Legislation Details

File #: HIST-10424    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 1/26/2009 Final action: 1/26/2009
Title: Acceptance of the Work Performed by KDC, Inc. (dba Dynalectric) for the Traffic Signal Upgrade and Certification of the Signal Communication Infrastructure Components of Work, Authorization to File a Notice of Completion and Authorization to Release the Balance of the Retention Payment for the Fox Hills Area Traffic Signal Synchronization Project, P-852.
Attachments: 1. Acceptance of the Work Performed by KDC, Inc. (dba - C-7_09-01-26_PW-Eng_Fox_Hills_Traffic_Signal_Synch_Traffic_Signal_Upgrade_Project_Acceptance_final.doc, 2. Acceptance of the Work Performed by KDC, Inc. (dba - Acceptance of Work by KDC Inc. Regading Fox hills Traffic Signal.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION Staff recommends the City Council take the following actions related to the construction of the Fox Hills Traffic Signal Synchronization traffic signal upgrade and certification of the signal communication infrastructure components of work (“the project”): • Accept the work performed by KDC, Inc. (dba Dynalectric); • Authorize the filing (recording) of the Notice of Completion for the Project; and • Authorize the release of the balance of the retention payment in the amount of $80,607.94 to Dynalectric after the thirty-five (35) day lien period expires. BACKGROUND The City received funding for the Fox Hills Area Traffic Signal Synchronization Project from the Los Angeles County Metropolitan Authority (Metro) 2001 Call for Projects program. The application proposed multiple components of work comprised of upgrading 12 traffic signals within the Fox Hills area, switching existing traffic signal data transmission from copper wire interconnection to the City’s existing fiber optic network, providing mutual video CCTV camera surveillance capability between Culver City and the Los Angeles Department of Transportation (LADOT), certifying the City’s existing traffic signal communication infrastructure and acquiring a citywide Traffic Control System (TCS). Meeting Date: 01/26/2009 Item Number: C-7 AGENDA ITEM: Acceptance of the Work Performed by KDC, Inc. (dba Dynalectric) for the Traffic Signal Upgrade and Certification of the Signal Communication Infrastructure Components of Work, Authorization to File a Notice of Completion and Authorization to Release the Balance of the Retention Payment for the Fox Hills Area Traffic Signal Synchronization Project, P-852 Contact Person/Dept.: Elaine Jeng/PW, Max Paetzold/PW Phone Number: 310-253-5621, 310-253-5613 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [ ] Action Item: [] Attachments: [X] Public Notification: Notify KDC, Inc. January 23, 2009; Master E-Mail Notification List (01/21/09) Department Approval: Charles D. Herbertson (01/15/09) City Attorney Approval: Carol Schwab (by H. Baker) (01/15/09) Chief Financial Officer Approval: Jeff Muir (by N. Kimball) (01/21/09) City Manager Approval: Jerry B. Fulwood (01/21/09) City of Culver City, California City Council Agenda Item Report On January 28, 2008, the City Council awarded a contract to Dynalectric for the construction of the project. The project included the following components of work: • Upgrade of 12 existing signalized locations (replace underground wiring, overhead signals, addition of signage and signal wiring) and; • Certifying the City’s existing traffic signal communication infrastructure. DISCUSSION: A notice to proceed was issued to Dynalectric on March 7, 2008, and work commenced on March 10, 2008. The contract period was 90 calendar days. The original contract awarded to Dynalectric was $676,900 with change order authority of $70,000 provided to the Director of Public Works/City Engineer. Staff took on the role of construction management with the Nickerson Company providing limited inspection services paid through project funds. The City Council provided additional change order authority of $100,000, in addition to previously authorized $70,000, on July 28, 2008, in order to resolve the difficulties experienced with existing underground conduits encountered in the project. The July 28, 2008 agenda report is attached. During construction, the existing conduits were found to be old. Some were damaged and others were “frozen” such that existing wires in the conduits were immovable. To resolve these unforeseen field conditions, four Contract Change Orders (CCOs) were approved to install new conduits to house new multi-conductor field wires and interconnect communication wires. The certification of the existing communication infrastructure (copper lines) component of work resulted in the discovery of numerous discontinued copper lines connected by boot splices as well as a gap in communication to City Hall. Thus two CCOs were approved to install new interconnect communication wires. The project was completed on September 25, 2008, with a total of twelve (12) CCOs totaling $129,179.42. The aforementioned six CCOs made up approximately 80% ($103,000) of the total CCO cost. The remaining six CCOs involved additional curb work, signal cabinet modifications due to presence of street lighting, additional pull boxes dictated by Southern California Edison and additional changes to the intersection due to the presence of red-light camera technology upgrades. The final project cost is $806,079.42. City of Culver City, California City Council Agenda Item Report Because the scope of each of the CCOs were attributed to unforeseen field conditions, and/or unforeseen needs, the contract time was extended based on the appropriate days according to the scope of the additional work. FISCAL ANALYSIS The project has a total $1,851,000 in funds plus an additional $185,100 of supplemental funds received in 2007, bringing the total project grant funds to $2,036,100. The local match is $414,275 out of the total budget of $2,450,375 for all components of the project. This represents the completion of this component only. The remaining funding will be needed to complete the other components of the project. Final Project Cost (Signal Upgrade & Certification Components Only) Original Project Cost $676,900.00 Total Change Orders $129,179.42 Total Project Cost $806,079.42 This project is funded by local Prop C money, not state or federal funds. At this point, there is no indication that previously approved Prop C funded projects such as this one will be affected by the delay in grant payments being experienced by state and federally funded grant projects. To date, in addition to this component of the project, funds from P-852 have been expended on the Signal Upgrade/Infrastructure Certification and mutual video surveillance design, construction of the mutual video surveillance component of work, and the hiring of a system manager for the TCS component of the project. The project is expected to expend funds this fiscal year for the installation and integration of the TCS and the construction of a new Information Technology room to house the TCS. ATTACHMENTS 1. July 28, 2008 Council Report City of Culver City, California City Council Agenda Item Report MOTION That the City Council: 1) Accept the work performed by Dynalectric for the Fox Hills Traffic Signal Synchronization, Traffic Signal Upgrade and Signal Communication Infrastructure Certification work; 2) Authorize the filing (recording) of the Notice of Completion for the Project and; 3) Authorize the release of the balance of the retention payment in the amount of $80,607.94 to Dynalectric after the thirty-five (35) day lien period expires. MEETING DATE: 1/26/09 AGENDA ITEM: Acceptance of the Work Performed by the Contractor KDC, Inc. (dba Dynalectric) for the Traffic Signal Upgrade and Certification of the Signal Communication Infrastructure Components of Work and Authorization to File a Notice of Completion and Authorization to Release the Balance of the Retention Payment for the Fox Hills Area Traffic Signal Synchronization Project, P-852 ATTACHMENTS Pages|109| July 28, 2008 Council Report 1-10Public Notification Master E-Mail Notification List on (07/2408). Department Head Approval: Charles D. Herbertson (07117108) Chief Financial Officer Approval: Jeff Muir (by N. Kimball)(07/22/08) i-ty:Attomey:Aopeoyal: Carol Schwab city:10(14-goiTAporov4k;, Jerry 6::::F...01.:W.660: (07/23/08):: City of Culver City, California City Council Agenda Item Report Date 07/28/08 Item Number: C •••• ••• • • • •• • • . •• :•• • •: • ••• Add itional • •-•-••••• •• •• •• •• .Upgrade :•. COMMunicatiOn:. ,. infrastrtictOre.....CertifitatiOn COMponentS . of ' ,Mirk :fOritheil.:FoX... Hills Area TraFfic Signal Synchronization Project. P-852. . . Contact Person/Dept.: Elaine Jeng/PW Phone Number: (310) 253-5621 Fiscal Impact: Y [X] N [1 General Fund: Yes [ [X] Public Hearing: Action Item [X] Attachments: [X] RECOMMENDATION: Staff recommends the City Council authorize the Public Works Director/City Engineer to approve change orders, as necessary, in an amount not to exceed $100,000 (in addition to the original $70,000 change order authority) for the Traffic Signal Upgrade / Communication Infrastructure Certification component of the Fox Hills Area Traffic Signal Synchronization Project, P-852. BACKGROUND: The City Council approved the award of a construction contract to KDC Inc. (DBA Dynalectric) on January 28, 2008 for an amount not to exceed $676,900 with a contingency of $70,000 at the discretion of the Director of Public Works/City Engineer. The work includes upgrade of existing traffic controllers, street signs, multi-conductor wires (signal phasing), DLC (loop detectors), Emergency Vehicle Preemption (EVP) cables, and the testing of the interconnect wires. Dynalectric commenced work on March 10, 2008 and as of date the contractor has completed approximately 50% of the work, including the upgrade to signalized intersections along Hannum Avenue (4 locations), and is currently working on signalized intersections along Green Valley Circle (2 locations) and Centinela Avenue (2 locations).City of Culver City, California City Council Agenda Item Report DISCUSSION: CHANGE ORDERS TO DATE In the process of upgrading wires, Dynalectric encountered difficulties with the City's existing conduit. The conduits were found to be old; some were damaged and others were "frozen" such that existing wires in the conduits were immovable. In either case, damaged or frozen, the existing wires in the conduits cannot be removed and thus new wires cannot be installed. To resolve these unforeseen field conditions, three change orders were approved to install new conduits for the installation of new multi-conductor wires and interconnect wires. Another change order was approved to install new interconnect wires along Hannum Avenue, from Slauson Avenue to Slauson Avenue at Buckingham Parkway due to existing deficiencies. To date, the project utilized $63,901.56 out of previously approved $70,000 of contingency. CURRENT NEED Present work at Hannum Avenue/Green Valley Circle and Buckingham Parkway/Green Valley Circle showed presence of damaged and frozen conduits. To install new multi-conductor wires at these locations, the project will need to install new 3" conduits. Preliminary estimate associated with the installation of new conduits at the aforementioned locations is approximately $30,000. The requested additional $100,000 in change order authority will expedite the extra work approval process in the event the project encounters similar conditions at the remaining project locations. Since the upgrade and certification testing are components of the overall Fox Hills Area Traffic Signal Synchronization project, any unused money will be available for the next component of work. FISCAL ANALYSIS: There are sufficient funds available in the adopted 2008/09 Capital Improvement Budget with reimbursable Metro (MTA) Grant funds (42300852) and State Gas Tax funds (41800852) to pay for the proposed work.City of Culver City, California City Council Agenda Item Report ATTACHMENT: A. January 28, 2008 Staff Report B. November 26, 2007 Staff Report MOTION: That the City Council authorize the Public Works Director/City Engineer to approve change orders, as necessary, in an amount not to exceed $100,000 (in addition to the original $70,000 change order capacity) for the Traffic Signal Upgrade / Communication Infrastructure Certification Component of the Fox Hills Area Traffic Signal Synchronization Project, P-852. 3MEETING DATE: 7/28108 AGENDA ITEM: Request for Additional Funding for Traffic Signal Upgrade Communication Infrastructure Certification components of work for the Fox Hills Area Traffic Signal Synchronization Project P-852. ATTACHMENTS Pactes January 28, 2008 Staff Report 1-2|109| November 26, 2007 Staff Report 3-6 LtCity of Culver City, California City Council Agenda Item Report Date: 01/28108 Item Number: A-5 AGENDA ITEM: Correction to the Award of Construction Contract to KDC Inc. (DBA Dynalectric) for the Traffic Signal Upgrade/Communication Infrastructure Certification Components of Work for the Fox Hills Area Traffic Signal Synchronization Project, P-852. Contact Person/Dept: Elaine Jeng/PW Phone Number: (310) 253-5621 Fiscal Impact: Yes [X] No [J General Fund: Yes [X] No [ ] Public Hearing: [] Action Item: [X] Attachments: [X] Public Notification: Moore Electric, Comet Electric, Freeway Electric, KDC Inc. and Crosstown Electric on January 23, 2008 via email; Master Notification List on January 23, 2008 Department Head Approval: Charles D. Herbertson /16/2008 City Attorney Approval: Carol Schwab (by H. Baker) (01/23/08) Fiscal Impact Review: Jeff Muir (by N. Kimball)(01/23/08) City Manager Approval: Jerry B. Fulwood (01/23/2008) RECOMMENDATION: award a construction contract to KDC Inc. (DBA exceed $676,900 for the construction of the Traffic Certification components of the Fox Project P-852. of a construction contract to KDC Inc, (DBA for an amount not to exceed $602,420. error in the addition of the bid items $602,420, the total bid submitted by Dynalectric amount is still below the other contractors' bid Staff recommends the City Council Dynalectric) for an amount not to Signal Upgrade/Communication Infrastructure Hills Area Traffic Signal Synchronization BACKGROUND/DISCUSSION: The City Council approved the award Dynalectric) on November 26, 2007 Subsequently staff discovered a mathematical shown in Attachment B. Instead of was $676,900. The corrected bid amounts. KDC Inc. Freeway Comet Moore Bid Amount $676,900 $734,500 $791,000 $769,321 This report recommends that the award of the construction contract to KDC Inc., (DBA Dynalectric) for a not-to-exceed contract fee of $602,420 be rescinded. A5-1City of Culver City, California City Council Agenda Item Report Staff now is recommending that the City Council authorize a new corrected construction contract amount with KDC Inc. for a not-to-exceed contract fee of $676,900. FISCAL ANALYSIS: There are sufficient funds in the adopted 2007/08 Capital Improvement Budget for the Fox Hills Area Traffic Signal Synchronization Project (P-852), which includes reimbursable Metro (MTA) Grant funds, developer mitigation funds, and State Gas Tax funds, to fund the proposed work. ATTACHMENTS: A. November 26, 2007 Staff Report B. Revised Attachment B from the November 26, 2007 Staff Report: Compilation of bid results for the Traffic Signal Upgrade and Communication Infrastructure Certification components of the Fox Hills Area Traffic Signal Synchronization Project, P-852 MOTION: That the City Council: 1) Rescind previous authority to enter into a construction contract with KDC Inc. (DM Dynalectric) for a not-to-exceed contract fee of $602,420 for the Traffic Signal Upgrade and Communication Infrastructure Certification components of the Fox Hills Area Traffic Signal Synchronization Project. P-852-, 2) Authorize a construction contract with KDC Inc. (DBA Dvnaiectric) for a not-to- exceed contract fee of $676,900 for the Traffic Signal Uocirade and Communication Infrastructure Certification components of Fox Hills Area Traffic Signal Synchronization Project P-852; 3) Authorize the Director of Public Works/City Engineer to have the authority to approve change orders totaling to a not-to-exceed amount of $70.000 for the Traffic Signal Upgrade and Communication Infrastructure Certification contract-, and 4) Authorize the City Attorney to prepare the necessary documents and the City Manager to execute the documents on behalf of the City. A5-2 City of Culver City, California City Council Agenda Item Report Date: 11/26/07 Item Number: A=8 AGENDA ITEM: Award a Construction Contract to KDC Inc. (DBA Dynaiectric)-for the Copper to Fiber Optic/Mutual Video Surveillance Equipment Change Over; and Award 'a Construction Contract to KDC Inc. (DBA DynalectriC) for the Traffic Signal Upgrade /Communication Infrastructure Certification components of work for the Fox Hills Area Traffic Signal Synchronization Project, P-852 Contact Person/Dept.: Elaine Jeng/PW Phone Number: (310) 253-5621 FiscalImpact: Yes Xj No [1. General Fund: Yes [X] No [1. Public Hearing: H Action Item: [X1 Attachments: [X] Public Notification: Notify Moore Electric, Cornet Electric, Freeway Electric, KDC Ind. and Crosstown Electric on November 20, 2007 via email; Master Notification List on November 21, 2007 Department Head Approval: Charles D. Herbertson 11/15/07 City Attorney Approval: Carol Schwab (by H. iker) (11/20/07) Fiscal Impact Review: Marlee Chang (by N. Kimball)( 1/20/07) City Manager Approval: Jerry B. Fulwood (11/21/2007) RECOMMENDATION: the following: (DBA Dynalectric) for an amount riot to of the Copper to Fiber Optic/Mutual Over; and Inc. (DBA Dynalectric) for amount not to of the Traffic Signal Upgrade and Certification components of the Fox Project P-852. Signal Synchronization Project to the Los 2001 Call for Projects program for components of work comprising of Hills area, switching existing traffic signal to the City's existing fiber optic capability between Culver City and Los certifying the City's existing traffic acquiring a citywide traffic control system. budget of $1,848,000 ($1,483,000 in Gas Tax funds). In June 2007, Metro|1010|Staff recommends the City Council award • A construction contract to KDC Inc. exceed $71,865 for the construction Video Surveillance Equipment Change • A construction contract to KDC exceed $602,420 for the construction Citywide Communication Infrastructure Hills Area Traffic Signal Synchronization BACKGROUND: Staff submitted the Fox Hills Area Traffic Angeles County Metropolitan Authority (Metro) funding. The application proposed multiple upgrading 12 traffic signals within the Fox data transmission from copper wire interconnect network, providing mutual video surveillance Angeles Department of Transportation (LADOT), signal communication infrastructure and The project, CIP P-852, has a total adopted Prop C grant funds and $365,160 in matchingCity of Culver City, California City Council Agenda Item Report granted an additional $138,825 for the project, which requires a local match of $46,275. On October 8, 2007, the City Council approved the final plans and specifications and authorized the advertising of construction bids for one component of the Fox Hills Traffic Signal Synchronization Project (Fox Hills Project): the upgrade of twelve (12) traffic signals and the certification of existing traffic signal communication infrastructure. DISCUSSION: Cooper to Fiber Optic/Mutual Video Surveillance Equipment Chance Over, Bid 1362 This component was advertised during October 2007 and on Thursday, November 8, 2007, the Deputy City Clerk publicly opened the bids. Bids were received from KDC Inc. (DBA Dynalectric), Moore Electrical Contracting Inc. and Crosstown Electrical and Data Inc, Bidders were instructed to provide bids •for two options for procuring equipment and installation of the Copper to Fiber Optic scope of work. Selection of the lowest and responsive bidder would be based on the lowest bid of the total project (Copper to Fiber Optic and Mutual Video Surveillance equipment -change over). The table below summaries the bids submitted by the aforementioned companies. • KDC in C: Moore Electrical Crosstown Electrical and Data • Option 1 $35,495 $33,296 $49,000 Option 2 $33,385 $33,196 $51,000 Mutual Video $48,700 $48,893 $48,700 Total w/Opt 1 $73,975 $82,189 $97,700 Total w/Opt 2 $71,865 $82,089 $99,700 Lowest Total $71,865 $82,089 $97,700 Staff reviewed the bid proposal submitted by KDC Inc. and concludes the bid documents are complete. The bonding information meets City. requirements. Staff reviewed their references and found that they performed satisfactorily in other jurisdictions for similar work. KDC has satisfactorily completed several major capitalCity of Culver City, California City Council Agenda Item Report improvement projects for fiber optic installation for the City and Redevelopment Agency in the past several years. Traffic Signal Upgrade and Communication Infrastructure Certification, Bid 1375 On Thursday, November 8, 2007, the Deputy City Clerk publicly opened bids. Bids were received from KDC Inc. (DBA Dynalectric), Freeway Electric, Cornet Electric Inc. and Moore Electrical Contracting Inc. The table below summaries the bids submitted by the aforementioned companies. KDC Inc. Freeway Electric Moore Electrical Comet Electric Bid Amount $602,420 $734,500 $769,321 $791,000 Staff reviewed the bid proposal documents are responsive requirements. As previously work for other jurisdictions and FISCAL ANALYSIS: submitted by and complete. The mentioned, KDC for Culver City. budget includes sufficient project, P-852. Current Available Amount* KDC Inc. and concludes the bid bonding information meets City has satisfactorily performed similar funds in the Fox Hills Area the additional funds granted by budget amendment to appropriate The adopted 2007/08 CIP Traffic Signal Synchronization Funding Source 418 Special Gas Tax 423 Capital Grants $262,395 $1,359,400 - *NOTE: TOTAL The available amount City Council will tonight's agenda. $1,621,795 does not include be considering a those Metro. The funds on ATTACHMENT:City of Culver City, California City Council Agenda Item Report A. Compilation of bid results for the Copper to Fiber Optic and Mutual Video Surveillance Equipment Change Over component of the Fox Hills Area Traffic Signal Synchronization Project, P-852 B. Compilation of bid results for the Traffic Signal Upgrade and Communication Infrastructure Certification components of the Fox Hills Area Traffic Signal Synchronization Project, P-852 MOTION: That the City Council: I) Award a construction contract to KDC Inc. (DBA Dynalectric) for a not-to-exceed contract amount of $71,865 for the Copper to Fiber Optic and Mutual Video Surveillance Equipment Change Over components of the Fox Hills Area Traffic Signal Synchronization Project P-852; 2) Award a construction contract to KDC Inc. (DBA Dynalectric) for a not-to-exceed contract fee of $602,420 for the Traffic Signal Upgrade and Communication Infrastructure Certification components of Fox Hills Area Traffic Signal Synchronization Project P-852;. 3) Authorize the Director of Public Works/City Engineer to approve change orders totaling a not-to-exceed amount of $7,000 for the Copper to Fiber Optic and Mutual Video Surveillance Equipment Change Over, 4) Authorize the Director of Public Works/City Engineer to approve change orders totaling to a not-to-exceed amount of $60,000 for the Traffic Signal Upgrade and Communication Infrastructure Certification contract; and 5) Authorize the City Attorney to review/prepare the necessary documents and authorize the City Manager to execute such documents on behalf of the City. 10