconsultant Cabnnha Hearn and Associates Our subconsultant Wheeler and Gray will research the City's records and research the utilities in the area As a part of the utility research we will also ascertain if the utility purveyors have any future work that will impact construction Right of way Engineering and Acquisition Services It is expected that no permanent new rights of way or easements will be necessary for the completion of this project Our fees in the Cost Proposal portion of this proposal are based on this assumption Permission for entry and temporary easements for construction are expected to be needed Our subconsultant Wheeler & Gray will prepare mapping and legal descnptions and Geo Environmental Inc will conduct communication with affected parties Preliminary Design Our subconsultant Wheeler & Gray will prepare preliminary documentation to the extent necessary to prepare environmental documentation construction cost estimates and provide review matenal for the City on which to comment Final Design — Plans, Specifications and Cost Estimates Final design will consist of completion of all documentation necessary to conduct a public bidding of the project including drawings specifications engineers construction cost estimates right of entry permissions and environmental documents Geo Environmental Inc will meet with the City of Culver City staff as required to review submittals and keep the City continually updated on the progress and the status of the plans and work Our subconsultant Wheeler & Gray will contact utility firms and transmit preliminary drawings early in the project to coordinate their anticipated work in the near future and to coordinate any potential conflicts Construction and Engineering Management Geo Environmental Inc will provide construction management and engineering services with the purpose to ensure adherence to the design intent and timely prosecution of the work Materials Testing and Inspection Testing and inspection in the field will be conducted by Geo Environmental Inc on an as needed basis in accordance with the estimate of cost included in this proposal GEI Proposal No 06 062 5 Geo Environmental Inc vCulver City Project Understanding and Approach Cranks / Tellefson Road Slide Slope Repairs GEOTECHNICAL INVESTIGATION — SLOPE STABILITY EVALUATIONS CRANKS 1 TELLEFSON ROAD SLIDE SLOPE REAPAIR CITY PROJECT NO P 867 PURPOSE GEI proposes to perform a soils investigation on the damaged slopes located at different locations to investigate the cause of slides and provide recommendations for their stabilizations This investigation will include the collection of bulk and undisturbed soil samples from the site by drilling bucket auger borings laboratory testing to determine pertinent geotechnical parameters engineering analyses (slope stability evaluations) and preparation of a report presenting recommendations for slope stabilization The soil investigation reports will also identify any clayey cushion subsurface soil and bedrock conditions which may be detrimental to the rehabilitation of the slopes Our scope of work is described in more detail below SCOPE OF WORK The scope of our investigation to evaluate slope stability will consist of five tasks (1) Background Data Review (2) Field Investigation (3) Laboratory Testing (4) Data Analysis and (5) Report Preparation These tasks are briefly described below Task 1 Data Review Available geotechnical data regarding the subject site and surrounding areas will be reviewed to assess the expected soil conditions at the site The data review will include review of published geologic maps stereoscopic aerial photographs and other information contained in our in house files and City/County files Task 2 Field Investigation The field investigation will consist of advancing two (2) 24 inch diameter limited access bucket auger borings to an estimated depth of 30 feet below the ground surface Based on our initial site visit the heights of the slopes are estimated to be approximately between 30 to 75 feet GEI will prepare benches on the slopes to accommodate limited access drill rig The boreholes will be downhole logged for in situ soil and bedrock conditions by a Certified Engineenng Geologist During our downhole logging we will note the orientation of the bedding planes and potential failure zones Dunng drilling we will collect bulk and relatively undisturbed drive samples of the subsurface soils The drive samples will be collected at approximately 5 foot intervals with a modified California split tube sampler or a standard penetration sampler Bulk samples will be collected from soil cuttings generated during drilling The samples from the borings will be tested in the laboratory as described in Task 3 Task 3 Laboratory Testing Samples collected during the proposed field investigation will be examined in the laboratory to confirm field classifications Selected samples from the proposed borings will be tested to help evaluate engineering properties The numbers and types of tests will depend upon the type of soils encountered For a list of anticipated laboratory testing please refer to Table 1 Fee Estimate GEI Proposal No 06 062 6 Geo Environmental IncCulver City Project Understanding and Approach Cranks / Tellefson Road Slide Slope Repairs Task 4 Engineering Analyses Results from the field and laboratory data and GEI's experience will be the basis for the engineenng analyses GEI will provide engineering conclusions for the following • Type and extent of materials encountered • Sliding zones and the potential for larger sliding in the near future • Compaction characteristics of on site soils • Presence of groundwater or seepage • Suitability of onsite materials for use for slope rehabilitation • Nature of bedrock and soil strength characteristics and • Recommendations for slope stabilization Task 5 Report Preparation GEI's conclusions recommendations and supporting field and laboratory test results will be presented in an engineering report A draft report will be submitted to you for review and comment The final report will address and incorporate the review comments as appropnate The report will present drawings depicting construction details with sufficient information for the contractor to implement the most cost effective alternative for the slope repairs GEI Proposal No 06 062 7 Geo Environmental Inc lbProject Understanding and Approach Culver City Cranks / Tellefson Road Slide Slope Repairs MATERIAL TESTING AND INSPECTION SERVICES CRANKS I TELLEFSON ROAD SLIDE SLOPE REPAIR CITY PROJECT NO P 867 PURPOSE The City intends to restore and reconstruct portions of the slopes and roadways located at different locations in the City (10743 through 10751 Cranks Road and 5722 through 5724 Tellefson Road) The reconstruction program includes the removal of debris damaged sections and all disturbed soils The restoration of the slopes and roadways will include the construction of two tier canilever soldier pile retaining wall which include some other pertinent small structures as curbs and gutters GEl will provide geotechnical observations and soil testing services during the reconstruction of the retaining wall and pertinent structures SCOPE OF WORK Task 1 Field Observations and Soils Testing 2 11 Evaluation of excavation GEI s Engineering technician shall inspect the bottom of excavations for the keys and benches to ensure that competent material has been exposed for the placement of the fill 2 1 2 Evaluation of earth material to be used as fill GEI s engineering technician will collect samples of the proposed fill matenal and take them to the soils laboratory Appropriate soil tests will be performed to determine whether the fill material is appropriate for use in the reconstruction of the slopes and for the new pavement sections 2 1 3 Evaluation of compaction procedures GEI s engineering technician shall evaluate the compaction procedure for the backfill of the slopes to ensure that the project specifications have been followed (Appropriate thickness of lift proper compaction method etc ) 2 1 4 Testing of compaction, moisture content, etc GEI s engineering technician shall conduct compaction tests by Sand Cone Test Method (ASTM D1556) and Nuclear Method (ASTM D 2922 01) to determine the relative compaction of the fill material placed for the restoration of the slopes and roadways During the progress of our work our field technician will prepare daily field reports A copy of these reports will be submitted to the Inspector from the City of Culver City on a daily basis The report will include a written summary of the days activities a summary of all field testing performed and a listing of outstanding failing tests which have not been reworked/retested In addition the location of all field density tests taken during the project will be plotted on a set of plans that is maintained by the field technicians The Contractor will be asked not to place any backfill material that does not meet project specifications Testing time and the associated fees can be minimized by proficient and timely work by the contractor and by coordination among project superintendent the City Inspector and GEI engineers and technicians When a larger number of tests are scheduled at one time greater efficiency can be achieved resulting in lower overall fees GEI Proposal No 06 062 8 Geo Environmental Inc IICulver City Project Understanding and Approach Cranks / Tellefson Road Slide Slope Repairs Task 2 Laboratory Testing The following tests shall be conducted in the soils laboratory to determine the engineering characteristics of the soils used for fill|109| Soil Classification Grain Size Distribution (ASTM 0422) 6 Tests Atterberg Limits Tests (ASTM 04318 D84) 6 Tests|109| Modified Proctor Tests to determine Max Dry Density & Optimum Moisture Content (Native and Imported Material) Modified Proctor (ASTM D1557 91 Methods A & B) 30 Tests|109| Modified Proctor Tests to determine Max Dry Density & Optimum Moisture Content (Aggregate Base) Modified Proctor (ASTM D1557 91 Method C) 3 Tests|109| Resistance Value (R Value) Tests for Soils and Aggregate Base 2 Tests Task 3 Technical Management GEI s Project Engineer will attend all construction meetings Then after consulting the Principal Engineer he will provide guidance and recommendations to the field staff The Senior Engineering Technician will implement all of the decisions made during the construction meetings The field compaction procedures will be evaluated and recommendations made where appropriate Task 4 Report Preparation At the completion of our services GEI will prepare a report which will summarize all of the work performed on the project The report will include our observations during construction results of our field and laboratory testing and a conclusion as to the projects compliance with the contract plans and specifications Three copies of the report will be provided GEI Proposal No 06 062 9 Geo Environmental Inc 12.Project Understanding and Approach Culver City Cranks / Tellefson Road Slide Slope Repairs CIVIL! STRUCTURAL ENGINEERING PERFORMED BY WHEELER & GRAY CONSULTING ENGINEERS CRANKS / TELLEFSON ROAD SLIDE SLOPE REPAIR CITY PROJECT NO P 867 Task 1 — Environmental Documents — It is expected that this project will be categorically exempt under California Environmental Quality Act (CEQA) and categorically excluded under the National Environmental Protection Act (NEPA) Our fees in the Cost Proposal portion of this proposal are based on this assumption Wheeler & Gray will prepare documentation for a Negative Declaration on a City provided form in the City format Task 2 — Management of Engineering Survey — Wheeler & Gray will provide management of the topographic survey The topographic survey will be used as base mapping for the preparation of construction contract documents Task 3 — Utility and Subsurface Facility Research — Wheeler & Gray will research the City s records and research the utilities in the area As a part of the utility research they will also ascertain if the utility purveyors have any future work that will impact construction Task 4 — Right of way Engineering — It is expected that no permanent new rights of way or easements will be necessary for the completion of this project Our fees in the Cost Proposal portion of this proposal are based on this assumption Permission for entry and temporary easements for construction are expected to be needed Wheeler & Gray will prepared mapping and conduct communication with affected parties Task 5 — Preliminary Design — Wheeler & Gray will prepare preliminary documentation to the extent necessary to prepare environmental documentation construction cost estimates and provide review material for the City on which to contract Task 6— Final Design — Wheeler & Gray will meet with the City of Culver City staff as required to review submittals and keep the City continually updated on the progress and the status of the plans and work Task 7 — Construction Engineering and Management — Wheeler & Gray will provide construction management and engineering services with the purpose of ensunng adherence to design intent and timely prosecution of work Task 8 — Preparation of Record Drawings and Documentation — Wheeler & Gray will prepare record drawings based on marked up record drawings kept on site by the contractor GEI Proposal No 06 062 10 Geo Environmental Inc '3Project Understanding and Approach Culver City Cranks / Tellefson Road Slide Slope Repairs MASTER DESIGN SCHEDULE I City of Final Design of INC Culver City Cranks I Tellefson Road Slide Slope Repair GEO ENVIRONMENTAL et Caltrans Certified DBE Firm ID TASK NAME DURATION 1 Notice to Proceed 1 day 2 Geotechnical Engineenng 15 days 3 Environmental Documentation 30 days 4 Engineering Survey 15 days 5 Right of way Engineering and Acquisition Services 30 days 6 Preliminary Design 15 days 7 Final Design 15 days 8 Construction Engineering and Management 30 days CONSTRUCTION ESTIMATE We contacted the Contractors who worked on slope repair projects for the Cities of Corona and Torrance under supervision of Geo Environmental Inc including Moore & Taber of Anaheim For the currently suggested method of repairs as recommended by the City s previous geotechnical engineer the Construction Cost is estimated to be $115 000 00 GE! Proposal No 06 062 11 Geo Environmental Inc i7 FAX NUMBER (949) 263 8338 6 TELEPHONE NUMBER (949) 263 8334 X 22 (714) 206 0028 cell 8 E MAIL ADDRESS fsiddiaacieo environmental corn cieincoro0aol corn Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1 TITLE AND LOCATION (City and State) Final Design of Cranks / Tellefson Road Slide Slope Repair Culver City California 2 PUBLIC NOTICE DATE 3 SOLITICATION OR PROJECT NUMBER April 3 2006 City Project No P 867 B. ARCHITECT-ENGINEER POINT OF CONTACT 4 NAME AND TITLE Farhat H Siddiqi Ph D P E — Principal Engineer 5 NAME OF FIRM Geo Environmental Inc C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 'M E E, E > o_ i a 9 FIRM NAME Geo Environmental Inc 0 CHECK IF BRANCH OFFICE Wheeler & Gray Consulting Engineers 0 CHECK IF BRANCH OFFICE Cabrinha Hearn & Associates Land Surveyors 0 CHECK IF BRANCH OFFICE 10 ADDRESS 1720E Garry Avenue I Suite 215 Santa Ana CA 92705 650 Sierra Madre Villa Avenue Suite 300 Pasadena CA 91107 408 South Rosemead Blvd Pasadena CA 91107 11 ROLE IN CONTRACT Prime Contractor Project Administration & Management Geotechnical Exploration, Reporting and Testing _ Civil Engineering Structural Engineering Surveying 0 CHECK IF BRANCH OFFICE 0 CHECK IF BRANCH OFFICE 0 CHECK IF BRANCH OFFICE 0 CHECK IF BRANCH OFFICE D. ORGANIZAT1NAL CHART OF PROPOSED TEAM El (Attached) GEI Proposal No 06 062 12 Geo Environmental Inc 1516 EDUCATION (DEGREE AND SPECIALIZATION) Ph D Geotechnical Engineering 1984 M S Geotechnical Engineering 1971 B S E Civil Engineenng 1965 B Sc Physics & Math 1961 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Civil Engineer California C25287 1975 Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12 NAME 13 ROLE IN THIS CONTRACT 14 YEARS EXPERIENCE FARHAT H SIDDIQI, PH D , P E a TOTAL b WITH CURRENT FIRM Principal Engineer 37 12 15 FIRM NAME AND LOCATION (City and State) Geo Environmental, Inc, Santa Ana, California 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications Organizations Training Awards etc) American Society of Civil Engineers Earthquake Engineenng Research Institute International Society of Soil Mechanics and Foundation En neenn • Associate of State Dam Safe Officials National Center for Earth • uake En • ineenn • Research Various Publications a 190TH STREET REHABILITATION PROJECT TORRANCE CALIFORNIA PROFESSIONAL SERVICES 2001|109| Check if project performed with CONSTRUCTION (If applicable) 2001 (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE Role Principal Engineer/Project Manager! Scope Independent Assurance Soils and Materials Testing construction operations to meet the City of Torrance Federal and Caltrans specifications The City s Quality In this project we were assigned to perform the Independent Assurance Sampling and Testing (IAST) to firm to ensure their conformance with Caltrans QAP requirements current firm funded project requiring the implemented dunng construction by another geotechnical The project was a federally Assurance Program (QAP) was verify the Accepting Testing (AT) performed b (1) TITLE AND LOCATION (City and State) 91 FREEWAY! MAIN STREET INTERCHANGE RAMP IMPROVEMENTS CORONA CALIFORNIA (2) YEAR PROFESSIONAL SERVICES 2002|109| Check If project performed with COMPLETED CONSTRUCTION (If applicable) 2002 (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Principal Engineer/Project Manager / Scope Construction Observation Batch Plant Inspection interchange to a diamond configuration eliminating the eastbound to northbound Main Street loop and objectives were to improve and enhance the interchange at 91 Freeway and Main Street current firm - Project involved configuring the eastbound off ramp The main and Materials Testing signalizing the intersection of the C (1) TITLE AND LOCATION (City and State) 1 SR 134 HOLLYWOOD WAY RAMPS IMPROVEMENTS BURBANK CALIFORNIA (3)- BRIETDESCRIPTTON -(Brief scope- size cost et) AND SPECIFIC ROLE - 1 Role Pnncipal Engineer/Project Manager! Scope Construction Supervision Soils and Materials existing on/off ramps construction of retaining walls up to six feet high and an additional 10 feet of screen soils and concrete testing services as well as supervision dunng construction Project required meeting specifications PROFESSIONAL SERVICES 1 2003 (2) YEAR COMPLETED CONSTRUCTION (If applicable) 2003 current firm consisted of the relocation of of the ramps GEI provided I Check if project performed with Testing - The proposed improvements wall at the top of wall for the relocation of both the City and Caltrans d (1) TITLE AND LOCATION (City and State) PAVEMENT EVALUATION OF PIGEON PASS ROAD AT FREEWAY 60 1 MORENO VALLEY CALIFORNIA PROFESSIONAL SERVICES I 2001 n Check if project performed with (2) YEAR COMPLETED CONSTRUCTION (If applicable) 2001 (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE Role Principal Engineer/Project Manager! Scope Geotechnical Investigation Pavement Evaluation involving a detailed evaluation of the existing pavement structure for Pigeon Pass Road which is approximately laboratory testing and provided recommendations for three different strategies for the rehabilitation based current firm is a federally funded undertaking performed pavement evaluation and Recommendations - This 11/2 mile in length GEI upon the condition of the pavement e (1) TITLE AND LOCATION (City and State) REHABILITATION OF SOUTH STREET AT 405 FREEWAY CERRITOS CALIFORNIA PROFESSIONAL SERVICES 1999 (2) YEAR COMPLETED CONSTRUCTION (If applicable) 1999 current firm Testing - The rehabilitation Freeway 105 through an overpass (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Principal Engineer/Project Manager / Scope Geotechnical Investigation Pavement Evaluation of South Street is between Studebaker Road and / of a mile east of Gndley Road The west portion therefore requinng interaction with Caltrans Check if project performed with Recommendations and Materials of South Street involved crossing GEI Proposal No 06 062 13 Geo Environmental Inc IC.13 ROLE IN THIS CONTRACT 14 YEARS EXPERIENCE 12 NAME 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) RED MOUNTAIN RESERVOIR (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION If acolicable Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) FRANK KRESSE a TOTAL b WITH CURRENT FIRM CONSULTING ENGINEER 40 Consultant 15 FIRM NAME AND LOCATION (City and State) Geo-Environmental Inc , Santa Ana, California 16 EDUCATION (DEGREE AND SPECIALIZATION) 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B A Geology University of California Berkeley 1956 Consulting Engineenng Geologist California 1970 No 1028 Certified Engineering Geologist California 1970 No 406 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications Organizations Training Awards etc) a FALLBROOK CALIFORNIA El Check if project performed with dunng construction of 95 foot with the Bureau of Reclamation current firm high earth dam including setup and the California Division of (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Principal Geologist/ Scope Provided project consultant services for Fallbrook Public Utilities District and operation of field soil and laboratory testing concrete substructure emplacement injection and coordination Safety of Dams b (1) TITLE AND LOCATION (City and State) WATER SUPPLY DAM BIG SULPHUR CREEK THE GEYSERS CALIFORNIA (2) YEAR PROFESSIONAL SERVICES 1=1 Check if project performed with current for the design of a 130-foot high dam withdrawal and survey data was being COMPLETED CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Principal Geologist / Scope Provided consultation to Northern California Power Association seismicity landslides and other geologic hazards Area was expenencing subsidence because of steam development firm Project involved evaluation of evaluated with respect to dam C (1) TITLE AND LOCATION (City and State) NORCONIAN DAM RIVERSIDE COUNTY CALIFORNIA|1010|PROFESSIONAL SERVICES i|109| Check If project performed with current of existing earthfill dam Project included (2) YEAR COMPLETED|1010|I CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Principal Geologist/ Scope Mr Kresse was the project consultant to the US Navy for analysis project design and geotechnical monitoring dunng construction firm geotechnical investigation d (1) TITLE AND LOCATION (City and State) 1 ROCK CREEK DAM I PLUMAS COUNTY CALIFORNIA I PROFESSIONAL SERVICES ' 0 Check If project performed with current MW hydroelectric facility for Oroville-Wyandotte studies for dam diversion (2) YEAR COMPLETED CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE I Role Principal Geologist/ Scope Participated with Raymond Kaiser Engineers in development of 15 tributary of the Feather River Conducted geological mapping seismic refraction rock fracture and excavation and powerhouse Presented engineering feasibility data for license approval firm Irngation District on a structure tunnel surface penstock e (1) TITLE AND LOCATION (City and State) COGSWELL RESERVOIR PROJECT , SOUTHERN CALIFORNIA PROFESSIONAL SERVICES 1 i|1010|El Check if project performed with current environmental assessment of disposal Client County of Los Angeles Department (2) YEAR COMPLETED CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Principal Geologist! Scope Responsible for technical review and corporate quality control of yards of sediments in Cogswell Reservoir at headwaters of Los Angeles County Drainage Area system firm options for 5 6 million cubic of Public Works GEI Proposal No 06 062 14 Geo Environmental Inc 1113 ROLE IN THIS CONTRACT 14 YEARS EXPERIENCE 12 NAME 19. RELEVANT PROJECTS Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) ROBERTO C FLORES a TOTAL b WITH CURRENT FIRM Sr Engineering Technician 11 2 15 FIRM NAME AND LOCATION (City and State) Geo Environmental Inc, Santa Ana, California 16 EDUCATION (DEGREE AND SPECIALIZATION) 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B S E Civil Engineering Monterey Institute of Technology 1999 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications Organizations Training Awards etc) Nuclear Gauge Operator Training #14205 CALTRANS Independent Assurance Program (Test Methods 105 201 202 216 217 226 and 231) Course on Cone Penetration Testin Gre DnIlin & Testin Inc (1) TITLE AND LOCATION (City and State) GEOTECHNICAL CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVICES FOR THE CONSTRUCTION OF MONTIEL PARK (PHASE I) SAN MARCOS CALIFORNIA (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE (2) YEAR COMPLETED I PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Ongoing 2004 IZ Check if project performed with current firm a Role Field Technician/ Scope Mr Flores is currently performing grading and concrete inspection The work to be constructed is located on Monte! Road approximately 1 15 miles east of Nordahl Road in the City of San Marcos The project generally consists of the construction of Phase I recreation facility on a 995 acre parcel which includes the grading for three pads a paved parking area for 31 vehicles sidewalk dnveways a basketball court facility picnic tables storm drain system landscaping Irrigation fencing site furnishings dnnking fountains water service and meter as well as related appurtenant structures b (1) TITLE AND LOCATION (City and State) I MONTE VISTA STORM DRAIN CORONA CALIFORNIA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1999 1999|1010|(3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE Role Field Technician / Scope Geotechnical Engineering Construction Observation and Testing configuration eliminating the eastbound to northbound Main Street loop and signalizing the intersection enhance the interchange at 91 Freeway and Main Street l n Check if project performed with current firm - Project involved configunng the interchange to a diamond of the eastbound off ramp The main objectives were to improve and c r (1) TITLE AND LOCATION (City and State) I SR 134 HOLLYWOOD WAY RAMPS IMPROVEMENTS I BURBANK CALIFORNIA (i) 'BRIEF $ESCRFPTIOf- 1- (inef- sc - opW size cost etc )AND SPECIFIC ROLE Role Field Technician / Scope Construction Supervision Soils and Materials Testing - The ramps construction of retaining walls up to six feet high and an additional 10 feet of screen wall at the concrete testing services as well as supervision during construction Project required meeting specifications (2) YEAR COMPLETED I PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) 2003 2003 I n Check if project performed with current firm proposed improvements consisted of the relocation of existing on/off top of wall for the relocation of the ramps GEl provided soils and of both the City and Caltrans d (1) TITLE AND LOCATION (City and State) I DEL AMO STREET TRUNK SEWER REPLACEMENT CARSON CALIFORNIA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2002 I 2002 (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE I Role Field Technician / Scope Geotechnical Investigation - Conducted field investigation in (CSDLAC) requirements Proposed trunk sewer is located along East Del Amo Street between Main Street A Check if project performed with current firm accordance with County Sanitation Districts of Los Angeles County and the Dominguez Channel east of the 405 Freeway e (1) TITLE AND LOCATION (City and State) I SOUTHERN RADIAL ROAD AND CALIFORNIA EXTENSION (UCI) IRVINE CALIFORNIA (2) YEAR COMPLETED j PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2003 I (3) BRIEF DESCRIPTION (Brief scope size cost etc) AND SPECIFIC ROLE Role Field Technician / Scope Geotechnical Investigation Construction Observation/Soils and project GEI as a subconsultant to PBS&J is providing both the design and later construction observation/soils approximately 18 months Scope of GEI s work includes a soils investigation to formulate recommendations proposed roads This includes site visits collection of bulk soil samples from the site laboratory testing provide recommendations for the design and construction of the proposed roads I Check if project performed with current firm Materials Testing - The proposed construction is a design build and matenals testing services The duration of the project is for the design construction and grading operations for the engineering analyses and preparation of a geotechnical report to GEI Proposal No 06 062 15 Geo Environmental Inc13 ROLE IN THIS CONTRACT 14 YEARS EXPERIENCE 12 NAME 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications Nuclear Gauge Operator Training CALTRANS Inde endent Assurance Pro ram Test Organizations Training Awards etc ) Methods 216 533 539 540 217 231 375a 19. RELEVANT PROJECTS Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) PARVIZ SHEIKHAVANDI a TOTAL b WITH CURRENT FIRM Sr Engineering Technician 22 6 15 FIRM NAME AND LOCATION (City and State) Geo-Environmental Inc, Santa Ana California 16 EDUCATION (DEGREE AND SPECIALIZATION) 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B S Civil Engineering 1975 (1) TITLE AND LOCATION (City and State) 190TH STREET REHABILITATION PROJECT TORRANCE CALIFORNIA (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2001 2001 a (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE 1 Check if project performed with current firm Role Supervising Technician / Scope Independent Assurance Soils and Materials Testing The project was a federally funded project requinng the construction operations to meet the City of Torrance Federal and Caltrans specifications The City s Quality Assurance Program (QAP) was implemented during construction In this project we were assigned to perform the Independent Assurance Sampling and Testing (IAST) to verify the Accepting Testing (AT) performed by another geotechnical firm to ensure their conformance with Caltrans QAP requirements b (1) TITLE AND LOCATION (City and State) 91 FREEWAY! MAIN STREET INTERCHANGE IMPROVEMENTS CORONA CALIFORNIA I (2) YEAR PROFESSIONAL SERVICES 2002 I Check if project performed with COMPLETED CONSTRUCTION (If applicable) 2002 (3) BRIEF DESCRIPTION (Bnef scope size cost et) AND SPECIFIC ROLE Role Supervising Technician / Scope Construction Observation Batch Plant Inspection and diamond configuration eliminating the eastbound to northbound Main Street loop and signalizing the improve and enhance the interchange at 91 Freeway and Main Street current firm configunng the interchange to a The main objectives were to Materials Testing — Project involved intersection of the eastbound off ramp c (1) TITLE AND LOCATION (City and State) SR 134 HOLLYWOOD WAY RAMPS IMPROVEMENTS BURBANK CALIFORNIA (2) YEAR PROFESSIONAL SERVICES 2003 I Check if project performed with COMPLETED CONSTRUCTION (If applicable) 2003 (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE Role Sr Field Technician / Scope Construction Supervision Soils and Materials Testing — The ramps construction of retaining walls up to six feet high and an additional 10 feet of screen wall at the concrete testing services as well as supervision during construction Project required meeting specifications current firm of the relocation of existing on/off ramps GEl provided soils and proposed improvements consisted top of wall for the relocation of the of both the City and Caltrans d (1) TITLE AND LOCATION (City and State) DEL AMO STREET TRUNK SEWER REPLACEMENT CARSON CALIFORNIA I (2) YEAR PROFESSIONAL SERVICES 2002 @ Check if project performed with COMPLETED I CONSTRUCTION (If applicable) 2002 (3) BRIEF DESCRIPTION (Bnef scope size cost etc.) AND SPECIFIC ROLE Role Sr Field Technician / Scope Geotechnical Investigation — Conducted field investigation in (CSDLAC) requirements Proposed trunk sewer is located along East Del Amo Street between Main Street current firm Distncts of Los Angeles County of the 405 Freeway accordance with County Sanitation and the Dominguez Channel east e (1) TITLE AND LOCATION (City and State) 1 SOUTHERN RADIAL ROAD AND CALIFORNIA EXTENSION (UCI) 1 IRVINE CALIFORNIA (2) YEAR PROFESSIONAL SERVICES [ 2003 COMPLETED CONSTRUCTION (If applicable) — current firm design build project GEI as a of the project is approximately 18 for the proposed roads This report to provide recommendations (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE ' Role Sr Field Technician / Scope Construction Observation/Soils and Materials Testing subconsultant to PBS&J is providing both the design and later construction observation/soils and matenals months Scope of GEI s work includes a soils investigation to formulate recommendations for the design includes site visits collection of bulk soil samples from the site laboratory testing engineenng analyses for the design and construction of the proposed roads A Check if project performed with — The proposed construction is a teshng services The duration construction and grading operations and preparation of a geotechnical GEI Proposal No 06 062 16 Geo Environmental Inc I 'I13 ROLE IN THIS CONTRACT Staff Geologist Sr Engineering Technician b WITH CURRENT FIRM|1010|12 NAME MICHAEL J GIVENS, B S a TOTAL|1010|14 YEARS EXPERIENCE Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15 FIRM NAME AND LOCATION (City and State) Geo-Environmental, Inc , Santa Ana, California 16 EDUCATION (DEGREE AND SPECIALIZATION) 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B S General Geology California State Long Beach 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications Organizations Training Awards etc) Nuclear Gauge Operator ID No 45047 Caltrans Independent Assurance Sampling Program CPT Training from Gregg In Situ 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) CULVER DRIVE REALIGNMENT AND WIDENING PROJECT IRVINE CALIFORNIA (2) YEAR|109| PROFESSIONAL SERVICES 2005 present Check if project performed with COMPLETED|109| CONSTRUCTION (If applicable) I (3) BRIEF DESCRIPTION (Brief scope size cost e) AND SPECIFIC ROLE Role Field Technician / Scope Assurance Testing The City of Irvine intends to realign and completion of a federally aided project Acceptance Testing (AT) services is required Mr Givens construction project The services performed include evaluation of excavation evaluation of imported earth testing of compaction and moisture content asphalt concrete/PCC testing and batch plant inspection current firm Drive to Bonita Canyon For the on matenals incorporated into this of compaction procedures widen Culver Dnve from Campus is performing acceptance tests matenal to be used as fill evaluation (I) TITLE AND LOCATION (City and State) SOUTHERN RADIAL ROAD AND CALIFORNIA EXTENSION (UCI) I IRVINE CALIFORNIA 1 (2) YEAR PROFESSIONAL SERVICES 2003 2005 I Check if project performed with COMPLETED|109| CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Bnef scope size cost etc.) AND SPECIFIC ROLE 1 Role Field Technician / Scope Geotechnical Investigation Construction Observation/Soils and project GEI as a subconsultant to PBS&J provided both the design and construction observation/soils approximately 18 months Scope of Mr Givens work consisted of performing a geotechmcal investigation project current firm construction is a design build The duration of the project was laboratory tests throughout the Matenals Testing —The proposed and materials testing services as well as performing all necessary C (1) TITLE AND LOCATION (City and State) REHABILITATION OF 27 STREETS FOR 05 06 STREET REHABILITATION PROJECT LA HABRA CALIFORNIA (2) YEAR PROFESSIONAL SERVICES 2005 n Check if project performed with COMPLETED|109| CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE Role Field Technician / Scope Geotechnical Investigation The purpose of this geotechnical engineering properties of the on site soils and provide recommendations for the rehabilitation of the streets has occurred over a period of time and ranged from minor to severe Mr Givens supervised the field borings Later he performed the pertinent laboratory tests and assisted the Project Engineer in engineenng current firm conditions evaluate the pavement distress that in the field and logged the soil report investigation was to explore the subsurface The subject streets have experienced dnIling and soil sampling operations analyses and preparation of the (1) TITLE AND LOCATION (City and State) I TRANSMISSION MAIN RELOCATION UNDER SR 60! I 215 FREEWAY RIVERSIDE CALIFORNIA (2) YEAR PROFESSIONAL SERVICES 2004 Check if project performed with COMPLETED CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE I Role Field Technician / Scope Soils and Materials Testing Geo-Environmental Inc (GEI) provided basis during the relocation of the water transmission mains located under the State Route 60/Interstate performed density tests on the compacted soil dunng the backfilling of the jacking pit and receiving pit the backfill soils at the locations Mr Givens performed the required laboratory tests for evaluation of the field density tests to verify that the project's compaction requirements were met current firm testing services on an as needed In the field GEI s technicians the relative compaction of Mr Givens performed the needed geotechnical observation and soil 215 Freeway in the City of Riverside at the end of the pipe casings to determine compacted matenal In the field e (1) TITLE AND LOCATION (City and State) SURFICIAL LANDSLIDE INVESTIGATION FOR EIGHT LOCATIONS LA CANADA FUNTRIDGE CALIFORNIA (2) YEAR PROFESSIONAL SERVICES 2005 COMPLETED CONSTRUCTION (If applicable) — (3) BRIEF DESCRIPTION (Bnef scope size cost etc) AND SPECIFIC ROLE 1 Role Field Technician / Scope Several landslides occurred in the City of La Canada Flintridge due to pnmary objectives of evaluation by Geo-Environmental Inc (GED were to charactenze the nature of the and provide advice and options for restoration of the slope guardrail and pavement surface Mr Givens and soil sampling operations The field work included the logging of exploratory trenches hand auger performed many soil tests in the laboratory which were needed for the performance of the stability evaluation @ Check if project performed with current firm California received in 2005 The slopes identify the mode of failure Geologist in the field exploration stem auger bonngs He also the record breaking rainfall Southern earth matenals in the distressed assisted the Certified Engmeenng and mechanically powered hollow GEI Proposal No 06 062 17 Geo Environmental Inc 20Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs E RESUMES OF KEY PERSONNEL PROPOSES:1 FOR THIS CONTRACT fratnplete one Seetiorr E for each key person 13 MEIN TIM CONTRACT Principal in Charge Civil &earring John Kelly i 4 A TOTAL ENT PIM N„„ FIRM RAW MO LOCATION =re 44d Vier/ Wheeler di Gray Convoking Engineers la 634/CATION MECUM AIM SPECALCZArlOAS Bachelor tirSeleine Clidt Engineering University of Southern California WIT PROTECIPONAL eloieTRATaN rSTATt At4r) GASOPLNEJ California, Cbil Artzaera Cirit Nevada, aril California, Registered Emilrennieniabirsesser lecrH FROFIIIIMIIAL VA MOewrn A tar CSC., Member Aniericon Wear Works Association LENT PK% ECTS ANØ LDCIFDN 1City id St WWknu Mermen, Swan Santa Ciartaa Ca1ifurs* Il YEAR CO PTOFE1ONAL 6 6 CONCTllLJOTl ON Idt F CI ON ANDseciñ hCL. Cheek I performed with ntnnwit ar & ann kr Pm Paine engineering services to the LA Courtly Department of? dJd.creaiWnjrthe replacement ea PAM° galftan water ,norap tank ca Wiliam S. Hart Par* in Santo Clarke. The replacement is required because the •xisting lank wet derourod during the 3994 Northridge earthquake. list storage capacity is now Molted to ha(' of its volume and k. Couto Fire Departutost Lts'Illaf an ORMr to restore the tank to its fkill copeck", E nakd omettcthio cost. $450,060. 1flILC Att0 todAhori (tot end Calkforida State Untrerute Northridge Northridge Callaireola Earthgaeice Recumaruction vw co erio SEIONL 2Ot4 C JCTION 3# Y|1010|10:I IIRIEF 1365V1ITION MAW moo err i i i'r I ojt per,rtiidcUrrerd firm Engineering picaming end dangl y services/0r the reconstruction of roc" parking /oft walkways, athletic floes huntseaping and atherSiteittedithis en the campus of Caleforma State llarecretty Northridge The cAunpos war damaged extensively by the Northridge earthquake Neciuttritedon wand ten,year Wort and war phased to marrame &eruption to the operation of the|109| The canipas covers approxfusately 38S a e total site restoration cur were proximately :25 million. :r1Z7.ND a 11 / LOCA111361 ant awl newel Kelvin Channel Reseda, Califorala 121|109| 11 IN COIdThJCTION 000 I PIO! CESCRIrrElft ?M r MAMA s ky. cur ere i Arroit MU LE Ohmic I p teem a one nraM 1!m Design of approsuaotels AMR feet of reinforced rnrocreto double bar storm down The orlon& storm dram W11.1 a trapezoidal cPeh channel designed to MP.), ahoal 4,009 us. The new drain allaired construction eras* a.nci parking structures for a slew direkopment. Project COITEtraCCIOR Ctlie V 9 oillEon TITLE MO LOCA I ON Palsy And Appian Way Retutning Well Santa Monica, Ca.tfernfn|1010|PtIOrEAL SEPWC 2402 Osr in KW opepRiPTION MAW scope sinkMO Ned AND SPECIFIC HMI W pcajau p LarnodI rlrrn Ogio *in:placement of a beach side that retetheng wall Aar14n41. t Ski* frthn r d moss threatening adjacent tarn* and utilities In the public rigkte-of way The m.1010211 MS dud air ai catr-fripIace aerate retaining structure on a foundation system of cast-ht•pleice Iliction piles and grad e beams prnuthg beñravi enth pile Project eonstruction cart. appeal . OM OW II True AND LOCATI01.11 If ardStolo0 y et Verdi, Regional Community Park Drainage vat Verde co/forma 5114 o 121 YEAH CCM IQNA15EIflCi 2002 1411Cheol4 ject performed }hooding problems needed an annual basis The were to identib the selations Said, fee corawrit sIDAI if f SP P 4 0 WV 20112 erkh current hero to be salved before flooding produces emcee and ClilltleS Of $11,909 MI BRICE CESI3iIPTION arref =we eve cosi ere I AND SEECIAC ROLE Draimege study of LA Count:.'s Vat Verde Canaan:111y Regional Park Chronic implementation Wan Improvement program. The park is objected to jloacting on debris and:mallows chat revive casajtcleen-up efforts every year Stirdy plum:Jives lite flooding, dearension: copacides of eadedng storm drain . Whim, and reconimend STANDARD FORM MO Flona4) PAW 2 GEI Proposal No 06 062 18 Geo Environmental Inc 21E RESUME'S OF KEY PERSONNEL PROPOSED FOR HIS CONTRACT Comp'eno hrPo Soudan E far weir /ray person „i t3 RILE Ift 11110 Civil Engineer 1 4 MAR ExemENCE Wary X Kinker Peso& PRO ta. Civil Engineer ilochelor of Sronco Civil Engineering ildeernly of iiffolorgtut h WON CURIUM K I NA T PPOJEC t2) YEAR catinc-an. tabk and 24111 SERWIL14 C74STFRAC irarnItelAr? 2005 -1EF DESCRIPTION ferinf moan sivy cire fir I AND SIP=FiC HU c ri,olect peril:mm=1 with of&otthrm of aPPruxturately 400 feet of 12 Inch eilitniefer potaftie rismitssan piperand the sumo op rirlis ridi meter reclaimed water pope The praiser included recattnranon of meters cIwe,firr hydrants anel °Mu, appurtenances Poe ',reject ia waled through an existing caournatay college 1.41114).044 and terniinnied in a inajar greet. Franey, easements wee *Grated and new casenictsts Tal`Cre mated Appras- convPlicifen Lost $ 450 0% 3i I4INF DOGCRIPTIDAI CF4oi r4not slat eggj. gr.L1 if• i trilt AND LOCA'TION e anti Anaheim Preet Grade Swerdlow Long Beach California Intim* and Find Design anif deeign support for construction of tire Southern Pacific Rk averpass Bridge for the Almada OFTRIt or Los Angela - Long Beech 1 art Ltpuristari Frojact Appiux construction etIst. $ 45 nrrihriu total mid $22 mdlion far roadway and structures 20 en. / AND Marx ROLE U Lhack If pr t and CON drucharr management kuppan services m Lt4 County MIA rn the Stroi keratoid° Valley of Oh City of Las 4ngele4_ ax$ 175 eillfian 31314 AND Ll.p-A I KM MI AITA San Fernando Valley Thficated San Fernando F I 0 sTs gmoiTtirapirtows-w Graffitroari 2005 th current firm des of tterW Ti Avanne and Aviation notileverd ihnimpluirmigs 1.14( r1 .1" - cast ex,' IFICNEL E Hawthorne Colurornui k ft rIet p rtarrn d With current firm n elt 19 Geo Environmental Inc GEI Proposal No 06 062 Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs 'ORAL ILLC11ONrims lifealfrar American Society of Cirii Engineers Member Institiite of 7 runsporsotion Entinocrs nt %peciOtativors and estimatorfor the widening of nec k arterial readoJar a ranar unthopnle straetere replacement for the iv of Carson Appeal e.nistmetion cost 2 fitiffuna TITLP AM) terArnrt (Cloy, and dorm EINinvietw and Sunset Plata Storm Dram C Drainage damn and. of way atialpis Approximate construction cost $ 5014,000E, RESUMES OF KEY PERSONNEL PROM BED FOR THIS CONTRACT (Camptete ors Staler F brewer key/warn) 111141SCOM1CT - Prirm.10/ Sr Clyde C Coilnohn 1fi FEW MIME that Cr:ATKA Air aro 5,psv Cahrir,.1hil 0114011,11 r,170 r44 Smelled A RI led rural Engineering —Califurrue St= Polyti.char University — Sao I ui Obispo yOr it3452 d Surveyor 0701 urveyor #3962 Nevada Profeariunni Lund Surmyor 405442 etmet, in,fro veneered 41,14 lir Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs utictii Hbutsssueoi. 0,1,444•17,MIONIreielatfiers,Chettem T Fie is i former member of the State Buratto: Director s or the Carisultmg togineera Ind Land Survevces of Caltka era 1CLLSOC/ 1990 2002 and past president of the Los Angeles Chapter pi lute taco ingt-Ev mieeciSlate? P& ii B11 Lill, Light hail Project PBSadeflal CA 19tJA IM Mr & LIEHLRIF OM WO PRP% AM 'Mi( 00) ANDEPECFEROLE Proemial in ChargeiPrOrectivianager of 14,Mille iiittkayear propel lAas Angeles to East Pasadena project Resporrillga for dimming rind indtt of-way utility photo mono], scrtal photOgrattinteinc mapping M 1Y11.110vitiLCV1tm (Qv swot"' tow, ep eleelpetirgreeveleiCeet:4131104 then1 interface negotiation of ovet 40 tdsk urckaon the elan participating in the creciormruice cif control design, end alignment 7tirveyi Ire desito of tilt knit rail sitters! aurjarreetirme Whittler City Schor Nu= Renovation Project — Whittier CA Pi BRIEF CEPORFRO t I V.( WC t etcjeite Snare rat. I Pet:0 00,11411 1.4 aPeliT11410004,1eipereabe 201:e melt e rfitycl pc! 0romed h raw Rgrn y 43 RIFF OEFICIIFT1111 Istai sear*„ 0* MIT 41CpMeo sofietbe elms Principal Survuyor/Projed Manager Sun liurs.eys of II `FTES tit dit tieing Se,Tieell it and irdiacPoi parking in unincorporated a rlj city areas a: Whittier produced 20 svAle mappitig with sappleme.ntal detailed ground towyi 1crior oltc nuder xud utihry,it.trth and tr. Puado4 SR 110 Mitigadno Protect, Pasadena,. CA Prnopal rw.rinreyor/Firoject Manager — Stmt. end Freeway X Sevin attonys &Sip typography pluxo s iminn ie leTelt-41f VW/ aineYS and legal descnoton preparam fur the. Raymond Avenue in Sit 110 COM1CCMT project Itl TIME AMILI2CATi2e ?We AidaWft) Cal Stoir•NorthrodgmEarthqualce renovator! Prateus Nat tilt idge,, CA. Mt WIN ecwo Free reGFEBeetem. 9 EFKOCE9 cotatiTnuCriL 2004 .t0,1 UM 0 DE1 e01 orlon (SAW sr*pat 044 *040. 440 ?AND te Kr* note plitsd rImmid 441nrri Tanneiptd. Survoleocrojeci Manager Over 45 detailed topographat. ()maga barrels both ground and aerial covering a major port= of tic campus 1or-114n sorveya mid InFlprog parkang lots athletic aelds, buildings, streets and complete campus tow CM and Inventor City of Pasarkna On slICYZ} l, Services contract Pasadroa. CA M DESCAP TOO tame wept' eao,c melsek1A-1- KU* Prink,ipal Sur veyortli‘orect Manager —Street As-Ruili &Men iurveys legal description prepacuton boundary locaoun & wity surveys utility research UPS oontrol surveys. auscdlencous no call services for the Dept_ of Putilte WarLs STANDARD FOFITA 310 przuei Noe 2 GEI Proposal No 06 062 20 Geo Environmental IncL FinureiEs Of KEY KRBONNEL pRoposuo irompAsta en, fleaker F Y &Ky. FL ADO RI THE OZTIrAc. Camden Catirman if MR APE LEL CAN' ,nha, Henn clk, Assoi.oneo — Pasadena li, tgLi.KA1 ` 144 ' (04441 ANU brkEMAXPilfri,1 CONTRA ralifactua Rofessittual Laud Savior —*675.5 Studied Survey, ng at Proariona City College orid Rancho Santiago College TIME AltStkl 1 60.1fLorsoil Street interchange Emplo yment Project 1$) atta *WPM Ors We =VA da ceed oft .1 AND W Ulf it mar P90473italbat 1004 El Chu* ponloweig1.64 9aut.r.i 641 yoroPany Chef— Control surveys field nod athwart-my support to rite CM on die Compton CrcLk RAJI ACTA Bodge at the Dominguez Chattael WUXI PaCifi C Rfai LW Dominguez Channel track hotelge Long Beach Rail zmeda Bridge, Watson Lead {Segment 3), Anaheim Street htorm Dram, As-bwita, gamut) sormys, track vardacatorts rid rtiletto of contractor control and la Pasadena SR I luEvinigation Pro 131 BEEF cescitiroNat. owpardmead, Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs is OVER PIRCFSC trp K, ti a Tioktvg "ands sit,0 Speuulactl truLung Clebni PorniontagSysterna cc ASITTECH His field uid office experience. toLtutici Plane I ahie Control (CPS a convilkupagio, consiroction layout, Topographic, ALFA Boundary and Map prickessinE projcois He has had extensive traitnag and comiderable expeoeme in Loop= a plx1 tuappulg and dean= pp.rieting and transfun'irg of survey data. ProJet.r SnlYcHIPErlY ctla Provided hionvantal vertical cony' ril sucveyg and field and office survey support for the citil Including topographic as built iquarittty survon and calculations anti field clirclun,., and 1 CVICW of tinurncor cmulul and 1 yout nri Frcewny X Rectscit maven design copcgraphy pbutograrnmetric intipping, nett of way survey aod paration for titc Raymond Avenue to SR 110 connector project Lk A1L) Avenue Road kaptuveructU Paliot.1,1x4 An is County CA J OLE tWOMIPorketricti ,atta a owl Ibra Party Chh-f Canty &valuated Road Impreiverneni pirijeet 1 7 mi lt-s of devilled topographic and dght-of way burley to meditate ine design of roadway improvements Centeehne recovery X Sections of stoat and dival. mapping delineating RAV, control and all topagrarkie ys both Kt mod nod lend coverimb malar portion of the campus, fields, buildings streets and complete campus onto lc:canon and d. GEI Proposal No 06 062 21 Geo Environmental Inc 2.4kCulver City Cranks / Tellefson Road Slide Slope Repairs F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each pro'ect. Stand a rd Form 330 EXAMPLE PROJECT KEY NUMBER 22 YEAR COMPLETED 21 TITLE AND LOCATION (City and State) Professional Services Construction (If applicable) Surficial Landslide Investigation of Eight (8) Locations La Canada Flintridge California 2005 2005 23 PROJECT OWNER S INFORMATION a PROJECT OWNER City of La Ca nada Flintndge b POINT OF CONTACT NAME I Mr Ying Kwan P E City Engineer c POINT OF CONTACT TELEPHONE NUMBER|1010|(818) 790 8882 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope size and cost) The purpose of this investigation was to explore geologic conditions and obtain soil and rock samples from the slide area for developing data to evaluate the slope stability and erosion conditions of the areas located at the subject site and to provide recommendations for the needed repairs and reconstruction so that the adversely impacted area of Earlmont Avenue may be safely reopened for the vehicular traffic Our geotechnical services consisted of the following 4. Researching and reviewing of readily available geologic maps geotechnical data topographic maps and aenal photographs pertinent to the area 4 Subsurface exploration including two (2) soil borings drilled with an 8 inch hollow stem auger drill rig and two (2) soil borings dug with hand auger equipment The borings were drilled to evaluate subsurface conditions and to collect soil samples for laboratory testing 4 Laboratory testing of selected soil samples including test to evaluate in situ moisture dry density maximum dry density and optimum moisture content grain size analysis plasticity index direct shear strength and consolidation parameters 4. Engineering analysis to evaluate slope stability erosion potential and geotechnical design criteria to provide recommendations for its reconstruction 4. Preparation of a geotechnical evaluation report presenting our findings along with our preliminary conclusions regarding geologic conditions along the portions of Earlmont Avenue and preliminary geotechnical recommendations for the proposed repairs and reconstruction Based on the findings of this study the Earlmont Avenue slope failure was not a manifestation of deep seated land instability Instead the weight of saturated and loose surficial fill appeared to have exceeded the capacity of a deteriorated timber wall and other short term remedies The rapid failure involved virtually no native soils Slip seems to have been localized along the original ground surface Multiple options existed to repair the slope and reconstruct the roadway to its original width generally involving walls engineered slopes or combinations thereof Rankings were made based on attributes such as the following Constructibility including site access and desire to avoid any construction east of the roadway centerline due to live utilities or in the creek bed itself (the ravine contains a blue line stream considered USA waters) Favorable flexibility and drainage characteristics Probable costs Quality of on site and readily available local import soil materials Aesthetics and ability to blend in with neighboring (undamaged) slopes Ability to meet all required minimum factors of safety for static and seismic slope stability Retention of surficial soils to •revent unwanted sediment run off 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME ; (2) FIRM LOCATION (City and State) (3) ROLE Geo Environmental Inc j Santa Ana California Geotechnical Engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Wheeler & Gray 1 Pasadena California 1 Chill and Structural Engineering (Design Services) (2) FIRM LOCATION (City and State) (3) ROLE Pasadena California GEI Proposal No 06 062 22 Geo Environmental Inc 4. 4. 4. 4. 4. a (1) FIRM NAME Cabnnha Hearn & Associates Surveying 2 5Culver City Cranks / Tellefson Road Slide Slope Repairs F. EXAMPLE PROJECTS WHICH REST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT Standard Form 330 21 EXAMPLE PROJECT KEY NUMBER|1010|(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each pro'ect. 21 TITLE AND LOCATION (City and State) Landslide Repairs at Highland view Corona California 22 YEAR COMPLETED Professional Services 2003 Construction (If applicable) 2003 23 PROJECT OWNER S INFORMATION a PROJECT OWNER City of Corona b POINT OF CONTACT NAME Mr Nabil Kassih Senior Civil Engineer c POINT OF CONTACT TELEPHONE NUMBER (909) 817 5765 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope size and cost) Slope behind residential structures at Highland View in the City of Corona failed during August 2003 At the request of the Public Works Department City of Corona GEI performed an investigation to identify the causes of the slope failure Following investigation GEI prepared a report summarizing the results of the investigation and presented recommendations for the restoration of the slope It was found that the slide occurred due to the saturation of the man made fill caused by over irrigation During the repairs GEI provided geotechnical observation and soil testing services to the City of Corona to ensure that the keys and the benches had been prepared properly for restoration of the slope Prior to benching and keying all unsuitable and deleterious materials were removed from the subject site During these operations the upper two to four feet of soils were excavated and replaced with imported non expansive fill material compacted in thin lifts The backfill material consisted predominantly of sandy soils with different percentages of silt and clay The grading operations were generally accomplished using two wheel barrows one belt conveyor one wacker (handheld compactor) one water hose and several shovels During the inspection depth of excavation was checked and found to be at least exposed to competent material (bedrock) ranging in different depths The overexcavated bottoms of the benches and the key were checked using the probe Due to the space constraints at the subject site the excavated soils and unsuitable materials were placed in different stockpiles located at the west side of the construction site and at the front of the existing property Prior to backfill operations the imported material was moisture conditioned at the time of the placement and compaction of fill progressed All imported material was loaded using wheelbarrows from the stockpile located at the front of the property to the small stockpile located at the west side of the construction site After these operations all the material was dumped and transported by the belt conveyor to the area of filling Prior to backfill operations within the last upper four feet near the top of the slope all loose material and debris were removed Prior to pouring 3 cubic yards of 1 sack cement slurry the existing irrigation pipes were set and tested by the City s landscaping inspector After these operations a French backdrain was installed that consisted of a 4 inch diameter perforated schedule 40 PVC pipe with the perforations facing up and embedded in 3/4 inch open graded gravel Consequently the pipe and the gravel were wrapped in filter fabric equivalent to Mirafi 140N The outlet pipe was installed perpendicular to the existing water pipes leaving a minimum flow gradient of 2 percent Fill soils were placed in 2 to 4 inch lifts and compacted with the wacker The minimum required compaction was 90 percent for the existin• and im orted soil res ectivel as determined from ASTM D1557 00 Testin. Procedure 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME a Geo Environmental Inc I(1) FIRM NAME (1) FIRM NAME|1010| (2) FIRM LOCATION (City and State) (3) ROLE Santa Ana California [ (2) FIRM LOCATION (City and State) (3) ROLE 1 (2) FIRM LOCATION (City and State) J(3) ROLE Geotechnical Engineering GEI Proposal No 06 062 23 Geo Environmental Inc 2(c)Culver City Cranks / Tellefson Road Slide Slope Repairs F. EXAMPLE PROJECTS WHICH REST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT Standard Form 330 (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each pro-ect. EXAMPLE PROJECT KEY NUMBER|1010|21 TITLE AND LOCATION (City and State) Slope Stability Evaluation Shorechffs Golf Course San Clemente California 22 YEAR COMPLETED Professional Services 1994 1999 Construction (If applicable) 1994 1999 c POINT OF CONTACT TELEPHONE NUMBER (714) 492 1177 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope size and cost) iGeo Environmental Inc (GED provided its geotechnical engineering- and forensic services to the owners of Shorechffs Golf Course in their dispute with the homeowners surrounding the Golf Course The Golf Course located in San Clemente is situated in a canyon surrounded by houses built on both sides of the canyon These houses facing the canyon were built at a time when the state of the art related to construction on a hilly site was not as advanced and the supervision of the grading operations by the governing agencies was not as stringent as it is now The level building pads for these houses were constructed by cut and fill The investigation performed by GEI for several properties indicated that the fills required to construct level building pads were neither properly compacted nor properly keyed and benched GEI s studies concluded that at least one of the properties investigated by GEI had a very low factor of safety against sliding GEI recommended several remedial measures to be implemented immediately to prevent landslide which was likely to occur in the event of heavy seasonal rains For one reason or the other the remedial measures recommended by GEI were not implemented by the homeowner and the property underwent through massive landslide during the heavy rains of early 1998 Dr Siddiqi of GEI as a Participating Expert Witness assisted the Attorneys representing the owners of the Shorecliff Golf Course in preparing their case for the trials GEI participated in the inspection of the effected properties mandated by the Court as well as the geotechnical investigations performed by the opposing parties Dr Siddiqi was deposed by the apposing Attorney and participated in arbitration proceedings 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 23 PROJECT OWNER S INFORMATION a PROJECT OWNER b POINT OF CONTACT NAME Shorecliffs Golf Course Mr Fon Leong Owner (1) FIRM NAME a Geo Environmental Inc (2) FIRM LOCATION (City and State) (3) ROLE Santa Ana California Geotechnical Engineenng b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) C (3) ROLE GEI Proposal No 06 062 24 Geo Environmental Inc 21The surficial failure of the Bishop Montgomery slope could be attributed to several factors These factors include the exceedance in the capacity of the storm drain coming from the parking lot and the street the rupture of the drainage system at the top of the slope the poor compaction of the on site soils at the top of the slope that could cause the migration of water into the slope fill causing the failure or a random combination of these factors The soil borings revealed the presence of organic material in the soil forming the slope The organic material decomposes over a period of time creating voids between the soil particles These voids provide easy passage to flowing water The soils comprising the slope are primarily sandy and silty These soils are highly erodible in nature where individual particles can very easily be dislodged by seepage forces Once the dislodging of individual soil particles begins sloughing and surficial failure follows rather quickly These cohesionless soils are prone to sliding if subjected to significant vibratory loading such as those caused by strong earthquakes The purpose of this study was to evaluate the contributing factors of the surficial failure and to provide recommendations for the restoration of the slope Potential causes of surficial slope failure to be investigated included the erosion of the top soil by seeping water the degree of compaction of the man made fill and the impact of the drainage line on the stability of the slope Based on our subsurface investigation field observations and laboratory testing the following conclusions were made The subject slope was inclined at an average gradient of approximately 1 5 1 (horizontal to vertical) Slopes with such steep gradients are found to be more prone to surficial failure than slopes exhibiting more gentle gradients The surficial soils were typically loose at the top and had gradually become more vulnerable to sliding due to repeated cycles of wetting and drying The rupture of the drainage pipe and the migration of water through the slope probably caused the surficial failure The poor compaction of the on site soils within the slope contributed to the surficial failure Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each pro'ect. 2 EXAMPLE PROJECT KEY NUMBER|1010|21 TITLE AND LOCATION (City and State) Slope Failure at the Bishop Montgomery Retention Basin Torrance California 22 YEAR COMPLETED Professional Services Construction (If applicable) 2006 2006 23 PROJECT OWNER S INFORMATION C POINT OF CONTACT a PROJECT OWNER b POINT OF CONTACT NAME TELEPHONE NUMBER City of Torrance I Mr John J Wisz Project Manager (310) 781 6900 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope size and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (3) ROLE a Ii (1) FIRM NAME (2) FIRM LOCATION (City and State) Geo Environmental Inc Santa Ana California --T(1-- )—FIRM NAME ----1-(2) FIRM LOCATION (City and State) I (3) ROLE Geotechnical Engineering I(1) FIRM NAME 1(2) FIRM LOCATION (City and State) (3) ROLE GEI Proposal No 06 062 25 Geo Environmental IncX - _ I- t Surficial Landslide Investigation of Eight (8) Locations La Canada Flintndge California Landslide Repairs at Highland View Corona California Slope Stability Evaluation Shorecliffs Golf Course San Clemente California Slope Failure at the Bishop Montgomery Retention Basin Torrance California|101010101010 10 10|Culver City Standard Form 330 Cranks / Tellefson Road Slide Slope Repairs Farhat H Siddiqi Ph D P E Mr John Kelly P E 26 NAMES OF KEY PERSONNEL (From Section E Block 12) 27 ROLE IN THIS CONTRACT (From Section E Block 13) Mr Clyde C Cabnnha Ms Mary Kinsler P E 28 EXAMPLE PROJECTS LISTED IN SECTION F (Fill in Example Projects Key section below first before completing table Place X under project key number for participation in same or similar role ) 2 I - 8 9 -10 X X – 1 I 1 I Pnncipal Engineer Civil Engineenng Civil Engineering Pnncipal Surveyor Mr Camden Cabnnha Mr Roberto Flores Mr Parviz Sheikhavandi Mr Michael Givens Senior Engineenng Technician Project Surveyor! Party Chief Senior Engineering Technician Senior Engineenng Technician — -4– — 29. EXAMPLE PROJECTS KEY NO TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO TITLE OF EXAMPLE PROJECT (FROM SECTION F) GEI Proposal No 06 062 26 Geo Environmental IncGEO ENVIRONMENTAL INC Ca!trans Certified DBE Firm Culver City Cranks / Tellefson Road Slide Slope Repairs H. ADDITIONAL INFORMATION QUALIFICATIONS OF GEO ENVIRONMENTAL, INC Geo Environmental Inc (GEI) founded in 1993 is a State of California certified Small Business Enterpnse (SBE) Metropolitan Water District of Southern California certified Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) firm for the States of California and Nevada (certified by Caltrans and NDOT respectively) We provide a broad spectrum of geotechnical geological matenal testing earthquake and environmental engineering consulting GEI s civil and geotechnical engineers geologists civil engineers and scientists are skilled in construction observation and matenal testing collecting and testing storm water samples and testing soil and rock mechanics soil dynamics and soil structure interaction soil liquefaction studies foundation engineering seismology seismic nsk evaluations geotechnical explorations and geophysical surveys Our capabilities include exploration of surface and subsurface conditions through a vanety of field techniques including geologic mapping dnIling with hollow stem and bucket auger rigs downhole logging and seismic surveys The firms exploration techniques encompass conventional and state of the art sampling methods as well as geophysical and seismological techniques Our Caltrans certified technicians will perform the work assigned by Caltrans for each task order issued Although an SBE firm the majority of the engineenng staff at GEI has worked at senior level positions with elite geotechnical firms such as Dames & Moore Woodward Clyde and Harding Lawson The professional staff of GEI has conducted geotechnical investigations construction monitonng matenal testing in accordance with Caltrans Testing Procedures and vanous Caltrans Manuals Recently GEI has provided Geotechnical Observation and Matenal Testing Services to the City of Irvine s Culver Drive Realignment and Widening Project which is a Caltrans supervised project Farhat H. Siddiei, Ph.D., P.E. Responsibility Project Manager! Principal Engineer Education Ph D Geotechnical Engineering University of California Davis, 1984 MS Geotechnical Engineering, Cahforma State University, Sacramento, 1971 B S Civil Engineering, University of Karachi Pakistan, 1965 B S, Physics and Mathematics, University of Karachi, Pakistan 1961 Dr Farhat H Siddiqi is the Pnncipal of Geo Environmental Inc (GEI) and will remain throughout the entire contract term as the Project Manager and the main Point of Contact through MACTEC for the successful operations on a day to day basis (Daytime Phone No (949) 263 8334) Dr Siddiqi is well known among the geotechnical engineenng community for his extensive experience He has a Bachelors Degree in Physics and Mathematics a Bachelors Degree in Civil Engineering a Masters Degree in Geotechnical Engineenng and a Ph D in Geotechnical Engineering For his Ph D dissertation Dr Siddiqi researched static and seismic stability evaluation of embankments containing very coarse grained nnatenal under the direction of the late Professor H Bolton Seed of the University of California at Berkeley He also researched resilient modulus for subgrade soils for highway design His other research projects include sediment transport soil liquefaction potential strength and stress strain charactenstics of clay sand mixtures plane strain strength characteristics of dry sands modeling strength of coarse grained soils and prediction of compaction charactenstics of coarse grained matenal He has received research grants from many organizations including the National Science Foundation Dr Siddiqi has taught at several Universities on a part time basis including NED Engineering University (Pakistan) University of California at Davis and California State University at Sacramento At the University of California Irvine where he is also a member of the Civil Engineering Advisory Committee Dr Siddiqi has taught graduate courses on pavement evaluation embankment design advanced foundation engineenng and earth retaining structures Additionally Dr Siddiqi has authored or co authored several professional papers related to behavior of coarse deposits and stability of earth embankments The Matnx Model as proposed by Dr Siddiqi in 1984 and commonly referred to as Siddiqi s Matnx Model in geotechnical engineenng practice is widely used for the evaluation of the dam embankments and foundations containing very coarse grained matenal too large to be tested in Soils Laboratones with conventional testing equipment Prior to incorporating Geo Environmental Inc in 1993, Dr Siddiqi as Pnncipal Engineer was In Charge of all geotechnical operations in Southern California at Harding Lawson Associates Dr Siddim is particularly strong in transportation projects He worked on the San Joaquin Corridor Eastern Corridor (State Route 260) and Foothill Corndor (State Route 241) He was the project manager of the prestigious geotechnical engineering understanding of the Eastern and Foothill Corridors (State Routes 260 and 241) Interchange He also worked on Caltrans supervised seismic retrofit of several bridges in the County of Los Angeles With late Professor H Bolton Seed Dr Siddiqi worked on the seismic stability re evaluation of Oroville Dam (the highest rockfill dam in the world) immediately following the Oroville earthquake With Late Professor Seed he also worked on Tarbela Dam (the largest earth and rockfill dam in the world) as well as on the hydraulic fracture evaluation of Teton Dam GEI Proposal No 06 062 27 Geo Environmental Inc Standard Form 330 30Culver City Cranks / Tellefson Road Slide Slope Repairs H. ADDITIONAL INFORMATION REFERENCES Standard Form 330 NAME , ADDRESS / PHONE NO Mr Abdul S Rashid] Vice President (Projects Groundwater Replenishment System Unit III Pipeline Construction Southeast Bamer Pipeline Orange County Sanitation Distnct and Orange County Water Distnct) Montgomery Watson Harza 301 North Lake Avenue Pasadena CA 91101 (714) 378 8202 (626) 437 7068 — Mobile Mr Sandy Cohen Project Manager (Projects City of Torrance Waterline On Call Geotechnical Consultant to the City of Torrance) City of Torrance 3031 Torrance Boulevard Torrance CA 90503 (310) 328 5310 Mr Charles (Chuck) Dowdell (Projects Various projects on an ongoing basis) County Sanitation Districts of Los Angeles County 1955 Workman Mill Road Whittier CA 90607 (562) 699 7411 x 2430 Mr Max Vahid President and CEO (Projects City of Newport Beach Street Improvements Dover Dnve) Van Dell and Associates Inc 17801 Cartwright Road Irvine CA 92614 (949) 474 1400 Mr Omar Mohezi — Senior Civil Engineer (SR 134 Hollywood Ramp Improvements) City of Burbank 275 East Olive Avenue Burbank CA 91510 (818) 238 3943 Mr Khalid Bazmi P E Principal Engineer (Projects 91 Fwy/Main Street City Hall Parking Lot) City of Corona 815 W Sixth Street Corona CA 92882 (951) 736 2266 Mr Arshad J Syed P E Principal Water Engineer (Projects Water Transmission Mains Fwy 60/1215 Crossing Riverside) City of Riverside 3900 Main Street Riverside CA 92522 (951) 826 5824 Mr Chuck Stephan (Rehabilitation of La Habra Boulevard FY05-06 Pavement Rehabilitation City of La Habra Fire Station Lambert Road Pavement Rehabilitation) City of La Habra 201 East La Habra Boulevard La Habra California 90633-0337 (562) 905 9720 Mr Mohammad Rowther Senior Vice President (Projects Inland Empire Utilities Agency (1EUA) Eastern Trunk Sewer Replacement City of Riverside Storm Drain Improvements) Berryman & Henigar Inc 2001 E First Street Santa Ana CA 92705 (714) 568 7300 Mr Nadeem Syed — Senior Civil Engineer City of Fontana 8353 Sierra Avenue Fontana CA 92335 (909) 350 7663 Mr Nick Bebek — Engineering Geologist Geotechnical Section (Geotechnical Investigations to residential properties located in Cities of Sunset Beach Shady Canyon (Irvine) and Ladera Ranch California) County of Orange 300 N Flower Street First Floor Santa Ana CA 92702 (714) 834 3328 I AUTHORIZED REPRESENTIVE The foregoing is a statement of facts. 31 SIGNATURE 32 DATE °LjN May 8 2006 33 NAME AND TITLE Farhat H Siddigi Ph D P E Pnncipal Engineer GEI Proposal No 06 062 28 Geo Environmental Inc 31I AUTHORIZED REPRESENTATIVE r of a ot ternent of foe GEI Proposal No 06 062 29 Geo Environmental Inc Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs H ADDITIONAL INFORMATION 30 i —rWiTF : e? AriOrTIONAL INEOFIMATKIN HEMMED UY THE AGENcr ATTACH ACIDITIOMAL SHEETS AS NEEDEC RESPONSES to SELECTiON ORITERIA Wheeler & Gray has consistently maintained high standards of quality over Ihe 58-year history of the Con Wein wte the redewar to contact the references listed below Colin OonahUe °tractor Facilities Planning Design & Construction California State University Northndge 13111 Nordhoff Street Northridge California 91330-8219 TEL (818)677 2581 FAX(818) 677-6552 E MAIL collo donahueigcsuo edu Eric Herman Depadment Facilities Planner County of Los Angeles Department of Perko and Recreation 510 Vei mart Avenue Los Angeles CA 90020 TEI (213) 738 2090 FA)(213) 738-6542 E MAIL.ehernierr&o la Gal Ub Delvrnh Wylie AIA Associam Vico president California Slate University Channel Islands One University Drive Comanilo, CA 93312 8590 1EL (80b)47 8422 F MAIL dwyll celstate edu Jan Thum PE Supervising Ced Enufnoor Los Angeles County Department of Public Works 900 South Fremont Avenue, 51h Floor Alhambra, CA 91803-1331 TEL (626)458 7837 FAX 1626) 458 7827 E MAIL Allwrowiggiadpw or John MaaDougal P.E DireLlor Engineering Design and Construction University of California Los Angeles Capital Poograres 1060 Veterans Avenue Los Angeles California 90095 1365 TEL (310) 825-2156 FAX 1310) 20e- 21 E MAIL jrrnacdou@capoeLuda eduMay 6 2005 Clibrinhe Preildun|1010|Cl Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs H ADDITIoNAL INFORMATION PRCNICO AMY AL) D 11113NAL 141 RrOLffTtD Err 71-1E AlakiNCY ATTACi 4000 no NAL SHEETS AS NEMEC COMPANY BACKGROUND Cabrinba, Hearn & Asnociates (CII&A) a professional surveying and mapping corporation was founded ra 1975 by Clyde Cabrinha and Neill Hearts to provide services to =Infects engineers public agencies nut pnvate industry throughout Southern California The two flounders worked together far over 30 years establishing a detnanstratzd Unduly of continuity and reliability GOALS AND CONTINUITY The primary goal of the firm is In provide quality surveying and mapping services to our claws in a bluely and =now= f5.31110E. Cabrinba Hearn & Associates has been dedicated to not only serving the client i needs but also to anticipating and solving potential problems before they arise This 3 accomplished through hands-on project -Fkuelpatien by the principals consistent and clear coniiminication with the client and use of the late.st technology In surveying cc.upment and methods The firm has over the past 2B years established a reputation for reliability and service as is demonstrated by the ongoing nature Of our clientele SERVICES Cabrinha, Beare & &satiates is a full service Surveying & Mapping firm providing • Control surveys and attain:ants • GIS data actranatton aervice.s, • Topegraptuc aisppuig (both ground and photagrammaric), ? improvement and infrastructure layout surveys • Boundary analysts and surveys • Legal description prepanition, • ALTA surveys, • Architectural and megmecting design,surveys, • COM -- t""cL ion management surveying support services. • Ototechnical and environmental engineering surveying suppo q services • Preparation and processing of record of survey arid parcel maps • Global Positioning survey (GM services • thgltal data collection and mapping OFFICE LOCATIOIV AND DBE STATUS CH&A is a minority-owned (MBE/DB2) small business, and is eartified as such by the City of Las Angeles the Las Angeles County Metropolitan Transportation Authority (SLIPI1)TIE/M11E) CalTrans arid the State of Cali5anint as a Small Business Our offices are located on Rosemead Backyard in Pasadena, with easy access to the 10 (San Bermardmo) do (Pomona) and 2.10 (14:01ht11) freeways L AUTHORIZED REPRESENTATIVE ThS P,POLAIS IP a idalamr4 vr STANDARD FORM 390 (EAIG041 PAGE 5 GEI Proposal No 06 062 30 Geo Environmental Inc 33Geo Environmental Inc 31 GEI Proposal No 06 062 b TE 5/8/2006 Culver City Cranks / Tellefson Road Slide Slope Repairs ARCHITECT-ENGINEER QUALIFICATIONS PART II— GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) Standard Form 330 SOLICITATION NUMBER (if any) City Project No P867 2a FIRM (OR BRANCH OFFICE) NAME 3 YEAR ESABLISHED 1993 4 DUNS NUMBER Geo Environmental Inc 826916405 2b STREET 5 OWNERSHIP 1720 East Garry Avenue Suite 215 Corporation 2c CITY 2d STATE 2e ZIP CODE Santa Ana California 92705 k NzS:> :“., US Small Business Enterpnse Disadvantaged Business Enterpnse 6a POINT OF CONTACT NAME AND TITLE Farhat H Siddirn Ph D P E 7 NAME OF FIRM (If block 2a is a branch office) Geo Environmental Inc 6b TELEPHONE NUMBER Sc E MAIL ADDRESS (949) 263 8334 fsiddiqi@geo environmental corn 80 FORMER FIRM NAME(S) (if any) 81) YEAR ESTABLISHED Be DUNS NUMBER N/A 1993 X 9 EMPLOYEES BY DISCIPLINE 10 PROFILE OF FIRM S EXPERIENCE D ANNUAL AVERGE REVENUE FOR LAST 5 YEARS Pti —ION a //M.> /f LW/L lal, / CF E AT V I; II /I:ra/ ; EII.44,,E 02 Administrative 2 B02 Bndges 1 08 CADD Technician 1 Cl 1 Community Facilities 1 12 Civil Engineer 1 1 D02 Dams (Earth Rock) Dikes / Levees 1 16 Construction Manager 1 E02 Educational Facilities Classrooms 1 23 Environmental Engineer i E09 Environmental Inpact Studies 1 27 Foundation / Geotechnical Engineer 2 El 3 Environmental Testing and Analysts 1 30 Geologist 2 1 H07 Streets Paving Parking Lots 2 40 Matenals Engineer 1 Hl 1 Housing (Residential Apartments 2 48 Project Manager 1 L04 Libranes Museums Galleries 1 55 Soils Engineer 1 001 Office Buildings / Industnal Parks 1 58 Technician / Analyst 2 R04 Recreation Facilities (Pa k M nnas Etc 1 R06 Rehabilitation (Buildings Structures Facilities) I RI 1 Rivers Canals Waterways Flood Control|1010|S05 Soils & Geologic Studies Foundations 2 rolAi 8 9 T02 Testing and Inspection Services 3 11 ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue tndex number shown at nghh L, ,' ) ) Lan Rk) ,30 ( PA £ i ha # ,,J7 TM t 000 /a T. 1 / tn —10 a / ,-,. .tt% a505 s $a 5 a p $ t /a/II a 00 00 / '. :. ta 0 $ I a Her C $ /1„ta $ 0 rT Oh* a a a a t/al k 2 / z/ Ir 0 ICr // I.etatl e a Fetler$ I Wa k 1 a $to a I' aderttl $$ a/ k 4 $ TO" , VO TI :.1 4 12 AUTHORIZED REPRESENTATIVE The foregoing is a statement of ac s2e CITY Pa ATE I P|1010|kang veoth ) 4 DUNE MISER 1150086883 2b 650 Ste Mart Aviuia. Stuia 3 0 N NT OF ACT MALE AbIll John lIilIy, Pratt-veal 04 TIMER ICHE ()3) 738-2951 Ha FORIAFFIRfl ti a. AD fkeliyt$sih N kil krwidgrey S NUMRER ls FIF141 fOilBRANLAI UIFFelIGN Wheeler & Gray CW131111211 PART II GENERAL QUALIFICATIONS branch offices, complete for each specific branch a a 10 PHOFIL€OFF1RMSEX PE ANNUAL AVERAGE REVENUE FO ENCE AND L AST 6 YFARS everweilnd Number Agin banw J msi HIlT mion mom Co 12. AUTHORIZED REPRESENTATIVE The comoning is a statement of facts GEI Proposal No 06 062 32 Geo Environmental Inc Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs ARCHITECT-ENGINEER QUALIFICATIONS 1 SOUCITATIONNumbeft tntyp or Employees 11 ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES or Rim RIR 1A51 3 YEARS (knert 'avatar* Index mother shown atr|1010|PROFESSIONAL SERVICES REVENUE INDEX NUMBER Less don 4100 000 6 $2 million to less than eb 4100 00 to less than $250 000 7 $6 million to less than 510 million $250 000 to lees than $500 8 410 million to lase than 126 million $500 000 to as than $1 million 9 425 million to less lhan $513 $1 million to Irma than 12 million 1 4541 milllerr or (treater a. Federal Work b Non Fat a c Total Wo 35ARCHITECT-ENGINEER QUALIFICATIONS Geo Environmental Inc 33 GEI Proposal No 06 062 11 ANNUAL AVERAGE PROFERSIONAL SERVICES REVENUES OF FrRm FOR LAbT 3 VEARb Moven feVeThio index inuriber shown t right! a Fodorci Work b Non-Federal Work Total PROFESSIONAL SERVICES REVENUE iraa&.x NUMBER I est; than $100 000 6 02 solitary to Iasi than 05 million 2 $10000 to lino then 4260,000 7 06 rollis.m to loss than 010 million 62E0 000 to lam then 0600,000 010 million to less than #26 million 4 4600 000 to law than al 9 026 million to lecs then $50 minor! fl n to less then $2 mitten 10 *BO million or greater Standard Form 330 Culver City Cranks / Tellefson Road Slide Slope Repairs PART II GENERAL QUALIFICATIONS IV a firm hes branch offices complete for aw/? specific branch office seeking work anA pictt OFFICEI. NAME 3 YEAR ESTAMJSRED oAxMsNUMBER CARRIVRA, HEARN & ANSOCIATHS 211, smer &OR S ROSEMEAD BLVD 2c MY PASADENA, AT S 911E7 cORT-zziajct4 b 1.BUSINESS STATUS tio POINT D oncr MAMF im TI CLYDE C CARRI1THA E flier) R. ADDRESS -69 clydoWcabrinhall FORMFR FIRM NASES ES F M.) Ob Wt. [DIAN.* (A. DUNS RUNNER OLD E=1111111111111111111111111======= MEM .011111111111E111111111111111111111 =1111011===.11111111=111111111IIIIIIIIIIII INNEININEE=. MENII=IIIIEINIMINIIIII111111111=111111111111111 MENI111111111111111111111111111=11===1.11 . 1N . =1111=11111=111111111111=MINEIM=1111=11111111111111111111111.1=1 IEINFIIINEIMEEN aminiiMMINNEINIII111111111111111111M111111111 Other Ern I SAS sLy/VW Cul) Ptryttqt tax14:4twttit art+ euv Line Ctarrtli Coe Ary Aoara. r cLun C," VOL:AA (.7•Iff t /thy( rem t Tr? iNw. &thy ,.A1.1.141 t,4 Priv*, frr vtnt ifiqua A Ilkeln r.A.$;47 threlsri tor ttmA i V1 IL Cl 4Ilri7.1 6,441 rk,Tery TiWkat 11. Wodttl DIMLY Cortetr We4evitItlam ftreetur wet e ret.rmil ex Corr4 Avve rerr PNIV4A roio CIFNCe Anew T L tg' at. r f7t1W4 DBE Certifications Culver City Cranks / Tellefson Road Slide Slope Repairs An' • C &ma C Aarzwi CALIFORNIA UNIFIED CERTIFICATION PROGRAM (CUCP) Cira (ws Om* April 5 2006 File No C1JCP 204116 OCTA 22873 Mr Farhat 11 Sithinp CiE0-Eivenotimental, Inc 1720 r Garry Ave Ste 4215 Santa Ana CA 92705 RF Three Veer Renew al of Disadvantaged Business Enterprise Certification Dear Mr Sidditp We are pleased to advise you that after caredul review of your applieation and suipporUng documentation, the Orange County Transportation Authority hes determined that your firm uirx.19 the eligibility standards to he certified as a Disadvantaged Business Enterprise (DBE) as required under the U S Department ofTransportation (U S DOI ) Regulation 49 art Part 26 as aniended The DBE certification will be honored by all U S DOT recipients In Galtiornm and yn ttmi stll be listed in the Califoutia Unified Certification Progruii (UCF) datdbase certified DBEs under the following specific areas of expertise that vou have identified ott y01.11 supplemental queshonnaire NAICS Codes Description 541330 Engineering Services Your DBE cetti iii4wn is good for three years fruit' the date of Li us letter and applies on13, for the above codes You nay review your firm s information in the Cab feral a V.? Dlih Database winch tan be accesst d dt the Cul i_rim Department of Trur v00011011 s weheitc at ww w dot La. aueglie lbetil Any additions and revisions must be sublimed to the District for approve( After the three-year certification period, youi entire file will be reviewed m ender to ascertain continued DBE certification status YOU will be notified of the pending DBE status review and any documentation updates neeessar y prior to the expirabon date 'The Regulations also require anrual -updates during this three-year period In order to assure corn-cluing DBE 314tua, you Must; 511b1111t annually a DBE DeLlaration %with eltaiye Coroq Tr•-trpornektti Aorgwv 5.4 south Moue Straw., PO 13Cit t4 r °rang CetrOf 11? 32W3 (71 4 ? CY-0... -TA 157i2) GE! Proposal No 06 062 34 Geo Environmental Inc 31Culver City DBE Certifications Cranks / Tellefson Road Slide Slope Repairs GEO-EareironmeiataL, inc Page 2 supporting documentation in the formai which will be sent to you Based on your annual submission that no change in owienthip and control has occurred, or if changes have um-uni gd they do not aCfect youi frrns DBE staudnig, hit DBE certification of your firm will continue until the three year certification has mimed Also, should any changes occur Lb it could affect your certific Mon status pi tor to receipt of the DBE Declaration, such as changes in your firra's name, busmessimading address, ownership, management or control or failure to meet the applicable business size standards or personal net worth standard, please notify me immediately DBE certification is subject to review at any time failure to submit forms .3nd/or change of information will be deemed is failure to coopei ate under Section 26 109 of the Replations Congratulations, and thank you for your continued unerest tn participatuig in the Cahforma IJCP I wish you esery business success and look !inward to healing from you if! may be or any assistance to you in this regard S nu.trsly 4.46) Tula Giles-Potter Sinal I Buslilas . Program Adnuniatratui GEI Proposal No 06 062 35 Geo Environmental Inc S814• 5,990 tit T sraverfiloWn iasmorsti etro ( tilltt‘tA NitlE.Dt EATIF ICA 1 ION 1140(.RA11/41 Otta.r.firtts6/1 '5411'0 ,4 Maprstt II, t.tx17„,„,c,t ?VIA ;31"( orlificiittan IS cr.o;,:' r: gr ,te...tft, Nit .20/ 2.; t tt,.•tA Itohttit'>• 1 Atte! Me ttitet , 4, 14 ,t I e I DVE. Iftt.-05/5:3 I: a '/<"V 555,1,,,50s/ ":,,1 147 t'il''' 1"'8'-'4g, ri-,1* :".4.40..."4.: 'I' CIC.P ., ". ,,,, n,III f, t(i n1.11,7-r. 1 I i^r :"* n":%AntiriOrl .i.' II` "...,),sit:',1*$1-m"; :cac,,km ,„:-t,3t,i),.0 ttl , 1t4 1(4, , , 1 th,lt nn n ,11, , d .vititltrirl v/,-0 r l f:', , t-I ,'.%4 4) °motto.: 1 0 ., A „ ,,, r uric, 1 ,t,-, ,I,, n A '41'1.1.,t rut !It' tt :) .“r .d,,,, /,,,,, -,-, - ,, r1 ' ,'” o' , I : /0'1 'lift?. Llittl ltr o 1,4 O a . rt it tAzttittLetde'l tlas HADIriar' ^Wriolk, koomoll 1411101{eft rrtifitveval rAtir .54 515. .5 155 Atale < "5 $, Y. 411,4U, 3.41 DBE Certifications Culver City Cranks / Tellefson Road Slide Slope Repairs A, 4 ,:tek Coltittho I foam A Ass biz 4r.8 ttut.,5ttd B ,f P111 ftttt 2- VIC: PE Ctva triAnt.age ri,%er5t511/1, Enterprtse cerpec4pon MT4 Far 379 p„,,t thtsi crlretio rth'41'. , tik.r.;,-t5iymn t ,, p-Jrtetizto Atit rtiaAtt,kto;iaj J tt, ktitt, t t DOT', rrtrtt•t-;ma.t) -tt ca,t1,„|1010|4' 4 biP:Qitkr, GEI Proposal No 06 062 36 Geo Environmental Inc 31