Legislation Details

File #: HIST-1790    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 2/27/2006 Final action: 2/27/2006
Title: Joint City Council/Redevelopment Consideration to Approve Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No. 63634) via Resolution 2006 - R___ to Subdivide Property at 13340 Washington Boulevard for the Construction of Six Proposed Live/Work Condominium Units and Determine that the Project is Consistent with the Redevelopment Plan for Component Area No. 4 of the Culver City Redevelopment Project.
Attachments: 1. 13340 Washington Bl CC-RA TTM Staff Report J-1.doc, 2. J-1 Tentative Tract Map.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends that the City Council approve Tentative Tract Map, TTM P- 2005087 (Vesting Tentative Tract Map No. 63634) subject to the Recommended Conditions of Approval as stated in City Council Resolution No. 2006-R____ (Attachment No. 6). PROCEDURE FOR PUBLIC MEETING: 1. Mayor seeks motion to receive and file affidavit of mailing and posting and publishing of public notice. 2. Mayor calls on staff for a brief staff report and City Council poses questions to staff as desired. 3. Mayor declares the public discussion open, providing the applicant the first opportunity to speak, followed by the general public. 4. Mayor seeks a motion to close the public discussion after all testimony has been presented. 5. City Council thoroughly discusses the matter and arrives at its decision. Meeting Date: 02/27/06 Item Number: J-1 AGENDA ITEM: Joint City Council/Redevelopment Consideration to Approve Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No. 63634) to Subdivide Property at 13340 Washington Boulevard for the Construction of Six Proposed Live/Work Condominium Units and Determine that the Project is Consistent with the Redevelopment Plan for Component Area No. 4 of the Culver City Redevelopment Project. Contact Person/Dept.: Sherry Jordan Phone Number: (310) 253-5746 Fiscal Impact: Yes [X] No [ ] General Fund: Yes [X] No [ ] Public Hearing: [ ] Action Item: [X] Attachments: [X] Public Notification: Notices were mailed on February 2, 2006 to all property owners and occupants, within a 300 foot radius of the site, extended to the end of the city block; courtesy notices were mailed to the Downtown Business Association, Culver City Homeowner Association, Culver City News, Culver City Observer, Culver City Chamber of Commerce, Planning Commission, City Council, East Culver City Neighborhood Alliance, various city personnel, and emailed to the Master Notification List on (02/02/06). Signs announcing the hearing were posted on-site. Department Approval: Susan Evans (02/15/06) CAO Approval: Martin Cole for Jerry B. Fulwood (2/21/06) City Controller Approval: Marlee Chang (02/20/06)City of Culver City, California City Council Agenda Item Report BACKGROUND: On January 25, 2006, the Planning Commission adopted Resolution No. 2006-P001 (Attachment No. 1) conditionally approving Site Plan Review, SPR P-2005086, and Tentative Tract Map, TTM P-2005087 for the construction of six condominium live/work units at 13340 Washington Boulevard. The existing lots on which the six units are proposed to be located are part of a larger development parcel (160’ X 215’) consisting of eight lots. The site is currently developed with a Burger King fast food restaurant. Only the first 50.38 feet of the site along the south side of Washington Boulevard is in Culver City. The remaining portion of the site is in the City of Los Angeles (LA). The applicant is proposing to consolidate the lots and subdivide the development parcel creating two separate tract maps following the city boundary lines. Vesting Tentative Tract Map No. 63634 in Culver City would contain six live/work condominium units facing Washington Boulevard (Attachment No. 4). Vesting Tentative Tract Map No. 63244 in LA would contain an additional 33 units of residential condominium units. The portion of the project in Culver City consists of six two-bedroom live/work units in two buildings. Each 1,499 sq. ft. unit will be comprised of three stories consisting of workspace, bathroom, and deck on the ground level with two levels of living space above. All of the parking for the overall development is located in a common subterranean garage with the only ingress and egress occurring from Beach Avenue in LA. The common subterranean parking garage extends under the live/work units and contains an elevator and stairwell up to the street level where there is pedestrian access for all the project residential units. Please refer to the January 25, 2006, Planning Commission Staff Report (Attachment No. 5) for more detailed project information. This item is also being presented to the Redevelopment Agency for consideration because any development within the Culver City Redevelopment Project, which requires Planning Commission or City Council approval, must also be reviewed by the Agency. Please refer to the Redevelopment staff report and agenda for a complete discussion of this agenda item.City of Culver City, California City Council Agenda Item Report DISCUSSION: The State Subdivision Map Act and Culver City Municipal Code (CCMC) Chapter 15.10, regulate the subdivision of land. Among numerous objectives, the tract map process allows the City to review the proposed subdivision to ensure necessary improvements and dedications for streets and parkland requirements are provided. The process also ensures the reservation of required easements and assures those easements are maintained. The Engineering Division of the Public Works Department has reviewed the proposed subdivision and found it to be in compliance with State and local regulations. Findings The Planning Commission has conditionally approved and recommends that the City Council approve the tentative tract map based on the findings pursuant to CCMC Section 15.10.265, Findings, as outlined in Planning Commission Resolution No. 2006-P001 and proposed Resolution No. 2006-R____ (Attachment No. 6). Environmental Determination Pursuant to the California Environmental Quality Act (CEQA) guidelines, the City of Los Angeles, as the Lead Agency for the overall project, completed and filed a Mitigated Negative Declaration (MND). The City of Culver City is a Responsible Agency as an agency other then the Lead Agency that has a legal responsibility for also approving the project. As a Responsible Agency, Culver City is required to rely on the Lead Agency’s MND when making a decision on the project. Through an Initial Study this project has been determined to have less than significant impacts on the community provided certain mitigations are incorporated. The MND containing the Initial Study and mitigation measures is attached to the January 25, 2006, Planning Commission staff report as Attachment No. 5 to this report. Fiscal Impact CCMC Section 15.10.755 requires the developer of condominiums to dedicate parkland or pay a fee in lieu thereof. Because there is no parkland proposed as part of the project, the in-lieu fee is required. Under CCMC Section 15.10.765, the parkland fee is based on a formula designed to provide three (3) acres of parkland property for each one thousand (1,000) persons and based on density and land value factors. City of Culver City, California City Council Agenda Item Report The in-lieu parkland dedication fee shall be based on the fair market value of providing 0.0439 acres (1,912.28 sq. ft.) of parkland as determined by a written appraisal report of the land value, approved by the City and dated no more than six (6) months prior to payment of the in-lieu fee for the six condominium units. Final calculations will be based upon the required appraisal. The CCMC requires payment of the fees prior to approval of the Final Map, or City policy permits a developer to post a financial guarantee of up to one (1) year after the Final Map approval. Partial payment must also be made from the escrow sale of each unit during the one (1) year period. To implement the CCMC and stated policies regarding the in-lieu fee, staff is recommending that the City Council impose the applicable condition on its approval of the tentative tract map. The condition is included in the draft City Council Resolution (Attachment No. 6). ATTACHMENTS: 1. January 25, 2006 Planning Commission Resolution No. 2006-P001. 2. Area Map. 3. Aerial Photo of Subject Site. 4. Preliminary Development Plans and Vesting Tentative Tract Map No. 63634 (last page) file dated January 13, 2006. 5. January 25, 2006 Planning Commission staff report. 6. Draft City Council Resolution No. 2006-R____ approving Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No. 63634). MOTION: That the City Council: Adopt the Mitigated Negative Declaration and Resolution No. 2006-R__ approving Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No. 63634) subject to the Recommended Conditions of Approval. MEETING DATE 2/27/2006 AGENDA ITEM Joint City Council/Redevelopment Consideration to Approve Tentative Tract Map TTM P-2005087 (Vesting Tentative Tract Map No 63634) to Subdivide Property at 13340 Washington Boulevard for the Construction of Six Proposed Live/Work Condominium Units and Determine that the Project is Consistent with the Redevelopment Plan for Component Area No 4 of the Culver City Redevelopment Project ATTACHMENTS Pages 1 January 25, 2006 Planning Commission Resolution No 2006-P001 1-11 2 Area Map 12 3 Aerial Photo of Subject Site 13 4 Preliminary Development Plans and Vesting Tentative Tract Map No 63634 (last page) file dated January 13, 2006 14-25 5 January 25, 2006 Planning Commission staff report 26-65 6 Draft City Council Resolution No 2006-R approving Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No 63634) 66-71Attachment No 1 RESOLUTION NO 2006-P001 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CULVER CITY, CALIFORNIA, APPROVING SITE PLAN REVIEW, SPR P-2005086 FOR THE CONSTRUCTION OF SIX LIVE/WORK UNITS AND APPROVING TENTATIVE TRACT MAP, TTM P-2005087 (VESTING TENTATIVE TRACT MAP NO 63634), TO SUBDIVIDE THE PROPERTY INTO CONDOMINIUM UNITS IN THE COMMERCIAL GENERAL AND COMMERCIAL ZERO SETBACK OVERLAY (CG-CZ) ZONES AT 13340 WASHINGTON BOULEVARD (Site Plan Review, SPR P-2005086 and Tentative Tract Map, TTM P-2005087) WHEREAS, on November 14, 2005, an application was filed for a Site Plan Review and Tentative Tract Map for construction of six live/work condominium units at 13340 Washington Boulevard being portions of Lots 10, 11, 12, and 13 of Beach s University Tract, in the Commercial General and Commercial Zero Setback Overlay (CG-CZ) Zones as part of a larger development consisting of 33 additional condominium residential units located in the City of Los Angeles, and WHEREAS, on January 25, 2006, the Planning Commission conducted a duly noticed public hearing on these applications, fully considering the applications, plans, staff reports, environmental information and all testimony presented, and WHEREAS, in accordance with the California Environmental Quality Act, the City of Los Angeles, as the Lead Agency for the larger overall project, adopted a Mitigated Negative Declaration for the project of 39 units Culver City, as a Responsible Agency considered the Mitigated Negative Declaration and finds that the project based upon the Mitigated Negative Declaration public comments, and the record before the Planning Commission, will not have|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Page 1 2006-P001 Ia significant adverse impact on the environment, and the Planning Commission hereby adopts the Mitigated Negative Declaration, and WHEREAS, following conclusion of the public discussion and thorough deliberation of the subject matter, the Planning Commission determined by a vote of 4 to 0 that Site Plan Review, SPR P-2005086 and Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No 63634) should be conditionally approved, as set forth herein below NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF CULVER CITY, CALIFORNIA, RESOLVES AS FOLLOWS SECTION 1 Pursuant to the foregoing recitations and the provisions of Culver City Municipal Code (CCMC) Section 17 540 020, required findings for Site Plan Review, and CCMC Section 15 10 265, required findings for Tentative Tract Map, and subject to the Conditions of Approval herein, the following findings are hereby made Site Plan Review 1 The general layout of the project, including orientation and location of buildings, open space, vehicular and pedestrian access and circulation, parking and loading facilities, building setbacks and heights, and other improvements on the site, is consistent with the purpose and intent of CCMC Chapter 17540, the requirements of the zoning distnct in which the site is located, and with all applicable development standards and design guidelines The layout of the site, with the six live/work units orientated to Washington Boulevard, have been designed to be compatible with surrounding uses on adjacent properties and will provide a safe and desirable vehicular and pedestrian atmosphere along Washington Boulevard The project will provide safe and proper vehicular circulation by placement of all vehicular ingress and egress from the subterranean parking off of Beach Avenue Direct pedestrian access to the live/work units is available from Washington Boulevard or easily accessible from the subterranean parking garage Private patios, decks, and common area plazas provide open space to the occupants of the project The project is in conformance with the Commercial General and Commercial Zero Setback Overlay (CG-CZ) Zones and all applicable Municipal Code development standards 2 The architectural design of the structure(s) and their matenals and colors are compatible with the scale and character of surrounding development and other improvements on the site and are consistent with the purpose and intent of CCMC Chapter 17540, the Page 2 2006-P001 a.requirements of the zoning district in which the site is located, and with all applicable development standards and design guidelines The project has been designed to comply with the Live/Work Development Standards of CCMC Chapter 17 400 060 The modern building design uses glass, stucco, and metal as the primary materials and provides 360 degree architecture The street wall is prominent along Washington Boulevard and is designed at a pedestrian scale with storefront entrances, overhangs, enhanced paving, and outdoor plaza areas 3 The landscaping, including the location, type, size, color, texture, and coverage of plant materials, provisions for irrigation, and protection of landscape elements has been designed to create visual relief, complement structures, and provide an attractive environment and is consistent with the purpose and intent of CCMC Chapter 17540, the requirements of the zoning district in which the site is located, and with all applicable development standards and design guidelines As the entire site will be constructed on a deck over the subterranean parking garage, decorative paving, planters, and potted plants compliment the building architecture and provide visual relief for all users of the site Open space areas contain both hardscape features and plant materials providing an attractive environment for residents and visitors to the site complying with the applicable development standards 4 The design and layout of the proposed project will not interfere with the use and enjoyment of neighboring existing or future development, will not result in vehicular or pedestrian hazards, and will be in the best interest of the public health, safety, and general welfare The approval of the proposed site plan is in the best interest of the public health, safety and general welfare because a parking lot will be improved with a new structure, providing an improved aesthetic quality to the site The layout of site improvements have been designed to be compatible with surrounding uses on adjacent properties through the orientation and location of the building towards Washington Boulevard, the provision of subterranean parking, and placement of the driveway ramp at the rear of the overall larger project on Beach Avenue The site will also provide proper pedestrian and vehicular circulation, and a safe and desirable environment on the site that minimizes impacts on adjacent areas The site design provides a prominent street wall along Washington Boulevard that will be compatible with the goal of creating a pedestrian friendly environment for mixed use developments 5 The existing or proposed public facilities necessary to accommodate the proposed project (e g, fire protection devices, parkways, public utilities, sewers, sidewalks, storm drains, street lights, traffic control devices, and the width and pavement of adjoining streets and alleys) will be available to serve the subject site The existing and proposed public service facilities necessary to accommodate the project such as the width and pavement of the adjoining street traffic control devices, sewers, storm 2006-P001|1010|I|1010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Page 3drains parkways, sidewalks, street lights, street trees, fire protection devices, and public utilities are provided for adequately as confirmed by the City agencies that reviewed the project during the interdepartmental review process 6 The proposed project is consistent with the General Plan and any applicable specific plan The proposed live/work project is consistent with the objectives of the General Plan Commercial General Corridor land use designation that encourages small-to-medium scale commercial uses and limited medium-density housing opportunities compatible with adjacent residential neighborhoods The live/work project implements the goals of General Plan Objective 24 by encouraging lot consolidation along Washington Boulevard, reducing the number of curb cuts, and providing residential development designed in such a manner to complement the vitality of the commercial corridor The project site in Culver City is not subject to any specific plan Tentative Tract Map I The proposed map is consistent with the General Plan The proposed map is consistent with the General Plan Land Use and Housing Elements in that the proposed six condominium live/work units will provide new commercial and housing opportunities that will support desirable existing and future neighborhood and community serving uses on an underdeveloped lot The subdivision implements the goals of General Plan Objective 24 by encouraging lot consolidation along Washington Boulevard, reducing the number of curb cuts, and providing residential development designed in such a manner to complement the vitality of the commercial corridor 2 The design of the proposed subdivision is consistent with the General Plan The design of the proposed subdivision is consistent with the General Plan Land Use Element in that the proposed live/work development is consistent with the objectives of the Commercial General Corridor land use designation that encourages small-to medium scale commercial uses and limited medium-density housing opportunities Additionally, the project implements Objective 24 of the Western Sub-Area by encouraging lot consolidation along Washington Boulevard and eliminating all curb cuts on Washington Boulevard Additionally, the use of live/work units ensures that the residential component of the live/work units are designed in such a manner to complement the vitality of a commercial corridor 3 The site is physically suitable for the type of development The site is physically suitable for the live/work development in that the project complies with all zoning standards The proposed structure has met all applicable setback, height and parking requirements as conditioned 4 The site is physically suitable for the proposed density of development Page 4 2006-P001|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 96.|101010101010101010 10 10|11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 The larger overall project s design for 6 live/work units and 33 residential units encompasses two tract map sites The design of the project allows for the lot created in Culver City to be physically suitable for the proposed density of 6 live/work units The Commercial General and Commercial Zero Setback Overlay (CG-CZ) Zones permit live/work development and the project meets and all applicable Municipal Code development standards as conditioned 5 The design of the subdivision is not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat The subdivision and improvements, as conditionally approved, will not cause environmental damage and will not damage fish and wildlife habitats because such habitats do not exist on or near the site 6 The design of the subdivision is not likely to cause serious public health problems The subdivision and improvements will not cause serious public health problems because all applicable zoning standards have been met, and the applicant is required to meet all conditions of approval that the reviewing agencies of the City, such as Fire, Planning, Building Safety, and Engineering have recommended for the project 7 The design of the subdivision or the type of improvement will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision This subdivision will not conflict with any existing easements SECTION 2 Pursuant to the foregoing recitations and findings, the Planning Commission of the City of Culver City, California, hereby approves Site Plan Review, SPR P-2005086 and Tentative Tract Map, TTM P-2005087 (Vesting Tentative Tract Map No 63634), subject to the following conditions A SITE PLAN REVIEW, SPR P-2005086 General Conditions/Planning 1 The final working drawings shall conform to the preliminary development plans, file dated January 13, 2006, and the Tentative Tract Map file dated January 13, 2006, except as noted below and otherwise noted during the building permit review process 2 The resolution approving this Site Plan Review and recommending approval of the Tentative Tract Map shall be referenced on the cover sheet of the final working Page 5 2006-P001drawings and the Conditions of Approval for SPR P-2005086 and TTM P-2005087 shall be repeated in full on the cover sheet of the final working drawings 3 All applicable development standards and requirements in Planning Commission Resolution No 92-P001, Comprehensive Site Plan Review Development Standards and Conditions of Approval, except as otherwise required herein, shall be met These standards as well as other conditions required in this approval shall be reflected on the plans submitted for building plan check 4 The applicant shall actively advertise all opportunities for employment, contract services, and purchasing of materials to Culver City businesses and residents The applicant shall use reasonable best efforts to solicit and utilize economical and qualified services from Culver City-based employees and businesses The applicant shall also require the construction contractor(s) and subcontractors related to the project to advertise all construction opportunities to Culver City businesses and residents 5 The applicant shall provide the construction contractor(s) and each subcontractor related to the project a copy of the final project Conditions of Approval The applicant and the City agree that these conditions shall be enforceable through all legal and equitable remedies, including the imposition of fines against each and every person who conducts any activity on behalf of the applicant on or near the project site The applicant, property owner, and general construction contractor are ultimately responsible for all actions or omissions of a subcontractor 6 The City reserves the right to periodically inspect the premises without prior notification, to ensure ongoing compliance with all conditions of approval 7 The Planning Manager may approve minor modifications to building siting, design, landscaping, and materials, provided such adjustments do not result in a significant change to the architectural design and/or site plan of the project as a whole Minor modifications approved by the Planning Manager shall not be in conflict with any other condition of approval or Culver City Municipal Code (CCMC) requirement 8 This Site Plan Review will expire if not used within one year after the date it becomes effective unless the applicant submits an extension request in writing, and is granted said extension by the Planning Manager or the Planning Commission pursuant to CCMC Section 17 595 030 9 A certificate of occupancy for the approved project/use will be issued only upon completion of all applicable conditions of approval and required site improvements 10 The applicant and contractors shall use all reasonable efforts to reuse and recycle construction and demolition debris, to use environmentally friendly materials, and to provide energy efficient buildings, equipment and systems Page 6 2006-P06111 Conditions of approval herein shall apply to the applicant, the contractor/builder of the project, and any successor property owner that may legally assume benefit of this Site Plan Review and Tentative Tract Map 12 During all phases of construction (including rough grading), information that includes contact names and telephone numbers for the applicant, contractor, and City shall be posted at the project site along Washington Boulevard so as to be visible to the public 13 During all phases of construction and once the development becomes operational, all graffiti shall be removed within 48 hours of its application 14 Prior to issuance of building permits, the applicant shall submit to the Planning Manager for approval an exterior light fixture plan The plan shall identify the location and type of all exterior light fixtures to be installed by the applicant All lighting shall be directed onsite and light sources shall be shielded so as not to be intrusive to surrounding properties 15 Pursuant to CCMC Section 15 10 755, parkland dedication or payment of an in-lieu parkland fee will be required upon issuance of a building permit 16 Covenants, Conditions, and Restrictions (CC&R's) and homeowner association bylaws shall be reviewed and approved by the City Attorney prior to issuance of any Certificate of Occupancy If available, at the same time, the City Attorney shall review the condominium plans There shall be recorded concurrently, with the recordation of a Final Map, a declaration of the CC&R's 17 Prior to the issuance of any building permits, the applicant shall provide separate final detailed landscape and irrigation plans for the project in compliance with CCMC Chapter 17 310 This plan shall include, but not be limited to planting areas dispersed throughout the concrete deck at the rear of the units and potted plants within the front setback plaza area along Washington Boulevard Approval of these plans shall be subject to the satisfaction of the Planning Manager and Environmental Maintenance Manager 18 The final working drawings filed for the building permit shall designate assigned parking spaces for residents and visitors for the six live/work units Only three tandem pairs of parking spaces shall be assigned to the residential portion of three live/work units All employee or guest parking shall be in prime access parking spaces 19 Prior to issuance of the Certificate of Occupancy, the applicant shall apply for an address change that requests addresses for each tenant space and elimination of all other addresses at the site The new addresses placed on the building shall be viewable and legible from the public right-of-way and approved by the Planning Division and the Fire Department Page 7 2006-P001 720 The project is subject to all standards and regulations of CCMC Section 17 400 060, Live/Work Development Standards, including but not limited to use restrictions, required covenants signage etc 21 All posted notices on the site shall be removed within seven days after conclusion of the project approval appeal period 22 Prior to the issuance of the Certificate of Occupancy, a covenant in favor of the City shall be executed and recorded to hold the lots of Vesting Tentative Tract Map Nos 63634 and 63244 together as a single parcel for the life of the development Proof of one covenant satisfying both Culver City and City of Los Angele's requirement to hold the two parcels together shall satisfy this condition 23 All mitigation measures, contained in the Mitigated Negative Declaration prepared by the City of Los Angeles for the overall project containing 39 units that are applicable to the project occurring within the City of Culver City shall be required 24 This Site Plan Review shall not become effective until Vesting Tentative Tract Map No 63244 (City of Los Angeles) and City of Los Angeles Specific Plan Exception, APCW-2005-4303-SPE are approved by the City Of Los Angeles and become effective Public Works/Engineering Conditions 25 Prior to the issuance of any building permits, two sets of Site Improvement and Horizontal Control Plans prepared by a civil engineer registered in the State of California, shall be submitted to the Engineering Division for review, approval, and permitting Among other things, the Site Improvement Plan shall include detailed drainage and grading of the site indicated by topographical lines and spot elevations, and indicate all proposed and existing utilities 26 Concurrent with the submittal of the site improvement plan, a Local Storm Water Pollution Prevention Plan (LSWPPP) and Standard Urban Storm Water Mitigation Plan (SUSMP) shall be submitted for review and approval by the City Engineer LSWPPP and SUSMP shall be developed and implemented in accordance with the requirements of the Los Angeles County Stormwater Quality Management Program, NPDES Permit No CAS614001 The plan shall include the design and placement of recommended Best Management Practices (BMPs) to effectively prohibit the entry of pollutants from the construction site into the public street or storm drain system The improvement plans shall note that the contractor shall comply with the "California Stormwater Best Management Practice Handbooks' 27 A landscape plan for parkway landscaping, to include planting of additional trees with tree wells, and irrigation within the public right-of-way shall be submitted for review and approval by the City Engineer The owner shall maintain the parkway area to the satisfaction of the Public Works Department Page 8 2006-P001 328 The two driveways along Washington Blvd shall be closed and replaced with new standard curb and gutter and sidewalk 29 The applicant shall replace the full length of the curb, gutter, sidewalk, and 8' — 9 wide parking lane pavement along the street frontage of the development The new paving shall be 2500 psi and shall match the existing roadway pavement thickness or 8" minimum The pavement shall be doweled to the existing roadway pavement with #4 dowels @ 24' o c The new curb shall not be poured monolithically with the new concrete pavement 30 Drainage devices, concrete curb and gutter, sidewalk, and roadway pavement shall be designed to the latest edition of the American Public Works Association (APWA) Standard Plans Roof drainage shall extend through the street curb or to an onsite drainage inlet All onsite drainage inlets shall convey pretreated storm water underground through the street curb 31 The applicant shall provide a geotechnical report from a State licensed geotechnical engineer reporting on the suitability of the onsite soils to support the proposed construction and shall include a liquefaction analysis The report shall also identify any special considerations necessary to satisfy California Building Code requirements 32 The applicant shall be responsible for the expense to repair or replace any damage to the public right-of-way caused by the construction of the proposed project Such repair or replacement shall be completed to the satisfaction of the City Engineer 33 Dirt hauling and construction material deliveries or removal are prohibited during the morning (7 00 A M to 9 00 A M) and afternoon (4 00 P M to 6 00 P M) peak traffic periods or as determined by the Public Works Director or designee 34 During construction, dust shall be controlled by regular watering and as directed by the City inspector 35 All staging and storage of construction equipment and materials, including the construction dumpster, shall be on-site only The applicant shall obtain written permission from adjacent property owners for any construction staging occurring on adjacent property 36 Prior to the commencement of any excavation, the applicant shall install a temporary construction fence around the site The height and fence material is subject to approval by the City Engineer 37 The construction contractor shall advise the Public Works inspector of the construction schedule and shall meet with the inspector prior to commencement of work 38 Due to the change of use and increased density, this project is subject to the City's Sewer Facility Charge This charge shall be paid prior to the issuance of any permit Page 9 2006-P001Building Safety Conditions 39 All dividing walls between each live/work unit shall be two hour rated from the concrete slab to the top of a parapet extending a minimum of 30 inches above any adjacent roof or walking surface As an alternate to the parapet, the roof structure within five feet of each two hour rated wall may be one hour rated 40 All utilities with Culver City shall be routed underground or within the building structure Fire Safety Conditions 41 A 'Knox box key entry system may be required for access through gates and locked common areas Location of the box is to be approved by the Fire Marshal 42 For access of emergency fire and medical personnel a) Concrete surfaces between the street and main entrance for each building shall be paved to allow the rolling of a medical gurney b) Motorized 'emergency access gate(s) shall have a 'Knox' key switch 43 The fire sprinkler system for the live/work units shall be connected to a southern California central reporting station for dispatch of the Culver City Fire Department (CCFD) 44 Within the live/work units, the fire sprinkler system shall be 13R compliant 45 The live/work units shall have a mini-horn in each of the six units These devices shall be powered and supervised by the Fire Alarm Panel (FAP) in the Culver City portion of the property 46 Building parapet(s) exceeding five feet in height require the installation of catwalks Catwalks shall be capable of supporting firefighters and equipment weighing 500 pounds 47 A site pre-fire plan shall be submitted and approved by the Fire Marshal prior to requesting any type of Certificate of Occupancy 48 All exterior fascias, tops of walls, and parapet surfaces shall be constructed to support the weight of fire fighters, suppression equipment, and ladders for fire fighting operations All proposed construction for these areas shall be submitted to the Fire Marshal for approval 49 If the Double Detector Check Assembly (DDCA) or Fire Department Connections (FDC) are located in Culver City, they shall be located as required and approved by the Fire • Page 10 2006-POOk 1UAttested by Y Hunt Administrative Secretary Marshal Screening of the DDCA shall be as required by the Planning Manager and as approved by the Fire Marshal 50 The Fire Marshal shall determine the locations and types of fire extinguishers required in the work portions of the live/work units B TENTATIVE TRACT MAP, TTM P-2005087 51 Tentative Tract Map, TTM P-2005087 shall be null and void if Site Plan Review, SPR P-2005086, (i) is appealed to the City Council and the City Council does not approve or conditionally approve it, or (ii) if City of Los Angeles case numbers APCW-2005-4303- SPE (Specific Plan Exception) and Vesting Tentative Tract Map No 63244 are not approved by the City of Los Angeles and remain effective 52 The final tract map shall be submitted to the Los Angles County Department of Public Works for review and approval 53 The project boundary shall be tied to at least one City GPS monument 54 All required boundary monuments shall be installed prior to the recordation of the final map At a minimum, a chisel "X or other approved monument shall be placed on the Washington Boulevard curb indicating the prolongation of the side property lines These monuments shall be shown on the final map 55 A copy of the final map, in digital format, shall be submitted to the Engineering Division prior to final acceptance by the City 56 A duplicate mylar copy of the recorded map shall be submitted to the Engineering Division 57 Prior to issuance of a certificate of occupancy, the final tract map shall be recorded with the County Recorder of Los Angeles County APPROVED and ADOPTED this 25th day of January, 2006 SHEILA M THOMAS, CHAIRPERSON PLANNING COMMISSION CITY OF CULVER CITY, CALIFORNIA Page 11 2006-P001 IILegend Selected Properties City of Culver City Planning Division Map Created Jan 13 2006 Meeting Date January 25 2006 13340 Washington Boulevard- SPR P2005086 and TTM P2005087 o 125 250 ft Scale 1 2 500 Attachment No 2 Area MapCity of Culver City Planning Division Map Created Jan 13 2006 Meeting Date January 25 2006 13340 Washington Boulevard SPR P2005086 and TIM P2005087 Scale 1 2,500|1010|125 250 ft Attachment No 3 Anal Map wWASHINGTON BLVD A REQUIRED STREET OEDC I PROJECT SUMMARY TOTALS LOS ANGELES / CULVER CITY ETBAC LOT AREA prior to dedication LOT AREA after dedication TOTAL UNITS DENSRY BUILDING AREA RESIDENTIAL TOTAL LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 85 scree ( 37 013 SF gross) 78 res (33 012 S F net) 39 residential rts provided 5731 du/ac ( 846 I per unit ) STREET PARKING TYP (8 ) LJNE OF BLDG ABOVE 54 200 S F 11 322 SF pe unit) 12 899 SF 14818 SF 15608SF 10775 SF DST STAIR CIRCULATION TOTAL 3 571 SF 8-6. STUCCO OVER CMU PERIMETER WALL SEE LANDSCAPE PLAN OFR ALL EXTERIOR BLDG LIGHT/NG IXTIJRE °CATIONS I BUILDING AREA TOTAL I 57 771 SF SECU ITT GATE 7YP 4 BIN CMU TRASH ENCLOSURE UNE OF SETBACK ABOVE FAR BUILDING COVERAGE BUILDING HEIGHT GARAGE AREA HARDSCAPE LANDSCAPE 1 75 (57 771 SF) 20 597 SF (82% OF LOT AREA) 55-8 30 300 SF / 0 309 F (31% OF LOT AREA) 2 105 S F (7% OF LOT AREA) SEE VESTING TENTATIVE TRACT MAP 83244 FOR DRAINAGE EXIT STAIR TOP TEAS TYP I OPEN SPACE umrs 0 UNITS 0 UNITS 38 UNITS 39 UNITS AREA REDO 0 S F SBF 8825SF 8 825 S F REDO 100 SF FOR UNITS 3 HABITABLE ROOMS 125 SF FOR UNITS OF 3 HABITABLE ROOMS 175 SF FOR UNITS 3 HABITABLE ROOMS TOTAL U E OF DEC @ GRADE TYP UNE OF DECKS ABOVE TYP EXISTING UTILITY POLE TYP COURT ROOF DECK LIVE WORK PRIVATE OPEN AREA I TOTAL OPEN SPACE PROVIDED I 6 825 SF 1 970 SF 2000 SF 5 CORRIDOR TYP 10 795 SF PROVIDED I RESIDENTIAL SUMMARY UGHT WELL TOP flare 861 I PLAN I DESCRIPTION I QUANTITY 'GROSS AREA I SUBTOTAL I A 1 BR STUDY /1 051. 8 825 S F 8 600 SF B 1 BR DEN / 1 0 BA 4 925 S F 3 700 SF C 2019 DEN/208A 5 13006F 10 400 SF D 298 STUDY /2 BA 1 1 350 SF 1 350 SF E 2519 DEN / 2 5 BA 4 1700SF 8 800 SF F 298 DEN/25 BA 3 1 750 S F 5 250 SF G 398 DEN/25 BA 4 2 200 SF 8 800 SF H 3619 DEN/25 BA I 2306 SF 2 306 SF RESIDENTIAL ttached flat ttached flat tteched flat attached flat taloned 2 skxy townhom teethed 2 story townhome [atoned 2 story townhome attached 2 story townhcrn SIDE YARD SETBACK TIP 8-8 STUCCO OVER CMU PERIMETER WALL TELEP ONEDABLE FIRE DEPARTMENT BACKFLOW PREvENTER 5 Cr E IRED SETB CK LW OF UNIT ABOVE LOB I TOTALS 33161119 provided 45 206 SF EL CTRICAL TRANSFORMER FRONT YARD SETBACK TNT I LIVE / WORK LOFT SUMMARY|101010|PEDESTRIAN ENTRY LANDSCAPE METER LA DOMESTIC WATER SUPPLY A MAIN ENTRY A MAIN ENTRY I PLAN I DESCRIPTION I caJANTRy !GROSS AREA SUBTOTAL I LW A 2197 WORK AREA 8 1499SF 8 984 S F LIVE /WORK ttached 3 story I TOTALS 7-15 R • Ul ED SETBACK rts provided 8994S F • EOUIRED SETSAC BEACH AVE I PARKING SUMMARY RESIDENTIAL PARKING PLAN SITE PLAN Required 101 spaces 108089001 (33 units 2 spaces) ea spaces live work (6 its 30580e0) 18 spaces residential guest parking ( 5 3316185) 17 I PROJECT SUMMARY TOTALS CULVER CRY I PROJECT SUMMARY TOTALS LOS ANGELES crry I RESIDENTIAL PARKING REWIRED I 101 parking spaces LOT AREA prior to dedication LOT AREA ter &demean TOTAL UNITS DENSITY BUILDING AREA RESIDENTIAL CIRCULATION 28acres(1120 SF ) 18 acres( 8001 SF ) 8 residential un as provided 33 33 du/ac ( 1334 I per ) LOT AREA poor to dedication LOT AREA for dedication TOTAL UNITS DENSITY BUILDING AREA RESIDENTIAL CIRCULATION 59 acres( 25811 SF) 57 acres ( 25 011 SF ) 33 residential units provided 57 89 caVac ( 780 I per unit ) I RESIDENTIAL PARKING PROVIDED I 101 parking spews STREET PARKING CULVER CRY 6 parking spaces LOS ANGELES 4 parking spaces 8 994 S F (1 499 SF per It) O S F 45 206 S F (1 369 SF per unit) 1 030 SF I BUILDING AREA TOTAL I FAR BUILDING COVERAGE BUILDING HEGHT GARAGE AREA HARDSCAPE LANDSCAPE !TOTAL STREET PARKNO I 10 parking spaces I BUILDING AREA TOTAL I 48 777 S F 8 994 S F 112 (8994SF) 3 628 SF (45% OF LOT AREA) 38-8 7 6E15 S F 3 366 S F (42% OF LOT AREA) 1 008 S F (13% OF LOT AREA) FAR BUILDING COVERAGE BULLING HEIGHT GARAGE AREA HARDSCAPE LANDSCAPE 195 16 989 SF (87% OF LOT AREA) SO-IT 22 615 SF 6 943 SF (28% OF LOT AREA) 1 099 S F (4% OF LOT AREA) I OPEN SPACE I OPEN SPACE UNITS 6 UNITS 8 UNITS AREA REDO 300 SF 300 S F REDO 2000 SF UNITS 33 UNITS 33 UNITS AREA REDD 5 775 S F 5 775 S F REDO 50 SQUARE FEET FOR EACH UNIT I TOTAL OPEN SPACE REQUIRED I TOTAL 175 SF FOR UNITS 3 HABITABLE ROOMS I TOTAL OPEN SPACE REQUIRED I TOTAL COURT ROOF DECK I TOTAL OPEN SPACE PROVIDED I LIVE WORK PRIVATE OPEN AREA I TOTAL OPEN SPACE PROVIDED 4 278 SF 1 970 SF 2000 SF PROVIDED 6 248 SF PRCMDED I LIVE / WORK LOFT SUMMARY WASHINGTON LOFTS I PLAN I DESCRIPTION !QUANTITY GROSS AREA I SUBTOTAL I LW A 280 WORK AREA 2 1 499 SF 2 998 SF LW B 250 WORK AREA 4 1499SF 5 996 S F LIVE/WORST Mailed 3 sten/ ttached 3 story I TOTALS LOS ANGELES CA APPLICANT STANDARD PACIFIC HOMES 3030 OLD RANCH PARKWAY SUITE 450 SEAL BEACH CA 90740 TEL (562) 430-0800 I RESIDENTIAL SUMMARY|1010|NORTH 6 nits provided 8994 SF I PLAN I DESCRIPTION I auArrrrryloRass AREA I SUBTOTAL J A 1919 STUDY / 1 0 BA a 825 S F 8 800 SF B 1 BR DEN / 1 091 4 925 S F 3 700 SF C 2 BR DEN /20 BA s 1 300 SF 10 400 SF D 298 STUDY /2 BA 1 1 350 SF 1 350 SF E 298 DEN/25 BA 4 1700SF 6 800 SF F 28R OEN /25 BA 3 1 750 S F 5 250 SF G 3519 DEN / 25 BA 4 2 200 SF 8 800 SF H 3 BR DEN /25 BA 1 2 306 S F 2 306 SF RESIDENTIAL ttached Set Itached flat ttachedil attached flat attached 2 story townhom ttached 2 story townhome ttached 2 story townhorne treched 2 story townh rne C, c ^g D c~ I PARKING SUMMARY Withee Malcolm Architects LLP 1983W 190111 Street S 86250 Torrence C 90504 T I (310) 217 8885 Fax (310) 217 0425 sada r or-ry RESIDENTIAL 4-iiitc,Ame,tve 14 v13- 7 - 06 00/c. Required 18 Paces Provided 18 spaces STREET PARKING live work (8 its 3 paces) El spaces TOTALS 33 wits provided 45 206 SF CULVER CITY 6 perkng spaces JOB NO A4099 SCALE 1 20 17 DATE 01/12/06|109| 20 40 60 80 )33 1ô Wask,eytonGRAPHIC SCALE WASHINGTON LOFTS LOS ANGELES CA APPLICANT NORTH STANDARD PACIFIC HOMES 3030 OLD RANCH PARKWAY SUITE 450 SEAL BEACH CA 90740 TEL (562) 430-0800 VICINITY MAP NORTH I PROJECT ADDRESS VTTM 63534 ADDRESS 13340W WASHINGTON BLVD LOS ANGELES CA 90055 I LEGAL DESCRIPTION THE LAND REFERRED TO HEREON IS SITUATED IN THE STATE OF CALIFORNIA COUNTY OF LOS ANGELES DESCRIBED AS FOLLOWS THE LAND REFERRED TO HEREON IS SITUATED IN THE STATE OF CALFORN/A COUNTY OF LOS ANGELES DESCRIBED AS FOLLOWS PORTION OF LOTS 10 11 12 AND 13 OF BEACH'S UNIVERSITY TRACT WITHIN THE CITY OF CULVER car COUNTY OF LOS ANGELES STATE OF CAUFORNIA AS PER MAP RECORDED IN 8001<8 PAGE 29 OF MAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY I ASSESSORS PARCEL MAP INFORMATION APES 4230-008-053 (CULVER CITY) I LOT AREA SOOT SF LEGEND • FR I-P(CRANT CENTERWE TREET LX3HT CS CATCH AS — CENTE UNE .1n1n11 CPERTY UNERIGHt OF W — — — — CITY BOUNDARY EXISTING W TER WE — EXISTING SEWER — — -- EASING PK/PERTY NE — — — — — EASEMENT PARES 1' CULVERT (PRCPOSED) - ROPOSED SEWE LATERAL PROPOSED W TER METE SERVICE JOB NO A4099 SCALE 1 20-0 DATE 11513515 Withee Malcolm Architects LLP 1883W 19015 Street S Re 200 Torrance Ca 90504 Tel (310)217,3885 Fax (310) 217-0425 IN PENT ince SOX James Mows Sem:. -3ssy Ca,e NA BUD VIt Cenimen. -Morn' aRnsCOMORETE 112 au3 PC0F PP W ARNIE COWSlIP WIRES CE W 6000W POWER ODES U0 TO BURGER IONG1-0 NEW FL 1 -es " _ -DO W APE. OTT WREN al CO DUD (POWER 5088 5E-0 $WO STORAGE AREA AMR WNW. IT _ ) > w g. WASHINGTON BOULEVARD e< RSV _ e