File #: 25-559    Version: 1 Name: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Sawtelle Sidewalk Improvement Project, PS-011 (CDBG Project No. 602687-24 )
Type: Minute Order Status: Consent Agenda
File created: 11/21/2024 In control: City Council Meeting Agenda
On agenda: 1/13/2025 Final action:
Title: CC - CONSENT ITEM: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Sawtelle Boulevard Sidewalk Improvement Project, PS-011 (Community Development Block Grant Project No. 602687-24).
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

CC - CONSENT ITEM: Approval of Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Sawtelle Boulevard Sidewalk Improvement Project, PS-011 (Community Development Block Grant Project No. 602687-24).

 

body

Meeting Date:                                           January 13, 2025

 

Contact.:                                          David Nauta/Public Works, Engineering

 

Phone Number:                                          (310) 253-5606

 

Fiscal Impact:                     Yes [  ]    No [X]                     General Fund:                     Yes [  ]    No [X]

 

Attachments:                     Yes [  ]    No [X]

 

Public Notification:                     E-Mail: Meetings and Agendas - City Council (01/08/2025)

 

Department Approval:                     Yanni Demitri, Public Works Director/City Engineer (12/11/2024)

_____________________________________________________________________

 

 

RECOMMENDATION

 

Staff recommends the City Council approve the final plans and specifications and authorize the publication of a notice inviting bids for the Sawtelle Sidewalk Improvement Project, PS-011 (CDBG Project No. 602687-24).

 

 

BACKGROUND

 

On November 13, 2023, the City Council approved Community Development Block Grant (CDBG) fund allocation for Fiscal Year 2024-2025 which includes the replacement of existing uplifted sidewalks to ADA compliant sidewalks at various locations across the City based on previously submitted resident reports and site visits by City staff.

 

The bid documents that include both the construction plans and specifications have been designed by engineering staff.  Also, the Los Angeles County Development Authority (LACDA) has reviewed the bid documents and deemed them acceptable in meeting CDBG funding program requirements.

 

This project will focus on two areas:

 

1.                     Sawtelle Boulevard Improvements: This project consists of the removal of architectural and material barriers through replacement of damaged and uplifted sidewalks to provide clear paths of travel for disabled residents. The proposed sidewalk locations are as follows:

a.                     3977 Sawtelle Boulevard

b.                     Along Sawtelle Boulevard between Washington Boulevard and Culver Boulevard

c.                     Along Sawtelle Boulevard between Ballona Creek and Sepulveda Boulevard.

 

2.                     Grinding and AC Ramping of Uplifted Sidewalk: This project repairs numerous uplifted sidewalk panels Citywide to enhance pedestrian safety and provide ADA access via grinding and AC ramping in areas of parkway street tree root uplifting.

 

Since the sidewalk uplift is mainly attributed to parkway street root intrusion, existing parkway tree well expansion, parkway tree removal and replacement, curb and gutter reconstruction, and driveway approach reconstruction are all also part of the scope of work at select locations.

 

FISCAL ANALYSIS

 

The total estimated project cost is $199,000. The Adopted Budget for Fiscal Year 2024-2025 includes sufficient funding for the project in two CIP Accounts: PS011 (CDBG Sidewalk Repairs) and PZ428 (Curb, Gutter, Sidewalk Replacement) which can be found in the Summary by Project Type in the CIP section of the budget book on page 475 under Streets and Alleys. The proposed project will be funded with primarily with CDBG Funds (Fund 428) with the remaining funding coming from Special Gas Tax funds (Fund 418) allocated to this project as shown below:

 

 

 

ATTACHMENTS

 

None.

 

 

MOTIONS

 

That the City Council:

                     

Approve the final plans and specifications authorize the publication of a notice inviting bids for the Sawtelle Sidewalk Improvement Project, PS-011 (CDBG Project No. 602687-24 ).