Staff recommends the City Council:
1) Approve an exception to the requirements for awarding Public Works Contract to
the lowest bidder,
2) Award a design-build contract to Fast-Track Construction Corporation (Fast-
Track), for a not-to-exceed cost of $581,772.25, to complete the necessary work
for the Firing Range Rehabilitation Project, P-832.
3) Authorize the Public Works Director/City Engineer and the Police Chief to
approve change orders in a not-to-exceed amount of $133,227.75 if necessary;
and
4) Authorize the City Attorney to prepare the necessary documents for the contract
and authorize the City Manager to approve the documents.
A 4/5ths vote is required.
PROCEDURES:
1. Mayor seeks motion to receive and file the affidavit and notice of publication.
2. Mayor calls on staff for a brief report.
3. Mayor declares the Public Hearing open, and calls upon the public for comment.
4. Mayor seeks a motion to close the Public Hearing.
Meeting Date: 12/11/06 Item Number: PH-3
AGENDA ITEM: Public Hearing for the Consideration to Approve an Exception to
the Usual Method for Awarding a Public Works Contract, and Award a Design-
Build Contract to Fast-Track Construction Corporation for the Firing Range
Rehabilitation Project
Contact Persons/Dept.:
Elaine Jeng/PW; Craig Bloor/PD
Phone Number:
(310) 253-5621; (310) 253-6105
Fiscal Impact: Yes [X] No [ ] General Fund: Yes [] No [X]
Public Hearing: [X] Action Item: [ ] Attachments: [X]
Public Notification:
Master Notification List on December 7, 2006.
Public Notification Advertisement in the Los Angeles Times, on November 30, 2006 and
in the Culver City News on December 7, 2006.
Department Approval:
Charles D. Herbertson 12/01/06
City Manager Approval:
City Controller Approval: City Attorney Approval:City of Culver City, California
City Council Agenda Item Report
5. City Council discusses the matter and arrives at its decision.
BACKGROUND/DISCUSSION:
On November 13, 2006, the City Council approved the following motions:
Authorize entering into a design-build contract with Fast-Track Construction
related to the Firing Range Project, P832, for a not-to-exceed cost of
$650,000;
Authorize the Public Works Director/City Engineer and the Police Chief to
approve change orders in a not-to-exceed amount of $65,000, if necessary;
and
Authorize the City Attorney to prepare the necessary documents for the
contract and authorize the City Manager to approve the documents.
Recently the City Attorney’s office discovered that since the project did not award
the design-build contract to the lowest bidder, an exception for awarding Contracts
for Public Works projects as permitted by the City’s Charter must be approved the
City Council.
Staff recommended that the City Council award a contract to Fast-Track because
their bid proposal was the most responsive of the three submitted.
Section 1304 of the previous City Charter established the procedures for awarding
public works contracts to the lowest responsible bidder. That section also permitted
the City Council to approve exceptions to that requirement after a public hearing.
Section 2007 of the recently adopted Charter provides the previous Section 1304
provisions shall continue in effect until new regulations are established by ordinance.
Those new regulations have not yet been established.
Former City Charter Section 1304 states, in part, the following:
“Every public works project to be performed by an independent contractor
involving an expenditure of more than Twenty-Five Thousand ($25,000.00)
Dollars… shall be let to the lowest responsible bidder after notice by publication
in the newspaper designated by the City Council pursuant to Section 517 hereof
by two or more insertions, the first of which shall be at least ten days before the
time of opening bids.
The City Council by four affirmative votes may award such a contract without
complying with bidding procedures provided a public hearing is held on the
award of the contract. Notice of the public hearing shall be published as City of Culver City, California
City Council Agenda Item Report
provided hereinabove and shall state the name of the proposed contractor, scope
of the contract and compensation.”
Public Notification
A Notice of Public Hearing for the expenditure of Culver City funds for the
construction of the Firing Range project was placed in the Classified Section of the
November 30, 2006 Los Angeles Times and the Public Notice Section of the
December 7, 2006, issue of Culver City News.
Staff is recommending that the City Council approve an exception to Public Works
bidding procedures, as allowed, and award the contract to Fast-Track Corporation,
based on staff’s determination that their bid proposal is the most responsive (see
November 13, 2006, City Council Agenda report attachment). As stated in the old
City Charter Section 13.04, a 4/5ths majority vote is required of the City Council to
approve the exception to procedures for awarding Public Works contracts.
FISCAL ANALYSIS:
The base bid proposal by Fast-Track is $581,772.25. In the November 13, 2006,
City Council agenda report, staff recommended a not-to-exceed contract amount of
$650,000 to allow for construction contingencies. Under the advice of the City
Attorney’s office, staff is recommending a not-to-exceed contract amount per the
base bid submitted by Fast-Track of $581,772.25 and to include the contingency
(difference between $650,000 and $581,772.25 = $68,227.75) in the change order
authority of the Public Works Director/City Engineer and Police Chief. This
$68,227.75 added to the previously approved $65,000 change order authority
provides for a total change order authority of $133,227.75. The $133,227.75
contingency amounts equates to 22.9% of the contract amount. The reason for this
relatively large contingency amount is the nature of design-build contracts. Design-
build contracts need larger contingencies because the design is only in a conceptual
stage at the time of project award. As design refinements occur, it is expected that
unforeseen issues or conditions may arise that will increase the overall project cost.
A larger contingency, therefore, provides more flexibility during the final design
process to ensure that the end product fully meets expectations. The total amount
of $715,000 is well within the amount budgeted for this project.
ATTACHMENTS:
1. Council Agenda Report dated November 13, 2006 with attachments
2. Notice of Public HearingCity of Culver City, California
City Council Agenda Item Report
MOTIONS:
That the City Council:
1) Approve an exception to the requirements set by City Charter for awarding Public
Works contracts to the lowest bidder,
2) Award a design-build contract to Fast-Track Construction Corporation for a not-
to-exceed cost of $581,772.25, to complete the necessary work for the Firing
Range Rehabilitation Project, P-832,
3) Authorize the Public Works Director/City Engineer and the Police Chief to
approve change orders in a not-to-exceed amount of $133,227.75, if necessary,
and,
4) Authorize the City Attorney to prepare the necessary documents for the contract
and authorize the City Manager to approve the documents.
A 4/5ths vote is required.
MEETING DATE: 12/14/06
AGENDA ITEM:
Public Hearing and Consideration to Award a Design-
Build Contract to Fast-Track Construction Corporation for
the Police Firing Range Project
ATTACHMENTS
Pages|1010| Council Agenda Report dated November 13, 2006 with
1-4
attachments
Notice of Public Hearing
5
Attachments 6-13[X] [X Fiscal Impact: Yes General Fund: Yes
Public Hearing: Attachments: [X] ACtion:iitern
Contact Persons/Dept.- Elaine .Jeng/PVV
Craig Bloor/PD
Phone Number: (310) 253-5621
(310) 253-6105
Public Notification:
Master Notification List on November-8, 2006,- Fast-Track Construction S.H E.
.
Engineering, and Metro Builders via fax on November 13, 2006.
Department Approval:
Charles a. Herbertson.(11/02/06
City Controller Approval:
Marlee Chang 11/0712006)
City Manager Approval:
. Jerry B Fulwoocl . 11108/2006
City of Culver City, California
City Council Agenda Item Report
Meeting Date: 11/13/06
Item Number: A-9
AGENDA ITEM: Award of a Design-Build Contract to Fast-Track Construction
Corporation for the Design and Construction of the Police Department Firing
Range Project
RECOMMENDATION:
Staff recommends the City Council award a design-build contract to Fast-Track
Construction Corporation (Fast-Track) to complete the necessary work for the Police
Firing Range Project, P-832.
BACKGROUND:
The demolition and environmental remediation of the existing Police Department
Firing Range was completed in March 2005_ Subsequent to this completion, Gillis &
Associates (Gillis) was retained by the City in April 2005 to provide conceptual
design alternatives for a new Firing Range.
In working with the Police Department (PD) and Public Works Department (PW)
staff, Gillis provided conceptual designs alternatives that incorporated the types of
equipment suitable and acceptable to the proposed use of the range. Frangible non-
lead bullets are anticipated to be used at this facility and the accompanying
equipment choices and building modifications will be included in this project_ Building
components requiring upgrading in order to have a complete operational system
include ventilation, lighting, fire proofing, and bullet proofing.
In February 2006, the City Council approved the following motions:
1. Approve conceptual design #3 as presented by Gillis & Associates
2. Authorize the Public Works Director/City Engineer to advertise bids using the
design-build format, and
3. Approve a budget amendment to allocate $466,000 from Fund 416 Asset
Seizure to the Police Firing Range Project.City of Culver City, California
City Council Agenda Item Report
The Police Firing Range project had a budgeted amount of $509,000 for Fiscal Year
2005-2006. The addition of $466,000 would bring the total project budget to
$975,000. The engineering estimate for the design concept #3 by Gillis was
$975,000. The entire project budget is funded by Fund 416, Asset Seizure account.
In June 2006, prior to the advertising of the issuance of the Design-Build Request for
Proposal, PW staff held a status meeting with PD staff and the new Police Chief,
Don Pedersen. The meeting resulted in the downsizing of the project scope. In
summary, the acquisition of a targeting system was removed from the project (to be
purchased under a separate contract), and the proposed structural changes to the
ancillary space and the proposed bathrooms were deleted from the scope of the
project. The—deletion—of—these—com-ponents—resulted—in—an—estirnatecl_savings_of_
$325,000, bringing the total estimated cost of the project from $975,000 to $650,000.
DISCUSSION:
The Design-Build RFP was prepared and reviewed by Gillis, PW and City Attorney
staff. The project was advertised on August 29, 2006 with a closing date of October
18, 2006. A mandatory RFP pre-submittal meeting was held on September 13,
2006. In order to submit a RFP for the project, interested parties were required to
attend the pre-submittal meeting. A total of eleven interested entities/companies
attended the mandatory pre-submittal meeting.
The RFP indicated proposals shall not exceed the project budget of $650,000. Any
proposals presenting a cost exceeding the project budget will be disqualified.
Three Design-Build proposals were received from the following companies:
1. Fast-Track Construction Corporation
2. S.H.E. Engineering & Construction Group Inc.
3. Metro Builders & Engineers
The evaluation of the proposals was conducted by PW and PD staff.
Fast-Track Construction Corporation
The Design-Build proposal submitted by Fast-Track Construction Corporation (Fast-
Track) was complete and responsive.
Fast-Track demonstrated a clear understanding of the project scope. The format
and presentation of material was well organized and defined in detail. The names of
the proposed architect, vendors and subcontractors were clearly identified. Fast-City of Culver City, California
City Council Agenda Item Report
Track also included the resumes of the proposed architect for the project showing
that Fast-Track has a well assembled team.
The submitted RFP included price quotes directly from specialty subcontractors,
architects and vendors. In each of the price quotes, the scope of services to be
provided by each subcontractor or vendor was described.
The base bid proposal presented by Fast-Track is $581,772.25.
S.H.E. Engineering & Construction Group Inc.
The Design-Build proposal submitted by S.H.E. Engineering & Construction Group
inc. (S.H.E.) was complete and responsive.
S.H.E. demonstrated minimal understanding of the project scope. Under each item
of work as called out in the conceptual plan prepared by Gillis, S.H.E. provided a
cost amount associated for each section of work with limited narratives. S.H.E. did
not provide any information pertaining to the subcontractors, architects, vendors or
engineers to be a part of the project team. Limited shop drawings were included in
the RFP package but there was no indication as to the relation to the project scope
of work.
The base bid proposal provided by S.H.E. was $568,878.
Metro Builders & Engineers
The Design-Build proposal submitted by Metro Builders & Engineer (Metro) was not
responsive because their bid proposal exceeded the maximum required $650,000,
as described in the request for proposal.
The base bid proposal presented by Metro Builders was $831,723.
Based on the proposals received, staff recommends the selection of Fast-Track to
complete the necessary work for the Firing Range Project. Fast-Track's proposal
demonstrated its readiness and comprehension of the project scope of services.City of Culver City, California
City Council Agenda Item Report
FISCAL ANALYSIS:
The Police Firing Range project has a budget amount of $975,000. The engineering
estimate for the design concept #3 by Gillis was $975,000. The project budget is
entirely funded by Fund 416, Asset Seizure fund account.
The design-build portion of the firing range will utilize $650,000 of the adopted
budget of $975,000. The targeting system for the Firing Range will be purchased
under a separate contract. Combined, (the construction of the firing range and the
installation of the targeting system) the total project cost will be within the overall
project budget.
The base bid proposal presented by Fast-Track is $581,772.25. Staff recommends
a not-to-exceed contract amount of $650,000 to allow for construction contingencies
and unforeseen conditions.
ATTACHMENTS:
1. Conceptual Design by Gillis & Associates
MOTIONS:
That the City Council:
1. Authorize entering into a design-build contract with Fast-Track Construction
related to the Police Firing Range Project, P832, for a not-to-exceed cost of
$650,000;
2. Authorize the Public Works Director/City Engineering and Police Chief to approve
change orders in a not-to-exceed amount of $65,000, if necessary; and
3. Authorize the City Attorney to prepare the necessary documents for the contract
and authorize the City Manager to approve the documents.CA/eft CITY
PUBLIC WORKS DEPARTMENT
NOTICE OF CULVER CITY CITY COUNCIL PUBLIC HEARING ON PROPOSED
EXPENDITURE OF CULVER CITY POLICE DEPARTMENT ASSET SEIZURE FUNDS
FOR THE FIRING RANGE PROJECT
A public hearing has been scheduled to consider a request for use of the Culver City
Police Department asset seizure funds in the amount of $581,772.25 and award a
design-build contract to Fast-Track Construction Corporation for the reconstruction of the
Culver City Police Firing Range project.
The proposed project will consist of construction of a firing range within the basement
leve -rof the existing P- olice —D- epartmenrbuilding. The newly renovated —basement level will accommodate a firing range, range master room, and shooter prepping room.
The public hearing will be heard on
Monday, December 11, 2006
The meeting will start at 7:00 P.M. and will be held in the
Mike Balkman
Council Chambers — City Hall
9770 Culver Boulevard
Culver City, CA 90232
The Council Chambers are accessible to disabled persons and free underground public
parking is available in the City Hall Parking garage, which is entered from Duquesne
Avenue. Other items may precede this item on the agenda.
You may obtain copies of the agenda report from the City Clerk's Office at City Hall, or
via the Internet at:
www.culvercitv.ordiadendas.
For more information, or to view a summary of the proposed project, or to submit written
comments contact Ms. Elaine Jeng, Public Works Project Manager, Culver City Public
Works Department, (310) 253-5621.
City Hall is open Monday through Friday, 7:30 A.M. to 5:30 P.M., except alternate
Fridays. City Hall will be closed Friday, December 8, 2006 and Friday, December 22,
2006.
CULVER CITY RANGE
GILLIS 0 ASSOCIATES ARCHITECTS, INC.
Donald Gillis, NA
PRINCIPAL-IN-CHARGE
Jack Panichapan, NA
PROJECT ARCHITECT
IMPROVEMENT FACILITY
we DRAWW
PROGRESS PRINTS
CHEOED
SC FM
SATE August MI6
JOB KU VICK
FILE
.4 ...rm=
71. damn!, maim Cribure Mc.= hem. me Ole
am=14. pmer.er,and my. ele run.= any fonn
..m. pmmloyesen pen.= of. GM apemmom|1010|Improvement Facility
Culver City Rari8e
Cover Sheet
PHASE II
9770 CULVER BOULEVARD, CULVER CITY, CA 90232-0507
1 Cover Sheet
2 Overall Hocir Plan
3 Existing Floor Plan
4 New Floor Plan
5 Enlarged Floor Plan
6 Section
7 Electricai Conmpt Plan
8 HVAC Concept Plan
SHEET INDEX
ARCHITECTURAL CONCEPT DESIGN:
VICINITY MAP (NOT TO SCALE) 0 LOCATION MAP (NOT TO SCALE) -0-
fLQILLIS WASSOCIA I .ES
fk RCIIIT-ECTS,INC
2900 BRISTOL STREET COSTA MESA CALIFORNIA 92626
FAX (714) 668-4263 SUITE 13-205 TB. (714) 6684260
CULVER CM'
RANGE4o
LEGEND:
%OSEPA,
-‘
Nil C-7955
2990 IIRISTOL STREET COSTA MESA EALIFORNIA 92626 - .
FAX (714) 668-4265 SUITE 0-205 TEL (714) 668-4260 cr"-c' PZ0.*
tciJILLIS LgASSOCIAI ES
A 12 cHIT
V
CTeLINC
OVERALL FLOOR PLAN & SCOPE OF WORK
"J Scale 3,116^ =1,17
PROGRESS PRINTS
NEW HVAC,ELECTRICAL
LIGHTING AND CEILING.
SEE DRAWING S.
DRAWIt Sid GM
AI Was F.arroi
DEOZEI
*roman end [Ix Me dm ten. ore Me
eap107.1.13pe7/
FCTR Marts, wrkicrt OM • ...ztee.
Improvement Facility
Culver City Rangc
Overall Floor Plan
INDICATING SCOPE OF WORKUP
re
ILLIS ASSOCIN1 ES
AR CHITECT&INC
BOO BRISTOL STREET COSTA MESA CALIFORNIA 92626
FAX (714) 668-4765 sot G-205 TEL (714) 658-4250
SNECKECe
- Scale 3/16" 1,0"
DRAM Safi
C
EXISTING FLOOR PLAN )
Yehtens
1115.4an. And cle orunsas ...ea nen. inea.
cL are Inv not WM. MOOrfn
.n.n.e.nnntraten,...14ems•am.,
II
II
II
II
Fl
STUMM
f|109| 1
11 1 II II] 11111111111
11 1 I 1 1 1 1 1 1 1 1 1170Tfr 1 1 1 1 1
111 11 |99| 1 f 11111 I 1
[ I lII 1I1I ITl TrTfl
L L _I t _L L _I_|10109| 1|1010|[III
III 1 1
11
IL _ _I_ _L. _I|109| 1 1|1010|PROGRESS PRINTS
Improvement Facility
Cuivor City Ran8c
r Existing Floor PlanILLIS ASSOCIA 1 ES
ARCIIITECT&INC
MO BRISTOL STREET COSTA MESA CALIFORNIA 92626
FAX (714) 668-4265 SATE G-295 TEL (714) 668-4269
NEW FLOOR PLAN
— Scale : Of16" - 1,0"
KEY NOTES:
I
1. NO b I RUCTURAL CHANGES TO THE BUILDING.
2. PROVIDE AND INSTALL A BULLET TRAP.
3. PROVIDE AND INSTALL OVERHEAD BAFFLES.
4. PROVIDE AND INSTALL NEW HVAC SYb IOC
5. PROVIDE AND INSTALL REQUIRED ELECTRICAL.
6. PROVIDE AND INSTALL BALLISTIC RUBBER WALL SURFACE.
BALLISTIC RUBBER TRAP OR HELICAL TRAP.
NEW HVAC SYSTEM.
BALLISTIC COVERED WALL SURFACE.
LINES DENOTE LANES FOR RANGE.
OVERHEAD METAL BAFFLES.
CLOSE IN EXISTING DOOR OPENING.
NEW BULLETPROOF DOOR AND FRAME.
NEW BULLETPROOF FRAME AND GLAZING.
NEW BULLETPROOF DOOR AND FRAME.
.
• ..... '•••'••• •
. . . . . .
/-°|109| T 1 I rIrI i-i|109| I 1 I I 1
111111111111111
111111111111111 I
±- 1 —1 H- I — H — — 1 H — —1
111111111111111111
PIT T T
F
— —
11111111
—1 — -L _I_ _L _I 1 1 —1-1
111111111
— +- —1 —I H
111111111
1-1- T — I — T —1 T — I — T — T T — 1 — T — I — T — 1 — T —I T — 1 — T --I
a_ _1_ 1_ 1 1 1 1 1 _ 1_ _1_ I_ _1_ 1 _L__L 1 L
•••-_€)
PROGRESS PRINTS
MAME Saff
DM August 216
GPIDElk
xe
ikISC FOR
F41.
11...7.1.ment wwl seitc.e hercla wrc the
~OW Par." ol, wal ro, nepraseoñfl&m
Stc %roam prmaitlw
Improvement Facility
Culver City 1:2an8e
New Floor Plan 1...20)111•11•n• •
HALL
006 1
UP
STORAGE
1 004 1
ommumm-
mi NINE
IN • m
1.11111M1.1
CD
f Existing Floor Plan CD
ENLARGED EXISTNG FLOOR PLAN
—
Scale : 3,1r = 1'47
STORAGE
C)
-
PARTIAL REFLECTED CEILING PLAN
Scale 3/13" =
KEYNOTES:
21(2 CEILING GRID W/ ACOUSTICAL TILES. (NEW)
10 RECESSED 2X2' FIXTURE IN ACCESSIBLE CEILING. (NEW)
ILLIS
ASSOCIA I ES
ADCIIITECTS.114C.
2900 BRISTOL STREET arrA MESA CAUT-ORNIA 92626
FAX (714) 604265 SUITE G-2115 TEL (714) 668-4260
PROGRESS PRINTS
STORAGE
RANGE MASTER
I 003|109| 002 I
SATE Poost11105 amos ftrcnaws
Itipte ft*
MEM: 204
711. Onarn mad Os inet amt. Ivre.
svrtm 1. ana er. te aura •, arm Nan
p••••• vor.9. parnEnien cr. GM lidmagaz. vir FLE
Improvement Facility
Culver City RanseRANGE MASTER
CLG.
F. F.
STORAGE
NEW BAFAES
SHOOTING RANGE
CD
SECTION
— Sale: 114" =
1C
ADCHITECTS. 1 8 C
2908 BRISTOL STREET COSTA MESA CALIFORNIA 92626
FAX (724) 668-1265 SUITE 0-285 Ta f714) 668-4260
p,OILLIS W, ASSOCIA I ES
PLUM; SO DATE Aaiusl7206
HE02101: 1041140.:
SCFLIR FRE
PROGRESS PRINTS
Yen
(C) lwres Paav.
Ink Mayne= riff anuore datber•rein :once.
mgnite palm cr, no may not te ns.0:43. .1.1
Wax. Pe MINI. perrrisam 9.1, Ms
Improvement Facility
Culver City Pange\ /
ELECTRICAL LEGEND:
CEILING mOuNNTED RECEPTAC/E @ED FOOT LINE
FOG mOTORTZED TARGETING SYSTEM (TIP., 5 qrr.
EAth LINE)
(F) INAPLEt RECEPTACLE, WALL MOUNTED AT +10 A.F.E.
OR AS NOTED
GFI GROUND FAULT INTERRUPITR RECEPTACLE,
WALL MOUNTED AT +113" A.F.F. DRAG NOTED
Istil TELEPHONE OUTLET BOX, WALL MOUNTED AT +18 A.F.F.
( MIN.) OR AS NOTED STUB A 3/4" CO. UP 6" ABOVE
THE ACCESSIBLE CEILING AND PROVIDE A EASHING.
41/DP MINIMUM WI SINGLE -GANG RING
KI DATA OUTLET BOX MOUNTED AT +18 A.F.F. (MIN.)
OR AS NOTED STUB A 3/4" CO. UP 15' ABOVE
THE ACCESSU1LE CEILING AND PROWDE A BUSHING.
45/DP MINIMUM WI SINGLE GANG RIMS
J tn s.
COMMERCIAL WIDE STRIP FLDORESCENT FIXTURE
ELECTRONIC BAIIAST, U.L. LISTED, SPEGLAL
DIMMING BALUISTS FROM urrgoN
Improvement Facility
Culver City Q.ari8e
( Electrical Concept Plan I 7 1
LgASSOCIAI ES
ARCHITfCTS.INC
2900 BRISTOL STREET COSTA MESA CALIFORNIA 92626
FAX (714) MS-426S SUITE G-205 TEL (714) 669-4260
SAT
PROGRESS PRINTS
DILAVAL
CHECCE:c
5CFCII
CATE Awe 2006
a Atka Caen.
714, caosnenc•nd
soggraa mg cc a nwf ts Med. mou.
re can. "loam vanIM,... •
IDENO. Me+
FILE
GTE
STORAGE
RANGE HAMA
STORAGE
I 0023
OR
) ELECTRICAL CONCEPT PLAN
— Scale : 3/16" = r-o-
r- .1
—|109| SHOOTB1G
V.•
IMMI
n-4 L51
UPLEGEND: MECHANICAL
DIFFUSER
HAIJST AIR DUCT
CEILING
1Z RISER,
KEYNOTES:
Ig GERING DIFFUSER.
© RISER, odinusr AIR INKT.
@I SUPPLY DUCT DISTRIBUMS AIR INTO CBUNG PLBIUM
WITH EGG CENTS OR PERFORATED SHEET METAL DISIITIBUTION,
10 SUPPORT EXHAUST INLET PLENUM FROM THE ROM
LOW FILTERED SUPPLY AIR INLET,
A 4 Sc SOCIA I'ES
MO BRET°
FAX
ERASER ERT 3011 1710.74:17
AL FILE
IIITECTS.INC
SUITE G-205 TEL (714) 6664260
PROGRESS PRINTS
COSTA MESA CALIFORNIA 92626
(714) 668-4265|10 10| Aim,. .0•CrIG.
itornnt decklaa are she
repmdua ,,........ 1n1 snOrnago
Wu .act.,0
LLIS
Improvement Facility
Culver City Ranir
HVAC Concept Plan I 8
FIVAC CONCEPT PLAN
—
J Sole; 3/16- =|101013|