Legislation Details

File #: HIST-3199    Version: 1 Subject:
Type: Historical Status: Action Item
In control: City Council Meeting Agenda
On agenda: 8/14/2006 Final action: 8/14/2006
Title: Approval of a Professional Services Agreement with RTI Consulting, Inc. to Provide Architectural Services for the Culver City Dog Park Project (P-816) – Phase II.
Attachments: 1. A-4__08_14_06_PRCS_RTI_Dog_Park.doc, 2. A-4__RTI Agreement.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends the City Council approve a professional services agreement with RTI Consulting, Inc. to provide architectural services for the Culver City Dog Park Project (P-816) – Phase II. BACKGROUND: In June 2003, Culver City was awarded a $50,000 assessment grant and a $200,000 clean-up grant from the EPA to clean up the “Bone Yard” area of Culver City Park for development of a Dog Park. At the City Council meeting of December 13, 2004, Council approved the plans and specifications for the Dog Park (P-816) and authorized the Friends of the Culver City Dog Park (Friends), a private, non- profit 501(c)(3) organization, to construct a Dog Park within Culver City Park (Attachment 1). In April 2005, the City entered into a Memorandum of Understanding (MOU) with the Friends allowing the construction of the Dog Park. This construction (excluding the initial site clean-up), now termed Phase I of the Dog Park, was fully funded by the Friends and consisted of the installation of a decomposed granite surface, fencing, signage, benches, water fountains, trees and a community bulletin board. A ribbon cutting ceremony was held on April 22, 2006 and the Dog Park is currently open to the public. At the September 19, 2005 City Council meeting, Herb Wesson Jr., serving as Special Assistant to Los Angeles County Supervisor Yvonne Brathwaite Burke, Second District, announced the availability of $150,000 in Prop. A Excess Funds for Meeting Date: 8/14/06 Item Number: A-4 AGENDA ITEM: Approval of a Professional Services Agreement with RTI Consulting, Inc. to Provide Architectural Services for the Culver City Dog Park Project (P-816) – Phase II Contact Person/Dept.: Patricia Mooney, PRCS Senior Management Analyst Phone Number: (310) 253-6668 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [X] Attachments: [] Public Notification: Master Notification List (08/10/06); Friends of the Culver City Dog Park (08/10/06); Parks and Recreation Commission (08/10/06); RTI Consulting, Inc. (08/10/06) Department Approval: Bill La Pointe, PRCS Director (08/03/06) City Manager Approval: Jerry B. Fulwood (08/09/2006) City Controller Approval: Marlee Chang (08/09/2006)City of Culver City, California City Council Agenda Item Report additional construction elements of the Dog Park (Attachment 2). At the November 7, 2005 meeting, Council approved a resolution for the submission of an application for $150,000 in Proposition A grant funding for the additional construction elements of the Culver City Dog Park (Resolution Number 2005 – R071; Attachment 3). A fully executed contract for grant number 58C6-06-2078 was received from the Los Angeles County Regional Park and Open Space District in February 2006 and $150,000 was appropriated for the project. DISCUSSION: Phase II of the Dog Park construction is being funded by $150,000 in Proposition A Excess Funds. Items to be included in Phase II are: (1) Weather and shade shelters, (2) paving for parking (including ADA accessible parking), (3) additional signage (including a highly visible and aesthetically pleasing entry way and dedication plaques), (4) additional landscaping and irrigation (including a cost- effective, water-saving irrigation system for the landscaping), and possibly, (5) lighting of the park for evening use. Staff recommends that City Council approve a professional services contract with RTI Consulting, Inc., not to exceed $8,670, to provide architectural services for the Culver City Dog Park. The scope of services will include the development of drawings for the site, coordination of the project with City agencies, development of the bid package and assistance to the City during the bidding process (Attachment 4). The City Manager is authorized to approve and execute contracts, on behalf of the City, for professional services that are not in excess of $10,000 (Culver City Municipal Code § 3.07.075). Under this provision, RTI Consulting, Inc. has been awarded a contract not to exceed $9,250.00 for architectural services for the Culver West Alexander Park Improvement Project (P-835). As this agreement with RTI for Phase II of the Dog Park is also for architectural services, and, in order to comply with the Code requirements, the Parks, Recreation and Community Services Department (PRCS) was advised by the City Attorney’s office to come forward to Council with this request for a professional services agreement with RTI Consulting, Inc. for architectural services for the Culver City Dog Park. Staff requests that RTI Consulting, Inc. be considered as the sole provider of architectural services for this phase of the Dog Park development. RTI brings a special level of expertise to the project, since they provided construction management services for the PXP Site Reclamation Project (Contract No. 2005-160) at the site in Culver City Park where the Dog Park is located.City of Culver City, California City Council Agenda Item Report FISCAL ANALYSIS: The are currently sufficient funds in Business Unit 42300816, Object Account 610400 (Consulting Services) to encumber and ultimately expend $8,760 to be used for architectural services for the Culver City Dog Park Project. ATTACHMENTS: 1. Excerpt of the Minutes of the December 13, 2004 City Council Meeting. 2. Excerpt of the Minutes of the September 19, 2005 City Council Meeting. 3. Excerpt of the Minutes of the November 7, 2005 City Council Meeting. 4. RTI, Consulting, Inc. Proposal for Architectural Services for the Culver City Dog Park Project – Phase II. MOTION: That the City Council: 1. Approve a Professional Services Agreement with RTI Consulting, Inc. for Architectural Services for the Culver City Dog Park Project (p-816) – Phase II Not to Exceed $8,760. MEETING DATE: August 14, 2006 AGENDA ITEM: Approve Professional Services Agreement with RTI Consulting, Inc. to Provide Architectural Services for the Culver City Dog Park Project (P-816) — Phase II. ATTACHMENTS Pages 1. Excerpt of the Minutes of the December 13, 2004 1 City Council Meeting 2. Excerpt of the Minutes of the September 19, 2005 2 City Council Meeting 3. Excerpt of the Minutes of the November 7, 2005 3 City Council Meeting 4. RTI, Consulting, Inc. Proposal for Architectural 4 Services for the Culver City Dog Park Project — Phase IIAttachment 1 December 13, 2004 5:15 P.M. REGULAR MEETING OF THE CITY COUNCIL, CITY OF CULVER CITY, CALIFORNIA MAYOR STEVEN J. ROSE, PRESIDING Call to Order The meeting of the City Council was called to order at 5:15 P.M. o0o Item 1.9 Consideration to Approve the Plans and Specifications for the Off-Leash Dog Park and Authorize the Friends of the Culver City Dog Park to Construct the Dog Park Provided that the Friends Enter into a License Agreement with the City. Joe Susca, Management Analyst, gave the staff report. Mr. Susca advised the City Council that the following additional language should be added to Motion #2: "and if the Friends do not enter into a licensing agreement to construct the park prior to February 14, 2005, that the City will bid the project as a City project." Discussion ensued regarding whether the City should take on the dog park construction if the Friends do not enter into the proper agreements by the February 14, 2005 deadline. Councilmember Gross proposed the following amendment for Motion #2: If the Friends have not entered into an agreement by February 14, 2005, the item will be returned to the City Council for further consideration. Carol Schwab, City Attorney, suggested that the City could bid the dog park project as a City project, provided that the Friends turn the money over to the City; or bring it back as a separate item. Following discussion, the following motion was voted on: MOVED BY COUNCILMEMBER VERA, SECONDED BY COUNCILMEMBER CORLIN AND UNANIMOUSLY CARRIED, THAT THE CITY COUNCIL: 1. APPROVE THE PLANS AND SPECIFICATIONS PREPARED FOR CONSTRUCTION OF THE DOG PARK, P-816; 2. AUTHORIZE THE FRIENDS TO CONSTRUCT THE DOG PARK THROUGH A LICENSE AGREEMENT, WITH THE CITY, PROVIDED THE FRIENDS ENTER INTO AGREEMENTS WITH THEIR CONTRACTORS FOR THE DOG PARK'S CONSTRUCTION PRIOR TO FEBRUARY 14, 2005. IF THE FRIENDS DO NOT ENTER INTO AGREEMENTS BY THE FEBRUARY 14, 2005 DEADLINE, THIS ITEM WILL BE BROUGHT BACK AS A SEPARATE ITEM FOR CITY COUNCIL CONSIDERATION; AND 3. INSTRUCT THE CITY ATTORNEY'S OFFICE TO PREPARE THE NECESSARY LICENSE AGREEMENT BETWEEN THE CITY AND THE FRIENDS AND AUTHORIZE THE CHIEF ADMINISTRATIVE OFFICER TO SIGN IT ON BEHALF OF THE CITY. o0o 1.Attachment 2 ADJOURNED REGULAR MEETING OF THE September 19, 2005 CITY COUNCIL, CITY OF CULVER CITY, 5:30 P.M. CALIFORNIA Call to Order & Roll Call The meeting of the City Council was called to order at 5:30 P.M. Present: Mayor Albert Vera Vice Mayor Gary Silbiger Councilmember Alan Corlin Councilmember Carol Gross Councilmember Steven Rose o0o o0o Presentations Item P-1 Presentation of a $150,000 Grant to the City of Culver City for the Culver City Dog Park by Herb Wesson, Jr., Special Assistant to Los Angeles County Supervisor Yvonne Brathwaite Burke, 2 nd District. Herb Wesson, on behalf of Los Angeles County Supervisor Yvonne Brathwaite Burke, presented a check in the amount of $150,000 for the Culver City Dog Park. Mayor Vera, on behalf of the City Council, thanked Mr. Wesson for his efforts for Culver City. At this time, Vicki Daly Redholtz, representing the Friends of the Culver City Dog Park, thanked Mr. Wesson for the donation. o0o 2.Attachment 3 ADJOURNED REGULAR MEETING OF THE CITY COUNCIL, CITY OF CULVER CITY, CALIFORNIA Call to Order & Roll Call The meeting of the City Council was called to order at 5:31 P.M. Present: Mayor Albert Vera Vice Mayor Gary Silbiger Councilmember Alan Corlin Councilmember Carol Gross Councilmember Steven Rose o0o Item A-6 November 7, 2005 5:31 P.M. Consideration of the City Council Approving the Resolution for a $150,000.00 County of Los Angeles Proposition A Grant for Construction of the Culver City Dog Park and Authorizing the Appropriation and Transfer of $150,000.00 in Prop A Grant Funds for the Construction of the Dog Park. Christopher Armenta, City Clerk read written comments submitted by the following: Michael Whitaker Laura Stuart Vicki Daly Redholtz, representing Friends of the Culver City Dog Park Following discussion, the following motion was made: MOVED BY COUNCILMEMBER GROSS, SECONDED BY COUNCILMEMBER ROSE AND UNANIMOUSLY CARRIED, THAT THE CITY COUNCIL: 1. APPROVE RESOLUTION NO. 2005-R071 TO APPROVE THE APPLICATION FOR PROP A GRANT FUNDS FOR THE DOG PARK IN CULVER CITY PARK; 2. AUTHORIZE THE CHIEF ADMINISTRATIVE OFFICER TO SIGN ALL DOCUMENTS RELATED TO THE SUBMITTAL OF THE PROPOSITION A GRANT APPLICATION; AND 3. AUTHORIZE THE APPROPRIATION AND TRANSFER OF $150,000.00 IN PROP A GRANT FUNDS FOR THE CONSTRUCTION OF THE DOG PARK UPON RECEIPT OF THE FULLY EXECUTED CONTRACT FROM THE LOS ANGELES COUNTY REGIONAL PARK AND OPEN SPACE DISTRICT. o0o 3.Attachment 4 Tasks 1 Review scaled drawings received from the City. 2 \Asit the site to confirm conditions based on the drawings and other information 3 Prepare the following drawings: a Cover Sheet, Notes & Specifications b Site Plan & Details 4 Review sketches from City for the design and incorporate same into the drawing. 5 Review information born City regarding utility locations and sizing and incorporate same into the drawing. 6 Meet with City Agencies to review documents in various stages, such as schematic, design development and bid (for construction) documents. Revise package as necessary. 7 Prepare schematic, design and bid (for construction) documents 8 Meet with City Council to present design development package and respond to questions Revise package as necessary. 9 Submit documents for Plan Check. Revise package as necessary for Permit approval. 10 Issue package for Bid. 11 Respond to Requests for Information which may be received from bidders. 12 Assist City with selection of successful bidder. 13 Respond to questions and provide customary architectural assistance during and for close-out of construction. 14 Review as-built drawings for accuracy and provide comment to City regarding same. Notes 1 Fee is a Not-to-exceed Fee. The Fee is based on the total amount of hours at the hourly rates and is not to be held to the line item breakdown above, which is a methodology for total fee computation only. 2 Standard and customary Reimbursable Expenses are in addition to the Fee and shall be invoiced monthly, at cost. Such expenses may include, but are not limited to, long distance telephone calls, reproduction of documents, delivery and postage costs. 3 Additional Work is work not identified above (indentified work: preparation of the above-listed Drawings, Meetings w/ City Agencies and City Council and Contract Administration of the Base Work). Additional Work also includes work that is changed by the City once drawings and/or designs have been approved by the City Such Additional Work is in addition to the Fee and shall not proceed without prior written approval by the City. The Additional Work shall be performed on a Time and Expenses basis using the hourly rates listed above. 4 Architect is not responsible for site safety and security, and/or means and methods of construction. Assumptions 1 Assume scaled drawings from City for site plan for use in preparing CAD drawings. 2 Assume sketches, informaiton and specifications from City for the Dog Park—Phase II design 3 Assume direction from City regarding utility locations and sizing 4 Assume appropriate and timely responses to questions asked of the City.