Legislation Details

File #: HIST-4001    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 12/11/2006 Final action: 12/11/2006
Title: Public Hearing for the Consideration to Approve an Exception to the Usual Method for Awarding a Public Works Contract, and Award a Design-Build Contract to Fast-Track Construction Corporation for the Firing Range Rehabilitation Project.
Attachments: 1. PH-3__06-12-11_PD_Firing_Range_ Report.doc, 2. PH-3__Police Firing Range Part 1 of 2.pdf, 3. PH-3__Police Firing Range Part 2 of 2.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATIONS: Staff recommends the City Council: 1) Approve an exception to the requirements for awarding Public Works Contract to the lowest bidder, 2) Award a design-build contract to Fast-Track Construction Corporation (Fast- Track), for a not-to-exceed cost of $581,772.25, to complete the necessary work for the Firing Range Rehabilitation Project, P-832. 3) Authorize the Public Works Director/City Engineer and the Police Chief to approve change orders in a not-to-exceed amount of $133,227.75 if necessary; and 4) Authorize the City Attorney to prepare the necessary documents for the contract and authorize the City Manager to approve the documents. A 4/5ths vote is required. PROCEDURES: 1. Mayor seeks motion to receive and file the affidavit and notice of publication. 2. Mayor calls on staff for a brief report. 3. Mayor declares the Public Hearing open, and calls upon the public for comment. 4. Mayor seeks a motion to close the Public Hearing. Meeting Date: 12/11/06 Item Number: PH-3 AGENDA ITEM: Public Hearing for the Consideration to Approve an Exception to the Usual Method for Awarding a Public Works Contract, and Award a Design- Build Contract to Fast-Track Construction Corporation for the Firing Range Rehabilitation Project Contact Persons/Dept.: Elaine Jeng/PW; Craig Bloor/PD Phone Number: (310) 253-5621; (310) 253-6105 Fiscal Impact: Yes [X] No [ ] General Fund: Yes [] No [X] Public Hearing: [X] Action Item: [ ] Attachments: [X] Public Notification: Master Notification List on December 7, 2006. Public Notification Advertisement in the Los Angeles Times, on November 30, 2006 and in the Culver City News on December 7, 2006. Department Approval: Charles D. Herbertson 12/01/06 City Manager Approval: City Controller Approval: City Attorney Approval:City of Culver City, California City Council Agenda Item Report 5. City Council discusses the matter and arrives at its decision. BACKGROUND/DISCUSSION: On November 13, 2006, the City Council approved the following motions:  Authorize entering into a design-build contract with Fast-Track Construction related to the Firing Range Project, P832, for a not-to-exceed cost of $650,000;  Authorize the Public Works Director/City Engineer and the Police Chief to approve change orders in a not-to-exceed amount of $65,000, if necessary; and  Authorize the City Attorney to prepare the necessary documents for the contract and authorize the City Manager to approve the documents. Recently the City Attorney’s office discovered that since the project did not award the design-build contract to the lowest bidder, an exception for awarding Contracts for Public Works projects as permitted by the City’s Charter must be approved the City Council. Staff recommended that the City Council award a contract to Fast-Track because their bid proposal was the most responsive of the three submitted. Section 1304 of the previous City Charter established the procedures for awarding public works contracts to the lowest responsible bidder. That section also permitted the City Council to approve exceptions to that requirement after a public hearing. Section 2007 of the recently adopted Charter provides the previous Section 1304 provisions shall continue in effect until new regulations are established by ordinance. Those new regulations have not yet been established. Former City Charter Section 1304 states, in part, the following: “Every public works project to be performed by an independent contractor involving an expenditure of more than Twenty-Five Thousand ($25,000.00) Dollars… shall be let to the lowest responsible bidder after notice by publication in the newspaper designated by the City Council pursuant to Section 517 hereof by two or more insertions, the first of which shall be at least ten days before the time of opening bids. The City Council by four affirmative votes may award such a contract without complying with bidding procedures provided a public hearing is held on the award of the contract. Notice of the public hearing shall be published as City of Culver City, California City Council Agenda Item Report provided hereinabove and shall state the name of the proposed contractor, scope of the contract and compensation.” Public Notification A Notice of Public Hearing for the expenditure of Culver City funds for the construction of the Firing Range project was placed in the Classified Section of the November 30, 2006 Los Angeles Times and the Public Notice Section of the December 7, 2006, issue of Culver City News. Staff is recommending that the City Council approve an exception to Public Works bidding procedures, as allowed, and award the contract to Fast-Track Corporation, based on staff’s determination that their bid proposal is the most responsive (see November 13, 2006, City Council Agenda report attachment). As stated in the old City Charter Section 13.04, a 4/5ths majority vote is required of the City Council to approve the exception to procedures for awarding Public Works contracts. FISCAL ANALYSIS: The base bid proposal by Fast-Track is $581,772.25. In the November 13, 2006, City Council agenda report, staff recommended a not-to-exceed contract amount of $650,000 to allow for construction contingencies. Under the advice of the City Attorney’s office, staff is recommending a not-to-exceed contract amount per the base bid submitted by Fast-Track of $581,772.25 and to include the contingency (difference between $650,000 and $581,772.25 = $68,227.75) in the change order authority of the Public Works Director/City Engineer and Police Chief. This $68,227.75 added to the previously approved $65,000 change order authority provides for a total change order authority of $133,227.75. The $133,227.75 contingency amounts equates to 22.9% of the contract amount. The reason for this relatively large contingency amount is the nature of design-build contracts. Design- build contracts need larger contingencies because the design is only in a conceptual stage at the time of project award. As design refinements occur, it is expected that unforeseen issues or conditions may arise that will increase the overall project cost. A larger contingency, therefore, provides more flexibility during the final design process to ensure that the end product fully meets expectations. The total amount of $715,000 is well within the amount budgeted for this project. ATTACHMENTS: 1. Council Agenda Report dated November 13, 2006 with attachments 2. Notice of Public HearingCity of Culver City, California City Council Agenda Item Report MOTIONS: That the City Council: 1) Approve an exception to the requirements set by City Charter for awarding Public Works contracts to the lowest bidder, 2) Award a design-build contract to Fast-Track Construction Corporation for a not- to-exceed cost of $581,772.25, to complete the necessary work for the Firing Range Rehabilitation Project, P-832, 3) Authorize the Public Works Director/City Engineer and the Police Chief to approve change orders in a not-to-exceed amount of $133,227.75, if necessary, and, 4) Authorize the City Attorney to prepare the necessary documents for the contract and authorize the City Manager to approve the documents. A 4/5ths vote is required. MEETING DATE: 12/14/06 AGENDA ITEM: Public Hearing and Consideration to Award a Design- Build Contract to Fast-Track Construction Corporation for the Police Firing Range Project ATTACHMENTS Pages|1010| Council Agenda Report dated November 13, 2006 with 1-4 attachments Notice of Public Hearing 5 Attachments 6-13[X] [X Fiscal Impact: Yes General Fund: Yes Public Hearing: Attachments: [X] ACtion:iitern Contact Persons/Dept.- Elaine .Jeng/PVV Craig Bloor/PD Phone Number: (310) 253-5621 (310) 253-6105 Public Notification: Master Notification List on November-8, 2006,- Fast-Track Construction S.H E. . Engineering, and Metro Builders via fax on November 13, 2006. Department Approval: Charles a. Herbertson.(11/02/06 City Controller Approval: Marlee Chang 11/0712006) City Manager Approval: . Jerry B Fulwoocl . 11108/2006 City of Culver City, California City Council Agenda Item Report Meeting Date: 11/13/06 Item Number: A-9 AGENDA ITEM: Award of a Design-Build Contract to Fast-Track Construction Corporation for the Design and Construction of the Police Department Firing Range Project RECOMMENDATION: Staff recommends the City Council award a design-build contract to Fast-Track Construction Corporation (Fast-Track) to complete the necessary work for the Police Firing Range Project, P-832. BACKGROUND: The demolition and environmental remediation of the existing Police Department Firing Range was completed in March 2005_ Subsequent to this completion, Gillis & Associates (Gillis) was retained by the City in April 2005 to provide conceptual design alternatives for a new Firing Range. In working with the Police Department (PD) and Public Works Department (PW) staff, Gillis provided conceptual designs alternatives that incorporated the types of equipment suitable and acceptable to the proposed use of the range. Frangible non- lead bullets are anticipated to be used at this facility and the accompanying equipment choices and building modifications will be included in this project_ Building components requiring upgrading in order to have a complete operational system include ventilation, lighting, fire proofing, and bullet proofing. In February 2006, the City Council approved the following motions: 1. Approve conceptual design #3 as presented by Gillis & Associates 2. Authorize the Public Works Director/City Engineer to advertise bids using the design-build format, and 3. Approve a budget amendment to allocate $466,000 from Fund 416 Asset Seizure to the Police Firing Range Project.City of Culver City, California City Council Agenda Item Report The Police Firing Range project had a budgeted amount of $509,000 for Fiscal Year 2005-2006. The addition of $466,000 would bring the total project budget to $975,000. The engineering estimate for the design concept #3 by Gillis was $975,000. The entire project budget is funded by Fund 416, Asset Seizure account. In June 2006, prior to the advertising of the issuance of the Design-Build Request for Proposal, PW staff held a status meeting with PD staff and the new Police Chief, Don Pedersen. The meeting resulted in the downsizing of the project scope. In summary, the acquisition of a targeting system was removed from the project (to be purchased under a separate contract), and the proposed structural changes to the ancillary space and the proposed bathrooms were deleted from the scope of the project. The—deletion—of—these—com-ponents—resulted—in—an—estirnatecl_savings_of_ $325,000, bringing the total estimated cost of the project from $975,000 to $650,000. DISCUSSION: The Design-Build RFP was prepared and reviewed by Gillis, PW and City Attorney staff. The project was advertised on August 29, 2006 with a closing date of October 18, 2006. A mandatory RFP pre-submittal meeting was held on September 13, 2006. In order to submit a RFP for the project, interested parties were required to attend the pre-submittal meeting. A total of eleven interested entities/companies attended the mandatory pre-submittal meeting. The RFP indicated proposals shall not exceed the project budget of $650,000. Any proposals presenting a cost exceeding the project budget will be disqualified. Three Design-Build proposals were received from the following companies: 1. Fast-Track Construction Corporation 2. S.H.E. Engineering & Construction Group Inc. 3. Metro Builders & Engineers The evaluation of the proposals was conducted by PW and PD staff. Fast-Track Construction Corporation The Design-Build proposal submitted by Fast-Track Construction Corporation (Fast- Track) was complete and responsive. Fast-Track demonstrated a clear understanding of the project scope. The format and presentation of material was well organized and defined in detail. The names of the proposed architect, vendors and subcontractors were clearly identified. Fast-City of Culver City, California City Council Agenda Item Report Track also included the resumes of the proposed architect for the project showing that Fast-Track has a well assembled team. The submitted RFP included price quotes directly from specialty subcontractors, architects and vendors. In each of the price quotes, the scope of services to be provided by each subcontractor or vendor was described. The base bid proposal presented by Fast-Track is $581,772.25. S.H.E. Engineering & Construction Group Inc. The Design-Build proposal submitted by S.H.E. Engineering & Construction Group inc. (S.H.E.) was complete and responsive. S.H.E. demonstrated minimal understanding of the project scope. Under each item of work as called out in the conceptual plan prepared by Gillis, S.H.E. provided a cost amount associated for each section of work with limited narratives. S.H.E. did not provide any information pertaining to the subcontractors, architects, vendors or engineers to be a part of the project team. Limited shop drawings were included in the RFP package but there was no indication as to the relation to the project scope of work. The base bid proposal provided by S.H.E. was $568,878. Metro Builders & Engineers The Design-Build proposal submitted by Metro Builders & Engineer (Metro) was not responsive because their bid proposal exceeded the maximum required $650,000, as described in the request for proposal. The base bid proposal presented by Metro Builders was $831,723. Based on the proposals received, staff recommends the selection of Fast-Track to complete the necessary work for the Firing Range Project. Fast-Track's proposal demonstrated its readiness and comprehension of the project scope of services.City of Culver City, California City Council Agenda Item Report FISCAL ANALYSIS: The Police Firing Range project has a budget amount of $975,000. The engineering estimate for the design concept #3 by Gillis was $975,000. The project budget is entirely funded by Fund 416, Asset Seizure fund account. The design-build portion of the firing range will utilize $650,000 of the adopted budget of $975,000. The targeting system for the Firing Range will be purchased under a separate contract. Combined, (the construction of the firing range and the installation of the targeting system) the total project cost will be within the overall project budget. The base bid proposal presented by Fast-Track is $581,772.25. Staff recommends a not-to-exceed contract amount of $650,000 to allow for construction contingencies and unforeseen conditions. ATTACHMENTS: 1. Conceptual Design by Gillis & Associates MOTIONS: That the City Council: 1. Authorize entering into a design-build contract with Fast-Track Construction related to the Police Firing Range Project, P832, for a not-to-exceed cost of $650,000; 2. Authorize the Public Works Director/City Engineering and Police Chief to approve change orders in a not-to-exceed amount of $65,000, if necessary; and 3. Authorize the City Attorney to prepare the necessary documents for the contract and authorize the City Manager to approve the documents.CA/eft CITY PUBLIC WORKS DEPARTMENT NOTICE OF CULVER CITY CITY COUNCIL PUBLIC HEARING ON PROPOSED EXPENDITURE OF CULVER CITY POLICE DEPARTMENT ASSET SEIZURE FUNDS FOR THE FIRING RANGE PROJECT A public hearing has been scheduled to consider a request for use of the Culver City Police Department asset seizure funds in the amount of $581,772.25 and award a design-build contract to Fast-Track Construction Corporation for the reconstruction of the Culver City Police Firing Range project. The proposed project will consist of construction of a firing range within the basement leve -rof the existing P- olice —D- epartmenrbuilding. The newly renovated —basement level will accommodate a firing range, range master room, and shooter prepping room. The public hearing will be heard on Monday, December 11, 2006 The meeting will start at 7:00 P.M. and will be held in the Mike Balkman Council Chambers — City Hall 9770 Culver Boulevard Culver City, CA 90232 The Council Chambers are accessible to disabled persons and free underground public parking is available in the City Hall Parking garage, which is entered from Duquesne Avenue. Other items may precede this item on the agenda. You may obtain copies of the agenda report from the City Clerk's Office at City Hall, or via the Internet at: www.culvercitv.ordiadendas. For more information, or to view a summary of the proposed project, or to submit written comments contact Ms. Elaine Jeng, Public Works Project Manager, Culver City Public Works Department, (310) 253-5621. City Hall is open Monday through Friday, 7:30 A.M. to 5:30 P.M., except alternate Fridays. City Hall will be closed Friday, December 8, 2006 and Friday, December 22, 2006. CULVER CITY RANGE GILLIS 0 ASSOCIATES ARCHITECTS, INC. Donald Gillis, NA PRINCIPAL-IN-CHARGE Jack Panichapan, NA PROJECT ARCHITECT IMPROVEMENT FACILITY we DRAWW PROGRESS PRINTS CHEOED SC FM SATE August MI6 JOB KU VICK FILE .4 ...rm= 71. damn!, maim Cribure Mc.= hem. me Ole am=14. pmer.er,and my. ele run.= any fonn ..m. pmmloyesen pen.= of. GM apemmom|1010|Improvement Facility Culver City Rari8e Cover Sheet PHASE II 9770 CULVER BOULEVARD, CULVER CITY, CA 90232-0507 1 Cover Sheet 2 Overall Hocir Plan 3 Existing Floor Plan 4 New Floor Plan 5 Enlarged Floor Plan 6 Section 7 Electricai Conmpt Plan 8 HVAC Concept Plan SHEET INDEX ARCHITECTURAL CONCEPT DESIGN: VICINITY MAP (NOT TO SCALE) 0 LOCATION MAP (NOT TO SCALE) -0- fLQILLIS WASSOCIA I .ES fk RCIIIT-ECTS,INC 2900 BRISTOL STREET COSTA MESA CALIFORNIA 92626 FAX (714) 668-4263 SUITE 13-205 TB. (714) 6684260 CULVER CM' RANGE4o LEGEND: %OSEPA, -‘ Nil C-7955 2990 IIRISTOL STREET COSTA MESA EALIFORNIA 92626 - . FAX (714) 668-4265 SUITE 0-205 TEL (714) 668-4260 cr"-c' PZ0.* tciJILLIS LgASSOCIAI ES A 12 cHIT V CTeLINC OVERALL FLOOR PLAN & SCOPE OF WORK "J Scale 3,116^ =1,17 PROGRESS PRINTS NEW HVAC,ELECTRICAL LIGHTING AND CEILING. SEE DRAWING S. DRAWIt Sid GM AI Was F.arroi DEOZEI *roman end [Ix Me dm ten. ore Me eap107.1.13pe7/ FCTR Marts, wrkicrt OM • ...ztee. Improvement Facility Culver City Rangc Overall Floor Plan INDICATING SCOPE OF WORKUP re ILLIS ASSOCIN1 ES AR CHITECT&INC BOO BRISTOL STREET COSTA MESA CALIFORNIA 92626 FAX (714) 668-4765 sot G-205 TEL (714) 658-4250 SNECKECe - Scale 3/16" 1,0" DRAM Safi C EXISTING FLOOR PLAN ) Yehtens 1115.4an. And cle orunsas ...ea nen. inea. cL are Inv not WM. MOOrfn .n.n.e.nnntraten,...14ems•am., II II II II Fl STUMM f|109| 1 11 1 II II] 11111111111 11 1 I 1 1 1 1 1 1 1 1 1170Tfr 1 1 1 1 1 111 11 |99| 1 f 11111 I 1 [ I lII 1I1I ITl TrTfl L L _I t _L L _I_|10109| 1|1010|[III III 1 1 11 IL _ _I_ _L. _I|109| 1 1|1010|PROGRESS PRINTS Improvement Facility Cuivor City Ran8c r Existing Floor PlanILLIS ASSOCIA 1 ES ARCIIITECT&INC MO BRISTOL STREET COSTA MESA CALIFORNIA 92626 FAX (714) 668-4265 SATE G-295 TEL (714) 668-4269 NEW FLOOR PLAN — Scale : Of16" - 1,0" KEY NOTES: I 1. NO b I RUCTURAL CHANGES TO THE BUILDING. 2. PROVIDE AND INSTALL A BULLET TRAP. 3. PROVIDE AND INSTALL OVERHEAD BAFFLES. 4. PROVIDE AND INSTALL NEW HVAC SYb IOC 5. PROVIDE AND INSTALL REQUIRED ELECTRICAL. 6. PROVIDE AND INSTALL BALLISTIC RUBBER WALL SURFACE. BALLISTIC RUBBER TRAP OR HELICAL TRAP. NEW HVAC SYSTEM. BALLISTIC COVERED WALL SURFACE. LINES DENOTE LANES FOR RANGE. OVERHEAD METAL BAFFLES. CLOSE IN EXISTING DOOR OPENING. NEW BULLETPROOF DOOR AND FRAME. NEW BULLETPROOF FRAME AND GLAZING. NEW BULLETPROOF DOOR AND FRAME. . • ..... '•••'••• • . . . . . . /-°|109| T 1 I rIrI i-i|109| I 1 I I 1 111111111111111 111111111111111 I ±- 1 —1 H- I — H — — 1 H — —1 111111111111111111 PIT T T F — — 11111111 —1 — -L _I_ _L _I 1 1 —1-1 111111111 — +- —1 —I H 111111111 1-1- T — I — T —1 T — I — T — T T — 1 — T — I — T — 1 — T —I T — 1 — T --I a_ _1_ 1_ 1 1 1 1 1 _ 1_ _1_ I_ _1_ 1 _L__L 1 L •••-_€) PROGRESS PRINTS MAME Saff DM August 216 GPIDElk xe ikISC FOR F41. 11...7.1.ment wwl seitc.e hercla wrc the ~OW Par." ol, wal ro, nepraseoñfl&m Stc %roam prmaitlw Improvement Facility Culver City 1:2an8e New Floor Plan 1...20)111•11•n• • HALL 006 1 UP STORAGE 1 004 1 ommumm- mi NINE IN • m 1.11111M1.1 CD f Existing Floor Plan CD ENLARGED EXISTNG FLOOR PLAN — Scale : 3,1r = 1'47 STORAGE C) - PARTIAL REFLECTED CEILING PLAN Scale 3/13" = KEYNOTES: 21(2 CEILING GRID W/ ACOUSTICAL TILES. (NEW) 10 RECESSED 2X2' FIXTURE IN ACCESSIBLE CEILING. (NEW) ILLIS ASSOCIA I ES ADCIIITECTS.114C. 2900 BRISTOL STREET arrA MESA CAUT-ORNIA 92626 FAX (714) 604265 SUITE G-2115 TEL (714) 668-4260 PROGRESS PRINTS STORAGE RANGE MASTER I 003|109| 002 I SATE Poost11105 amos ftrcnaws Itipte ft* MEM: 204 711. Onarn mad Os inet amt. Ivre. svrtm 1. ana er. te aura •, arm Nan p••••• vor.9. parnEnien cr. GM lidmagaz. vir FLE Improvement Facility Culver City RanseRANGE MASTER CLG. F. F. STORAGE NEW BAFAES SHOOTING RANGE CD SECTION — Sale: 114" = 1C ADCHITECTS. 1 8 C 2908 BRISTOL STREET COSTA MESA CALIFORNIA 92626 FAX (724) 668-1265 SUITE 0-285 Ta f714) 668-4260 p,OILLIS W, ASSOCIA I ES PLUM; SO DATE Aaiusl7206 HE02101: 1041140.: SCFLIR FRE PROGRESS PRINTS Yen (C) lwres Paav. Ink Mayne= riff anuore datber•rein :once. mgnite palm cr, no may not te ns.0:43. .1.1 Wax. Pe MINI. perrrisam 9.1, Ms Improvement Facility Culver City Pange\ / ELECTRICAL LEGEND: CEILING mOuNNTED RECEPTAC/E @ED FOOT LINE FOG mOTORTZED TARGETING SYSTEM (TIP., 5 qrr. EAth LINE) (F) INAPLEt RECEPTACLE, WALL MOUNTED AT +10 A.F.E. OR AS NOTED GFI GROUND FAULT INTERRUPITR RECEPTACLE, WALL MOUNTED AT +113" A.F.F. DRAG NOTED Istil TELEPHONE OUTLET BOX, WALL MOUNTED AT +18 A.F.F. ( MIN.) OR AS NOTED STUB A 3/4" CO. UP 6" ABOVE THE ACCESSIBLE CEILING AND PROVIDE A EASHING. 41/DP MINIMUM WI SINGLE -GANG RING KI DATA OUTLET BOX MOUNTED AT +18 A.F.F. (MIN.) OR AS NOTED STUB A 3/4" CO. UP 15' ABOVE THE ACCESSU1LE CEILING AND PROWDE A BUSHING. 45/DP MINIMUM WI SINGLE GANG RIMS J tn s. COMMERCIAL WIDE STRIP FLDORESCENT FIXTURE ELECTRONIC BAIIAST, U.L. LISTED, SPEGLAL DIMMING BALUISTS FROM urrgoN Improvement Facility Culver City Q.ari8e ( Electrical Concept Plan I 7 1 LgASSOCIAI ES ARCHITfCTS.INC 2900 BRISTOL STREET COSTA MESA CALIFORNIA 92626 FAX (714) MS-426S SUITE G-205 TEL (714) 669-4260 SAT PROGRESS PRINTS DILAVAL CHECCE:c 5CFCII CATE Awe 2006 a Atka Caen. 714, caosnenc•nd soggraa mg cc a nwf ts Med. mou. re can. "loam vanIM,... • IDENO. Me+ FILE GTE STORAGE RANGE HAMA STORAGE I 0023 OR ) ELECTRICAL CONCEPT PLAN — Scale : 3/16" = r-o- r- .1 —|109| SHOOTB1G V.• IMMI n-4 L51 UPLEGEND: MECHANICAL DIFFUSER HAIJST AIR DUCT CEILING 1Z RISER, KEYNOTES: Ig GERING DIFFUSER. © RISER, odinusr AIR INKT. @I SUPPLY DUCT DISTRIBUMS AIR INTO CBUNG PLBIUM WITH EGG CENTS OR PERFORATED SHEET METAL DISIITIBUTION, 10 SUPPORT EXHAUST INLET PLENUM FROM THE ROM LOW FILTERED SUPPLY AIR INLET, A 4 Sc SOCIA I'ES MO BRET° FAX ERASER ERT 3011 1710.74:17 AL FILE IIITECTS.INC SUITE G-205 TEL (714) 6664260 PROGRESS PRINTS COSTA MESA CALIFORNIA 92626 (714) 668-4265|1010| Aim,. .0•CrIG. itornnt decklaa are she repmdua ,,........ 1n1 snOrnago Wu .act.,0 LLIS Improvement Facility Culver City Ranir HVAC Concept Plan I 8 FIVAC CONCEPT PLAN — J Sole; 3/16- =|1010 13|