Legislation Details

File #: HIST-20964    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 11/12/2012 Final action: 11/12/2012
Title: Introduction of an Ordinance Amending the Culver City Zoning Map, as Referenced in Title 17, Zoning, of the Culver City Municipal Code, Section 17.200.015, Establishing Planned Development Zone No. 10 Zoning Code Map Amendment (ZCMA P-2012020) and Approving a Comprehensive Plan (CP P-2012018) to Allow a Commercial Development Consisting of Approximately 41,735 Square Feet of Retail and Restaurant Uses and 38,732 Square Feet of Office Uses Located at 8810-8850 Washington Boulevard and 3920 Landmark Street.
Attachments: 1. Introduction of an Ordinance Amending the Culver C - PH-3__12_11_12_CDD_Planning_Platform - FINAL.pdf, 2. Introduction of an Ordinance Amending the Culver C - PH-3__12_11_12_ATT_CDD_Platform.pdf
City of Culver City, California Agenda Item Report RECOMMENDATION: Staff recommends that the City Council 1) Determine that no new information has become available and no changes in the proposed project have been made since the Planning Commission’s adoption of a Mitigated Negative Declaration related to the project and, therefore, no additional environmental analysis is required; and, 2) introduce the proposed Ordinance (Attachment No. 1), amending the Culver City Zoning Map, as referenced in Title 17, Zoning, of the Culver City Municipal Code, Section 17.200.015, establishing Planned Development Zone No. 10 (Zoning Code Map Amendment, ZCMA-P2012020) and approving a Comprehensive Plan (CP P- 2012018) for a commercial development consisting of approximately 41,735 square feet of retail and restaurant uses and 38,732 square feet of office uses located at 8810-8850 Washington Boulevard and 3920 Landmark Street. Meeting Date: 11/12/12 Item Number: PH-3 CITY COUNCIL AGENDA ITEM: PUBLIC HEARING – Introduction of an Ordinance Amending the Culver City Zoning Map, as Referenced in Title 17, Zoning, of the Culver City Municipal Code, Section 17.200.015, Establishing Planned Development Zone No. 10 Zoning Code Map Amendment (ZCMA P-2012020) and Approving a Comprehensive Plan (CP P-2012018) to Allow a Commercial Development Consisting of Approximately 41,735 Square Feet of Retail and Restaurant Uses and 38,732 Square Feet of Office Uses Located at 8810-8850 Washington Boulevard and 3920 Landmark Street. Contact Person/Dept.: Susan Yun, Thomas Gorham Phone Number: 310-253-5755 310-253-5727 Fiscal Impact: Yes [X] No [] Fiscal Impact: Yes Public Hearing: [X] Action Item: [] Attachments: [X] Commission Action Required: Yes [X] No [] Date: 10/4/12 Planning Commission Public Notification: On October 22, 2012, a notice was mailed to all the property owners and occupants beyond a 1,000-foot radius of the project site and emailed to the Master Notification List. The notice was mailed to East Culver City Neighborhood Alliance Homeowners Association, the Chamber of Commerce and Downtown Business Association. On October 22, 2012, the site was posted. The notice was also published in the Culver City News on October 25, 2012 and November 1, 2012; Meetings and Agendas – City Council (11/08/12) Department Approval: Sol Blumenfeld: (10/31/12) City Attorney Approval: Carol Schwab (by H. Baker) (11/05/12) Chief Financial Officer Approval: Jeff Muir (11/07/12) City Manager Approval: John M. Nachbar (11/08/12) City of Culver City, California Agenda Item Report PROCEDURE: 1. Mayor seeks motion to receive and file the affidavit of mailing and posting of public notice. 2. Mayor calls on staff for a brief staff report and City Council poses questions to staff as desired. 3. Mayor seeks motion to declare the public hearing open, providing the applicant the first opportunity to speak, followed by the general public. 4. Mayor seeks a motion to close the public hearing after all testimony has been presented. 5. City Council discusses the matter and arrives at its decision. BACKGROUND: The proposed request is to establish a Planned Development (PD) Zone through a Zoning Code Map Amendment (ZCMA) and a Comprehensive Plan (CP) to allow the construction of a multi-use commercial development consisting of approximately 41,735 square feet of retail and restaurant uses and 38,732 square feet of office use with a total of 312 parking spaces located in two above ground parking structures (the Project). The Project site is located near the recently completed Exposition Light Rail Transit (Expo LRT) line, Culver City Expo Station and the City’s Washington National Transit Oriented Development (TOD) at 8810–8850 Washington Boulevard and 3920 Landmark Street. In order to facilitate the proposed Project, a Zoning Code Map Amendment and Comprehensive Plan are required pursuant to Zoning Code Section 17.240, Planned Development Zoning Districts and Section 17.560, Comprehensive Plans. The proposed Zoning Code Map Amendment includes re-zoning the project site from Industrial General (IG) to Planned Development (PD). The proposed Comprehensive Plan implements the PD zoning with specific development standards and permitted land uses. The Comprehensive Plan is intended to allow flexibility in the application of the Zoning Code standards for larger scaled proposed developments and considers innovation in site planning in order to more effectively respond to site features, uses on adjoining properties, and other impacts that the Zoning Code may not be able to adequately address. At its September 12, 2012 meeting, after considering the staff report, the application materials and applicant presentation, the Planning Commission continued the item to its October 4, 2012 meeting, requesting various clarifications, revisions and additional information regarding the Project. At its October 4, 2012 meeting the Planning Commission unanimously adopted a resolution (Attachment No. 2) recommending City Council approval of ZCMA-P2012020 establishing PD Zone No. 10 and Comprehensive Plan (CP P-2012018) to allow the proposed Project on the site. City of Culver City, California Agenda Item Report Please see Attachment Nos. 3 through 6 (Comprehensive Plan document, Planning Commission Staff Reports, Environmental Analysis, and Traffic Study) for a detailed review of the Project. ATTACHMENTS: 1. Proposed Ordinance and Exhibit A, Zone Change Map and Exhibit B, Conditions of Approval. 2. Planning Commission Resolution No. 2012-P011 (without attachments). 3. Proposed Comprehensive Plan. 4. September 12 th and October 4 th Planning Commission Staff Reports (without attachments). 5. Initial Study/Mitigated Negative Declaration dated August 22, 2012. 6. Traffic Analysis prepared by Raju and Associates Inc, dated July 2011 and supplemented on March 2012. MOTION: That the City Council: 1. Determine that there is no new information or substantial changes to the Project since the Planning Commission’s adoption of the Mitigated Negative Declaration and, therefore, no additional environmental analysis is required; and 2. Introduce the proposed Ordinance, amending the Culver City Zoning Map, as referenced in Title 17, Zoning, of the Culver City Municipal Code, Section 17.200.015, establishing Planned Development Zone No. 10 (Zoning Code Map Amendment, ZCMA-P2012020) and approving a Comprehensive Plan (CP P- 2012018). MEETING DATE: 11.12.12 AGENDA ITEM: Introduction of an Ordinance Amending the Culver City Zoning Map, as referenced in Title 17, Zoning, of the Culver City Municipal Code, Section 17.200.015, establishing Planned Development Zone No. 10 Zoning Code Map Amendment (ZCMA P-2012020) and approving a Comprehensive Plan (CP P-2012018) to allow a commercial development consisting of approximately 41,735 square feet of retail and restaurant uses and 38,732 square feet of office uses located at 8810-8850 Washington Boulevard and 3920 Landmark Street. ATTACHMENTS Pages 1. Proposed Ordinance and Exhibit A, Zone Change Map and Exhibit B, Conditions of Approval 1- 34 2. Planning Commission Resolution No. 2012-P011 (without attachments) 35 - 42 3. Proposed Comprehensive Plan 43 - 168 4. September 12 th and October 4 th Planning Commission Staff Reports (without attachments) 169 - 192 5. Initial Study/Mitigated Negative Declaration dated August 22, 2012 193 - 221 6. Traffic Analysis prepared by Raju and Associates Inc, dated July 2011 and supplemented on March 2012 222 - 642 ATTACHMENT 1 1ATTACHMENT 1 2ATTACHMENT 1 3ATTACHMENT 1 4ATTACHMENT 1 5ATTACHMENT 1 6ATTACHMENT 1 7ATTACHMENT 1 8ATTACHMENT 1 9Or di na nc e No. _ _ _ _ _ _ _ _ _ ATTACHMENT 1 10EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 1 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 1. These Conditions of Approval are being imposed on Platform Planned Development and Comprehensive Plan, a commercial development of 41,745 square feet of retail and restaurant floor area, 38,732 square feet of office floor area, and two multi-level parking structures providing a total of 312 parking spaces (the “Project”), for the property located at 8810 – 8850 Washington Boulevard and 3920 Landmark Street (the “Property”). All Standard 2. A copy of the Resolution approving the Project, and a copy of these Conditions of Approval, shall be printed on the plans submitted as part of any building permit application for the Project. Planning Standard 3. All building permit applications for the Project shall include sufficient information and detail to clearly reflect compliance with all applicable requirements of the Culver City Municipal Code (the “CCMC”) and with these Conditions of Approval. Planning Standard 4. The land use permit to which these Conditions of Approval apply (the “Land Use Permit’) shall expire four years from the date of final approval of said Land Use Permit, if the use has not been exercised. As provided in CCMC Section 15.595.030 –“Time Limits and Extensions”, an applicant may request an extension of said expiration date by filing a written request with the Planning Division prior to the expiration of the land use permit. Planning Standard ATTACHMENT 1 11EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 2 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 5. Pursuant to CCMC Section 17.630.010.C.4 – “Posted Notice”, the public notification sign(s) installed in accordance with the public notification requirements for the Land Use Permit shall be removed within ten days after the end of the appeal period or the final decision by the City Council on the Land Use Permit, whichever occurs last. Planning Standard 6. The Project shall be developed pursuant to CCMC Chapter 17.300 – “General Property Development and Use Standards”. Planning Standard 7. All planted areas on the Property shall be landscaped and irrigated pursuant to CCMC Chapter 17.310 - “Landscaping”. Planning Standard 8. All parking areas on the Property shall be developed pursuant to CCMC Chapter 17.320 - “Off-Street Parking and Loading”. Planning Standard 9. Signs proposed for the Project shall meet all applicable requirements of CCMC Chapter 17.330 - “Signs”. All signs require a separate permit and approval. Planning Standard 10. All permits and licenses required in connection with the development or use of the Project shall be applied for and obtained separately. All Standard 11. All work within the public right-of-way (including but not limited to curb, gutter, sidewalk, and driveways) shall be designed and completed to the satisfaction of the City Engineer. Public Works Standard 12. Street trees shall be installed, to the satisfaction of the City Engineer and the Community Development Director, in conformity with the City’s approved Street Tree Master Plan and/or the City’s Transit Oriented Development District Streetscape Plan adopted for this area including tree wells and irrigation. All new (and existing) street trees shall be supplied with irrigation water from the overall site irrigation system which shall include a timer and a rain sensor. All new (and existing) street trees, landscaping, and irrigation shall be indicated on the overall site landscaping/ irrigation plan. Planning/ Public Works Standard ATTACHMENT 1 12EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 3 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 13. Drainage devices, concrete curbs and gutters, sidewalks, drive approaches, and roadway pavement shall be designed in conformity with all provisions of the latest edition of the American Public Works Association Standard Plans (“APWA Standards”). Public Works Standard 14. At the sole cost and expense of the Property Owner, any broken or damaged curbs, gutters, sidewalks, and street pavement resulting from construction of the Project shall be repaired and reconstructed in conformity with APWA Standards. Public Works Standard 15. Trash enclosures shall be provided and shall each have a minimum inside dimension of 10 feet x 12 feet, a gated opening that is at least 8 feet wide, and a 6 inch high by 6 inch wide concrete curb along the inside perimeter wall. Each enclosure shall also have at least a 6 inch thick concrete slab that drains at a one percent gradient out of the enclosure. Final approval for the size, location, and type of equipment needed for the adequate storage and disposal of all solid and recyclable waste generated by the Project shall be obtained from the City’s Environmental Programs and Operations Manager. A fire suppression sprinkler system shall be provided within any covered trash enclosure area as required by the Fire Marshal. All refuse containers assigned to or otherwise used by the Project shall be stored on-site in the trash enclosures. Public Works/ Fire/ Planning Standard 16. All Project related solid and recyclable waste material handling shall be in accordance with CCMC Section 5.01.010 – “Solid Waste Management”, which outlines the Sanitation Division’s exclusive franchise for this service. Public Works Standard 17. The Project shall meet all provisions of CCMC Section 7.05.015 -”Transportation Demand and Trip Reduction Measures”. Trans. Standard ATTACHMENT 1 13EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 4 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification GENERAL 18. All buildings and structures to be constructed as part of the Project shall be designed and constructed in accordance with all applicable regulations and standards of the City’s Building Code, Fire Code and any related codes as determined by the Building Official and Fire Marshal; and all other applicable provisions of the CCMC which are adopted and in effect at the time of issuance of a building permit. Building/ Fire Standard 19. Any new utilities shall be placed underground or enclosed within the building construction; no new overhead utilities shall be permitted. Building/ Planning Standard 20. The Project shall comply with all applicable requirement of the Culver City Green Building Program as set forth in CCMC Section 15.02.1100, et.seq. Building Standard 21. The Project shall comply with the all applicable requirements relating to solar photovoltaic requirements as set forth in CCMC Section 15.02.100, et. seq. Building Standard 22. Changes to the Project or use approved as part of the Land Use Permit may only be made in accordance with the provisions of CCMC Section 17.595.035 – “Changes to an Approved Project”. Planning Standard ATTACHMENT 1 14EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 5 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 23. A covenant and agreement, on a form provided by the Planning Division and in form and substance acceptable to the City Attorney, acknowledging and agreeing to comply with all terms and conditions established herein, shall be signed by the Property Owner and recorded in the County Recorder’s Office. The covenant and agreement shall run with the land and shall be binding on any subsequent owners, and tenants or occupants of the Property. After recordation, a certified copy bearing the Recorder’s number and date shall be provided to the Planning Division. Planning/ City Attorney Standard 24. The Applicant and Property Owner shall indemnify and agree to defend (at the Applicant’s and Property Owner’s sole expense, with legal counsel approved by the City) and hold harmless the City, and its elected and appointed officials, officers, employees, agents, contractors and consultants from and against any and all loss, damages, injuries, costs, expenses, liabilities, claims, demands, lawsuits, attorneys’ fees and judgments, arising from or in any manner connected to any third party challenge to the City's approval of the Project. The obligations required by this Condition shall be set forth in a written instrument in form and substance acceptable to the City Attorney and signed by the Applicant and the Property Owner. City Attorney Standard 25. A minimum of three sets of final landscaping and irrigation plans (separate from the plans submitted for the building permit) shall be submitted to the Planning Division for review and approval. Planning/ Parks & Rec. Standard 26. Payment of New Development Impact Fees pursuant to CCMC Section 15.06.005 et. seq. shall be submitted. Planning/ Building Standard ATTACHMENT 1 15EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 6 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 27. A Construction Management Plan prepared by the construction contractor, which identifies the areas of construction staging, temporary power, portable toilet, and trash and material storage locations, shall be submitted to and approved by the Building Official. Prior to commencement of work the construction contractor shall advise the Public Works Inspector and the Building Inspector (‘Inspectors”) of the construction schedule and shall meet with the Inspectors. Building/ Public Works Standard 28. A Pedestrian Protection Plan shall be submitted to and approved by the Building Official. Such plan shall identify all areas of pedestrian protection and indicate the method of pedestrian protection or pedestrian diversion when required. When pedestrian diversion is required, the Pedestrian Protection Plan must also be approved by the Public Works Director. Building/ Public Works Standard 29. Plans submitted as part of the building permit application shall include a schedule of the special inspections anticipated, the firm proposed for the special inspections, and the resumes of all proposed special inspectors. The Building Official reserves the right to reject any special inspector at any time for the duration of the Project. All special inspection reports shall be made available to the Building Official and to any Culver City Building Safety inspector as required by the Building Official No work shall be covered without a Culver City Building Safety inspection, whether or not a special inspection was performed on such work. Building Standard ATTACHMENT 1 16EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 7 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 30. A Construction Traffic Management Plan shall be prepared by a traffic or civil engineer registered in the State of California. The Construction Traffic Management Plan shall be submitted to the City Engineer and Planning Manager for review and approval prior to the issuance of any Project demolition, grading, or excavation permit. The Construction Traffic Management Plan shall also be reviewed and approved by the City’s Fire and Police Departments. The City Engineer and Planning Manager reserve the right to reject any engineer at any time and to require that the Plan be prepared by a different engineer. The Construction Traffic Management Plan shall contain, but not be limited to, the following: A. The name and telephone number of a contact person who can be reached 24 hours a day regarding construction traffic complaints or emergency situations. B. An up-to-date list of local police, fire, and emergency response organizations and procedures for the continuous coordination of construction activity, potential delays, and any alerts related to unanticipated road conditions or delays, with local police, fire, and emergency response agencies. Coordination shall include the assessment of any alternative access routes that might be required through the Property, and maps showing access to and within the Property and to adjacent properties. C. Procedures for the training and certification of the flag persons used in implementation of the Construction Traffic Management Plan. D. The location, times, and estimated duration of any roadway closures, traffic detours, use of protective devices, warning signs, and staging or queuing areas. E. The location and travel routes of off-site staging and parking locations. Planning/ Public Works Standard ATTACHMENT 1 17EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 8 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 31. Reasonable efforts shall be used to reuse and recycle construction and demolition debris, to use environmentally friendly materials, and to provide energy efficient buildings, equipment and systems. A Demolition Debris Recycling Plan that indicates where select demolition debris is to be sent shall be provided to the Building Official prior to the issuance of a demolition permit. The Plan shall list the material to be recycled and the name, address, and phone number of the facility of organization accepting the materials. Building Standard 32. A vector/pest control abatement plan prepared by a pest control specialist licensed or certified by the State of California shall be submitted for review and approval by the Planning Manager and the Building Official. Said plan shall outline all steps to be taken prior to the commencement of any demolition or construction activity in order to ensure that any and all pests (including, but not limited to, rodents, bees, ants and mosquitoes) that may populate the Property do not relocate to or impact adjoining properties. Building/ Planning Standard 33. Prior to issuance of a building permit, notice of the Project construction schedule shall be provided to all abutting property owners and occupants. Evidence of such notification shall be provided to the Building Division. The notice shall identify the commencement date and proposed timing for all construction phases (demolition, grading, excavation/shoring, foundation, rough frame, plumbing, roofing, mechanical and electrical, and exterior finish). Building Standard ATTACHMENT 1 18EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 9 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 34. A Phase 1 Archaeological/Paleontological Survey shall be completed and submitted to the Planning Division and Building Safety Division for review. If the Phase 1 Archaeological/Paleontological Survey indicates the presence of archaeological and/or paleontological resources, then an archaeological and/or paleontological professional(s), approved by the City, shall monitor all phases of the excavation for the project site. In the event that the Phase 1 Archaeological/Paleontological Survey determines that no such resources exist but undetected fossil resources and/or human remains, or other archaeological/paleontological resources are encountered during construction activities, work in that area must be halted, and both the City of Culver City and the coroner must be notified. Work will be halted in that area of the detected resource until the City of Culver City’s archaeologist and paleontologist have been contacted to evaluate the resources and permission to commence work in that area has been given by the City of Culver City. Planning/ Building Mitigation Measure 35. An asbestos and lead survey shall be submitted to the Planning Division and Building Safety Division for review. The survey shall indicate the requirements on remediating the site and precautions taken during demolition and transport of hazardous materials according to the state regulations and Asbestos Hazard Emergency Response Act (AHERA). Planning/ Building Mitigation Measure ATTACHMENT 1 19EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 10 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 36. A covenant and agreement on a form provided by the Planning Division and in form and substance acceptable to the City Attorney, agreeing to hold lot numbers 1, 2, and 3 of Record of Survey 81-95 as one parcel and lot numbers 14 and portion of 13 of Record of Survey 81-95 as one parcel, shall be signed by the Property Owner and recorded in the County Recorder’s office. After recordation, a certified copy bearing the Recorder’s number and date shall be provided to the Planning Division. Planning/ Public Works Special 37. A covenant and agreement (reciprocal access agreement) on a form provided by the Planning Division and in form and substance acceptable to the City Attorney, agreeing to tie all on-site parking required for the project on both sites making said parking available to all users of the project shall be signed by the Property Owner and recorded in the County Recorder’s office. The covenant and agreement shall run with the land and shall be binding on any subsequent owners, and tenants or occupants of the Property. After recordation, a certified copy bearing the Recorder’s number and date shall be provided to the Planning Division. Planning Special 38. The off-site improvement plans shall demonstrate streetscape improvements in accordance with the City’s Transit Oriented Development District Streetscape Plan including but not limited to street trees and other landscaping, concrete sidewalks, and street furniture (benches, trash receptacles, and bicycle racks.) These streetscape improvements shall be installed along the project’s Washington Boulevard and Landmark Street frontage as determined by the Community Development Director and Public Works Director. Planning/ Public Works Special ATTACHMENT 1 20EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 11 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO BUILDING PERMIT ISSUANCE 39. This project is subject to the National Pollution Discharge Elimination System (N.P.D.E.S.) requirements for a Standard Urban Stormwater Mitigation Plan (SUSMP). The SUSMP shall be approved prior to the issuance of the building permit. Public Works Special 40. A Storm Water Pollution Prevention Plan (SWPPP) shall be approved prior to the issuance of any construction permits. Public Works Special 41. This project is subject to the City’s Sewer Facility Charge. This charge shall be paid prior to the issuance of building permits or any construction permits issued by the Engineering Division. Public Works Special DURING CONSTRUCTION 42. During all phases of construction, a “Construction Rules Sign” that includes contact names and telephone numbers of the Applicant, Property Owner, construction contractor(s), and the City, shall be posted on the Property in a location that is visible to the public. These names and telephone numbers shall also be made available to adjacent property owners and occupants to the satisfaction of the Planning Manager and Building Official. Building/ Planning Standard 43. The Property shall be maintained daily so that it is free of trash and litter. Building Standard 44. During construction, dust shall be controlled by regular watering or other methods as determined by the Building inspector. Building Standard 45. The Building Division may apply administrative assessments and/ or post general stop work notices for any violations of the Conditions of Approval for the Project, and any violations of the CCMC. Building Standard ATTACHMENT 1 21EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 12 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 46. During all phases of construction, best efforts shall be used to ensure that all construction workers, contractors and others involved with the Project park on the Property or at designated offsite locations approved by the City, and not in the surrounding neighborhood. Building Standard 47. When foundation shoring and/or foundation piles will be part of the Project, the engineer of record shall use noise dampening measures such as the drilling of shoring supports and piles as determined by the Building Official and Planning Manager. Building/ Planning Standard 48. Prior to the commencement of any excavation, a temporary construction fence shall be installed around the site. The height and fence material is subject to approval by the City Engineer and the Planning Manager. Building/ Planning/ Public Works Standard 49. Hours of construction shall be limited to the following: 8:00 AM to 8:00 PM Monday through Friday; 9:00 AM to 7:00 PM Saturday; and 10:00 AM to 7:00 PM Sunday and National holidays. Dirt hauling and construction material deliveries or removal are prohibited during the morning (7:00 AM to 9:00 AM) and afternoon (4:00 PM to 6:00 PM) peak traffic periods. All construction workers shall be respectful of the surrounding neighborhood and keep non-construction related noise to a minimum prior to, during, and after permissible construction hours. Building/ Public Works Standard 50. All staging and storage of construction equipment and materials, including the construction dumpster, shall be on-site only. The Property Owner must obtain written permission from adjacent property owners for any construction staging occurring on adjacent property. Building/ Public Works Standard ATTACHMENT 1 22EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 13 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 51. Compliance with the following noise standards shall be required with at all times: A. No construction equipment shall be operated without an exhaust muffler, and all such equipment shall have mufflers and sound control devices (i.e., intake silencers and noise shrouds) that are no less effective than those provided on the original equipment; B. All construction equipment shall be properly maintained to minimize noise emissions; C. If any construction vehicles are serviced at a location onsite, the vehicle(s) shall be setback from any street and other property lines so as to maintain the greatest distance from the public right-of- way and from Noise Sensitive Receptors; D. Noise impacts from stationary sources (i.e., mechanical equipment, ventilators, and air conditioning units) shall be minimized by proper selection of equipment and the installation of acoustical shielding as approved by the Planning Manager and the Building Official in order to comply with the City’s Noise Regulations and Standards as set forth in CCMC Chapter 9.07; and E. Stationary source equipment (i.e., compressors) shall be located so as to maintain the greatest distance from the public right-of-way and from Noise Sensitive Receptors. Building/ Planning Standard ATTACHMENT 1 23EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 14 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification DURING CONSTRUCTION 52. In the event three citations are issued in connection with the Project for violations of these Conditions of Approval or for other violations of the CCMC, Project construction shall be stopped until such time that it is determined to the satisfaction of the Community Development Director, that causes of such violations have been eliminated or corrected and that the Project will be able to proceed in full compliance with these Conditions of Approval and the CCMC. Building/ Planning Standard 53. Flag persons with certified training shall be provided for work site traffic control to minimize impacts to traffic flow and to ensure the safe movement of vehicles into and out of the Property. Building/ Public Works Standard 54. During construction, trucks and other vehicles in loading and unloading queues must be parked with their engines off to reduce vehicle emissions. Construction deliveries shall be phased and scheduled to avoid emissions peaks as determined by the Building Official and discontinued during second-stage smog alerts. Building Standard 55. Construction vehicles shall not be permitted to stage or queue where they would interfere with vehicular and pedestrian traffic or block access to adjacent properties. Off-site staging shall be at locations approved by the City Engineer and shall be of sufficient length to accommodate large trucks without being unduly disruptive to traffic operations. The drivers of these trucks shall be in radio or phone communication with on-site personnel who shall advise the drivers when to proceed from the staging location to the Property. Construction-related vehicles shall not be permitted to park on public streets. Building/ Public Works Standard ATTACHMENT 1 24EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 15 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 56. All provisions, and requirements set forth in these Conditions of Approval, in the Resolution approving the project, in the CCMC, or in any applicable written comments as provided by City representatives at the March 15, 2012 Project Review Committee meeting (or from updates from the City thereafter) on the Land Use Permit application, shall be fulfilled and satisfied to the satisfaction of all City departments before the use may be established or the Project occupied. All Standard 57. All requirements of the City’s Art in Public Places Program, as set forth in CCMC Section 15.06.100, et. seq., shall be fully satisfied prior to the issuance of a certificate of occupancy; provided that if such requirements will be satisfied by the payment of the public art in-lieu fee, the same shall be paid prior to the issuance of a building permit. Cultural Affairs Standard 58. All onsite and offsite improvements and all conditions of approval except those which are deferred pursuant to a bond or letter of credit as determined and approved by the Building Official, Fire Marshal, Planning Manager, and/or City Engineer shall be completed prior to issuance of any certificate of occupancy. Prior to issuance of any certificate of occupancy the following shall be provided to and approved by the City: A. Five full sets of as-built plans that shall include at a minimum the site plan, grading and utility plan, landscape and irrigation plan, floor plan for each level of the Project, parking structure plan, roof plan with all mechanical equipment identified as to purpose and source and all offsite improvements; and B. One set of as-built plans as described above in a digital format compatible with the City’s computer system. All Standard ATTACHMENT 1 25EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 16 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 59. Washington Boulevard, along the project’s frontage, shall be widened to a 40 foot half street. The widening shall also include a new 10 foot sidewalk that will extend from the new curb face to the existing southerly 50 foot right-of-way line. The new easterly curb along Washington Boulevard shall join the existing curb through a smooth transitional reverse curve. The new street section of Washington Boulevard shall be a minimum of 6-inches of asphalt paving over 10-inches of crushed aggregate base (CAB). This work shall be designed and installed to the satisfaction of the City Engineer. Public Works Special 60. New parking stalls and standard or kiosk type parking meters shall be installed on Washington Boulevard as determined by the City Engineer. If standard meters are selected, they shall be of the type that allows the use of credit cards as manufactured by the IPS Group. If a kiosk meter is selected, it shall be of the type as manufactured by Duncan Solutions with each stall being uniquely numbered. Public Works Special 61. A bus stop and related appurtenances shall be installed along the project’s Washington Boulevard frontage. The bus shelter shall conform to the City’s Transportation Department standards. This work shall be designed and installed to the satisfaction of the City Engineer. Public Works Special 62. A bike lane shall be installed along the project’s Washington Boulevard frontage. The required striping and signage shall be reflected in the signing and striping plan as part of the project’s street improvement plans. Public Works Special 63. The existing curb returns at both corners of Washington Boulevard and Landmark Street shall be reconstructed with a 25-foot radius and new curb ramps. Adequate street easements shall be dedicated for the corner cut-off at each corner and any additional right-of-way necessary for the construction of the new curb returns. Public Works Special ATTACHMENT 1 26EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 17 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 64. The existing traffic signal poles at both corners of Washington Boulevard and Landmark Street shall be relocated to an approved location based on the reconstructed curb returns. A new pedestrian crosswalk shall be installed across Washington Boulevard at the easterly return, which shall include a new or reconstructed curb ramp on the north side of Washington Boulevard. New LED countdown pedestrian heads shall be installed on the two traffic signals controlling this new crosswalk. ADA compliant “Bulldog” type pedestrian push buttons and audible signal devices shall be installed on the four traffic signal poles that control all pedestrian crosswalks at this intersection. A westbound left- turn signal on Washington Boulevard shall also be required at this intersection. Any other ancillary work as determined by the City Engineer required to accomplish the above described work, including but not limited to installation of new mast arms, signal poles, street lights, and modifications to the service and controller cabinets shall be included. Any new signal poles shall be designed for 100 mph winds per CALTRANS standards. This work shall be shown on a traffic signal plan and a signing and striping plan, prepared by a civil or traffic engineer registered in the State of California, and shall be submitted to the Engineering Division for review, approval, and permitting. Separate traffic signal timing charts shall be submitted for review. Public Works Special 65. A five foot sidewalk shall be provided adjacent to the curb on Landmark Street. All street lights, street trees, fire hydrants, etc. shall be relocated to behind the sidewalk. A street easement shall be dedicated for the sidewalk and a public utility easement shall be dedicated at each location where a public facility will be located. The new sidewalk will require the reconstruction of the existing drive approaches that will still be used. Public Works Special ATTACHMENT 1 27EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 18 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 66. The full width of Landmark Street shall be repaved from Washington Boulevard to the southeasterly project boundary. The repaving shall consist of a two-inch grind and inlay of Rubberized Asphalt Concrete (RAC). All striping, parking tees and markers removed by said repaving shall be replaced with thermoplastic paint. The applicant has requested that a portion of Landmark Street, as it approaches Washington Boulevard, be reconstructed in concrete. If this option is selected, the concrete shall be a minimum of 8 inches thick and shall be placed on a 6 inch layer of compacted CAB. Public Works Special 67. All drive approaches that will no longer be used shall be removed and reconstructed with curb, gutter, and sidewalk. Public Works Special 68. Existing parking meters located along the project’s frontage with Landmark Street shall be relocated due to the closure of any driveways. New parking meters may be required as determined by the City Engineer. Existing parking meter heads shall be replaced and the new parking meter heads shall both be of the type that allows the use of credit cards as manufactured by the IPS Group and approved by the City Engineer. Public Works Special 69. All drive approaches shall be at least as wide as the drive aisle and not more than one foot wider on each side. Public Works Special 70. All existing and proposed drive approaches shall have a minimum 3 foot ADA concrete landing at the top of the approach. Public Works Special 71. All concrete used in the public right-of-way shall have a minimum strength of 3250 psi. Public Works Special 72. The existing street light system along the project's frontage with Washington Boulevard and Landmark Street shall be converted to low voltage induction type lighting. New street light conduit, wiring, pull boxes, light fixtures, and ballast shall be required. Public Works Special ATTACHMENT 1 28EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 19 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 73. Street trees, tree wells, tree grates, ground cover planting, and irrigation shall be installed within the project's frontage along Washington Boulevard and Landmark Street in accordance with the City’s Transit Oriented Development District Streetscape Plan. A separate landscape and irrigation plan shall be submitted to the Engineering Division for review, approval, and permitting. Irrigation within the public right-of- way shall be connected to the private on-site irrigation system. Planning/ Public Works Special 74. Secure bicycle parking shall be provided to accommodate twenty-two (22) bicycles. The bicycle parking shall be provided to accommodate seven (7) long-term and at least fifteen (15) short-term parking positions. The long-term spaces shall be provide in individual bike lockers or bike racks in a secure locking fenced enclosure on the ground floor of the project’s parking structure on the main development parcel. The short-term spaces shall be provided on both of the development sites and on the adjacent public sidewalk right- of-way, using eight (8) City approved “Inverted - U” Bicycle Racks. Exact location of the Bicycle Racks and in the public right-of-way shall be approved by the City Engineer. Public Works Special 75. All existing sewer laterals that have been abandoned or will be abandoned due to the project design and are located within the project boundary shall be capped at the property line. Public Works Special ATTACHMENT 1 29EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 20 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification PRIOR TO CERTIFICATE OF OCCUPANCY OR FINAL INSPECTION 76. The Project shall contribute $50,000 towards a study and implementation of a shuttle system connecting the residential and commercial areas in Downtown Culver City and Hayden Tract areas to and from the Culver City Exposition Light Rail Transit (LRT) Station. This shuttle system will include shuttle buses with stops along Washington Boulevard. The schedules for these shuttles should be developed such that coordinated transfers to and from the LRT station at Culver City are achieved. These shuttles would operate at enhanced frequencies during the peak commuter time periods and provide fast, convenient, and efficient connections to the Metro Exposition LRT line. In the event that the proposed shuttle program has not progressed sufficiently to warrant study funding, the $50,000 contribution mentioned above shall be used as the project’s fair share towards the design and implementation of Adaptive Traffic Control Systems (ATCS) at the intersection of Washington Boulevard/National Boulevard. This includes provision of ATCS- associated control PC hardware/software, if required. Public Works Mitigation Measure 77. A westbound left-turn signal at the intersection of Washington Boulevard and Landmark Street shall be designed and constructed by the Applicant to the satisfaction of the Public Works Director. The Applicant shall be responsible for all costs associated with the modification of the traffic signal. Public Works Mitigation Measure 78. A valet parking plan outlining the parking management of the valet parking in Building D shall be submitted to the Planning Division for review and approval by the Planning Manager and the City Traffic Engineer. Planning Special ATTACHMENT 1 30EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 21 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 79. The use and development of the Property shall be in substantial conformance with the plans and materials submitted with the application for the Land Use Permit as reviewed by the Planning Commission at its meeting on October 4, 2012, excepted as modified by these Conditions of Approval. Planning Standard 80. Pursuant to CCMC Section 17.650.020 - “Inspection”, the Property Owner and Applicant shall allow authorized City officials, or their designees, access to the Property where there is reasonable cause to believe the Property is not in compliance with these Conditions of Approval or other requirements of the CCMC. All Standard 81. The use and development of the Property shall comply with these Conditions of Approval and all applicable local, special district or authority, county, state and federal statutes, codes, standards, and regulations including, but not limited to, Building Division, Fire Department, Planning Division and Public Works Department requirements, and shall comply with all applicable CCMC requirements and all comments made during the City’s building permit plan check review process. Failure to comply with said Conditions, statutes, codes, standards, and regulations may result in reconstruction work, demolition, stop work orders, withholding of certificate of occupancy, revocation of land use permit approval and/or any other lawful action the City might deem reasonable and appropriate to bring about compliance. All Standard 82. All graffiti shall be removed from the Property within 48 hours of its application. Building/ Planning/ Public Works Standard ATTACHMENT 1 31EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 22 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 83. The Property Owner shall maintain all street trees along the property frontage at his/her sole cost and expense. Public Works Standard 84. All mitigation measures set forth in any environmental document relating to the Project (including any reports of the type contemplated by the California Environmental Quality Act) shall be completed as specified therein. Planning Standard 85. The Director, or his or her designee, shall conduct follow-up inspections on the design, operation and maintenance of the Project after full operation of the Project has commenced, as set forth in this Condition. A report on the Project traffic mitigations, on-site circulation, parking, project design, maintenance and operation shall be reviewed by the Planning Commission six months after occupancy of the Project. In the event the Project is not in full compliance with the approved Project plans, Project conditions of approval and approved Comprehensive Plan, the matter shall be set for public hearing pursuant to CCMC Chapter 17.660 – Revocations and Modifications. Planning Special 86. Changes or alterations to this Comprehensive Plan shall not be considered minor (and therefore shall not be subject to administrative approval pursuant to CCMC Section 17.560.025) if they will: a) Alter the exterior appearance of the project; b) Alter the materials being used on the exterior of the project (unless the new materials are of equal or better quality and are so similar in appearance to the materials on the approved materials board that the difference would not be noticed by a reasonably observant person); or c) Alter the floor plans in any material way, or increase the size of any one or more of the following areas: retail, restaurant, outdoor dining, and/or office. Planning Special ATTACHMENT 1 32EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 23 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 87. The applicant shall be responsible for installing “way finding signs” for the TOD District as provided in the Washington National Streetscape Plan as determined by the Director. Planning Special 88. The total floor area of retail and restaurant (including bars and nightclubs) uses shall not exceed 41,745 square feet. Restaurants (including bars and nightclubs) shall not exceed 35% of the overall retail/restaurant floor area. Planning Special 89. The courtyard trees to be a minimum 72 inch box size at installation and the exact location and final species selection shall be subject to review and approval by the City’s Landscape Architect. Planning Special ATTACHMENT 1 33EXHIBIT B Ordinance No._______________ Case Nos. ZCMA P-2012020,CP-P2012018 AND MND P-2012019 Page 24 of 24 NO. CONDITIONS OF APPROVAL Agency Source Compliance Verification ON-GOING 90. Inspections of the on-site parking and valet parking operations shall be conducted by the Planning Manager and the City’s Traffic Engineer at 6-month, 12-month, and 24-month periods after full operation of the Project. Thereafter, follow-up inspections shall be conducted on a case by case basis as determined necessary by the City. If it is determined (i) that the number of on-site parking spaces is not sufficient to satisfy demand, or (ii) that the valet parking operations are not adequately serving the Project, or (iii) that the Project’s parking facilities or operations are in any other way not fully and adequately serving the customers, patrons, employees, suppliers and contractors of the Project, then additional methods to provide fully adequate on-site parking shall be devised, such additional requirements shall be set forth in a revised valet parking plan acceptable to the City, and said plan shall be promptly and fully implemented. If fully adequate parking cannot be provided by the above methods, the demand for parking at the Project shall be reduced in a manner acceptable to the City (by, for example, reducing the amount of outdoor dining area), until the parking that can be provided will be adequate for the reduced demand. Planning Special ATTACHMENT 1 34ATTACHMENT 2 35ATTACHMENT 2 36ATTACHMENT 2 37ATTACHMENT 2 38ATTACHMENT 2 39ATTACHMENT 2 40ATTACHMENT 2 41ATTACHMENT 2 42PLATFORM PLANNED DEVELOPMENT ZONE, and COMPREHENSIVE PLAN Adopted on ___________, 2012, Ordinance No 2012-_________ ABRAMSON TEIGER ARCHITECTS ATTACHMENT 3 4301 Project Description 1 02 Land Use and Development Standards 7 A. Land Use 8 B. Development Standards 1. Building Setbacks 9 2. Building Heights 10 3. Parking • Vehicle Parking Plan 11 • Bicycle Parking Plan 11 • Parking Requirements 12 4. Loading Plan 13 5. Trash and Recycling Management Plan 13 6. Signage 13 C. Permitted Uses 14-16 D. Administration 17 03 Sustainability 18 04 Site 20 • Aerial Map 21 • Site Plan and Photos of Existing Conditions 22 • Proposed Site Plan 23 • Proposed Washington Boulevard Street Elevation 25 05 Building A 26 06 Building B 39 07 Building C 53 08 Building D 60 09 Building E/F 68 10 Conceptual Landscape Plan 81 11 Conceptual Lighting 93 12 Civil Engineering 107 • Site Survey 108-111 • Infrastructure/CFD 112 • Utility Plan 113-115 • Site Control Plan 116-118 • Site Grading Plan 119-121 13 Documents under Separate Cover 122 A. Geotechnical Report C. Traffic Study D. Carbon Emission Report E. Phase 1 Environmental Assessment TABLE OF CONTENTS ATTACHMENT 3 44Page 1 PROJECT DESCRIPTION 01 ATTACHMENT 3 45TRUE NORTH D E FA C B A Page 2 PROJECT DESCRIPTION The project is a multi-use commercial development located at 8810, 8840, and 8850 Washington Boulevard and 3920 Landmark Street within the Washington/National Transit Oriented District (TOD) near the Exposition Light Rail Transit Line and Station (Expo) in Culver City. The project comprises two sites totaling approximately 89,560 s.f. or 2.06 acres (Parcel 1: 21,796 s.f. or 0.5 acres and Parcel 2: 67,804 s.f. or 1.56 acres), fronting Washington Boulevard with Landmark Street bisecting the project. Both sites were formerly occupied by the Hyundai, Mazda and Nissan car-dealership. The current surrounding uses include a private primary school, air conditioning manufacturing, general warehouse, auto repair and some retail. Project Area Summary Table Building Retail Restaurant/ Retail + Office Parking Total Building A 4,109 s.f. 3,020 s.f. 29,816 s.f. 36,945 s.f. Tenant Space Utility Circulation 4,109 s.f. 3,020 s.f. 24,110 s.f. 1,608 s.f. 4,098 s.f. Building B 2,060 s.f. 2,400 s.f. 576 s.f. 107,450 s.f. 112,486 s.f. Tenant Space Utility Circulation 2,060 s.f. 2,400 s.f. 576 s.f. 100,271 s.f. 2,456 s.f. 4,723 s.f. Building C 5,095 s.f. 5,095 s.f. Tenant Space Utility 4,345 s.f. 750 s.f. Building D* 660 s.f. 39,935 s.f. 40,595 s.f. Tenant Space Utility Circulation 660 s.f. 37,504 s.f. 2,016 s.f. 415 s.f. Building E** 10,998 s.f. 6,789 s.f. 8,340 s.f. 1,068 s.f. 27,195 s.f. Tenant Space Utility Circulation 8,176 s.f. 876 s.f. 1,946 s.f. 5,369 s.f. 639 s.f. 781 s.f. 5,865 s.f. 416 s.f. 2,059 s.f. 1,068 s.f. Building F 4,135 s.f. 2,479 s.f. 6,614 s.f. Tenant Space 4,135 s.f. 2,479 s.f. Total Area by Use 27,057 s.f. 14,688 s.f. 38,732 s.f. 148,453 s.f. 228,930 s.f. + maximum allowable area for potential restaurant use, may also be used as retail * including courtyard kiosk ** excluding roof deck Aerial view of project with Expo Train line in foreground. KEY PLAN The project consists of six buildings (Buildings A through F) totaling 41,745 square feet of retail and restaurant floor area, and 38,732 square feet of office floor area. There are two above ground parking structures, one existing 3 level structure containing 93 parking spaces in a combination of self-parking and valet parking; and the other a new 5 level structure containing 219 self-parking spaces for a total of 312 on-site parking spaces. The project includes adaptive reuse of some existing buildings in conjunction with new construction to create a community oriented niche shopping environment with office uses in some of the buildings at the upper levels. The broad themes that drive the design are transportation, pedestrian flow and sustainability. ATTACHMENT 3 46Page 3 DESIGN CONCEPTS This is a transit oriented project that will complement the nearby Expo station. The proximity of the project to the new Expo station at Washington and National Boulevards is a key generator of visual cues for the design of the retail and office environment. Platform is a campus of six buildings that are connected by open spaces between the buildings. This open space includes two paseos and a 7,000 square foot open air central courtyard. The courtyard serves as an interactive community space that serves as the connector to the two paseos as well as to Washington Boulevard. In addition to these open spaces the project is designed with wide pedestrian oriented building setbacks along Washington Boulevard. Pedestrian amenities such as canopies, benches and landscape elements will add character to Washington Boulevard and offer a pleasant amenity to the pedestrian. The project also fosters pedestrian access and connectivity from the Expo station which is located to the north across Washington Boulevard, by providing a pedestrian entrance into the easternmost part of the site near the intersection of Washington Boulevard and National Boulevard. This urban design feature was incorporated into the project to provide a direct and convenient access into the site from the Expo station and to encourage people to visit the site. Furthermore, the project will activate this portion of Washington Boulevard that is currently undergoing revitalization as part of the TOD district and is an integral and vital link of urban and commercial activity between the Helms Bakery Complex and Arts District area to the east, Downtown Culver City to the west, and the Hayden Tract area to the South. Energy saving and sustainable design is integral to the project. It is incorporated throughout in the building systems and in the choice of materials. There is an outward expression of green building design visible from the passing train above and from the street level. The buildings incorporate green design elements such as photovoltaic electricity generation and storm water filtration. View of Washington Boulevard ATTACHMENT 3 47PLATFORM EXPO LINE STATION WASHINGTON BLVD Page 4 URBAN CONTEXT HAYDEN TRACT CULVER CITY DOWNTOWN HELMS BAKERY I-10 VENCIE BOULEVARD ROBERTSON BLVD NATIONAL BLVD CULVER CITY ARTS DISTRICT TO LA CIENEGA TRANSIT ORIENTED DEVELOPMENT DISTRICT BOUNDARY TRUE NORTH ATTACHMENT 3 48Page 5 SITE CONTEXT WASHINGTON BOULEVARD VENICE BOULEVARD ROBERTSON BOULEVARD NATIONAL BOULEVARD ? EXPO LINE TO USC/DOWNTOWN CULVER CITY STATOIN PARKING FOR CULVER CITY EXPO TRAIN STATION AND FUTURE MIXED USE DEVELOPMENT FUTURE MIXED USE DEVELOPMENT PROJECT SITE BOUNDARY TRUE NORTH ATTACHMENT 3 49Page 6 SITE CONTEXT Washington Boulevard L C L L L P L L 10'-3" 10'-3" 8'-9" 20'-0' 11'-10" 20'-0" 5'-0" 11'-10" " 21'-7 1/2" 19'-6" 3'-3" 5'-0" 5'-0" 10-3" 5'-0" 5'-9 1/2" SHOWERS TRASH/RECYCLING AREA BIKE E E KE KE IK BIK B B LOCKERS S RS RS RS ER KE KE CK CK OC OC O LO LO L NEW PROPERTYLINE RETAIL RESTAURANT/ RETAIL ELEV. . STAIR RETAIL RETAIL RETAIL AIL ELEV. LOBBY VALET/CONCIERGE UTILITY RETAIL RETAIL INACCESSIBLE L SIB PARKING RETAIL RESTAURANT/RETAIL STAIR LOBBY UTILITY V ELEV V V V V. . . ELEV. . RESTAURANT/ RETAIL MECH H. . RETAIL RETAIL RETAIL STAIR RETAIL V V V V ELEV V. MECH. MECH H H CH. . M. RETAIL MEN 9'-7 3/4" ATTACHMENT 3 50Page 7 LAND USE AND DEVELOPMENT STANDARDS 02 ATTACHMENT 3 51Page 8 A. LAND USE General Plan The General Plan Land Use designation of the project site is General Corridor. The General Corridor designation allows a range of small to medium scale commercial uses, emphasizing community serving retail, office and service uses along major corridors. It is intended to support desirable existing and future neighborhood and community serving commercial uses and housing opportunities that are compatible with nearby residential neighborhoods. Zoning Zoning for this site is intended to conform to the General Plan. The zoning pursuant to the Platform Comprehensive Plan is Planned Development (PD) District. The underlying Industrial General (IG) zoning for the project site is changed to PD along with adoption of the Comprehensive Plan. In combination with the PD zoning district, the Comprehensive Plan supports innovation in site planning and other aspects of project design, and more effective design responses to site features, uses on adjoining properties and other impacts that the underlying zoning code standards would produce without adjustment. The PD zoning district is applied to areas of existing large scale, multiple family residential and commercial complexes developed as a Planned Development zoning district, and sites suitable for similar large scale development. The PD zoning district is consistent with the General Corridor land use designation of the General Plan. View of Washington Boulevard ATTACHMENT 3 5210.3’ 10.3’ 17.7’ 14.5’ 8.8’ 9.8’ 11.9’ 10’ 0.5’ 12.8’ 5.8’ 4.3’ 7’ 10’ ++ 10’ ++ Page 9 B. DEVELOPMENT STANDARDS In addition to the development standards outlined herein, every land use and structure shall comply with applicable requirements of the Culver City Municipal Code (CCMC), Title 17, Zoning Code or as amended. Pedestrian Setbacks The project provides an ample pedestrian environment by providing undulating setbacks ranging from approximately 9’ to 13’ wide at the ground level along Washington Boulevard (Building A and B) as well as the provision of a 10’ wide public sidewalk that will be furnished with street trees, planters, tree grates, benches, bicycle racks, trash receptacles, wayfinding signage, and other street furniture consistent with the City’s Transit Oriented Development District Streetscape Plan. The pedestrian setback area provides for opportunities for amenities such as seating areas, landscape planters, as well as opportunities for outdoor dining. The upper levels of the buildings along Washington Boulevard (Building A and B) overhang the ground floor, providing shaded entryways to the retail and restaurant spaces. 1. Building Setbacks Building setbacks shall comply with the following: Setbacks Required Street Facing Landmark Street* Building A (min 5’-9” - max 17’-8”) average 12’-0” Building B (min 0’-6” - max 10’-0”) average 3’-6” Building C existing 7’-0” Building D existing 4’-4” Metro Line Facing Building E 0’-0” Building F existing 0’-0” Interior Lot Line / Side Yard Building B 0’-0” Building D 0’-0” Building E 0’-0” * Setbacks are calculated after new 5’-0” sidewalk dedication. Building Setback - Existing Building Building Setback - New Building Building Setback Diagram ++ 10’ Public Right of Way Pedestrian Sidewalk Setbacks Required Street Facing Washington Blvd Ground Floor Second Floor Third Floor Fourth Floor Fifth Floor Roof Level Building A 10’-3’ 5’-3” 8’-0” 5’-3” Building B min 8’-9” max 12’-10” avg. 9’-9” 5’-0” min 0’-9” max 5’-8” avg. 5’-4” min 0’-9” max 5’-8” avg. 4’-7” min 0’-9” max 5’-8” avg. 5’-4” 5’-8” Building F existing 0’-0” TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 53Page 10 B. DEVELOPMENT STANDARDS 2. Building Heights TRUE NORTH D E FA C B A KEY PLAN *Roof-mounted structures for the housing of mechanical equipment required to operate and maintain the structure, shall be allowed, up to a maximum of 13 feet 6 inches above the height of a building. Structures for the housing of elevators and stairs shall be allowed up to a maximum of 16 feet above the roofline of the building. View of Washington Boulevard Buildings shall not exceed the maximum allowed height limit of 56’. Buildings heights within the Comprehensive Plan vary in height from one story to five story structures. Height Limit 56 Feet* 5 Stories Height per Building Building A 56 Feet 4 Stories Building B 56 Feet 5 Stories Building C 32 Feet 2 Stories Building D 30 Feet 2 Stories Building E 56 Feet 3 Stories Building F 18 Feet 1 Stories Roof-mounted mechanical equipment (e.g., air conditioning, heating, exhaust, and ventilation ducts, etc.), shall be screened from public view from adjoining public streets and rights-of-way. The method of screening shall be architectur- ally compatible with other on-site development in terms of colors, materials, and architectural style as determined by the Planning Manager. ATTACHMENT 3 54Page 11 B. DEVELOPMENT STANDARDS 3. Parking Vehicle Parking Plan Parking for the project shall be provided in two separate above ground structures. The newly built parking structure on the corner of Landmark Street and Washington Boulevard (Building B) shall contain at least 219 parking stalls across five levels of covered parking and a roof level. The entire structure is accessed through an automatic entry system off of Landmark Street that will be activated by either a ticket or a key card system. Office users and store employees shall be prohibited from parking in the lower three levels of this structure, leaving these prime spaces to customers. The second parking structure will be a rehabilitated existing structure located on the north side of Landmark Street (Building D) containing 93 parking stalls. This structure shall have ingress and egress off of Landmark Street. Valet services shall be provided, with drop off and pick up occurring on the first level and parking on the two levels above. There will be 33 spaces on the second level including 28 in tandem configuration and 38 spaces on the third level including 36 in tandem configuration. There will be 22 self-parking spaces on the first level. Both parking structures will offer preferred parking for low emission vehicles (e.g. hybrid, alternative fuel and electrical automobiles) and carpool vehicles as required by the California Green Building Code (CGBC). Handicapped accessible spaces are provided per California Building Code (CBC) regulations. Bicycle Parking Plan Long term bike parking shall be provided within fully enclosed bicycle lockers in the newly built parking structure on the corner of Landmark Street and Washington Boulevard (Building B). These lockers shall be coin/card operated and available for the general public. Additional long term bike parking shall be available within a gated keycard operated area inside the parking structure on the main site (Building D). To facilitate employee and office worker bike commuting, a keycard protected shower shall be provided in the existing (Building D) parking structure and shall be available to anyone who works in the project and commutes by bike. In addition short term bike racks shall be provided along Washington Boulevard in the public right of way. Short Term Bicycle Parking Long Term Secured Bicycle Parking Automobile Parking ATTACHMENT 3 55Page 12 B. DEVELOPMENT STANDARDS Numerical Parking Requirements Parking for the project site shall be provided at a ratio of 1 stall per 250 square feet of retail and restaurant floor area consistent with the Zoning Code parking requirements for shopping centers and 1 stall per 350 square feet of office floor area consistent with the Zoning Code parking requirements for office uses. Restaurant space over 25% of the combined retail and restaurant floor area shall be parked at a ratio of 1 stall per 100 square feet of floor area. Outdoor dining areas up to 500 square feet per restaurant are covered under these parking requirements. Outdoor dining areas larger than 500 square feet per restaurant space including roof top dining at Building E shall be required to provide 1 stall per 250 square feet in excess of the initial 500 square feet. Bicycle Parking Requirements Short Term Bicycle Parking Required* 36 Spaces Long Term Bicycle Parking Required + 23 Spaces * Short Term Bicycle Parking in the form of bike racks is provided offsite in pub- lic right of way along Washington Boulevard. One rack holds two bicycles. + Long Term Bicycle Parking is provided onsite only, in form of secured lock- ers and a gated storage area inside the parking structures. See page 11 for detailed location. Auto Parking Required Retail 1 Space per 250 s.f. Restaurants up to 25% of the combined retail and restaurant floor area 1 Space per 250 s.f. Restaurants over 25% of the combined retail and restaurant floor area 1 Space per 100 s.f. Office 1 Space per 350 s.f. Spaces Required Retail 27,057 s.f. / 250 108 Spaces Restaurants up to 25% of the com- bined retail and restaurant floor area 10,435 s.f. / 250 42 Spaces Restaurants over 25% of the com- bined retail and restaurant floor area 4,253 s.f. / 100 43 Spaces Outdoor Dining* 2,050 s.f. / 250 8 Spaces Office + 38,732 s.f. / 350 111 Spaces Total 312 Spaces Spaces Provided Building B 219 Spaces Building D Regular Valet 22 Spaces 71 Spaces Total 312 Spaces * area in excess of 500 square feet per restaurant tenant (including excess area of Building E roof deck dining) + Office floor area includes Art Studio floor area in Building B parking structure Accessible Parking Requirements Building B Total Spaces Required 219 Spaces Total Accessible Spaces Required 7 Spaces Van Accessible Required* 2 Spaces Clean Air Vehicle Spaces Required* 24 Spaces Building D Total Spaces Required 93 Spaces Total Accessible Spaces Required 4 Spaces Van Accessible Required* 2 Spaces Clean Air Vehicle Spaces Required 8 Spaces * Required spaces listed are based on Comprehensive Plan and exceed requirements of Cali- fornia Building Code Chapter 11B and California Green Building Code Chapter 5. ATTACHMENT 3 56Page 13 B. DEVELOPMENT STANDARDS 4. Loading Plan Deliveries shall only be received in two dedicated locations. Loading area (1) is located behind Building C and serves the main development site, measures 1,500 square feet and is able to accommodate large trucks. Loading area (2) is located inside the new parking structure Building B and accommodates smaller, van size delivery trucks (e.g. UPS delivery trucks). 5. Trash and Recycling Management Plan Trash and recycling enclosures shall be provided in two locations. The main development site shall be served by a trash compactor housed inside a dedicated room within the parking structure as well as dedicated recycling area within the service yard (Area A). Building B shall be served by a combined recycling and trash room inside the parking garage (Area B). This shall be accessed by smaller trucks which shall move the bins to the side of Landmark Street for pickup. Both areas shall be gated and visually shielded from public view from adjoining public streets and rights-of-way. All trash shall be collected by on-site maintenance at the tenant suite at the end of each business day and collectively disposed or recycled. The development fosters recycling of reusable materials (e.g. cardboard, plastics and aluminum) and shall provide dedicated and easily accessible bins in the above outlined locations. 6. Signage To ensure that signs for the project are uniquely designed and compatible with the overall architectural theme of the project, all signage shall be processed through a Master Sign Program pursuant to Zoning Code Section 17.330.050.D.2 or as amended. Loading Area Trash and Recycling Access Path |101010|A B TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 57Page 14 (1) See Article 7 of the Culver City Zoning Code for definitions of the land uses listed. (2) See Chapter 17.530 of the Culver City Zoning Code for specific permit requirements (3) Ancillary to a primary retail use. (4) Only Specialized non-degree granting schools offering instruction in one of the follow- ing: art, ballet and other dance, bartending, computer and electronics, drama, driver education, language or music. (5) Use shall not be permitted on the ground floor. (6) Use shall not be permitted on the ground floor in tenant spaces fronting Washington Boulevard or the central courtyard space. C. PERMITTED USES 1. General Provisions The project lies along the southerly edge of Washington Boulevard and forms its southerly street wall, contributing in a major way to the character of the boulevard. The project shall be pedestrian oriented and include a mix of permitted uses to draw patrons from the surrounding neighborhoods as well as from the adjacent light rail station. The ground floor shall contain pedestrian oriented uses including retail, eating and drinking establishments, and artisan businesses. Restaurant uses shall not exceed more than 35% of the commercial space. Office uses and non-pedestrian oriented uses shall be located on the upper levels. The open areas of the project shall include outdoor dining and an open air courtyard with community oriented uses such as live music, farmers markets and fashion events. 2. Allowed Uses and Permit Requirements The following is a complete list of uses that shall be allowed within the Platform Comprehensive Plan. PERMIT REQUIREMENT P - Permitted Use AUP - Administrative Use Permit (2) CUP - Conditional Use Permit (2) Alcoholic beverage sales AUP 17.400.015.B Artisan shops P Automated teller machines (ATMs) P 17.400.025 Banks and financial services (6) P Bars, night clubs CUP Broadcast studios (5) P General retail stores P Health/fitness facilities (5) CUP Indoor amusement/entertainment facilities P Internet Café P Media production – Indoor support facilities (5) P Medical services – Office/Clinics (5) P Offices (5) P Outdoor retail sales and display (3) AUP 17.400.075 Parking facilities P Personal services (6) P Pet shop P Public recreational and cultural facilities P Restaurants P Restaurants, outdoor dining P Specialized schools (4)(6) AUP Studios – art, dance, music, photography, etc. P Telecommunications facilities, cellular (5) AUP 17.400.010 Theaters P LAND USE (1) SEE SPECIFIC USE REGULATIONS OF THE ZONING CODE ATTACHMENT 3 58Page 15 3. Allowed Special Events and Temporary Events The following types of special events and temporary events, either outdoor or indoor, public or private shall be permitted to take place within the open central courtyard area or the rooftop level of the two parking structure(s) subject to the provisions of Zoning Code Chapter 17.520 “Temporary Use, Special Event, and Temporary Event Per- mits” and as outlined below: 1. Markets and Fairs: Events including farmers markets (food, flower and crafts), food events, arts and craft fairs, small sporting events (i.e. bocce ball, ping pong), incidental to the center (no seating necessary) shall be allowed up to 52 days per calendar year subject to review and approval by the Planning Division. A special event per- mit may be required for these types of events as determined by the Planning Manager. These types of events shall be subject to a con- formance review with the adopted Comprehensive Plan and approval by the Planning Division prior to the event taking place. Conditions of approval may be placed on the special event to ensure conformance with the standards contained herein, compatibility with adjacent uses, and compliance with any other applicable City requirements for spe- cial events. 2. Performances and Public Events: Events including carnivals, concerts, live entertainment, fashion shows, movie screenings and other similar events designed to attract a large crowd and involves seating for the public shall be allowed up to 24 days per calendar year. These events must demonstrate provisions of adequate park- ing. A special events permit is required for these types of events. Conditions of approval may be placed on the special event to en- sure conformance with the standards contained herein, compatibility with adjacent uses, and compliance with any other applicable City requirements for special events. 3. Private Events: Events that are privately held including wed- dings and banquets shall be allowed up to 24 days per calendar year. Fashion show event. PERMITTED USES - COURTYARD SPACE These events must demonstrate provisions of adequate park- ing and must be held when office uses are not in operation (i.e. weekday evenings or weekends). A special events permit is required for these types of events. Conditions of approval may be placed on the special event to ensure conformance with the standards contained herein, compatibility with adjacent uses, and compliance with any other applicable City requirements for special events. ATTACHMENT 3 59Page 16 2,000 sq ft Third Floor Roof Top Dining 500 sq ft 10'-0" 9'-6' 7'-8" 10'-0" 600 sq ft 250 sq ft 600 sq ft 315 sq ft 500 sq ft 600 sq ft PROPERTY LINE PROPERTY LINE 4. Outdoor Dining Outdoor dining is key contributor to the interactive pedestrian atmosphere which will stimulate the shopping experience. Areas have been identified, as shown on the following diagram, where outdoor dining may take place. Multiple areas are open to Washington Boulevard further activating the pedestrian orientation and environment along this frontage. The following diagram highlights the allowable areas for outdoor dining. Design and Operational Standards • An unobstructed minimum 4 foot (4’-0”) clear wide pedestrian pathway shall be maintained at all times between the outside boundary of any outdoor dining areas and any obstruction. • The design of furniture, barriers and equipment to be used within any outdoor dining area shall be high quality and harmonious and compatible with the overall architecture of the project as well as any site furniture provided by the development. • No additional canopies, trellises, or awnings are permitted. Inclement weather enclosures shall be allowed provided the enclosure is constructed of clear glass folding or stacking panels that can be stored unobtrusively within the interior of the tenant space. Plastic or acrylic enclosures of any kind shall not be permitted. • Umbrellas shall have a minimum vertical clearance of 6’8” and shall not exceed a maximum height of 13’-0”. • Portable heaters are subject to prior Landlord and City approval and shall be of uniform design. They shall not project beyond the limit of the outdoor dining area and shall require written approval of the City of Culver City Fire Marshal prior to placement. • Establishments that serve alcoholic beverages in the outdoor dining area shall provide a physical barrier. No barrier is required if alcohol will not be served. Barriers shall not exceed three feet-six inches (3’-6”) in height. All barrier systems shall maintain at least 70% transparency. • All outdoor dining areas shall be accessible to the disabled in accordance with ADA standards. • Outdoor dining areas shall be operated in a manner PERMITTED USES - OUTDOOR DINING Potential outdoor dining Pedestrian Zone that meets all requirements of the Los Angeles County Health Department. • The outdoor dining area shall be kept clear of litter, food scraps, and soiled dishes and utensils at all times. Trash receptacles shall be provided in outdoor dining areas used for consuming take-out items. Review Process All proposed outdoor dining areas shall be subject to a conformance review with the adopted Comprehensive Plan and approval by the Planning Division prior to installation and operation. Conditions of approval may be placed on outdoor dining areas to ensure conformance with the standards contained herein, compatibility with adjacent uses, and any other applicable City requirements. ATTACHMENT 3 60Page 17 D. ADMINISTRATION Relationship to Other Regulations This Comprehensive Plan provides policies, standards and regulations guiding the development the project identified in Section 01, Project Description. Specif- ic topics not otherwise addressed or provided in this Comprehensive Plan shall be governed by the Culver City Municipal Code. No provision of this Comprehen- sive Plan is intended to repeal, abrogate, annul, im- pair, or interfere with any existing ordinance, resolu- tions, or policy except: a) as specifically repealed by the adoptions of this Comprehensive Plan; or b) where this Comprehensive Plan’s provisions are more precise or restrictive than the existing Municipal Code. Where provisions of this Comprehensive Plan impose more restrictive regulations than required by any other ordinance, resolution or policy, the provisions of this Comprehensive Plan shall govern. Amendments Modifications to the Comprehensive Plan shall be pursu- ant to the Culver City Zoning Code, Section 17.560.025 – Comprehensive Plan Modifications, Major and Minor or as amended. ADMINISTRATION ATTACHMENT 3 61Page 18 SUSTAINABILITY 03 ATTACHMENT 3 62Page 19 SUSTAINABILITY Energy saving and sustainable design is integral to the project. It is incorporated throughout in the building systems and in the choice of materials. The project incorporates green building design in many ways as demonstrated in the list below, which is categorized into three main categories: conservation; energy efficiency; carbon emission reduction Conservation: In an effort to promote the conservation, reduction, reuse, and recycling of renewable and non-renewable resources Platform is actively participating in this endeavor by adopting the following: • Saving existing structures for adaptive re-use where possible, such as the renovated Building C, the refurbished Parking Structure (Building D) and the modified warehouse (Building F). • Recycling of building materials during demolition of existing structures. • Using non-wood alternatives for exposed wood products such as Resysta (simulated wood manufactured from rice husks) in the wood decks. • Using local manufactured and recycled products where possible. • Storm Water Filtration systems. • Permeable exterior paving surfaces to reduce storm water run-off Energy Efficiency: Below is a list of energy efficient and sustainable specifications that have been used and incorporated into Platform: • Photovoltaic electricity generation • Low flow fixtures and low consumption urinals • Landscape with drought tolerant vegetation • Green-screen walls systems • Living green walls to promote thermal stability • Irrigation timers with rain sensors • Dual low emissivity Glazing • High reflective roof material • High efficiency heating and air conditioning systems View from Metro Train towards project (RENDERING FOR ILLUSTRATIVE PURPOSES ONLY) Carbon emission reduction: Below is a list of Carbon emission reduction elements that have been incorporated into Platform: • Bicycle racks spread out throughout the site and bicycle facilities that include safe lockable areas and bathroom and showers facilities. Employees and office workers will have electronic card access to these facilities to promote riding to work. • Washington Boulevard will be widened to incorporate a new bicycle lane. • Developer participation in the start up of a shuttle service that will loop from the Hayden Tract to the Expo Station and Platform and then to Downtown Culver City. • Preferred parking for low emission vehicles and carpool vehicles. SUSTAINABILITY ATTACHMENT 3 63Page 20 SITE 04 ATTACHMENT 3 64Page 21 AERIAL VIEW SITE SITE The project site is located at the intersection of Washington Boulevard and National Boulevard adjacent to the newly constructed Metro light rail EXPO line, within 500 feet of the Culver City Expo station. It is formed by five tied parcels encompassing 2.06 acres, and abuts commercial warehouses. The site was previously occupied by automotive sales and services uses. The project is rehabilitating and reusing parts of the existing building (i.e. a warehouse and repair shop). Railroads and trains have had a long history with the site. The corridor of the Expo Line has been historically utilized by The Pacific Electric Railway. ATTACHMENT 3 65Page 22 SITE PLAN OF EXISTING BUILDINGS View of Landmark Site. View looking South East from Washington Blvd. EXISTING TO BE DEMOLISHED EXISTING TO REMAIN View looking South East towards future courtyard entrance. ATTACHMENT 3 66016' 32' 64' Scale: 1” = 40’ TRUE NORTH Page 23 SITE PLAN D E F A C B A KEY PLAN L C L P L C L C L P L P L P L P L P L P L P L P C L P L 30'-0" 20'-0" 10'-3" 10'-0" 10'-3" 5'-0" 7'-1 3/4" 4'-4" 8'-0" 20'-0" 8'-0" 8'-9" 30'-2" 20'-0' 11'-10" 20'-0" 5'-0" 11'-10" 108'-1" 160'-10" 104'-11" 118'-11 3/4" 66'-6 3/4" 113'-3" 46'-8 3/4" 154'-5" 89'-4 1/2" 12'-4" 45'-1" 53'-11" 57'-7 3/4" 28'-7 3/4" 21'-7" 21'-7 1/2" 19'-6" 107'-10 1/4" 3'-3" 14'-5 1/2" 5'-0" 5'-0" 6" 40'-0" 10'-0" 10-3" 5'-0" 5'-9 1/2" 40'-0" 10'-0" 9'-10" 11'-11" 45'-1" 53'-11" 18'-7" 69'-8" 124'-8" EMPLOYEE BIKE SHOWERS STAIR TRASH COMPACTOR TRASH/RECYCLING AREA BIKE LOCKERS RECYCLING EXISTING CURB LINE TO BE DEMOLISHED EXISTING CURB LINE TO BE DEMOLISHED EXISTING PROPERTY- LINE, TO BE MOVED NEW PROPERTYLINE 2 STORY EXISTING SCHOOL BUILDING WASHINGTON BOULEVARD LANDMARK STREET 2 STORY EXISTING SCHOOL BUILDING 1 STORY EXISTING WAREHOUSE BUILDING RETAIL RESTAURANT/ RETAIL ELEV. STAIR RETAIL RETAIL RETAIL RETAIL RETAIL ELEV. LOBBY STAIR WOMEN MEN VALET/CONCIERGE GARAGE UTILITY RETAIL RETAIL UTILITY INACCESSIBLE EXTERIOR SPACE PARKING RETAIL RESTAURANT/RETAIL STAIR LOBBY UTILITY SCE. TRANS. ELEV. SCE TRANS. ELEV. ELEV. LOADING AREA RESTAURANT/ RETAIL MECH. NEW BUS SHELTER SIZE, SHAPE, FORM, AND FINAL LOCATION TO BE DETERMINED IN COORDINATION WITH THE CITY RETAIL RETAIL RETAIL STAIR ELEV. STAIR RETAIL ELEV. MECH. MECH. M. RETAIL FAMILY RETAIL UTILITY MEN WO- MEN 9'-7 3/4" ATTACHMENT 3 67016' 32' 64' Scale: 1” = 5’ NOTE: Street furniture shall be consistent with the City’s Transit Oriented Development District Streetscape Plan. Final location, type, and size of tree wells to be determined by the City prior to building permit issuance. TRUE NORTH Page 24 TYPICAL TREE WELL DETAIL D E F A C B A KEY PLAN 2’ 0 4’ 8’ 6" 5'-6" 4'-0" 2'-8" 5'-4" 2'-8" 6" 1'-6" MIN 4'-1" 5" 1'-6" MIN 4'-1" 1'-6" MIN 4'-1" 5" 2'-3" 2'-6" 1'-6" 2'-3" 2'-6" 6" 5'-6" 4'-0" 10'-0" 10'-0" PERVIOUS CONCRETE TREE STAKING ROOT BARRIER STREET TREE TREE WELL PERVIOUS CONCRETE CURB AND GUTTER BENCH PCC SIDEWALK R/W BICYCLE RACK GRASS PLANTER CURB AND GUTTER PCC SIDEWALK R/W BICYCLE RACK TRASH/ RECYCLING RECEPTABLE WASHINGTON BOULEVARD ATTACHMENT 3 68016' 32' 64' Scale: 1” = 40’ TRUE NORTH P L C L L L L L L L P P P P P P P P P P L L L L L L L L L L L L L L L L L L L L L L P P P P L L L L L L P L P L L L L 10'-3" 10'-3" 20'-0" 5'-0" 11'-10" 108'-1" 160'-10" 113'-3" 154'-5" 57'-7 3/4" 28'-7 3/4" 21'-7" 21'-7 1/2" 19'-6" 3'-3" 5'-0" 10-3" 5'-0" 5'-9 1/2" 11'-11" EMPLOYEE BIKE SHOWERS STAIR TRASH/RECYCLING AREA BIKE E E KE KE LOCKERS S RS RS RS ER KE KE CK CK OC OC O LO LO L RECYCLING NEW PROPERTYLINE EXISTING WAREHOUSE BUILDING RETAIL RESTAURANT/ RETAIL ELEV. . STAIR RETAIL RETAIL RETAIL RETAIL ELEV. LOBBY UTILITY RETAIL RETAIL UTILITY INACCESSIBLE L SIB EXTERIOR SPACE PARKING RETAIL RESTAURANT/RETAIL STAIR UTILITY V ELEV V V V V. . . ELEV. . LOADING AREA RESTAURANT/ RETAIL RETAIL RETAIL STAIR R STAIR RETAIL V V V V ELEV V. MECH. MECH H H CH. . M. RETAIL UTILITY 9'-7 3/4" Page 25 SITE ELEVATION 30'-2" '-0" '-0" EXISTING CURB LINE TO BE DEMOLISHED EXISTING CURB LINE TO BE DEMOLISHED EXISTING PROPERTY- LINE, TO BE MOVED NEW BUS SHELTER SIZE, SHAPE, FORM, AND FINAL LOCATION TO BE DETERMINED IN ATTACHMENT 3 69Page 26 BUILDING A 05 ATTACHMENT 3 70Page 27 BUILDING A This four story building consists of ground floor retail with three stories of office above. The ground floor retail opens onto the wide sidewalk on Washington Boulevard as well as the central interior courtyard and paseo. The building is split into two separate buildings on the lower levels allowing pedestrians to enter the project site at multiple locations along Washington Boulevard. The two building sides are connected by sky-bridges, to accommodate the building circulation while introducing more light into the newly created open air atrium space. The retail is detailed in textured, warm colored metals and glass. It is an inviting palette designed to enhance the trees and plants found in the courtyard. The upper stories cantilever out overhead and offers protection from the weather. Above the retail spaces are three stories of office spaces. The design of the buildings above is meant to reference the site’s location along the Red Car line by referencing a series of stacked box cars. The individual units combine to create a harmonious and varied facade. The stacking of the box cars provides visual relief to the building mass. View of Building A BUILDING A TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 71Scale: 1” = 20’ 0’ 10’ 20’ 40’ Page 28 TRUE NORTH D E FA C B A KEY PLAN BUILDING A: FIRST FLOOR PLAN 1 1 62'-11 1/2" 10-3" 4' 11'-5 3/4" 28'-2" 18'-11" 142'-2" 5'-2" 3'-3" 18'-5" 18'-7" 147'-10" 3'-10" 64'-11 1/2" 4' 11'-5 3/4" 28'-1 3/4" 20'-11 1/4" 4 1/2" 10'-3" 3' 24' 23'-6" 5'-1 1/2" 19'-4 1/2" 21' 24' 24' LINE OF FLOOR ABOVE, TYP. LINE OF FLOOR ABOVE, TYP. ELEV. ELEV. L L L L Restaurant/Retail 3,020 sq ft Retail 2,428 sq ft Retail 1,681 sq ft Mech A: 196 sq ft Mech A: 160 sq ft|10101010101010|P P P P Stair A: 340 sq ft Stair A: 343 sq ft ATTACHMENT 3 72Scale: 1” = 20’ Page 29 TRUE NORTH D E FA C B A KEY PLAN BUILDING A: SECOND FLOOR PLAN 0’ 10’ 20’ 40’ 1 1 72'-11 1/4" 18'-10 1/4" 7'-4 3/4" 18'-10 1/4" 8'-11 3/4" 18'-10 1/4" 72'-11 1/4" 5'-3 1/4" 24'-1" 18'-10 1/4" 11'-1 3/4" 18'-10 1/4" 6'-9" 55'-8 3/4" 17'-3" 74'-11 3/4" 4'-3" 158'-11 1/4" 17'-11" 14'-7 3/4" 65'-9" 14'-3 3/4" 75'-11 1/4" 158'-11 1/4" 9'-3 1/4" 24' 24' 24' 21' 24' 24' 5'-8 3/4" LINE OF FLOOR ABOVE, TYP. OPEN TO BELOW L L Restrooms A: 620 sq ft Elev A: 93 sq ft Elev A: 94 sq ft Circulation A: 175 sq ft Circulation A: 177 sq ft|10101010101010|P P Stair A: 226 sq ft Office A: 4,890 sq ft Office A: 3,200 sq ft Stair A: 226 sq ft ATTACHMENT 3 73Scale: 1” = 20’ Page 30 TRUE NORTH D E FA C B A KEY PLAN BUILDING A: THIRD FLOOR PLAN 0’ 10’ 20’ 40’ 1 1 67'-8 1/2" 18' 9'-1 1/4" 18'-2 1/4" 4'-2 3/4" 18'-2 1/4" 2'-1 1/4" 90'-3/4" 9'-11 3/4" 53'-9 1/4" 153'-10" 18'-2 1/4" 8'-4 1/4" 18'-2 1/4" 4'-11 3/4" 18' 67'-8 1/2" 154'-5 1/4" 62'-4" 16'-2 3/4" 75'-3 1/4" 7 1/4" 10'-1/2" 24' 24' 23'-6" 21'-6" 24' 24' 8'-1/4" LINE OF FLOOR BELOW, TYP. OPEN TO BELOW OPEN TO BELOW L L Elev A: 94 sq ft Elev A: 94 sq ft Circulation A: 176 sq ft Circulation A: 177 sq ft Restrooms A: 479 sq ft|10101010101010|P P Stair A: 226 sq ft Office A: 7,828 sq ft Stair A: 226 sq ft ATTACHMENT 3 74Scale: 1” = 20’ 0’ 10’ 20’ 40’ Page 31 TRUE NORTH D E FA C B A KEY PLAN BUILDING A: FOURTH FLOOR PLAN 1 1 3'-2 3/4" 24' 24' 24' 21' 24' 24' 4'-4 3/4" 4'-3" 41'-9 3/4" 9'-3/4" 97'-8 3/4" 1'-7" 154'-5 1/4" 1'-7" 61'-8 3/4" 21'-1/4" 66'-3 1/4" 3'-10" 154'-5 1/4" 72'-11 3/4" 72'-11 1/2" 5'-3" 18'-10 1/4" 5'-2 3/4" 18'-10 1/4" 11'-2" 18'-10 1/4" 18'-10 1/4" 7'-4 3/4" 18'-10 1/4" 8'-9 1/2" 19'-1" OPEN TO BELOW OPEN TO BELOW L L Elev A: 93 sq ft Elev A: 94 sq ft Circulation A: 177 sq ft Circulation A: 177 sq ft Restrooms A: 509 sq ft Circ. A: 77 sq ft|10101010101010|P P Stair A: 229 sq ft Office A: 5,043 sq ft Stair A: 228 sq ft Office A: 3,149 sq ft ATTACHMENT 3 75Scale: 1” = 20’ 0’ 10’ 20’ 40’ Page 32 TRUE NORTH D E FA C B A KEY PLAN BUILDING A: ROOF PLAN 1 1 4'-3" 41'-9 3/4" 9'-3/4" 97'-8 3/4" 1'-7" 154'-5 1/4" 154'-5 1/4" 1'-7" 62'-3/4" 20'-8 1/4" 66'-3 1/4" 72'-11 3/4" 72'-11 1/2" 18'-5" 24'-2 3/4" 18'-10 1/4" 5'-2 3/4" 18'-10 1/4" 11'-2" 18'-10 1/4" 18'-10 1/4" 7'-4 3/4" 18'-10 1/4" 8'-9 1/2" 19'-1" PHOTOVOLTAIC PANEL TYP. SCREEN FOR HVAC UNITS HVAC EQUIPMENT TYP. PHOTOVOLTAIC PANEL TYP. SCREEN FOR HVAC UNITS HVAC EQUIPMENT TYP. OPEN TO BELOW|10101010101010|48'-4 3/4" ATTACHMENT 3 76Scale: 1” = 20’ 0’ 10’ 20’ 40’ Photovoltaic Panels Stucco - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Lunar Landing” (DE6241) Paint Finish Vertical Corrugated Metal Siding -“Watermist” (DE6240) Paint Finish Blue Patina Metal Panel Steel Guardrail “Iron Fixture” (DE6384) Paint Finish Low-E Glazing, Typ.|101010101010101010|Page 33 +16' +16' 2nd Floor 2nd Floor +29' +29' 3rd Floor 3rd Floor +42' +42' 4th Floor 4th Floor +55'-6" +55'-6" Roof Roof +65' +65' Parapet Staircase Parapet Staircase +0" 1st Floor +0.33' 1st Floor -6" Adjacent Grade 16' 13' 13' 55'-6" 15'-8 1/4" 11'-11 3/4" 13' 14'-6 1/4" 9'-6" 13'-6" 37'-6 3/4" 53'-7 3/4" 56' 6" BUILDING A ELEVATIONS North Elevation South Elevation 1 2 4 8 3 5 6 +16' +16' 2nd Floor 2nd Floor +29' +29' 3rd Floor 3rd Floor +42' +42' 4th Floor 4th Floor +55'-6" +55'-6" Roof Roof +65' +65' Parapet Staircase Parapet Staircase 16'-5 1/4" 13' 13' 13'-6" 13'-6" 37'-6 3/4" 53'-7 3/4" 55'-6" 56' +0" 1st Floor +0.33' 1st Floor 13' 13' 6" 15'-6 1/2" *DISTANCE TO PROPERTY LINE VARIES PER PLANS *DISTANCE TO PROPERTY LINE VARIES PER PLANS 1 2 7|1010|4 8 3 5 6 ATTACHMENT 3 77Scale: 1” = 20’ 0’ 10’ 20’ 40’ Photovoltaic Panels Stucco - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Lunar Landing” (DE6241) Paint Finish Vertical Corrugated Metal Siding -“Watermist” (DE6240) Paint Finish Blue Patina Metal Panel Steel Guardrail “Iron Fixture” (DE6384) Paint Finish Low-E Glazing, Typ.|101010101010101010|+16' 2nd Floor +29' 3rd Floor +42' 4th Floor +55'-6" Roof +65' Parapet Staircase +0" 1st Floor 16' 13' 13' 55'-6" 13'-6" 4'-8" 5'-3" 20' 23'-9 3/4" 55'-10" 56' P L 16' 13' 13' 13'-6" +16' 2nd Floor +29' 3rd Floor +42' 4th Floor +55'-6" Roof +65' Parapet Staircase 55'-2 1/4" 9'-6" 13' 13' 13'-6" 4'-8" 20' 5'-3" 23'-9 3/4" P L +0.33' 1st Floor 15'-8 1/4" 13' 13' 13'-6" 55'-2" 15'-8" Page 34 BUILDING A ELEVATIONS East Elevation West Elevation 1 2 4 8 3 5 6 1 2 4 8 3 5 6 *DISTANCE TO PROPERTY LINE VARIES PER PLANS *DISTANCE TO PROPERTY LINE VARIES PER PLANS ATTACHMENT 3 78Scale: 1” = 20’ 0’ 10’ 20’ 40’ Photovoltaic Panels Stucco - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Lunar Landing” (DE6241) Paint Finish Vertical Corrugated Metal Siding -“Watermist” (DE6240) Paint Finish Blue Patina Metal Panel Steel Guardrail “Iron Fixture” (DE6384) Paint Finish Low-E Glazing, Typ.|101010101010101010|Page 35 +16' +16' 2nd Floor 2nd Floor +29' +29' 3rd Floor 3rd Floor +42' +42' 4th Floor 4th Floor +55'-6" +55'-6" Roof Roof +65' +65' Parapet Staircase Parapet Staircase 5'-3" 20' 23'-9 3/4" 13' 13' 13'-6" 15'-7 1/4" 9'-6" 55'-2" 55'-2" P L +0.33' +0.33' 1st Floor 1st Floor 15'-8" 13' 13' 13'-6" 4'-8" OFFICE OFFICE OFFICE CE +16' 2nd Floor +29' 3rd Floor +42' 4th Floor +55'-6" Roof +65' Parapet Staircase 55'-2 1/4" 4'-8" 13' 13' 13'-6" 15'-8" 13' 13' 13'-6" 20' 5'-3" 23'-9 3/4" 15'-8" P L +0.33' 1st Floor 55'-2" OFFICE OFFICE BUILDING A ELEVATIONS Elevation Section 4 Elevation Section 3 1 8 2 4 3 5 6 7 1 8 2 4 3 5 6 7 *DISTANCE TO PROPERTY LINE VARIES PER PLANS *DISTANCE TO PROPERTY LINE VARIES PER PLANS ATTACHMENT 3 79Page 36 BUILDING A MATERIAL BOARD Photovoltaic Panels Vertical Corrugated Metal Siding - “Iron Fixture” (DE6384) Paint Finish Vertical Corrugated Metal Siding - “Lunar Landing” (DE6241) Paint Finish Steel Guardrail “Iron Fixture” (DE6384) Paint Finish Low-E Glazing, Typ. Stucco - “Iron Fixture” (DE6384) Paint Finish Blue Patina Metal Panel Vertical Corrugated Metal Siding -“Watermist” (DE6240) Paint Finish Blue Patina Metal Panel ATTACHMENT 3 80Page 37 BUILDING A MATERIAL BOARD Vertical Corrugated Metal Siding Steel Guardrail “Iron Fixture” (DE6384) Paint Finish Low-E Glazing, Typ. ATTACHMENT 3 81Scale: 1” = 20’ Section 1 Section 2 0’ 10’ 20’ 40’ Page 38 BUILDING A SECTIONS +16' +16' 2nd Floor 2nd Floor +29' +29' 3rd Floor 3rd Floor +42' +42' 4th Floor 4th Floor +55'-6" +55'-6" Roof Roof +65' +65' Parapet Staircase Parapet Staircase 55'-6" 31'-8" 47'-3" +0" 1st Floor +0.33' 1st Floor 16' 13' 13' 13'-6" 9'-6" 15'-8" 13' 13' 13'-6" 9'-6" OFFICE OFFICE OFFICE RETAIL / RESTAURANT RETAIL OFFICE OFFICE OFFICE +16' +16' 2nd Floor 2nd Floor +29' +29' 3rd Floor 3rd Floor +42' +42' 4th Floor 4th Floor +55'-6" +55'-6" Roof Roof +65' +65' Parapet Staircase Parapet Staircase 13' 13' 13'-6" 19'-7 3/4" 23'-5 3/4" 4'-8" 4'-10" 4'-10" 55'-2 1/4" P L +0.33' +0.33' 1st Floor 1st Floor 55'-2" 9'-6" 15'-8" 15'-8 1/4" 13' 13' 13'-6" OFFICE OFFICE OFFICE RESTAURANT/RETAIL OFFICE OFFICE OFFICE ATTACHMENT 3 82Page 39 BUILDING B 06 ATTACHMENT 3 83Page 40 BUILDING B This building is a 5 story parking structure with retail and restaurant space on the ground floor. The retail and restaurant space faces Washington Boulevard and partially turns the corner to open up onto Landmark Street. The retail is detailed in a natural material selection consisting of wood, glass, and metal. The retail façades undulate in and out with store front windows flanked by solid wood elements. The controlled entry to the parking structure is off of Landmark Street. From this entrance, access is provided to five stories of parking with 219 parking spaces. On the ground floor of the parking structure is secure bicycle parking and a designated loading area for deliveries needed to service the retail uses. Trash and recycling are also housed in a gated and protected area. The façade on Washington Boulevard, while open for natural ventilation, is accented with two pop-out glass art display studios. The Landmark Street façade is designed as a wall with a series of varying punched openings that add interest to this elevation and serve to allow natural ventilation to flow through the building. View of Building B BUILDING B TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 84Page 41 10" 8'-6" 8'-6" 8'-6" 5'-4" 8'-6" 8'-6" 8'-6" 7'-6" 8'-6" 8'-6" 8'-6" 9' 9' 8'-10" 9' 9' 5' 9' 30" 30" 30" 30" 30" 18' 33'-4" 18' 4' 4' 18' 29'-4" 124'-6" 12'-10" 100'-10 1/4" 115'-7 1/4" 44'-7 1/4" 1' 10' 2'-6" 10' 1' 4'-11" 25' 1'-6" 6'-6" 12'-6" 6' 8'-9" 11'-10" 9'-9 3/4" 7'-11" CMU WALL 4'-9" CMU WALL ROLL-UP SECURITY GATE ABOBE|1010|9. CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE TEMP LOADING ONLY TEMP LOADING ONLY TEMP LOADING ONLY VAN VAN 7 7.9% SLOPE 6" WHEELSTOP ELEV. ELEV. ELEV. MECH. ROOM L L L L 11.25% SLOPE 5.25% SLOPE 6.9% SLOPE Trans- former Parking A: 10,711 sq ft Stair A: 208 sq ft Utility A: 243 sq ft Trash/ Recycling A: 329 sq ft Utility A: 947 sq ft Restaurant/Retail 2,400 sq ft Retail 800 sq ft Utility A: 193 sq ft Elev. Lobby A: 415 sq ft Retail 1,260 sq ft Utility A: 574 sq ft Restrooms A: 170 sq ft|1010101010|3 3 11'-11" 150'-7" BIKE LOCKERS P P P P Stair A: 235 sq ft TRUE NORTH D E FA C B A KEY PLAN BUILDING B: FIRST FLOOR PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ 16 Parking Stalls ATTACHMENT 3 85Page 42 25' 116'-1 1/4" 18' 27' 18' 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 9' 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 18' 27' 18' 18' 46'-7 3/4" 18'-2 1/4" 119'-4 1/4" 8' 2'-3" 2'-6" 1' 2' TYP. 5' 24'-8 1/2" 70'-5 3/4" 95'-2 1/4"|1010101010|3 3 HVAC DUCT TYP. 13|1010|9. 6.|1010|1% SLOPE 2% SLOPE 16% SLOPE 8% SLOPE 8% SLOPE 2% SLOPE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE WHEELSTOP ELEV. ELEV. L Elev. Lobby A: 366 sq ft Stair A: 210 sq ft Stair A: 197 sq ft 18' 27'-6" P Parking A: 18,421 sq ft TRUE NORTH D E FA C B A KEY PLAN BUILDING B: SECOND FLOOR PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ 40 Parking Stalls ATTACHMENT 3 86Page 43|1010101010|3 3 HVAC DUCT TYP. OPEN TO BELOW 13|1010|1% SLOPE 2% SLOPE 16% SLOPE 8% SLOPE 8% SLOPE 2% SLOPE|1010|CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE|10 10|6. WHEELSTOP ELEV. ELEV. CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE L Elev. Lobby A: 366 sq ft Stair A: 210 sq ft Stair A: 197 sq ft Art Display A: 126 sq ft 18' 27' 18' 18' 27' 18' 116'-1 1/4" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 28'-8" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 18' 27'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 18' 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 46'-7 3/4" 2'-6" 2'-3" 2' TYP. 118'-1/4" 8'-8" 5'-8" 24'-1/2" 70'-5 3/4" 9 1/4" 94'-6 1/4" P Parking A: 17,924 sq ft TRUE NORTH D E FA C B A KEY PLAN BUILDING B: THIRD FLOOR PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ 40 Parking Stalls ATTACHMENT 3 87Page 44|1010101010|3 3 9 1/4" HVAC DUCT TYP. 13|1010|1% SLOPE 2% SLOPE 16% SLOPE 8% SLOPE 8% SLOPE 2% SLOPE|1010|OPEN TO BELOW CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE 6. WHEELSTOP ELEV. ELEV. 6. L Elev. Lobby A: 366 sq ft Stair A: 210 sq ft Stair A: 197 sq ft Art Studio A: 450 sq ft 18' 27' 18' 8'-6" 8'-6" 18' 27' 18' 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 27'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 18' 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 116'-1 1/4" 46'-7 3/4" 2'-6" 2'-3" 2' TYP. 2'-4" 5'-8" 24'-1/2" 70'-5 3/4" 94'-6 1/4" 18'-10 1/4" 118'-1/4" 8'-8" P Parking A: 17,568 sq ft TRUE NORTH D E FA C B A KEY PLAN BUILDING B: FOURTH FLOOR PLAN 37 Parking Stalls Scale: 1” = 20’ 0’ 10’ 20’ 40’ ATTACHMENT 3 88Page 45|1010101010|3 3 116'-1 1/4" 46'-7 3/4" 9 1/4" HVAC DUCT TYP. 13|1010|1% SLOPE 2% SLOPE 16% SLOPE 8% SLOPE 8% SLOPE 2% SLOPE|1010|OPEN TO BELOW 7. 6. WHEELSTOP ELEV. ELEV. L Elev. Lobby A: 366 sq ft Stair A: 210 sq ft Stair A: 197 sq ft 18' 27' 18' 18' 27' 18' 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 18' 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 27'-6" 8'-6" 8'-6" 8'-6" 3'-2" 8'-6" 8'-6" 8'-6" 20'-10" 8'-6" 18'-2 1/4" 127'-4 1/4" 2'-3" 2'-6" 2' TYP. 18' 5'-8" 24'-1/2" 70'-5 3/4" 94'-6 1/4" P Parking A: 17,593 sq ft TRUE NORTH D E FA C B A KEY PLAN BUILDING B: FIFTH FLOOR PLAN 38 Parking Stalls Scale: 1” = 20’ 0’ 10’ 20’ 40’ ATTACHMENT 3 89Page 46|1010101010|3 3 18' 27' 18' 18' 27' 18' 7'-6" 7'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 28' 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 18' 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 14'-6" 8'-6" 8'-6" 8'-6" 8'-6" 17' 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3' 94'-5 3/4" 21'-7 1/2" 18'-10 1/4" 126'-8 1/4" 2' TYP. 94'-6 1/4" 5'-8" 24'-1/2" 70'-5 3/4" 46'-7 3/4" 14 10|1010|6. 1% SLOPE 2% SLOPE 16% SLOPE 8% SLOPE 2% SLOPE WHEELSTOP ELEV. ELEV. 11 OPEN TO BELOW L Elev. Lobby A: 366 sq ft Stair A: 210 sq ft Stair A: 197 sq ft HVAC DUCT TYP. P Parking A: 18,054 sq ft TRUE NORTH D E FA C B A KEY PLAN BUILDING B: ROOF FLOOR PLAN 48 Parking Stalls Scale: 1” = 20’ 0’ 10’ 20’ 40’ ATTACHMENT 3 90Scale: 1” = 20’ 54'-2 1/4" 9'-6 3/4" 17'-2 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 54'-2 1/4" Existing Neighboring Building 16'-10 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 15'-4" 54'-1 3/4" 15'-1" 16'-10 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 15'-4" 53'-5 1/4" 4' ENTRANCE TO 54'-1 - 3/4" 15'-1" 16'-10 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 15'-4" 53'-5 5 1/4" 4' ENTRANCE ANC R NT TO Page 47 BUILDING B ELEVATIONS North Elevation East Elevation 0’ 10’ 20’ 40’ Artist Mural Merlex Stucco P100- “Glacier White, Sta. Barbara” Finish Steel Grate Railing, Blue Patina Finish Low-E Glazing, Typ. Concrete – Painted White Charred Cedar Siding Concrete- Board formed, Black Stained Metal Mesh Screen|101010101010101010|1 8 7 5 2 7 6 1 7 7 3 8 6 4 5 ATTACHMENT 3 9154'-2 1/4" 9'-6 3/4" 17'-2 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 9'-6 3/4" Existing Neighboring Building Line 55'-6 3/4" 4' 3'-4 1/2" 15'-2" 9'-3" 9'-3" 9'-3" 9'-3" 4' Page 48 BUILDING B ELEVATIONS Scale: 1” = 20’ South Elevation West Elevation 0’ 10’ 20’ 40’ 9'-3" 9'-3" 4' 9'-3" 9'-3" 4' 7 8 7 3 4 2 Artist Mural Merlex Stucco P100- “Glacier White, Sta. Barbara” Finish Steel Grate Railing, Blue Patina Finish Low-E Glazing, Typ. Concrete – Painted White Charred Cedar Siding Concrete- Board formed, Black Stained Metal Mesh Screen|101010101010101010|1 5 7 8 2 7 2 6 ATTACHMENT 3 92Page 49 BUILDING B MATERIAL BOARD Artist Mural Merlex Stucco P100- “Glacier White, Sta. Barbara” Finish Steel Grate Railing, Blue Patina Finish Low-E Glazing, Typ. Concrete – Painted White Charred Cedar Siding Concrete- Board formed, Black Stained ATTACHMENT 3 93Page 50 BUILDING B MATERIAL BOARD Metal Mesh Screen Steel Grate Railing, Blue Patina Finish Low-E Glazing, Typ. ATTACHMENT 3 94Scale: 1” = 20’ 0’ 10’ 20’ 40’ Page 51 BUILDING B SECTIONS Section 2 Section 1 EL. 68'-8" T.O. Parapet P L P L +0" +0" 1st Floor 1st Floor +17'-2 1/4" +17'-2 1/4" 2nd Fl. West Landing 2nd Fl. West Landing +26'-5 1/4" +26'-5 1/4" 3rd Fl. West Landing 3rd Fl. West Landing +35'-8 1/4" +35'-8 1/4" 4th Fl. West Landing 4th Fl. West Landing +44'-11 1/4" +44'-11 1/4" 5th Fl. West Landing 5th Fl. West Landing +54'-2 1/4" +54'-2 1/4" 6th Fl. West Landing 6th Fl. West Landing 17'-2 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 5'-10" 55'-5 1/2" 4'-1/2" 16'-10 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 15'-4" P L P L +25'-7" +25'-7" 3rd Fl. Elev. Landing 3rd Fl. Elev. Landing +-6 1/4" 1st Floor Elev. Landing +16'-4" +16'-4" 2nd Fl. Elev. Landing 2nd Fl. Elev. Landing +68'-8" T.O. Parapet +53'-4" +53'-4" 6th Fl. Elev. Landing 6th Fl. Elev. Landing +44'-1" +44'-1" 5th Fl. Elev. Landing 5th Fl. Elev. Landing +34'-10" +34'-10" 4th Fl. Elev. Landing 4th Fl. Elev. Landing 3'-6" 11'-6" ATTACHMENT 3 95Section 3 Scale: 1” = 20’ 0’ 10’ 20’ 40’ Page 52 BUILDING B SECTION + 0" + 0" 1st Floor 1st Floor + 17'-2 1/4" + 17'-2 1/4" 2nd Fl. West Landing 2nd Fl. West Landing + 26'-5 1/4" + 26'-5 1/4" 3rd Fl. West Landing 3rd Fl. West Landing + 35'-8 1/4" + 35'-8 1/4" 4th Fl. West Landing 4th Fl. West Landing + 44'-11 1/4" + 44'-11 1/4" 5th Fl. West Landing 5th Fl. West Landing + 54'-2 1/4" + 54'-2 1/4" 6th Fl. West Landing 6th Fl. West Landing + 63'-9" T.O. Parapet EL. 68'-8" T.O. Parapet + 0" + 0" 1st Floor 1st Floor + 26'-5 1/4" + 26'-5 1/4" 3rd Fl. West Landing 3rd Fl. West Landing + 35'-8 1/4" + 35'-8 1/4" 4th Fl. West Landing 4th Fl. West Landing + 54'-2 1/4" + 54'-2 1/4" 6th Fl. West Landing 6th Fl. West Landing EL. 68'-8" T.O. Parapet + 17'-2 1/4" + 17'-2 1/4" 2nd Fl. West Landing 2nd Fl. West Landing RETAIL RETAIL / RESTAURANT 17'-2 1/4" 9'-3" 9'-3" 9'-3" 9'-3" 54'-1 3/4" 15'-3 3/4" 54'-2 1/4" 9'-6 3/4" 1' 5' 66'-11 1/4" 2'-3" ATTACHMENT 3 96Page 53 BUILDING C 07 ATTACHMENT 3 97Page 54 BUILDING C This building is an existing automotive repair building from the previous auto dealership that occupied this site. Through adaptive re-use this building is being converted to retail uses. The ground floor façade will open up to the paseo that leads from the parking structure at Landmark Street to the central courtyard. The existing concrete masonry façade will be maintained and complimented with natural wood and aged metal panels on the retail façade. View of Building C on right BUILDING C TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 980’ 10’ 20’ 40’ Page 55 TRUE NORTH D E FA C B A KEY PLAN BUILDING C: FIRST FLOOR PLAN Scale: 1” = 20’ 81'-4" 26'-8 1/4" 14'-10 1/2" 11'-8 3/4" 23'-5" 50'-1/4" 122'-9 1/2" 25' 21'-4 1/2" 20' 20' 21'-8 3/4" 14'-8" 50'-1/4" 19'-10 3/4" 30'-1 1/2" 1 1|101010|Retail A: 550 sq ft Retail A: 1,225 sq ft Mechanical A: 750 sq ft Retail A: 500 sq ft Retail A: 1,000 sq ft Retail A: 1,070 sq ft ATTACHMENT 3 99Page 56 TRUE NORTH D E FA C B A KEY PLAN BUILDING C: ROOF PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ 1 1|101010|81'-5 3/4" 26'-9" 50'-2 3/4" 108'-2 3/4" 26'-9" 23'-5 1/2" ATTACHMENT 3 100Scale: 1” = 20’ Page 57 BUILDING C ELEVATIONS 0’ 10’ 20’ 40’ North Elevation West Elevation South Elevation East Elevation Merlex Stucco P722 - “Artemisia, Sta. Barbara” Finish Low-E Glazing, Typ. Blue Patina Metal Panel Powder Coated Steel – “Olive Drab” (RAL 6022) Finish Living Green Wall Vertical Trellis Open steel frame canopy, finished with Rusting Agent, Clear Coat Existing CMU – “Warm White” (SW7063) Paint Finish|1010101010101010|+15'-2 3/4" 2nd Floor +25'-9 3/4" Roof NEIGHBORING BUILDING +0" 1st Floor -3'-0" Project Datum 2'-8 3/4" 3/4" 11'-9" 29'-8 1/2" 15'-2 3/4" 10'-7" 27' +15'-2 3/4" 2nd Floor +25'-9 3/4" Roof 12'-9" NEIGHBORING BUILDING +0" 1st Floor -3'-0" Project Datum 11'-9" 27' 14'-3"|1010|1 2 6 3 1 7 5|101010|1 4|1010|ATTACHMENT 3 101Page 58 BUILDING C MATERIAL BOARD Merlex Stucco P722 - “Artemisia, Sta. Barbara” Finish Low-E Glazing, Typ. Low-E Glazing, Typ. Blue Patina Metal Panel Powder Coated Steel – “Olive Drab” (RAL 6022) Finish Living Green Wall Vertical Trellis Open steel frame canopy, finished with Rusting Agent, Clear Coat Open steel frame canopy, finished with Rusting Agent, Clear Coat Existing CMU – “Warm White” (SW7063) Paint Finish ATTACHMENT 3 102Scale: 1” = 20’ Section 2 Section 1 0’ 10’ 20’ 40’ Page 59 BUILDING C SECTIONS +15'-2 3/4" +15'-2 3/4" 2nd Floor 2nd Floor +25'-9 3/4" +25'-9 3/4" Roof Roof 15'-2 3/4" 10'-7" 1'-2" 28'-11 3/4" 12'-4 3/4" 2'-10" 8'-3 1/4" 2'-3 3/4" +0" +0" 1st Floor 1st Floor -3'-0" -3'-0" Project Datum Project Datum RETAIL RETAIL RETAIL RETAIL RETAIL +15'-2 3/4" 2nd Floor +25'-9 3/4" Roof 15'-2 3/4" 11'-9" 12'-4 3/4" 2'-10" 9'-3 3/4" 1'-3 1/4" +0" 1st Floor -3'-0" Project Datum RETAIL RETAIL ATTACHMENT 3 103Page 60 BUILDING D 08 ATTACHMENT 3 104Page 61 BUILDING D This building is an existing parking structure that was used by the previous auto dealership that occupied this site. The structure parks 93 cars on three levels. The existing concrete façade on Landmark Street will be embellished with green screen mesh and some smooth trowel cement plaster at discrete areas that will allow way finding signage to stand out. The green screen will be planted, adding much needed greenery on this industrial side street. Self-parking as well as secure bicycle parking and bathroom and shower facilities for the cyclists that work in the project will be located on the first level. Valet parking will be located on the second and third level. View towards Building D at right side of background (RENDERING FOR ILLUSTRATIVE PURPOSES ONLY) BUILDING D TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 105Scale: 1” = 20’ 0’ 10’ 20’ 40’ BUILDING D: FIRST FLOOR PLAN Page 62 TRUE NORTH D E FA C B A KEY PLAN 22 Parking Stalls Garage A: 12,437 sq ft 18' 25'-4" 15' 8'-10 1/2" 8'-10 1/2" 8'-10 1/2" 8'-10 1/2" 3'-2" 9' 2'-5" 7'-6" 7'-6" 7'-6" 7'-6" 3'-2" 7'-10 1/2" 7'-10 1/2" 7'-10 1/2" 7'-10 1/2" 3'-2" 7' 7' 18'-5" 9' 4' 1' 9' 9' 4' 4' 9' 8'-6" 8'-6" 8'-6" 1'-6" 32' 18' 25'-4" 12'-1 3/4" 20'-6" 2'-6" 23'-9 1/2" 37'-10" 20'-6 1/2" 1'-3 3/4" 8' 3'-10" 5'-10" 43'-8 3/4" 14'-6 3/4" 64'-1 1/4" 15'-10 3/4" 39'-4 1/4" 47'-5 1/2" 104' 83'-8 1/2" 21'-1 1/4" 16'-10" 118'-11 3/4" 8'-8"|101010101010 1010|25% SLOPE Valet & Concierge Service 16 Bike Racks 12.5% SLOPE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE CLEAN AIR VEHICLE TEMP LOADING ONLY TEMP LOADING ONLY TEMP LOADING ONLY Men's Locker Room Women's Locker Room Retail VAN VAN CLEAN AIR VEHICLE Stair A: 89 sq ft Trash Compactor A: 412 sq ft Locker Rooms A: 366 sq ft Retail A: 660 sq ft|101010|ATTACHMENT 3 106Page 63 TRUE NORTH D E FA C B A KEY PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ BUILDING D: SECOND FLOOR PLAN KEY PLAN 33 Parking Stalls|1010101010|20'-6" 39'-4 1/4" 47'-5 1/2" 83'-8 1/2" 21'-1 1/4" 64'-1 1/4" 2'-9 3/4" 49'-8 1/4" 11'-7" 19'-1 1/4" 8'-6" 15'-4" 10" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 15'-3/4" 18' 18' 8'-6" 8'-6" 8'-6" 7'-6" 7'-6" 20'-4" 8'-6" 6'-11" 3'-10" 118'-11 3/4" 54'-4" 104'|1010|25% SLOPE 12.5% SLOPE 25% SLOPE 12.5% SLOPE 11 10|1010|Stair A: 220 sq ft Mechanical/ Storage A: 1,238 sq ft|101010|13'-6" 27' 15'-3/4" 18' 18' 4' Garage A: 11,857 sq ft ATTACHMENT 3 107Page 64 TRUE NORTH D E FA C B A KEY PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ BUILDING D: ROOF PLAN KEY PLAN 38 Parking Stalls|1010101010|18' 18' 18' 48'-8" 20'-6" 39'-4 1/4" 47'-5 1/2" 83'-8 1/2" 21'-1 1/4" 64'-1 1/4" 10" 9' TYP. 9' TYP. 4'-11" 18' 18' 27' 8'-6" 8'-6" 4'-8" 34' 104' 118'-11 3/4" 10 25% SLOPE 12.5% SLOPE 12.5% SLOPE 10 10|1010101010|Stair A: 106 sq ft|101010|Garage A: 13,210 sq ft ATTACHMENT 3 108Scale: 1” = 20’ +9' Project Datum +15'-4 3/4" 2nd Floor +25' 3rd Floor +0" 1st Floor 29'-8 1/4" TO GRADE LINE + 9" PROJECT DATUM + 15'-4 3/4" 2ND FLOOR + 25' 3RD FLOOR 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0 8'- 8 8 8 + 0" 1ST FLOOR 16'-6" 13 -1 1/2 +5'-11" 1st Floor Retail +9" Project Datum +17'-7 1/4" T.O. Roof +29'-8 1/2" T.O Parapet 13'-1 1/2" +5'-11 3/4" 1st Floor Retail +9" Project Datum +17'-8 3/4" Roof +29'-8 1/2" T.O. Parapet 26' 2'-3/4" 10'-1" 13'-9 3/4" r r r Page 65 BUILDING D ELEVATIONS North Elevation East Elevation West Elevation East Elevation South Elevation Landmark Street 0’ 10’ 20’ 40’ West Elevation * Signage is shown for illustrative purposes only. All signage is processed through Master Sign Program (See page 13). Merlex Stucco P722- “Artemisia, Sta. Barbara” Finish Steel with Blue Patina CMU – “Warm Grey” Paint Finish, with Combed Face Powder Coated Steel – “Olive Drab” (RAL 6022) Paint Finish Concrete – Exposed Concrete with a larger Aggregate Finish Corten Steel– Corrugated Roof Panels (1.25 x 1.25) Charred Cedar Siding Corten Steel – Window/ Door Frame Existing CMU – “Warm White” (SW7063) Paint Finish Living Green Wall Vertical Trellis|10101010 1010101010 1010|r r r 7 10 9 3 8 6 9|1010 10|4 10 10 2 2 9 2 4 5 7 3 7|10 101010|ATTACHMENT 3 109Page 66 BUILDING D MATERIAL BOARD Merlex Stucco P722- “Artemisia, Sta. Barbara” Finish Steel with Blue Patina CMU – “Warm Grey” Paint Finish, with Combed Face Powder Coated Steel – “Olive Drab” (RAL 6022) Paint Finish Concrete – Exposed Concrete with a larger Aggregate Finish Corten Steel– Corrugated Roof Panels (1.25 x 1.25) Charred Cedar Siding Corten Steel – Window/Door Frame Existing CMU – “Warm White” (SW7063) Paint Finish Living Green Wall Vertical Trellis ATTACHMENT 3 1100’ 10’ 20’ 40’ Page 67 BUILDING D SECTIONS Scale: 1” = 20’ Section 2 Section 1 Section 3 +17'-7 1/4" T.O. Roof +29'-8 1/2" T.O. Parapet 10'-6" 1'-3" +5'-11 3/4" 1st Floor Retail +9" Project Datum +0" +0" 1st Floor 1st Floor +9" +9" Project Datum Project Datum +15'-4 3/4" +15'-4 3/4" 2nd Floor 2nd Floor +25' +25' 3rd Floor 3rd Floor NEIGHBORING BUILDING GARAGE GARAGE GARAGE 9" 14'-7 3/4" 9'-7 1/4" 4'-8 1/2" 29'-8 1/4" +0" +0" 1st Floor 1st Floor +9" +9" PROJECT DATUM PROJECT DATUM 9'-7 1/4" 4'-10" 2'-2" 2'-2 1/4" 28'-11 1/4" 14'-7 3/4" 14'-7 3/4" 9'-7 1/4" 5'-1 1/4" 2' NEIGHBORING BUILDING P L GARAGE GARAGE GARAGE +15'-4 3/4" +15'-4 3/4" 2nd Floor 2nd Floor +25' +25' 3rd Floor 3rd Floor ATTACHMENT 3 111Page 68 BUILDING E/F 09 ATTACHMENT 3 112Page 69 BUILDING E/F Building E This three story building is positioned on the interior of the site in the location of the large warehouse building. While it is situated to the rear of the site it will rise up above the adjacent Expo light rail line overhead track. The third story restaurant and dining terrace is highly visible from the Expo Line train that passes by on the way to the station. The exterior of the third floor resembles the appearance of a green house stacked on top of an existing warehouse style building. The second floor is office use. It is covered with living green. It presents an exciting view of an elevated green garden that is visible from the passing train and the nearby station. The retail component on the ground floor is covered by greens growing down from the office floor above. This building is conceived as one open space with a 21’-0” high open ceiling. The space will serve as a retail market space to be used by several smaller vendors. The exterior of this building is covered in living green walls. Building F The large existing warehouse building is reduced in size and through adaptive re-use the remainder of the warehouse structure is converted into retail and restaurant space that opens to Washington Boulevard, the central courtyard and the paseo at Building E. The tilt up concrete façade will be left in its natural concrete state reminiscent of an old industrial building from the early 20th century. Aged metal panels articulate the store window bays. ? View towards Building E on left side and Building F on right side - ? View Inside Building E BUILDING E/F TRUE NORTH D E FA C B A KEY PLAN ATTACHMENT 3 113Page 70 TRUE NORTH D E FA C B A KEY PLAN BUILDING E/F: FIRST FLOOR PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ 44'-3 1/2" 45'-1" 89'-4 1/2" 21'-10" 75'-3 1/4" 55'-3" 17'-2 1/4" 2'-10" 40'-7" 23'-9 1/2" 16'-9 1/4" 60'-11 1/2" Restaurant/ Retail 2,479 sq ft Retail 1,270 sq ft Retail 1,600 sq ft Retail 1,265 sq ft|101010 10|Valet & Concierg Service 16 B CLEAN AIR VEHICLE CLEAN AIR VEHICLE R TEMP LOADING ONLY TEMP LOADING ONLY LO ON Men's Locker Room Women's Locker Room Retail VAN|101010|Elev. Mech A: 98 sq ft 159'-9 1/2" 19'-6 1/2" 18'-6" 18'-6" 18'-6" 18'-6" 18'-6" 12'-5" 35'-4" 27'-9" 11'-3 1/2" 21'-5 3/4" 56'-8 1/2" 8'-2 3/4" 40'-3 3/4" 8'-2 1/4" 29'-4" 83'-3 1/4" ACCESS FOR EXISTING PARKING STRUCTURE ACCESS FOR EXISTING PARKING STRUCTURE Stair A: 379 sq ft Retail 7,451 sq ft Retail 725 sq ft Hall A: 454 sq ft Stair A: 389 sq ft Lobby/ Elevator A: 536 sq ft Restrooms A: 778 sq ft Lobby/ Elevator A: 188 sq ft ATTACHMENT 3 114Page 71 TRUE NORTH D E FA C B A KEY PLAN BUILDING E/F: PARKING ACCESS LEVEL Scale: 1” = 20’ 0’ 10’ 20’ 40’ 72'-5 1/4" 40'-7" 21'-10 1/2" 89'-5 1/4" 60'-11 1/2"|1010101010|83'-3 1/4" 35'-4" 124'-5 1/2" 30'-7" 32'-9" 56'-8 1/2" 29'-4" OPEN TO BELOW INHABITABLE NEW ACCESSIBLE ACCESS FOR EXISTING PARKING STRUCTURE OPEN TO BELOW Lobby/ Elevator A: 679 sq ft Stair A: 389 sq ft ATTACHMENT 3 115Page 72 TRUE NORTH D E FA C B A KEY PLAN BUILDING E/F: SECOND FLOOR PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’ 72'-5 1/4" 40'-7" 21'-10 1/2" 89'-5 1/4" 60'-11 1/2"|1010101010|10" 158'-11 1/2" 83'-3 1/4" 30'-7" 32'-9" 29'-4" 7'-7 1/2" 49'-1" 56'-8 1/2" 10" 45'-7 1/2" 78' 35'-4" Patio NEW ACCESSIBLE ACCESS FOR EXISTING PARKING STRUCTURE Restaurant/ Retail 1,007 sq ft Stair A: 406 sq ft Office A: 5,865 sq ft Lobby/ Elevator A: 837 sq ft Stair A: 389 sq ft Lobby/ Elevator A: 427 sq ft Restrooms A: 416 sq ft ATTACHMENT 3 116Page 73 TRUE NORTH D E FA C B A KEY PLAN BUILDING E/F: THIRD FLOOR PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’|101010|Outdoor Dining A: 2,000 sq ft 149' 9'-9 1/2" 35'-4" 48'-10 1/2" 13' 25'-3 3/4" 26'-5 3/4" 9'-9 1/2" 68'-4" 14'-11 1/4" 44'-10 1/4" 4'-1 3/4" 41'-5 3/4" 65'-2 3/4" 32'-9" Stair A: 209 sq ft Stair A: 392 sq ft Elev. A: 96 sq ft Restrooms A: 639 sq ft Elev. A: 84 sq ft Restaurant 4,362 sq ft ATTACHMENT 3 117Page 74 TRUE NORTH D E FA C B A KEY PLAN BUILDING E/F: ROOF PLAN Scale: 1” = 20’ 0’ 10’ 20’ 40’|101010|9'-9 1/2" 64'-9 1/2" 74'-8 1/2" 9'-6" 41'-6" 50' 10'-10" 7'-6" 8'-2 1/2" 36'-7 3/4" 4'-1 3/4" SCREEN FOR HVAC UNITS HVAC EQUIPMENT TYP. 81'-6" ATTACHMENT 3 118Scale: 1” = 20’|1010|Photovoltaic Panels Merlex Stucco P722 - “Artemisia, Sta. Barbara” Finish Low-E Glazing, Typ. Corten Steel Panels Powder Coated Steel – “Olive Drab” (RAL 6022) Finish Concrete – Exposed Concrete with a larger Aggregate Finish Living Green Wall with Potted Plants CMU – “Warm Grey” Paint Finish with Combed Face Corten Steel –Corrugated Roof Panels (1.25 x 7/8) Steel Window Mullions – “Aged Brass” Finish Steel Window Mullions – “Blackened” Finish White Cap Sheet Roofing Membrane|101010101010|12 11 10|10 101010| 10'-10" 11'-11" 14'-6" 18'-5" 55'-8" 10'-10" 11'-11" 54'-3" 17' 14'-6" 10'-10" 11'-11" 14'-6" 18'-5" 55'-8" 17'-6" Page 75 BUILDING E/F ELEVATIONS West Elevation Bldg E North Elevation Bldg E - F 0’ 10’ 20’ 40’ Northwest Elevation Bldg E 9 12 12 4 11 10 7 5 11|1010|2 4 4 10 7 6 8 6|10101010|7 1 12 ATTACHMENT 3 119Scale: 1” = 20’ 0’ 10’ 20’ 40’ 10'-10" 11'-11" 14'-6" 18'-5" 55'-8" Page 76 BUILDING E/F: ELEVATIONS Southwest Elevation Bldg E - F East Elevation Bldg E 10'-10" 11'-11" 14'-6" 18'-5" 55'-8"|1010|Photovoltaic Panels Merlex Stucco P722 - “Artemisia, Sta. Barbara” Finish Low-E Glazing, Typ. Corten Steel Panels Powder Coated Steel – “Olive Drab” (RAL 6022) Finish Concrete – Exposed Concrete with a larger Aggregate Finish Living Green Wall with Potted Plants CMU – “Warm Grey” Paint Finish with Combed Face Corten Steel –Corrugated Roof Panels (1.25 x 7/8) Steel Window Mullions – “Aged Brass” Finish Steel Window Mullions – “Blackened” Finish White Cap Sheet Roofing Membrane|101010101010|12 11 10|10 101010|9 4 1 8 12 10 3 6 3 5 7 11|10 10|8 4 12 3|1010|Line of Building in Front Line of Building in Front ATTACHMENT 3 12017'-6" 20'-6" 10'-10" 11'-11" 14'-6" 18'-5" 55'-8" Page 77 South Elevation Bldg E Scale: 1” = 20’ 0’ 10’ 20’ 40’ BUILDING E/F: ELEVATIONS East Elevation Bldg F Northwest Elevation Bldg F South Elevation Bldg F 4 1 11 11 11 11 2 12 3 4 3 1 2 4 1 2 5 9 12 8 4 6 Photovoltaic Panels Merlex Stucco P722 - “Artemisia, Sta. Barbara” Finish Low-E Glazing, Typ. Corten Steel Panels Powder Coated Steel – “Olive Drab” (RAL 6022) Finish Concrete – Exposed Concrete with a larger Aggregate Finish CMU – “Warm Grey” Paint Finish with Combed Face Corten Steel –Corrugated Roof Panels (1.25 x 7/8) Steel Window Mullions – “Blackened” Finish White Cap Sheet Roofing Membrane|101010101010|12 11|10 101010|Line of Building in Front ATTACHMENT 3 121Page 78 BUILDING E/F MATERIAL BOARD Photovoltaic Panels Merlex Stucco P722 - “Artemisia, Sta. Barbara” Finish Low-E Glazing, Typ. Corten Steel Panels Powder Coated Steel – “Olive Drab” (RAL 6022) Finish Concrete – Exposed Concrete with a larger Aggregate Finish CMU – “Warm Grey” Paint Finish with Combed Face Corten Steel –Corrugated Roof Panels (1.25 x 7/8) Steel Window Mullions – “Blackened” Finish White Cap Sheet Roofing Membrane Living Green Wall with Potted Plants Steel Window Mullions – “Aged Brass” Finish ATTACHMENT 3 122Page 79 BUILDING E/F MATERIAL BOARD Low-E Glazing, Typ. Corten Steel –Corrugated Roof Panels (1.25 x 7/8) ATTACHMENT 3 123Scale: 1” = 20’ Section 2 Section 1 +10'-10" +10'-10" Parking Access Parking Access +0" +0" 1st Floor 1st Floor +22'-9" +22'-9" 2nd Floor 2nd Floor +37'-3" +37'-3" 3rd Floor 3rd Floor +55'-8' +55'-8' Roof Roof + 0" 1st Floor + 20'-6" T.O. Parapet +17'-6" Existing Parapet Page 80 BUILDING E/F SECTIONS 0’ 10’ 20’ 40’ ATTACHMENT 3 124Page 81 CONCEPTUAL LANDSCAPE PLAN 10 ATTACHMENT 3 125Page 82 CONTEXTUAL SITE PLAN WITH ADJACENT PARK LANDSCAPE The Platform exterior has four distinctive landscape character zones; Washington Streetscape, the Central Courtyard, Green-house/ Landmark (Building E/F) Paseo’s and WashArts (Building B). Each having unique landscape characters summarized below. The Washington Streetscape shall follow pre-established Culver City Streetscape Guidelines. Street trees and furnishings shall be coordinated with the City. The Central Courtyard shall be a shaded seating areas of Decomposed Granite framed by filtering specimen trees. The Greenhouse Paseo façade will to be draped in trailing vines Vinca major (Trailing Periwinkle) and Hedera helix (English Ivy). The WashArts building has varying colors (white, orange, red and magenta) of Bougainvillea on the stair towers to serve as a vegetative mural of color. ATTACHMENT 3 126Page 83 ILLUSTRATIVE LANDSCAPE PLAN ATTACHMENT 3 127Page 84 LAYOUT AND MATERIALS PLAN ATTACHMENT 3 128Page 85 MATERIAL AND FURNISHING IMAGERY Paving Colors Courtyard Sea ng and Olives Bench Sea ng Vegetated Structure CIP Concrete Seat Wall Trees in Decomposed Granite CIP Concrete Steps Concrete Honed Finish Ivy Wall Bike Rack Decomposed Granite Ivy Wall Concrete Seat Wall Raised Wood Decking ATTACHMENT 3 129Page 86 PLANTING DIAGRAM ATTACHMENT 3 130Page 87 PLANTING IMAGERY Tabebuia impe ginosa Pink Trumpet Tree Hymenosporum ? avum Sweet Shade Tree Platanus acerifolia London Plane Tree Paulownia tomentosa Empress Tree Quercus agrifolia California Coast Live Oak Olea europeae Fruitless Mission Olive Iris douglasiana Douglas Iris Campanula poscharskyana Bell? ower Ophiopogon japonicus Mondo Grass Clytostoma callistegiodes Violet Trumpet Vine Dis c s ‘Rivers’ Royal Trumpet Vine Wisteria sinensis ‘Rosea’ Chinese Wisteria Calamagros s x acu folia Feather Reed Grass Muhlenbergia capillaris Pink Muhly Nassela tenuissima Mexican Feather Grass Pennisetum orientale Chinese Fountain Grass Phyllostachys nigra Black Bamboo Bambusa mul plex ‘AK’ Alphonse Karr Bamboo Festuca Glauca Blue Fescue Carex buchanii Leather Leaf Sedge Carex elata “Aurea’ Bowles Golden Sedge ATTACHMENT 3 131Aloe arborescens Torch Aloe Agave vilmoriniana Octopus Agave Agave victoriae-reginae Queen Victoria Agave Agave ‘Blue Glow’ Agave Agave a enuata ‘Variegata’ Variegated Agave Agave ‘Blue Flame’ Agave Aloe striata Coral Aloe Aloe ‘Johnson’s Hybrid’ No Common Name Aloe brevifolia No Common Name Aloe plica lis Fan Aloe Aloe barberae Tree Aloe Aloe ‘Blue Elf’ No Common Name Crassusa captella ‘Camp? re’ Crassula Aeonium arboreum Tree Aeonium Aeonium arboreum ‘Zwartkop’ Zwartkop Aeonium Aeonium ‘Kiwi’ No Common Name Echeveria ‘A erglow’ No Common Name Echeveria imbricate No Common Name Echeveria secunda No Common Name Echeveria agavoides Agave Echeveria Senecio serpens Blue Chalks cks Euphorbia characias ‘Wulfenii’ Mediterranean Spurge Euphorbia rucalii ‘S cks of Fire’ Milkbush Page 88 PLANTING IMAGERY ATTACHMENT 3 132Page 89 LANDSCAPE IRRIGATION NOTES: ALL LANDSCAPE AREAS TO BE WATERED WITH A FULLY AUTOMATIC UNDERGROUND IRRIGATION SYSTEM UTILIZING AN AUTOMATIC CONTROLLER, REMOTE CONTROL VAL VES, POP-UP SPRINKLERS AND A REDUCED PRESSURE TYPE BACKFLOW PREVENTOR. (TO MEET LOCAL CODE) ALL IRRIGATION SYSTEMS SHALL BE DESIGNED TO AVOID SURFACE RUN-OFF, LOW HEAD DRAINAGE, OVERSPRAY OR SIMILAR CONDITIONS WHERE IRRIGATION WATER FLOWS ONTO ADJACENT AREAS NOT PART OF THE IRRIGATED AREA SUCH AS ADJACENT PROPERTY, NON-IRRIGATED AREAS, WALKS, ROADWAYS OR STRUCTURES. LANDSCAPE AREAS WILL BE DIVIDED INTO HYOROZONES SO THAT PLANTS WITH SIMILAR WATER REQUIREMENTS WILL BE VALVED TOGETHER. IRRIGATION DIAGRAM ATTACHMENT 3 133Page 90 STREETSCAPE PLANTING ATTACHMENT 3 134Page 91 COURTYARD PLANTING ATTACHMENT 3 135Page 92 GREENHOUSE PLANTING ATTACHMENT 3 136Page 93 CONCEPTUAL LIGHTING 11 ATTACHMENT 3 137Page 94 LIGHTING CONCEPT NARRATIVE Lighting Design Narrative The Lighting Design for the Platform project strives to create an invit- ing and dynamic nighttime presence that is both energy-efficient and responsive to the multiple demands of both the tenants and visitors at this exciting mixed-use development. Building and Paseo Lighting Lensed LED downlights (ambient lighting) integrated into the exterior architecture at building canopies will produce light levels that strike a restrained balance, making people feel good and comfortable while providing retailers and restaurant tenants with lighting that invites cus- tomers. This lighting move is clean and simple, meant to reinforce the architecture with a refined aesthetic that is also highly energy-efficient. Light levels will vary between 5fc and 25fc based on specific locations under building canopies. Because the public paseo areas are relatively narrow, the architectural canopies serve as the location for the main source of lighting, allowing the center landscaped areas to be lit using low-level landscape lighting and lighting integrated into the hardscape. Decorative surface-mounted light fixtures along with decorative pen- dants shall be used on buildings to provide scale to the architecture and to establish elements of visual interest. These fixtures shall be of a design meant to support the architectural style of the buildings. All wall/building-mounted lighting shall provide glare free, full-cutoff light- ing. Facade Lighting Facade lighting will be subtle yet will strive to reinforce the architecture of the building while also helping to establish a nighttime presence for the project. Lighting shall be executed so as to prevent lighting from spilling onto neighboring properties. Uplighting shall be limited and all lighting sources shall provide cut-off optics to prevent unwanted visual glare. The goal is to establish a nighttime presence for the develop- ment as a whole that works on both a pedestrian-scale and on a larger scale that helps to communicate the character and qualities of the project to riders on the Expo line as well as to drivers and pedestrians. Site and Landscape Lighting Feature trees shall be illuminated by small-scale, energy efficient up- lights. Along prominent streetscapes, these fixtures shall be integrated into the raised planter beds. At other locations, in-grade uplights shall be integrated into the hardscape to illuminate feature trees. Low-level steplights shall be used in planter and step walls to provide orientation lighting and wayfinding. A creative use of suspended lighting fixtures will be implemented in the ‘park’ feature, where decorative light fixtures will be hung from mature trees creating a beautiful canopy of lighting, helping to reinforce the park as a unique gathering place for guests to the project during both daytime and nighttime hours. The suspended lighting creates the notion of ‘festoon’ lighting overhead and serves to meet the many proposed uses of this prominent outdoor area. The large planted living walls shall be illuminated with recessed linear LED uplights. All lighting shall comply with all prevailing energy and building codes, specifically California’s Title 24. Lamps shall be selected to accurately render color, and all lighting shall maintain a consistent color tempera- ture. Unless used for specific decorative purposes, no lamps shall be visible to direct view and no lighting shall produce unwanted glare. ATTACHMENT 3 138Page 95 SCHEMATIC LIGHTING PLAN - BUILDING A D E FA C B A KEY PLAN SCALE: 1/16” = 1’-0” ATTACHMENT 3 139Page 96 SCHEMATIC LIGHTING PLAN - BUILDING B D E FA C B A KEY PLAN SCALE: 1/16” = 1’-0” ATTACHMENT 3 140Page 97 SCHEMATIC LIGHTING PLAN - BUILDING C D E FA C B A KEY PLAN SCALE: 1/16” = 1’-0” ATTACHMENT 3 141Page 98 SCHEMATIC LIGHTING PLAN - BUILDING D D E FA C B A KEY PLAN SCALE: 1/16” = 1’-0” ATTACHMENT 3 142Page 99 SCHEMATIC LIGHTING PLAN - BUILDINGS E & F D E FA C B A KEY PLAN SCALE: 1/16” = 1’-0” ATTACHMENT 3 143Page 100 SCHEMATIC LIGHTING PLAN - CENTRAL COURTYARD D E FA C B A KEY PLAN SCALE: 1/16” = 1’-0” ATTACHMENT 3 144Page 101 FIXTURE TYPE: F1 STAKE MOUNTED LINEAR LED UPLIGHT (IN PLANTERS) FIXTURE TYPE: F2 RECESSED ADJUSTABLE ACCENT LIGHT PERMA POSTS ATTACHMENT 3 145Page 102 FIXTURE TYPE: F3 RECESSED COMPACT FLUORESCENT DOWNLIGHT FIXTURE TYPE: F6 FLUSH MOUNTED STEPLIGHT Directed Unshielded ATTACHMENT 3 146Page 103 FIXTURE TYPE: F7 WALL MOUNTED LIGHT FIXTURE FIXTURE TYPE: F8 TREE MOUNTED LANTERN LANTERN OPTIONS 10.1 in 4"/100MM 9.7 in 5.0"/125MM .38"/10MM x .50"/12MM SLOT 1.0"/25MM HOLE 3"/78MM AWM2 Wall mounted arm for SP2. Wall plate is 6.375”/162mm x 3.5”/89mm WT: 5 lbs. EPA: 0.11 4”/100mm 3”/78mm 0.38”/10mm x 0.50”/12mm slot 1”/25mm hole 5”/127mm 27" (686mm) 29" (736mm) 16 |1010|/4" (425mm) ATTACHMENT 3 147Page 104 FIXTURE TYPE: F9 WALL MOUNTED LIGHT FIXTURE (FULL CUT-OFF) FIXTURE TYPE: F10 WALL MOUNTED LIGHT FIXTURE Luminaire for interior and exterior use . Powdercoat 10 step process heavy extruded aluminum housing 11.8” width, featuring varying sizes to accommodate the electrical components. Powdercoat copper free die cast aluminum trims and caps. Powdercoat 10 step process die cast aluminum bracket for wall mounted applications, featuring ease of installation. Clear tempered glass diffuser, 0.157” thick. Polymer gasket. Aluminum type 99.85 reflectors with controlled optics G12 lamp type versions, featuring light beam type A, B, or C. B versions, with dual light output, are supplied with either one or two lamps and are specifically designed for direct/ indirect light distribution. M versions, with single light output, are supplied with a single lamp and can be used for either direct or indirect light distribution. Compact fluorescent or HID lamp versions with direct/indirect light distribution. Reflectors can be supplied varying combinations. Consult factory . UL Listed . Suitable for wet locations. 12 DILUME 300x230 e Dilume 300x230 B 1x70W MH e Dilume 300x230 M/B 1x70W MH r Dilume 300x230 M 1x57W CFL e Dilume 300x230 M/C 1x70W MH e Dilume 300x230 M/A 1x70W MH r Dilume 300x230 B 1x57W CFL 9.02” 12.6” 3.15” 3.93” 2.13” 0.51” 5.91” 2.76” 6.58” 11.54” 3.98” DILUME 300X230 B e G12 1x70w MH M139 T6 r GX24q-5 1x57w CFL DILUME 300X230 M r GX24q-5 1x57w CFL DILUME 300X230 M/A DILUME 300X230 M/B DILUME 300X230 M/C e G12 1x70w MH M139 T6 MATTE METALLIC GRAY IRON GRAY ATTACHMENT 3 148Page 105 FIXTURE TYPE: F11 IN-GRADE UPLIGHT (LOW VOLTAGE) FIXTURE TYPE: F12 IN-GRADE LINEAR LED UPLIGHT OUTER CASING (I.5904), (TO BE ORDERED SEPERATELY) EXTRUDED ALUMINUM HOUSING CONCRETE GROUND SURFACE STAINLESS STEEL ALLEN HEAD SCREW W/ INTERNAL ADJUSTABLE LOCKING SYSTEM (X2, TYP.) ENSURE 8" OF GRAVEL FOR DRAINAGE 4-5/8" (117mm) 4" (101mm) SECTION VIEW SIDE VIEW INTEGRAL POWER SUPPLY (X3 TYP.) ATTACHMENT 3 149Page 106 FIXTURE TYPE: F13 LANDSCAPE ACCENT LIGHT FIXTURE TYPE: F14 IN-GRADE UPLIGHT (METAL HALIDE) ATTACHMENT 3 150Page 107 CIVIL ENGINEERING 12 ATTACHMENT 3 151Page 108 SURVEY ATTACHMENT 3 152Page 109 ALTA-SURVEY ATTACHMENT 3 153Page 110 SURVEY ATTACHMENT 3 154Page 111 SURVEY ATTACHMENT 3 155Page 112 INFRASTRUCTURE / CFD INFRASTRUCTURE Based upon the proposed development as described in the Comprehensive Plan, the site development will not require major upgrades to infrastructure such as water, sewer, or gas. Some utility relocation as well as various offsite streetscape improvements shall be required with Site development. A Community Facilities District (CFD) is one financial tool available to commercial property owners within the TOD District to help fund public improvements and services through private property assessment and bond finance. Required off-site improvements for Platform Comprehensive Plan may be funded through a CFD if commercial property owners agree. The kinds of improvement that may be funded on a pro rata basis include: • New Infrastructure • Utility Relocations • Streetscape Improvements • On-going maintenance A CFD can ensure timely completion of all necessary pubic improvements. Consistent with the CFD provisions in the City’s Municipal Code (Section 15.12.035), if established, the CFD funding for improvements may be based upon a pro rata assessment for each parcel within the District. ATTACHMENT 3 156Page 113 UTILITY PLAN PAGE 108 FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. PAGE 107 ATTACHMENT 3 157Page 114 UTILITY PLAN PAGE 108 PAGE 106 FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. ATTACHMENT 3 158FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 115 UTILITY PLAN PAGE 107 PAGE 106 ATTACHMENT 3 159FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 116 SITE CONTROL PLAN PAGE 111 PAGE 110 ATTACHMENT 3 160FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 117 SITE CONTROL PLAN PAGE 111 PAGE 109 ATTACHMENT 3 161FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 118 SITE CONTROL PLAN PAGE 110 PAGE 109 ATTACHMENT 3 162FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 119 GRADING PLAN PAGE 114 PAGE 113 ATTACHMENT 3 163FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 120 GRADING PLAN PAGE 114 PAGE 112 ATTACHMENT 3 164FOR REFERENCE ONLY. Subject to ? nal review and approval by the City Engineer. Page 121 GRADING PLAN PAGE 113 PAGE 112 ATTACHMENT 3 165Page 122 DOCUMENTS UNDER SEPARATE COVER 13 ATTACHMENT 3 166Page 123 DOCUMENTS UNDER SEPARATE COVER DOCUMENT REPORT DATED CONSULTANT GEOTECHNICAL REPORT 11/05/2010 Feffer Geological Consulting TRAFFIC STUDY 07/01/2011 Raju Associates, Inc. GREENHOUSE GAS ASSESSMENT 04/26/2012 RBF Consulting PHASE I ENVIRONMENTAL ASSESSMENT 11/02/2010 AECOM ATTACHMENT 3 167Page 124 PROJECT TEAM Owner The Runyon Group 9107 Wilshire Blvd., Ste. 725 Beverly Hills, CA 90210 Contact: Joseph Miller joseph@runyongroup.com Tel. (213) 243-5530 Architect Abramson Teiger Architects 8924 Lindblade Street Culver City, CA 90232 Contact: Bjorn Schrader bjorn@abramsonteiger.com Tel. (310) 838-8998 Ext. 209 Fax. (310) 838-8332 Project Mgmt. GARDINER + THEOBALD INC 9777 Wilshire Blvd, Ste. 800 Beverly Hills, CA 90210 Contact: Daniel Green d.green@gardinerusa.com Tel. (310) 598-1944 Fax. (310) 285-9833 Structural Eng. Nabih Youssef Associates 800 Wilshire Blvd, Ste. 200 Los Angeles, CA 90017 Contact: Ryan Wilkerson rwilkerson@nyase.com Tel. (213) 362-0707 Fax. (213) 688-3099 MEP Engineers ARC Engineering 15260 Ventura Blvd, Ste. 1520 Sherman Oaks, CA 91403 Contact: Hisham Nicholas Barakat hbarakat@arceng.net Tel. (818) 508-6300 Ext. 202 Fax. (818) 508-7050 Landscape Design Artifex 10 Contact: Eric S. Lennox eric@artifex10.com Tel. (480) 297-9464 Lighting Design Sean O’Connot Lighting 8820 Wilshire Blvd, Ste. 320 Beverly Hills, CA 90211 Contact: sean o’connor sean@seanoconnorlighting.com Tel. (310) 659-5900 Fax. (310) 659-5915 Civil Engineer VCA Engineers Inc 3951 Medford Street Los Angeles, CA 90063 Contact: Mauricio Castro mauricio.castro@vcaengineers-inc.com Tel. (323) 729-6098 Fax. (323) 729-6043 Surveyor Mollenhauer Group 316 W 2nd Street, Fifth Floor Los Angeles, CA 90012 Contact: Bill Nailing bnailling@mollenhauergroup.com Tel. (213) 624-2661 Fax. (213) 614-1863 Geotechnical Engineer Feffer Geotechnical Consulting 1990 S. Bundy Drive, 4th Floor Los Angeles, CA 90025 Contact: Joshuar R. Feffer josh@feffergeo.com Tel. (310) 207-5408 Fax. (310) 826-0182 Traffic Study Raju Associates Inc. 505 E. Colorado Blvd, Suite 202 Pasadena, CA 91101 Contact: Srinath Raju srinath.raju@rajuassociates.com Tel. (626) 792-2700 Fax. (626) 792-2772 Greenhouse Gas RBF Consulting Assessment 14725 Alton Parkway Irvine, CA 92618 Contact: Eddie Torres, Kelly Chiene Tel. (949) 472-3505 Environmental Consultant / Citadel Environmental Services Phase I and II Report 1725 Victory Blvd. Glendale, CA 91201 Contact: Nicolette Casarez ncasarez@citadelenvironmental.com Tel. (818) 246-2707 Fax. (818) 246-3145 AECOM 999 Town & Country Road, Fourt Floor Orange, CA 92868 Tel. (714) 835-4447 Fax. (714) 953-6989 ATTACHMENT 3 168 City of Culver City, California Planning Commission Agenda Item Report Page 1 of 8 CONTINUATION OF SEPTEMBER 12, 2012, AGENDA ITEM NO. PH-1: This item was presented to the Planning Commission as a public hearing at the Commission’s September 12, 2012. RECOMMENDATION: That the Planning Commission: 1. Adopt a Mitigated Negative Declaration (MND) based on the Initial Study finding that the project, with mitigation measures incorporated, will not have a significant adverse impact on the environment; and 2. Recommend Approval to the City Council of Zoning Code Map Amendment, ZCMA P-2012020, and Comprehensive Plan, CP P-2012018, subject to the Conditions of Approval as stated in Resolution No. 2012-P011 (Attachment No. 1). PROCEDURES: 1. Chair calls on staff for a staff report and Commission poses questions to staff as desired. 2. Chair opens the public hearing, providing the applicant the first opportunity to speak, followed by the general public. Meeting Date: October 4, 2012 Item Number: PH-1 AGENDA ITEM: (CONTINUED ITEM FROM SEPTEMBER 12, 2012) Consideration of Zoning Code Map Amendment (P-2012020) establishing Planned Development Zone No.10 and Comprehensive Plan (P2012018) to allow a commercial development consisting of approximately 41,735 square feet of retail and restaurant uses and 38,732 square feet of office uses located at 8810-8850 Washington Boulevard and 3920 Landmark Street. Contact Person/Dept.: Susan Yun, Senior Planner Phone Number: (310) 253-5755 Public Hearing: [X] Action Item: [] Attachments: [X] Public Notification: On August 21, 2012, a notice (approximately 1,900 recipients) was mailed to all the property owners and occupants beyond a 500-foot radius of the site, posted on the site and emailed to the Master Notification List. Planning Approval: Thomas Gorham, Planning Manager Department Approval: Sol Blumenfeld, Community Development Director ATTACHMENT 4 169 City of Culver City, California Planning Commission Agenda Item Report Page 2 of 8 3. Chair seeks a motion to close the public hearing after all testimony has been presented. 4. Commission discusses the matter and arrives at its decision. BACKGROUND / DISCUSSION: At its September 12, 2012 meeting, after considering the staff report, the application materials and applicant presentation, the Commission adopted a motion (5-0) to continue the item to the October 4, 2012, meeting, requesting various clarifications, revisions and additional information regarding the project. Please refer to the September 12 th Agenda Item PH-1 packet for a full description, analysis, and attachments regarding this project. Comprehensive Plan The Commission directed that the Comprehensive Plan be revised to incorporate the alternate design to Building A and Building E, in its entirety as the single project proposal rather than represent it as an option. The alternate design option was proposed after the full application package was received. The developer included this alternate design option based on feedback from potential tenants and a desire to provide a direct connection from Washington Boulevard to the paseo behind Building A and to create a more dynamic restaurant space on Building E by relocating it to the third floor. This was the preferred design option by the applicant/owner. The Commission felt the Comprehensive Plan should reflect the preferred design option and the document was revised accordingly. All relevant pages of the Comprehensive Plan including floor plans, elevations, tables and various diagrams were revised and/or added into the document to reflect the previously proposed alternative design option to Building A and Building E. In addition, all project summary tables, diagrams and illustrations were revised to accurately reflect proposed project building square footages and parking calculations (Attachment No. 2). The language and text of the Comprehensive Plan was also revised to contain more declarative statements to avoid any ambiguities related to City requirements versus optional provisions. ATTACHMENT 4 170 City of Culver City, California Planning Commission Agenda Item Report Page 3 of 8 Parking The Commission requested clarifications in regards to how the projects required parking was calculated. Numerical Parking Requirements: Parking for the project site is provided at a ratio of 1 stall per 250 square feet of retail and restaurant floor area consistent with the Zoning Code parking requirements for shopping centers and 1 stall per 350 square feet of office floor area consistent with the Zoning Code parking requirements for office uses. Restaurant space over 25% of the combined retail and restaurant floor area is required to be parked at a ratio of 1 stall per 100 square feet of floor area, consistent with requirements of the Parking Ordinance. The Zoning Code provides that the first 250 square feet of outdoor dining is allowed without requiring parking. The Platform project proposes that this credit of 250 square feet be increased to 500 square feet. This results in 6 additional parking spaces required when applying a parking credit for first 250 square foot of outdoor dining area as opposed to applying a parking credit to the first 500 square feet of outdoor dining area. The parking requirements described above are summarized in the following table: Land Use Parking Factor Retail (Shopping center) 1 stall per 250 sf Restaurant (Up to 25% of the combined retail and restaurant floor area.) 1 stall per 250sf Restaurant (Over 25% of the combined retail and restaurant floor area.) 1 stall per 100 sf Office 1 stall per 350 sf Outdoor Dining Areas (Area in excess of 500 square feet per restaurant space.) 1 stall per 250 sf The project proposes a total of 27,057 square feet of retail spaces, 14,688 square feet of restaurant spaces and 38,732 square feet of office spaces. As mentioned above, restaurant space over 25% of the combined retail and restaurant floor area is required to be parked at a ratio of 1 stall per 100 square feet of floor area. The Project Area Summary Table on Page 3 of the revised Comprehensive Plan provides detailed building square footage breakdown of the proposed uses for each of the buildings proposed. ATTACHMENT 4 171 City of Culver City, California Planning Commission Agenda Item Report Page 4 of 8 Restaurant Parking Pursuant to Commission direction, the maximum percentage of restaurant space is 35% of the combined retail and restaurant floor area (See Permitted Uses, Page 14 of the Comprehensive Plan). The 14,688 square feet of proposed restaurant space represents 35% of the combined retail and restaurant floor area. The project proposes an additional 10% or 4,252 square feet of restaurant space over the 25% or 10,436 square feet maximum. As a result, 4,252 square feet of total restaurant space is parked at the required parking ratio of 1 stall per 100 square feet of floor area. Outdoor Dining Parking The project proposes a total of 5,365 square feet of outdoor dining. The proposed outdoor dining area in excess of 500 square feet per restaurant space totals 2,050 square feet. 8 parking spaces would be required for this outdoor dining at the 1 to 250 ratio. The project provides parking for the 2,050 square feet of outdoor dining in excess of 500 square feet per restaurant space or 8 spaces as shown in the required parking table on Page 12 of the Comprehensive Plan. 1 The increase of parking credit to the first 500 square feet of outdoor dining rather than the first 250 square feet results in only a 2% or 6 space reduction in what the Zoning Code would otherwise require and is justified by the proximity of the project to transit as part of the Transit Oriented Development (TOD) district.|1010| There will not be a significant parking impact as result of applying the parking credit due to the amount of parking that will be provided on-site and the nature of the expected population the project will serve. Many users of the outdoor dining area will generally include local office workers from the site and employees and residents from the adjacent Hayden Tract and other TODs planned nearby and will not likely generate additional auto trips and parking demand. It is expected that many site users will be arriving by alternative modes of travel such as walking, bicycling, or by taking the bus or train to the site. Further, the project does not take any parking credit or discount as could be allowed as a TOD project. Based on the proposed uses (including the outdoor dining area in excess of 500 square feet), building square footage and parking ratios described above, the project requires a total of 312 parking spaces. The quantity of parking required based the land use and parking ratio is summarized in the table below: ATTACHMENT 4 172 City of Culver City, California Planning Commission Agenda Item Report Page 5 of 8 Land Use Area s.f. Parking Ratio Total Parking Stalls Retail 27,057 1:250 sf 108 Restaurant 14,688* 1:250 sf 85 Outdoor Dining Areas (Area in excess of 500 square feet per restaurant space.) 2,050 1:250 sf 8 Office 38,732 1:350 sf 111 Total 312 *4,252 square feet of this total was calculated at 1 stall per 100 square feet of restaurant space. Vehicle Parking Plan: Parking for the project is provided in two separate above ground structures. The newly built parking structure on the corner of Landmark Street and Washington Boulevard (Building B) contains 219 parking stalls across five levels of covered parking and a roof level. The entire structure is accessed through an automatic entry system off of Landmark Street that will be activated by either a ticket or a key card system. This structure is intended for people who are patronizing the shops and restaurants at Platform. Office users and store employees are prohibited from parking in the lower three levels, leaving the lower these prime spaces to customers. There have been no changes to this structure with the revised plans. The second parking garage is an existing structure that is to be rehabilitated and is located on the north side of Landmark Street (Building D) In the original plan this structure contained 72 parking spaces. The parking plan for Building D has been revised to provide 93 parking stalls by converting the second and third levels to valet parking only. The structure will have ingress and egress off of Landmark Street. There will be 22 self-parking spaces on the first level along with valet parking drop off and pick up. There will be 33 spaces on the second level including 28 in tandem configuration, and 38 spaces on the third level including 36 in tandem configuration that will be utilized for valet parking. This structure will primarily be used by office users and patrons of the restaurant in Building E. A condition of approval has been added requiring the applicant/owner to provide a valet parking and management plan as approved by the Planning Manager and City’s Traffic Engineer. Both parking structures will offer preferred parking for low emission vehicles (e.g. hybrid, alternative fuel and electrical automobiles) and carpool vehicles as required by the California Green Building Code (CGBC). Handicapped accessible spaces are provided per California Building Code (CBC) regulations. ATTACHMENT 4 173 City of Culver City, California Planning Commission Agenda Item Report Page 6 of 8 General Land Use Provisions The project is proposed as a pedestrian oriented development located near the Exposition Light Rail Transit station and within the City’s Transit Oriented Development (TOD) area. As such, the Commission wanted more assurances in the land use provisions of Comprehensive Plan to reflect the goals and objectives of a pedestrian friendly and TOD project by limiting the types of uses that can be allowed on the ground floor. The Permitted Uses section on page 14 of the Comprehensive plan has been revised to permit pedestrian oriented uses including retail, eating and drinking establishments, and artisan businesses on the ground floor. Also, restaurant uses have been limited to no more than 35% of the commercial space to avoid potential oversaturation of restaurant uses over retail uses in this project. The office uses and other non-pedestrian oriented uses (i.e. health and fitness facilities, broadcast studios, indoor support facilities of media production) are not allowed on the ground floor. Other uses such as personal services (i.e, day spa, hair salon, and nail salon), specialized schools (i.e. culinary school) or banks or financial services are not permitted on the ground floor in tenant spaces fronting Washington Boulevard or the central courtyard space as these frontages are the primary pedestrian oriented areas of the project. For retail and restaurant uses selling alcohol, an Administrative Use Permit is required. Convenience store use was removed from the permitted use table. Landscaping One of the concerns expressed by the Commission was lack of size specificity of the trees preliminary landscape plan, in particular those proposed for the central courtyard area. The original plan showed 6 trees in this area. The applicant has revised the plan to show 3 trees in order to provide a larger scale tree. The trees are proposed to be 72 inch box size which will result in a tree height at planting of approximately 17-20 feet with a canopy spread of approximately 18 feet. Staff has included an condition that requires the courtyard trees to be a minimum 72 inch box size and that the exact location and final species selection be subject to review and approval by the City’s Landscape Architect. The remaining trees in the project are the required street trees along Washington Boulevard which will be installed pursuant to the City’s TOD District Streetscape Plan which will provide a coordinated plan for public improvements within the TOD area. Streetscape improvements will include new street trees, planters, tree grates, benches, trash receptacles, bicycle racks, decorative pavers, way finding ATTACHMENT 4 174 City of Culver City, California Planning Commission Agenda Item Report Page 7 of 8 signage and other street furniture. The developer is required to fund and install all streetscape improvements in front of the project and is required to pro provide a pro rata share of funding for decorative paved crosswalks at Washington and National Boulevards as specified in a TOD District Streetscape Plan. Sample Materials Board and Exhibits As requested by the Commission, the applicant has provided an expanded view or perspective of the entire projects’ building frontage as viewed from Washington Boulevard in the Comprehensive Plan document. A large exhibit of this perspective will be presented at the Commission meeting. Also, pictures of the building materials have been incorporated into the Comprehensive Plan document. An updated materials sample board reflecting all the materials in the proposed project will also be presented at the Commission meeting. CONCLUSION: Based on the analysis contained herein staff believes the findings for a Comprehensive Plan and Zoning Code Map Amendment can be made as outlined in proposed Resolution No. 2012-P011 (Attachment No. 2) and recommends project approval. ENVIRONMENTAL DETERMINATION: Pursuant to the California Environmental Quality Act (CEQA) guidelines a Mitigated Negative Declaration (MND) has been prepared; the project has been determined that with mitigation measures incorporated, it will have less than significant impacts on the community. ALTERNATIVE OPTIONS: The following alternative actions may be considered by the Planning Commission: 1. Approve the application with the recommended conditions of approval if the application is deemed to meet the required findings. 2. Approve the application with additional or different conditions of approval, if deemed necessary to meet the required findings and mitigate any new project impacts identified at the meeting. ATTACHMENT 4 175 City of Culver City, California Planning Commission Agenda Item Report Page 8 of 8 3. Disapprove the application if it does not meet the required findings. NOTES: 1. As a comparison, staff calculated the difference in the parking required when applying a parking credit for the first 250 square feet of outdoor dining area as opposed to a parking credit for the first 500 square feet of outdoor dining area. The outdoor dining area in excess of the first 250 square feet per restaurant space would total 3,615 square feet. Parking for this at the 1 to 250 ratio would result in the need for 14 parking spaces. 2. Reduced parking is justified by close proximity to the Culver City Expo LRT station and outdoor dining is an important pedestrian related use which should be encourage in TOD’s to promote pedestrian activity. ATTACHMENTS: 1. Draft Resolution No. 2012-P011 (ZCMA P-2012020, CP-P2012018, MND – P-2012019) including Exhibit A, Zone Change Map and Exhibit B, Conditions of Approval. 2. Revised Comprehensive Plans date stamped September 28, 2012. ATTACHMENT 4 176 City of Culver City, California Planning Commission Agenda Item Report Page 1 of 16 RECOMMENDATION: That the Planning Commission: 1. Adopt a Mitigated Negative Declaration (MND) based on the Initial Study finding that the project, with mitigation measures incorporated, will not have a significant adverse impact on the environment (Attachment No. 5 ); and 2. Recommend Approval to the City Council of Zoning Code Map Amendment, ZCMA P-2012020, and Comprehensive Plan, CP P-2012018, subject to the Conditions of Approval as stated in Resolution No. 2012-P011 (Attachment No. 4). PROCEDURES: 1. Chair calls on staff for a staff report and Commission poses questions to staff as desired. 2. Chair opens the public hearing, providing the applicant the first opportunity to speak, followed by the general public. 3. Chair seeks a motion to close the public hearing after all testimony has been presented. 4. Commission discusses the matter and arrives at its decision Meeting Date: September 12, 2012 Item Number: PH-1 AGENDA ITEM: Proposed Zoning Code Map Amendment to establish a Planned Development Zoning District and Comprehensive Plan to allow a commercial development consisting of approximately 41,253 square feet of retail and restaurant uses and 38,120 square feet of office uses located at 8810-8850 Washington Boulevard and 3920 Landmark Street. Contact Person/Dept.: Susan Yun, Senior Planner Phone Number: (310) 253-5755 Public Hearing: [X] Action Item: [] Attachments: [X] Public Notification: On August 21, 2012, a notice (approximately 1,900 recipients) was mailed to all the property owners and occupants beyond a 500-foot radius of the site, posted on the site and emailed to the Master Notification List. Planning Approval: Thomas Gorham, Planning Manager Department Approval: Sol Blumenfeld, Community Development Director ATTACHMENT 4 177 City of Culver City, California Planning Commission Agenda Item Report Page 2 of 16 BACKGROUND: Request The proposed request is to establish a Planned Development (PD) Zone through a Zoning Code Map Amendment (ZCMA) and a Comprehensive Plan (CP) to allow the construction of multi-use commercial development consisting of approximately 41,253 square feet of retail and restaurant uses and 38,120 square feet of office use. There are two above ground parking structures that will provide a total of 291 parking spaces. The project site is located at 8810–8850 Washington Boulevard and 3920 Landmark Street (See Attachment No.1), near the recently completed Exposition Light Rail Transit (Expo LRT) line, Culver City Expo Station and the City’s Washington National Transit Oriented Development (TOD.) Existing Conditions The project site comprises two properties on the south side of Washington Boulevard split by Landmark Street and totals approximately 2.06 acres. Both properties are currently zoned Industrial General (IG) and have a General Corridor General Plan land use designation and were previously occupied by car dealerships. The smaller of the two properties is located west of Landmark Street and totals .5 acres with 5,817 square feet of existing building area. The larger property located east of Landmark Street totals 1.56 acres with 80,015 square feet of existing building area. The site topography is flat and contains one to two story structures with two at grade paved surface parking lots at the front of both sites adjacent to Washington Boulevard. The larger site contains a warehouse, service repair bay area, a showroom, office areas, and a three level above ground parking structure. Some of the buildings such as the parking structure, service repair bay building and a portion of the warehouse structure will not be demolished and will be adaptively reused as part of the proposed project. The smaller site contains a building which will be demolished and replaced with a new six level parking structure with the ground floor dedicated to retail uses. The area around the project site is characterized by light industrial/warehouse, commercial service and retail uses. Most prominent among the features characterizing the surrounding area is the Expo LRT and Culver City Expo station just north and east of the site. The project will be located 10 to 11 feet from the elevated train platform creating unique views within the project and from the train. To the west of the project is a one story brick commercial/warehouse ATTACHMENT 4 178 City of Culver City, California Planning Commission Agenda Item Report Page 3 of 16 building and directly north are Washington Boulevard and a warehouse/distribution building. To the south are Landmark Street and light industrial uses and Pak Century private school. Project Description The project is one of several new Transit Oriented Developments that are proposed for the area surrounding the new Culver City Expo Station. The proposed project known as “Platform” consists of six buildings, Buildings A through F (totaling approximately 227,136 square feet). There will be approximately 41,253 square feet of retail and restaurant uses and 38,120 square feet of office uses. There are two above ground parking structures; one is an existing structure consisting of three levels totaling approximately 39,940 square feet (including roof level area) and the other is a new structure consisting of retail/restaurant uses at the ground level and parking on the upper five levels totaling approximately 112,886 square feet (including roof level). The new six level parking structure, Building B is located on the smaller site and the existing three level parking structure (Building D) is located on the larger site. Both parking structures combined accommodate a total of 291 parking spaces. The project includes adaptive reuse of some existing buildings (Building C, D and F) in conjunction with construction of new buildings to create a community oriented shopping environment with office uses in some of the buildings (Buildings A, B and E) at the upper levels. Currently, the site consists of approximately 85,832 square feet of building area. The total net new building area will be approximately 141,304 square feet with the majority of this new square footage consisting of the new parking garage (Building B, 112,886 square feet) located on the smaller site. The six buildings are connected by a pedestrian network of open space between the buildings. This open space includes two “paseos” or pedestrian walks and a 7,000 square foot open air central courtyard. The courtyard serves as an interactive community space that connects the two paseos as well as to Washington Boulevard. The developer envisions the open air central courtyard paseos as venues for special events such as art exhibitions, outdoor evening movie showings, community festivals, philanthropic charity events, outdoor fashion shows, and family oriented special events. Pedestrian amenities such as canopies, benches and landscape elements will enhance the street frontage of Washington Boulevard and offer a variety of pedestrian amenities. The property currently is divided into three lots on the larger site and one lot on the smaller site. All of the lots are under common ownership. A covenant and ATTACHMENT 4 179 City of Culver City, California Planning Commission Agenda Item Report Page 4 of 16 agreement, as part of this project, will combine the lots into one parcel. The covenant and agreement will also tie all on-site parking at both sites to create common parking for the project. The project will have offsite improvements including new sidewalks, street furniture and street trees and bike lanes adjacent to the site as well as various operational and circulation improvements at the adjacent intersection of Washington Boulevard and Landmark Street. It also includes new crosswalks on Washington Boulevard and Landmark Street. These improvements must comport with a TOD District Streetscape Plan that will be prepared for the area. The owner’s expectation is to develop a place-making project. The project is designed as a high quality multi-use commercial development with ample plazas and setbacks to provide opportunities for outdoor dining and landscaping. Staff has worked with the project developer and the community to incorporate design and land use features that enhance the street and are fitting with adjacent areas. The office component is also key element of the project. The office tenants that the developer envisions include technology, fashion, and media companies. These types of companies are prevalent in the Hayden Tract and Downtown Culver City and it is the intent of developer to build upon that attraction in tenanting the project. The office uses will maximize the benefits of close proximity to the light rail station. The retail space will include design features that help ensure quality retail tenants with attractive storefronts and signage. The materials, colors and textures of the building evoke a contemporary look. The building finishes include stucco, wood siding, corten steel, brick veneer, metal and rock cladding, and store front glass. The buildings include setbacks at the ground level and stepbacks at the upper levels to create an attractive building form and provide visual interest. The project will also include public spaces and plazas with benches, planters, seating niches, trellis structures and green screens and an artist mural is proposed for the east building elevation of Building B and north elevation of Building D. Property line walls will be constructed on those portions of Buildings B and E that are situated at zero lot lines. Building D is an existing building and its property line wall will remain. On Building B there are two property line walls, one facing the west, and one facing south. As required by the Building Code, no window openings will be located where there are zero setbacks, however, architectural relief will be provided in the form of square and rectangular shaped recessed or niched areas. These recessed areas will be distributed over the wall surfaces and treated with Resysta siding finish (which is a durable, recycled material but has a natural wood appearance). The product is a sustainable material that will add color and visual interest to these zero setback areas of the project. Building ATTACHMENT 4 180 City of Culver City, California Planning Commission Agenda Item Report Page 5 of 16 E’s interior property line wall faces a large warehouse building and will be finished in stucco. An alternate design option is proposed for Buildings A and Building E as part of the requested Comprehensive Plan. In the interest of increasing the pedestrian flow and circulation through the project site, Building A was split into two separate buildings allowing pedestrians to enter the project site at multiple locations along Washington Boulevard. The two building sides are connected by sky-bridges to accommodate the building circulation while introducing more light into the newly created open air atrium space. The alternate design option breaks up the massing of Building A by providing a paseo from Washington Boulevard. The alternate design option maintains the same contemporary architectural treatments as described above. To counter balance the lost building area of approximately 3,500 square feet in Building A due to the paseo, the layout and floor area of Building E has been changed. The office space has been moved to the second floor with the restaurant space and terrace dining area now occupying the top floor, allowing for 360 degrees views above the adjacent Expo light rail bridge. The office floor area in Building E has increased by approximately 2,500 square feet and the restaurant/retail space has been increased by approximately 1,600 square feet for a total of approximately 4,100 square feet. This slight increase (600 square feet) in overall building area is due to additional required circulation for the 3rd floor restaurant space. The alternate design option for Building E maintains the same contemporary architectural treatments as described above. The alternate design option was conceived after the full application package was received. The developer included this alternate option based on feedback from potential tenants and a desire to provide a direct connection from Washington Boulevard to the paseo behind Building A and to create a more dynamic restaurant space on Building E by relocating it to the third floor. The alternate design option is preferred by the developer. ANALYSIS: In order to facilitate the proposed project, a Zoning Code Map Amendment and Comprehensive Plan are required pursuant to Zoning Code Section 17.240, Planned Development Zoning Districts and Section 17.560, Comprehensive Plans. The proposed Zoning Code Map Amendment includes re-zoning the project site from Industrial General (IG) to Planned Development (PD) (see Attachment No. 2). The proposed Comprehensive Plan includes the development standards and allowed land uses in the newly established PD ATTACHMENT 4 181 City of Culver City, California Planning Commission Agenda Item Report Page 6 of 16 zoning district. The intent of a Comprehensive Plan is to allow for flexibility in the application of the Zoning Code standards for larger scaled proposed developments. A Comprehensive Plan considers innovation in site planning in order to more effectively respond to site features, uses on adjoining properties, and other impacts that the Zoning Code may not be able to adequately address. The PD zoning district is the zoning designation created for a site that has been entitled with a Comprehensive Plan. Comprehensive Plan The project has been designed to conform to all applicable Zoning Code provisions for a Comprehensive Plan and all City development standards. The building mass and scale has been designed to be compatible with the surrounding adjacent uses and to provide a pedestrian orientation along Washington Boulevard. The buildings will cover roughly 75 percent of the site, with the remainder of the site developed with courtyard open space, landscaping or pedestrian circulation. The proposed and rehabilitated buildings are well articulated and aesthetically engaging by incorporation of varying building heights, setbacks and design elements. The project’s mechanical equipment and refuse containers have been designed to be concealed from the street, public places and neighboring properties. Height: The Planned Development district as well as the Commercial General zone allows a maximum 56’ foot height limit. The proposed buildings will range from one to six stories, all of which are consistent with the maximum height requirement of 56 feet for commercial general designated areas. Setback: The building frontage at ground level along Washington Boulevard will be setback at varying widths of 8.9’ at a minimum and 13’ at a maximum (with the exception of an existing building which is a zero setback) to accommodate pedestrian amenities such as landscaped planter areas, seating niches for tables and benches, and building canopies to provide for an enhanced pedestrian friendly street edge. Various building setback and stepback provisions of Comprehensive Plan result in buildings that are compatible in size and scale with the existing single and multi-story commercial buildings surrounding the project site. General Land Use Provisions: The permitted uses in the Comprehensive Plan shall be compatible with the General Corridor Land Use designation of the ATTACHMENT 4 182 City of Culver City, California Planning Commission Agenda Item Report Page 7 of 16 General Plan, which is intended to support desirable existing and future neighborhood and community serving uses that are compatible with adjacent residential neighborhoods and with the Exposition Light Rail Transit TOD district which encourages transit oriented uses. The uses in the Comprehensive Plan are intended to be similar in nature to the allowed and permitted uses of the Commercial General (CG) zone including but not limited to medium scale commercial, restaurant, office, and retail services. However, certain uses permitted under the CG zoning district such as auto related or auto repair facilities, warehousing or distributing facilities are not allowed in the Comprehensive Plan because they preclude pedestrian friendly or transit oriented development. The project lies along the southerly edge of Washington Boulevard, contributing in a major way to the character of the boulevard. The ground floor will contain retail, eating and drinking establishments and artisan businesses. The open areas of the project will include outdoor dining and an open air courtyard with community oriented uses such as live music, farmers markets and fashion events. Office uses will be located on the upper levels. The project is designed to be pedestrian oriented and the mixes of permitted uses are intended to draw patrons from the surrounding neighborhoods as well as from the adjacent Expo LRT station. • Open Space/Courtyard: A large attractive open courtyard area is designated for a portion of the property interior, providing a site amenity for retail, restaurant and office tenants and customers. The open courtyard space is on grade which allows on-grade planting, ground water recharge and landscaping with mature trees in addition to shrubs and ground cover. The Courtyard provides an opportunity for outdoor dining and a programmed space for occasional special events. • Special Events: Various types of special events and temporary events, outdoor or indoor, public or private will take place within the open courtyard area or the rooftop level of the two parking structure(s). Various types of special events including markets and fairs, performances and public events and private events may be allowed subject to the provisions of Zoning Code Chapter 17.520 “Temporary Use, Special Event, and Temporary Event Permits” and as outlined in the proposed Comprehensive Plan: • Outdoor Dining: Outdoor dining is a key contributor to the pedestrian experience. The areas identified for outdoor dining are shown on the Comprehensive Plan. ATTACHMENT 4 183 City of Culver City, California Planning Commission Agenda Item Report Page 8 of 16 Architectural Design: The proposed project has a contemporary industrial feel particularly along the Building A Washington Boulevard frontage that is clad in corrugated metal and includes exposed metal diagonal bracing that is intended to replicate the look of stacked ”box cars” to evoke the project name, Platform. Other buildings in the project contain a mix of materials including stucco, wood siding, metal cladding, glass store fronts, wood, metal and glass railings, corten steel and aluminum framing but overall reflect a contemporary project image. The colors are predominantly natural and neutral with bright color accents that will fit the neighborhood character. The buildings are well articulated with the use of stepbacks, overhangs and canopies; private balconies for office uses on the second and third floors; substantial use of planter areas and open space/courtyard areas which provide architectural articulation on of the sides of building. The project will enhance the visual quality of the site and will be a significant improvement for the immediate area. Site Plan: The project has been laid out as a “campus” of six buildings which reflects the adaptive reuse of the property and the geometry of the site. The campus feel is created by varied building height and form and the pedestrian network of paseos. The varied building form and setbacks helps avoid a monolithic project feel. A central court provides a formal project entry comprised of elevated planter, seat walls and planting with canopy shade trees, shrubs and ground covers and connects to the pedestrian paths that wind through the project. Some of the project restaurant space will front on the courtyard creating the opportunity for outdoor dining. The adaptive reuse allows the development to make use of existing buildings, but also results in some public space shading that will occur along the paseos located immediately to the north of Buildings C, D and E. The Central Courtyard is also proposed to be used intermittently for special events creating opportunities for public gatherings such as art or craft fairs or small farmer’s markets. The project layout therefore provides the benefit for maximizing site use for pedestrian serving purposes consistent with the goals for establishing a Transit Oriented District. Sustainability/Green Building Features: The project is comprised of adaptive reuse and new construction. The reuse of buildings coupled with green building retrofit and sustainable new construction will help make the project energy efficient, conservation friendly and reduce the project carbon footprint. The proposed project will incorporate building design standards to meet the Culver City Green Building Program, California Green Building Code and U.S. Green Building Council (USGBC’s) Leadership in Energy and Environmental Design (LEED) green building standards. Sustainable/green building elements include: ATTACHMENT 4 184 City of Culver City, California Planning Commission Agenda Item Report Page 9 of 16 Conservation: In an effort to promote the conservation, reduction, reuse, and recycling of renewable and non-renewable resources, the project is: • Using non-wood alternatives for exposed wood products such as Resysta (simulated wood manufactured from rice husks) in the wood details, benches soffits and Trespa (a Phoenelic resin panel made to look like wood) in the facades of some of the store fronts. • Using local manufactured products where possible. • Storm Water Filtration systems. • Highest rated building insulation. • Operable windows in all retail and office spaces. • Permeable exterior paving surfaces to reduce storm water run-off, wherever possible. Energy Efficiency: The following provides a list of energy efficient and sustainable specifications that have been incorporated into the project: • Photovoltaic electricity generation consistent with the City’s Photovoltaic Solar Ordinance. • Low flow /low consumption bathroom fixtures • Landscape design with drought tolerant planting to conform with AB 1881 low water usage. • Green-screen walls systems incorporated into the courtyard landscape design to minimize solar gain in buildings and along public spaces • Reduce energy consumption with LED lighting. • Dual low emissivity glazing. • Building façade shading elements (awnings, building projections, roof overhangs) to reduce solar heat gain. Operable windows to permit natural cooling. • High efficiency heating and air conditioning systems. Carbon Emission Reduction: The following provides a list of carbon emission reduction items that have been incorporated into the project: • Building reuse and building conservation. • Bicycle racks located throughout the site to support biking to the project. • Project location adjacent to the Expo Culver City LRT to permit easy and convenient access for project office commuters or customers. • Participation and support of a potential shuttle service that will connect the Hayden track, the Expo Station and Downtown Culver City. • Preferred parking for low emission vehicles and carpools vehicles. • Sourcing products from local manufacturers wherever possible. ATTACHMENT 4 185 City of Culver City, California Planning Commission Agenda Item Report Page 10 of 16 Landscaping. The Platform exterior has four distinctive landscape character zones; Washington Streetscape, The Central Courtyard, Greenhouse/Landmark (Building E/F), Paseos, and WashArts (Building B). Each having unique landscape characters summarized below. The Washington Streetscape will follow Culver City Streetscape Guidelines. Street trees and furnishings will be coordinated with the City’s Transit Oriented Development District Streetscape Plan that is being prepared for the area. The Central Courtyard will be a shaded seating area with planter seat wall and informal groupings of tables, chairs and benches. The landscape plan includes formal planting of canopy shade trees such as Olea Europea (Fruitless Olive) and Quercus Agrifolia (Coast Live Oak). The paseo between the Greenhouse Building E and Showroom Building F will include an Ivy trellis constructed from rebar and formed into arches projecting from the wall. The Ivy Arches will frame the space and views as the plan renderings indicate. The WashArts Building B has a plant palette with of varying colors (white, orange, red and magenta) of Bougainvillea on the stair towers to serve as a landscaped color accent. Offsite Park Area. The applicant is working with the City and the Los Angeles County Metropolitan Transit Authority (LACMTA) to use the Metro right of way area directly adjacent and east of the site as a small parkette. The parkette would be connected to the development through one of the paseos that may be extended beneath the Metro Expo LRT bridge. The parkette plans are not defined but may include some passive elements such as landscaped walks, seating areas, art pieces and potential outdoor vending as approved by the City. Parking and Access. Vehicle Parking for the project site is provided at a ratio of 1 stall per 250 square feet of retail and restaurant floor area consistent with the Zoning Code parking requirements for shopping centers and 1 stall per 350 square feet of office floor area consistent with the Zoning Code parking requirements for office uses. Outdoor dining areas up to 500 square feet per restaurant are covered under these parking requirements. Outdoor dining areas larger than 500 square feet per restaurant space including roof top dining at Building E are required to provide 1 stall per 250 square feet in excess of the initial 500 square feet, up to 3,750 square feet or 15 cars. The Zoning Code allows the first 250 square feet of outdoor dining to be allowed without requiring parking. The increase to the first 500 square feet is justified by the amount of parking that will be provided on-site and the nature of the expected population the project will serve. Many users of the outdoor dining area will generally include local office workers from the site and employees and residents from the adjacent Hayden Tract and TOD developments and will not likely generate additional parking demand. It is expected that many site users will be arriving by ATTACHMENT 4 186 City of Culver City, California Planning Commission Agenda Item Report Page 11 of 16 alternative modes of travel such as walking, bicycling, or by taking the bus or train to the site. A total of 291 parking spaces are provided on both sites in order to meet the Zoning Code required parking for the project. Driveways located along Landmark Street will provide access to the project’s parking structures. One driveway would be located on the west side of the street providing access to the new 219-space parking structure. Three driveways would be located on the east side of the street, two driveways providing access to the existing 72-space parking structure and the other driveway providing access to the loading/trash collection area. The existing driveways to the site along Washington Boulevard will be removed. Motorists entering and exiting the site’s driveways will have adequate maneuvering space and visibility. Additionally no stopping zones will be striped as necessary for improved driver visibility. Long term bicycle parking is being provided within fully enclosed bicycle lockers in the newly built parking structure on the corner of Landmark Street and Washington Boulevard (Building B). These lockers are coin/card operated and available for the general public. Additional long term bike parking is available within a gated keycard operated area inside the parking structure on the main site (Building D). To facilitate employee and office worker bike commuting, a keycard protected shower is provided in the existing parking structure (Building D). In addition, short term bike racks are provided along Washington Boulevard in the public right of way. Loading for the project is proposed on-site in two dedicated locations. The first loading area will be located on the larger parcel and will accommodate large trucks. The second loading area is located inside the new parking structure and will accommodate smaller, van size delivery trucks (e.g. UPS delivery trucks). Traffic and Circulation A traffic study prepared for the proposed project, dated July 11, 2011, and supplemented on March 5, 2012, by Raju Associates Inc. was reviewed and accepted by the City’s Traffic Engineer. Parking, access and circulation systems were assessed as part of the study. A review of the proposed site plan was also conducted. This review indicates that the project would adequately and that there would not be adverse impact from the proposed project. The traffic analysis evaluated thirty-four (34) intersections in the vicinity of the project site during both the AM and PM peak hours. Of the 34 intersections, 17 are located within the City of Culver City and 17 intersections within City of Los Angeles. ATTACHMENT 4 187 City of Culver City, California Planning Commission Agenda Item Report Page 12 of 16 In order to assess the potential impact of the proposed project on the local street system, and using the City’s significance criteria, the traffic study compared the volume to capacity (V/C) ratio, which is a numerical measure of traffic congestion, at each study location to determine the incremental difference in V/C ratios caused by the proposed project. The “Critical Movement Analysis- Planning” method of intersection capacity analysis was used to determine the intersection V/C ratio and corresponding level of service (LOS), which is a letter- grade measure of traffic congestion, at each of the signalized intersections. The study indicates that 24 of the 34 analyzed intersection locations are operating at acceptable levels of service (LOS) D or better during the morning peak hour. During the evening peak hour, 26 of the 34 analyzed intersections are operating at LOS D or better. The remaining intersections are operating at LOS E or F. Using the threshold criteria for determining significance of impacts of a project at a specific location, the traffic analysis concluded one (1) out the thirty four (34) analyzed intersection locations would be impacted by traffic generated by the proposed project unless mitigation is incorporated. As a result of the traffic generated by the proposed project, during the evening peak hour, the Washington Boulevard/ National Boulevard intersection would exceed the threshold for significance impact by .003 or .3%, which is an extremely small amount and would not be considered significant. The traffic study concluded that there would not be a significant impact at any of the remaining intersections studied. In order to address the project’s impact at the intersection of Washington Boulevard/National Boulevard, the project is required to contribute funds ($50,000) for either the study and implementation of a shuttle system that would operate within proposed project’s study area or the implementation of Adaptive Traffic Control Systems (ATCS) at the intersection of Washington Boulevard/National Boulevard. Funding of a study and implementation of a shuttle service would improve traffic flow by reducing the amount of vehicles in the immediate area because of the use of the shuttle. Similarly, implementation of ATCS will improve traffic flow and reduce delays in the affected intersection through the use signal synchronization. There will be off-site improvements as part of the proposed project. The proposed project will include various pedestrian and vehicular operational improvements at and near the adjacent signalized intersections of Washington Boulevard and Landmark Street. To improve access to the proposed project’s facilities which are located off of Landmark Street, the proposed project will ATTACHMENT 4 188 City of Culver City, California Planning Commission Agenda Item Report Page 13 of 16 require the design and construction of a westbound left-turn signal at the intersection of Washington Boulevard and Landmark Street including all associated costs for the modification of the traffic signal. Additionally, the curb at the southwest corner and southeast corner of Landmark Street and Washington Boulevard will be reconstructed to provide a larger radius and minimize the impact of the existing acute angle experienced by motorists eastbound on Washington Boulevard turning onto Landmark Street. The above changes will enhance ingress/egress for motorists on Landmark Street, particularly for larger trucks and emergency vehicle access. Offsite and Streetscape Improvements Pedestrian Setback: The project has been designed to include a “pedestrian setback” along the major street frontage at the intersection of Washington Boulevard and Landmark Avenue. This setback will allow ample area for outdoor dining, installation of street trees, planters, trellis structures, arbors and other pedestrian amenities. Pedestrian related improvements include widening the roadways to provide pedestrian friendly sidewalks. The project is required to install a 5’ wide sidewalk along both the project’s frontage along Landmark Street. The sidewalk along Washington Boulevard will be reconstructed to provide a 10’ wide sidewalk. Also at the Washington/Landmark signalized intersection, a new crosswalk across Washington Boulevard at the east side of the intersection will be installed (a crosswalk currently exists on the west side of the intersection). Transit Oriented Development District Streetscape Plan: The City is currently developing a streetscape plan for the TOD District (see Attachment No. 3, TOD Area Map). The project is required as condition of approval to comply with the streetscape program for the area to be prepared as part of the Transit Oriented District Streetscape Plan and funded on a pro rata basis by area developments. The plan will include new canopy street trees, planters and tree grates, new concrete sidewalks and new street furniture (benches, trash receptacles, and bicycle racks). Also, a new bus shelter will be provided at the bus stop in front of the project site. The existing palm trees will be replaced with new street trees. Exact tree location will be determined pursuant to the placement of traffic signal equipment and utilities and production of the TOD Streetscape Plan. The preliminary landscape plan identifies the London Plane tree (Platanus Acerfolia) as the street tree that best fits the area in terms of scale and shade producing characteristics. ATTACHMENT 4 189 City of Culver City, California Planning Commission Agenda Item Report Page 14 of 16 Infrastructure and Community Facilities District Based upon the proposed development in the project Comprehensive Plan, the site development will not require major upgrades to infrastructure such as water, sewer, or gas; however, some utility relocation as well as various offsite streetscape improvements will be required. The property owner/developer is responsible for all project related public improvements and services. A Community Facilities District (CFD) is one financial tool available to commercial property owners within the TOD District to help fund public improvements and services through private property assessment and bond finance. A CFD can ensure timely completion of all necessary public improvements. Consistent with the CFD provisions in the City’s Municipal Code (Section 15.12.35), if established, the CFD funding may be based upon a pro rata assessment for each commercial parcel within the District. The kinds of improvement that may be funded on a pro rata basis include: • New Infrastructure • Utility Relocations • Streetscape Improvements • On-going maintenance Community Meetings Pursuant to the City’s Community Outreach Guidelines, the applicant hosted three community meetings on November 30, 2010, May 5, 2011, and April 12, 2012. They hosted an additional community meeting on August 1, 2012. All of the community meetings were well attended with approximately 20 people per meeting. The feedback and input were generally positive and no written correspondence in opposition to the proposed project has been received. Attendee questions or comments were related to the project’s connection to the Metro Exposition Light Rail Transit line and station, types and size of uses proposed, parking provision, and access to and from the site. Attendees also asked about the project schedule and when the project would begin construction. ATTACHMENT 4 190 City of Culver City, California Planning Commission Agenda Item Report Page 15 of 16 CONCLUSION: Platform is the first of several Transit Oriented Developments proposed in connection with the Culver City Expo station. Staff has worked closely with the applicant on the Platform Comprehensive Plan in order to ensure that it is coordinated with future TOD projects and is fitting for the area. A Comprehensive Plan is intended to reflect innovation in site planning and design in order to more effectively respond to site features and minimize impacts upon surrounding properties. Toward that end, the proposed PD zoning and Comprehensive plan for Platform will help advance the goals good planning for the site and achieve the City’s goals for transit oriented development. Based on the analysis contained herein staff believes the findings for a Comprehensive Plan and Zoning Code Map Amendment can be made as outlined in proposed Resolution No. 2012-P011 (Attachment No. 4) and recommends project approval. ENVIRONMENTAL DETERMINATION: Pursuant to the California Environmental Quality Act (CEQA) guidelines a Mitigated Negative Declaration (MND) has been prepared; the project has been determined that with mitigation measures incorporated, it will have less than significant impacts on the community. ALTERNATIVE OPTIONS: The following alternative actions may be considered by the Planning Commission: 1. Approve the application with the recommended conditions of approval if the application is deemed to meet the required findings. 2. Approve the application with additional or different conditions of approval, if deemed necessary to meet the required findings and mitigate any new project impacts identified at the meeting. 3. Disapprove the application if it does not meet the required findings. ATTACHMENT 4 191 City of Culver City, California Planning Commission Agenda Item Report Page 16 of 16 ATTACHMENTS: 1. Area Map 2. Zone Change Map 3. Transit Oriented Development District Map 4. Draft Resolution No. 2012-P011 (ZCMA P-2012020, CP-P2012018, MND – P-2012019). 5. Initial Study/Mitigated Negative Declaration dated August 22, 2012. 6. Traffic Analysis prepared by Raju and Associates Inc, dated July 2011 and supplemented on March 2012. 7. Comprehensive Plans date stamped August 29, 2012. ATTACHMENT 4 192ATTACHMENT 5 193ATTACHMENT 5 194ATTACHMENT 5 195ATTACHMENT 5 196ATTACHMENT 5 197ATTACHMENT 5 198ATTACHMENT 5 199ATTACHMENT 5 200ATTACHMENT 5 201ATTACHMENT 5 202ATTACHMENT 5 203ATTACHMENT 5 204ATTACHMENT 5 205ATTACHMENT 5 206ATTACHMENT 5 207ATTACHMENT 5 208ATTACHMENT 5 209ATTACHMENT 5 210ATTACHMENT 5 211ATTACHMENT 5 212ATTACHMENT 5 213ATTACHMENT 5 214ATTACHMENT 5 215ATTACHMENT 5 216ATTACHMENT 5 217ATTACHMENT 5 218ATTACHMENT 5 219ATTACHMENT 5 220ATTACHMENT 5 221 MEMORANDUM TO: Mr. Barry Kurtz, P.E., City of Culver City CC: Mr. Joseph Miller, The Runyon Group FROM: Srinath Raju, P.E. Chris Munoz SUBJECT: The Platform Project Updated Project Description Comparison of Trip Generation Estimates DATE: March 5, 2012 REF: RA340-1 This memorandum documents details of the updated project description including the new square-footages for the various uses at 8810 Washington Boulevard in the City of Culver City, CA and compares the trip generation of the Proposed Project evaluated in the July 2011 Traffic Study Final Report for the Platform at Culver Station Project with those of the updated Proposed Project on the same site. BACKGROUND A detailed and comprehensive traffic study was prepared for the mixed-use project located at 8810 Washington Boulevard by Raju Associates, Inc. in July 2011 that the City of Culver City had reviewed and approved. Since then, some modifications to the proposed project description have occurred. This memorandum details these changes and provides an assessment of the potential effects on trip generation and consequently, the traffic impacts detailed in the Original Traffic Study. 505 E.Colorado Blvd. Suite 202 Pasadena, CA 91101 91101 Voice: Fax: (626) 792-2772 (626) 792-2700 |1010|ATTACHMENT 6 222The Original Traffic Study, dated July 2011, had the following project components – 1. Office equivalent to 28,708 square feet. 2. Retail equivalent to 36,819 square feet and Restaurant equivalent to 12,257 square feet for a total of 49,076 square feet of retail and restaurant use. 3. Total Project of size 77,784 square feet. 4. Total off-street Parking of 279 spaces. The Updated Project Description consists of the following component uses and elements – 1. Office equivalent to 38,120 square feet. 2. Retail equivalent to 31,059 square feet and Restaurant equivalent to 10,558 square feet for a total of 41,617 square feet of retail and restaurant use. 3. Total Project of size 79,737 square feet. 4. Total off-street Parking of 292 spaces. The updated project description calls for 9,412 square feet of additional office in lieu of 7,459 square feet of retail and restaurant use. The overall project size proposed is 1,953 square feet more than that evaluated in the Original Traffic Study. TRIP GENERATION COMPARISON The Original Traffic Study uses and associated trip generation estimates are provided in Table 7 of the Final Report and enclosed for convenience in Attachment A of this memorandum. The updated Project Description uses and corresponding associated trip generation estimates are provided in Table 7 (Updated). From Table 7 and Table 7 (Updated), the following observations can be made: 1. The Updated Proposed Project is estimated to generate a net additional 2,173 daily trips of which 101 trips (81 inbound and 20 outbound) would occur in the morning peak hour, and 187 trips (89 trips inbound and 98 trips outbound) would occur in the evening peak hour. |1010|ATTACHMENT 6 2232. The Proposed Project evaluated in the Original July 2011 Raju Associates’ Traffic Study was estimated to generate a net additional 2,357 daily trips of which 91 trips (71 inbound and 20 outbound) would occur in the morning peak hour, and 200 trips (100 inbound and 100 outbound) would occur in the evening peak hour. 3. A comparison of the two project scenarios indicates that the updated project description is estimated to result in 184 less daily trips, 10 additional morning peak hour trips and 13 less evening peak hour trips. TRAFFIC IMPACTS EVALUATION From the Original July 2011 Raju Traffic Study, it can be observed that there would be no residual significant traffic impacts at any of the 34 analyzed intersections in the study with the proposed project and mitigation measure (or alternate mitigation measure) discussed in the study. The traffic impact analyses table (Table 8) from the Original July 2011 Raju Traffic Study has been included in Attachment B, for evaluation purposes. From Table 8, the following observations can be made: 1. The Original Traffic Study’s Proposed Project would cause significant impact at the intersection of Washington Boulevard and National Boulevard during the evening peak hour, but with the proposed shuttle or advanced traffic signal synchronization alternative mitigation, there would be no residual significant impact at this location. 2. The updated project description is estimated to generate less trips in the PM peak hour (and daily conditions) than those evaluated in the study. Therefore, the conclusion of no residual significant impact with the updated proposed project and the same mitigation measure can be made. 3. During the morning peak hour, the updated proposed project would result in only 10 additional AM peak hour trips and an examination of the magnitude of traffic impacts at all the analysis locations reveals that, similar to the conclusions in the July 2011 Raju Traffic Study, there would be no significant impacts due to the updated proposed project during the AM peak hour, as well. 4. At the intersection of Washington Boulevard and National Boulevard, during the morning peak |1010|ATTACHMENT 6 224hour, with the 10 additional project-only trips, the increase in volume to capacity ratio (V/C ratio) would be an additional 0.002 for a total V/C increase of 0.019. This would not create a significant impact in the morning peak hour at this location. Further, with the proposed mitigation or alternative mitigation noted above, the V/C increase would be much less than significance levels as shown in Table 8 of the Original Traffic Study Report. Therefore, there would be no change to the conclusions of the Original Traffic Study Report. 5. In conclusion, given that the updated proposed project trip generation is very similar to or lower than the proposed project trip generation in the July 2011 Raju Traffic Study, the same conclusions relative to no residual significant impacts during both the peak hours at all the analyzed intersection locations would hold and no further analysis would be necessary. PARKING EVALUATION The updated Proposed Project consists of 38,120 square feet of office use and 41,617 square feet of retail and restaurant use. Based on the City of Culver City Municipal Zoning Code, the updated Proposed Project would require 276 (office of 38,120/350 =109 spaces; retail/restaurant of 41,617/250 = 167 spaces) off-street parking spaces. The updated project description calls for provision of 292 parking spaces. Therefore, there would be adequate parking for the updated Proposed Project. CONCLUSION The updated Proposed Project (along with the mitigation measure or the alternate mitigation measure described in the July 2011 Raju Traffic Study) would not result in any residual significant impacts at any of the analysis locations. The updated parking provisions would also be adequate for the updated Proposed Project uses. The traffic impact analyses and conclusions in the July 2011 Traffic Study for the Platform at Culver Station Project, prepared by Raju Associates would hold true for the updated project description evaluated in this memorandum. |1010|ATTACHMENT 6 225TABLE 7 (UPDATED) ESTIMATED UPDATED PROJECT TRIP GENERATION AM Peak Hour PM Peak Hour Size Daily IN OUT TOTAL IN OUT TOTAL Proposed Project (Updated) Retail 31,059 s.f. 1,334 19 12 31 57 59 116 Restaurant 10,558 s.f. 950 5 4 9 53 26 79 Office 38,120 s.f. 635 77 10 87 10 47 57 Project Trip Generation Total 2,919 101 26 127 120 132 252 Transit Trip Use (7.5%) - Office (48) (6) (1) (7) (1) (4) (5) *Internal Capture (10%) Trip Credit (287) (10) (2) (12) (12) (13) (25) **Pass-By (20%) Trip Reduction - Retail/Restaurant (411) (4) (3) (7) (18) (17) (35) Project Trip Generation Net Total 2,173 81 20 101 89 98 187 Trip Rates [1] General Office (ITE Land Use 710) Trips per 1,000 s.f. [2] 88% 12% [2] 17% 83% 1.49 Retail (ITE Land Use 820) Trips per 1,000 s.f. 42.94 61% 39% 1.00 49% 51% 3.73 Restaurant (ITE Land Use 931) Trips per 1,000 s.f. 89.95 50% 50% 0.81 67% 33% 7.49 * Internal capture credit taken after reduction of transit trips. ** Pass-by trip reduction taken after internal capture credits. [1] Trip Generation, An ITE Information Report , 8th Edition, ITE 2008 [2] Daily and AM peak hour trip generation for office was calculated using the following formulas: Daily: Ln(T) = 0.77 Ln(X) + 3.65 Where: AM Peak Hour: Ln(T) = 0.80 Ln(X) + 1.55 Ln = Natural logarithm T = Two-way volume of traffic (total trip-ends) X = Area in 1,000 square feet gross floor area|1010|ATTACHMENT 6 226 ATTACHMENT A |1010|ATTACHMENT 6 227TABLE 7 ESTIMATED PROJECT TRIP GENERATION AM Peak Hour PM Peak Hour Size Daily IN OUT TOTAL IN OUT TOTAL Proposed Project Retail 36,819 s.f. 1,581 23 14 37 67 70 137 Restaurant 12,257 s.f. 1,103 5 5 10 62 30 92 Office 28,708 s.f. 510 61 8 69 7 36 43 Project Trip Generation Total 3,194 89 27 116 136 136 272 Transit Trip Use (7.5%) - Office (38) (5) (1) (6) (1) (3) (4) *Internal Capture (10%) Trip Credit (316) (8) (3) (11) (14) (13) (27) **Pass-By (20%) Trip Reduction - Retail/Restaurant (483) (5) (3) (8) (21) (20) (41) Project Trip Generation Net Total 2,357 71 20 91 100 100 200 Trip Rates [1] General Office (ITE Land Use 710) Trips per 1,000 s.f. [2] 88% 12% [2] 17% 83% 1.49 Retail (ITE Land Use 820) Trips per 1,000 s.f. 42.94 61% 39% 1.00 49% 51% 3.73 Restaurant (ITE Land Use 931) Trips per 1,000 s.f. 89.95 50% 50% 0.81 67% 33% 7.49 * Internal capture credit taken after reduction of transit trips. ** Pass-by trip reduction taken after internal capture credits. [1] Trip Generation, An ITE Information Report, 8th Edition, ITE 2008 [2] Daily and AM peak hour trip generation for office was calculated using the following formulas: Daily: Ln(T) = 0.77 Ln(X) + 3.65 Where: AM Peak Hour: Ln(T) = 0.80 Ln(X) + 1.55 Ln = Natural logarithm T = Two-way volume of traffic (total trip-ends) X = Area in 1,000 square feet gross floor area|1010|ATTACHMENT 6 228 ATTACHMENT B |1010|ATTACHMENT 6 229TABLE 8 SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 1 Robertson Boulevard Cattaraugus Avenue [1] AM 0.948 E 0.949 E 0.001 No PM 0.933 E 0.936 E 0.003 No 2 Robertson Boulevard I-10 WB Off-Ramp/Kincardine Avenue [1] AM 0.797 C 0.801 D 0.004 No PM 0.809 D 0.815 D 0.006 No 3 Robertson Boulevard National Boulevard [1] AM 1.049 F 1.053 F 0.004 No PM 1.042 F 1.047 F 0.005 No 4 National Boulevard I-10 Eastbound On-Ramp [1] AM 0.415 A 0.415 A 0.000 No PM 0.454 A 0.457 A 0.003 No 5 Hughes Avenue Venice Boulevard [1] AM 0.841 D 0.843 D 0.002 No PM 0.767 C 0.771 C 0.004 No 6 Bagley Avenue Venice Boulevard [1] AM 0.789 C 0.791 C 0.002 No PM 0.763 C 0.767 C 0.004 No 7 Culver Boulevard Venice Boulevard [1] AM 0.849 D 0.852 D 0.003 No PM 0.957 E 0.961 E 0.004 No 8 Robertson Boulevard Venice Boulevard [1] AM 1.461 F 1.462 F 0.001 No PM 1.430 F 1.434 F 0.004 No 9 National Boulevard Venice Boulevard [1] AM 1.038 F 1.043 F 0.005 No PM 1.013 F 1.021 F 0.008 No 10 Helms Avenue Venice Boulevard [1] AM 0.527 A 0.528 A 0.001 No PM 0.515 A 0.517 A 0.002 No 11 Cattaraugus Avenue Venice Boulevard [1] AM 0.863 D 0.865 D 0.002 No PM 0.723 C 0.727 C 0.004 No|10 10|ATTACHMENT 6 230TABLE 8 (continued) SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 12 La Cienega Boulevard Venice Boulevard [1,2] AM 1.083 F 1.085 F 0.002 No PM 1.066 F 1.069 F 0.003 No 13 Hughes Avenue/Duquesne Avenue Washington Boulevard AM 0.641 B 0.641 B 0.000 No PM 0.653 B 0.654 B 0.001 No 14 Duquesne Avenue Culver Boulevard AM 0.760 C 0.762 C 0.002 No PM 0.886 D 0.891 D 0.005 No 15 Culver Boulevard Washington Boulevard/Irving Place AM 0.618 B 0.620 B 0.002 No PM 0.635 B 0.638 B 0.003 No 16 Main Street Culver Boulevard AM 0.581 A 0.582 A 0.001 No PM 0.613 B 0.613 B 0.000 No 17 Culver Boulevard Washington Boulevard AM 0.782 C 0.783 C 0.001 No PM 0.752 C 0.756 C 0.004 No 18 Robertson Boulevard/Higuera Street Washington Boulevard AM 0.975 E 0.990 E 0.015 No PM 0.816 D 0.847 D 0.031 No 19 Landmark Street Washington Boulevard AM 0.601 B 0.610 B 0.009 No PM 0.514 A 0.599 A 0.085 No 20 National Boulevard Washington Boulevard AM 0.946 E 0.963 E 0.017 No PM 0.925 E 0.947 E 0.022 Yes with Mitigation Measure [5] AM 0.913 E -0.033 No PM 0.897 D -0.028 No with Mitigation Measure - Alternative [5] AM 0.933 E -0.013 No PM 0.917 E -0.008 No 10 ATTACHMENT 6 231TABLE 8 (continued) SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 21 Wesley Avenue Washington Boulevard [3] AM 134.9 sec F 138.9 sec F 0.005 No PM 484.0 sec F 521.5 sec F 0.008 No AM 0.768 [6] 0.773 [6] - - PM 0.781 [6] 0.789 [6] - - 22 Helms Avenue Washington Boulevard AM 0.563 A 0.568 A 0.005 No PM 0.503 A 0.509 A 0.006 No 23 Cattaraugus Avenue Washington Boulevard [3] AM *** sec F *** sec F 0.007 No PM 709.6 sec F 778.5 sec F 0.016 No AM 1.030 [6] 1.037 [6] - - PM 0.898 [6] 0.914 [6] - - 24 La Cienega Boulevard Washington Boulevard AM 1.199 F 1.203 F 0.004 No PM 0.990 E 0.996 E 0.006 No 25 La Cienega Boulevard Fairfax Avenue [1] AM 1.060 F 1.060 F 0.000 No PM 0.898 D 0.898 D 0.000 No 26 Wesley Street National Boulevard AM 0.710 C 0.715 C 0.005 No PM 0.472 A 0.479 A 0.007 No 27 Hayden Avenue National Boulevard AM 0.640 B 0.643 B 0.003 No PM 0.738 C 0.747 C 0.009 No 28 Jefferson Boulevard National Boulevard [1] AM 1.002 F 1.009 F 0.007 No PM 0.752 C 0.757 C 0.005 No 29 La Cienega Boulevard Jefferson Boulevard [1,2] AM 1.278 F 1.280 F 0.002 No PM 1.205 F 1.210 F 0.005 No 30 Jefferson Boulevard Higuera Street/Rodeo Road [1] AM 0.755 C 0.758 C 0.003 No PM 0.781 C 0.790 C 0.009 No 11 ATTACHMENT 6 232TABLE 8 (continued) SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 31 La Cienega Boulevard Rodeo Road [1] AM 1.217 F 1.219 F 0.002 No PM 1.248 F 1.251 F 0.003 No 32 Braddock Drive Duquesne Avenue [4] AM 227.9 sec F 229.1 sec F 0.001 No PM 158.5 sec F 160.3 sec F 0.003 No AM 1.185 [6] 1.186 [6] - - PM 1.325 [6] 1.328 [6] - - 33 Lucerne Avenue Duquesne Avenue [4] AM 51.7 sec F 52.2 sec F 0.002 No PM 66.8 sec F 68.4 sec F 0.005 No AM 0.939 [6] 0.941 [6] - - PM 1.052 [6] 1.057 [6] - - 34 Jefferson Boulevard Duquesne Avenue AM 1.211 F 1.215 F 0.004 No PM 1.030 F 1.034 F 0.004 No *** Intersection delay cannot be calculated. [1] City of Los Angeles location. [2] Los Angeles County Congestion Management Program (CMP) monitoring location. [3] Unsignalized intersections - stop-controlled on minor approach(es). [4] Unsignalized intersections - stop-controlled on all approach. [6] V/C ratio was calculated, based on signalized LOS methodology, to determine project impacts. [5] The Project requires only a small increment of V/C improvement to alleviate the significance of its impact (0.003 or 0.3% V/C improvement) during the PM peak hour. No significant impact occurs during the AM peak hour and therefore, no V/C improvement is required. 12 ATTACHMENT 6 233 TRAFFIC STUDY FOR THE PLATFORM AT CULVER STATION PROJECT Submitted by : Prepared for: July 2011 THE RUNYON GROUP ATTACHMENT 6 234 TRAFFIC STUDY FOR THE PLATFORM AT CULVER STATION PROJECT Prepared for: THE RUNYON GROUP Prepared by: RAJU ASSOCIATES, INC. 505 E. Colorado Boulevard, Suite 202 Pasadena, California 91101 (626) 792-2700 Ref: RA 340 ATTACHMENT 6 235 TABLE OF CONTENTS EXECUTIVE SUMMARY I. INTRODUCTION ............................................................................................................. 4 PROJECT DESCRIPTION ................................................................................. 4 STUDY SCOPE ................................................................................................ 6 ORGANIZATION OF REPORT ......................................................................... 8 II. EXISTING CONDITIONS .............................................................................................. 9 STUDY AREA ..................................................................................................... 9 EXISTING STREET SYSTEM .......................................................................... 9 EXISTING TRAFFIC VOLUMES AND LEVELS OF SERVICE ......................... 13 EXISTING TRANSIT LINES ............................................................................... 21 III. FUTURE YEAR 2014 TRAFFIC PROJECTIONS ........................................................ 26 CUMULATIVE (2014) BASE TRAFFIC PROJECTIONS ................................... 26 PROJECT TRAFFIC VOLUMES ...................................................................... 37 CUMULATIVE (2014) PLUS PROJECT TRAFFIC VOLUMES ......................... 39 IV. FUTURE YEAR 2014 TRAFFIC CONDITIONS & IMPACT ANALYSIS ...................... 45 SIGNIFICANT TRAFFIC IMPACT CRITERIA .................................................. 45 FUTURE BASE ROADWAY NETWORK IMPROVEMENTS .......................... 46 CUMULATIVE (2014) BASE TRAFFIC CONDITIONS .................................... 49 CUMULATIVE (2014) PLUS PROJECT TRAFFIC CONDITIONS .................. 54 PROJECT IMPACTS ........................................................................................ 55 RECOMMENDED MITIGATION MEASURE ..................................................... 55 V. STREET SEGMENT AND PARKING/ACCESS ANALYSIS ........................................ 60 RESIDENTIAL STREET SEGMENT TRAFFIC IMPACT ANALYSIS .............. 60 PARKING EVALUATION .................................................................................. 64 ACCESS AND CIRCULATION ........................................................................... 64 VI. REGIONAL CONGESTION MANAGEMENT PROGRAM ANALYSIS ........................ 67 CMP TRAFFIC IMPACT ANALYSIS ................................................................ 67 VII. SUMMARY OF CONCLUSIONS .................................................................................. 69 APPENDICES ATTACHMENT 6 236 LIST OF FIGURES NO. 1 LOCATION OF PROJECT AND ANALYZED INTERSECTIONS ................................ 5 2A EXISTING (2011) AM PEAK HOUR TRAFFIC VOLUMES .......................................... 14 2B EXISTING (2011) PM PEAK HOUR TRAFFIC VOLUMES .......................................... 15 3 EXISTING TRANSIT LINES ........................................................................................... 25 4 LOCATION OF RELATED PROJECTS ......................................................................... 30 5A RELATED PROJECTS ONLY AM PEAK HOUR TRAFFIC VOLUMES ...................... 33 5B RELATED PROJECTS ONLY PM PEAK HOUR TRAFFIC VOLUMES ...................... 34 6A CUMULATIVE (2014) BASE AM PEAK HOUR TRAFFIC VOLUMES ........................ 35 6B CUMULATIVE (2014) BASE PM PEAK HOUR TRAFFIC VOLUMES ........................ 36 7 PROJECT TRIP DISTRIBUTION ................................................................................ 40 8A PROJECT ONLY AM PEAK HOUR TRAFFIC VOLUMES .......................................... 41 8B PROJECT ONLY PM PEAK HOUR TRAFFIC VOLUMES .......................................... 42 9A CUMULATIVE (2014) PLUS AM PROJECT PEAK HOUR TRAFFIC VOLUMES ....... 43 9B CUMULATIVE (2014) PLUS PM PROJECT PEAK HOUR TRAFFIC VOLUMES ....... 44 10 CULVER CITY CIRCULATOR SERVICE-PRELIMINARY ROUTE ............................... 56 11 PROPOSED PROJECT SITE PLAN ............................................................................ 65 LIST OF TABLES NO. 1 LIST OF STUDY INTERSECTIONS ............................................................................... 7 2 LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS .............. 17 3 LEVEL OF SERVICE DEFINITIONS FOR STOP-CONTROLLED INTERSECTIONS . 18 4 SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS-EXISTING (2011) CONDITIONS ................................................................................................................. 20 5 LIST OF RELATED PROJECTS .................................................................................. 28 6 ESTIMATED WEEKDAY TRIP GENERATION OF RELATED PROJECTS .............. 31 7 ESTIMATED PROJECT TRIP GENERATION ............................................................ 38 8 SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS – FUTURE CONDITIONS ................................................................................................................. 50 9 RESIDENTIAL STREET TRAFFIC ANALYSIS ............................................................ 62 ATTACHMENT 6 237 APPENDICES A MEMORANDUM OF UNDERSTANDING B INTERSECTION LANE CONFIGURATIONS C TRAFFIC COUNTS D CAPACITY CALCULATION WORKSHEETS – EXISTING (2011) CONDITIONS E RELATED PROJECTS TRIP GENERATION RATES / CAPACITY CALCULATION WORKSHEETS – CUMULATIVE (2014) BASE CONDITIONS F CAPACITY CALCULATION WORKSHEETS – CUMULATIVE (2014) PLUS PROJECT CONDITIONS G CAPACITY CALCULATION WORKSHEETS – CUMULATIVE (2014) PLUS PROJECT WITH MITIGATION MEASURES ATTACHMENT 6 238 EXECUTIVE SUMMARY A detailed traffic study was performed by Raju Associates, Inc. to assess the traffic impacts of the proposed Platform at Culver Station Mixed-Use Project within the City of Culver City, California. The Project is located at 8810-40-50 Washington Boulevard and 3920 Landmark Street. The Project site occupies the southwest and southeast corners of the Landmark Street/Washington Boulevard intersection. The Proposed Project involves the construction of six buildings (two of the six buildings are parking structures) varying from one-story to four- stories. Only one building, a multi-level parking structure with ground floor retail, would be located on the southwest corner of the Landmark Street/Washington Boulevard intersection. The remaining five buildings would be located on the southeast corner of this intersection. As proposed, the Project would consist of 28,708 square feet of office use, 36,819 square feet of retail use, and 12,257 square feet of restaurant use. The Project would provide a 202-space multi-level parking structure (with ground floor retail) and a 77-space parking structure for an overall total supply of 279 parking spaces. Currently, the existing site includes a vacant car dealership. Driveways located along Landmark Street would provide access to the Project’s parking structures. One driveway would be located on the west side of the street providing access to the 202-space parking structure. Three driveways would be located on the east side of the street; two driveways providing access to the 77-space parking structure and the other driveway providing access to the loading/trash collection area. The existing driveways along Washington Boulevard to the site would be removed. Current and future traffic analyses at 34 intersections within the Cities of Culver City and Los Angeles were conducted in this study. At these locations, traffic operations were studied prior to and after implementation of the Proposed Project; deficiencies and impacts, if any, identified; improvements and mitigation measures, if required, developed; their effectiveness determined and residual traffic impacts, if any, ascertained as part of this study. Access and circulation at the proposed driveways to the parking area for the Project were also evaluated. The following executive summary highlighting the key findings of this study is presented in the following page. |1010|ATTACHMENT 6 239 ? Thirty-four intersections were analyzed within the study area for this project. These locations are within the study area bounded by Cattaraugus Avenue on the north, Jefferson Boulevard/Rodeo Road on the south, Hughes Avenue/Duquesne Avenue on the west and La Cienega Boulevard on the east. Of the 34 intersections, 17 intersections are located within the City of Culver City and 17 intersections within the City of Los Angeles. ? Currently, 24 of the 34 analyzed intersection locations are operating at acceptable levels of service (LOS) D or better during the morning peak hour. During the evening peak hour, 26 of the 34 analyzed intersections are operating at LOS D or better. The remaining intersections are operating at LOS E or F. ? In the Cumulative (Year 2014) Base conditions, i.e., future conditions without the implementation of the Proposed Project, 17 of the 34 analyzed intersection locations are projected to continue to operate at LOS D or better during the morning peak hour. During the evening peak hour, 19 of the 34 analyzed intersections are projected to operate at LOS D or better. The remaining intersections are projected to operate at LOS E or F. ? The Proposed Project would consist of 28,708 square feet of office use, 36,819 square feet of retail use, and 12,257 square feet of restaurant use. The Project is estimated to generate a net total of approximately 91 trips during the morning peak hour and 200 trips during the evening peak hour. ? In the Cumulative (Year 2014) plus Project conditions, both the AM and PM peak hour operating conditions would be similar to those projected for the Cumulative (2014) Base conditions. ? The Cumulative (Year 2014) plus Project conditions indicate that the Proposed Project would cause a significant traffic impact at the intersection of National Boulevard and Washington Boulevard during the evening peak hour. The Project’s impact exceeds the threshold for significant impact by an incremental volume-to-capacity ratio of 0.003 or 0.3%. No significant impact would occur at any of the other analyzed intersections. ? In order to address the Project’s impact at the intersection of National Boulevard/Washington Boulevard, the following mitigation measure is recommended: The Project shall contribute its fair share towards implementation of a shuttle system connecting the residential and commercial areas in Downtown Culver City and Hayden Tract areas to and from the Venice/Robertson Light Rail Train (LRT) Station on the Exposition Line. This shuttle system will include shuttle buses with stops along Washington Boulevard. The schedules for these shuttles should be developed such that coordinated transfers to and from the rail station at Venice/Robertson are achieved. These shuttles would operate at enhanced frequencies during the peak commuter time periods and provide fast, convenient, and efficient connections to the Metro Exposition LRT Line. |1010|ATTACHMENT 6 240 In event that the proposed shuttle program has not progressed sufficiently to warrant study funding, the following alternative mitigation measure shall be implemented: The Project shall contribute its fair share towards the design and implementation of ATCS (Adaptive Traffic Control System) at the intersection of National Boulevard/Washington Boulevard. This includes provision of ATCS-associated signal equipment, additional loop detectors, communications set-up and the associated control PC hardware/software, if required. Additionally, to improve access to the Proposed Project’s parking facilities along Landmark Street, the applicant of the Proposed Project shall be required to design, and construct the westbound left-turn signal at the intersection of Washington Boulevard and Landmark Street and be responsible for all costs associated with the modification of the traffic signal. ? Parking, access and circulation systems were assessed as part of this study. A review of the proposed site plan was also conducted. This review indicates that they would all function adequately and that there would be no adverse impact from the Proposed Project. |1010|ATTACHMENT 6 241 I. INTRODUCTION This report documents the assumptions, methodologies and findings of a study conducted by Raju Associates, Inc., to evaluate the potential traffic impacts of the proposed Platform at Culver Station Mixed-Use Project located at 8810-40-50 Washington Boulevard and 3920 Landmark Street within the City of Culver City, California. PROJECT DESCRIPTION The Proposed Project is located on the south side of Washington Boulevard between Robertson Boulevard-Higuera Street and National Boulevard. The Project site occupies the southwest and southeast corners of the Landmark Street/Washington Boulevard intersection. Figure 1 illustrates the location of the Proposed Project in relation to the surrounding street system. The Proposed Project involves the construction of six buildings (two of the six buildings are parking structures) varying from one-story to four-stories. Only one building, a multi-level parking structure with ground floor retail, would be located on the southwest corner of the Landmark Street/Washington Boulevard intersection. The remaining five buildings would be located on the southeast corner of this intersection. As proposed, the Project would consist of 28,708 square feet of office use, 36,819 square feet of retail use, and 12,257 square feet of restaurant use. The Project would provide a 202-space multi-level parking structure (with ground floor retail) and a 77-space parking structure for an overall total supply of 279 parking spaces. Currently, the existing site includes a vacant car dealership. Driveways located along Landmark Street would provide access to the Project’s parking structures. One driveway would be located on the west side of the street providing access to the 202-space parking structure. Three driveways would be located on the east side of the street; |1010|ATTACHMENT 6 2425 ATTACHMENT 6 243 two driveways providing access to the 77-space parking structure and the other driveway providing access to the loading/trash collection area. The existing driveways along Washington Boulevard to the site would be removed. STUDY SCOPE The scope of work for this study was developed in conjunction with the Cities of Culver City and Los Angeles staff. The base assumptions, technical methodologies and geographic coverage of the study were all identified as part of the study approach. The study is directed at the analysis of potential traffic impacts on the street system produced by the Proposed Project per the City of Culver City traffic impact significance criteria. For locations within the City of Los Angeles, the City of Los Angeles traffic impact significance criteria have been used. The scenarios identified on the following page have been evaluated in this study. • Existing (2011) Conditions - The analysis of existing traffic conditions is intended to provide a basis for the remainder of the study. The existing conditions analysis includes an assessment of streets, traffic volumes, and operating conditions. • Cumulative Base (2014) Conditions - Future traffic conditions without the proposed project has been developed for the year 2014. The objective of this analysis is to project future traffic growth and operating conditions, which could be expected to result from regional growth and related projects in the vicinity of the study area by the year 2014. • Cumulative plus Project (2014) Conditions – The traffic expected to be generated by the proposed project is estimated and added to the Cumulative Base (2014) traffic forecasts. The impacts of the proposed project on future traffic operating conditions are then identified. As part of this traffic study, a total of 34 intersections within two jurisdictions have been analyzed. A listing of these intersections including jurisdiction, control type, and signal control system is presented in Table 1 and their locations are illustrated in Figure 1. Thirty of the 34 analyzed intersections are signalized, while four intersections are stop-controlled. Of the 34 study locations, 17 intersections are in the City of Culver City, 16 intersections are in the City of Los Angeles, and one intersection is within the Cities of Culver City and Los Angeles. These study locations were coordinated with the affected jurisdictions as part of the scoping for the study and were analyzed for the scenarios described above. |1010|ATTACHMENT 6 244TABLE 1 LIST OF STUDY INTERSECTIONS Intersection Signal System # Northbound/Southbound Eastbound/Westbound Jurisdiction Signalized? Control 1. Robertson Boulevard Cattaraugus Avenue City of Los Angeles Yes ATSAC/ATCS 2. Robertson Boulevard I-10 WB Off-Ramp/Kincardine Avenue City of Los Angeles Yes ATSAC/ATCS 3. Robertson Boulevard National Boulevard City of Los Angeles Yes ATSAC/ATCS 4. National Boulevard I-10 Eastbound On-Ramp City of Los Angeles Yes ATSAC/ATCS 5. Hughes Avenue Venice Boulevard City of Los Angeles Yes ATSAC 6. Bagley Avenue Venice Boulevard City of Los Angeles Yes ATSAC 7. Culver Boulevard Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 8. Robertson Boulevard Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 9. National Boulevard Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 10. Helms Avenue Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 11. Cattaraugus Avenue Venice Boulevard City of Los Angeles Yes ATSAC 12. La Cienega Boulevard Venice Boulevard [1] City of Los Angeles Yes ATSAC/ATCS 13. Hughes Avenue/Duquesne Avenue Washington Boulevard Culver City Yes ATSAC 14. Duquesne Avenue Culver Boulevard Culver City Yes ATSAC 15. Culver Boulevard Washington Boulevard/Irving Place Culver City Yes ATSAC 16. Main Street Culver Boulevard Culver City Yes ATSAC 17. Culver Boulevard Washington Boulevard Culver City Yes ATSAC 18. Robertson Boulevard/Higuera Street Washington Boulevard Culver City Yes ATSAC 19. Landmark Street Washington Boulevard Culver City Yes ATSAC 20. National Boulevard Washington Boulevard Culver City Yes ATSAC 21. Wesley Avenue Washington Boulevard Culver City No - 22. Helms Avenue Washington Boulevard Culver City Yes ATSAC 23. Cattaraugus Avenue Washington Boulevard Culver City No - 24. La Cienega Boulevard Washington Boulevard Culver City Yes ATSAC 25. La Cienega Boulevard Fairfax Avenue [1] City of Los Angeles/Culver City Yes ATSAC/ATCS 26. Wesley Street National Boulevard Culver City Yes ATSAC 27. Hayden Avenue National Boulevard Culver City Yes ATSAC 28. Jefferson Boulevard National Boulevard City of Los Angeles Yes ATSAC/ATCS 29. La Cienega Boulevard Jefferson Boulevard [1] City of Los Angeles Yes ATSAC/ATCS 30. Jefferson Boulevard Higuera Street/Rodeo Road City of Los Angeles Yes ATSAC/ATCS 31. La Cienega Boulevard Rodeo Road City of Los Angeles Yes ATSAC/ATCS 32. Braddock Drive Duquesne Avenue Culver City No - 33. Lucerne Avenue Duquesne Avenue Culver City No - 34. Jefferson Boulevard Duquesne Avenue Culver City Yes ATSAC [1] Los Angeles County Congestion Management Program monitoring location.|1010|ATTACHMENT 6 245 A detailed Memorandum of Understanding (MOU) was prepared in coordination with the City of Culver City staff. The MOU includes among other details, a description of the Proposed Project, its trip generation and distribution characteristics. A copy of the MOU is attached in Appendix A of this report. ORGANIZATION OF REPORT An executive summary presenting key details of the traffic study is provided at the beginning of this report. The rest of the report is divided into seven chapters. Chapter I presents an introduction and provides details of the various elements of the study. Chapter II describes the existing circulation system, traffic volumes, and traffic conditions within the study area. The methodology to obtain Future Year 2014 traffic volumes with and without the Proposed Project are described and applied in Chapter III. Chapter IV presents assessment of traffic conditions with and without the project and the potential traffic impacts due to the Proposed Project. Residential street segment analysis, parking, and access/circulation evaluations are presented in Chapter V. The results of the analysis of the Proposed Project’s impacts on the Congestion Management Program (CMP) regional transportation system are provided in Chapter VI. A summary of the analysis and study conclusions are included in Chapter VII. Appendices to this report include details of the technical analysis. |1010|ATTACHMENT 6 246 II. EXISTING CONDITIONS A comprehensive data collection effort was undertaken to develop a detailed description of existing conditions within the study area. The assessment of conditions relevant to this study includes an inventory of the street system, traffic volumes on these facilities, and operating condi- tions at key intersections. A detailed description of these elements is presented in this chapter. STUDY AREA The Project site is located on south side of Washington Boulevard between Robertson Boulevard- Higuera Street and National Boulevard. The Project site occupies the southwest and southeast corners of the Landmark Street/Washington Boulevard intersection. The San Diego (I-405) Freeway is located approximately two miles west of the Project site and the Santa Monica (I-10) Freeway is located less than a half mile north of the Project site. The study area is bounded by Cattaraugus Avenue on the north, Jefferson Boulevard/Rodeo Road on the south, Hughes Avenue/Duquesne Avenue on the west and La Cienega Boulevard on the east. EXISTING STREET SYSTEM The City of Culver City uses the following street classification designations: primary arterials, secondary arterials, and neighborhood feeder streets. The City of Los Angeles uses the following designations: major highways, secondary highways, collector streets, and local streets. The existing street system within the study area consists of a regional highway system including primary arterials/major highways east of the San Diego (I-405) Freeway and south of the Santa Monica (I-10) Freeway, and a sub-regional street system including secondary arterials/highways, and neighborhood feeder streets/collectors and local streets. A description of the regional and local access and circulation offered by the various roadways follows. |10 10|ATTACHMENT 6 247 The San Diego (I-405) and Santa Monica (I-10) Freeways provide the primary regional access to the study area. The key arterials/highways serving the site are Venice Boulevard, National Boulevard, Washington Boulevard, Culver Boulevard, Duquesne Avenue, Robertson Boulevard, Higuera Street, Hayden Avenue, Fairfax Avenue, Rodeo Road, Jefferson Boulevard, and La Cienega Boulevard. The remaining neighborhood streets (collector and local streets) offer local circulation possibilities. Brief descriptions of these facilities serving the study area are included in the following section. • Santa Monica (I-10) Freeway – The I-10 Freeway is an east-west freeway that transverses the Southern California region from its western terminus at Pacific Coast Highway in the City of Santa Monica into San Bernardino County and points east. Within the vicinity of the study area, this freeway generally provides four lanes in the westbound direction and four lanes in the eastbound direction. There are interchanges at Robertson Boulevard, National Boulevard, La Cienega Boulevard/Venice Boulevard and Washington Boulevard/Fairfax Avenue in the vicinity of the study area. This freeway provides access to the regional interstate system. • San Diego (I-405) Freeway – The I-405 Freeway is a north-south freeway that transverses the Southern California region from its northern terminus at the I-5 Freeway in Sylmar to its southern terminus at the I-5 Freeway in Irvine. Within the vicinity of the study area, this freeway provides five lanes in the northbound direction and six lanes in the southbound direction (including one HOV lane north of SR-90). There are interchanges at Culver Boulevard and Venice Boulevard/Washington Boulevard in the vicinity of the study area. This freeway provides access to the regional interstate system. • Venice Boulevard – Venice Boulevard is classified as a primary arterial/major highway, within the study area, and traverses in an east-west direction across several jurisdictions. Venice Boulevard generally offers six travel lanes, three lanes in each direction, with left- turn lanes at key intersections and a large raised median island. On-street parking is allowed on both sides of the street throughout the study area. Venice Boulevard provides access to the I-10 (Santa Monica) Freeway. • Washington Boulevard – Washington Boulevard is classified as a primary arterial roadway within the City of Culver City and a major highway within the City of Los Angeles and defines the northern frontage of the Project site. Washington Boulevard traverses in an east-west direction across several jurisdictions and generally offers four travel lanes, two lanes per direction, with a central left-turn lane or median. On-street parking is generally allowed along this roadway in the vicinity of the study area. • Culver Boulevard – Culver Boulevard is a primary arterial within the City of Culver City and a major highway within the City of Los Angeles and traverses diagonally in an east-west direction from Playa del Rey to its terminus at Venice Boulevard. Within the study area, this roadway offers four travel lanes, two lanes per direction, with a raised median and turn 10 ATTACHMENT 6 248 lanes at major or key intersections. On-street parking is allowed along this roadway throughout the study area, except at major intersections where turn lanes are provided. Culver Boulevard currently provides access to the I-405 (San Diego) Freeway to and from the north. • Jefferson Boulevard – Jefferson Boulevard is a primary arterial/major highway west of La Cienega Boulevard and traverses in an east-west direction. East of La Cienega Boulevard, Jefferson Boulevard is classified as a secondary highway. Within the study area, this roadway generally provides four travel lanes, two lanes in each direction with a central left- turn lane. On-street parking is generally allowed along this roadway. • La Cienega Boulevard – La Cienega Boulevard is classified as a primary arterial/major highway and traverses in a north-south direction across several jurisdictions. This roadway offers six travel lanes, three lanes per direction, with a central left-turn median. There is no stopping at any time along the roadway within the study area. This roadway provides access to the I-10 (Santa Monica) Freeway, as well as, the I-405 (San Diego) Freeway to and from the south. • Fairfax Avenue – Fairfax Avenue is a primary arterial/major highway that traverses in a north-south direction and offers four travel lanes, two lanes per direction, with left-turn lanes at key intersections. On-street parking is generally prohibited along this roadway within the study area. This roadway provides access to the I-10 (Santa Monica) Freeway. • Rodeo Road – Rodeo Road is classified as a major highway and runs in an east-west direction across the City of Los Angeles. Within the study area, this roadway generally provides six travel lanes during peak commute hours, three lanes in each direction, with a central left-turn median. Restricted on-street parking is generally allowed along this roadway. • Robertson Boulevard – Within the City of Los Angeles, Robertson Boulevard is classified as a secondary highway. Within Culver City, south of Venice Boulevard, Robertson Boulevard is classified as a primary arterial. This roadway runs in a north-south direction and generally provides four travels lanes, two lanes in each direction. On-street parking is allowed on both sides of the streets within the study area. Some segments of Robertson Boulevard have parking prohibitions and/or restrictions on one or both sides of the street. Robertson Boulevard provides access to the I-10 (Santa Monica) Freeway. • National Boulevard – National Boulevard is a secondary arterial/highway that runs in an east-west direction. It generally offers two lanes in the each direction and provides connection to the I-10 (Santa Monica) Freeway north of the Project site. On-street parking is available along many stretches of this roadway, generally, except at major intersections where turn lanes are provided. • Duquesne Avenue – Duquesne Avenue is a secondary arterial roadway that traverses in a north-south direction. Within the study area, this roadway offers two travel lanes, one lane per direction. On-street parking is generally allowed on both sides of the street. 11 ATTACHMENT 6 249 • Hayden Avenue – Hayden Avenue is a secondary arterial that traverses in a north-south direction. This roadway offers two travel lanes, one lane in each direction. Between National Boulevard and Higuera Street, on-street parking is generally prohibited or restricted. • Higuera Street – Higuera Street is classified as a secondary arterial between Hayden Avenue and Jefferson Boulevard and provides four travel lanes, two lanes in each direction. Between Washington Boulevard and Hayden Avenue, Higuera Street is classified as a neighborhood feeder street and provides two travel lanes, one lane per direction. On-street parking is generally allowed along many stretches of this roadway. At the intersection of Hayden Avenue-Hayden Place/Higuera Street, a raised median barrier has been placed to prevent eastbound and westbound through traffic movements. All traffic in either direction along Higuera Street must turn onto Hayden Avenue or Hayden Place. • Hughes Avenue – Hughes Avenue is classified as a collector street and traverses in a north-south direction. Within the study area, this roadway provides two travel lanes, with one lane in each direction. On-street parking is generally allowed along this roadway throughout the study area. Between Venice Boulevard and Washington Boulevard, on- street parking is prohibited. • Wesley Street – Wesley Street is a discontinuous local roadway that runs in a north–south direction. One segment of Wesley Street extends south from Washington Boulevard, terminating in a cul-de-sac. The other segment of Wesley Street connects National Boulevard to Higuera Street. This roadway provides two travel lanes, one lane per direction. On-street parking is generally allowed along this roadway within the study area. • Irving Place – Irving Place is a local roadway that traverses in a north-south direction. North of ‘A’ Street, the roadway provides one travel lane per direction with metered parking on both sides of the street. South of ‘A’ Street to its terminus at Lucerne Avenue, the roadway provides one-way northbound circulation. Parking is generally allowed on both sides of the street along this segment. • Braddock Drive – Braddock Avenue is a neighborhood feeder street that runs in a northwest to southeast direction. It provides two travel lanes, one lane per direction. On- street parking is generally allowed on the south side of the street within the study area. • Landmark Street – Landmark Street is a local roadway that traverses in a north-south direction and provides direct access to the Project site. This roadway offers two travel lanes, one lane in each direction, and it is undivided. On-street parking is allowed along this roadway. • Cattaraugus Avenue – Cattaraugus Avenue is classified as a local roadway within the City of Culver City and is classified as a collector street within the City of Los Angeles. This roadway traverses in a north-south direction and generally offers two travel lanes, with one lane per direction. On-street parking is generally allowed along this roadway. 12 ATTACHMENT 6 250 • Lucerne Avenue - Lucerne Avenue is a neighborhood feeder street that runs in a northwest to southeast direction. It provides two travel lanes, one lane per direction. On- street parking is generally allowed on the south side of the street within the study area. The existing lane configurations of the analyzed intersections are included in Appendix B. EXISTING TRAFFIC VOLUMES AND LEVELS OF SERVICE The following sections present the existing intersection peak hour traffic volumes, a description of the methodology utilized to analyze the intersection operating conditions, and the resulting level of service conditions at each of the study intersections. Existing Traffic Volumes Weekday morning (7:00 to 9:00 AM) and evening (4:00 to 6:00 PM) peak hour traffic counts were compiled from data collected at the 34 analyzed intersections between September 2008 and March 2011. Due to the Metro Exposition Light Rail Project construction occurring at and affecting the lane geometry at many of analyzed intersections consequently altering traffic patterns within the study area, traffic counts collected prior to the construction were utilized in this analysis. All traffic counts collected prior to 2011 were factored upward 1% per year (compounded annually) to reflect existing 2011 conditions. These traffic volumes reflect typical weekday operations during current year conditions. The traffic volumes in Figure 2A and 2B represent, for the purposes of this analysis, the Existing (2011) AM and PM peak hour conditions, respectively. The raw data showing the intersection traffic counts are attached in Appendix C. Level of Service Methodology Level of Service (LOS) is a qualitative measure used to describe the condition of traffic flow, ranging from excellent conditions at LOS A to overloaded conditions at LOS F. LOS D is typically 13 ATTACHMENT 6 25114 ATTACHMENT 6 25215 ATTACHMENT 6 253 recognized as the minimum acceptable level of service in urban areas. The Level of Service definitions for signalized and unsignalized intersections is provided in Table 2 and Table 3, respectively. Thirty of the 34 analyzed intersections are controlled by traffic signals. Two intersections, Wesley Street/Washington Boulevard and Cattaraugus Avenue/Washington Boulevard, are unsignalized and controlled by a stop sign on the minor approaches. The remaining two locations, Braddock Drive/Duquesne Avenue and Lucerne Avenue/Duquesne Avenue, are all-way stop controlled intersections. The "Critical Movement Analysis-Planning" (Transportation Research Board, 1980) method of intersection capacity analysis was used to determine the intersection volume to capacity (V/C) ratio and corresponding level of service at the signalized intersections. The CALCADB software package developed by LADOT was used to implement the CMA methodology. Table 2 defines the ranges of V/C ratios and corresponding levels of service for signalized intersections. All 17 of the signalized study intersections under the City of Los Angeles jurisdiction are currently controlled by the City of Los Angeles’ Automated Traffic Surveillance (ATSAC) and are part of the Smart Corridor ATSAC system. Fourteen of the 17 intersections also include the City’s Adaptive Traffic Control System (ATCS). A capacity increase of 10% (0.07 V/C adjustments for ATSAC and 0.03 V/C adjustments for ATCS) was applied to reflect the benefits of ATSAC/ATCS control at these 14 intersections. At the remaining three intersections (intersection #5, 6 and 11), a capacity increase of 7% (0.07 V/C adjustments) was applied to reflect the benefits of ATSAC control. The remaining 13 signalized intersections under the jurisdiction of the City of Culver City currently operate under a signal coordination system similar to ATSAC, but have not yet been upgraded with the ATCS-type operations. Therefore, a capacity increase of 7% (0.07 V/C adjustments) was applied to reflect the benefits of ATSAC-type control at these intersections. The Highway Capacity Manual (HCM) 2000 method of unsignalized intersection analysis was used to determine the delay (in seconds) and corresponding level of service at the stop-controlled intersections. 16 ATTACHMENT 6 254TABLE 2 LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS Volume/Capacity Level of Service Ratio Definition A 0.000 - 0.600 EXCELLENT. No Vehicle waits longer than one red light and no approach phase is fully used. B >0.600 - 0.700 VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C >0.700 - 0.800 GOOD. Occasionally drivers may have to wait through more than one red light; backups may develop behind turning vehicles. D >0.800 - 0.900 FAIR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E >0.900 - 1.000 POOR. Represents the most vehicles intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F > 1.000 FAILURE. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Tremendous delays with continuously increasing queue lengths. Source: Transportation Research Board, Transportation Research Circular No. 212, Interim Materials on Highway Capacity , 1980. 17 ATTACHMENT 6 255TABLE 3 LEVEL OF SERVICE DEFINITIONS FOR STOP-CONTROLLED INTERSECTIONS Average Total Delay Level of Service (seconds/vehicle) A < 10.0 B > 10.0 and < 15.0 C > 15.0 and < 25.0 D > 25.0 and < 35.0 E > 35.0 and < 50.0 F > 50.0 Source: Transportation Research Board, Highway Capacity Manual, Special Report 209, 2000. 18 ATTACHMENT 6 256 For all-way stop controlled intersections, the intersection delay is defined as the average delay experienced by drivers at the intersection. For two-way stop-controlled locations, the intersection delay is defined as the worst case delay experienced by drivers at the intersection who must stop or yield to unimpeded major street traffic. This method uses a “gap acceptance” technique to predict driver delay and is applicable to unsignalized intersections where there is potential for difficulty for minor street or stopped traffic to cross the traffic on the major or unimpeded street. Table 3 defines the ranges of delay and corresponding levels of service for unsignalized intersections. Existing Levels of Service The existing traffic volumes presented in Figures 2A and 2B for AM and PM peak hours, respectively, were used in conjunction with the level of service methodologies described above and the current intersection characteristics illustrated in Appendix B, to determine the existing operating conditions at the analyzed intersections. Table 4 summarizes the results of the intersection capacity analysis for existing conditions at each of the analyzed intersections in the study area. The table indicates the existing V/C ratio (or delay) during the morning and evening peak hours and the corresponding LOS at the study intersections. As indicated in the table, 24 of the 34 study intersections are currently operating at LOS D or better during the morning peak hour. During the evening peak hour, 26 of the 34 study intersections are operating at LOS D or better. The remaining intersections are operating at LOS E or F: • Robertson Boulevard/Venice Boulevard: AM and PM Peak Hour – LOS F • National Boulevard/Venice Boulevard: AM and PM Peak Hour – LOS E • La Cienega Boulevard/Venice Boulevard: AM Peak Hour–LOS E; PM Peak Hour–LOS E • Cattaraugus Avenue/Washington Boulevard: AM and PM Peak Hour – LOS F • La Cienega Boulevard/Washington Boulevard: AM Peak Hour – LOS F • La Cienega Boulevard/Fairfax Avenue: AM Peak Hour – LOS E • Jefferson Boulevard/National Boulevard: PM Peak Hour – LOS F • La Cienega Boulevard/Jefferson Boulevard: AM and PM Peak Hour – LOS F 19 ATTACHMENT 6 257TABLE 4 SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - EXISTING (2011) CONDITIONS AM PEAK HOUR PM PEAK HOUR # INTERSECTION V/C or Delay LOS V/C or Delay LOS 1 Robertson Boulevard Cattaraugus Avenue [1] 0.841 D 0.831 D 2 Robertson Boulevard I-10 WB Off-Ramp/Kincardine Avenue [1] 0.611 B 0.689 B 3 Robertson Boulevard National Boulevard [1] 0.898 D 0.894 D 4 National Boulevard I-10 Eastbound On-Ramp [1] 0.363 A 0.359 A 5 Hughes Avenue Venice Boulevard [1] 0.705 C 0.639 B 6 Bagley Avenue Venice Boulevard [1] 0.708 C 0.678 B 7 Culver Boulevard Venice Boulevard [1] 0.683 B 0.783 C 8 Robertson Boulevard Venice Boulevard [1] 1.237 F 1.159 F 9 National Boulevard Venice Boulevard [1] 0.970 E 0.954 E 10 Helms Avenue Venice Boulevard [1] 0.457 A 0.479 A 11 Cattaraugus Avenue Venice Boulevard [1] 0.771 C 0.653 B 12 La Cienega Boulevard Venice Boulevard [1,2] 0.961 E 0.975 E 13 Hughes Avenue/Duquesne Avenue Washington Boulevard 0.534 A 0.577 A 14 Duquesne Avenue Culver Boulevard 0.612 B 0.775 C 15 Culver Boulevard Washington Boulevard/Irving Place 0.504 A 0.534 A 16 Main Street Culver Boulevard 0.499 A 0.515 A 17 Culver Boulevard Washington Boulevard 0.566 A 0.540 A 18 Robertson Boulevard/Higuera Street Washington Boulevard 0.706 C 0.538 A 19 Landmark Street Washington Boulevard 0.472 A 0.394 A 20 National Boulevard Washington Boulevard 0.789 C 0.722 C 21 Wesley Avenue Washington Boulevard [3] 11.5 sec B 28.3 sec D 22 Helms Avenue Washington Boulevard 0.492 A 0.366 A 23 Cattaraugus Avenue Washington Boulevard [3] *** sec F 133.3 sec F 24 La Cienega Boulevard Washington Boulevard 1.047 F 0.881 D 25 La Cienega Boulevard Fairfax Avenue [1] 0.960 E 0.812 D 26 Wesley Street National Boulevard 0.586 A 0.355 A 27 Hayden Avenue National Boulevard 0.827 D 0.614 B 28 Jefferson Boulevard National Boulevard [1] 0.697 B 1.037 F 29 La Cienega Boulevard Jefferson Boulevard [1,2] 1.081 F 1.059 F 30 Jefferson Boulevard Higuera Street/Rodeo Road [1] 0.739 C 0.677 B 31 La Cienega Boulevard Rodeo Road [1] 1.067 F 1.203 F 32 Braddock Drive Duquesne Avenue [4] 140.4 sec F 85.7 sec F 33 Lucerne Avenue Duquesne Avenue [4] 23.7 sec C 28.6 sec D 34 Jefferson Boulevard Duquesne Avenue 0.950 E 0.833 D *** Intersection delay cannot be calculated. [1] City of Los Angeles location. [2] Los Angeles County Congestion Management Program (CMP) monitoring location. [3] Unsignalized intersections - stop-controlled on minor approach(es). [4] Unsignalized intersections - stop-controlled on all approach. 20 ATTACHMENT 6 258 • La Cienega Boulevard/Rodeo Road: AM and PM Peak Hour – LOS F • Braddock Drive/Duquesne Avenue: AM and PM Peak Hour – LOS F • Jefferson Boulevard/Duquesne Avenue: AM Peak Hour – LOS E Capacity calculation worksheets for Existing (2011) conditions are provided in Appendix D. EXISTING TRANSIT LINES Eighteen bus lines operated by three different transportation agencies currently serve the study area. Four bus lines are operated by the Culver City Bus (CC), ten bus lines are operated by the Los Angeles County Metropolitan Transportation Authority (MTA), three bus lines are operated by the Santa Monica Big Blue Bus (SM) and one bus is operated by the Los Angeles Department of Transportation (LADOT CE). These transit lines are described below: • CC Line 1 – Line 1 is a local east/west line that provides service from Venice Beach to West Los Angeles and travels primarily along Washington Boulevard within the study area. This line runs everyday, including holidays. The frequency of service during peak commute hours is approximately 12 minutes. The western terminus is at the intersection of Windward Avenue and Main Street in Venice. The eastern terminus is at the West Los Angeles Transit Center located at the intersection of Apple Street/Fairfax Avenue in West Los Angeles. • CC Line 4 – Line 4 is a local north/south line that provides service from the Fox Hills Mall (Culver City) to West Los Angeles and travels primarily along Washington Boulevard within the study area. This line runs Monday through Friday at a frequency of approximately 60 minutes during peak commute hours. No weekend or holiday service is provided. The southern terminus is at the Fox Hills Mall Transit Center. The northern terminus is at the West Los Angeles Transit Center located at the intersection of Apple Street/Fairfax Avenue in West Los Angeles. • CC Line 5 – Line 5 is a local east/west line that provides service from the west side of Culver City to Blair Hills on the east side, and travels primarily along Washington Boulevard and Higuera Street within the study area. This line operates Monday through Friday at a frequency of approximately 60 minutes during peak commute hours. No weekend or holiday service is provided. The western terminus is at the intersection of Washington Boulevard/Inglewood Boulevard. The eastern terminus is at the intersection of La Cienega Boulevard/Rodeo Road. 21 ATTACHMENT 6 259 • CC Line 7 – Line 7 is a local east/west line that provides service from Marina Del Rey to Culver City and travels primarily along Culver Boulevard within the study area. This line runs Monday through Saturday at a frequency of approximately 40 minutes. No service is provided on Sundays and holidays. The western terminus is at Fisherman’s Village in Marina Del Rey. The eastern terminus is at the intersection of Culver Boulevard/Venice Boulevard in Culver City. • MTA Line 33 - Line 33 is a local east/west line that provides service from Santa Monica to Downtown Los Angeles and travels primarily along Venice Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 5-15 minutes during peak commute hours. The western terminus is at the intersection of 2 nd Street/Santa Monica Boulevard in Santa Monica. The eastern terminus is at the Patsaouras Transit Plaza (Union Station) in Downtown Los Angeles. • MTA Line 35/335 - Line 35/335 is a local east/west line that provides service from West Los Angeles to Downtown Los Angeles and travels primarily along Washington Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 12 minutes during peak commute hours. The western terminus is at the West Los Angeles Transit Center located at the intersection of Apple Street/Fairfax Avenue in West Los Angeles. The eastern terminus is at the intersection of Main Street/17 th Street in Downtown Los Angeles. Line 335 provides limited stop service Monday through Friday and does not operate on weekends/holidays. • MTA Line 38 - Line 38 is a local east/west line that provides service from West Los Angeles to Downtown Los Angeles and travels primarily along Venice Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 30 minutes during peak commute hours. The western terminus is at the West Los Angeles Transit Center located at the intersection of Apple Street/Fairfax Avenue in West Los Angeles. The eastern terminus is at the intersection of Broadway/17 th Street in Downtown Los Angeles. • MTA 105 - Line 105 is a local north/south line that provides service from West Hollywood to Vernon and travels primarily along La Cienega Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 10-12 minutes during peak commute hours. The northern terminus is at the intersection of San Vicente Boulevard/Santa Monica Boulevard in West Hollywood. The southern terminus is at the intersection of Santa Fe Avenue/Vernon Avenue in the Vernon. • MTA Line 217 – Line 217 is a local north/south line that provides service from West Los Angeles to Hollywood and travels primarily along Fairfax Avenue and Washington Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 10-12 minutes during peak commute hours. The southern terminus is at the West Los Angeles Transit Center located at the intersection of Apple Street/Fairfax Avenue in West Los Angeles. The northern terminus is at Vermont/Sunset Metro Station in Hollywood. 22 ATTACHMENT 6 260 • MTA Line 220 – Line 220 is a local north/south line that provides service from Los Angeles International Airport (LAX) to West Hollywood and travels primarily along Venice Boulevard and National Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 55 minutes during peak commute hours. The southern terminus is at the LAX City Bus Center. The northern terminus is at intersection of Santa Monica Boulevard/San Vicente Boulevard in West Hollywood. • MTA 439 - Line 439 is an express service north/south line that provides service from Los Angeles International Airport to Downtown Los Angeles and travels primarily along La Cienega Boulevard within the study area. This line runs everyday, including holidays, at a frequency of approximately 45 minutes during peak commute hours. The southern terminus is at the Aviation/I-105 Green Line Station. The northern terminus is at the Patsaouras Transit Plaza (Union Station) in Downtown Los Angeles. • MTA 705 - Line 705 is a north/south ‘Rapid Bus’ line that provides service from West Hollywood to Vernon and travels primarily along La Cienega Boulevard within the study area. This line runs Monday through Friday at a frequency of approximately 10 minutes during peak commute hours. No service is provided on weekends or holidays. The northern terminus is at the intersection of San Vicente Boulevard/Santa Monica Boulevard in West Hollywood. The southern terminus is at the intersection of Santa Fe Avenue/Vernon Avenue in the Vernon. • MTA 733 - Line 733 is an east/west ‘Rapid Bus’ line that provides service from Santa Monica to Downtown Los Angeles and travels primarily along Venice Boulevard within the study area. This line runs Monday through Friday at a frequency of approximately 10 minutes during peak commute hours. Service is also provided on weekends and holidays. The western terminus is at the intersection of Ocean Avenue/Arizona Avenue in Santa Monica. The eastern terminus is at the Patsaouras Transit Plaza (Union Station) in Downtown Los Angeles. • MTA 780 - Line 780 is an east/west ‘Rapid Bus’ line that provides service from Pasadena to West Los Angeles and travels primarily along Washington Boulevard within the study area. This line runs Monday through Friday at a frequency of approximately 8- 10 minutes during peak commute hours. No service is provided on weekends and holidays. The western terminus is at the West Los Angeles Transit Center located at the intersection of Apple Street/Fairfax Avenue in West Los Angeles. The eastern terminus is at the intersection of Hill Avenue/Colorado Boulevard in Pasadena. • CE 437 - Line 437 is a commuter express east/west line that provides service from Downtown Los Angeles to Venice and travels primarily along Culver Boulevard within the study area. This line runs Monday through Friday at a frequency of approximately 25 minutes during peak commute hours. The western terminus is at the intersection of Pacific Avenue/Washington Boulevard in Venice. The eastern terminus is at the intersection of San Pedro Street/Temple Street Drive in Los Angeles. 23 ATTACHMENT 6 261 • SM 6 – Santa Monica Big Blue Bus Line 6 is an east/west commuter line that provides service from Santa Monica College to the Palms Community of Los Angeles and travels primarily along Venice Boulevard and National Boulevard within the study area. This line runs Monday through Friday at a peak frequency of approximately 25-30 minutes during peak commute hours. The western terminus is at Santa Monica College in Santa Monica. The eastern terminus is at the intersection of Venice Boulevard/Culver Boulevard in Palms. • SM 12 – Santa Monica Big Blue Bus Line 12 is a local east/west line that provides service from Westwood to Palms Community of Los Angeles and travels primarily along Venice Boulevard, National Boulevard and Robertson Boulevard within the study area. This line runs Monday through Friday at a peak frequency of approximately 15 minutes during peak commute hours. Service is also provided on weekends and holidays. The western terminus is at the University of California Los Angeles (UCLA) Ackerman Terminal in Westwood. The eastern terminus is at the intersection of Robertson Boulevard/Pico Boulevard in Palms. • SM Super 12 – Santa Monica Bus Blue Bus Line Super 12 is a north/south UCLA commuter line that provides service from Westwood to West Los Angeles and travels primarily along National Boulevard within the study area. This line runs Monday through Friday at a frequency of approximately 10-15 minutes with no midday service. Service is not provided on weekends and holidays. The northern terminus is at the University of California Los Angeles (UCLA) Ackerman Terminal in Westwood. The southern terminus is at the intersection of National Boulevard/Venice Boulevard in West Los Angeles. These transit lines within the study area are illustrated in Figure 3. It can be observed from Figure 3 that there is a robust transit network serving the study area. Further, the Exposition Line Light Rail Transit (LRT) with its Phase I terminus adjacent to the Project site will provide mass transit connections to the University of Southern California (USC) and Downtown Los Angeles. This phase of the Exposition LRT is expected to open with the next year and the subsequent Phase 2 service extension to Santa Monica is expected to open by 2015. 24 ATTACHMENT 6 26225 ATTACHMENT 6 263 III. FUTURE YEAR 2014 TRAFFIC PROJECTIONS In order to properly evaluate the potential impact of the proposed project on the local street system, estimates of the Future Year 2014 traffic volumes both with and without the project were developed. The Future Year 2014 without the project was first developed including estimates for background growth in area-wide trip making and trips generated by future developments (related projects) in the vicinity of the study area. The Future Year 2014 without project traffic represents the cumulative base conditions. The traffic generated by the proposed project was then estimated and assigned separately to the street system. The addition of the project traffic and the cumulative base traffic represents the Future Cumulative (2014) Plus Project conditions. Each of these future traffic scenarios is further described in this chapter. CUMULATIVE (2014) BASE TRAFFIC PROJECTIONS The Cumulative (2014) Base traffic projections reflect growth in traffic from two primary sources: firstly, the background, or ambient growth, to reflect the effects of overall area-wide regional growth both within and outside the study area; and secondly, from traffic generated by specific related projects located within, or in the vicinity of, the study area. Each of these components is described below. Area-Wide Ambient Traffic Growth The traffic in the vicinity of the study area has been estimated to increase at a rate of about 1% per year. Future increases in background traffic volumes due to regional growth and development are expected to continue at this rate. With the assumed completion date of 2014, the existing 2011 traffic volumes were adjusted upward by a factor of 3% (1% per year compounded annually) to reflect this area-wide regional growth. 26 ATTACHMENT 6 264 Related Projects Traffic Generation and Assignment As indicated, the second potential source of traffic growth in the study area is that expected from other future development projects in the vicinity. These "cumulative” or related projects are those developments that are planned and expected to be in place within the same timeframe as the Proposed Project. Data describing related projects in the area was solicited from the City of Culver City and the City of Los Angeles. Fifty-two related projects from the City of Culver City, City of Los Angeles and County of Los Angeles were identified within the study area. The related projects included in this study are described in Table 5. The locations of these projects are shown in Figure 4. The trip generation estimates for the related projects were based on different sources including trip generation rates contained in the Institute of Traffic Engineers (ITE), Trip Generation – An ITE Information Report, 8 th Edition, and trip generation estimates provided by the recently completed traffic studies for projects in Culver City. These rates are provided in Appendix E. The trip generation estimates for the related projects are shown in Table 6. As summarized in Table 6, the related projects are expected to generate approximately 52,000 daily trips, of which 5,063 trips are estimated to occur during the morning peak hour and 5,452 trips during the evening peak hour. These related projects’ trips were assigned to the street system and the results are shown in Figures 5A and 5B. These related projects’ traffic estimates were added to the existing plus ambient growth traffic to obtain the Cumulative (2014) Base traffic volumes. Figures 6A and 6B provide the Cumulative (2014) Base traffic volumes at each of the analyzed intersections during both AM and PM peak hours, respectively. These volumes represent Future Cumulative (2014) Base (without project) conditions. It is important to note that there are several large related projects planned in the immediate vicinity of the Project site. Two of these projects, Metro Exposition Light Rail Washington/National Station (#29) and the Triangle Project (#39), are located in the northwest corner of intersection of National Boulevard/Washington Boulevard, across the street from the Proposed Project. These two cumulative projects would have combined net trip generation total of approximately 1,045 trips in the morning peak hour and 1,117 trips in the evening peak hour with driveways located along National Boulevard and Washington Boulevard. 27 ATTACHMENT 6 265TABLE 5 LIST OF RELATED PROJECTS [1] Map # Project Name Address Description 1 Sony 10202 Washington Bl Sony Lot Project - Approved to build net new 100,000 G.S.F. of office, post-production, stage, and support uses. 2 Huron Townhouses 3823-3833 Huron Av 15 new townhouses, demo 3 existing townhouses 3 Four Unit Condominium 3972 Tilden Av 4 unit condominium, TPM 4 Baldwin Hills Scenic Overlook Park Hetzler Rd Existing 10,300 G.S.F. visitor center, passive recreation area 5 Three New Condominiums 4048 Lincoln Av 3 townhome condominiums 6 Eight Unit Condo 4067/4073 Lincoln Av 8 unit condominiums, TTM, 2,000 G.S.F.; 20 parking spaces provided 7 Turning Point School 8794 National School, addition/remodel of net 9,000 G.S.F. 8 Uptown Lofts 9900 Culver Bl 5,457 G.S.F. offices, 18 condominiums 9 Hampton Inn 3954 Sepulveda Bl 77-unit hotel 10 Four Unit Condominium 4014 Van Buren Pl 4 unit condominium, TPM 11 Irving Residential/Office 4043 Irving Pl 4 Story; 26 residential units; 3 office units 12 Legado Mixed Use TOD 8770 Washington Bl New mixed used development w/preliminary concept of up to (appox.) 115 residential units, retail (market, pharmacy & café) 31,040 G.S.F. 13 West Los Angeles Community College Master Plan and EIR LA County Approx. 291,300 G.S.F. of new building construction & renovation. Anticipate future student population of approx. 18,904 students & 1,248 employees by fall 2022. Project includes second access road, parking structures, landscaping & development of athletic facilities. 14 Morphosis Architects Office 3440 Wesley 11,657 S.F. Architects Office (Previously Clyde's Auto Body Shop) 15 Lux @ 9901 Mixed Use 9901 Washington Bl, City of LA 14,112 G.S.F. mixed use development with 131 dwelling units, 12,178 G.S.F. of retail and three level subterranean parking structure with 244 parking spaces. 16 New Restaurant 5854 Blackwelder St/3077 La Cienega Addition of 1,150 G.S.F. Two story structure to existing 1,195 G.S.F. building for new restaurant use. 17 New Dental Office - Building Permit 10826, and 10830 Washington Bl Construction of new one story dental and retail building (2,989 G.S.F) 18 Union 76 10638 Culver Bl Gas station and convenience store with new car wash; 2,500 G.S.F. 19 Distribution & Warehouse 3434 Wesley St Approximately 10,500 G.S.F. of office, warehouse, & distribution 20 Four Unit Condominium 3846 Bentley Av 4 unit condominium, TPM 21 Four Unit Condominium 4058 Madison Av 4 unit condominium, TPM 22 Warner Parking Structure 8511 Warner Dr 51,520 G.S.F. Retail/Restaurant; 784 Parking Spaces, five levels 23 Office Building 9919 Jefferson Bl 113,467 G.S.F., three-story office building 24 New Vehicle Repair Shop 11167 Washington Pl Construction of a new vehicle repair shop with 1,196 G.S.F. of repair area with two service bays and 191 G.S.F. of office. 25 Fresh Paint Mixed Use 9355 Culver Bl Additional 2nd story office and third floor residential unit for a total of 5,708 G.S.F. to an existing office/warehouse building 26 Abraxis Bio Science 9920 Jefferson Bl Exterior and interior renovation to an existing two-story building. Addition of a three story, 17,000 G.S.F. building over a one-story building (net addition is 14,999 G.S.F. - demo 2,001 G.S.F of existing building area). 27 Clive Wilkinson Architects 6114, 6116, 6118 Washington Bl New two-story, 5,560 G.S.F. office building which includes an ancillary retail or office. 28 New 7-Eleven Convenient Store 4436 Sepulveda Bl Construction of a new 2,500 G.S.F., one story convenience store. 29 Metro Expo Light Rail Station- Venice/Robertson Station Venice Bl/Robertson Bl Light Rail Train Station 30 Metro Expo Light Rail Station-La Cienega Station [2] La Cienega Bl/Jefferson Bl Light Rail Train Station 31 Parcel B 9300 Culver Bl 118,000 G.S.F. of office, restaurant, and retail spaces 32 West Los Angeles Community College Master Plan and EIR (2010) West LA College Approximately 92,000 of net new building construction and renovation. 33 Culver Studios Amend. No. 6 9336 Washington Bl Phase 1 - 25,093 G.S.F. office; 13,634 G.S.F. support; 302 parking spaces. Phase 2 - 63,500 G.S.F. office; 8,741 G.S.F. support 34 Arco AM/PM - New Carwash 5884 Washington Bl New Carwash and storage room totaling 1,200 G.S.F. at an existing fueling station. 35 New Two story commercial building 11012 - 11014 Washington Bl Two story commercial building totaling 3,385 G.S.F. 36 Tilden Terrace 11042-11056 Washington Bl New three-story, 48,525 G.S.F. mixed use development with 10,700 G.S.F. of ground floor retail and 33 residential units. 37 Duquesne Ave Condominiums 4139-4145 Duquesne Av Seven (7) condominium units. 38 Greg Reitz 8665 Hayden Pl Construct 63,679 G.S.F. of office 28 ATTACHMENT 6 266TABLE 5 (continued) LIST OF RELATED PROJECTS [1] Map # Project Name Address Description 39 Triangle Site - Washington/National TOD Corner of Washington/National New transit oriented development to include light rail station & mixed use development (preliminary concept includes up to 200 du, 149 room hotel, 200,000 G.S.F. office, 51,500 G.S.F. retail, & 20,000 G.S.F. restaurant. 40 Willow's School Comprehensive Plan 8509-8487 Higuera St, 8476 Warner Dr Phase 1 - new surface parking; increased student enrollment by 50 from 425 to 475; Phase II & III increased student enrollment by 100, from 475 to 575. 41 Bridge Housing Project 3814 Lenawee Av Proposal for 2-3 story senior housing project with 62 units and 41 parking spaces. 42 Jewish Home for the Aging, Gonda Healthy Aging Campus 3847 Delmas Ter., 3820-3842 Hughes, 9823 Venice Bl 184 congregate care units, 48 residential care units, 14,000 G.S.F. PACE program 43 Mixed-Use (The Palms) [3] 10601 Washington Boulevard Proposed mixed-use with 126-unit apartment, 9,000 s.f. retail and 9,000 s.f. restaurant space. Existing 10,000 s.f. office to be removed. 44 Apartment/Retail [3] 3417 Motor Avenue Proposed mixed-use with 115-unit apartment and 975 s.f. retail. Existing 15 apartment units, 2 single-family d.u. and 3,300 s.f. office to be demolished. 45 Mixed-Use [3] 10604 National Boulevard Construct 29 condominiums d.u., 1,250 s.f. retail, and 2,000 s.f. retail. 46 Mixed-Use [3] 2900 S. Sepulveda Boulevard Proposed mixed-use with 48-unit apartment and 1,500 s.f. office. 47 Media Related Office [3] 3105 La Cienega Boulevard Proposed 133,000 s.f. media-relations office. Existing 109,000 s.f. manufacturing to be removed. 48 Office [3] 10100 Culver Boulevard Proposed 50,000 s.f. office. 49 Mixed-Use [3] 3115 S. Sepulveda Boulevard Proposed mixed-use with 175-unit condominium and 28,000 s.f. retail. Existing 28,000 discount store to be removed. 50 Condominium [3] 11131 Rose Avenue Proposed 227-unit condominium. Existing 89-unit apartment to be removed. 51 Restaurant/Retail [3] 10612 National Boulevard Proposed 2,500 s.f. restaurant and 3,500 s.f. retail. 52 Private School [3] 2920 S. Sepulveda Boulevard Proposed 120-student private school (Goethe International Charter School). Existing 9,000 s.f. office to be removed. [1] Source: Culver City Related Projects List provided by the City of Culver City, dated March 31, 2011, unless otherwise noted. [2] Mid-City/Exposition LRT Project Final EIR/EIS, Los Angeles Metropolitan Transportation Authority/USDOT, Federal Transit Administration, October 2005. [3] Related Projects List provided by the City of Los Angeles, LADOT, February 2011. 29 ATTACHMENT 6 26730 ATTACHMENT 6 268TABLE 6 ESTIMATED WEEKDAY TRIP GENERATION OF RELATED PROJECTS [1] Map AM Peak Hour PM Peak Hour # Project Name Description Daily IN OUT TOTAL IN OUT TOTAL 1 Sony Sony Lot Project - Approved to build net new 100,000 G.S.F. of office, post-production, stage, and support uses. 1,334 165 23 188 32 159 191 2 Huron Townhouses 15 new townhouses, demo 3 existing townhouses 70 1 5 6 4 2 6 3 Four Unit Condominium 4 unit condominium, TPM 23 0 2 2 1 1 2 4 Baldwin Hills Scenic Overlook Park [2] Existing 10,300 G.S.F. visitor center, passive recreation area 446 0 0 0 8 60 68 5 Three New Condominiums 3 townhome condominiums 17 0 1 1 1 1 2 6 Eight Unit Condo 8 unit condominiums, TTM, 2,000 G.S.F.; 20 parking spaces provided 46 1 3 4 3 1 4 7 Turning Point School [2] School, addition/remodel of net 9,000 G.S.F. 130 23 19 42 12 16 28 8 Uptown Lofts 5,457 G.S.F. offices, 18 condominiums 165 8 8 16 7 10 17 9 Hampton Inn 77-unit hotel 687 30 22 52 26 28 54 10 Four Unit Condominium 4 unit condominium, TPM 23 0 2 2 1 1 2 11 Irving Residential/Office 4 Story; 26 residential units; 3 office units 188 6 10 16 10 9 19 12 Legado Mixed Use TOD [2] New mixed used development w/preliminary concept of up to (appox.) 115 residential units, retail (market, pharmacy & café) 31,040 G.S.F. 2,914 69 85 154 150 125 275 13 West Los Angeles Community College Master Plan and EIR [2] Approx. 291,300 G.S.F. of new building construction & renovation. Anticipate future student population of approx. 18,904 students & 1,248 employees by fall 2022. Project includes second access road, parking structures, landscaping & development of athletic facilities. 6,785 436 45 481 300 133 433 14 Morphosis Architects Office 11,657 S.F. Architects Office (Previously Clyde's Auto Body Shop) 129 16 2 18 3 14 17 15 Lux @ 9901 Mixed Use 14,112 G.S.F. mixed use development with 131 dwelling units, 12,178 G.S.F. of retail and three level subterranean parking structure with 244 parking spaces. 1,457 24 60 84 74 49 123 16 New Restaurant Addition of 1,150 G.S.F. Two story structure to existing 1,195 G.S.F. building for new restaurant use. 146 7 6 13 8 5 13 17 New Dental Office - Building Permit Construction of new one story dental and retail building (2,989 G.S.F) 108 6 1 7 3 7 10 18 Union 76 Gas station and convenience store with new car wash; 2,500 G.S.F. 2,700 101 97 198 122 121 243 19 Distribution & Warehouse Approximately 10,500 G.S.F. of office, warehouse, & distribution 89 6 1 7 2 5 7 20 Four Unit Condominium 4 unit condominium, TPM 23 0 2 2 1 1 2 21 Four Unit Condominium 4 unit condominium, TPM 23 0 2 2 1 1 2 22 Warner Parking Structure 51,520 G.S.F. Retail/Restaurant; 784 Parking Spaces, five levels 3,112 94 76 170 116 109 225 23 Office Building 113,467 G.S.F., three-story office building 1,470 183 25 208 35 171 206 24 New Vehicle Repair Shop Construction of a new vehicle repair shop with 1,196 G.S.F. of repair area with two service bays and 191 G.S.F. of office. 42 3 1 4 2 2 4 25 Fresh Paint Mixed Use Additional 2nd story office and third floor residential unit for a total of 5,708 G.S.F. to an existing office/warehouse building 63 8 1 9 2 7 9 26 Abraxis Bio Science [3] Exterior and interior renovation to an existing two-story building. Addition of a three story, 17,000 G.S.F. building over a one-story building (net addition is 14,999 G.S.F. - demo 2,001 G.S.F of existing building area). 194 23 2 25 4 21 25 27 Clive Wilkinson Architects New two-story, 5,560 G.S.F. office building which includes an ancillary retail or office. 62 8 1 9 1 7 8 28 New 7-Eleven Convenient Store Construction of a new 2,500 G.S.F., one story convenience store. 1,845 84 84 168 67 64 131 29 Metro Expo Light Rail Station- Venice/Robertson Station [4] Light Rail Train Station n/a 370 62 432 50 296 346 30 Metro Expo Light Rail Station-La Cienega Station [4] Light Rail Train Station n/a 223 41 264 33 179 212 31 Parcel B 118,000 G.S.F. of office, restaurant, and retail spaces 4,766 249 155 404 199 225 424 31 ATTACHMENT 6 269TABLE 6 (continued) ESTIMATED WEEKDAY TRIP GENERATION OF RELATED PROJECTS [1] Map AM Peak Hour PM Peak Hour # Project Name Description Daily IN OUT TOTAL IN OUT TOTAL 32 West Los Angeles Community College Master Plan and EIR (2010) Approximately 92,000 of net new building construction and renovation. 2,529 204 71 275 136 98 234 33 Culver Studios Amend. No. 6 Phase 1 - 25,093 G.S.F. office; 13,634 G.S.F. support; 302 parking spaces. Phase 2 - 63,500 G.S.F. office; 8,741 G.S.F. support 1,445 180 24 204 35 168 203 34 Arco AM/PM - New Carwash New Carwash and storage room totaling 1,200 G.S.F. at an existing fueling station. 189 8 9 17 9 8 17 35 New Two story commercial building Two story commercial building totaling 3,385 G.S.F. 145 2 1 3 6 7 13 36 Tilden Terrace [3] New three-story, 48,525 G.S.F. mixed use development with 10,700 G.S.F. of ground floor retail and 33 residential units. 367 6 15 21 17 12 29 37 Duquesne Ave Condominiums Seven (7) condominium units. 41 1 2 3 3 1 4 38 Greg Reitz Construct 63,679 G.S.F. of office 705 87 12 99 16 79 95 39 Triangle Site - Washington/National TOD New transit oriented development to include light rail station & mixed use development (preliminary concept includes up to 200 du, 149 room hotel, 200,000 G.S.F. office, 51,500 G.S.F. retail, & 20,000 G.S.F. restaurant. 9,021 415 198 613 349 476 825 40 Willow's School Comprehensive Plan [3] Phase 1 - new surface parking; increased student enrollment by 50 from 425 to 475; Phase II & III increased student enrollment by 100, from 475 to 575. 372 75 60 135 12 15 27 41 Bridge Housing Project Proposal for 2-3 story senior housing project with 62 units and 41 parking spaces. 216 3 5 8 6 4 10 42 Jewish Home for the Aging, Gonda Healthy Aging Campus 184 congregate care units, 48 residential care units, 14,000 G.S.F. PACE program 975 33 13 46 34 53 87 43 Mixed-Use (The Palms) [5] Proposed mixed-use with 126-unit apartment, 9,000 s.f. retail and 9,000 s.f. restaurant space. Existing 10,000 s.f. office to be removed. 1,802 56 69 125 95 72 167 44 Apartment/Retail [5] Proposed mixed-use with 115-unit apartment and 975 s.f. retail. Existing 15 apartment units, 2 single-family d.u. and 3,300 s.f. office to be demolished. 651 6 374331 16 47 45 Mixed-Use [5] Construct 29 condominiums d.u., 1,250 s.f. retail, and 2,000 s.f. retail. 683 13 25 38 79 59 138 46 Mixed-Use [5] Proposed mixed-use with 48-unit apartment and 1,500 s.f. office. 376 7 24 31 18 10 28 47 Media Related Office [5] Proposed 133,000 s.f. media-relations office. Existing 109,000 s.f. manufacturing to be removed. 490 46 3 49 25 14 39 48 Office [5] Proposed 50,000 s.f. office. 551 66 9 75 16 80 96 49 Mixed-Use [5] Proposed mixed-use with 175-unit condominium and 28,000 s.f. retail. Existing 28,000 discount store to be removed. 989 25 64 89 75 56 131 50 Condominium [5] Proposed 227-unit condominium. Existing 89-unit apartment to be removed. 727 8 475555 26 81 51 Restaurant/Retail [5] Proposed 2,500 s.f. restaurant and 3,500 s.f. retail. 475 18 16 34 37 29 66 52 Private School [5] Proposed 120-student private school (Goethe International Charter School). Existing 9,000 s.f. office to be removed. 199 56 56 112 3 4 7 RELATED PROJECTS TRIP GENERATION TOTAL 52,005 3,459 1,604 5,063 2,335 3,117 5,452 [1] Unless otherwise noted, trip generation estimates determined from trip rates contained in Trip Generation, An ITE Information Report, 8th Edition, ITE 2008. [3] Trip generation provided by the City of Culver City. [4] Trip generation from Mid-City/Exposition LRT Project Final EIR/EIS, Los Angeles Metropolitan Transportation Authority/USDOT, Federal Transit Administration, October 2005. [5] Trip generation totals provided by LADOT, February 2011. Directional distribution based on Trip Generation, An ITE Information Report, 8th Edition, ITE 2008. [2] Trip generation from Traffic Impact Analysis Report, Proposed Mixed-Use Development (115-Unit Residential and 31,240 Square Foot Retail) Located at 8770 Washington Boulevard in Culver City, California , Hirsch/Green Transportation Consulting, Inc., July 2010. 32 ATTACHMENT 6 27033 ATTACHMENT 6 27134 ATTACHMENT 6 27235 ATTACHMENT 6 27336 ATTACHMENT 6 274 Another related project, the Legado Mixed-Use Project (#12) at 8770 Washington Boulevard, is planned at the southeast corner of the National Boulevard/Washington Boulevard intersection. This project is estimated to generate a net total of approximately 154 trips during the morning peak hour and 275 trips during the evening peak hour. These three related projects would substantially increase the future traffic volumes along National Boulevard and Washington Boulevard in the vicinity of the Project site. However, it is also worth noting that several physical improvements to the intersection of Washington Boulevard and National Boulevard are also planned for implementation prior to the addition of this traffic. PROJECT TRAFFIC VOLUMES The Proposed Project consists of 28,708 square feet of office use, 36,819 square feet of retail use, and 12,257 square feet of restaurant use. The Project would provide a 202-space multi- level parking structure (with ground floor retail) and a 77-space parking structure for an overall total supply of 279 parking spaces. Utilizing the Trip Generation – An ITE Information Report, 8 th Edition trip generation rates, the Proposed Project’s trip generation was determined. Table 7 presents details of the Proposed Project’s trip generation including type of use, size, applicable rates and trip generation estimates. Other calculations within the table also provide for adjustments due to transit, internal capture and pass-by trips. It is important to note that existing use trip reduction credit was not taken. From Table 7, it can be observed that the Proposed Project’s trip generation would result in a net total of approximately 2,360 daily trips of which 91 trips (71 trips inbound, 20 trips outbound) would occur during the morning peak hour and 200 trips (100 trips inbound, 100 trips outbound) would occur during the evening peak hour. 37 ATTACHMENT 6 275TABLE 7 ESTIMATED PROJECT TRIP GENERATION AM Peak Hour PM Peak Hour Size Daily IN OUT TOTAL IN OUT TOTAL Proposed Project Retail 36,819 s.f. 1,581 23 14 37 67 70 137 Restaurant 12,257 s.f. 1,103 5 5 10 62 30 92 Office 28,708 s.f. 510 61 8 69 7 36 43 Project Trip Generation Total 3,194 89 27 116 136 136 272 Transit Trip Use (7.5%) - Office (38) (5) (1) (6) (1) (3) (4) *Internal Capture (10%) Trip Credit (316) (8) (3) (11) (14) (13) (27) **Pass-By (20%) Trip Reduction - Retail/Restaurant (483) (5) (3) (8) (21) (20) (41) Project Trip Generation Net Total 2,357 71 20 91 100 100 200 Trip Rates [1] General Office (ITE Land Use 710) Trips per 1,000 s.f. [2] 88% 12% [2] 17% 83% 1.49 Retail (ITE Land Use 820) Trips per 1,000 s.f. 42.94 61% 39% 1.00 49% 51% 3.73 Restaurant (ITE Land Use 931) Trips per 1,000 s.f. 89.95 50% 50% 0.81 67% 33% 7.49 * Internal capture credit taken after reduction of transit trips. ** Pass-by trip reduction taken after internal capture credits. [1] Trip Generation, An ITE Information Report, 8th Edition, ITE 2008 [2] Daily and AM peak hour trip generation for office was calculated using the following formulas: Daily: Ln(T) = 0.77 Ln(X) + 3.65 Where: AM Peak Hour: Ln(T) = 0.80 Ln(X) + 1.55 Ln = Natural logarithm T = Two-way volume of traffic (total trip-ends) X = Area in 1,000 square feet gross floor area 38 ATTACHMENT 6 276 Project Trip Distribution The generalized trip distribution for Project trips was estimated to be the following based on current traffic patterns and land uses in the study area: • To and From the North: 20% • To and From the South: 15% • To and From the East: 35% • To and From the West: 30% Intersection level trip distribution percentages are shown in Figure 7. Based on these distribution assumptions, location of the Project driveways, and trip generation from the Proposed Project, traffic estimates of project-only trips were developed. These project-only trips are presented in Figures 8A and 8B for the AM and PM peak hours, respectively. CUMULATIVE (2014) PLUS PROJECT TRAFFIC VOLUMES Utilizing the project-only traffic estimates developed for both AM and PM peak hours, traffic forecasts for the Future Year 2014 with Project conditions were developed. The Cumulative (2014) Base traffic forecasts were combined with the project-only traffic volumes to obtain the Future with Project traffic volume forecasts. The Future Year 2014 Cumulative plus Project traffic volumes during both AM and PM peak hours are presented in Figures 9A and 9B, respectively. 39 ATTACHMENT 6 27740 ATTACHMENT 6 27841 ATTACHMENT 6 27942 ATTACHMENT 6 28043 ATTACHMENT 6 28144 ATTACHMENT 6 282 IV. FUTURE YEAR 2014 TRAFFIC CONDITIONS & IMPACT ANALYSIS The Future Year 2014 Cumulative Base and Cumulative plus Project conditions were analyzed utilizing the methodologies and assumptions per the City of Culver City traffic study guidelines. The results were then used to assess the potential impact of the proposed project on the local street system. The traffic impact analysis compares the volume to capacity (V/C) ratios at each study location under the cumulative base and cumulative plus project conditions to determine the incremental difference in V/C ratios caused by the proposed project. This provides the information needed to assess the potential impact of the project using significance criteria established by the Cities of Culver City and Los Angeles. SIGNIFICANT TRAFFIC IMPACT CRITERIA City of Culver City Significant Impact Criteria For intersections under the City of Culver City jurisdiction, the City of Culver City has established threshold criteria for determining the significance of impacts of a project at a specific location. According to the criteria provided by the City of Culver City, a project impact is considered significant if the following conditions are met: Intersection Condition Project-Related Increase With Project Traffic __ in V/C Ratio LOS V/C Ratio D 0.801 – 0.900 equal to or greater than 0.040 E, F > 0.900 equal to or greater than 0.020 Using these criteria, for example, a project would not have a significant impact at an intersection if it is operating at LOS D after the addition of project traffic and the incremental change in the V/C ratio is less than 0.040. However, if the intersection is operating at LOS F after the addition of 45 ATTACHMENT 6 283 project traffic and the incremental change in the V/C ratio is 0.020 or greater, the project would be considered to have a significant impact. At unsignalized intersections, the levels of service for conditions with and without the project are determined using the Highway Capacity Manual Methodology. Additionally, the V/C ratios at these locations are computed and the incremental changes in V/C ratio due to the proposed project are determined. Both the delay (and corresponding LOS) and V/C ratio are reported in the level of service summary tables. Next, using the same sliding scale shown in significance criteria stated for the signalized intersections, the unsignalized intersections significant impacts are identified. City of Los Angeles Significant Impact Criteria Intersections under the jurisdiction of the City of Los Angeles are evaluated using threshold criteria|1010| established by the City of Los Angeles to determine if a project has a significant traffic impact. According to the criteria provided by the City of Los Angeles, a project impact is considered significant if the following conditions are met: Intersection Condition Project-Related Increase With Project Traffic __ in V/C Ratio LOS V/C Ratio C 0.701 – 0.800 equal to or greater than 0.040 D 0.801 – 0.900 equal to or greater than 0.020 E, F > 0.900 equal to or greater than 0.010 FUTURE BASE ROADWAY NETWORK IMPROVEMENTS The roadway network for the future base conditions within the study area is affected by a number of regional improvement plans and improvements implemented by the Metro Exposition Light Rail Phase 1 Project (Related Project #29). These improvements are identified in the Mid- City/Exposition LRT Project Final EIS/EIR, Los Angeles Metropolitan Transportation Authority/U.S. Department of Transportation, Federal Transit Administration, October 2005 and have been verified by the City of Culver City. These improvements are included in the following page. |1010| L.A. CEQA Thresholds Guide: Your Resource for Preparing CEQA Analysis in Los Angeles, City of Los Angeles, 2006. 46 ATTACHMENT 6 284 • Venice Boulevard between Robertson Boulevard/Exposition Boulevard and Ivy Street - The improvement along this street segment would include widening the north side of Venice Boulevard from approximately 500 feet west of Robertson Boulevard/Exposition Boulevard easterly to Ivy Street. The south side of Venice Boulevard would also be widened, including reconfiguration of the median islands, from Exposition Boulevard to approximately 500 feet west of Robertson Boulevard/Exposition Boulevard. This improvement would not result in any changes in lane configurations or operations from existing conditions at the intersection of Robertson Boulevard/Venice Boulevard. • Venice Boulevard/National Boulevard - The improvement at this location would include the addition of a second left-turn lane and exclusive right-turn lane on the eastbound and westbound approaches. Both the eastbound and westbound approach would then provide dual left-turn lanes, three through lanes, and a separate right-turn lane. This improvement is in addition to the Venice Boulevard widening described above. • National Boulevard/Washington Boulevard – The westbound approach on Washington Boulevard would be improved at this location to include a shared through/right-turn lane. This improvement would be accomplished by restriping the westbound right-turn lane to a shared through/right-turn lane. The westbound approach would then provide a left- turn lane, two through lanes, and a shared through/right-turn lane. • Hayden Avenue/National Boulevard – The eastbound approach on National Boulevard would be improved at this location to include an exclusive right-turn lane. This improvement will be accomplished by modifying the existing raised median along National Boulevard to provide a separate right-turn lane on the eastbound approach. The eastbound approach would then provide two through lanes and a separate right-turn lane. • Jefferson Boulevard/National Boulevard – The improvement at this location would reconstruct the existing intersection to provide a private driveway on the westbound approached with a single shared left/through/right-turn lane. The northbound approach would be constructed to provide a left-turn lane (from Jefferson Boulevard to westbound National Boulevard), two through lanes and a separate right-turn lane into the private driveway. The southbound approach would be reconfigured to provide a left-turn lane into the private driveway, a through lane, and a separate right-turn lane (to westbound National Boulevard). The eastbound approach would be reconfigured to provide two through lanes (including access to the private driveway) and a separate right-turn lane. • La Cienega Boulevard/Jefferson Boulevard - The improvement at this location would modify the eastbound/westbound traffic signal operations to provide permissive left-turn phasing. • La Cienega Boulevard/Rodeo Road - The westbound approach on Rodeo Road would be improved at this location to provide a second left-turn lane. The westbound approach would then provide dual left-turn lanes, two through lanes, and a separate right-turn lane. 47 ATTACHMENT 6 285 In addition to the Metro Exposition Light Rail Project improvements described above, the City of Culver City has identified other future roadway improvements within the study area. These improvements include the following: • Robertson Boulevard-Higuera Street/Washington Boulevard – The City of Culver City has identified an improvement at this location to convert the existing northbound shared through/right-turn lane to an exclusive right-turn lane. The northbound approach would be restriped to provide a left-turn lane, a through lane, and a separate right-turn lane. The northbound departure would also be striped to one lane. • National Boulevard between Venice Boulevard and Washington Boulevard – As part of the Triangle Site Project (Related Project #39), located on the northwest corner of the intersection of National Boulevard/Washington Boulevard, the City of Culver City intends to dedicate and widen the west side of National Boulevard between Venice Boulevard and Washington Boulevard by 10 feet to provide a 72-foot roadway. All on-street parking along this segment would be removed to accommodate bicycles lanes on both sides of the street. No additional travel lanes have been proposed. These roadway improvements are included in both the Cumulative (2014) Base conditions and Cumulative (2014) plus Project conditions analyses and would improve/increase the overall capacity of the future roadway network. The traffic effects due to the improvement at Jefferson Boulevard/National Boulevard have been included in the Cumulative (2014) Base conditions and Cumulative (2014) plus Project conditions analyses. The future lane configurations of the analyzed intersections are included in Appendix B. It worth noting that there are other long-term improvements planned in the study area including improvements to the Santa Monica (I-10) Freeway Ramps at Robertson Boulevard, auxiliary lane improvements to the Santa Monica (I-10) Freeway, and improvements to the Santa Monica (I- 10)/San Diego (I-405) Freeway interchange. These improvements are not anticipated to be completed within the study timeframe (Year 2014), and, therefore, were not included in the future conditions. The Metro Exposition Light Rail Train (LRT) Phase 1 Project is providing local and regional improvements within the study area. Phase 1 of the Metro Exposition LRT Project is an 8.5-mile corridor project providing light rail train service from Downtown Los Angeles to the Westside and Culver City that would be operated by Metro. Within the study area, the Exposition LRT will provide service parallel to Jefferson Boulevard and National Boulevard. Ten new stations will be 48 ATTACHMENT 6 286 provided along the route from the existing Metro Rail station at 7 th Street/Metro Center in Downtown Los Angeles to the Venice/Robertson Station in Culver City. The route alignment will be all above-grade within the study area. The LRT project includes aerial stations at Expo/La Brea, La Cienega/Jefferson, and Venice/Robertson Stations. Phase 1 is expected to be completed by 2012. Phase 2 of the Metro LRT Project will provide service from Culver City to Santa Monica and is expected to be completed by 2015. Two of the LRT Phase 1 stations, Venice/Robertson Station and La Cienega/Jefferson Station, are located within the study area. The Proposed Project is located across the street from the Venice/Robertson Station. The Venice/Robertson Station will also provide some parking spaces for park-and-ride patrons. Driveways to the Venice/Robertson Station’s parking lot will be located along National Boulevard and Washington Boulevard. The La Cienega/Jefferson Station will be located on the southeast corner of the La Cienega Boulevard/Jefferson Boulevard intersection. This station also provides park-and-ride possibilities at a parking structure located adjacent to it. Driveways to this station’s park-and-ride facility are proposed along La Cienega Boulevard and Jefferson Boulevard. CUMULATIVE (2014) BASE TRAFFIC CONDITIONS The Cumulative (2014) Base without proposed project peak hour traffic volumes were analyzed at each of the study intersections to determine the V/C ratio (or delay in seconds) and corresponding level of service. Table 8 presents the results of the Year 2014 Cumulative Base (without project) traffic analysis. As indicated in the table, 17 of the 34 analyzed intersections are projected to operate at LOS D or better during the morning peak hour. During the evening peak hour, 19 of the 34 analyzed intersections are projected to operate at LOS D or better. Eighteen of the 34 intersections are projected to be operating at LOS E or F during the morning and/or evening peak hours and include the following: • Robertson Boulevard/Cattaraugus Avenue: AM and PM Peak Hour – LOS E • Robertson Boulevard/National Boulevard: AM and PM Peak Hour – LOS F • Culver Boulevard/Venice Boulevard: PM Peak Hour – LOS E 49 ATTACHMENT 6 287TABLE 8 SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 1 Robertson Boulevard Cattaraugus Avenue [1] AM 0.948 E 0.949 E 0.001 No PM 0.933 E 0.936 E 0.003 No 2 Robertson Boulevard I-10 WB Off-Ramp/Kincardine Avenue [1] AM 0.797 C 0.801 D 0.004 No PM 0.809 D 0.815 D 0.006 No 3 Robertson Boulevard National Boulevard [1] AM 1.049 F 1.053 F 0.004 No PM 1.042 F 1.047 F 0.005 No 4 National Boulevard I-10 Eastbound On-Ramp [1] AM 0.415 A 0.415 A 0.000 No PM 0.454 A 0.457 A 0.003 No 5 Hughes Avenue Venice Boulevard [1] AM 0.841 D 0.843 D 0.002 No PM 0.767 C 0.771 C 0.004 No 6 Bagley Avenue Venice Boulevard [1] AM 0.789 C 0.791 C 0.002 No PM 0.763 C 0.767 C 0.004 No 7 Culver Boulevard Venice Boulevard [1] AM 0.849 D 0.852 D 0.003 No PM 0.957 E 0.961 E 0.004 No 8 Robertson Boulevard Venice Boulevard [1] AM 1.461 F 1.462 F 0.001 No PM 1.430 F 1.434 F 0.004 No 9 National Boulevard Venice Boulevard [1] AM 1.038 F 1.043 F 0.005 No PM 1.013 F 1.021 F 0.008 No 10 Helms Avenue Venice Boulevard [1] AM 0.527 A 0.528 A 0.001 No PM 0.515 A 0.517 A 0.002 No 11 Cattaraugus Avenue Venice Boulevard [1] AM 0.863 D 0.865 D 0.002 No PM 0.723 C 0.727 C 0.004 No 50 ATTACHMENT 6 288TABLE 8 (continued) SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 12 La Cienega Boulevard Venice Boulevard [1,2] AM 1.083 F 1.085 F 0.002 No PM 1.066 F 1.069 F 0.003 No 13 Hughes Avenue/Duquesne Avenue Washington Boulevard AM 0.641 B 0.641 B 0.000 No PM 0.653 B 0.654 B 0.001 No 14 Duquesne Avenue Culver Boulevard AM 0.760 C 0.762 C 0.002 No PM 0.886 D 0.891 D 0.005 No 15 Culver Boulevard Washington Boulevard/Irving Place AM 0.618 B 0.620 B 0.002 No PM 0.635 B 0.638 B 0.003 No 16 Main Street Culver Boulevard AM 0.581 A 0.582 A 0.001 No PM 0.613 B 0.613 B 0.000 No 17 Culver Boulevard Washington Boulevard AM 0.782 C 0.783 C 0.001 No PM 0.752 C 0.756 C 0.004 No 18 Robertson Boulevard/Higuera Street Washington Boulevard AM 0.975 E 0.990 E 0.015 No PM 0.816 D 0.847 D 0.031 No 19 Landmark Street Washington Boulevard AM 0.601 B 0.610 B 0.009 No PM 0.514 A 0.599 A 0.085 No 20 National Boulevard Washington Boulevard AM 0.946 E 0.963 E 0.017 No PM 0.925 E 0.947 E 0.022 Yes with Mitigation Measure [5] AM 0.913 E -0.033 No PM 0.897 D -0.028 No with Mitigation Measure - Alternative [5] AM 0.933 E -0.013 No PM 0.917 E -0.008 No 51 ATTACHMENT 6 289TABLE 8 (continued) SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 21 Wesley Avenue Washington Boulevard [3] AM 134.9 sec F 138.9 sec F 0.005 No PM 484.0 sec F 521.5 sec F 0.008 No AM 0.768 [6] 0.773 [6] - - PM 0.781 [6] 0.789 [6] - - 22 Helms Avenue Washington Boulevard AM 0.563 A 0.568 A 0.005 No PM 0.503 A 0.509 A 0.006 No 23 Cattaraugus Avenue Washington Boulevard [3] AM *** sec F *** sec F 0.007 No PM 709.6 sec F 778.5 sec F 0.016 No AM 1.030 [6] 1.037 [6] - - PM 0.898 [6] 0.914 [6] - - 24 La Cienega Boulevard Washington Boulevard AM 1.199 F 1.203 F 0.004 No PM 0.990 E 0.996 E 0.006 No 25 La Cienega Boulevard Fairfax Avenue [1] AM 1.060 F 1.060 F 0.000 No PM 0.898 D 0.898 D 0.000 No 26 Wesley Street National Boulevard AM 0.710 C 0.715 C 0.005 No PM 0.472 A 0.479 A 0.007 No 27 Hayden Avenue National Boulevard AM 0.640 B 0.643 B 0.003 No PM 0.738 C 0.747 C 0.009 No 28 Jefferson Boulevard National Boulevard [1] AM 1.002 F 1.009 F 0.007 No PM 0.752 C 0.757 C 0.005 No 29 La Cienega Boulevard Jefferson Boulevard [1,2] AM 1.278 F 1.280 F 0.002 No PM 1.205 F 1.210 F 0.005 No 30 Jefferson Boulevard Higuera Street/Rodeo Road [1] AM 0.755 C 0.758 C 0.003 No PM 0.781 C 0.790 C 0.009 No 52 ATTACHMENT 6 290TABLE 8 (continued) SUMMARY OF INTERSECTION LEVEL OF SERVICE ANALYSIS - FUTURE CONDITIONS Cumulative (2014) Cumulative (2014) Plus Project Conditions Peak Base Conditions Increase Significant Map # INTERSECTION Hour V/C LOS V/C LOS in V/C Impact 31 La Cienega Boulevard Rodeo Road [1] AM 1.217 F 1.219 F 0.002 No PM 1.248 F 1.251 F 0.003 No 32 Braddock Drive Duquesne Avenue [4] AM 227.9 sec F 229.1 sec F 0.001 No PM 158.5 sec F 160.3 sec F 0.003 No AM 1.185 [6] 1.186 [6] - - PM 1.325 [6] 1.328 [6] - - 33 Lucerne Avenue Duquesne Avenue [4] AM 51.7 sec F 52.2 sec F 0.002 No PM 66.8 sec F 68.4 sec F 0.005 No AM 0.939 [6] 0.941 [6] - - PM 1.052 [6] 1.057 [6] - - 34 Jefferson Boulevard Duquesne Avenue AM 1.211 F 1.215 F 0.004 No PM 1.030 F 1.034 F 0.004 No *** Intersection delay cannot be calculated. [1] City of Los Angeles location. [2] Los Angeles County Congestion Management Program (CMP) monitoring location. [3] Unsignalized intersections - stop-controlled on minor approach(es). [4] Unsignalized intersections - stop-controlled on all approach. [6] V/C ratio was calculated, based on signalized LOS methodology, to determine project impacts. [5] The Project requires only a small increment of V/C improvement to alleviate the significance of its impact (0.003 or 0.3% V/C improvement) during the PM peak hour. No significant impact occurs during the AM peak hour and therefore, no V/C improvement is required. 53 ATTACHMENT 6 291 • Robertson Boulevard/Venice Boulevard: AM and PM Peak Hour – LOS F • National Boulevard/Venice Boulevard: AM and PM Peak Hour – LOS F • La Cienega Boulevard/Venice Boulevard: AM and PM Peak Hour–LOS F • Robertson Boulevard-Higuera Street/Washington Boulevard: AM Peak Hour – LOS E • National Boulevard/Washington Boulevard: AM and PM Peak Hour – LOS E • Wesley Street/Washington Boulevard: AM and PM Peak Hour – LOS F • Cattaraugus Avenue/Washington Boulevard: AM and PM Peak Hour – LOS F • La Cienega Boulevard/Washington Boulevard: AM Peak Hour – LOS F; PM Peak Hour - LOS E • La Cienega Boulevard/Fairfax Avenue: AM Peak Hour – LOS F • Jefferson Boulevard/National Boulevard: AM Peak Hour – LOS F • La Cienega Boulevard/Jefferson Boulevard: AM and PM Peak Hour – LOS F • La Cienega Boulevard/Rodeo Road: AM and PM Peak Hour – LOS F • Braddock Drive/Duquesne Avenue: AM and PM Peak Hour – LOS F • Lucerne Avenue/Duquesne Avenue: AM and PM Peak Hour – LOS F • Jefferson Boulevard/Duquesne Avenue: AM and PM Peak Hour – LOS F Capacity calculation worksheets for Cumulative (2014) Base conditions are attached in Appendix E of the report. CUMULATIVE (2014) PLUS PROJECT TRAFFIC CONDITIONS The Cumulative (2014) plus Project peak hour traffic volumes were analyzed to determine the volume to capacity (V/C) ratio (or delay in seconds) and LOS at each of the analyzed intersections. The results of this analysis are also summarized on Table 8. Table 8 indicates that traffic generated by the Project would not change the intersection levels of service from cumulative base conditions at 33 of the 34 study intersections. Addition of the Project traffic would change the level of service at one of the study intersections. The intersection of Robertson Boulevard/I-10 Westbound Off-Ramp-Kincardine Avenue would operate at a LOS D under Cumulative (2014) plus Project conditions compared to a high LOS C under Cumulative (2014) Base conditions during the morning peak hour. 54 ATTACHMENT 6 292 Capacity calculation worksheets for Cumulative (2014) Plus Project conditions are attached in Appendix F of the report. PROJECT IMPACTS Using the specified significant impact criteria in the jurisdictions involved, traffic impacts at the analysis locations were determined. Table 8 identifies the individual impacts during both AM and PM peak hours at each of the analysis locations. It was estimated that one of the 34 analyzed intersections would be significantly impacted by the Proposed Project. It can be observed that the intersection of National Boulevard/Washington Boulevard would be significantly impacted during the evening peak hour by the traffic effects of the Proposed Project. The Project’s impact exceeds the threshold for significant impact by an incremental volume-to-capacity ratio of 0.003 or 0.3%. Therefore, intersection level mitigation measures at this location would be required for the Proposed Project. Note that for the stop-controlled intersection, both the delay and V/C ratio are reported in order to identify significant impacts. The delay is used to determine the level of service and the V/C is used to determine the incremental difference in V/C ratios to assess the impact caused by the Proposed Project. RECOMMENDED MITIGATION MEASURES In order to address the Project’s impact at the intersection of National Boulevard/Washington Boulevard, the following mitigation measure is recommended: ? The Project shall contribute its fair share towards implementation of a shuttle system service connecting the residential and commercial areas in Downtown Culver City and Hayden Tract areas to and from the Venice/Robertson Light Rail Train (LRT) Station on the Exposition Line (see Figure 10). Figure 10 shows the preliminary recommended route for this Culver City circulator service (Culver City Downtown/Culver Studios – Expo Culver City Station – Hayden Tract). This route will traverse along Washington Boulevard with stops in both directions adjacent to the Proposed Project site. The schedules for these shuttles should be developed such that coordinated transfers to and from the rail station at Venice Boulevard/Robertson Boulevard are achieved. These shuttles would operate at enhanced frequencies (10 minute headways) and provide fast, convenient, and efficient connections to the Metro Exposition LRT Line. 55 ATTACHMENT 6 29356 ATTACHMENT 6 294 In event that the shuttle program has not progressed sufficiently to warrant study funding, the following alternative mitigation measure shall be implemented: ? The Project shall contribute its fair share to the design and implementation of ATCS (Adaptive Traffic Control System) at the intersection of National Boulevard/Washington Boulevard. This includes provision of ATCS-associated signal equipment, additional loop detectors, communications set-up and the associated control PC hardware/software, if required. The ATCS is a PC-based traffic signal control program that provides full- response signal control based on real time traffic operating conditions. ATCS automatically adjusts and optimizes traffic signal timing in response to current traffic demands on the entire signal network such that the number of stops and the amount of delay are minimized along with improved traffic signal coordination throughout the network. The City of Culver City allows intersection capacity improvement of 3% with ATCS implementation. It is also worth noting that the Project requires only a small increment of V/C improvement to alleviate the significance of its impact (0.003 or 0.3% V/C improvement) during the PM peak hour at the intersection of National Boulevard and Washington Boulevard. No significant impact occurs in the AM peak hour and therefore, no V/C improvement is required. The Triangle Project at the Venice/Robertson Station and other nearby future projects would also be able to utilize the overall V/C improvement that the shuttle system service (or implementation of ATCS) would provide. It is recommended that the City allow sharing of these important improvement measures to advance their implementation schedule. Project Access Improvement Additionally, to enhance project access, the applicant of the Proposed Project shall be required to design, and construct the westbound left-turn signal at the intersection of Washington Boulevard and Landmark Street and be responsible for all costs associated with the modification of the traffic signal. This would improve operations at this intersection such that potential queuing beyond the left-turn pocket at the intersection would be alleviated. 57 ATTACHMENT 6 295 Effectiveness of Mitigation Measures The potential effectiveness of the proposed shuttle bus mitigation measure is calculated using a widely-used methodology. This methodology has been approved in several jurisdictions including the City of Los Angeles (Playa Vista First Phase Project EIR and the Village at Playa Vista Project EIR) and the City of Pasadena (Lake at Colorado Mixed-Use Project EIR). ? A shuttle bus has a seating capacity of 25 people. The auto occupancy in this region is 1.2 persons per automobile. Therefore, a 25-seat shuttle bus has the potential capacity of 21 autos (25/1.2 = 21) or critical movement trips traversing the intersection depending upon the direction and the number of lanes available at the intersection for the critical movement that the bus is traveling in. ? The frequency of the bus service provides the number of buses traversing the proposed route in one hour. The proposed shuttle bus is expected to operate at 10 minute frequencies throughout the day or at a rate of 6 buses per hour. Therefore, a total capacity of 125 critical movement trips (25 x 6 / 1.2 = 125) will be offered by the proposed shuttle route at the impacted intersection of National Boulevard/Washington Boulevard. ? This capacity of 125 critical movement trips was applied in the CMA (Critical Movement Analysis) worksheet at the National Boulevard/Washington Boulevard intersection to arrive at the intersection V/C ratio and level of service for the ‘traffic conditions with mitigation’ scenario. ? The ATCS improvement is allowed an intersection capacity improvement of 3%. Therefore, with the implementation of ATCS, the National Boulevard/Washington Boulevard intersection V/C ratio is estimated to improve by 3% in the traffic conditions with the alternative mitigation scenario. The results of the implementation of the recommended project-level improvements (including the alternative improvement) are summarized in Table 8. As indicated in the table, the recommended improvement (and alternative improvement) would fully mitigate the Project-related impact at the impacted intersection, National Boulevard/Washington Boulevard. Capacity calculation worksheets for Cumulative (2014) plus Project with Mitigation conditions are attached in Appendix G. It is also worth noting that this shuttle bus route would offer access to the Exposition LRT Line at the Venice/Robertson Station to the commercial and office uses along Washington Boulevard corridor including several large employers such as Sony Studios, Culver City City Hall, Culver 58 ATTACHMENT 6 296 Studios and others, as well as the residential community adjacent to City Hall and the Hayden Tract area. The applicant agrees to contribute $50,000 towards any costs associated with the implementation of the shuttle program, including a study to determine the benefits of a shuttle service, the City’s administrative work and start-up costs. In addition, the applicant agrees to participate in an assessment district that will be formed to pay for the operation and maintenance of the shuttle service. In event that the proposed shuttle is not implemented, the applicant agrees to contribute $50,000 towards any costs associated with the implementation of ATCS at the intersection of National Boulevard/Washington Boulevard, including the ATCS-associated signal equipment, additional loop detectors, communications set-up and the associated control PC hardware/software, if required. 59 ATTACHMENT 6 297 V. STREET SEGMENT AND PARKING/ACCESS ANALYSIS This chapter provides an analysis of roadway segments in the vicinity of the Project. This analysis is targeted towards assessment of potential neighborhood traffic intrusion impacts as a result of the Proposed Project. Additionally, parking evaluation on site and other access/circulation issues are addressed in this chapter. The parking evaluation consists of examining the proposed parking supply for the Project in relation to the parking requirements for the various uses proposed by the Project. The access and egress evaluation consists of a review of vehicular access and egress driveways to ascertain that adequate provisions are provided by the Project. RESIDENTIAL STREET SEGMENT TRAFFIC IMPACT ANALYSIS Working closely with the City of Culver City staff, eight roadway segment locations were identified for analysis and assessment of conditions with the Project. These street segments include: • Lucerne Avenue between Duquesne Avenue and Ince Boulevard • Lucerne Avenue between Ince Boulevard and Higuera Street • Wesley Street between National Boulevard and Higuera Street • Helms Avenue Street between National Boulevard and Higuera Street • Schaefer Street between National Boulevard and Higuera Street • Higuera Street between Washington Boulevard and Lucerne Avenue • Higuera Street between Lucerne Avenue and Wesley Street • Higuera Street between Wesley Street and Jefferson Boulevard Existing Street Segment Traffic Volumes Daily traffic counts were conducted in May 2010 and March 2011 using machine counters. Traffic counts collected in May 2010 were factored upward 1% per year to reflect existing 2011 conditions. The raw data for these traffic counts are included in Appendix C. 60 ATTACHMENT 6 298 Existing daily traffic volumes are summarized in Table 9. As indicated in the table, the existing daily traffic volume on Lucerne Avenue between Duquesne Avenue and Ince Boulevard is 6,629 vehicles per day and the street segment between Ince Boulevard and Higuera Street carries 3,956 vehicles per day. The existing daily traffic volume on Wesley Street between National Boulevard and Higuera Street is 519 vehicles per day. The existing daily traffic volume on Helms Avenue between National Boulevard and Washington Boulevard is 497 vehicles per day. The existing daily traffic volume on Schaefer Avenue between National Boulevard and Washington Boulevard is 600 vehicles per day. The analyzed street segments along Higuera Street carry 6,540 vehicles per day on the east, between Wesley Street and Jefferson Boulevard, and 8,361 vehicles per day on the west, between Washington Boulevard and Lucerne Avenue. Cumulative (2014) Base - Street Segment Traffic Volumes Future daily traffic volumes were projected for the residential streets in a manner similar to that used for the intersections described earlier. Firstly, with the assumed completion date of 2014, the existing 2011 traffic volumes were adjusted upward by a factor of 3% (1% per year compounded annually) to reflect this area-wide regional growth. Secondly, from traffic generated by specific cumulative projects located within, or in the vicinity of, the study area were added to the existing plus ambient growth traffic to obtain the Cumulative (2014) Base traffic volumes. The resulting Cumulative (2014) Base street segment daily and peak hour traffic volumes are summarized in Table 9. The daily traffic volume along the Helms Avenue and Schaefer Avenue study street segments increase by 3% due to future ambient growth and related projects. The Lucerne Avenue and Wesley Street analyzed street segments experienced a 7% to 8% daily traffic volume increase; while the Higuera Street analyzed street segments had a daily traffic increase of 14% to 17%. It was observed that the increase in traffic along Higuera Street is primarily due to the future planned projects along Hayden Place and Warner Drive. 61 ATTACHMENT 6 299TABLE 9 RESIDENTIAL STREET TRAFFIC ANALYSIS Two-Way Traffic Volume Time Existing (2011) Cumulative (2014) Project Cumulative (2014) Project % Significant Street Segment Period Conditions Base Conditions Traffic Plus Project Increase Impact Lucerne Avenue ADT 6,629 7,074 47 7,121 0.7% No between Duquesne Avenue and Ince Boulevard AM 712 755 1 756 0.1% No PM 760 803 4 807 0.5% No Lucerne Avenue ADT 3,956 4,264 47 4,311 1.1% No between Ince Boulevard and Higuera Street AM 446 476 1 477 0.2% No PM 384 412 4 416 1.0% No Wesley Street ADT 519 561 0 561 0.0% No between National Boulevard and Higuera Street AM 60 63 0 63 0.0% No PM 52 57 0 57 0.0% No Helms Avenue ADT 497 512 0 512 0.0% No between National Boulevard and Higuera Street AM 67 69 0 69 0.0% No PM 45 46 0 46 0.0% No Schaefer Street ADT 600 618 0 618 0.0% No between National Boulevard and Higuera Street AM 61 63 0 63 0.0% No PM 55 57 0 57 0.0% No Higuera Street ADT 8,361 9,546 47 9,593 0.5% No between Washington Boulevard and Lucerne Avenue AM 842 964 1 965 0.1% No PM 743 851 4 855 0.5% No Higuera Street ADT 6,760 7,761 0 7,761 0.0% No between Lucerne Avenue and Wesley Avenue AM 769 875 0 875 0.0% No PM 541 630 0 630 0.0% No Higuera Street ADT 6,540 7,675 71 7,746 0.9% No between Wesley Avenue and Jefferson Boulevard AM 696 809 4 813 0.5% No PM 577 669 6 675 0.9% No 62 ATTACHMENT 6 300 Cumulative (2014) plus Project - Street Segment Traffic Volumes Based on the distribution assumptions (included in Figure 7) and the daily trip generation estimates (approximately 2,360 daily trips) for the Proposed Project, daily traffic estimates of project-only trips were developed. It was determined that the Project would add 47 daily trips to Higuera Street between Washington Boulevard and Lucerne Avenue and both Lucerne Avenue analyzed street segments and would add 71 daily trips on Higuera Street between Wesley Street and Jefferson Boulevard. The Cumulative (2014) plus Project daily traffic volumes resulting from the addition of trips generated by the Proposed Project are shown in Table 9. Street Segment Significant Impact Criteria As outlined in the City of Culver City Traffic Study Criteria, the following specific threshold criteria for project impacts to any street segment detailed below were used in this study: Projected Avenue Daily Project-Related Increase Traffic (ADT) with Project in Average Daily (ADT) Volume 999 Less 120 or more 1,000 to 1,999 12% or more of final ADT 2,000 to 2,999 10% or more of final ADT 3,000 or more 8% or more of final ADT Assessment of Significant Impacts As shown in Table 9, the Proposed Project would increase the traffic on Lucerne Avenue roadway segment between Duquesne Avenue and Ince Boulevard by 0.7% on a daily basis and by 0.1% and 0.5% during the morning and evening peak hours, respectively. On Lucerne Avenue between Ince Boulevard and Higuera Street, the Proposed Project would increase traffic by 1.1% on a daily basis and by 0.2% during the morning peak hour and 1% during the evening peak hour. On Higuera Street between Washington Boulevard and Lucerne Avenue, the Proposed Project would increase traffic by 0.5% on a daily basis and by 0.1% during the morning peak hour and 0.5% during the evening peak hour. On Higuera Street between Wesley Street and Jefferson Boulevard, the Proposed Project would increase traffic by 0.9% on a daily basis and by 0.5% and 0.9% during the morning and evening peak hours, respectively. 63 ATTACHMENT 6 301 The potential impacts of the Proposed Project traffic on the adjacent neighborhood residential streets were assessed using the City of Culver City criteria specified earlier in the chapter. The results of the analysis, which are summarized in Table 9, indicate that the Proposed Project would not have a significant impact on the residential streets in the local neighborhood. PARKING EVALUATION The Proposed Project consists of 28,708 square feet of office use, 36,819 square feet of retail use, and 12,257 square feet of restaurant use. The Project would provide a 202-space multi- level parking structure (with ground floor retail) and a 77-space parking structure for an overall total supply of 279 parking spaces. The Project site plan is shown in Figure 10. The following are the parking requirements contained within Section 17.320.020 Number of Parking Spaces Required established by the Culver City Municipal Zoning Code: ? Offices, Administrative, Corporate, Professional - 1 space per 350 G.S.F. ? Shopping Centers, Less than 5 acres in net parcel area – 1 space per 250 G.S.F. ? Restaurant, Located in shopping centers: Less than 25% of floor area of center for all restaurants – Parking requirement covered under the general requirement for shopping center. Based on these requirements, the required parking for this project would be 278 spaces (office: 28,708 G.S.F. x 1 space/350 G.S.F. = 82 spaces, retail: 36,819 G.S.F x 1 space/250 G.S.F =147 spaces; restaurant: 12,257 G.S.F. x 1 space/250 G.S.F. = 49 spaces). The Project would provide a total 279 parking spaces. Therefore, there would be adequate parking for the Proposed Project. ACCESS AND CIRCULATION Driveways located along Landmark Street would provide access to the Project parking structures. One driveway would be located on the west side of the street providing access to the 202-space parking structure. Three driveways would be located on the east side of the 64 ATTACHMENT 6 30265 ATTACHMENT 6 303 street; two driveways providing access to the 77-space parking structure and the other driveway providing access to the loading/trash area. The existing driveways along Washington Boulevard to the site would be removed. In the western 202-space parking structure, the typical parking spaces would be 18 feet deep X 8 ½ feet wide in size. The width of the parking aisles vary from approximately 34 ½ feet on the first floor to 27 feet to 28 feet wide on floors 2 through 5, with a 25-foot ramp to access the parking levels. The parking field would provide nine handicapped spaces. The driveway would include gate arms controlling the entrance and exit lanes. In the 77-space eastern parking structure, the typical parking spaces would be 18 feet deep X 8 ½ feet wide in size. On the first floor, the width of the parking aisles vary from approximately 25 feet to 27 feet, with a 19 ½-foot ramp to access the second floor. On the second floor, the width of the parking aisles vary from approximately 19 feet to 30 feet, with a 20 ½-foot ramp to access the third floor. On the third floor, the width of the parking aisle varies from approximately 14 feet to 26 feet. This parking structure would provide four handicapped spaces. A detailed review of the site plan was conducted and it was determined that the access driveway, all the parking aisles and parking spaces at all levels proposed as part of the Project would function adequately. Summarizing, the project’s parking, access and circulation systems would be adequate and they would all function satisfactorily. 66 ATTACHMENT 6 304 VI. REGIONAL CONGESTION MANAGEMENT PROGRAM ANALYSIS This section presents the Congestion Management Program (CMP) Transportation Impact analysis. This analysis was conducted in accordance with the procedures outlined in the 2010 Congestion Management Program for Los Angeles County (Los Angeles County Metropolitan Transportation Authority, 2010). The CMP requires that when a traffic impact report is prepared for a project, traffic impact analyses be conducted for selected regional facilities based on the quantity of project traffic expected to use these facilities. CMP TRAFFIC IMPACT ANALYSIS The CMP guidelines for determining the study area of the analysis for CMP arterial monitoring intersections and for freeway monitoring locations are as follows: • All CMP arterial monitoring intersections where the proposed project will add 50 or more trips during either the AM or PM weekday peak hours of adjacent street traffic. • All CMP mainline freeway monitoring locations where the proposed project will add 150 or more trips, in either direction, during either the AM or PM weekday peak hours. The CMP arterial monitoring intersections within a three-mile from the Project site includes the following: • La Cienega Boulevard/Venice Boulevard – City of Los Angeles jurisdiction • La Cienega Boulevard/Jefferson Boulevard – City of Los Angeles jurisdiction • Centinela Avenue/Venice Boulevard – City of Los Angeles jurisdiction • La Cienega Boulevard/Stocker Street – County of Los Angeles jurisdiction • La Cienega Boulevard/Wilshire Boulevard – City of Beverly Hills jurisdiction • Santa Monica Boulevard/Wilshire Boulevard – City of Beverley Hills jurisdiction • Overland Avenue/Venice Boulevard – City of Culver City jurisdiction 67 ATTACHMENT 6 305 Based on the incremental Project trip generation estimates presented in Chapter III, the Proposed Project is not expected to add 50 or more new trips per hour to any of these locations. Therefore, no further analysis of these CMP monitoring intersections would be required. However, two of the CMP arterial monitoring intersections listed above, La Cienega Boulevard/Venice Boulevard and La Cienega Boulevard/Jefferson Boulevard, have been included in the traffic analysis and it was determined that the Project would not have a significant intersection traffic impact at either of these locations. The CMP mainline freeway monitoring locations within a three-mile radius from the Project site includes the following: • Santa Monica (I-10) Freeway east of Overland Avenue • Santa Monica (I-10) Freeway east of La Brea Avenue • San Diego Freeway (I-405) north of Venice Boulevard Based on the incremental Project trip generation estimates, the Proposed Project will not add 150 or more new trips per hour to these locations in either direction. Therefore, no further analysis of CMP freeway monitoring stations is required. 68 ATTACHMENT 6 306 VII. SUMMARY OF CONCLUSIONS This study was undertaken to assess existing traffic conditions, estimate future conditions with and without the proposed project, analyze potential traffic impacts of the Proposed Project, assess required improvements and identify/recommend project mitigation to alleviate the significant traffic impacts on the transportation system. Raju Associates, Inc. has performed this detailed study and the following summarizes the results of this analysis: ? Thirty-four intersections were analyzed within the study area for this project. These locations are within the study area bounded by Cattaraugus Avenue on the north, Jefferson Boulevard/Rodeo Road on the south, Hughes Avenue/Duquesne Avenue on the west and La Cienega Boulevard on the east. Of the 34 intersections, 17 intersections are located within the City of Culver City and 17 intersections within the City of Los Angeles. ? Currently, 24 of the 34 analyzed intersection locations are operating at acceptable levels of service (LOS) D or better during the morning peak hour. During the evening peak hour, 26 of the 34 analyzed intersections are operating at LOS D or better. The remaining intersections are operating at LOS E or F. ? In the Cumulative (Year 2014) Base conditions, i.e., future conditions without the implementation of the Proposed Project, 17 of the 34 analyzed intersection locations are projected to continue to operate at LOS D or better during the morning peak hour. During the evening peak hour, 19 of the 34 analyzed intersections are projected to operate at LOS D or better. The remaining intersections are projected to operate at LOS E or F. ? The Proposed Project would consist of 28,708 square feet of office use, 36,819 square feet of retail use, and 12,257 square feet of restaurant use. The Project is estimated to generate a net total of approximately 91 trips during the morning peak hour and 200 trips during the evening peak hour. ? In the Cumulative (Year 2014) plus Project conditions, both the AM and PM peak hour operating conditions would be similar to those projected for the Cumulative (2014) Base conditions. ? The Cumulative (Year 2014) plus Project conditions indicate that the Proposed Project would cause a significant traffic impact at the intersection of National Boulevard and Washington Boulevard during the evening peak hour. The Project’s impact exceeds the threshold for significant impact by an incremental volume-to-capacity ratio of 0.003 or 0.3%. No significant impact would occur at any of the other analyzed intersections. 69 ATTACHMENT 6 307 ? In order to address the Project’s impact at the intersection of National Boulevard/Washington Boulevard, the following mitigation measure is recommended: The Project shall contribute its fair share towards implementation of a shuttle system connecting the residential and commercial areas in Downtown Culver City and Hayden Tract areas to and from the Venice/Robertson Light Rail Train (LRT) Station on the Exposition Line. This shuttle system will include shuttle buses with stops along Washington Boulevard. The schedules for these shuttles should be developed such that coordinated transfers to and from the rail station at Venice/Robertson are achieved. These shuttles would operate at enhanced frequencies during the peak commuter time periods and provide fast, convenient, and efficient connections to the Metro Exposition LRT Line. In event that the proposed shuttle program has not progressed sufficiently to warrant study funding, the following alternative mitigation measure shall be implemented: The Project shall contribute its fair share towards the design and implementation of ATCS (Adaptive Traffic Control System) at the intersection of National Boulevard/Washington Boulevard. This includes provision of ATCS-associated signal equipment, additional loop detectors, communications set-up and the associated control PC hardware/software, if required. Additionally, to improve access to the Proposed Project’s parking facilities along Landmark Street, the applicant of the Proposed Project shall be required to design, and construct the westbound left-turn signal at the intersection of Washington Boulevard and Landmark Street and be responsible for all costs associated with the modification of the traffic signal. ? Parking, access and circulation systems were assessed as part of this study. A review of the proposed site plan was also conducted. This review indicates that they would all function adequately and that there would be no adverse impact from the Proposed Project. 70 ATTACHMENT 6 308 APPENDICES A MEMORANDUM OF UNDERSTANDING B INTERSECTION LANE CONFIGURATIONS C TRAFFIC COUNTS D CAPACITY CALCULATION WORKSHEETS – EXISTING (2011) CONDITIONS E RELATED PROJECTS TRIP GENERATION RATES / CAPACITY CALCULATION WORKSHEETS – CUMULATIVE (2014) BASE CONDITIONS F CAPACITY CALCULATION WORKSHEETS – CUMULATIVE (2014) PLUS PROJECT CONDITIONS G CAPACITY CALCULATION WORKSHEETS – CUMULATIVE (2014) PLUS PROJECT WITH MITIGATION MEASURES ATTACHMENT 6 309 APPENDIX A Memorandum of Understanding (MOU) ATTACHMENT 6 310Attachment A Memorandum Of Understanding For Traffic Study This Memorandum of Understanding (MOU) acknowledges and agrees to all of the City of Culver City requirements and fees for the preparation of a traffic study for the following project: Project Name: The Platform @ Culver Station____________________________ Project Address: 8810-40-50 Washington Boulevard/3920 Landmark Street, Culver City, CA______________________________________________ Project Description: 28,708 s.f. GFA Office / GFA Industrial 36,819 s.f. GFA Retail / Residential Units 12,257 s.f. GFA Restaurant / GFA Other * Gross Floor Area (GFA) shall be as defined in the most recent ITE publication. Project Horizon Year: ___2014__ Ambient Growth Rate: One (1.0) % Per Year Directional Distribution: N: 20 % S: 15% % E: 35 % W: 30 % [Attach map(s) illustrating directional distribution percentages at all intersections and driveways.] Please see Figure C. Trip Generation Rate(s): ITE Latest Edition / Other: Please see Attachment A. Land Use: ITE Code #: ITE Code #: In / Out In / Out Total In / Total Out AM Trips: _____ / __ / ___ ___ / PM Trips: _____ / __ _ __ / ___ / __ Use additional pages if necessary. Prior to the start of any proposed project analysis, the Traffic Consultant shall: 1) Obtain a list of related projects from the City of Culver City Planning Division and from all other affected jurisdictions; 2) Prepare a draft list of “related projects specific to the proposed project”; and Please see Attachment B. 3) Obtain written approval from the City of the “related projects specific to the proposed project” list. Intersections To Be Studied: 34 intersections, please see Attachment C. No. Intersection: / Jurisdiction: 1. / 2. / 3. / 4. / 5. / 6. / 7. / 8. / 9. / 10. / Use additional pages if necessary. Additionally, indicate any intersections that are subject to capacity analysis credit for advanced traffic signal control synchronization. Indicate any non- signalized intersections to be studied. ATTACHMENT 6 311City of Culver City Traffic Study Criteria Page 2 Residential Streets To Be Studied No. Street Segment: / Jurisdiction: 1. Lucerne Avenue between Duquesne Av and Ince Bl / Culver City 2. Lucerne Avenue between Ince Bl and Higuera St / Culver City 3. Wesley Street between Higuera St and National Bl / Culver City 4. Helms Avenue between Higuera St and National Bl / Culver City 5. Schaeffer Street between Higuera St and National Bl / Culver City 6. Higuera Street between Washington Bl and Lucerne Av / Culver City 7. Higuera Street between Lucerne Av and Wesley St / Culver City 8. Higuera Street between Wesley St and Jefferson Bl / Culver City 9. / 10. / Use additional pages if necessary. Additionally, all intersection and street segment traffic count data shall be submitted both in written format and in an electronic format acceptable to the City. Indicate trip credits to be requested (Amount subject to City approval): Yes No 1. Existing Uses: ? X 2. Pass-By Trips: X ? 3. Internal Trip Capture: X ? 4. Transit Oriented Developments (TOD): X ? 5. Transportation Demand Management (TDM): ? X Proposed Traffic Mitigation Any proposed traffic mitigation measure shall be listed and accompanied by a drawing of the existing and proposed improvements [including city boundary lines and existing / proposed property lines] and plans shall be of a minimum scale of one inch (1”) equal to forty feet (40’-0”). Post-Occupancy Traffic Counts By signing below, the Property Owner / Developer / Applicant hereby agrees to pay for and submit to the City a post-occupancy traffic count analysis of the development to the satisfaction of the City. The analysis shall determine the amount of actual traffic generated by the development compared to the ITE trip generation rates. The analysis shall include traffic counts of all onsite driveways to be taken upon reaching eighty five percent (85.0%) occupancy of the total building gross floor area or within one (1) year of the issuance of the first Temporary Certificate of Occupancy (TCO), as determined by the City. The data shall be used to confirm the findings in the approved traffic study, and shall not result in any additional traffic mitigation measures and/or conditions of approval on the subject project. Congestion Management Plan (CMP) This project shall also be subject to all City imposed CMP developer fees if the Planning Commission approval date is on or after the effective date of any City Council imposed CMP developer fees or as may be otherwise imposed by the City. ATTACHMENT 6 312ATTACHMENT 6 313ATTACHMENT 6 314ATTACHMENT A ESTIMATED PROJECT TRIP GENERATION AM Peak Hour PM Peak Hour Size Daily IN OUT TOTAL IN OUT TOTAL Proposed Project Retail 36,819 s.f. 1,581 23 14 37 67 70 137 Restaurant 12,257 s.f. 1,103 5 5 10 62 30 92 Office 28,708 s.f. 510 61 8 69 7 36 43 Project Trip Generation Total 3,194 89 27 116 136 136 272 Transit Trip Use (7.5%) - Office (38) (5) (1) (6) (1) (3) (4) *Internal Capture (10%) Trip Credit (316) (8) (3) (11) (14) (13) (27) **Pass-By (20%) Trip Reduction - Retail/Restaurant (483) (5) (3) (8) (21) (20) (41) Project Trip Generation Net Total 2,357 71 20 91 100 100 200 Trip Rates [1] General Office (ITE Land Use 710) Trips per 1,000 s.f. [2] 88% 12% [2] 17% 83% 1.49 Retail (ITE Land Use 820) Trips per 1,000 s.f. 42.94 61% 39% 1.00 49% 51% 3.73 Restaurant (ITE Land Use 931) Trips per 1,000 s.f. 89.95 50% 50% 0.81 67% 33% 7.49 * Internal capture credit taken after reduction of transit trips. ** Pass-by trip reduction taken after internal capture credits. [1] Trip Generation, An ITE Information Report, 8th Edition, ITE 2008 [2] Daily and AM peak hour trip generation for office was calculated using the following formulas: Daily: Ln(T) = 0.77 Ln(X) + 3.65 Where: AM Peak Hour: Ln(T) = 0.80 Ln(X) + 1.55 Ln = Natural logarithm T = Two-way volume of traffic (total trip-ends) X = Area in 1,000 square feet gross floor area ATTACHMENT 6 315ATTACHMENT B1 LIST OF RELATED PROJECTS - CULVER CITY [1] Estimated Completed # Project Name Address Description City Completion Date Date Project Phase PROJECTS TO BE INCLUDED IN TRAFFIC STUDY 1 Sony 10202 Washington Bl Sony Lot Project - Approved to build net new 100,000 G.S.F. of office, post-production, stage, and support uses. CC 2009 2009 Completed 2 Huron Townhouses 3823-3833 Huron Av 15 new townhouses, demo 3 existing CC 2009 2009 Completed 3 Four Unit Condominium 3972 Tilden Av 4 unit condominium, TPM CC 2009 2009 Completed 5 Baldwin Hills Scenic Overlook Park Hetzler Rd Existing 10,300 G.S.F. visitor center, passive recreation area CC 2009 2009 Completed 6 Washington-Ince Realignment Washington and Ince Bl at 9300 Culver Bl Washington-Ince Bl Realignment CC 2009 2009 Completed 9 Three New Condominiums 4048 Lincoln Av 3 Townhome Condominiums CC 2010 2010 Completed 10 Eight Unit Condo 4067/4073 Lincoln Av 8 unit condominiums, TTM, 2,000 G.S.F.; 20 parking spaces provided CC 2010 2010 Completed/TCO 12 Turning Point School - CUP Modification 8794 National School, addition/remodel of net 9,000 G.S.F. CC 2010 2010 Completed 13 Uptown Lofts 9900 Culver Bl 5,457 G.S.F. offices, 18 condominiums CC 2010 2010 Completed 16 Hampton Inn 3954 Sepulveda Bl 77-unit hotel CC 2011 TBD Building Permit 17 Four Unit Condominium 4014 Van Buren Pl 4 unit condominium, TPM CC 2011 TBD Construction 18 Irving Residential/Office 4043 Irving Pl 4 Story; 26 residential units; 3 office units CC 2011 TBD Building Permit 20 Legado Mixed Use TOD 8770 Washington Bl New mixed used development w/preliminary concept of up to (appox.) 115 residential units, retail (market, pharmacy & café) 31,040 G.S.F. CC 2011 TBD Pre-Application 21 West Los Angeles Community College Master Plan and EIR LA County Approx. 291,300 G.S.F. of new building construction & renovation. Anticipate future student population of approx. 18,904 students & 1,248 employees by fall 2022. Project includes second access road, parking structures, landscaping & development of athletic facilities. LA County 2011 TBD Construction 22 Morphosis Architects Office 3440 Wesley 11,657 S.F Architects Office (Previously Clyde's Auto Body Shop) CC 2011 TBD Construction 23 Lux @ 9901 Mixed Use 9901 Washington Bl, City of LA 14,112 G.S.F. mixed use development with 131 dwelling units, 12,178 G.S.F. of retail and three level subterranean parking structure with 244 parking spaces. LA 2011 TBD Entitlement 24 New Restaurant 5854 Blackwelder St/3077 La Cienega Addition of 1,150 G.S.F. Two story structure to existing 1,195 G.S.F. building for new restaurant use. CC 2011 TBD Entitlement 25 New Dental Office - Building Permit 10826, and 10830 Washington Bl Construction of new one story dental and retail building (2,989 G.S.F) CC 2011 TBD Construction 27 Union 76 10638 Culver Bl Gas station and convenience store with new car wash; 2,500 G.S.F. CC 2012 TBD Building Permit 29 Distribution & Warehouse 3434 Wesley St 10,500 G.S.F. of office, warehouse, & distribution CC 2012 TBD Pre-Building Permit. Entitlements but no Building Permits. 30 Four Unit Condominium 3846 Bentley Av 4 unit condominium, TPM CC 2012 TBD Building Permit 31 Four Unit Condominium 4058 Madison Av 4 unit condominium, TPM CC 2012 TBD Building Permit 34 Warner Parking Structure 8511 Warner Dr 51,520 G.S.F. Retail/Restaurant; 784 Parking Spaces, five levels CC 2012 TBD Building Permit 35 Office Building 9919 Jefferson Bl 113,467 G.S.F., three-story office building CC 2012 TBD Building Permit 36 New Vehicle Repair Shop 11167 Washington Pl Construction of a new vehicle repair shop with 1,196 G.S.F. of repair area with two service bays and 191 G.S.F. of office. CC 2012 TBD Entitlement 37 Fresh Paint Mixed Use 9355 Culver Bl Additional 2nd story office and third floor residential unit for a total of 5,708 G.S.F. to an existing office/warehouse building CC 2012 TBD Building Permit ATTACHMENT 6 316ATTACHMENT B1 LIST OF RELATED PROJECTS - CULVER CITY [1] Estimated Completed # Project Name Address Description City Completion Date Date Project Phase 40 Abraxis Bio Science 9920 Jefferson Bl Exterior and interior renovation to an existing two-story building. Addition of a three story, 17,000 G.S.F. building over a one-story building (net addition is 14,999 G.S.F. - demo 2,001 G.S.F of existing building area). CC 2012 TBD Entitlement 41 Clive Wilkinson Architects, New Architects Office and Ancillary Retail or Office 6114, 6116, 6118 Washington Bl New two-story, 5,560 G.S.F. office building which includes an ancillary retail or office. CC 2012 TBD Building Permit 42 New 7-Eleven Convenient Store 4436 Sepulveda Bl Construction of a new 2,500 G.S.F., one story convenience store. CC 2012 TBD Entitlement 43 Expo Light Rail Station-Culver City Station Washington Bl/National Bl Light Rail Train Station CC 2013 TBD Pre-Application 48 Parcel B 9300 Culver Bl 118,000 G.S.F. of office, restaurant, and retail spaces CC 2013 TBD Building Permit 49 West Los Angeles Community College Master Plan and EIR (2010) West LA College Approximately 92,000 of net new building construction and renovation. LA County 2013 TBD Entitlement 50 Culver Studios Amend. No. 6 9336 Washington Bl Phase 1 - 25,093 G.S.F. office; 13,634 G.S.F. support; 302 parking spaces. Phase 2 - 63,500 G.S.F. office; 8,741 G.S.F. support CC 2013 TBD Pre-Application 51 Arco AM/PM - New Carwash 5884 Washington Bl New Carwash and storage room totaling 1,200 G.S.F. at an existing fueling station. CC 2013 TBD Building Permit 52 New Two story commercial building 11012 - 11014 Washington Bl Two story commercial building totaling 3,385 G.S.F. CC 2013 TBD Entitlement 53 Tilden Terrace 11042-11056 Tilden Av New three-story, 48,525 G.S.F. mixed use development with 10,700 G.S.F. of ground floor retail and 33 residential units. CC 2013 TBD Entitlement 54 Duquesne Ave Condominiums 4139-4145 Duquesne Av Seven (7) condominium units. CC 2013 TBD Entitlement 55 Greg Reitz 8665 Hayden Pl Construct 63,679 G.S.F. of office CC 2014 TBD Pre-Building Permit. Entitlements but no Building Permits. 56 Triangle Site - Washington/National TOD Corner of Washington/National New transit oriented development to include light rail station & mixed use development (preliminary concept includes up to 200 du, 149 room hotel, 200,000 G.S.F. office, 51,500 G.S.F. retail, & 20,000 G.S.F. restaurant CC 2014 TBD Pre-Application 57 Willow's School Comprehensive Plan 8509-8487 Higuera St, 8476 Warner Dr Phase 1 - new surface parking; increased student enrollment by 50 from 425 to 475; Phase II & III increased student enrollment by 100, from 475 to 575. CC 2014 TBD Pre-Application 58 Bridge Housing Project 3814 Lenawee Av Proposal for 2-3 story senior housing project with 62 units and 41 parking spaces. CC 2014 TBD Pre-Application 59 Jewish Home for the Aging, Gonda Healthy Aging Campus 3847 Delmas Ter., 3820-3842 Hughes, 9823 Venice Bl 184 congregate care units, 48 residential care units, 14,000 G.S.F. PACE program CC/LA 2016 TBD Pre-Application ATTACHMENT 6 317ATTACHMENT B1 LIST OF RELATED PROJECTS - CULVER CITY [1] Estimated Completed # Project Name Address Description City Completion Date Date Project Phase PROJECTS FARTHER THAN 2 MILES FROM THE SITE, UNLESS NOTED OTHERWISE; EXCLUDED FROM THE STUDY'S RELATED PROJECTS LIST 4 Child Day-Care Center 4024/4026 Wade St Conversion of a 1,371 G.S.F. duplex into a day care - no new square footage. CC 2009 2009 Completed 7 Westfield Fox Hills Mall Expansion 6000 Sepulveda Bl 293,786 G.S.F. retail and 427 parking spaces CC 2010 2010 Phase 1 Completed 8 Four Unit Condominium 4025 Wade St 4 unit condominium, TPM CC 2010 2010 Completed 11 Fire Station No. 3 6030 Bristol Pkwy Two-story, 12,156 G.S.F. fire station CC 2010 2010 Completed 14 Burger King - Live/Work Units 13340 Washington Bl 41 unit condominium development with 6 live/work condominium units in Culver City and 35 units in LA CC/LA 2011 TBD Construction 15 Glencoe/Washington Mixed Use 13365 Washington Bl 4,183 G.S.F. ground floor retail and 19 units CC 2011 TBD Building Permit 19 Office & Retail Building 700-701 Corporate Pointe 240,612 G.S.F. office; 4,242 G.S.F. retail CC 2011 TBD Entitlement 26 11957 Washington Bl Office Project 11957 Washington Bl 73,569 G.S.F., 3-story office building CC 2012 TBD Entitlement 28 Faynsod Family Trust 11501-11509 Washington Bl Mixed Use: 3 Retail (2,359 G.S.F.), 1 Office (937 G.S.F.) & 2 Apts. (1,867 G.S.F.) CC 2012 TBD Building Permit 32 Dr. Brenord Dutt 5800 Uplander Wy Add 3 stories/57,050 G.S.F. to a 2 story 26,140 G.S.F. Office CC 2012 TBD Pre-Building Permit. Entitlements but no Building Permits. 33 Radisson Office Tower 6161 Centinela Bl 342,400 G.S.F. office tower and parking structure addition CC 2012 2010 Building Permit 38 12714-12718 Washington Bl Mixed Use 12714-12718 Washington Bl 5 unit mixed use project with approximately 3,300 G.S.F. ground floor retail CC 2012 TBD Pre-Application 39 11304 Culver Bl, CUP for Auto Repair Shop 11304 Culver Bl T.I. to existing 1,280 G.S.F., 3-bay vacant building for auto repair shop per plan CC 2012 TBD Entitlement 44 Modification to CUP, Expanding School 12095-12101 Washington Bl Conversion of a 20,090 G.S.F. office building into classrooms & administrative offices. CC 2013 TBD Pre-Application 45 Washington Place Office Condos 12402 Washington Pl 42,000 S.F. 4-story office and retail building. 9,300 G.S.F. of retail and 30,400 G.S.F. of office CC 2013 TBD Pre-Building Permit. Entitlements but no Building Permits. 46 Baldwin Site 12803 W. Washington Bl New 3 story commercial (office and retail) condominium building (retail ground floor) totaling 37,308 G.S.F. CC 2013 TBD Pre-Building Permit. Entitlements but no Building Permits. 47 Washington/Landmark Mixed Use TOD Project Site 8810,8840,8850 Washington Bl New commercial development consisting of approximately 12,257 G.S.F. of restaurant use, 36,819 G.S.F. of retail, and 28,708 G.S.F. of office use. CC 2013 TBD Pre-Application [1] Culver City Related Projects List (dated March 31, 2011) provided by the City of Culver City. ATTACHMENT 6 318No. Project Name Location Land Use Size CITY OF LOS ANGELES RELATED PROJECTS LIST - PROVIDED BY LADOT, FEBRUARY 2011 1 Mixed-Use (The Palms) 10601 Washington Boulevard Apartment 126 units Office 23,000 s.f. Retail 9,000 s.f. Restaurant 9,000 s.f. Office (to be removed) (10,000) s.f. 2 Apartment/Retail 3417 Motor Avenue Apartment 115 units Retail 975 s.f. Apartment (to be removed) (15) units Single-Family Dwelling (to be removed) (2) units Office (to be removed) (3,300) s.f. 3 Mixed-Use 10604 West National Boulevard Condominium 29 units Retail 1,250 s.f. Office 2,000 s.f. 4 Mixed-Use 2900 S. Sepulveda Boulevard Apartment 48 units Office 1,500 s.f. 5 Media Related Office 3105 La Cienega Boulevard Office 133,000 s.f. Manufacturing (to be removed) (109,000) s.f. 6 Office 10100 Culver Boulevard Office 50,000 s.f. 7 Mixed-Use 3115 S. Sepulveda Boulevard Condominium 175 units Retail 28,000 s.f. Discount Store (to be removed) (28,000) s.f. 8 Condominium 11131 Rose Avenue Condominium 227 units Apartment (to be removed) (89) units 9 Restaurant/Retail 10612 National Boulevard Restaurant 2,500 s.f. Retail 3,500 s.f. 10 Private School 2920 S. Sepulveda Boulevard Private School 120 student Office (to be removed) (9,000) s.f. ATTACHMENT B2 LIST OF RELATED PROJECTS- CITY OF LOS ANGELES ATTACHMENT 6 319ATTACHMENT C LIST OF STUDY INTERSECTIONS Intersection Signal System # Northbound/Southbound Eastbound/Westbound Jurisdiction Signalized? Control 1. Robertson Boulevard Cattaraugus Avenue City of Los Angeles Yes ATSAC/ATCS 2. Robertson Boulevard I-10 WB Off-Ramp/Kincardine Avenue City of Los Angeles Yes ATSAC/ATCS 3. Robertson Boulevard National Boulevard City of Los Angeles Yes ATSAC/ATCS 4. National Boulevard I-10 Eastbound On-Ramp City of Los Angeles Yes ATSAC/ATCS 5. Hughes Avenue Venice Boulevard City of Los Angeles Yes ATSAC 6. Bagley Avenue Venice Boulevard City of Los Angeles Yes ATSAC 7. Culver Boulevard Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 8. Robertson Boulevard Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 9. National Boulevard Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 10. Helms Avenue Venice Boulevard City of Los Angeles Yes ATSAC/ATCS 11. Cattaraugus Avenue Venice Boulevard City of Los Angeles Yes ATSAC 12. La Cienega Boulevard Venice Boulevard [1] City of Los Angeles Yes ATSAC/ATCS 13. Hughes Avenue/Duquesne Avenue Washington Boulevard Culver City Yes ATSAC 14. Duquesne Avenue Culver Boulevard Culver City Yes ATSAC 15. Culver Boulevard Washington Boulevard/Irving Place Culver City Yes ATSAC 16. Main Street Culver Boulevard Culver City Yes ATSAC 17. Culver Boulevard Washington Boulevard Culver City Yes ATSAC 18. Robertson Boulevard/Higuera Street Washington Boulevard Culver City Yes ATSAC 19. Landmark Street Washington Boulevard Culver City Yes ATSAC 20. National Boulevard Washington Boulevard Culver City Yes ATSAC 21. Wesley Avenue Washington Boulevard Culver City No - 22. Helms Avenue Washington Boulevard Culver City Yes ATSAC 23. Cattaraugus Avenue Washington Boulevard Culver City No - 24. La Cienega Boulevard Washington Boulevard Culver City Yes ATSAC 25. La Cienega Boulevard Fairfax Avenue [1] City of Los Angeles/Culver City Yes ATSAC/ATCS 26. Wesley Street National Boulevard Culver City Yes ATSAC 27. Hayden Avenue National Boulevard Culver City Yes ATSAC 28. Jefferson Boulevard National Boulevard City of Los Angeles Yes ATSAC/ATCS 29. La Cienega Boulevard Jefferson Boulevard [1] City of Los Angeles Yes ATSAC/ATCS 30. Jefferson Boulevard Higuera Street/Rodeo Road City of Los Angeles Yes ATSAC/ATCS 31. La Cienega Boulevard Rodeo Road City of Los Angeles Yes ATSAC/ATCS 32. Braddock Drive Duquesne Avenue Culver City No - 33. Lucerne Avenue Duquesne Avenue Culver City No - 34. Jefferson Boulevard Duquesne Avenue Culver City Yes ATSAC [1] Los Angeles County Congestion Management Program monitoring location. ATTACHMENT 6 320Copyright © 1988-2004 Microsoft Corp. and/or its suppliers. All rights reserved. http://www.microsoft.com/streets/ © Copyright 2003 by Geographic Data Technology, Inc. All rights reserved. © 2004 NAVTEQ. All rights reserved. This data includes information taken with permission from Canadian authorities © Her Majesty the Queen in Right of Canada. ATTACHMENT D - LOCATION OF STUDY INTERSECTIONS/STREET SEGMENTS 0 mi 0.2 0.4 0.6 0.8 ATTACHMENT 6 321ATTACHMENT 6 322 APPENDIX B Intersection Lane Configurations ATTACHMENT 6 323ATTACHMENT 6 324ATTACHMENT 6 325ATTACHMENT 6 326ATTACHMENT 6 327ATTACHMENT 6 328ATTACHMENT 6 329 APPENDIX C Traffic Counts ATTACHMENT 6 330*Counts provided by the City of Culver City. ATTACHMENT 6 331*Counts provided by the City of Culver City. ATTACHMENT 6 332*Counts provided by the City of Culver City. ATTACHMENT 6 333*Counts provided by the City of Culver City. ATTACHMENT 6 334*Counts provided by the City of Culver City. ATTACHMENT 6 335*Counts provided by the City of Culver City. ATTACHMENT 6 336*Counts provided by the City of Culver City. ATTACHMENT 6 337Intersection Turning Movement Prepared by: National Data & Surveying Services Day: THURSDAY NS STREET: DATE: 3/10/2011 LOCATION: EW STREET: DAY: THURSDAY PROJECT#: NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 120021000000 4:00 PM 13 137 180 133 463 4:15 PM 27 135 219 99 480 4:30 PM 26 142 237 134 539 4:45 PM 31 161 237 143 572 5:00 PM 20 150 235 135 540 5:15 PM 39 134 236 160 569 5:30 PM 25 171 246 135 577 5:45 PM 31 155 248 132 566 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL TOTAL VOLUMES : 212 1185 0 0 1838 1071 000000 4306 APPROACH %'s : 15.18% 84.82% 0.00% 0.00% 63.18% 36.82% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! nb a nb d sb a sb d eb a eb d wb a nb d PEAK HR START TIME : 445 PM TOTAL PEAK HR VOL :115 616 00 954 573 000000 2258 PEAK HR FACTOR : 0.978 CONTROL : City of Culver City 0.000 WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND 0.964 0.000 0.932 Signalized 11-5076-005 I-10 EB On-Ramp NS/EW Streets: I-10 EB On-Ramp PM National Blvd National Blvd I-10 EB On-Ramp Project ID: CA11_5076_005 National Blvd ATTACHMENT 6 338*Counts provided by the City of Culver City. ATTACHMENT 6 339*Counts provided by the City of Culver City. ATTACHMENT 6 340*Counts provided by the City of Culver City. ATTACHMENT 6 341*Counts provided by the City of Culver City. ATTACHMENT 6 342*Counts provided by the City of Culver City. ATTACHMENT 6 343*Counts provided by the City of Culver City. ATTACHMENT 6 344*Counts provided by the City of Culver City. ATTACHMENT 6 345*Counts provided by the City of Culver City. ATTACHMENT 6 346*Counts provided by the City of Culver City. ATTACHMENT 6 347*Counts provided by the City of Culver City. ATTACHMENT 6 348*Counts provided by the City of Culver City. ATTACHMENT 6 349*Counts provided by the City of Culver City. ATTACHMENT 6 350*Counts provided by the City of Culver City. ATTACHMENT 6 351*Counts provided by the City of Culver City. ATTACHMENT 6 352*Counts provided by the City of Culver City. ATTACHMENT 6 353*Counts provided by the City of Culver City. ATTACHMENT 6 354*Counts provided by the City of Culver City. ATTACHMENT 6 355*Counts provided by the City of Culver City. ATTACHMENT 6 356*Counts provided by the City of Culver City. ATTACHMENT 6 357*Counts provided by the City of Culver City. ATTACHMENT 6 358*Counts provided by the City of Culver City. ATTACHMENT 6 359*Counts provided by the City of Culver City. ATTACHMENT 6 360*Counts provided by the City of Culver City. ATTACHMENT 6 361*Counts provided by the City of Culver City. ATTACHMENT 6 362*Counts provided by the City of Culver City. ATTACHMENT 6 363*Counts provided by the City of Culver City. ATTACHMENT 6 364*Counts provided by the City of Culver City. ATTACHMENT 6 365*Counts provided by the City of Culver City. ATTACHMENT 6 366*Counts provided by the City of Culver City. ATTACHMENT 6 367Intersection Turning Movement Prepared by: National Data & Surveying Services Day: THURSDAY NS STREET: DATE: 3/24/2011 LOCATION: EW STREET: DAY: THURSDAY PROJECT#: NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 101000020120 4:00 PM 20 26 236 15 5 182 484 4:15 PM 7 6 269 3 5 180 470 4:30 PM 19 14 260 4 5 172 474 4:45 PM 8 9 255 3 1 181 457 5:00 PM 11 13 293 2 2 207 528 5:15 PM 7 10 315 0 0 227 559 5:30 PM 4 12 335 2 1 269 623 5:45 PM 8 6 355 2 0 353 724 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL TOTAL VOLUMES :84 0 96 0000 2318 31 19 1771 0 4319 APPROACH %'s : 46.67% 0.00% 53.33% #DIV/0! #DIV/0! #DIV/0! 0.00% 98.68% 1.32% 1.06% 98.94% 0.00% nb a nb d sb a sb d eb a eb d wb a nb d PEAK HR START TIME : 500 PM TOTAL PEAK HR VOL :30 0 41 0000 1298 6 3 1056 0 2434 PEAK HR FACTOR : 0.840 CONTROL : City of Culver City 0.750 WESTBOUND NORTHBOUND Washington Blvd PM Landmark St Landmark St SOUTHBOUND Project ID: CA11_5081_011 Landmark St Signalized 11-5081-011 Washington Blvd NS/EW Streets: 0.740 Washington Blvd EASTBOUND 0.000 0.913 ATTACHMENT 6 368*Counts provided by the City of Culver City. ATTACHMENT 6 369*Counts provided by the City of Culver City. ATTACHMENT 6 370*Counts provided by the City of Culver City. ATTACHMENT 6 371*Counts provided by the City of Culver City. ATTACHMENT 6 372*Counts provided by the City of Culver City. ATTACHMENT 6 373*Counts provided by the City of Culver City. ATTACHMENT 6 374*Counts provided by the City of Culver City. ATTACHMENT 6 375*Counts provided by the City of Culver City. ATTACHMENT 6 376*Counts provided by the City of Culver City. ATTACHMENT 6 377*Counts provided by the City of Culver City. ATTACHMENT 6 378*Counts provided by the City of Culver City. ATTACHMENT 6 379*Counts provided by the City of Culver City. ATTACHMENT 6 380*Counts provided by the City of Culver City. ATTACHMENT 6 381*Counts provided by the City of Culver City. ATTACHMENT 6 382*Counts provided by the City of Culver City. ATTACHMENT 6 383*Counts provided by the City of Culver City. ATTACHMENT 6 384*Counts provided by the City of Culver City. ATTACHMENT 6 385*Counts provided by the City of Culver City. ATTACHMENT 6 386*Counts provided by the City of Culver City. ATTACHMENT 6 387*Counts provided by the City of Culver City. ATTACHMENT 6 388*Counts provided by the City of Culver City. ATTACHMENT 6 389*Counts provided by the City of Culver City. ATTACHMENT 6 390*Counts provided by the City of Culver City. ATTACHMENT 6 391*Counts provided by the City of Culver City. ATTACHMENT 6 392*Counts provided by the City of Culver City. ATTACHMENT 6 393*Counts provided by the City of Culver City. ATTACHMENT 6 394*Counts provided by the City of Culver City. ATTACHMENT 6 395Intersection Turning Movement Prepared by: National Data & Surveying Services Day: WEDNESDAY NS STREET: DATE: 3/16/2011 LOCATION: EW STREET: DAY: WEDNESDAY PROJECT#: NL NT NR SL ST SR EL ET ER WL WT WR TOTAL LANES: 011010000010 4:00 PM 103 28 13 102 47 18 311 4:15 PM 112 46 10 119 46 17 350 4:30 PM 84 56 12 112 44 10 318 4:45 PM 84 49 15 90 31 15 284 5:00 PM 89 48 12 118 66 21 354 5:15 PM 118 50 20 118 84 17 407 5:30 PM 116 60 7 93 84 17 377 5:45 PM 111 68 17 116 93 16 421 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL TOTAL VOLUMES : 0 817 405 106 868 0000 495 0 131 2822 APPROACH %'s : 0.00% 66.86% 33.14% 10.88% 89.12% 0.00% #DIV/0! #DIV/0! #DIV/0! 79.07% 0.00% 20.93% nb a nb d sb a sb d eb a eb d wb a nb d PEAK HR START TIME : 500 PM TOTAL PEAK HR VOL : 0 434 226 56 445 0000 327 0 71 1559 PEAK HR FACTOR : 0.926 CONTROL : City of Culver City 0.913 WESTBOUND NORTHBOUND Duquesne Ave PM Lucerne Ave Lucerne Ave SOUTHBOUND Project ID: CA11_5081_013 Lucerne Ave 3-Way Stop (NB,SB,WB) 11-5081-013 Duquesne Ave NS/EW Streets: 0.922 Duquesne Ave EASTBOUND 0.908 0.000 ATTACHMENT 6 396*Counts provided by the City of Culver City. ATTACHMENT 6 397*Counts provided by the City of Culver City. ATTACHMENT 6 398Day: City: Culver City Date: Project #: CA11_5082_001 NB SB EB WB 00 3,340 3,289 AM PeriodNB SB EB WB NB SB EB WB 00:00 1 1 2 34 51 85 00:15 3 1 4 42 59 101 00:30 4 2 6 46 56 102 00:45 19263 15 49 171 41 207 90 378 01:00 2 0 2 42 54 96 01:15 1 3 4 71 63 134 01:30 2 1 3 70 69 139 01:45 16041 10 51 234 42 228 93 462 02:00 0 0 0 75 43 118 02:15 2 0 2 55 47 102 02:30 0 0 0 63 56 119 02:45 021113 53 246 51 197104443 03:00 0 0 0 64 53 117 03:15 0 1 1 46 56 102 03:30 1 1 2 50 42 92 03:45 123547 61 221 43 194104415 04:00 0 1 1 48 57 105 04:15 2 1 3 54 51 105 04:30 2 4 6 63 49 112 04:45 2 6 6 12 8 18 63 228 42 199 105 427 05:00 0 3 3 63 80 143 05:15 5 4 9 65 105 170 05:30 3 6 9 79 128 207 05:45 7 15 5 18 12 33 68 275 119 432 187 707 06:00 6 6 12 79 117 196 06:15 14 11 25 64 86 150 06:30 16 17 33 72 79 151 06:45 17 53 17 51 34 104 78 293 65 347 143 640 07:00 36 19 55 64 63 127 07:15 54 29 83 41 66 107 07:30 60 50 110 40 47 87 07:45 92 242 76 174 168 416 25 170 49 225 74 395 08:00 101 75 176 35 41 76 08:15 125 68 193 29 39 68 08:30 96 79 175 20 21 41 08:45 99 421 51 273 150 694 21 105 24 125 45 230 09:00 86 57 143 19 12 31 09:15 70 45 115 21 22 43 09:30 58 35 93 8 14 22 09:45 38 252 33 170 71 422 5 53 10 58 15 111 10:00 53 40 93 14 12 26 10:15 43 41 84 10 12 22 10:30 31 36 67 8 10 18 10:45 24 151 28 145 52 296 7 39 10 44 17 83 11:00 34 27 61 7 6 13 11:15 33 49 82 2 5 7 11:30 30 42 72 5 1 6 11:45 34 131 41 159 75 290 1 15 3 15 4 30 TOTALS 1290 1018 2308 2050 2271 4321 SPLIT % 55.9% 44.1% 34.8% 47.4% 52.6% 65.2% NB SB EB WB 00 3,340 3,289 AM Peak Hour 08:00 07:45 07:45 18:00 17:15 17:15 AM Pk Volume 421 298 712 293 469 760 Pk Hr Factor 0.842 0.943 0.922 0.927 0.916 0.918 7 - 9 Volume 00 663 447 1110 00 503 631 1134 7 - 9 Peak Hour 08:00 07:45 07:45 17:00 17:00 17:00 7 - 9 Pk Volume 0 0 421 298 712 0 0 275 432 707 Pk Hr Factor 0.000 0.000 0.842 0.943 0.922 0.000 0.000 0.870 0.844 0.854 20:45 19:15 16:45 17:00 17:15 Pk Hr Factor PM Peak PM Pk Volume Pk Hr Factor 4 - 6 Volume 4 - 6 Peak 4 - 6 Pk TOTAL 23:45 TOTALS 20:30 18:00 18:15 18:30 18:45 19:00 Total 6,629 DAILY TOTALS 21:00 21:15 SPLIT % DAILY TOTALS 22:15 22:30 22:45 23:00 23:15 23:30 Lucerne Ave between Lafayette Place & Duquesne Ave 21:30 21:45 22:00 Total 6,629 19:30 19:45 20:00 20:15 17:30 17:45 15:15 15:30 15:45 16:00 16:15 16:30 14:30 3/16/2011 14:45 15:00 DAILY TOTALS PM Period 13:45 14:00 TOTAL 14:15 VOLUME Prepared by NDS/ATD 13:15 13:30 12:00 12:15 12:30 12:45 13:00 Wednesday ATTACHMENT 6 399*Counts provided by the City of Culver City. ATTACHMENT 6 400*Counts provided by the City of Culver City. ATTACHMENT 6 401*Counts provided by the City of Culver City. ATTACHMENT 6 402*Counts provided by the City of Culver City. ATTACHMENT 6 403Day: City: Culver City Date: Project #: CA11_5082_002 NB SB EB WB 00 4,542 3,819 AM PeriodNB SB EB WB NB SB EB WB 00:00 6 0 6 54 51 105 00:15 6 2 8 62 60 122 00:30 5 3 8 73 69 142 00:45 6 23 1 6 7 29 75 264 73 253 148 517 01:00 9 3 12 66 91 157 01:15 5 2 7 75 98 173 01:30 2 2 4 88 60 148 01:45 0 16 0 7 0 23 65 294 50 299 115 593 02:00 0 0 0 64 45 109 02:15 1 0 1 73 43 116 02:30 2 0 2 82 48 130 02:45 141125 97 316 44 180141496 03:00 0 0 0 100 72 172 03:15 0 1 1 104 62 166 03:30 0 1 1 71 48 119 03:45 333568 76 351 56 238132589 04:00 3 3 6 86 43 129 04:15 1 1 2 79 50 129 04:30 0 3 3 85 58 143 04:45 1 5 4 11 5 16 85 335 62 213 147 548 05:00 4 2 6 92 47 139 05:15 7 8 15 105 46 151 05:30 17 7 24 103 70 173 05:45 21 49 21 38 42 87 112 412 85 248 197 660 06:00 14 13 27 97 86 183 06:15 19 19 38 111 79 190 06:30 23 17 40 84 76 160 06:45 24 80 49 98 73 178 85 377 78 319 163 696 07:00 27 69 96 71 77 148 07:15 34 95 129 46 38 84 07:30 63 112 175 76 41 117 07:45 95 219 124 400 219 619 45 238 35 191 80 429 08:00 97 94 191 38 32 70 08:15 90 107 197 38 23 61 08:30 88 121 209 37 19 56 08:45 119 394 112 434 231 828 36 149 18 92 54 241 09:00 94 111 205 29 20 49 09:15 81 106 187 30 9 39 09:30 79 75 154 26 11 37 09:45 79 333 66 358 145 691 18 103 9 49 27 152 10:00 68 53 121 26 6 32 10:15 74 36 110 22 9 31 10:30 71 42 113 20 7 27 10:45 58 271 38 169 96 440 12 80 2 24 14 104 11:00 44 51 95 12 6 18 11:15 38 30 68 8 5 13 11:30 60 45 105 7 8 15 11:45 50 192 37 163 87 355 7 34 4 23 11 57 TOTALS 1589 1690 3279 2953 2129 5082 SPLIT % 48.5% 51.5% 39.2% 58.1% 41.9% 60.8% NB SB EB WB 00 4,542 3,819 AM Peak Hour 08:00 08:15 08:15 17:30 12:30 17:30 AM Pk Volume 394 451 842 423 331 743 Pk Hr Factor 0.828 0.932 0.911 0.944 0.844 0.943 7 - 9 Volume 00 613 834 1447 00 747 461 1208 7 - 9 Peak Hour 08:00 07:45 08:00 17:00 17:00 17:00 7 - 9 Pk Volume 0 0 394 446 828 0 0 412 248 660 Pk Hr Factor 0.000 0.000 0.828 0.899 0.896 0.000 0.000 0.920 0.729 0.838 VOLUME Prepared by NDS/ATD 13:15 13:30 12:00 12:15 12:30 12:45 13:00 Wednesday 3/16/2011 14:45 15:00 DAILY TOTALS PM Period 13:45 14:00 16:00 16:15 16:30 14:30 Higuera St between Washington Blvd & Hubbard St 21:30 21:45 22:00 Total 8,361 19:30 19:45 20:00 20:15 DAILY TOTALS 22:15 22:30 22:45 23:00 23:15 23:30 TOTAL 23:45 TOTALS 20:30 17:30 17:45 15:15 15:30 15:45 Total 8,361 DAILY TOTALS 21:00 21:15 19:00 Pk Hr Factor PM Peak PM Pk Volume Pk Hr Factor 4 - 6 Volume 18:00 18:15 18:30 18:45 4 - 6 Peak 4 - 6 Pk SPLIT % TOTAL 20:45 19:15 16:45 17:00 17:15 14:15 ATTACHMENT 6 404*Counts provided by the City of Culver City. ATTACHMENT 6 405Day: City: Culver City Date: Project #: CA11_5082_003 NB SB EB WB 00 1,219 5,321 AM PeriodNB SB EB WB NB SB EB WB 00:00 2 5 7 21 68 89 00:15 0 2 2 12 66 78 00:30 0 2 2 10 66 76 00:45 1 3 1 10 2 13 19 62 62 262 81 324 01:00 0 0 0 23 56 79 01:15 0 5 5 18 66 84 01:30 1 2 3 22 74 96 01:45 2 3 4 11 6 14 18 81 91 287 109 368 02:00 0 0 0 15 110 125 02:15 0 0 0 24 113 137 02:30 0 3 3 23 139 162 02:45 0 3636 28 90 121483149573 03:00 0 4 4 30 99 129 03:15 1 0 1 27 58 85 03:30 0 1 1 45 69 114 03:45 012728 27 129 82 308109437 04:00 0 2 2 27 86 113 04:15 0 1 1 24 87 111 04:30 0 9 9 27 93 120 04:45 1 1 3 15 4 16 32 110 87 353 119 463 05:00 0 3 3 58 98 156 05:15 0 7 7 44 81 125 05:30 3 11 14 43 70 113 05:45 0 3 28 49 28 52 42 187 56 305 98 492 06:00 2 24 26 40 64 104 06:15 1 23 24 29 61 90 06:30 3 57 60 18 61 79 06:45 4 10 105 209 109 219 22 109 69 255 91 364 07:00 4 131 135 26 63 89 07:15 0 133 133 23 54 77 07:30 4 169 173 21 48 69 07:45 14 22 173 606 187 628 16 86 47 212 63 298 08:00 13 161 174 14 30 44 08:15 10 150 160 11 26 37 08:30 13 162 175 11 27 38 08:45 13 49 150 623 163 672 8 44 32 115 40 159 09:00 20 152 172 16 17 33 09:15 9 125 134 3 13 16 09:30 15 91 106 6 16 22 09:45 11 55 112 480 123 535 1 26 26 72 27 98 10:00 16 120 136 3 15 18 10:15 13 66 79 5 16 21 10:30 11 60 71 5 22 27 10:45 12 52 78 324 90 376 5 18 9 62 14 80 11:00 23 55 78 2 5 7 11:15 11 57 68 3 8 11 11:30 21 57 78 3 4 7 11:45 14 69 75 244 89 313 1 9 6 23 7 32 TOTALS 268 2584 2852 951 2737 3688 SPLIT % 9.4% 90.6% 43.6% 25.8% 74.2% 56.4% NB SB EB WB 00 1,219 5,321 AM Peak Hour 11:00 07:30 07:45 17:00 14:00 14:15 AM Pk Volume 69 653 696 187 483 577 Pk Hr Factor 0.750 0.944 0.930 0.806 0.869 0.890 7 - 9 Volume 00 71 1229 1300 00 297 658 955 7 - 9 Peak Hour 07:45 07:30 07:45 17:00 16:15 16:30 7 - 9 Pk Volume 0 0 50 653 696 0 0 187 365 520 Pk Hr Factor 0.000 0.000 0.893 0.944 0.930 0.000 0.000 0.806 0.931 0.833 VOLUME Prepared by NDS/ATD 13:15 13:30 12:00 12:15 12:30 12:45 13:00 Wednesday 3/16/2011 14:45 15:00 DAILY TOTALS PM Period 13:45 14:00 16:00 16:15 16:30 14:30 Higuera St between Jefferson Blvd & Hayden Ave 21:30 21:45 22:00 Total 6,540 19:30 19:45 20:00 20:15 DAILY TOTALS 22:15 22:30 22:45 23:00 23:15 23:30 TOTAL 23:45 TOTALS 20:30 17:30 17:45 15:15 15:30 15:45 Total 6,540 DAILY TOTALS 21:00 21:15 19:00 Pk Hr Factor PM Peak PM Pk Volume Pk Hr Factor 4 - 6 Volume 18:00 18:15 18:30 18:45 4 - 6 Peak 4 - 6 Pk SPLIT % TOTAL 20:45 19:15 16:45 17:00 17:15 14:15 ATTACHMENT 6 406 APPENDIX D Capacity Calculation Worksheets Existing (2011) Conditions ATTACHMENT 6 407 Existing (2011) Conditions AM Peak Hour ATTACHMENT 6 408Existing Conditions AM Robertson Boulevard Cattaragus Avenue N/S: W/E: 1 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 84 A: B: 390 38 A: B: 837 631 A: B: 78 0.871 = + + + + + 390 837 107 78 *1500 353 A: B: 107 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 78 AMBIENT RELATED PROJECT TOTAL 78 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 1257 5 38 1602 71 84 236 70 107 136 110 84 70 236 71 1602 38 5 1257 110 136 107 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 409Existing Conditions AM Robertson Boulevard I-10 WB Off-Ramp/Kincardine Av N/S: W/E: 2 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 64 A: B: 124|1010|A: B: 791 558 A: B: 37 0.641 = + + + + + 124 791 115 37 *1500 160 A: B: 115 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 37 AMBIENT RELATED PROJECT TOTAL 37 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 LT 1115 0 0 1508 73 64 13 170 115 0 45 64 170 13 73 1508 0 0 1115 45 0 115 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 410Existing Conditions AM Robertson Boulevard National Boulevard N/S: W/E: 3 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 145 A: B: 574 507 A: B: 328 111 A: B: 318 0.928 = + + + + + 574 318 152 328 *1375 447 A: B: 152 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 111 AMBIENT RELATED PROJECT TOTAL 111 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto OLA Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 LT 592 44 596 814 200 145 574 457 152 639 254 145 457 574 200 814 596 44 592 254 639 152 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 411Existing Conditions AM National Boulevard I-10 EB On-Ramp N/S: W/E: 4 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: A: B: 0|101010|A: B: 596 562 A: B: 99 0.393 = + + + + + 596 99 *1500 A: B: 0|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(N/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 99 AMBIENT RELATED PROJECT TOTAL 99 LANE SIGNAL Prot-Fix|1010|Perm Auto Auto 0 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LT 1123 0 0 771 596 0 0 0 0 0 0 0 0 0 596 771 0 0 1123 0 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 412Existing Conditions AM Hughes Avenue Venice Boulevard N/S: W/E: 5 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 601 A: B: 174 64 A: B: 309 324 A: B: 93 0.705 = + + + + + 587 309 174 93 *1500 41 A: B: 587 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 93 AMBIENT RELATED PROJECT TOTAL 93 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 3 0 0 1 0 LT 182 49 64 199 46 174 1804 43 41 1760 117 174 43 1804 46 199 64 49 182 117 1760 41 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 413Existing Conditions AM Bagley Avenue Venice Boulevard N/S: W/E: 6 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 59 A: B: 642 74 A: B: 311 193 A: B: 48 0.708 = + + + + + 642 311 69 48 *1375 622 A: B: 69 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 48 AMBIENT RELATED PROJECT TOTAL 48 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 0 0 1 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 2 0 1 0 0 LT 150 43 74 170 67 59 1926 40 69 1817 50 59 40 1926 67 170 74 43 150 50 1817 69 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 414Existing Conditions AM Culver Boulevard Venice Boulevard N/S: W/E: 7 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 656 A: B: 218 127 A: B: 127 39 A: B: 116 0.713 = + + + + + 615 127 116 218 *1375 29 A: B: 615 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 39 AMBIENT RELATED PROJECT TOTAL 39 LANE SIGNAL Split|1010|Split Prot-Fix Prot-Fix OLA Auto Auto Auto 0 1 0 0 2 0 1 0 0 1 0 0 0 2 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 84 607 178 44 32 396 1821 148 29 1820 26 396 148 1821 32 44 178 607 84 26 1820 29 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 415Existing Conditions AM Robertson Boulevard Venice Boulevard N/S: W/E: 8 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 79 A: B: 810 325 A: B: 513 178 A: B: 218 1.267 = + + + + + 810 218 298 513 *1375 739 A: B: 298 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 178 AMBIENT RELATED PROJECT TOTAL 178 LANE SIGNAL Split|1010|Split Prot-Var Prot-Var OLA Auto Auto Auto 0 2 0 0 1 0 0 1 1 0 0 1 0 1 0 2 0 1 0 0 2 0 2 0 1 0 0 LT 435 47 513 325 142 79 2097 334 541 2086 132 79 334 2097 142 325 513 47 435 132 2086 541 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 416Existing Conditions AM National Boulevard Venice Boulevard N/S: W/E: 9 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 685 A: B: 90 334 A: B: 131 198 A: B: 464 1.000 = + + + + + 786 464 90 131 *1375 182 A: B: 786 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 198 AMBIENT RELATED PROJECT TOTAL 198 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 906 22 131 567 101 90 1939 116 182 2069 288 90 116 1939 101 567 131 22 906 288 2069 182 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 417Existing Conditions AM Helms Avenue Venice Boulevard N/S: W/E: 10 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 22 A: B: 712 12 A: B: 38 20 A: B: 11 0.487 = + + + + + 712 38 75 11 *1500 718 A: B: 75 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 11 AMBIENT RELATED PROJECT TOTAL 11 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 1 0 0 0 1 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 9 4 12 2 24 22 2114 22 75 2133 21 22 22 2114 24 2 12 4 9 21 2133 75 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 418Existing Conditions AM Cattaraugus Avenue Venice Boulevard N/S: W/E: 11 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 69 A: B: 714 261 A: B: 160 47 A: B: 318 0.771 = + + + + + 714 318 70 160 *1500 647 A: B: 70 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 47 AMBIENT RELATED PROJECT TOTAL 47 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 245 26 160 84 17 69 2040 101 70 1930 11 69 101 2040 17 84 160 26 245 11 1930 70 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 419Existing Conditions AM La Cienega Boulevard Venice Boulevard N/S: W/E: 12 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 127 A: B: 586 35 A: B: 558 605 A: B: 124 0.991 = + + + + + 586 558 191 124 *1375 564 A: B: 191 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 124 AMBIENT RELATED PROJECT TOTAL 124 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1771 45 35 1325 348 127 1758 15 348 1691 157 127 15 1758 348 1325 35 45 1771 157 1691 348 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 420Existing Conditions AM Hughes Avenue/Duquesne Avenue Washington Boulevard N/S: W/E: 13 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 54 A: B: 365 12 A: B: 337 345 A: B: 164 0.534 = + + + + + 365 337 40 164 *1500 336 A: B: 40 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 164 AMBIENT RELATED PROJECT TOTAL 164 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 306 39 12 290 47 54 684 45 40 494 178 54 45 684 47 290 12 39 306 178 494 40 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 421Existing Conditions AM Duquesne Avenue Culver Boulevard N/S: W/E: 14 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 366 A: B: 91 50 A: B: 371 352 A: B: 91 0.612 = + + + + + 385 371 91 91 *1375 104 A: B: 385 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 91 AMBIENT RELATED PROJECT TOTAL 91 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 352 100 50 371 68 91 677 55 104 734 36 91 55 677 68 371 50 100 352 36 734 104 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 422Existing Conditions AM Washington Bl/Irving Pl Culver Boulevard N/S: W/E: 15 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 67 A: B: 405 262 A: B: 262 80 A: B: 122 0.504 = + + + + + 405 262 0 122 *1375 299 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 122 AMBIENT RELATED PROJECT TOTAL 122 LANE SIGNAL Split|1010|Split Prot-Fix Perm Auto Auto Auto Auto 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 0 1 1 0 0 0 2 0 1 0 0 LT 0 114 501 0 23 67 742 474 0 854 42 -262 67 736 742 23 0 501 114 0 42 854 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 423Existing Conditions AM Main Street Culver Boulevard N/S: W/E: 16 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 503 49 A: B: 147|1010|A: B:|1010|0.499 = + + + + + 503 0 161 147 *1425 430 A: B: 161 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Prot-Fix Auto Auto Auto 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 1 0 0 1 0 3 0 0 0 0 LT 0 0 147 0 130 0 1353 157 161 1290 0 0 157 1353 130 0 147 0 0 0 1290 161 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 424Existing Conditions AM Culver Boulevard Washington Boulevard/Canfield Avenu N/S: W/E: 17 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 534 A: B: 534 207 A: B: 36 12 A: B: 337 0.566 = + + + + + 534 0 337 36 *1425|1010|A: B:|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 12 AMBIENT RELATED PROJECT TOTAL 12 LANE SIGNAL Prot-Fix|1010|Prot-Fix Split OLA Auto Auto OLA 0 2 0 0 2 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 1 0 LT 674 757 36 409 4 1033 35 73 0 0 6 1033 73 35 4 409 36 757 674 6 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 425Existing Conditions AM Robertson Boulevard/Higuera Street Washington Boulevard N/S: W/E: 18 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 85 A: B: 649 225 A: B: 182 65 A: B: 203 0.706 = + + + + + 649 203 72 182 *1425 409 A: B: 72 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 65 AMBIENT RELATED PROJECT TOTAL 65 LANE SIGNAL Prot-Fix|1010|Prot-Fix Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 338 68 182 225 65 85 1088 209 72 758 60 85 209 1088 65 225 182 68 338 60 758 72 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 426Existing Conditions AM Landmark Street Washington Boulevard N/S: W/E: 19 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 61 A: B: 783|1010|A: B:|1010|29 A: B: 30 0.472 = + + + + + 783 0 30 0 *1500 460 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 29 AMBIENT RELATED PROJECT TOTAL 29 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto Auto 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 30 0 0 0 61 1566 0 0 842 78 61 0 1566 0 0 0 30 0 78 842 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 427Existing Conditions AM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 77 A: B: 583 399 A: B: 75 122 A: B: 449 0.789 = + + + + + 583 449 74 75 *1375 357 A: B: 74 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 221 AMBIENT RELATED PROJECT TOTAL 221 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 792 105 137 737 61 77 1166 313 74 714 110 77 313 1166 61 737 137 105 792 110 714 74 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 428Default Scenario Wed May 25, 2011 12:48:43 Page 3-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #21 WESLEY AV/WASHINGTON BL [EXISTING AM] ******************************************************************************** Average Delay (sec/veh): 0.0 Worst Case Level Of Service: B[ 11.5] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 0 0 1 0 0 0 0 0 0 0 1 1 0 1 0 2 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 1 0 0 0 0 922 4 3 1571 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 1 0 0 0 0 922 4 3 1571 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 1 0 0 0 0 922 4 3 1571 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 1 0 0 0 0 922 4 3 1571 0 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp:xxxxx xxxx 6.9 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim:xxxxx xxxx 3.3 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: xxxx xxxx 463 xxxx xxxx xxxxx xxxx xxxx xxxxx 926 xxxx xxxxx Potent Cap.: xxxx xxxx 551 xxxx xxxx xxxxx xxxx xxxx xxxxx 746 xxxx xxxxx Move Cap.: xxxx xxxx 551 xxxx xxxx xxxxx xxxx xxxx xxxxx 746 xxxx xxxxx Volume/Cap: xxxx xxxx 0.00 xxxx xxxx xxxx xxxx xxxx xxxx 0.00 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.0 xxxx xxxxx Stopped Del:xxxxx xxxx 11.5 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 9.8 xxxx xxxxx LOS by Move: * * B * * * * * * A * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd StpDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: * * * * * * * * * * * * ApproachDel: 11.5 xxxxxx xxxxxx xxxxxx ApproachLOS: B * * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 429Existing Conditions AM Helms Avenue Washington Boulevard N/S: W/E: 22 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 30 A: B: 754|1010|A: B:|1010|72 A: B: 89 0.492 = + + + + + 754 0 89 0 *1500 468 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 72 AMBIENT RELATED PROJECT TOTAL 72 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 17 0 0 0 30 1508 0 0 898 38 30 0 1508 0 0 0 17 0 38 898 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 430Default Scenario Wed May 25, 2011 12:48:43 Page 5-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #23 CATTARAUGUS AV/WASHINGTON AV [EXISTING AM] ******************************************************************************** Average Delay (sec/veh): 86.5 Worst Case Level Of Service: F[1767.2] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 1 0 1 0 0 1 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 9 5 3 86 6 45 22 812 6 3 1518 320 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 9 5 3 86 6 45 22 812 6 3 1518 320 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 9 5 3 86 6 45 22 812 6 3 1518 320 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 9 5 3 86 6 45 22 812 6 3 1518 320 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 7.5 6.5 6.9 7.5 6.5 6.9 4.1 xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 4.0 3.3 3.5 4.0 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 1627 2703 409 2137 2546 919 1838 xxxx xxxxx 818 xxxx xxxxx Potent Cap.: 69 22 597 28 27 277 336 xxxx xxxxx 819 xxxx xxxxx Move Cap.: 45 20 597 22 25 277 336 xxxx xxxxx 819 xxxx xxxxx Volume/Cap: 0.20 0.25 0.01 3.96 0.24 0.16 0.07 xxxx xxxx 0.00 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.2 xxxx xxxxx 0.0 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 16.5 xxxx xxxxx 9.4 xxxx xxxxx LOS by Move: * * * * * * C * * A * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 37 xxxxx xxxx 31 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 1.6 xxxxx xxxxx 16.3 xxxxx 0.2 xxxx xxxxx 0.0 xxxx xxxxx Shrd StpDel:xxxxx 165 xxxxx xxxxx 1767 xxxxx 16.5 xxxx xxxxx 9.4 xxxx xxxxx Shared LOS: * F * * F * C * * A * * ApproachDel: 165.1 1767.2 xxxxxx xxxxxx ApproachLOS: F F * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 431Existing Conditions AM La Cienega Boulevard Washington Boulevard N/S: W/E: 24 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 56 A: B: 754 481 A: B: 182 251 A: B: 552 1.047 = + + + + + 754 552 48 182 *1375 391 A: B: 48 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 251 AMBIENT RELATED PROJECT TOTAL 251 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 1637 20 182 1416 28 56 1508 245 48 782 106 56 245 1508 28 1416 182 20 1637 106 782 48 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 432Existing Conditions AM La Cienega Boulevard Fairfax Avenue N/S: W/E: 25 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 55 A: B: 599 451 A: B: 0 24 A: B: 891 0.990 = + + + ++21 891 599 0 *1425 13 A: B: 21 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 24 AMBIENT RELATED PROJECT TOTAL 24 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 2 0 0 0 2 0 1 0 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 LT 1781 927 0 1331 21 1089 25 30 13 0 8 1089 30 25 21 1331 0 927 1781 8 0 13 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 433Existing Conditions AM Wesley Street National Boulevard N/S: W/E: 26 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 39 A: B: 773 0 A: B: 0 112 A: B: 211 0.586 = + + + + + 773 211 0 0 *1500 405 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 112 AMBIENT RELATED PROJECT TOTAL 112 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 99 0 0 0 39 1546 0 0 809 83 39 0 1546 0 0 0 99 0 83 809 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 434Existing Conditions AM Hayden Avenue National Boulevard N/S: W/E: 27 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 173 A: B: 942|1010|A: B:|1010|336 A: B: 336 0.827 = + + + + + 942 0 336 0 *1425 451 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 608 AMBIENT RELATED PROJECT TOTAL 608 LANE SIGNAL Split|1010| Prot-Fix Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1 0 1 0 0 LT 0 63 0 0 0 173 942 0 0 675 227 173 0 942 0 0 0 63 0 227 675 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 435Existing Conditions AM Jefferson Boulevard National Boulevard N/S: W/E: 28 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B:|1010|332 A: B: 0|1010|A: B: 576 0.727 = + + + + + 0 620 576 0 *1500 486 A: B: 620 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL Perm|1010|Perm Split Auto Free Auto 0 1 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 LT 576 0 0 664 1159 0 0 0 486 0 134 0 0 0 1159 664 0 0 576 134 0 486 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 436Existing Conditions AM La Cienega Boulevard Jefferson Boulevard N/S: W/E: 29 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 315 A: B: 549 610 A: B: 71 99 A: B: 787 1.111 = + + + + + 549 787 217 71 *1375 351 A: B: 217 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 99 AMBIENT RELATED PROJECT TOTAL 99 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto OLA Auto Auto 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 2 0 0 1 0 2 0 1 0 1 0 0 LT 2249 113 71 1829 580 572 1098 118 394 592 109 572 118 1098 580 1829 71 113 2249 109 592 394 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 437Existing Conditions AM Jefferson Boulevard Higuera Street/Rodeo Road N/S: W/E: 30 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 421 A: B: 555 76 A: B: 315 289 A: B: 254 0.769 = + + + + + 555 71 315 254 *1425 26 A: B: 71 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 254 AMBIENT RELATED PROJECT TOTAL 254 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 1 0 1 0 2 0 0 1 0 2 0 1 0 0 1 0 1 0 2 0 0 1 0 LT 578 718 76 630 76 766 555 57 26 141 41 766 57 555 76 630 76 718 578 41 141 26 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 438Existing Conditions AM La Cienega Boulevard Rodeo Road N/S: W/E: 31 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 357 A: B: 306 131 A: B: 743 727 A: B: 295 1.097 = + + + + + 261 743 306 295 *1375 177 A: B: 261 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 537 AMBIENT RELATED PROJECT TOTAL 537 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto OLA OLA 0 2 0 1 0 0 2 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 2090 92 239 2046 183 306 714 313 177 521 201 306 313 714 183 2046 239 92 2090 201 521 177 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 439Default Scenario Wed May 25, 2011 12:48:43 Page 7-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #32 BRADDOCK DR/DUQUESNE AV [EXISTING AM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.407 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 140.4 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 87 193 135 27 311 32 42 423 37 42 486 38 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 87 193 135 27 311 32 42 423 37 42 486 38 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 87 193 135 27 311 32 42 423 37 42 486 38 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 87 193 135 27 311 32 42 423 37 42 486 38 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 87 193 135 27 311 32 42 423 37 42 486 38 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.21 0.46 0.33 0.07 0.84 0.09 0.08 0.85 0.07 0.07 0.86 0.07 Final Sat.: 86 190 133 29 333 34 34 339 30 30 345 27 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 1.02 1.02 1.02 0.93 0.93 0.93 1.25 1.25 1.25 1.41 1.41 1.41 Crit Moves: **** **** **** **** Delay/Veh: 79.2 79.2 79.2 60.8 60.8 60.8 157.7 158 157.7 221.9 222 221.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 79.2 79.2 79.2 60.8 60.8 60.8 157.7 158 157.7 221.9 222 221.9 LOS by Move: F F F F F F F F F F F F ApproachDel: 79.2 60.8 157.7 221.9 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 79.2 60.8 157.7 221.9 LOS by Appr: F F F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 440Default Scenario Wed May 25, 2011 12:48:43 Page 9-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #33 LUCERNE AV/DUQUESNE AV [EXISTING AM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 0.847 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 23.7 Optimal Cycle: 0 Level Of Service: C ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 1 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 175 0 61 89 416 0 0 517 329 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 175 0 61 89 416 0 0 517 329 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 175 0 61 89 416 0 0 517 329 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 175 0 61 89 416 0 0 517 329 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 0 0 175 0 61 89 416 0 0 517 329 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 0.74 0.00 0.26 0.18 0.82 0.00 0.00 1.00 1.00 Final Sat.: 0 0 0 397 0 138 111 519 0 0 610 692 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: xxxx xxxx xxxx 0.44 xxxx 0.44 0.80 0.80 xxxx xxxx 0.85 0.48 Crit Moves: **** **** **** Delay/Veh: 0.0 0.0 0.0 14.0 0.0 14.0 26.9 26.9 0.0 0.0 32.2 12.4 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 0.0 0.0 14.0 0.0 14.0 26.9 26.9 0.0 0.0 32.2 12.4 LOS by Move: * * * B * B D D * * D B ApproachDel: xxxxxx 14.0 26.9 24.5 Delay Adj: xxxxx 1.00 1.00 1.00 ApprAdjDel: xxxxxx 14.0 26.9 24.5 LOS by Appr: * B D C ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 441Existing Conditions AM Jefferson Boulevard Duquesne Avenue N/S: W/E: 34 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 32 A: B: 8 18 A: B: 633 529 A: B: 421 0.950 = + + + + + 341 633 8 421 *1375 290 A: B: 341 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 421 AMBIENT RELATED PROJECT TOTAL 421 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto OLA Auto 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 1 0 0 1 0 1 0 0 0 1 0 0 LT 1031 27 18 1265 411 8 32 6 290 31 310 8 6 32 411 1265 18 27 1031 310 31 290 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:36:15 PM CalcaDB EXISTAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 442 Existing (2011) Conditions PM Peak Hour ATTACHMENT 6 443Existing Conditions PM Robertson Boulevard Cattaragus Avenue N/S: W/E: 1 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 179 A: B: 60 54 A: B: 839 782 A: B: 66 0.861 = + + + + + 432 839 60 66 *1500 98 A: B: 432 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 66 AMBIENT RELATED PROJECT TOTAL 66 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 1549 15 54 1614 63 60 78 41 98 223 111 60 41 78 63 1614 54 15 1549 111 223 98 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 444Existing Conditions PM Robertson Boulevard I-10 WB Off-Ramp/Kincardine Av N/S: W/E: 2 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 373 A: B: 470|1010|A: B: 624 611 A: B: 14 0.719 = + + + + + 470 624 75 14 *1500 159 A: B: 75 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 14 AMBIENT RELATED PROJECT TOTAL 14 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 LT 1222 0 0 1214 34 373 22 545 75 0 84 373 545 22 34 1214 0 0 1222 84 0 75 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 445Existing Conditions PM Robertson Boulevard National Boulevard N/S: W/E: 3 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 372 A: B: 114 574 A: B: 299 76 A: B: 457 0.924 = + + + + + 497 457 114 299 *1375 162 A: B: 497 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 76 AMBIENT RELATED PROJECT TOTAL 76 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto OLA Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 LT 784 130 544 931 216 114 372 230 162 858 136 114 230 372 216 931 544 130 784 136 858 162 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 446Existing Conditions PM National Boulevard I-10 EB On-Ramp N/S: W/E: 4 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: A: B: 0|101010|A: B: 573 308 A: B: 115 0.389 = + + + + + 573 115 *1500 A: B: 0|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(N/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 115 AMBIENT RELATED PROJECT TOTAL 115 LANE SIGNAL Prot-Fix|1010|Perm Auto Auto 0 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LT 616 0 0 954 573 0 0 0 0 0 0 0 0 0 573 954 0 0 616 0 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 447Existing Conditions PM Hughes Avenue Venice Boulevard N/S: W/E: 5 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 514 A: B: 119 269 A: B: 40 104 A: B: 354 0.639 = + + + + + 550 354 119 40 *1500 57 A: B: 550 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 104 AMBIENT RELATED PROJECT TOTAL 104 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 3 0 0 1 0 LT 172 78 40 177 52 119 1543 44 57 1651 96 119 44 1543 52 177 40 78 172 96 1651 57 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 448Existing Conditions PM Bagley Avenue Venice Boulevard N/S: W/E: 6 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 513 A: B: 78 89 A: B: 348 142 A: B: 39 0.678 = + + + + + 564 348 78 39 *1375 110 A: B: 564 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 39 AMBIENT RELATED PROJECT TOTAL 39 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 0 0 1 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 2 0 1 0 0 LT 101 41 89 165 94 78 1538 70 110 1584 107 78 70 1538 94 165 89 41 101 107 1584 110 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 449Existing Conditions PM Culver Boulevard Venice Boulevard N/S: W/E: 7 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 620 A: B: 216 210 A: B: 210 84 A: B: 189 0.813 = + + + + + 599 210 189 216 *1375 52 A: B: 599 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 84 AMBIENT RELATED PROJECT TOTAL 84 LANE SIGNAL Split|1010|Split Prot-Fix Prot-Fix OLA Auto Auto Auto 0 1 0 0 2 0 1 0 0 1 0 0 0 2 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 81 736 299 72 48 393 1653 208 52 1735 62 393 208 1653 48 72 299 736 81 62 1735 52 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 450Existing Conditions PM Robertson Boulevard Venice Boulevard N/S: W/E: 8 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 105 A: B: 692 307 A: B: 538 124 A: B: 245 1.189 = + + + + + 692 245 256 538 *1375 720 A: B: 256 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 124 AMBIENT RELATED PROJECT TOTAL 124 LANE SIGNAL Split|1010|Split Prot-Var Prot-Var OLA Auto Auto Auto 0 2 0 0 1 0 0 1 1 0 0 1 0 1 0 2 0 1 0 0 2 0 2 0 1 0 0 LT 489 59 538 307 161 105 1951 125 465 2003 156 105 125 1951 161 307 538 59 489 156 2003 465 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 451Existing Conditions PM National Boulevard Venice Boulevard N/S: W/E: 9 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 518 A: B: 68 183 A: B: 400 303 A: B: 215 0.984 = + + + + + 766 400 68 215 *1375 168 A: B: 766 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 215 AMBIENT RELATED PROJECT TOTAL 215 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 507 99 183 702 98 68 1494 60 168 1991 307 68 60 1494 98 702 183 99 507 307 1991 168 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 452Existing Conditions PM Helms Avenue Venice Boulevard N/S: W/E: 10 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 547 A: B: 32 28 A: B: 63 17 A: B: 16 0.509 = + + + + + 758 63 32 16 *1500 73 A: B: 758 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 16 AMBIENT RELATED PROJECT TOTAL 16 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 1 0 0 0 1 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 1 9 28 9 26 32 1634 8 73 2241 33 32 8 1634 26 9 28 9 1 33 2241 73 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 453Existing Conditions PM Cattaraugus Avenue Venice Boulevard N/S: W/E: 11 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 541 A: B: 78 185 A: B: 289 86 A: B: 13 0.653 = + + + + + 704 289 78 13 *1500 111 A: B: 704 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 13 AMBIENT RELATED PROJECT TOTAL 13 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 62 11 185 73 31 78 1547 76 111 2099 13 78 76 1547 31 73 185 11 62 13 2099 111 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 454Existing Conditions PM La Cienega Boulevard Venice Boulevard N/S: W/E: 12 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 421 A: B: 199 36 A: B: 606 375 A: B: 94 1.005 = + + + + + 579 606 199 94 *1375 152 A: B: 579 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 94 AMBIENT RELATED PROJECT TOTAL 94 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1104 20 36 1513 306 199 1263 34 277 1738 237 199 34 1263 306 1513 36 20 1104 237 1738 277 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 455Existing Conditions PM Hughes Avenue/Duquesne Avenue Washington Boulevard N/S: W/E: 13 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 199 A: B: 78 29 A: B: 382 344 A: B: 60 0.577 = + + + + + 451 382 78 60 *1500 46 A: B: 451 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 60 AMBIENT RELATED PROJECT TOTAL 60 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 324 20 29 322 60 78 360 37 46 671 231 78 37 360 60 322 29 20 324 231 671 46 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 456Existing Conditions PM Duquesne Avenue Culver Boulevard N/S: W/E: 14 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 385 A: B: 104 120 A: B: 471 288 A: B: 108 0.775 = + + + + + 479 471 104 108 *1375 68 A: B: 479 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 108 AMBIENT RELATED PROJECT TOTAL 108 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 288 148 120 471 73 104 748 22 68 870 87 104 22 748 73 471 120 148 288 87 870 68 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 457Existing Conditions PM Washington Bl/Irving Pl Culver Boulevard N/S: W/E: 15 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 420 A: B: 79 344 A: B: 344 14 A: B: 38 0.534 = + + + + + 370 344 79 38 *1375|1010|A: B: 370 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 38 AMBIENT RELATED PROJECT TOTAL 38 LANE SIGNAL Split|1010|Split Prot-Fix Perm Auto Auto Auto Auto 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 0 1 1 0 0 0 2 0 1 0 0 LT 0 54 681 0 6 79 840 126 0 1054 56 -344 79 470 840 6 0 681 54 0 56 1054 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 458Existing Conditions PM Main Street Culver Boulevard N/S: W/E: 16 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 444 106 A: B: 276|1010|A: B:|1010|0.515 = + + + + + 444 0 113 276 *1425 531 A: B: 113 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Prot-Fix Auto Auto Auto 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 1 0 0 1 0 3 0 0 0 0 LT 0 0 276 0 163 0 1216 115 113 1592 0 0 115 1216 163 0 276 0 0 0 1592 113 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 459Existing Conditions PM Culver Boulevard Washington Boulevard/Canfield Avenu N/S: W/E: 17 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 419 A: B: 419 252 A: B: 35 14 A: B: 409 0.540 = + + + + + 419 6 409 35 *1425|1010|A: B:|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 14 AMBIENT RELATED PROJECT TOTAL 14 LANE SIGNAL Prot-Fix|1010|Prot-Fix Split OLA Auto Auto OLA 0 2 0 0 2 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 1 0 LT 818 971 35 494 9 809 29 76 0 0 20 809 76 29 9 494 35 971 818 20 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 460Existing Conditions PM Robertson Boulevard/Higuera Street Washington Boulevard N/S: W/E: 18 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 427 A: B: 73 200 A: B: 176 57 A: B: 125 0.538 = + + + + + 492 125 73 176 *1425 119 A: B: 492 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 57 AMBIENT RELATED PROJECT TOTAL 57 LANE SIGNAL Prot-Fix|1010|Prot-Fix Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 167 82 176 200 149 73 719 135 119 896 88 73 135 719 149 200 176 82 167 88 896 119 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 461Existing Conditions PM Landmark Street Washington Boulevard N/S: W/E: 19 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 528 A: B: 3|1010|A: B:|1010|30 A: B: 41 0.394 = + + + + + 652 0 41 3 *1500|1010|A: B: 652 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 30 AMBIENT RELATED PROJECT TOTAL 30 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto Auto 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 41 0 0 0 3 1056 0 0 1298 6 3 0 1056 0 0 0 41 0 6 1298 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 462Existing Conditions PM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 381 A: B: 69 113 A: B: 451 361 A: B: 95 0.722 = + + + + + 474 451 69 95 *1375 41 A: B: 474 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 173 AMBIENT RELATED PROJECT TOTAL 173 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 634 87 205 848 54 69 761 177 41 948 192 69 177 761 54 848 205 87 634 192 948 41 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 463Default Scenario Wed May 25, 2011 12:48:43 Page 11-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #211 WESLEY AV/WASHINGTON BL [EXISTING PM] ******************************************************************************** Average Delay (sec/veh): 0.2 Worst Case Level Of Service: D[ 28.3] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 0 0 0 0 0 1 1 0 1 0 2 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 5 0 7 0 0 0 0 1199 1 1 939 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 5 0 7 0 0 0 0 1199 1 1 939 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 5 0 7 0 0 0 0 1199 1 1 939 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 5 0 7 0 0 0 0 1199 1 1 939 0 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 6.8 xxxx 6.9 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 xxxx 3.3 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 1671 xxxx 600 xxxx xxxx xxxxx xxxx xxxx xxxxx 1200 xxxx xxxxx Potent Cap.: 89 xxxx 449 xxxx xxxx xxxxx xxxx xxxx xxxxx 589 xxxx xxxxx Move Cap.: 88 xxxx 449 xxxx xxxx xxxxx xxxx xxxx xxxxx 589 xxxx xxxxx Volume/Cap: 0.06 xxxx 0.02 xxxx xxxx xxxx xxxx xxxx xxxx 0.00 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.0 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 11.1 xxxx xxxxx LOS by Move: * * * * * * * * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 166 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 0.2 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd StpDel:xxxxx 28.3 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: * D * * * * * * * * * * ApproachDel: 28.3 xxxxxx xxxxxx xxxxxx ApproachLOS: D * * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 464Existing Conditions PM Helms Avenue Washington Boulevard N/S: W/E: 22 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 464 A: B: 14|1010|A: B:|1010|48 A: B: 61 0.366 = + + + + + 579 0 61 14 *1500|1010|A: B: 579 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 48 AMBIENT RELATED PROJECT TOTAL 48 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 13 0 0 0 14 927 0 0 1129 29 14 0 927 0 0 0 13 0 29 1129 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 465Default Scenario Wed May 25, 2011 12:48:43 Page 13-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #231 CATTARAUGUS AV/WASHINGTON AV [EXISTING PM] ******************************************************************************** Average Delay (sec/veh): 6.1 Worst Case Level Of Service: F[133.3] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 1 0 1 0 0 1 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 4 2 3 58 2 36 19 1134 9 11 880 75 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 4 2 3 58 2 36 19 1134 9 11 880 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 4 2 3 58 2 36 19 1134 9 11 880 75 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 4 2 3 58 2 36 19 1134 9 11 880 75 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 7.5 6.5 6.9 7.5 6.5 6.9 4.1 xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 4.0 3.3 3.5 4.0 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 1640 2154 572 1546 2120 478 955 xxxx xxxxx 1143 xxxx xxxxx Potent Cap.: 68 49 469 79 51 539 728 xxxx xxxxx 619 xxxx xxxxx Move Cap.: 59 46 469 74 49 539 728 xxxx xxxxx 619 xxxx xxxxx Volume/Cap: 0.07 0.04 0.01 0.79 0.04 0.07 0.03 xxxx xxxx 0.02 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.1 xxxx xxxxx 0.1 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 10.1 xxxx xxxxx 10.9 xxxx xxxxx LOS by Move: * * * * * * B * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 77 xxxxx xxxx 107 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 0.4 xxxxx xxxxx 5.3 xxxxx 0.1 xxxx xxxxx 0.1 xxxx xxxxx Shrd StpDel:xxxxx 58.1 xxxxx xxxxx 133 xxxxx 10.1 xxxx xxxxx 10.9 xxxx xxxxx Shared LOS: * F * * F * B * * B * * ApproachDel: 58.1 133.3 xxxxxx xxxxxx ApproachLOS: F F * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 466Existing Conditions PM La Cienega Boulevard Washington Boulevard N/S: W/E: 24 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 342 A: B: 68 220 A: B: 561 381 A: B: 144 0.881 = + + + + + 534 561 68 144 *1375 72 A: B: 534 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 144 AMBIENT RELATED PROJECT TOTAL 144 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 1086 56 220 1643 41 68 684 123 72 1068 135 68 123 684 41 1643 220 56 1086 135 1068 72 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 467Existing Conditions PM La Cienega Boulevard Fairfax Avenue N/S: W/E: 25 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 30 A: B: 468 452 A: B: 0|1010|A: B: 779 0.842 = + + + ++52 779 468 0 *1425 36 A: B: 52 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 2 0 0 0 2 0 1 0 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 LT 1557 1374 0 1342 14 851 12 18 36 0 16 851 18 12 14 1342 0 1374 1557 16 0 36 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 468Existing Conditions PM Wesley Street National Boulevard N/S: W/E: 26 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 447 A: B: 5 0 A: B: 0 24 A: B: 139 0.355 = + + + + + 493 139 5 0 *1500|1010|A: B: 493 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 24 AMBIENT RELATED PROJECT TOTAL 24 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 115 0 0 0 5 894 0 0 985 4 5 0 894 0 0 0 115 0 4 985 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 469Existing Conditions PM Hayden Avenue National Boulevard N/S: W/E: 27 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 279 A: B: 34|1010|A: B:|1010|377 A: B: 377 0.614 = + + + + + 564 0 377 34 *1425|1010|A: B: 564 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 610 AMBIENT RELATED PROJECT TOTAL 610 LANE SIGNAL Split|1010| Prot-Fix Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1 0 1 0 0 LT 0 144 0 0 0 34 279 0 0 992 135 34 0 279 0 0 0 144 0 135 992 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 470Existing Conditions PM Jefferson Boulevard National Boulevard N/S: W/E: 28 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B:|1010|272 A: B: 0|1010|A: B: 869 1.067 = + + + + + 0 836 869 0 *1500 808 A: B: 836 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL Perm|1010|Perm Split Auto Free Auto 0 1 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 LT 869 0 0 544 346 0 0 0 808 0 28 0 0 0 346 544 0 0 869 28 0 808 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 471Existing Conditions PM La Cienega Boulevard Jefferson Boulevard N/S: W/E: 29 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 329 A: B: 158 704 A: B: 34 64 A: B: 846 1.089 = + + + + + 556 846 158 34 *1375 294 A: B: 556 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 64 AMBIENT RELATED PROJECT TOTAL 64 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto OLA Auto Auto 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 2 0 0 1 0 2 0 1 0 1 0 0 LT 2233 306 34 2113 215 288 657 64 535 887 224 288 64 657 215 2113 34 306 2233 224 887 535 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 472Existing Conditions PM Jefferson Boulevard Higuera Street/Rodeo Road N/S: W/E: 30 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 244 A: B: 321 245 A: B: 101 34 A: B: 404 0.707 = + + + + + 321 281 404 101 *1425 56 A: B: 281 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 34 AMBIENT RELATED PROJECT TOTAL 34 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 1 0 1 0 2 0 0 1 0 2 0 1 0 0 1 0 1 0 2 0 0 1 0 LT 808 876 101 489 38 443 321 8 56 562 149 443 8 321 38 489 101 876 808 149 562 56 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 473Existing Conditions PM La Cienega Boulevard Rodeo Road N/S: W/E: 31 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 228 A: B: 206 732 A: B: 230 175 A: B: 810 1.233 = + + + + + 546 810 206 230 *1375 251 A: B: 546 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 319 AMBIENT RELATED PROJECT TOTAL 319 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto OLA OLA 0 2 0 1 0 0 2 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 2199 230 419 2131 65 206 455 133 251 1091 322 206 133 455 65 2131 419 230 2199 322 1091 251 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 474Default Scenario Wed May 25, 2011 12:48:43 Page 15-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #321 BRADDOCK DR/DUQUESNE AV [EXISTING PM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.256 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 85.7 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 150 169 171 7 35 13 123 404 155 16 387 16 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 150 169 171 7 35 13 123 404 155 16 387 16 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 150 169 171 7 35 13 123 404 155 16 387 16 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 150 169 171 7 35 13 123 404 155 16 387 16 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 150 169 171 7 35 13 123 404 155 16 387 16 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.31 0.34 0.35 0.13 0.63 0.24 0.18 0.59 0.23 0.04 0.92 0.04 Final Sat.: 162 183 185 51 254 95 98 322 123 20 472 20 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.92 0.92 0.92 0.14 0.14 0.14 1.26 1.26 1.26 0.82 0.82 0.82 Crit Moves: **** **** **** **** Delay/Veh: 47.5 47.5 47.5 12.6 12.6 12.6 151.5 151 151.5 33.1 33.1 33.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 47.5 47.5 47.5 12.6 12.6 12.6 151.5 151 151.5 33.1 33.1 33.1 LOS by Move: E E E B B B F F F D D D ApproachDel: 47.5 12.6 151.5 33.1 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 47.5 12.6 151.5 33.1 LOS by Appr: E B F D ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 475Default Scenario Wed May 25, 2011 12:48:43 Page 17-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #331 LUCERNE AV/DUQUESNE AV [EXISTING PM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 0.876 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 28.6 Optimal Cycle: 0 Level Of Service: D ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 1 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 327 0 71 56 445 0 0 434 226 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 327 0 71 56 445 0 0 434 226 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 327 0 71 56 445 0 0 434 226 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 327 0 71 56 445 0 0 434 226 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 0 0 327 0 71 56 445 0 0 434 226 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 0.82 0.00 0.18 0.11 0.89 0.00 0.00 1.00 1.00 Final Sat.: 0 0 0 441 0 96 64 508 0 0 537 599 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: xxxx xxxx xxxx 0.74 xxxx 0.74 0.88 0.88 xxxx xxxx 0.81 0.38 Crit Moves: **** **** **** Delay/Veh: 0.0 0.0 0.0 24.6 0.0 24.6 37.2 37.2 0.0 0.0 30.8 12.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 0.0 0.0 24.6 0.0 24.6 37.2 37.2 0.0 0.0 30.8 12.1 LOS by Move: * * * C * C E E * * D B ApproachDel: xxxxxx 24.6 37.2 24.4 Delay Adj: xxxxx 1.00 1.00 1.00 ApprAdjDel: xxxxxx 24.6 37.2 24.4 LOS by Appr: * C E C ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 476Existing Conditions PM Jefferson Boulevard Duquesne Avenue N/S: W/E: 34 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 28 A: B: 41 52 A: B: 419 685 A: B: 349 0.833 = + + + + +41 419 432 349 *1375 394 A: B: 432 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 349 AMBIENT RELATED PROJECT TOTAL 349 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto OLA Auto 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 1 0 0 1 0 1 0 0 0 1 0 0 LT 1335 34 52 838 189 28 41 20 432 62 332 28 20 41 189 838 52 34 1335 332 62 432 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 12:45:39 PM CalcaDB EXISTPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 477 APPENDIX E Related Projects Trip Generation Rates Capacity Calculation Worksheets Cumulative (2014) Base Conditions ATTACHMENT 6 478 Related Projects Trip Generation Rates ATTACHMENT 6 479APPENDIX E RELATED PROJCETS TRIP GENERATION RATES [1] AM Peak Hour PM Peak Hour Size Daily IN OUT TOTAL IN OUT TOTAL Trip Rates [1] Warehouse (ITE Land Use 150) per 1,000 s.f. [2] 79% 21% 0.30 25% 75% 0.32 Apartment (ITE Land Use 220) per d.u. [3] 20% 80% [3] 65% 35% [3] Condominium/Townhouse (ITE Land Use 230) per d.u. 5.81 17% 83% 0.44 67% 33% 0.52 Senior Housing (ITE Land Use 252) per occupied d.u. 3.48 36% 64% 0.13 60% 40% 0.16 Congregate Care (ITE Land Use 253) per d.u. 2.02 59% 41% 0.06 55% 45% 0.17 Hotel (ITE Land Use 310) per occupied room 8.92 58% 42% 0.67 49% 51% 0.70 Community College (ITE Land Use 540) per 1,000 s.f. 27.49 74% 26% 2.99 58% 42% 2.54 General Office (ITE Land Use 710) per 1,000 s.f. [4] 88% 12% [4] 17% 83% [4] Medical/Dental Office (ITE Land Use 720) per 1,000 s.f. 36.13 79% 21% 2.30 27% 73% 3.46 Specialty Retail (ITE Land Use 814) per 1,000 s.f. 44.32 60% 40% [5] 44% 56% 2.71 Retail (ITE Land Use 820) per 1,000 s.f. 42.94 61% 39% 1.00 49% 51% 3.73 Convenience Store (ITE Land Use 851) per 1,000 s.f. 737.99 50% 50% 67.03 51% 49% 52.41 Restaurant (ITE Land Use 931) per 1,000 s.f. 89.95 50% 50% 0.81 67% 33% 7.49 High-Turnover Restaurant (ITE Land Use 932) per 1,000 s.f. 127.15 52% 48% 11.52 59% 41% 11.15 Auto Care Center (ITE Land Use 942) per 1,000 s.f. n/a 65% 35% 2.94 50% 50% 3.38 Gas Station w/Convenience Store (ITE Land Use 945) per 1,000 s.f. n/a 51% 49% 79.30 50% 50% 97.08 Automated Car Wash (ITE Land Use 948) per 1,000 s.f. 900 [6] 50% 50% [6] 50% 50% 14.12 [1] Trip Generation, An ITE Information Report, 8th Edition, ITE 2008 [2] Daily trip generation for warehouse was calculated using the following formula: Where: Daily: Ln(T) = 0.86 Ln(X) + 2.24 Ln = Natural logarithm T = Two-way volume of traffic (total trip-ends) X = Area in 1,000 gross square feet of leasable area [3] Trip generation for apartment was calculated using the following formulas: Daily: T = 6.06 (X) + 123.56 Where: AM Peak Hour: T =0.49 (X) + 3.73 T = Two-way volume of traffic (total trip-ends) PM Peak Hour: T =0.55 (X) + 17.65 X = Number of dwelling units [4] Trip generation for office was calculated using one of the following methods per ITE Trip Genration: a) Average Rates Daily: T = 11.01 (X) AM Peak Hour: T = 1.55 (X) PM Peak Hour: T = 1.49 (X) b) Equations Where: Daily: Ln(T) = 0.77 Ln(X) + 3.65 Ln = Natural logarithm AM Peak Hour: Ln(T) = 0.80 Ln(X) + 1.55 T = Two-way volume of traffic (total trip-ends) PM Peak Hour: T = 1.12 (X) + 78.81 X = Area in 1,000 gross square feet of leasable area [5] AM peak hour trip rate obtained from Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region, SANDAG, April 2002. AM peak hour is 3% of Daily Trips. [6] Daily and AM peak hour trip rate obtained from Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region, SANDAG, April 2002. AM peak hour is 4% of Daily Trips. ATTACHMENT 6 480 Cumulative (2014) Base Conditions AM Peak Hour ATTACHMENT 6 481Cumulative (2014) Base AM Robertson Boulevard Cattaragus Avenue N/S: W/E: 1 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 87 A: B: 403 40 A: B: 961 684 A: B: 98 0.978 = + + + + + 403 961 110 98 *1500 398 A: B: 110 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 98 AMBIENT RELATED PROJECT TOTAL 98 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 1363 5 40 1848 73 87 244 72 110 142 146 87 72 244 73 1848 40 5 1363 146 142 110 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 482Cumulative (2014) Base AM Robertson Boulevard I-10 WB Off-Ramp/Kincardine Av N/S: W/E: 2 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 227 A: B: 214|1010|A: B: 930 618 A: B: 38 0.827 = + + + + + 164 930 214 38 *1500 118 A: B: 164 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 38 AMBIENT RELATED PROJECT TOTAL 38 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 LT 1235 0 0 1784 75 214 13 175 118 0 46 214 175 13 75 1784 0 0 1235 46 0 118 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 483Cumulative (2014) Base AM Robertson Boulevard National Boulevard N/S: W/E: 3 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 149 A: B: 609 612 A: B: 447 121 A: B: 357 1.079 = + + + + + 609 357 167 447 *1375 501 A: B: 167 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 121 AMBIENT RELATED PROJECT TOTAL 121 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto OLA Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 LT 658 55 813 1013 211 149 609 500 167 740 262 149 500 609 211 1013 813 55 658 262 740 167 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 484Cumulative (2014) Base AM National Boulevard I-10 EB On-Ramp N/S: W/E: 4 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: A: B: 0|101010|A: B: 624 602 A: B: 148 0.445 = + + + + + 624 148 *1500 A: B: 0|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(N/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 148 AMBIENT RELATED PROJECT TOTAL 148 LANE SIGNAL Prot-Fix|1010|Perm Auto Auto 0 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LT 1204 0 0 1075 624 0 0 0 0 0 0 0 0 0 624 1075 0 0 1204 0 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 485Cumulative (2014) Base AM Hughes Avenue Venice Boulevard N/S: W/E: 5 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 665 A: B: 214 81 A: B: 364 360 A: B: 97 0.841 = + + + + + 692 364 214 97 *1500 42 A: B: 692 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 97 AMBIENT RELATED PROJECT TOTAL 97 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 3 0 0 1 0 LT 206 57 81 236 47 214 1996 44 42 2075 121 214 44 1996 47 236 81 57 206 121 2075 42 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 486Cumulative (2014) Base AM Bagley Avenue Venice Boulevard N/S: W/E: 6 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 717 A: B: 65 78 A: B: 331 204 A: B: 49 0.789 = + + + + + 736 331 65 49 *1375 72 A: B: 736 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 49 AMBIENT RELATED PROJECT TOTAL 49 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 0 0 1 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 2 0 1 0 0 LT 159 45 78 179 74 65 2150 42 72 2153 54 65 42 2150 74 179 78 45 159 54 2153 72 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 487Cumulative (2014) Base AM Culver Boulevard Venice Boulevard N/S: W/E: 7 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 724 A: B: 356 131 A: B: 131 67 A: B: 90 0.879 = + + + + + 728 131 90 356 *1375 30 A: B: 728 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 67 AMBIENT RELATED PROJECT TOTAL 67 LANE SIGNAL Split|1010|Split Prot-Fix Prot-Fix OLA Auto Auto Auto 0 1 0 0 2 0 1 0 0 1 0 0 0 2 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 87 810 183 45 33 647 2021 152 30 2094 91 647 152 2021 33 45 183 810 87 91 2094 30 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 488Cumulative (2014) Base AM Robertson Boulevard Venice Boulevard N/S: W/E: 8 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 81 A: B: 894 429 A: B: 650 228 A: B: 269 1.491 = + + + + + 894 269 334 650 *1375 880 A: B: 334 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 228 AMBIENT RELATED PROJECT TOTAL 228 LANE SIGNAL Split|1010|Split Prot-Var Prot-Var OLA Auto Auto Auto 0 2 0 0 1 0 0 1 1 0 0 1 0 1 0 2 0 1 0 0 2 0 2 0 1 0 0 LT 538 61 650 429 319 81 2327 356 607 2482 158 81 356 2327 319 429 650 61 538 158 2482 607 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 489Cumulative (2014) Base AM National Boulevard Venice Boulevard N/S: W/E: 9 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 701 A: B: 118 135 A: B: 485 512 A: B: 232 1.068 = + + + + + 730 485 118 232 *1375 116 A: B: 730 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 232 AMBIENT RELATED PROJECT TOTAL 232 LANE SIGNAL Perm|1010|Prot-Fix Prot-Fix Prot-Fix Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 2 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1001 23 135 821 148 214 2104 122 211 2189 683 214 122 2104 148 821 135 23 1001 683 2189 211 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 490Cumulative (2014) Base AM Helms Avenue Venice Boulevard N/S: W/E: 10 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 24 A: B: 809 12 A: B: 42 20 A: B: 11 0.557 = + + + + + 809 42 78 11 *1500 759 A: B: 78 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 11 AMBIENT RELATED PROJECT TOTAL 11 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 1 0 0 0 1 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 9 4 12 2 28 24 2404 23 78 2255 22 24 23 2404 28 2 12 4 9 22 2255 78 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 491Cumulative (2014) Base AM Cattaraugus Avenue Venice Boulevard N/S: W/E: 11 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 79 A: B: 805 273 A: B: 168 68 A: B: 354 0.863 = + + + + + 805 354 72 168 *1500 685 A: B: 72 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 68 AMBIENT RELATED PROJECT TOTAL 68 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 252 34 168 87 18 79 2309 105 72 2045 11 79 105 2309 18 87 168 34 252 11 2045 72 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 492Cumulative (2014) Base AM La Cienega Boulevard Venice Boulevard N/S: W/E: 12 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 159 A: B: 657 36 A: B: 632 649 A: B: 131 1.113 = + + + + + 657 632 206 131 *1375 594 A: B: 206 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 131 AMBIENT RELATED PROJECT TOTAL 131 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1867 79 36 1485 411 159 1972 15 375 1783 173 159 15 1972 411 1485 36 79 1867 173 1783 375 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 493Cumulative (2014) Base AM Hughes Av/Duquesne Av Washington Boulevard N/S: W/E: 13 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 56 A: B: 439 14 A: B: 411 371 A: B: 170 0.641 = + + + + + 439 411 46 170 *1500 414 A: B: 46 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 170 AMBIENT RELATED PROJECT TOTAL 170 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 331 40 14 360 51 56 827 51 46 641 186 56 51 827 51 360 14 40 331 186 641 46 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 494Cumulative (2014) Base AM Duquesne Avenue Culver Boulevard N/S: W/E: 14 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 417 A: B: 150 52 A: B: 437 374 A: B: 101 0.760 = + + + + + 453 437 150 101 *1375 113 A: B: 453 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 101 AMBIENT RELATED PROJECT TOTAL 101 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 374 140 52 437 79 150 776 57 113 855 51 150 57 776 79 437 52 140 374 51 855 113 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 495Cumulative (2014) Base AM Culver Boulevard Washington Bl/Irving Pl N/S: W/E: 15 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 76 A: B: 481 337 A: B: 337 94 A: B: 128 0.618 = + + + + + 481 337 0 128 *1375 353 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 128 AMBIENT RELATED PROJECT TOTAL 128 LANE SIGNAL Split|1010|Split Prot-Fix Perm Auto Auto Auto Auto 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 0 1 1 0 0 0 2 0 1 0 0 LT 0 132 650 0 24 76 896 548 0 1015 44 -337 76 885 896 24 0 650 132 0 44 1015 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 496Cumulative (2014) Base AM Main Street Culver Boulevard N/S: W/E: 16 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 607 53 A: B: 151|1010|A: B:|1010|0.581 = + + + + + 607 0 170 151 *1425 536 A: B: 170 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Prot-Fix Auto Auto Auto 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 1 0 0 1 0 3 0 0 0 0 LT 0 0 151 0 138 0 1656 164 170 1609 0 0 164 1656 138 0 151 0 0 0 1609 170 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 497Cumulative (2014) Base AM Culver Boulevard Washington Bl/Canfield Av N/S: W/E: 17 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 606 A: B: 606 289 A: B: 187 12 A: B: 421 0.782 = + + + + + 606 0 421 187 *1425|1010|A: B:|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 12 AMBIENT RELATED PROJECT TOTAL 12 LANE SIGNAL Prot-Fix|1010|Prot-Fix Split OLA Auto Auto OLA 0 2 0 0 2 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 1 0 LT 842 913 187 574 4 1176 36 139 0 0 6 1176 139 36 4 574 187 913 842 6 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 498Cumulative (2014) Base AM Robertson Bl/Higuera St Washington Boulevard N/S: W/E: 18 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 91 A: B: 835 279 A: B: 188 68 A: B: 383 0.975 = + + + + + 835 383 83 188 *1425 495 A: B: 83 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 68 AMBIENT RELATED PROJECT TOTAL 68 LANE SIGNAL Prot-Fix|1010|Prot-Fix Perm Perm Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 383 71 188 279 136 91 1350 319 83 919 71 91 319 1350 136 279 188 71 383 71 919 83 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 499Cumulative (2014) Base AM Landmark Street Washington Boulevard N/S: W/E: 19 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 63 A: B: 975|1010|A: B:|1010|30 A: B: 31 0.601 = + + + + + 975 0 31 0 *1500 544 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 30 AMBIENT RELATED PROJECT TOTAL 30 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto Auto 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 31 0 0 0 63 1949 0 0 1007 80 63 0 1949 0 0 0 31 0 80 1007 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 500Cumulative (2014) Base AM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 90 A: B: 560 142 A: B: 485 500 A: B: 256 0.946 = + + + + + 560 485 96 256 *1375 393 A: B: 96 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 466 AMBIENT RELATED PROJECT TOTAL 466 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 874 126 258 902 67 90 1339 340 96 785 184 90 340 1339 67 902 258 126 874 184 785 96 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 501Default Scenario Wed May 25, 2011 14:47:01 Page 3-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #21 WESLEY AV/WASHINGTON BL [CUMULATIVE (2014) BASE AM] ******************************************************************************** Average Delay (sec/veh): 2.0 Worst Case Level Of Service: F[134.9] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 0 0 0 0 0 1 1 0 1 0 2 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 30 0 13 0 0 0 0 1112 36 26 1756 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 0 13 0 0 0 0 1112 36 26 1756 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 0 13 0 0 0 0 1112 36 26 1756 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 30 0 13 0 0 0 0 1112 36 26 1756 0 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 6.8 xxxx 6.9 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 xxxx 3.3 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 2060 xxxx 574 xxxx xxxx xxxxx xxxx xxxx xxxxx 1148 xxxx xxxxx Potent Cap.: 49 xxxx 467 xxxx xxxx xxxxx xxxx xxxx xxxxx 616 xxxx xxxxx Move Cap.: 47 xxxx 467 xxxx xxxx xxxxx xxxx xxxx xxxxx 616 xxxx xxxxx Volume/Cap: 0.64 xxxx 0.03 xxxx xxxx xxxx xxxx xxxx xxxx 0.04 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.1 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 11.1 xxxx xxxxx LOS by Move: * * * * * * * * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 65 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 2.9 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd StpDel:xxxxx 135 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: * F * * * * * * * * * * ApproachDel: 134.9 xxxxxx xxxxxx xxxxxx ApproachLOS: F * * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 502Cumulative (2014) Base AM Wesley Avenue/Driveway Washington Boulevard N/S: W/E: 21 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 26 A: B: 878|1010|A: B:|1010|30 A: B: 43 0.768 = + + + + + 878 0 43 0 1200 574 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 30 AMBIENT RELATED PROJECT TOTAL 30 LANE SIGNAL Perm|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 13 0 0 0 26 1756 0 0 1112 36 26 0 1756 0 0 0 13 0 36 1112 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 503Cumulative (2014) Base AM Helms Avenue Washington Boulevard N/S: W/E: 22 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 31 A: B: 855|1010|A: B:|1010|77 A: B: 95 0.563 = + + + + + 855 0 95 0 *1500 569 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 77 AMBIENT RELATED PROJECT TOTAL 77 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 18 0 0 0 31 1710 0 0 1098 40 31 0 1710 0 0 0 18 0 40 1098 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 504Default Scenario Wed May 25, 2011 14:47:01 Page 5-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #23 CATTARAUGUS AV/WASHINGTON AV [CUMULATIVE (2014) BASE AM] ******************************************************************************** Average Delay (sec/veh): 265.8 Worst Case Level Of Service: F[5720.0] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 1 0 1 0 0 1 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 9 5 3 89 6 54 50 982 6 3 1713 330 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 9 5 3 89 6 54 50 982 6 3 1713 330 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 9 5 3 89 6 54 50 982 6 3 1713 330 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 9 5 3 89 6 54 50 982 6 3 1713 330 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 7.5 6.5 6.9 7.5 6.5 6.9 4.1 xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 4.0 3.3 3.5 4.0 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 1951 3134 494 2478 2972 1022 2043 xxxx xxxxx 988 xxxx xxxxx Potent Cap.: 39 11 526 16 14 237 280 xxxx xxxxx 708 xxxx xxxxx Move Cap.: 16 9 526 8 12 237 280 xxxx xxxxx 708 xxxx xxxxx Volume/Cap: 0.57 0.55 0.01 11.61 0.51 0.23 0.18 xxxx xxxx 0.00 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.6 xxxx xxxxx 0.0 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 20.7 xxxx xxxxx 10.1 xxxx xxxxx LOS by Move: * * * * * * C * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 15 xxxxx xxxx 12 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 2.6 xxxxx xxxxx 19.9 xxxxx 0.6 xxxx xxxxx 0.0 xxxx xxxxx Shrd StpDel:xxxxx 618 xxxxx xxxxx 5720 xxxxx 20.7 xxxx xxxxx 10.1 xxxx xxxxx Shared LOS: * F * * F * C * * B * * ApproachDel: 618.3 5720.0 xxxxxx xxxxxx ApproachLOS: F F * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 505Cumulative (2014) Base AM Cattaraugus Avenue Washington Boulevard N/S: W/E: 23 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 1028 89 A: B: 149 17 A: B: 9 1.030 = + + + + + 1028 149 50 9 1200 644 A: B: 50 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|10 10|AMBIENT RELATED PROJECT TOTAL|10 10|LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 0 LT 5 3 89 6 54 3 1713 330 50 982 6 3 330 1713 54 6 89 3 5 6 982 50 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 506Cumulative (2014) Base AM La Cienega Boulevard Washington Boulevard N/S: W/E: 24 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 58 A: B: 840 188 A: B: 549 580 A: B: 260 1.199 = + + + + + 840 549 96 260 *1375 446 A: B: 96 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 260 AMBIENT RELATED PROJECT TOTAL 260 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 1718 21 188 1591 56 58 1679 252 96 892 122 58 252 1679 56 1591 188 21 1718 122 892 96 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 507Cumulative (2014) Base AM La Cienega Boulevard Fairfax Avenue N/S: W/E: 25 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 68 A: B: 690 513 A: B: 0 46 A: B: 932 1.090 = + + + ++31 932 690 0 *1425 17 A: B: 31 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 46 AMBIENT RELATED PROJECT TOTAL 46 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 2 0 0 0 2 0 1 0 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 LT 1863 978 0 1495 43 1255 37 31 17 2 12 1255 31 37 43 1495 0 978 1863 12 2 17 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 508Cumulative (2014) Base AM Wesley Street National Boulevard N/S: W/E: 26 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 40 A: B: 953 0 A: B: 0 115 A: B: 217 0.710 = + + + + + 953 217 0 0 *1500 529 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 115 AMBIENT RELATED PROJECT TOTAL 115 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 102 0 0 0 40 1906 0 0 1058 87 40 0 1906 0 0 0 102 0 87 1058 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 509Cumulative (2014) Base AM Hayden Avenue National Boulevard N/S: W/E: 27 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 652 A: B: 221|1010|A: B:|1010|352 A: B: 352 0.640 = + + + + + 439 0 352 221 *1425|1010|A: B: 439 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 607 AMBIENT RELATED PROJECT TOTAL 607 LANE SIGNAL Split|1010| Prot-Fix Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 96 0 0 0 221 1304 0 0 877 275 221 0 1304 0 0 0 96 0 275 877 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 510Cumulative (2014) Base AM Jefferson Boulevard National Boulevard N/S: W/E: 28 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B:|101010|A: B: 1088 312 A: B: 174 1.032 = + + + + + 0 309 1088 174 *1425 309 A: B: 309 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 174 AMBIENT RELATED PROJECT TOTAL 174 LANE SIGNAL Perm|1010|Perm Split Split Auto OLA Auto Auto 0 2 0 0 1 0 1 0 1 0 0 1 0 0 0 0 1 0 0 0 1 1 0 0 0 1 0 LT 624 0 0 753 1396 0 0 0 617 0 176 0 0 0 1396 753 0 0 624 176 0 617 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 511Cumulative (2014) Base AM La Cienega Boulevard Jefferson Boulevard N/S: W/E: 29 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 325 A: B: 657 665 A: B: 179 146 A: B: 822 1.308 = + + + + + 657 822 237 179 *1375 423 A: B: 237 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 146 AMBIENT RELATED PROJECT TOTAL 146 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto OLA Auto Auto 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 2 0 0 1 0 2 0 1 0 1 0 0 LT 2351 116 179 1994 643 591 1313 138 430 715 130 591 138 1313 643 1994 179 116 2351 130 715 430 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 512Cumulative (2014) Base AM Jefferson Boulevard Higuera St/Rodeo Rd N/S: W/E: 30 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 562 A: B: 583 111 A: B: 354 357 A: B: 202 0.785 = + + + + + 583 80 354 202 *1425 27 A: B: 80 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 202 AMBIENT RELATED PROJECT TOTAL 202 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 1 0 1 0 2 0 0 1 0 2 0 1 0 0 1 0 1 0 2 0 0 1 0 LT 713 800 111 707 95 1022 583 147 27 160 51 1022 147 583 95 707 111 800 713 51 160 27 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 513Cumulative (2014) Base AM La Cienega Boulevard Rodeo Road N/S: W/E: 31 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 179 A: B: 461 141 A: B: 806 788 A: B: 331 1.247 = + + + + + 461 806 213 331 *1375 298 A: B: 213 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 601 AMBIENT RELATED PROJECT TOTAL 601 LANE SIGNAL Prot-Fix|1010|Prot-Fix Prot-Var Prot-Var Auto Auto OLA OLA 0 2 0 1 0 0 2 0 2 0 1 0 0 2 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 2268 95 256 2126 291 325 921 329 213 595 228 325 329 921 291 2126 256 95 2268 228 595 213 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 514Default Scenario Wed May 25, 2011 14:47:01 Page 7-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #32 BRADDOCK DR/DUQUESNE AV [CUMULATIVE (2014) BASE AM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.635 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 227.9 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 90 209 143 30 328 39 48 556 38 56 550 40 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 90 209 143 30 328 39 48 556 38 56 550 40 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 90 209 143 30 328 39 48 556 38 56 550 40 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 90 209 143 30 328 39 48 556 38 56 550 40 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 90 209 143 30 328 39 48 556 38 56 550 40 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.20 0.48 0.32 0.07 0.83 0.10 0.07 0.87 0.06 0.09 0.85 0.06 Final Sat.: 82 190 130 30 328 39 30 342 23 34 336 24 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 1.10 1.10 1.10 1.00 1.00 1.00 1.62 1.62 1.62 1.64 1.64 1.64 Crit Moves: **** **** **** **** Delay/Veh: 105.2 105 105.2 76.3 76.3 76.3 314.6 315 314.6 319.0 319 319.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 105.2 105 105.2 76.3 76.3 76.3 314.6 315 314.6 319.0 319 319.0 LOS by Move: F F F F F F F F F F F F ApproachDel: 105.2 76.3 314.6 319.0 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 105.2 76.3 314.6 319.0 LOS by Appr: F F F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 515Cumulative (2014) Base AM Braddock Drive Duquesne Avenue N/S: W/E: 32 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 646 A: B: 56 30 A: B: 397 442 A: B: 90 1.185 = + + + + + 642 397 56 90 1000 48 A: B: 642 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 90 AMBIENT RELATED PROJECT TOTAL 90 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 209 143 30 328 39 56 550 40 48 556 38 56 40 550 39 328 30 143 209 38 556 48 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 516Default Scenario Wed May 25, 2011 14:47:01 Page 9-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #33 LUCERNE AV/DUQUESNE AV [CUMULATIVE (2014) BASE AM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.047 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 51.7 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 1 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 188 0 63 92 554 0 0 596 352 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 188 0 63 92 554 0 0 596 352 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 188 0 63 92 554 0 0 596 352 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 188 0 63 92 554 0 0 596 352 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 0 0 188 0 63 92 554 0 0 596 352 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 0.75 0.00 0.25 0.14 0.86 0.00 0.00 1.00 1.00 Final Sat.: 0 0 0 399 0 134 88 529 0 0 586 661 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: xxxx xxxx xxxx 0.47 xxxx 0.47 1.05 1.05 xxxx xxxx 1.02 0.53 Crit Moves: **** **** **** Delay/Veh: 0.0 0.0 0.0 15.6 0.0 15.6 73.0 73.0 0.0 0.0 66.1 14.2 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 0.0 0.0 15.6 0.0 15.6 73.0 73.0 0.0 0.0 66.1 14.2 LOS by Move: * * * C * C F F * * F B ApproachDel: xxxxxx 15.6 73.0 46.8 Delay Adj: xxxxx 1.00 1.00 1.00 ApprAdjDel: xxxxxx 15.6 73.0 46.8 LOS by Appr: * C F E ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 517Cumulative (2014) Base AM Lucerne Avenue Duquesne Avenue N/S: W/E: 33 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 596 188 A: B: 251|1010|A: B:|1010|0.939 = + + + + + 596 251092 1000 646 A: B: 92 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Perm Auto Auto Auto 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 LT 0 0 188 0 63 0 596 352 92 554 0 0 352 596 63 0 188 0 0 0 554 92 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 518Cumulative (2014) Base AM Jefferson Boulevard Duquesne Avenue N/S: W/E: 34 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 33 A: B: 8 19 A: B: 794 595 A: B: 493 1.211 = + + + + + 467 794 8 493 *1375 316 A: B: 467 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 493 AMBIENT RELATED PROJECT TOTAL 493 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto OLA Auto 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 1 0 0 1 0 1 0 0 0 1 0 0 LT 1162 28 19 1588 440 8 33 6 316 32 435 8 6 33 440 1588 19 28 1162 435 32 316 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 01:27:11 PM CalcaDB CBASEAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 519 Cumulative (2014) Base Conditions PM Peak Hour ATTACHMENT 6 520Cumulative (2014) Base PM Robertson Boulevard Cattaragus Avenue N/S: W/E: 1 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 186 A: B: 62 57 A: B: 923 882 A: B: 105 0.963 = + + + + + 460 923 62 105 *1500 101 A: B: 460 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 105 AMBIENT RELATED PROJECT TOTAL 105 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 1748 15 57 1780 65 62 81 43 101 231 128 62 43 81 65 1780 57 15 1748 128 231 101 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 521Cumulative (2014) Base PM Robertson Boulevard I-10 WB Off-Ramp/Kincardine Av N/S: W/E: 2 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 531 A: B: 476 709 A: B: 0 14 A: B: 724 0.839 = + + + + + 164 724 476 0 *1500 77 A: B: 164 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 14 AMBIENT RELATED PROJECT TOTAL 14 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 LT 1448 0 0 1382 35 476 23 562 77 0 87 476 562 23 35 1382 0 0 1448 87 0 77 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 522Cumulative (2014) Base PM Robertson Boulevard National Boulevard N/S: W/E: 3 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 415 A: B: 117 646 A: B: 370 106 A: B: 553 1.072 = + + + + + 530 553 117 370 *1375 175 A: B: 530 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 106 AMBIENT RELATED PROJECT TOTAL 106 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto OLA Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 LT 948 158 673 1056 235 117 415 278 175 920 140 117 278 415 235 1056 673 158 948 140 920 175 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 523Cumulative (2014) Base PM National Boulevard I-10 EB On-Ramp N/S: W/E: 4 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: A: B: 0|101010|A: B: 614 354 A: B: 217 0.484 = + + + + + 614 217 *1500 A: B: 0|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(N/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 217 AMBIENT RELATED PROJECT TOTAL 217 LANE SIGNAL Prot-Fix|1010|Perm Auto Auto 0 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LT 708 0 0 1132 614 0 0 0 0 0 0 0 0 0 614 1132 0 0 708 0 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 524Cumulative (2014) Base PM Hughes Avenue Venice Boulevard N/S: W/E: 5 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 623 A: B: 130 301 A: B: 43 108 A: B: 457 0.767 = + + + + + 626 457 130 43 *1500 59 A: B: 626 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 108 AMBIENT RELATED PROJECT TOTAL 108 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 3 0 0 1 0 LT 217 132 43 204 54 130 1869 45 59 1877 101 130 45 1869 54 204 43 132 217 101 1877 59 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 525Cumulative (2014) Base PM Bagley Avenue Venice Boulevard N/S: W/E: 6 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 81 A: B: 622 93 A: B: 367 154 A: B: 41 0.763 = + + + + + 622 367 116 41 *1375 656 A: B: 116 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 41 AMBIENT RELATED PROJECT TOTAL 41 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 0 0 1 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 2 0 1 0 0 LT 108 46 93 174 100 81 1866 73 116 1859 110 81 73 1866 100 174 93 46 108 110 1859 116 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 526Cumulative (2014) Base PM Culver Boulevard Venice Boulevard N/S: W/E: 7 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 714 A: B: 299 216 A: B: 216 146 A: B: 245 0.987 = + + + + + 694 216 245 299 *1375 54 A: B: 694 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 146 AMBIENT RELATED PROJECT TOTAL 146 LANE SIGNAL Split|1010|Split Prot-Fix Prot-Fix OLA Auto Auto Auto 0 1 0 0 2 0 1 0 0 1 0 0 0 2 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 83 988 308 74 49 543 1928 214 54 1984 99 543 214 1928 49 74 308 988 83 99 1984 54 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 527Cumulative (2014) Base PM Robertson Boulevard Venice Boulevard N/S: W/E: 8 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 108 A: B: 771 370 A: B: 619 247 A: B: 380 1.460 = + + + + + 771 380 334 619 *1375 841 A: B: 334 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 247 AMBIENT RELATED PROJECT TOTAL 247 LANE SIGNAL Split|1010|Split Prot-Var Prot-Var OLA Auto Auto Auto 0 2 0 0 1 0 0 1 1 0 0 1 0 1 0 2 0 1 0 0 2 0 2 0 1 0 0 LT 759 67 619 370 259 108 2165 147 607 2354 170 108 147 2165 259 370 619 67 759 170 2354 607 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 528Cumulative (2014) Base PM National Boulevard Venice Boulevard N/S: W/E: 9 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 548 A: B: 69 189 A: B: 486 366 A: B: 265 1.043 = + + + + + 710 486 69 265 *1375 128 A: B: 710 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 265 AMBIENT RELATED PROJECT TOTAL 265 LANE SIGNAL Perm|1010|Prot-Fix Prot-Fix Prot-Fix Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 2 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 629 102 189 847 125 126 1644 66 233 2131 538 126 66 1644 125 847 189 102 629 538 2131 233 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 529Cumulative (2014) Base PM Helms Avenue Venice Boulevard N/S: W/E: 10 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 618 A: B: 33 29 A: B: 67 17 A: B: 16 0.545 = + + + + + 807 67 33 16 *1500 76 A: B: 807 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 16 AMBIENT RELATED PROJECT TOTAL 16 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 1 0 0 0 1 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 1 10 29 9 29 33 1847 8 76 2388 34 33 8 1847 29 9 29 10 1 34 2388 76 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 530Cumulative (2014) Base PM Cattaraugus Avenue Venice Boulevard N/S: W/E: 11 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 601 A: B: 91 193 A: B: 300 136 A: B: 47 0.723 = + + + + + 752 300 91 47 *1500 114 A: B: 752 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 47 AMBIENT RELATED PROJECT TOTAL 47 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 64 25 193 75 32 91 1723 79 114 2243 13 91 79 1723 32 75 193 25 64 13 2243 114 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 531Cumulative (2014) Base PM La Cienega Boulevard Venice Boulevard N/S: W/E: 12 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 469 A: B: 223 37 A: B: 654 457 A: B: 104 1.096 = + + + + + 622 654 223 104 *1375 166 A: B: 622 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 104 AMBIENT RELATED PROJECT TOTAL 104 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1254 116 37 1618 344 223 1407 35 302 1865 249 223 35 1407 344 1618 37 116 1254 249 1865 302 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 532Cumulative (2014) Base PM Hughes Av/Duquesne Av Washington Boulevard N/S: W/E: 13 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 293 A: B: 80 33 A: B: 421 428 A: B: 66 0.653 = + + + + + 517 421 80 66 *1500 52 A: B: 517 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 66 AMBIENT RELATED PROJECT TOTAL 66 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 407 21 33 352 69 80 534 52 52 793 240 80 52 534 69 352 33 21 407 240 793 52 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 533Cumulative (2014) Base PM Duquesne Avenue Culver Boulevard N/S: W/E: 14 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 449 A: B: 149 124 A: B: 500 364 A: B: 124 0.886 = + + + + + 542 500 149 124 *1375 80 A: B: 542 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 124 AMBIENT RELATED PROJECT TOTAL 124 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 364 194 124 500 82 149 874 23 80 987 97 149 23 874 82 500 124 194 364 97 987 80 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 534Cumulative (2014) Base PM Culver Boulevard Washington Bl/Irving Pl N/S: W/E: 15 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 504 A: B: 95 407 A: B: 407 18 A: B: 41 0.635 = + + + + + 426 407 95 41 *1375|1010|A: B: 426 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 41 AMBIENT RELATED PROJECT TOTAL 41 LANE SIGNAL Split|1010|Split Prot-Fix Perm Auto Auto Auto Auto 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 0 1 1 0 0 0 2 0 1 0 0 LT 0 66 807 0 6 95 1008 254 0 1217 60 -407 95 661 1008 6 0 807 66 0 60 1217 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 535Cumulative (2014) Base PM Main Street Culver Boulevard N/S: W/E: 16 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 567 112 A: B: 286|1010|A: B:|1010|0.613 = + + + + + 567 0 120 286 *1425 628 A: B: 120 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Prot-Fix Auto Auto Auto 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 1 0 0 1 0 3 0 0 0 0 LT 0 0 286 0 172 0 1583 119 120 1883 0 0 119 1583 172 0 286 0 0 0 1883 120 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 536Cumulative (2014) Base PM Culver Boulevard Washington Bl/Canfield Av N/S: W/E: 17 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 550 A: B: 550 307 A: B: 118 14 A: B: 496 0.752 = + + + + + 550 7 496 118 *1425|1010|A: B:|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 14 AMBIENT RELATED PROJECT TOTAL 14 LANE SIGNAL Prot-Fix|1010|Prot-Fix Split OLA Auto Auto OLA 0 2 0 0 2 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 1 0 LT 991 1097 118 605 9 1069 30 219 0 0 21 1069 219 30 9 605 118 1097 991 21 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 537Cumulative (2014) Base PM Robertson Bl/Higuera St Washington Boulevard N/S: W/E: 18 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 85 A: B: 725 229 A: B: 183 67 A: B: 212 0.816 = + + + + + 725 212 143 183 *1425 625 A: B: 143 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 67 AMBIENT RELATED PROJECT TOTAL 67 LANE SIGNAL Prot-Fix|1010|Prot-Fix Perm Perm Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 212 86 183 229 191 85 989 460 143 1156 93 85 460 989 191 229 183 86 212 93 1156 143 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 538Cumulative (2014) Base PM Landmark Street Washington Boulevard N/S: W/E: 19 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 834|1010|A: B:|1010|31 A: B: 42 0.514 = + + + + + 834 0 42 0 *1500 790 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 31 AMBIENT RELATED PROJECT TOTAL 31 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto Auto 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 42 0 0 0 3 1667 0 0 1574 6 3 0 1667 0 0 0 42 0 6 1574 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 539Cumulative (2014) Base PM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 366 A: B: 86 261 A: B: 563 427 A: B: 186 0.925 = + + + + + 533 563 86 186 *1375 85 A: B: 533 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 338 AMBIENT RELATED PROJECT TOTAL 338 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 730 123 475 1067 58 86 885 213 85 1066 303 86 213 885 58 1067 475 123 730 303 1066 85 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 540Default Scenario Wed May 25, 2011 14:47:01 Page 11-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #211 WESLEY AV/WASHINGTON BL [CUMULATIVE (2014) BASE PM] ******************************************************************************** Average Delay (sec/veh): 15.2 Worst Case Level Of Service: F[484.0] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 0 0 0 0 0 1 1 0 1 0 2 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 54 0 33 0 0 0 0 1578 34 44 1065 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 54 0 33 0 0 0 0 1578 34 44 1065 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 54 0 33 0 0 0 0 1578 34 44 1065 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 54 0 33 0 0 0 0 1578 34 44 1065 0 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 6.8 xxxx 6.9 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 xxxx 3.3 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 2216 xxxx 806 xxxx xxxx xxxxx xxxx xxxx xxxxx 1612 xxxx xxxxx Potent Cap.: 38 xxxx 329 xxxx xxxx xxxxx xxxx xxxx xxxxx 410 xxxx xxxxx Move Cap.: 35 xxxx 329 xxxx xxxx xxxxx xxxx xxxx xxxxx 410 xxxx xxxxx Volume/Cap: 1.54 xxxx 0.10 xxxx xxxx xxxx xxxx xxxx xxxx 0.11 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.4 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 14.8 xxxx xxxxx LOS by Move: * * * * * * * * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 53 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 8.2 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd StpDel:xxxxx 484 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: * F * * * * * * * * * * ApproachDel: 484.0 xxxxxx xxxxxx xxxxxx ApproachLOS: F * * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 541Cumulative (2014) Base PM Wesley Avenue/Driveway Washington Boulevard N/S: W/E: 21 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 533 A: B: 44|1010|A: B:|1010|54 A: B: 87 0.781 = + + + + + 806 0 87 44 1200|1010|A: B: 806 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 54 AMBIENT RELATED PROJECT TOTAL 54 LANE SIGNAL Perm|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 33 0 0 0 44 1065 0 0 1578 34 44 0 1065 0 0 0 33 0 34 1578 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 542Cumulative (2014) Base PM Helms Avenue Washington Boulevard N/S: W/E: 22 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 547 A: B: 14|1010|A: B:|1010|51 A: B: 64 0.503 = + + + + + 781 0 64 14 *1500|1010|A: B: 781 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 51 AMBIENT RELATED PROJECT TOTAL 51 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 13 0 0 0 14 1094 0 0 1530 31 14 0 1094 0 0 0 13 0 31 1530 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 543Default Scenario Wed May 25, 2011 14:47:01 Page 13-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #231 CATTARAUGUS AV/WASHINGTON AV [CUMULATIVE (2014) BASE PM] ******************************************************************************** Average Delay (sec/veh): 28.8 Worst Case Level Of Service: F[709.6] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 1 0 1 0 0 1 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 4 2 3 60 2 48 68 1487 9 11 1034 77 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 4 2 3 60 2 48 68 1487 9 11 1034 77 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 4 2 3 60 2 48 68 1487 9 11 1034 77 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 4 2 3 60 2 48 68 1487 9 11 1034 77 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 7.5 6.5 6.9 7.5 6.5 6.9 4.1 xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 4.0 3.3 3.5 4.0 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 2168 2761 748 1975 2727 556 1111 xxxx xxxxx 1496 xxxx xxxxx Potent Cap.: 27 20 359 38 21 480 636 xxxx xxxxx 454 xxxx xxxxx Move Cap.: 20 17 359 31 18 480 636 xxxx xxxxx 454 xxxx xxxxx Volume/Cap: 0.20 0.12 0.01 1.96 0.11 0.10 0.11 xxxx xxxx 0.02 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.4 xxxx xxxxx 0.1 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 11.3 xxxx xxxxx 13.1 xxxx xxxxx LOS by Move: * * * * * * B * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 28 xxxxx xxxx 51 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 1.0 xxxxx xxxxx 11.1 xxxxx 0.4 xxxx xxxxx 0.1 xxxx xxxxx Shrd StpDel:xxxxx 188 xxxxx xxxxx 710 xxxxx 11.3 xxxx xxxxx 13.1 xxxx xxxxx Shared LOS: * F * * F * B * * B * * ApproachDel: 188.4 709.6 xxxxxx xxxxxx ApproachLOS: F F * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 544Cumulative (2014) Base PM Cattaraugus Avenue Washington Boulevard N/S: W/E: 23 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 589 A: B: 11 60 A: B: 110 9 A: B: 4 0.898 = + + + + + 952 110 11 4 1200 68 A: B: 952 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 0 LT 2 3 60 2 48 11 1034 77 68 1487 9 11 77 1034 48 2 60 3 2 9 1487 68 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 545Cumulative (2014) Base PM La Cienega Boulevard Washington Boulevard N/S: W/E: 24 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 405 A: B: 70 227 A: B: 604 419 A: B: 150 0.990 = + + + + + 634 604 70 150 *1375 212 A: B: 634 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 150 AMBIENT RELATED PROJECT TOTAL 150 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 1200 58 227 1755 56 70 809 127 212 1268 157 70 127 809 56 1755 227 58 1200 157 1268 212 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 546Cumulative (2014) Base PM La Cienega Boulevard Fairfax Avenue N/S: W/E: 25 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 38 A: B: 509 492 A: B: 0 21 A: B: 840 0.928 = + + + ++73 840 509 0 *1425 45 A: B: 73 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 21 AMBIENT RELATED PROJECT TOTAL 21 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 2 0 0 0 2 0 1 0 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 LT 1679 1460 0 1450 27 926 19 19 45 4 24 926 19 19 27 1450 0 1460 1679 24 4 45 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 547Cumulative (2014) Base PM Wesley Street National Boulevard N/S: W/E: 26 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 595 A: B: 5 0 A: B: 0 26 A: B: 144 0.472 = + + + + + 664 144 5 0 *1500|1010|A: B: 664 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 26 AMBIENT RELATED PROJECT TOTAL 26 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 118 0 0 0 5 1190 0 0 1327 5 5 0 1190 0 0 0 118 0 5 1327 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 548Cumulative (2014) Base PM Hayden Avenue National Boulevard N/S: W/E: 27 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 249 A: B: 53|1010|A: B:|1010|442 A: B: 442 0.738 = + + + + + 656 0 442 53 *1425|1010|A: B: 656 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 687 AMBIENT RELATED PROJECT TOTAL 687 LANE SIGNAL Split|1010| Prot-Fix Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 197 0 0 0 53 497 0 0 1312 161 53 0 497 0 0 0 197 0 161 1312 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 549Cumulative (2014) Base PM Jefferson Boulevard National Boulevard N/S: W/E: 28 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B:|101010|A: B: 617 464 A: B: 77 0.782 = + + + + + 0 520 617 77 *1425 520 A: B: 520 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 77 AMBIENT RELATED PROJECT TOTAL 77 LANE SIGNAL Perm|1010|Perm Split Split Auto Auto Auto Auto 0 2 0 0 1 0 1 0 1 0 0 1 0 0 0 0 1 0 0 0 1 1 0 0 0 1 0 LT 927 0 0 617 506 0 0 0 1039 0 116 0 0 0 506 617 0 0 927 116 0 1039 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 550Cumulative (2014) Base PM La Cienega Boulevard Jefferson Boulevard N/S: W/E: 29 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 413 A: B: 168 751 A: B: 60 100 A: B: 892 1.235 = + + + + + 674 892 168 60 *1375 323 A: B: 674 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 100 AMBIENT RELATED PROJECT TOTAL 100 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto OLA Auto Auto 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 2 0 0 1 0 2 0 1 0 1 0 0 LT 2360 315 60 2253 245 306 826 102 588 1076 271 306 102 826 245 2253 60 315 2360 271 1076 588 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 551Cumulative (2014) Base PM Jefferson Boulevard Higuera St/Rodeo Rd N/S: W/E: 30 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 333 A: B: 337 281 A: B: 178 34 A: B: 441 0.811 = + + + + + 337 300 441 178 *1425 58 A: B: 300 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 34 AMBIENT RELATED PROJECT TOTAL 34 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 1 0 1 0 2 0 0 1 0 2 0 1 0 0 1 0 1 0 2 0 0 1 0 LT 882 1026 178 561 52 605 337 67 58 600 165 605 67 337 52 561 178 1026 882 165 600 58 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 552Cumulative (2014) Base PM La Cienega Boulevard Rodeo Road N/S: W/E: 31 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 299 A: B: 141 792 A: B: 243 195 A: B: 847 1.278 = + + + + + 622 847 141 243 *1375 312 A: B: 622 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 355 AMBIENT RELATED PROJECT TOTAL 355 LANE SIGNAL Prot-Fix|1010|Prot-Fix Prot-Var Prot-Var Auto Auto OLA OLA 0 2 0 1 0 0 2 0 2 0 1 0 0 2 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 2305 237 442 2248 129 257 598 150 312 1244 380 257 150 598 129 2248 442 237 2305 380 1244 312 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 553Default Scenario Wed May 25, 2011 14:47:01 Page 15-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #321 BRADDOCK DR/DUQUESNE AV [CUMULATIVE (2014) BASE PM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.531 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 158.5 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 155 181 192 8 47 19 133 475 160 21 515 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 155 181 192 8 47 19 133 475 160 21 515 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 155 181 192 8 47 19 133 475 160 21 515 17 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 155 181 192 8 47 19 133 475 160 21 515 17 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 155 181 192 8 47 19 133 475 160 21 515 17 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.29 0.34 0.37 0.11 0.63 0.26 0.17 0.62 0.21 0.04 0.93 0.03 Final Sat.: 149 174 184 43 254 103 87 310 104 19 462 15 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 1.04 1.04 1.04 0.18 0.18 0.18 1.53 1.53 1.53 1.11 1.11 1.11 Crit Moves: **** **** **** **** Delay/Veh: 78.3 78.3 78.3 14.0 14.0 14.0 268.5 269 268.5 101.8 102 101.8 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 78.3 78.3 78.3 14.0 14.0 14.0 268.5 269 268.5 101.8 102 101.8 LOS by Move: F F F B B B F F F F F F ApproachDel: 78.3 14.0 268.5 101.8 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 78.3 14.0 268.5 101.8 LOS by Appr: F B F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 554Cumulative (2014) Base PM Braddock Drive Duquesne Avenue N/S: W/E: 32 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 553 A: B: 21 74 A: B: 8 155 A: B: 528 1.325 = + + + + + 768 528 21 8 1000 133 A: B: 768 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 155 AMBIENT RELATED PROJECT TOTAL 155 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 181 192 8 47 19 21 515 17 133 475 160 21 17 515 19 47 8 192 181 160 475 133 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 555Default Scenario Wed May 25, 2011 14:47:01 Page 17-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #331 LUCERNE AV/DUQUESNE AV [CUMULATIVE (2014) BASE PM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.102 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 66.8 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 1 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 351 0 73 58 534 0 0 570 239 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 351 0 73 58 534 0 0 570 239 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 351 0 73 58 534 0 0 570 239 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 351 0 73 58 534 0 0 570 239 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 0 0 351 0 73 58 534 0 0 570 239 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 0.83 0.00 0.17 0.10 0.90 0.00 0.00 1.00 1.00 Final Sat.: 0 0 0 438 0 91 54 496 0 0 517 575 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: xxxx xxxx xxxx 0.80 xxxx 0.80 1.08 1.08 xxxx xxxx 1.10 0.42 Crit Moves: **** **** **** Delay/Veh: 0.0 0.0 0.0 32.0 0.0 32.0 85.5 85.5 0.0 0.0 95.7 13.3 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 0.0 0.0 32.0 0.0 32.0 85.5 85.5 0.0 0.0 95.7 13.3 LOS by Move: * * * D * D F F * * F B ApproachDel: xxxxxx 32.0 85.5 71.4 Delay Adj: xxxxx 1.00 1.00 1.00 ApprAdjDel: xxxxxx 32.0 85.5 71.4 LOS by Appr: * D F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 556Cumulative (2014) Base PM Lucerne Avenue Duquesne Avenue N/S: W/E: 33 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 570 351 A: B: 424|1010|A: B:|1010|1.052 = + + + + + 570 424058 1000 592 A: B: 58 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Perm Auto Auto Auto 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 LT 0 0 351 0 73 0 570 239 58 534 0 0 239 570 73 0 351 0 0 0 534 58 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 557Cumulative (2014) Base PM Jefferson Boulevard Duquesne Avenue N/S: W/E: 34 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 29 A: B: 42 54 A: B: 532 782 A: B: 472 1.030 = + + + + +42 532 466 472 *1375 475 A: B: 466 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 472 AMBIENT RELATED PROJECT TOTAL 472 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto OLA Auto 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 1 0 0 1 0 1 0 0 0 1 0 0 LT 1528 35 54 1064 212 29 42 21 466 64 411 29 21 42 212 1064 54 35 1528 411 64 466 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 25, 2011 ,Wednesday 02:46:17 PM CalcaDB CBASEPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 558 APPENDIX F Capacity Calculation Worksheets Cumulative (2014) Plus Project Conditions ATTACHMENT 6 559 Cumulative (2014) Plus Project Conditions AM Peak Hour ATTACHMENT 6 560Cumulative (2014) Plus Project AM Robertson Boulevard Cattaragus Avenue N/S: W/E: 1 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 87 A: B: 403 40 A: B: 963 685 A: B: 98 0.979 = + + + + + 403 963 110 98 *1500 399 A: B: 110 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 98 AMBIENT RELATED PROJECT TOTAL 98 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 1364 5 40 1852 73 87 244 72 110 142 147 87 72 244 73 1852 40 5 1364 147 142 110 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 561Cumulative (2014) Plus Project AM Robertson Boulevard I-10 WB Off-Ramp/Kincardine Av N/S: W/E: 2 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 231 A: B: 218|1010|A: B: 932 618 A: B: 38 0.831 = + + + + + 164 932 218 38 *1500 118 A: B: 164 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 38 AMBIENT RELATED PROJECT TOTAL 38 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 LT 1236 0 0 1788 75 218 13 175 118 0 46 218 175 13 75 1788 0 0 1236 46 0 118 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 562Cumulative (2014) Plus Project AM Robertson Boulevard National Boulevard N/S: W/E: 3 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 149 A: B: 609 612 A: B: 452 121 A: B: 357 1.083 = + + + + + 609 357 167 452 *1375 502 A: B: 167 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 121 AMBIENT RELATED PROJECT TOTAL 121 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto OLA Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 LT 658 55 821 1013 211 149 609 501 167 741 262 149 501 609 211 1013 821 55 658 262 741 167 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 563Cumulative (2014) Plus Project AM National Boulevard I-10 EB On-Ramp N/S: W/E: 4 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: A: B: 0|101010|A: B: 624 603 A: B: 149 0.445 = + + + + + 624 149 *1500 A: B: 0|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(N/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 149 AMBIENT RELATED PROJECT TOTAL 149 LANE SIGNAL Prot-Fix|1010|Perm Auto Auto 0 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LT 1205 0 0 1084 624 0 0 0 0 0 0 0 0 0 624 1084 0 0 1205 0 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 564Cumulative (2014) Plus Project AM Hughes Avenue Venice Boulevard N/S: W/E: 5 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 666 A: B: 214 81 A: B: 364 360 A: B: 97 0.843 = + + + + + 695 364 214 97 *1500 42 A: B: 695 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 97 AMBIENT RELATED PROJECT TOTAL 97 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 3 0 0 1 0 LT 206 57 81 236 47 214 1999 44 42 2086 121 214 44 1999 47 236 81 57 206 121 2086 42 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 565Cumulative (2014) Plus Project AM Bagley Avenue Venice Boulevard N/S: W/E: 6 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 718 A: B: 65 78 A: B: 331 204 A: B: 49 0.791 = + + + + + 739 331 65 49 *1375 72 A: B: 739 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 49 AMBIENT RELATED PROJECT TOTAL 49 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 0 0 1 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 2 0 1 0 0 LT 159 45 78 179 74 65 2153 42 72 2164 54 65 42 2153 74 179 78 45 159 54 2164 72 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 566Cumulative (2014) Plus Project AM Culver Boulevard Venice Boulevard N/S: W/E: 7 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 725 A: B: 356 131 A: B: 131 67 A: B: 90 0.882 = + + + + + 732 131 90 356 *1375 30 A: B: 732 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 67 AMBIENT RELATED PROJECT TOTAL 67 LANE SIGNAL Split|1010|Split Prot-Fix Prot-Fix OLA Auto Auto Auto 0 1 0 0 2 0 1 0 0 1 0 0 0 2 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 87 810 183 45 33 647 2024 152 30 2105 91 647 152 2024 33 45 183 810 87 91 2105 30 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 567Cumulative (2014) Plus Project AM Robertson Boulevard Venice Boulevard N/S: W/E: 8 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 81 A: B: 894 436 A: B: 650 231 A: B: 270 1.492 = + + + + + 894 270 334 650 *1375 884 A: B: 334 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 231 AMBIENT RELATED PROJECT TOTAL 231 LANE SIGNAL Split|1010|Split Prot-Var Prot-Var OLA Auto Auto Auto 0 2 0 0 1 0 0 1 1 0 0 1 0 1 0 2 0 1 0 0 2 0 2 0 1 0 0 LT 540 61 650 436 319 81 2327 356 607 2482 169 81 356 2327 319 436 650 61 540 169 2482 607 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 568Cumulative (2014) Plus Project AM National Boulevard Venice Boulevard N/S: W/E: 9 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 701 A: B: 121 135 A: B: 489 514 A: B: 232 1.073 = + + + + + 730 489 121 232 *1375 116 A: B: 730 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 232 AMBIENT RELATED PROJECT TOTAL 232 LANE SIGNAL Perm|1010|Prot-Fix Prot-Fix Prot-Fix Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 2 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1003 25 135 830 148 220 2104 122 211 2189 683 220 122 2104 148 830 135 25 1003 683 2189 211 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 569Cumulative (2014) Plus Project AM Helms Avenue Venice Boulevard N/S: W/E: 10 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 24 A: B: 811 12 A: B: 42 20 A: B: 11 0.558 = + + + + + 811 42 78 11 *1500 760 A: B: 78 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 11 AMBIENT RELATED PROJECT TOTAL 11 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 1 0 0 0 1 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 9 4 12 2 28 24 2410 23 78 2257 22 24 23 2410 28 2 12 4 9 22 2257 78 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 570Cumulative (2014) Plus Project AM Cattaraugus Avenue Venice Boulevard N/S: W/E: 11 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 81 A: B: 807 273 A: B: 168 68 A: B: 355 0.865 = + + + + + 807 355 72 168 *1500 686 A: B: 72 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 68 AMBIENT RELATED PROJECT TOTAL 68 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 252 35 168 87 18 81 2315 105 72 2047 11 81 105 2315 18 87 168 35 252 11 2047 72 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 571Cumulative (2014) Plus Project AM La Cienega Boulevard Venice Boulevard N/S: W/E: 12 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 159 A: B: 660 36 A: B: 633 649 A: B: 131 1.115 = + + + + + 660 633 206 131 *1375 595 A: B: 206 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 131 AMBIENT RELATED PROJECT TOTAL 131 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1867 79 36 1486 412 159 1979 15 375 1785 173 159 15 1979 412 1486 36 79 1867 173 1785 375 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 572Cumulative (2014) Plus Project AM Hughes Av/Duquesne Av Washington Boulevard N/S: W/E: 13 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 56 A: B: 440 14 A: B: 411 371 A: B: 170 0.641 = + + + + + 440 411 46 170 *1500 416 A: B: 46 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 170 AMBIENT RELATED PROJECT TOTAL 170 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 331 40 14 360 51 56 828 51 46 645 186 56 51 828 51 360 14 40 331 186 645 46 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 573Cumulative (2014) Plus Project AM Duquesne Avenue Culver Boulevard N/S: W/E: 14 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 417 A: B: 151 52 A: B: 437 374 A: B: 101 0.762 = + + + + + 455 437 151 101 *1375 113 A: B: 455 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 101 AMBIENT RELATED PROJECT TOTAL 101 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 374 142 52 437 79 151 777 57 113 859 51 151 57 777 79 437 52 142 374 51 859 113 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 574Cumulative (2014) Plus Project AM Culver Boulevard Washington Bl/Irving Pl N/S: W/E: 15 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 76 A: B: 482 339 A: B: 339 94 A: B: 128 0.620 = + + + + + 482 339 0 128 *1375 355 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 128 AMBIENT RELATED PROJECT TOTAL 128 LANE SIGNAL Split|1010|Split Prot-Fix Perm Auto Auto Auto Auto 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 0 1 1 0 0 0 2 0 1 0 0 LT 0 132 654 0 24 76 898 547 0 1021 44 -339 76 886 898 24 0 654 132 0 44 1021 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 575Cumulative (2014) Plus Project AM Main Street Culver Boulevard N/S: W/E: 16 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 608 53 A: B: 151|1010|A: B:|1010|0.582 = + + + + + 608 0 170 151 *1425 539 A: B: 170 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Prot-Fix Auto Auto Auto 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 1 0 0 1 0 3 0 0 0 0 LT 0 0 151 0 138 0 1659 164 170 1618 0 0 164 1659 138 0 151 0 0 0 1618 170 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 576Cumulative (2014) Plus Project AM Culver Boulevard Washington Bl/Canfield Av N/S: W/E: 17 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 608 A: B: 608 289 A: B: 187 12 A: B: 421 0.783 = + + + + + 608 0 421 187 *1425|1010|A: B:|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 12 AMBIENT RELATED PROJECT TOTAL 12 LANE SIGNAL Prot-Fix|1010|Prot-Fix Split OLA Auto Auto OLA 0 2 0 0 2 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 1 0 LT 842 922 187 574 4 1179 36 139 0 0 6 1179 139 36 4 574 187 922 842 6 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 577Cumulative (2014) Plus Project AM Robertson Bl/Higuera St Washington Boulevard N/S: W/E: 18 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 91 A: B: 839 279 A: B: 206 68 A: B: 383 0.990 = + + + + + 839 383 83 206 *1425 500 A: B: 83 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 68 AMBIENT RELATED PROJECT TOTAL 68 LANE SIGNAL Prot-Fix|1010|Prot-Fix Perm Perm Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 383 72 206 279 136 91 1353 324 83 928 71 91 324 1353 136 279 206 72 383 71 928 83 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 578Cumulative (2014) Plus Project AM Landmark Street Washington Boulevard N/S: W/E: 19 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 109 A: B: 975|1010|A: B:|1010|39 A: B: 45 0.610 = + + + + + 975 0 45 0 *1500 559 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 39 AMBIENT RELATED PROJECT TOTAL 39 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto Auto 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 45 0 0 0 109 1949 0 0 1007 110 109 0 1949 0 0 0 45 0 110 1007 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET [1] Note: Pass-by credit not applied at this location. ATTACHMENT 6 579Cumulative (2014) Plus Project AM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 90 A: B: 564 142 A: B: 492 500 A: B: 264 0.963 = + + + + + 564 492 100 264 *1375 395 A: B: 100 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 480 AMBIENT RELATED PROJECT TOTAL 480 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 874 126 258 902 82 90 1353 340 100 789 188 90 340 1353 82 902 258 126 874 188 789 100 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 580Default Scenario Thu May 26, 2011 16:04:10 Page 3-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #21 WESLEY AV/WASHINGTON BL [CUMULATIVE (2014) + PROJECT AM] ******************************************************************************** Average Delay (sec/veh): 2.1 Worst Case Level Of Service: F[138.9] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 0 0 0 0 0 1 1 0 1 0 2 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 30 0 13 0 0 0 0 1116 36 26 1770 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 0 13 0 0 0 0 1116 36 26 1770 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 0 13 0 0 0 0 1116 36 26 1770 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 30 0 13 0 0 0 0 1116 36 26 1770 0 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 6.8 xxxx 6.9 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 xxxx 3.3 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 2071 xxxx 576 xxxx xxxx xxxxx xxxx xxxx xxxxx 1152 xxxx xxxxx Potent Cap.: 48 xxxx 466 xxxx xxxx xxxxx xxxx xxxx xxxxx 614 xxxx xxxxx Move Cap.: 46 xxxx 466 xxxx xxxx xxxxx xxxx xxxx xxxxx 614 xxxx xxxxx Volume/Cap: 0.65 xxxx 0.03 xxxx xxxx xxxx xxxx xxxx xxxx 0.04 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.1 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 11.1 xxxx xxxxx LOS by Move: * * * * * * * * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 64 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 2.9 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd StpDel:xxxxx 139 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: * F * * * * * * * * * * ApproachDel: 138.9 xxxxxx xxxxxx xxxxxx ApproachLOS: F * * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 581Cumulative (2014) Plus Project AM Wesley Avenue/Driveway Washington Boulevard N/S: W/E: 21 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 26 A: B: 885|1010|A: B:|1010|30 A: B: 43 0.773 = + + + + + 885 0 43 0 1200 576 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 30 AMBIENT RELATED PROJECT TOTAL 30 LANE SIGNAL Perm|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 13 0 0 0 26 1770 0 0 1116 36 26 0 1770 0 0 0 13 0 36 1116 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 582Cumulative (2014) Plus Project AM Helms Avenue Washington Boulevard N/S: W/E: 22 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 31 A: B: 862|1010|A: B:|1010|77 A: B: 95 0.568 = + + + + + 862 0 95 0 *1500 571 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 77 AMBIENT RELATED PROJECT TOTAL 77 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 18 0 0 0 31 1724 0 0 1102 40 31 0 1724 0 0 0 18 0 40 1102 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 583Default Scenario Thu May 26, 2011 16:04:10 Page 5-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #23 CATTARAUGUS AV/WASHINGTON AV [CUMULATIVE (2014) + PROJECT AM] ******************************************************************************** Average Delay (sec/veh): 283.7 Worst Case Level Of Service: F[6057.0] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 1 0 1 0 0 1 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 9 5 3 89 6 56 51 985 6 3 1724 330 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 9 5 3 89 6 56 51 985 6 3 1724 330 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 9 5 3 89 6 56 51 985 6 3 1724 330 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 9 5 3 89 6 56 51 985 6 3 1724 330 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 7.5 6.5 6.9 7.5 6.5 6.9 4.1 xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 4.0 3.3 3.5 4.0 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 1961 3150 496 2492 2988 1027 2054 xxxx xxxxx 991 xxxx xxxxx Potent Cap.: 39 11 525 15 14 235 277 xxxx xxxxx 706 xxxx xxxxx Move Cap.: 15 9 525 7 11 235 277 xxxx xxxxx 706 xxxx xxxxx Volume/Cap: 0.61 0.56 0.01 12.28 0.53 0.24 0.18 xxxx xxxx 0.00 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.7 xxxx xxxxx 0.0 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 20.9 xxxx xxxxx 10.1 xxxx xxxxx LOS by Move: * * * * * * C * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 14 xxxxx xxxx 12 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 2.7 xxxxx xxxxx 20.2 xxxxx 0.7 xxxx xxxxx 0.0 xxxx xxxxx Shrd StpDel:xxxxx 658 xxxxx xxxxx 6057 xxxxx 20.9 xxxx xxxxx 10.1 xxxx xxxxx Shared LOS: * F * * F * C * * B * * ApproachDel: 658.2 6057.0 xxxxxx xxxxxx ApproachLOS: F F * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 584Cumulative (2014) Plus Project AM Cattaraugus Avenue Washington Boulevard N/S: W/E: 23 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 1033 89 A: B: 151 17 A: B: 9 1.037 = + + + + + 1033 151 51 9 1200 649 A: B: 51 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|10 10|AMBIENT RELATED PROJECT TOTAL|10 10|LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 0 LT 5 3 89 6 56 3 1724 330 51 985 6 3 330 1724 56 6 89 3 5 6 985 51 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 585Cumulative (2014) Plus Project AM La Cienega Boulevard Washington Boulevard N/S: W/E: 24 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 58 A: B: 845 188 A: B: 549 580 A: B: 260 1.203 = + + + + + 845 549 96 260 *1375 448 A: B: 96 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 260 AMBIENT RELATED PROJECT TOTAL 260 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 1718 21 188 1591 57 58 1690 252 96 895 122 58 252 1690 57 1591 188 21 1718 122 895 96 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 586Cumulative (2014) Plus Project AM La Cienega Boulevard Fairfax Avenue N/S: W/E: 25 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 68 A: B: 690 513 A: B: 0 46 A: B: 932 1.090 = + + + ++31 932 690 0 *1425 17 A: B: 31 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 46 AMBIENT RELATED PROJECT TOTAL 46 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 2 0 0 0 2 0 1 0 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 LT 1863 978 0 1495 43 1255 37 31 17 2 12 1255 31 37 43 1495 0 978 1863 12 2 17 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 587Cumulative (2014) Plus Project AM Wesley Street National Boulevard N/S: W/E: 26 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 40 A: B: 960 0 A: B: 0 115 A: B: 217 0.715 = + + + + + 960 217 0 0 *1500 531 A: B: 0 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 115 AMBIENT RELATED PROJECT TOTAL 115 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 102 0 0 0 40 1920 0 0 1062 87 40 0 1920 0 0 0 102 0 87 1062 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 588Cumulative (2014) Plus Project AM Hayden Avenue National Boulevard N/S: W/E: 27 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 657 A: B: 221|1010|A: B:|1010|354 A: B: 354 0.643 = + + + + + 441 0 354 221 *1425|1010|A: B: 441 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 611 AMBIENT RELATED PROJECT TOTAL 611 LANE SIGNAL Split|1010| Prot-Fix Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 96 0 0 0 221 1314 0 0 881 275 221 0 1314 0 0 0 96 0 275 881 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 589Cumulative (2014) Plus Project AM Jefferson Boulevard National Boulevard N/S: W/E: 28 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B:|101010|A: B: 1096 312 A: B: 174 1.039 = + + + + + 0 310 1096 174 *1425 310 A: B: 310 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 174 AMBIENT RELATED PROJECT TOTAL 174 LANE SIGNAL Perm|1010|Perm Split Split Auto OLA Auto Auto 0 2 0 0 1 0 1 0 1 0 0 1 0 0 0 0 1 0 0 0 1 1 0 0 0 1 0 LT 624 0 0 753 1406 0 0 0 620 0 177 0 0 0 1406 753 0 0 624 177 0 620 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 590Cumulative (2014) Plus Project AM La Cienega Boulevard Jefferson Boulevard N/S: W/E: 29 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 325 A: B: 660 665 A: B: 179 149 A: B: 822 1.310 = + + + + + 660 822 237 179 *1375 424 A: B: 237 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 149 AMBIENT RELATED PROJECT TOTAL 149 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto OLA Auto Auto 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 2 0 0 1 0 2 0 1 0 1 0 0 LT 2351 116 179 1994 643 591 1320 138 430 717 131 591 138 1320 643 1994 179 116 2351 131 717 430 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 591Cumulative (2014) Plus Project AM Jefferson Boulevard Higuera St/Rodeo Rd N/S: W/E: 30 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 562 A: B: 587 112 A: B: 354 357 A: B: 202 0.788 = + + + + + 587 80 354 202 *1425 27 A: B: 80 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 202 AMBIENT RELATED PROJECT TOTAL 202 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 1 0 1 0 2 0 0 1 0 2 0 1 0 0 1 0 1 0 2 0 0 1 0 LT 713 800 112 707 95 1022 587 147 27 160 51 1022 147 587 95 707 112 800 713 51 160 27 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 592Cumulative (2014) Plus Project AM La Cienega Boulevard Rodeo Road N/S: W/E: 31 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 179 A: B: 463 141 A: B: 806 789 A: B: 331 1.249 = + + + + + 463 806 213 331 *1375 298 A: B: 213 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 602 AMBIENT RELATED PROJECT TOTAL 602 LANE SIGNAL Prot-Fix|1010|Prot-Fix Prot-Var Prot-Var Auto Auto OLA OLA 0 2 0 1 0 0 2 0 2 0 1 0 0 2 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 2271 95 256 2126 291 325 925 329 213 596 229 325 329 925 291 2126 256 95 2271 229 596 213 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 593Default Scenario Thu May 26, 2011 16:04:10 Page 7-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #32 BRADDOCK DR/DUQUESNE AV [CUMULATIVE (2014) + PROJECT AM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.639 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 229.1 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 90 209 143 30 328 39 48 557 38 56 552 40 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 90 209 143 30 328 39 48 557 38 56 552 40 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 90 209 143 30 328 39 48 557 38 56 552 40 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 90 209 143 30 328 39 48 557 38 56 552 40 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 90 209 143 30 328 39 48 557 38 56 552 40 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.20 0.48 0.32 0.07 0.83 0.10 0.07 0.87 0.06 0.09 0.85 0.06 Final Sat.: 82 190 130 30 328 39 30 343 23 34 337 24 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 1.10 1.10 1.10 1.00 1.00 1.00 1.63 1.63 1.63 1.64 1.64 1.64 Crit Moves: **** **** **** **** Delay/Veh: 105.2 105 105.2 76.3 76.3 76.3 315.7 316 315.7 321.2 321 321.2 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 105.2 105 105.2 76.3 76.3 76.3 315.7 316 315.7 321.2 321 321.2 LOS by Move: F F F F F F F F F F F F ApproachDel: 105.2 76.3 315.7 321.2 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 105.2 76.3 315.7 321.2 LOS by Appr: F F F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 594Cumulative (2014) Plus Project AM Braddock Drive Duquesne Avenue N/S: W/E: 32 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 648 A: B: 56 30 A: B: 397 442 A: B: 90 1.186 = + + + + + 643 397 56 90 1000 48 A: B: 643 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 90 AMBIENT RELATED PROJECT TOTAL 90 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 209 143 30 328 39 56 552 40 48 557 38 56 40 552 39 328 30 143 209 38 557 48 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 595Default Scenario Thu May 26, 2011 16:04:10 Page 9-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #33 LUCERNE AV/DUQUESNE AV [CUMULATIVE (2014) + PROJECT AM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.049 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 52.2 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 1 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 188 0 63 92 555 0 0 598 353 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 188 0 63 92 555 0 0 598 353 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 188 0 63 92 555 0 0 598 353 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 188 0 63 92 555 0 0 598 353 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 0 0 188 0 63 92 555 0 0 598 353 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 0.75 0.00 0.25 0.14 0.86 0.00 0.00 1.00 1.00 Final Sat.: 0 0 0 399 0 134 88 529 0 0 586 661 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: xxxx xxxx xxxx 0.47 xxxx 0.47 1.05 1.05 xxxx xxxx 1.02 0.53 Crit Moves: **** **** **** Delay/Veh: 0.0 0.0 0.0 15.6 0.0 15.6 73.5 73.5 0.0 0.0 67.0 14.2 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 0.0 0.0 15.6 0.0 15.6 73.5 73.5 0.0 0.0 67.0 14.2 LOS by Move: * * * C * C F F * * F B ApproachDel: xxxxxx 15.6 73.5 47.4 Delay Adj: xxxxx 1.00 1.00 1.00 ApprAdjDel: xxxxxx 15.6 73.5 47.4 LOS by Appr: * C F E ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 596Cumulative (2014) Plus Project AM Lucerne Avenue Duquesne Avenue N/S: W/E: 33 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 598 188 A: B: 251|1010|A: B:|1010|0.941 = + + + + + 598 251092 1000 647 A: B: 92 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Perm Auto Auto Auto 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 LT 0 0 188 0 63 0 598 353 92 555 0 0 353 598 63 0 188 0 0 0 555 92 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 597Cumulative (2014) Plus Project AM Jefferson Boulevard Duquesne Avenue N/S: W/E: 34 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 33 A: B: 8 19 A: B: 794 595 A: B: 497 1.215 = + + + + + 468 794 8 497 *1375 316 A: B: 468 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 497 AMBIENT RELATED PROJECT TOTAL 497 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto OLA Auto 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 1 0 0 1 0 1 0 0 0 1 0 0 LT 1162 28 19 1588 440 8 33 6 316 32 436 8 6 33 440 1588 19 28 1162 436 32 316 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:02:51 AM CalcaDB CPROJAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 598 Cumulative (2014) Plus Project Conditions PM Peak Hour ATTACHMENT 6 599Cumulative (2014) Plus Project PM Robertson Boulevard Cattaragus Avenue N/S: W/E: 1 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 186 A: B: 62 57 A: B: 925 884 A: B: 106 0.966 = + + + + + 461 925 62 106 *1500 101 A: B: 461 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 106 AMBIENT RELATED PROJECT TOTAL 106 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 1753 15 57 1785 65 62 81 43 101 231 129 62 43 81 65 1785 57 15 1753 129 231 101 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 600Cumulative (2014) Plus Project PM Robertson Boulevard I-10 WB Off-Ramp/Kincardine Av N/S: W/E: 2 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 533 A: B: 481 712 A: B: 0 14 A: B: 727 0.845 = + + + + + 164 727 481 0 *1500 77 A: B: 164 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 14 AMBIENT RELATED PROJECT TOTAL 14 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 LT 1454 0 0 1388 35 481 23 562 77 0 87 481 562 23 35 1388 0 0 1454 87 0 77 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 601Cumulative (2014) Plus Project PM Robertson Boulevard National Boulevard N/S: W/E: 3 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 416 A: B: 117 646 A: B: 376 106 A: B: 553 1.077 = + + + + + 531 553 117 376 *1375 175 A: B: 531 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 106 AMBIENT RELATED PROJECT TOTAL 106 LANE SIGNAL Perm|1010|Prot-Fix Perm Prot-Fix Auto Auto OLA Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 LT 948 158 684 1056 235 117 416 284 175 921 140 117 284 416 235 1056 684 158 948 140 921 175 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 602Cumulative (2014) Plus Project PM National Boulevard I-10 EB On-Ramp N/S: W/E: 4 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: A: B: 0|101010|A: B: 614 358 A: B: 222 0.487 = + + + + + 614 222 *1500 A: B: 0|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(N/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 222 AMBIENT RELATED PROJECT TOTAL 222 LANE SIGNAL Prot-Fix|1010|Perm Auto Auto 0 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LT 715 0 0 1144 614 0 0 0 0 0 0 0 0 0 614 1144 0 0 715 0 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 603Cumulative (2014) Plus Project PM Hughes Avenue Venice Boulevard N/S: W/E: 5 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 628 A: B: 130 301 A: B: 43 108 A: B: 457 0.771 = + + + + + 631 457 130 43 *1500 59 A: B: 631 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 108 AMBIENT RELATED PROJECT TOTAL 108 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 3 0 0 1 0 LT 217 132 43 204 54 130 1884 45 59 1892 101 130 45 1884 54 204 43 132 217 101 1892 59 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 604Cumulative (2014) Plus Project PM Bagley Avenue Venice Boulevard N/S: W/E: 6 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 81 A: B: 627 93 A: B: 367 154 A: B: 41 0.767 = + + + + + 627 367 116 41 *1375 661 A: B: 116 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 41 AMBIENT RELATED PROJECT TOTAL 41 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 0 0 1 0 0 0 0 0 1 0 0 0 1 0 3 0 0 1 0 1 0 2 0 1 0 0 LT 108 46 93 174 100 81 1881 73 116 1874 110 81 73 1881 100 174 93 46 108 110 1874 116 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 605Cumulative (2014) Plus Project PM Culver Boulevard Venice Boulevard N/S: W/E: 7 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 719 A: B: 299 216 A: B: 216 146 A: B: 245 0.991 = + + + + + 699 216 245 299 *1375 54 A: B: 699 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 146 AMBIENT RELATED PROJECT TOTAL 146 LANE SIGNAL Split|1010|Split Prot-Fix Prot-Fix OLA Auto Auto Auto 0 1 0 0 2 0 1 0 0 1 0 0 0 2 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 83 988 308 74 49 543 1943 214 54 1999 99 543 214 1943 49 74 308 988 83 99 1999 54 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 606Cumulative (2014) Plus Project PM Robertson Boulevard Venice Boulevard N/S: W/E: 8 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 108 A: B: 771 380 A: B: 619 262 A: B: 385 1.464 = + + + + + 771 385 334 619 *1375 846 A: B: 334 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 262 AMBIENT RELATED PROJECT TOTAL 262 LANE SIGNAL Split|1010|Split Prot-Var Prot-Var OLA Auto Auto Auto 0 2 0 0 1 0 0 1 1 0 0 1 0 1 0 2 0 1 0 0 2 0 2 0 1 0 0 LT 769 67 619 380 259 108 2165 147 607 2354 185 108 147 2165 259 380 619 67 769 185 2354 607 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 607Cumulative (2014) Plus Project PM National Boulevard Venice Boulevard N/S: W/E: 9 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 548 A: B: 74 189 A: B: 492 376 A: B: 265 1.051 = + + + + + 710 492 74 265 *1375 128 A: B: 710 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 265 AMBIENT RELATED PROJECT TOTAL 265 LANE SIGNAL Perm|1010|Prot-Fix Prot-Fix Prot-Fix Auto Auto Auto Auto 0 1 0 1 0 0 1 0 1 0 1 0 0 2 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 641 111 189 859 125 135 1644 66 233 2131 538 135 66 1644 125 859 189 111 641 538 2131 233 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 608Cumulative (2014) Plus Project PM Helms Avenue Venice Boulevard N/S: W/E: 10 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 621 A: B: 33 29 A: B: 67 17 A: B: 16 0.547 = + + + + + 810 67 33 16 *1500 76 A: B: 810 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 16 AMBIENT RELATED PROJECT TOTAL 16 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 1 0 0 0 1 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 1 10 29 9 29 33 1856 8 76 2397 34 33 8 1856 29 9 29 10 1 34 2397 76 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 609Cumulative (2014) Plus Project PM Cattaraugus Avenue Venice Boulevard N/S: W/E: 11 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 604 A: B: 94 193 A: B: 300 139 A: B: 47 0.727 = + + + + + 755 300 94 47 *1500 114 A: B: 755 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 47 AMBIENT RELATED PROJECT TOTAL 47 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 1 0 2 0 1 0 0 1 0 2 0 1 0 0 LT 64 28 193 75 32 94 1732 79 114 2252 13 94 79 1732 32 75 193 28 64 13 2252 114 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 610Cumulative (2014) Plus Project PM La Cienega Boulevard Venice Boulevard N/S: W/E: 12 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 472 A: B: 223 37 A: B: 655 457 A: B: 104 1.099 = + + + + + 625 655 223 104 *1375 167 A: B: 625 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 104 AMBIENT RELATED PROJECT TOTAL 104 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 3 0 0 1 0 LT 1255 116 37 1619 346 223 1417 35 304 1875 249 223 35 1417 346 1619 37 116 1255 249 1875 304 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 611Cumulative (2014) Plus Project PM Hughes Av/Duquesne Av Washington Boulevard N/S: W/E: 13 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 296 A: B: 80 33 A: B: 421 428 A: B: 66 0.654 = + + + + + 519 421 80 66 *1500 52 A: B: 519 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 66 AMBIENT RELATED PROJECT TOTAL 66 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 407 21 33 352 69 80 539 52 52 798 240 80 52 539 69 352 33 21 407 240 798 52 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 612Cumulative (2014) Plus Project PM Duquesne Avenue Culver Boulevard N/S: W/E: 14 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 451 A: B: 152 124 A: B: 500 364 A: B: 124 0.891 = + + + + + 545 500 152 124 *1375 80 A: B: 545 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 124 AMBIENT RELATED PROJECT TOTAL 124 LANE SIGNAL Prot-Var|1010|Prot-Var Prot-Var Prot-Var Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 364 197 124 500 82 152 879 23 80 992 97 152 23 879 82 500 124 197 364 97 992 80 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 613Cumulative (2014) Plus Project PM Culver Boulevard Washington Bl/Irving Pl N/S: W/E: 15 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 508 A: B: 95 409 A: B: 409 18 A: B: 41 0.638 = + + + + + 428 409 95 41 *1375|1010|A: B: 428 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 41 AMBIENT RELATED PROJECT TOTAL 41 LANE SIGNAL Split|1010|Split Prot-Fix Perm Auto Auto Auto Auto 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 1 0 1 1 0 0 0 2 0 1 0 0 LT 0 66 812 0 6 95 1016 257 0 1225 60 -409 95 666 1016 6 0 812 66 0 60 1225 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 614Cumulative (2014) Plus Project PM Main Street Culver Boulevard N/S: W/E: 16 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 567 112 A: B: 286|1010|A: B:|1010|0.613 = + + + + + 567 0 120 286 *1425 628 A: B: 120 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) B LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Prot-Fix Auto Auto Auto 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 1 0 0 1 0 3 0 0 0 0 LT 13 0 286 13 172 0 1583 119 120 1883 0 0 119 1583 172 13 286 0 13 0 1883 120 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 615Cumulative (2014) Plus Project PM Culver Boulevard Washington Bl/Canfield Av N/S: W/E: 17 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 556 A: B: 556 307 A: B: 118 14 A: B: 496 0.756 = + + + + + 556 7 496 118 *1425|1010|A: B:|1010|V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 14 AMBIENT RELATED PROJECT TOTAL 14 LANE SIGNAL Prot-Fix|1010|Prot-Fix Split OLA Auto Auto OLA 0 2 0 0 2 0 1 0 1 0 1 0 0 1 1 0 0 0 1 0 0 0 0 0 0 1 0 LT 991 1110 118 605 9 1082 30 219 0 0 21 1082 219 30 9 605 118 1110 991 21 0 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 616Cumulative (2014) Plus Project PM Robertson Bl/Higuera St Washington Boulevard N/S: W/E: 18 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 87 A: B: 744 229 A: B: 208 67 A: B: 212 0.847 = + + + + + 744 212 143 208 *1425 631 A: B: 143 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 67 AMBIENT RELATED PROJECT TOTAL 67 LANE SIGNAL Prot-Fix|1010|Prot-Fix Perm Perm Auto Auto Auto Auto 0 1 0 0 1 0 1 0 1 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 0 0 LT 212 88 208 229 191 87 1002 485 143 1169 93 87 485 1002 191 229 208 88 212 93 1169 143 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 617Cumulative (2014) Plus Project PM Landmark Street Washington Boulevard N/S: W/E: 19 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 834 A: B: 76|1010|A: B:|1010|79 A: B: 114 0.599 = + + + + + 814 0 114 76 *1500|1010|A: B: 814 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 79 AMBIENT RELATED PROJECT TOTAL 79 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto Auto 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 114 0 0 0 76 1667 0 0 1574 54 76 0 1667 0 0 0 114 0 54 1574 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET [1] Note: Pass-by credit not applied at this location. ATTACHMENT 6 618Cumulative (2014) Plus Project PM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 372 A: B: 86 261 A: B: 573 427 A: B: 197 0.947 = + + + + + 543 573 86 197 *1375 106 A: B: 543 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 358 AMBIENT RELATED PROJECT TOTAL 358 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 730 123 475 1067 79 86 904 213 106 1085 323 86 213 904 79 1067 475 123 730 323 1085 106 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 619Default Scenario Thu May 26, 2011 16:04:10 Page 11-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #211 WESLEY AV/WASHINGTON BL [CUMULATIVE (2014) + PROJECT PM] ******************************************************************************** Average Delay (sec/veh): 16.2 Worst Case Level Of Service: F[521.5] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 0 0 0 0 0 1 1 0 1 0 2 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 54 0 33 0 0 0 0 1597 34 44 1084 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 54 0 33 0 0 0 0 1597 34 44 1084 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 54 0 33 0 0 0 0 1597 34 44 1084 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 54 0 33 0 0 0 0 1597 34 44 1084 0 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 6.8 xxxx 6.9 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 xxxx 3.3 xxxxx xxxx xxxxx xxxxx xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 2244 xxxx 816 xxxx xxxx xxxxx xxxx xxxx xxxxx 1631 xxxx xxxxx Potent Cap.: 36 xxxx 325 xxxx xxxx xxxxx xxxx xxxx xxxxx 403 xxxx xxxxx Move Cap.: 33 xxxx 325 xxxx xxxx xxxxx xxxx xxxx xxxxx 403 xxxx xxxxx Volume/Cap: 1.61 xxxx 0.10 xxxx xxxx xxxx xxxx xxxx xxxx 0.11 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.4 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx 15.0 xxxx xxxxx LOS by Move: * * * * * * * * * C * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 51 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 8.4 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd StpDel:xxxxx 522 xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: * F * * * * * * * * * * ApproachDel: 521.5 xxxxxx xxxxxx xxxxxx ApproachLOS: F * * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 620Cumulative (2014) Plus Project PM Wesley Avenue/Driveway Washington Boulevard N/S: W/E: 21 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 542 A: B: 44|1010|A: B:|1010|54 A: B: 87 0.789 = + + + + + 816 0 87 44 1200|1010|A: B: 816 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 54 AMBIENT RELATED PROJECT TOTAL 54 LANE SIGNAL Perm|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 33 0 0 0 44 1084 0 0 1597 34 44 0 1084 0 0 0 33 0 34 1597 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 621Cumulative (2014) Plus Project PM Helms Avenue Washington Boulevard N/S: W/E: 22 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 557 A: B: 14|1010|A: B:|1010|51 A: B: 64 0.509 = + + + + + 790 0 64 14 *1500|1010|A: B: 790 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 51 AMBIENT RELATED PROJECT TOTAL 51 LANE SIGNAL Split|1010| Perm Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 1 0 1 0 0 LT 0 13 0 0 0 14 1113 0 0 1549 31 14 0 1113 0 0 0 13 0 31 1549 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 622Default Scenario Thu May 26, 2011 16:04:10 Page 13-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ******************************************************************************** Intersection #231 CATTARAUGUS AV/WASHINGTON AV [CUMULATIVE (2014) + PROJECT PM] ******************************************************************************** Average Delay (sec/veh): 31.9 Worst Case Level Of Service: F[778.5] ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 1 0 1 0 0 1 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 4 2 3 60 2 51 71 1503 9 11 1050 77 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 4 2 3 60 2 51 71 1503 9 11 1050 77 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 4 2 3 60 2 51 71 1503 9 11 1050 77 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 4 2 3 60 2 51 71 1503 9 11 1050 77 ------------|---------------||---------------||---------------||---------------| Critical Gap Module: Critical Gp: 7.5 6.5 6.9 7.5 6.5 6.9 4.1 xxxx xxxxx 4.1 xxxx xxxxx FollowUpTim: 3.5 4.0 3.3 3.5 4.0 3.3 2.2 xxxx xxxxx 2.2 xxxx xxxxx ------------|---------------||---------------||---------------||---------------| Capacity Module: Cnflict Vol: 2197 2799 756 2005 2765 564 1127 xxxx xxxxx 1512 xxxx xxxxx Potent Cap.: 26 19 355 36 20 474 627 xxxx xxxxx 448 xxxx xxxxx Move Cap.: 19 16 355 29 17 474 627 xxxx xxxxx 448 xxxx xxxxx Volume/Cap: 0.22 0.12 0.01 2.09 0.12 0.11 0.11 xxxx xxxx 0.02 xxxx xxxx ------------|---------------||---------------||---------------||---------------| Level Of Service Module: Queue: xxxxx xxxx xxxxx xxxxx xxxx xxxxx 0.4 xxxx xxxxx 0.1 xxxx xxxxx Stopped Del:xxxxx xxxx xxxxx xxxxx xxxx xxxxx 11.5 xxxx xxxxx 13.2 xxxx xxxxx LOS by Move: * * * * * * B * * B * * Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx 26 xxxxx xxxx 49 xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx 1.1 xxxxx xxxxx 11.7 xxxxx 0.4 xxxx xxxxx 0.1 xxxx xxxxx Shrd StpDel:xxxxx 206 xxxxx xxxxx 778 xxxxx 11.5 xxxx xxxxx 13.2 xxxx xxxxx Shared LOS: * F * * F * B * * B * * ApproachDel: 205.8 778.5 xxxxxx xxxxxx ApproachLOS: F F * * Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 623Cumulative (2014) Plus Project PM Cattaraugus Avenue Washington Boulevard N/S: W/E: 23 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 597 A: B: 11 60 A: B: 113 9 A: B: 4 0.914 = + + + + + 969 113 11 4 1200 71 A: B: 969 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 1 0 0 0 1 0 0 1 0 0 LT 2 3 60 2 51 11 1050 77 71 1503 9 11 77 1050 51 2 60 3 2 9 1503 71 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 624Cumulative (2014) Plus Project PM La Cienega Boulevard Washington Boulevard N/S: W/E: 24 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 412 A: B: 70 227 A: B: 604 419 A: B: 150 0.996 = + + + + + 642 604 70 150 *1375 213 A: B: 642 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 150 AMBIENT RELATED PROJECT TOTAL 150 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 2 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 1200 58 227 1755 57 70 824 127 213 1283 157 70 127 824 57 1755 227 58 1200 157 1283 213 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 625Cumulative (2014) Plus Project PM La Cienega Boulevard Fairfax Avenue N/S: W/E: 25 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 38 A: B: 509 492 A: B: 0 21 A: B: 840 0.928 = + + + ++73 840 509 0 *1425 45 A: B: 73 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 21 AMBIENT RELATED PROJECT TOTAL 21 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 2 0 0 0 2 0 1 0 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 LT 1679 1460 0 1450 27 926 19 19 45 4 24 926 19 19 27 1450 0 1460 1679 24 4 45 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 626Cumulative (2014) Plus Project PM Wesley Street National Boulevard N/S: W/E: 26 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 605 A: B: 5 0 A: B: 0 26 A: B: 144 0.479 = + + + + + 674 144 5 0 *1500|1010|A: B: 674 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) A LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 26 AMBIENT RELATED PROJECT TOTAL 26 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 118 0 0 0 5 1210 0 0 1347 5 5 0 1210 0 0 0 118 0 5 1347 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 627Cumulative (2014) Plus Project PM Hayden Avenue National Boulevard N/S: W/E: 27 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 256 A: B: 53|1010|A: B:|1010|445 A: B: 445 0.747 = + + + + + 666 0 445 53 *1425|1010|A: B: 666 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 693 AMBIENT RELATED PROJECT TOTAL 693 LANE SIGNAL Split|1010| Prot-Fix Perm Auto Auto Auto 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0 0 2 0 0 1 0 LT 0 197 0 0 0 53 511 0 0 1332 161 53 0 511 0 0 0 197 0 161 1332 0 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 628Cumulative (2014) Plus Project PM Jefferson Boulevard National Boulevard N/S: W/E: 28 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B:|101010|A: B: 617 464 A: B: 77 0.787 = + + + + + 0 527 617 77 *1425 527 A: B: 527 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) A(E/B) A(S/B) C LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 77 AMBIENT RELATED PROJECT TOTAL 77 LANE SIGNAL Perm|1010|Perm Split Split Auto Auto Auto Auto 0 2 0 0 1 0 1 0 1 0 0 1 0 0 0 0 1 0 0 0 1 1 0 0 0 1 0 LT 927 0 0 617 520 0 0 0 1053 0 122 0 0 0 520 617 0 0 927 122 0 1053 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 629Cumulative (2014) Plus Project PM La Cienega Boulevard Jefferson Boulevard N/S: W/E: 29 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 418 A: B: 168 751 A: B: 60 104 A: B: 892 1.240 = + + + + + 681 892 168 60 *1375 323 A: B: 681 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 104 AMBIENT RELATED PROJECT TOTAL 104 LANE SIGNAL Perm|1010|Perm Prot-Var Prot-Var Auto OLA Auto Auto 0 2 0 1 0 0 1 0 3 0 0 1 0 2 0 2 0 0 1 0 2 0 1 0 1 0 0 LT 2360 315 60 2253 245 306 836 102 588 1086 275 306 102 836 245 2253 60 315 2360 275 1086 588 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 630Cumulative (2014) Plus Project PM Jefferson Boulevard Higuera St/Rodeo Rd N/S: W/E: 30 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 333 A: B: 343 281 A: B: 184 34 A: B: 441 0.820 = + + + + + 343 300 441 184 *1425 58 A: B: 300 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) A(E/B) B(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 34 AMBIENT RELATED PROJECT TOTAL 34 LANE SIGNAL Perm|1010|Perm Split Split Free Auto Auto Auto 0 2 0 0 1 0 1 0 2 0 0 1 0 2 0 1 0 0 1 0 1 0 2 0 0 1 0 LT 882 1026 184 561 52 605 343 67 58 600 165 605 67 343 52 561 184 1026 882 165 600 58 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 631Cumulative (2014) Plus Project PM La Cienega Boulevard Rodeo Road N/S: W/E: 31 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 302 A: B: 141 793 A: B: 244 196 A: B: 849 1.281 = + + + + + 624 849 141 244 *1375 312 A: B: 624 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 356 AMBIENT RELATED PROJECT TOTAL 356 LANE SIGNAL Prot-Fix|1010|Prot-Fix Prot-Var Prot-Var Auto Auto OLA OLA 0 2 0 1 0 0 2 0 2 0 1 0 0 2 0 2 0 0 1 0 1 0 2 0 0 1 0 LT 2309 237 444 2250 129 257 603 150 312 1247 383 257 150 603 129 2250 444 237 2309 383 1247 312 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 632Default Scenario Thu May 26, 2011 16:04:10 Page 15-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #321 BRADDOCK DR/DUQUESNE AV [CUMULATIVE (2014) + PROJECT PM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.538 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 160.3 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 155 181 192 8 47 19 133 478 160 21 518 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 155 181 192 8 47 19 133 478 160 21 518 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 155 181 192 8 47 19 133 478 160 21 518 17 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 155 181 192 8 47 19 133 478 160 21 518 17 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 155 181 192 8 47 19 133 478 160 21 518 17 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.29 0.34 0.37 0.11 0.63 0.26 0.17 0.62 0.21 0.04 0.93 0.03 Final Sat.: 149 174 184 43 254 103 87 311 104 19 462 15 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 1.04 1.04 1.04 0.18 0.18 0.18 1.54 1.54 1.54 1.12 1.12 1.12 Crit Moves: **** **** **** **** Delay/Veh: 78.3 78.3 78.3 14.0 14.0 14.0 271.1 271 271.1 103.8 104 103.8 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 78.3 78.3 78.3 14.0 14.0 14.0 271.1 271 271.1 103.8 104 103.8 LOS by Move: F F F B B B F F F F F F ApproachDel: 78.3 14.0 271.1 103.8 Delay Adj: 1.00 1.00 1.00 1.00 ApprAdjDel: 78.3 14.0 271.1 103.8 LOS by Appr: F B F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 633Cumulative (2014) Plus Project PM Braddock Drive Duquesne Avenue N/S: W/E: 32 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 556 A: B: 21 74 A: B: 8 155 A: B: 528 1.328 = + + + + + 771 528 21 8 1000 133 A: B: 771 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) A(N/B) A(E/B) B(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 155 AMBIENT RELATED PROJECT TOTAL 155 LANE SIGNAL Perm|1010|Perm Perm Perm Auto Auto Auto Auto 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 LT 181 192 8 47 19 21 518 17 133 478 160 21 17 518 19 47 8 192 181 160 478 133 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 634Default Scenario Thu May 26, 2011 16:04:10 Page 17-1 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM 4-Way Stop Method (Base Volume Alternative) ******************************************************************************** Intersection #331 LUCERNE AV/DUQUESNE AV [CUMULATIVE (2014) + PROJECT PM] ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap. (X): 1.109 Loss Time (sec): 0 (Y+R = 4 sec) Average Delay (sec/veh): 68.4 Optimal Cycle: 0 Level Of Service: F ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Stop Sign Stop Sign Stop Sign Stop Sign Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 0 0 1! 0 0 0 1 0 0 0 0 0 1 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 353 0 73 58 537 0 0 573 241 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 353 0 73 58 537 0 0 573 241 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 353 0 73 58 537 0 0 573 241 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 353 0 73 58 537 0 0 573 241 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 0 0 353 0 73 58 537 0 0 573 241 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 0.83 0.00 0.17 0.10 0.90 0.00 0.00 1.00 1.00 Final Sat.: 0 0 0 438 0 91 54 496 0 0 517 574 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: xxxx xxxx xxxx 0.81 xxxx 0.81 1.08 1.08 xxxx xxxx 1.11 0.42 Crit Moves: **** **** **** Delay/Veh: 0.0 0.0 0.0 32.4 0.0 32.4 87.7 87.7 0.0 0.0 98.2 13.4 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 0.0 0.0 32.4 0.0 32.4 87.7 87.7 0.0 0.0 98.2 13.4 LOS by Move: * * * D * D F F * * F B ApproachDel: xxxxxx 32.4 87.7 73.1 Delay Adj: xxxxx 1.00 1.00 1.00 ApprAdjDel: xxxxxx 32.4 87.7 73.1 LOS by Appr: * D F F ******************************************************************************** Traffix 7.6.0715 (c) 2003 Dowling Assoc. Licensed to RAJU ASSOC., PASADENA ATTACHMENT 6 635Cumulative (2014) Plus Project PM Lucerne Avenue Duquesne Avenue N/S: W/E: 33 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE:|1010|A: B: 573 353 A: B: 426|1010|A: B:|1010|1.057 = + + + + + 573 426058 1000 595 A: B: 58 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) A(N/B) B(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT|1010|AMBIENT RELATED PROJECT TOTAL|1010|LANE SIGNAL |1010|Split Perm Perm Auto Auto Auto 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 LT 0 0 353 0 73 0 573 241 58 537 0 0 241 573 73 0 353 0 0 0 537 58 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 636Cumulative (2014) Plus Project PM Jefferson Boulevard Duquesne Avenue N/S: W/E: 34 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 42 A: B: 29 54 A: B: 532 782 A: B: 477 1.034 = + + + + + 480 532 29 477 *1375 466 A: B: 480 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) F LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 477 AMBIENT RELATED PROJECT TOTAL 477 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto OLA Auto 0 1 0 1 0 0 1 0 2 0 0 1 0 1 0 1 0 0 1 0 1 0 0 0 1 0 0 LT 1528 35 54 1064 212 29 42 21 466 64 416 29 21 42 212 1064 54 35 1528 416 64 466 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 May 27, 2011 ,Friday 10:03:44 AM CalcaDB CPROJPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 637 APPENDIX G Capacity Calculation Worksheets Cumulative (2014) Plus Project with Mitigation Measures ATTACHMENT 6 638Cumulative (2014) Plus Project MIT AM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 90 A: B: 564 142 A: B: 492 500 A: B: 195 0.913 = + + + + + 564 492 100 195 *1375 395 A: B: 100 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 480 AMBIENT RELATED PROJECT TOTAL 355 -125 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 874 126 258 902 82 90 1353 340 100 789 63 -125 90 340 1353 82 902 258 126 874 188 789 100 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 June 15, 2011 ,Wednesday 09:08:55 AM CalcaDB CMITAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 639Cumulative (2014) Plus Project MIT PM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 372 A: B: 86 261 A: B: 573 427 A: B: 128 0.897 = + + + + + 543 573 86 128 *1375 106 A: B: 543 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) D LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 358 AMBIENT RELATED PROJECT TOTAL 233 -125 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 730 123 475 1067 79 86 904 213 106 1085 198 -125 86 213 904 79 1067 475 123 730 323 1085 106 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 June 15, 2011 ,Wednesday 09:10:34 AM CalcaDB CMITPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 640Cumulative (2014) Plus Project MIT AM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 90 A: B: 564 142 A: B: 492 500 A: B: 264 0.963 = + + + + + 564 492 100 264 *1375 395 A: B: 100 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E A(W/B) B(N/B) B(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 480 AMBIENT RELATED PROJECT TOTAL 480 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 874 126 258 902 82 90 1353 340 100 789 188 90 340 1353 82 902 258 126 874 188 789 100 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 August 17, 2012 ,Friday 04:08:44 PM CalcaDB CMITAM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 641Cumulative (2014) Plus Project MIT PM National Boulevard Washington Boulevard N/S: W/E: 20 I/S No: AM/PM: Comments: COUNT DATE: GROWTH FACTOR: STUDY DATE: 372 A: B: 86 261 A: B: 573 427 A: B: 197 0.947 = + + + + + 543 573 86 197 *1375 106 A: B: 543 V/C = West/East Critical Movements = North/South Critical Movements = SouthBound WestBound EastBound NorthBound A = Adjusted Through/Right Volume B = Adjusted Left Volume * = ATSAC Benefit Results V/C RATIO LOS 0.00 - 0.60 A 0.61 - 0.70 B 0.71 - 0.80 C 0.81 - 0.90 D 0.91 - 1.00 E B(W/B) B(N/B) A(E/B) A(S/B) E LOS = Critical Movements Diagram TH RT LT TH LT TH RT LT TH RT Phasing RTOR Phasing Phasing Phasing RTOR RTOR NORTHBOUND SOUTHBOUND WESTBOUND EASTBOUND EXISTING RTOR RT 358 AMBIENT RELATED PROJECT TOTAL 358 LANE SIGNAL Prot-Var|1010|Prot-Var Perm Perm Auto Auto Auto Auto 0 1 0 1 0 0 2 0 1 0 1 0 0 1 0 2 0 1 0 0 1 0 2 0 0 1 0 LT 730 123 475 1067 79 86 904 213 106 1085 323 86 213 904 79 1067 475 123 730 323 1085 106 Volume/Lane/Signal Configurations Developed by Chun Wong, 12/94 August 17, 2012 ,Friday 04:10:52 PM CalcaDB CMITPM INTERSECTION DATA SUMMARY SHEET ATTACHMENT 6 642