Title:
|
Approval of Plans and Specifications and Authorization to Advertise for Construction Bids for the Culver City Transfer Station Tipping Floor Repair Project.
|
City of Culver City, California
City Council Agenda Item Report
RECOMMENDATION:
Staff recommends the City Council approve the plans and specifications and
authorize the advertising for construction bids for the Culver City Transfer Station
Tipping Floor Repair Project and authorize staff to solicit construction bids.
BACKGROUND:
The City owns and operates a solid waste transfer station. Solid waste collected
by the City’s Sanitation Division trucks is transferred to tractor/trailers at the facility
for ultimate disposal at the Puente Hills landfill. Roll-off service, green waste
processing, and all other Sanitation Division functions are also based at this
facility.
The transfer station is a two-story reinforced concrete structure located adjacent to
Ballona Creek at 9255 Jefferson Boulevard. Sanitation Division collection trucks
dump their loads on the upper level tipping floor and a large tractor loader pushes
the material through an opening in the tipping floor into Sanitation Division transfer
trucks parked on the lower level. These loading activities wear the surface of the
tipping floor requiring that the floor be repaired from time to time to maintain its
structural integrity.
DISCUSSION:
Meeting Date: 3/23/2009 Item Number: C-8
AGENDA ITEM: Approval of Plans and Specifications and Authorization to
Advertise for Construction Bids for the Culver City Transfer Station Tipping Floor
Repair Project.
Contact Person/Dept.: Steven Finton Phone Number: (310) 253-6406
Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X]
Public Hearing: [] Action Item: [] Attachments: [X]
Public Notification: Master E-Mail Notification List (03/18/09)
Department Approval:
Charles D. Herbertson (03/11/09)
City Attorney Approval:
Carol Schwab (by H. Baker) (03/17/09)
Chief Financial Officer Approval:
Jeff Muir (by N. Kimball) (03/18/09)
City Manager Approval
Jerry B. Fulwood (03/18/09) City of Culver City, California
City Council Agenda Item Report
Presently, the tipping floor surface is showing significant wear and it is
recommended that a repair effort be conducted at this time.
The recommended repair consists of the application of a special high-strength
concrete overlay over worn portions of the tipping floor to restore floor thickness. A
complete set of plans and specifications is available for review at the City Clerk’s
Office in City Hall.
FISCAL ANALYSIS:
Funding for the project is included in the Refuse Fund’s adopted 2008-09 Budget
(Account No. 20267300).
ATTACHMENTS:
1) Tipping floor repair plan
2) Diagram of loading operation
MOTION:
That the City Council:
Approve the plans and specifications and authorize the advertising for
construction bids for the Culver City Transfer Station Tipping Floor Repair
project.
MEETING DATE: 3/23/09
AGENDA ITEM:
Approval of Plans and Specifications and Authorization to
Advertise for Construction Bids for the Culver City
Transfer Station Tipping Floor Repair Project.
ATTACHMENTS
Pages
1 Tipping floor repair plan
1, 2
2 Diagram of loading operation
3
70’
50’
60’
9255 Jefferson Boulevard
Ballona Creek
Culver City Transfer Station
Tipping Floor Repair Plan
Tipping Floor
3’
10’
B B
B B
Total Area to be overlaid = 3850 SF
Place high strength concrete overlay
Per specifications
Material Quantity:
Min 1” thick, 2” max (1.5” Avg.) 3850 SF=
500 CF
Limit of previous visible
keyway and overlay
place min. 1” thick,
2” max (2” Avg.)
overlay thickness
(3850 SF)
B B
A
A
Attachment 1, Pg 1
1Existing
Surface
Truck Loading Pit
Section A-A
3’
3’
Sawcut and Remove Keyway
Per Specifications
Place 1.5”
Overlay
Exist. Steel Corner Protection
Existing
Surface
3’
Place 1.5”
Overlay
Sawcut and Remove Keyway
Per Specifications
Section B-B
Culver City Transfer Station
Tipping Floor Repair Plan Attachment 1, Pg 2
2Culver City Transfer Station
Diagram of Loading Operation
Trash
Truck
Loader
Tipping Floor
Attachment 2|1013|