Legislation Details

File #: HIST-19109    Version: 1 Subject:
Type: Historical Status: Public Hearing
In control: City Council Meeting Agenda
On agenda: 4/2/2012 Final action: 4/2/2012
Title: PUBLIC HEARING - Adoption of a Resolution Approving a Tentative Tract Map to Subdivide the Property at 11957 Washington Boulevard into 31 Airspace Units for the Development of a 3-Story Mixed-Use Development (Retail and Residential).
Attachments: 1. PUBLIC HEARING - Adoption of a Resolution Approvin - PH-1__12-04-02_CDD__CITY COUNCIL__Planning_Marcasel TTM CC - FINAL.pdf, 2. PUBLIC HEARING - Adoption of a Resolution Approvin - 12-04-02_CDD_ATT_Tentative Tract Map_Marcasel.pdf
City of Culver City, California Agenda Item Report RECOMMENDATION: Staff recommends that the City Council adopt a resolution approving Tentative Tract Map No. 71799, TTM P-2011163 to subdivide the property into 31 airspace units (30 residential and one ground floor retail) subject to the recommended Conditions of Approval as stated in the proposed resolution. PROCEDURE: 1. Mayor seeks motion to receive and file the affidavit of mailing of public notice. 2. Mayor calls on staff for a brief staff report. 3. Mayor seeks a motion to open the public hearing. 4. The City Council receives comment from public. 5. Mayor seeks a motion to close the public hearing after all testimony has been presented. 6. The City Council discusses the matter and arrives at its decision. BACKGROUND: Project Description The proposed project consists of a new 55,019 square foot 3-story mixed use building with 8,682 square feet of ground floor commercial/retail space and two Meeting Date: 04/02/12 Item Number: PH -1 CITY COUNCIL AGENDA ITEM: PUBLIC HEARING - Adoption of a Resolution Approving a Tentative Tract Map to Subdivide the Property at 11957 Washington Boulevard into 31 Airspace Units for the Development of a 3-Story Mixed-Use Development (Retail and Residential). Contact Person/Dept.: Jose Mendivil, Thomas Gorham Phone Number: 310.253.5757 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [X] Action Item: [] Attachments: [X] Commission Action Required: Yes [X] No [] Date: 12/14/2011 Planning Commission Public Notification: Meetings and Agendas – City Council (03/30/12); On March 12, 2012, Master Notification List; Residents, Property Owners and Business within 500 feet of proposed project boundary. Department Approval: Sol Blumenfeld (03/29/12) City Attorney Approval: Carol Schwab (by H. Baker) (03/29/12) Chief Financial Officer Approval: Jeff Muir (03/29/12) City Manager Approval: John Nachbar (03/29/12) City of Culver City, California Agenda Item Report levels of dwelling units at 15 dwelling units per level for a total of 30 units. The project also includes one subterranean parking level and surface level parking. The total units proposed includes a density increase from the base 35 du/ac of 21 units to 50 du/ac or 30 units (an increase of 9 units) as allowed with a Community Benefit pursuant to City Council Resolution No. 2008-R015. The project will provide a total of 90 on-site parking spaces [four more than the minimum required by the Culver City Municipal Code (CCMC)]. There will be 23 surface parking spaces and 12 spaces in a one-level subterranean garage for visitors to the retail space, employees, and residential guests. The remaining 55 spaces, located in the subterranean garage, will be for the residential tenants. The project will provide on-site amenities for residents including private balconies, a central courtyard on the first residential level, a central common balcony access area on the second residential level, private landscaped areas for each unit, outdoor balcony fire places for half of the units, and private laundry facilities for each unit. Project Enhancements Staff has worked closely with the applicant to provide enhanced off-site and on-site improvements which will provide amenities to the neighborhood and address community concerns. The project will include offsite improvements including decorative sidewalk paving, benches, new street trees, and a pocket park consisting of an extra wide, tree lined pedestrian space (approximately 15 feet wide) along Marcasel Avenue. This extra wide sidewalk includes 10 feet of public sidewalk and 5 feet of private outdoor area which may also be used for outdoor dining in connection with the ground level retail. The decorative sidewalk and new street trees will continue along the Washington Boulevard frontage. Public bicycle parking will be installed along Washington Boulevard and Marcasel Avenue. The bicycle parking on the sidewalk will be augmented by 22 on-site bicycle parking spaces, which are 8 more than required by the City’s Bicycle Master Plan. Local traffic circulation improvements will include the conversion of Marcasel Avenue to a one-way street southbound and narrowing it to 24 feet, with a right turn only at Washington Boulevard which will address a concern of the residential community to the north of the project by eliminating cut-through traffic. The project will include a new 175 foot left-turn storage pocket on Washington Boulevard to accommodate westbound left-turn trips at the intersection of Inglewood and Washington Boulevards. This left-turn pocket will be delineated with a raised curb that will assist in preventing the maneuver currently observed of northbound Inglewood Boulevard traffic veering to northbound Marcasel Avenue. The project will provide a community benefit in the form of streetscape improvements consistent with the West Washington Area Improvement Plan (AIP). City of Culver City, California Agenda Item Report These streetscape improvements will provide a raised, curbed planted median that includes street trees, shrubs and ground covers, irrigation and lighting. The improvements will be maintained by the developer for 30 years. The selected community benefits will provide a much needed amenity at little or no capital cost to the City. On-site enhancements include an increased rear property line planter strip from the CCMC required 2 feet to 5 feet and relocation of the subterranean parking retaining wall 5 feet off of the rear property line in order to provide for planting of deep root columnar trees that have significant height and spread. This wider planter strip and tree planting will provide an enhanced privacy screen for the residential properties to the north. The project has also been conditioned to address some of the parking concerns raised by the community. This includes reducing the total number of tandem parking spaces from 24 (12 sets of two tandem spaces) to 14 spaces (7 sets of two tandem spaces) by reconfiguring 5 parking spaces so that they are accessed head- in from the shared drive aisle. Also, In the event that a parking district is established for the area along Atlantic Avenue (or other streets as may be appropriate), the applicant will provide funding to establish the parking district for one year, including installation of parking district signs, within Culver City and within the City of Los Angeles if so approved. Community Development staff will be facilitating the establishment of a parking district with the Public Works Department and the City of Los Angeles Department of Transportation. At the December 14, 2011 meeting, the Planning Commission adopted Resolution No. 2011-P005 (Attachment No. 2) conditionally approving the project’s Site Plan Review, SPR P-2011162; Administrative Modification, AM P-2011159; and Administrative Use Permit, AUP P-2011160; and recommending that the City Council approve Tentative Tract Map, TTM P-2011163. Approval by the City Council of Tentative Tract Map, TTM P-2011163 is required in order to subdivide the property into 30 residential condominium airspace units and one commercial/retail condominium airspace unit. The configuration of the condominium units will be finalized prior to the approval of the final tract map. Because the Site Plan Review, Administrative Modification, and Administrative Use Permit were approved by the Planning Commission with no appeals submitted, the Planning Commission’s decision regarding these entitlements has become final. The Tentative Tract Map is the only item under consideration by the City Council. City of Culver City, California Agenda Item Report DISCUSSION: The action requested of the City Council is the consideration of the Tentative Tract Map. Because the project is for condominium units, a one lot subdivision for condominium purposes is required. The Public Works Department reviewed the proposed condominium subdivision and found it to be in compliance with State and local regulations. The Planning Division, in its review of the subdivision, found it to be consistent with the General Plan and the CCMC. As noted above, the Planning Commission made the appropriate findings for the subdivision and made its recommendation to the City Council to approve the Tentative Tract Map. Findings The Planning Commission recommends that the City Council approve the Tentative Tract Map based on the findings pursuant to CCMC Section 15.10.265, as outlined below, and subject to the conditions of approval set forth in the proposed Resolution (Attachment No. 1). Section 15.10.265 of the CCMC authorizes the City Council to approve a Tentative Tract Map when the following findings can be made: A. The proposed map is consistent with the General Plan. B. The design of the proposed subdivision is consistent with the General Plan. C. The site is physically suitable for the type of development. D. The site is physically suitable for the proposed density of development. E. The design of the subdivision is not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. F. The design of the subdivision is not likely to cause serious public health problems. G. The design of the subdivision will not conflict with easements acquired by the public at large for access through or use of, property within the proposed subdivision. City of Culver City, California Agenda Item Report Environmental Determination Pursuant to the California Environmental Quality Act (CEQA) guidelines, an Initial Study was prepared and a Mitigated Negative Declaration (MND) finding was adopted by the Planning Commission on December 14, 2011 for the Marcasel Mixed Use project. This Tentative Tract Map application does not propose any changes to the previously approved application; no new information has become available and no changes in the approved project have been made since the Planning Commission’s adoption of the MND. Therefore, pursuant to Section 21166 of the Public Resources Code and Section 15162 of CEQA, no new environmental analysis is required for this subdivision application. FISCAL ANALYSIS: The project will result in construction of a total of 30 residential condominiums and ground level retail space consistent with the property zoning, a proposed street vacation and the Community Benefits provisions of the Mixed Use Ordinance.|1010| Through a street vacation, recommended by the City’s traffic engineer |1010| to accommodate project circulation, six additional units may be developed on the property since approximately ½ of the street width along Marcasel contiguous with the project will be eliminated and added to the subject property. The project is also subject to the Community Benefits provisions of the Mixed Use Ordinance.|1010| The street vacation will result in the construction of a “pocket park” of 750 square feet and the Community Benefits requirement will result in the construction of a landscaped median of 115 linear feet consistent with the Area Improvement Plan (AIP) program of streetscape improvements currently being installed along West Washington Boulevard. The pocket park, median and other street improvements have a construction value of approximately $800,000 and will include long term maintenance at the owner’s expense. The developer has also agreed to fund the cost for installation of preferential parking districts signs should such a district be formed in the residential area immediately to the north of the project. Also, the development will result in a projected increase in General Fund revenues based on Property, Sales, Business and Utility Users Taxes. In addition, the project will generate in lieu park fees of approximately $7,500 per unit for a total of approximately $225,000. City of Culver City, California Agenda Item Report CONCLUSION: Staff has worked closely with the applicant from project inception to guide its design in order to meet Zoning Code requirements, address community concerns, and create a mixed use residential development that promotes area redevelopment goals and is consistent with good planning practice. Based on the information contained herein and as recommended by staff and the Planning Commission, all of the required findings can be made for the project, and staff recommends approval of the Tentative Tract Map. NOTES: 1. Density calculation: ? Site Area under base density: 20,984 sf @ 35 du/ac (1:1245 sf) = 16.8 units Site Area with Community Benefit: 20,984 sf @ 50 du/ac (1:871 sf) = 24.1 units ? Site Area + Street Vacation Area under base density: 20,984sf + 5,896= 26,880 sf @ 35 du/ac (1:1245sf)= 21.5 units ? Site Area + Street Vacation Area with Community Benefit: 20,984sf + 5,896= 26,880 sf @ 50 du/ac (1:871 sf) =30.8 units ? Net gain in units with inclusion of street vacation area = 6 (30 units with vacation area vs. 24 units without vacation area). 2. The Engineering Division initially recommended fully closing Marcasel Avenue from the City boundary to Washington Boulevard but ultimately determined to make Marcasel Avenue a one-way street for southbound traffic. Engineering further conditioned the developer to install a raised median on Washington Boulevard to eliminate any turning movements from eastbound Washington Boulevard to Marcasel Avenue. The one-way portion of Marcasel Avenue was to be one 14 foot wide drive lane and a ten foot wide sidewalk along the east side of the street. Since the existing Right of Way portion of Marcasel Avenue is 80 feet wide, the easterly 46 feet of the Right of Way would no longer be needed for street purposes and therefore a street vacation reverting this portion of the street to the underlying fee owner could be required. 3. $268,000 Community Benefit Contribution $103,593 Community Benefit Construction. Estimate for construction based on linear footage calculated from AIP Phase I and Phase II = $900.81 per foot X 115’ = $103,593. $164,407 Net Community Benefit Contribution allocated to maintenance / $4,600 per year = 35 years. Estimate for maintenance based on 115 linear feet is $40 per foot X 115 = $4,600 per year. ATTACHMENTS: 1. Proposed City Council Resolution. 2. Planning Commission Resolution No. 2011-P005. 3. Tentative Tract Map No. 71799. 4. Vicinity Map. 5. Preliminary Development plans dated November 23, 2011 (for reference only). 6. Letter from Bastion (Applicant). City of Culver City, California Agenda Item Report MOTIONS: That the City Council: Adopt a Resolution approving Tentative Tract Map, TTM P-2011163 (Tentative Tract Map No. 71799) to subdivide the property into 30 residential condominium airspace units and one commercial/retail condominium airspace unit, subject to the recommended Conditions of Approval contained in the Resolution. MEETING DATE: 04/02/12 AGENDA ITEM: CITY COUNCIL AGENDA ITEM: Public Hearing for Consideration by the City Council of a Tentative Tract Map, to subdivide the property at 11957 Washington Boulevard into 31 airspace units (30 residential and one ground floor retail) for the development of a 3-Story Mixed-Use Development (Retail and Residential. ATTACHMENTS Pages 1. Proposed City Council Resolution No. 2012-R___ approving 1 - 6 Tentative Tract Map, TTM P-2011163 (Tentative Tract Map No. 71799). 2. Planning Commission Resolution No. 2011-P005. 7 - 44 3. Tentative Tract Map No. 71799. 45 4. Vicinity Map. 46 5. Preliminary Development plans dated November 23, 2011 47 - 59 (for reference only). 6. Letter From Bastion (Applicant). 60 - 61 Attachment No. 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 10 Page 11 Page 13 Page 15 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Attachment No. 3 Page 45 Page 46 Attachment No. 5 Page 47 Page 48 Page 49 ffiffiF.A,,$ffiQA$ February 2,2012 Mr. Sol Blumenfeld Community Development Director Culver City 9770 Culver Boulevard Culver City,90232 RE: Washington/Marcasel Dear Sol, I would like to address a comment made by one of the Planning Commissioners regarding the inoeased densiq, (unit count) of our Project as a result of the vacation of a portion of Marcasel Avenue and point out the following: The rationale for the vacation of a portion of Marcasel - which was promoted by City Staff - was two fold: First, Marcasel was over the City standard width for a secondary street. Consequently the 2A feet of roadway easement (now improved as a sidewalk) was not required for vehicular ffatfic and so was deemed surplus. Stafls recommendation was that this would be best vacated and, since the fee ownership still remained with us as owners of the adjacent property, the properly would revert to our ownership once the City easement was vacated. The areavacaled could then be used to create a pocket park to serve the community with added open space. Stafffelt that it would complement the landscaped medians and other improvements that are being developed in the area. Secondly, and most importantly, the intersection of Inglewood, Marcasel and Washington was deemed unsafe by the various concerned Culver City departments. Indeed, as one of the City Planning Commissioners pointed out in our Planning Commission hearing, they were nearly in an accident as a result of cars making the illegal left turn onto Marcasel from either the north bound traffic on Inglewood or east bound traffic on Washington. As a consequence, we were tasked with finding a solution, in concert with Staff, to remediating this unsafe condition. While the our collective preference was to create a cul-de-sac on Marcasel, the Culver City Fire Department's requirements for an extra- ordinarily wide radius for the cul-de-sac and their desire for continued access from Washington onto Marcasel rosulted in the street configuration described in our current site plan. The current configuration resolves the unsafe condition at this intersection while still preventing trafhc from our Project from entering into the Oval neighborhood. Page 60 Attachment No. 6As to the increased unit count resulting from the vacation of a portion of Marcasel I would like to point out that owing to Culver City's zoning code, a reduced unit count in the Project would not necessarily result in our decreasing the basic building envelope of the Project, nor would it result in fewer parking spaces on site. Further, while trip generation by the apartment turits in our Project was marginal, decreasing the unit count will have no material effect - if any - on traffic generated by the Project. Therefore from a building envelope and environmental perspective, a decreased unit count will have no effect. Decreasing the unit count would mean that we would probably combine some of our one- bedroom units to create more two-bedroom unitso and increase the size of our smaller two-bedroom units. The practical effect would be that we would lose some of our most affordable units, and instead offer an increased number of higher priced two-bedroom units. This defeats the whole concept of our Project - that is to provide new, high quality but smaller, more affordable market-rate units into the market. We have worked hard with Staff to make this Project both acceptable to the neighborhood and the to the market, as well as financially viable. We have always strived in our Culver City developments to respect and adhere to the Zonrng guidelines as well as respect our neighbors. In this Project we have conformed to all the required setbacks, while keeping the height of the Project well belowthe maximum height allowed as well as providing more parking than was required by code. Unlike many Projects in the City which are on hold, we are aggressively working towards submitting construction drawings for Cif review with an eye towards beginning construction at the start of next quarter, including addressing the unsafe intersection at Marcasel and Washington and the construction of the landscaped medians in accordance with our project Community Benefit. As always, we have enjoyed working with the Culver City community and look forward to this as well as future Projects in the City. Sincerely, Kevin Read Page 61