RECOMMENDATION:
Staff recommends the City Council approve professional services agreements with
CBM Consulting Inc., Paller-Roberts Engineering, KDM Meridian, Norris-Repke,
Psomas, for General Civil Engineering services (Design, Construction Management,
Inspection, and Survey); and Nickerson Company, and APD Consultants,
(Construction Management and Inspection) to support the City’s Capital
Improvement Program for a total aggregate not-to-exceed cost of $675,000. Staff is
proposing that the contracts expire on June 30, 2009.
BACKGROUND:
The Public Works Department/Engineering Division is responsible for the
management of the citywide capital improvement program. The Engineering Division
has several civil engineering positions that oversee and implement the capital
improvement program such as the Public Works Director/City Engineer, Engineering
Services Manager, two Senior Civil Engineers, two Associate Engineers, one
reclassified Associate Engineer position and a part-time Assistant Engineer. In
addition the Engineering staff has other responsibilities such as responding to
questions at the public counter, working with other City departments on citywide
issues, conducting condition setting and plan check of private development projects,
answering resident inquiries on the telephone, and other City engineering work.
With these work responsibilities along with a capital improvement project workload in
the millions of dollars and occasional position vacancies within the Division, it is
necessary to augment Engineering Division staff with consultants, principally for
project design, construction management, and inspection services.
Meeting Date: 7/23/07 Item Number: A-6
AGENDA ITEM: Approval of Professional Services Agreements with CBM
Consulting Inc., Paller-Roberts Engineering, Inc., KDM Meridian, Norris-Repke, and
Psomas for General Civil Engineering Services; and Nickerson Company and APD
Consultants for Construction Management and Inspection Services
Contact Person/Dept: Mate Gaspar/PW Phone Number: (310) 253-5602
Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No []
Public Hearing: [] Action Item: [X] Attachments: [X]
Public Notification: CBM Consulting Inc., Paller-Roberts Engineering Inc., KDM
Meridian, Norris-Repke, Psomas, Nickerson Company, and APD Consultants Inc. via
letter on July 16, and Master Notification List on July 18.
Department Head Approval:
Charles D. Herbertson 7/03/07
City Attorney Approval:
Carol Schwab (by H. Iker) (07/13/07)
City Controller Approval:
Marlee Chang (07/18/07)
City Manager Approval:
Jerry B. Fulwood (07/18/07) City of Culver City, California
City Council Agenda Item Report
To address this need, the City has previously entered into multi-year contracts with
civil engineering firms to support the capital improvement program. These firms
provide the specific technical knowledge and the time to ensure that projects are
effectively designed in accordance with sound engineering practices and standards.
On November 28, 2005, the City Council approved professional services
agreements with five (5) civil engineering firms to support the Engineering Division in
implementing the capital improvement program. The consulting firms successfully
designed and managed many of the capital improvement projects in fiscal year
2006/07. Their contracts expired on June 30, 2007.
DISCUSSION:
On June 5, 2007, a request for a Statement of Qualification (SOQ) for general civil
engineering design, construction management, and inspection was mailed to
thirteen (13) civil engineering firms. Twelve (12) firms responded and staff reviewed
and evaluated each of the firm’s SOQ using the following criteria:
• Qualifications, experience, education, and technical training of personnel
proposed to provide the required services
• The experience and record of success on comparable capital projects (sewer,
street, drainage, and streetlight improvements)
• Fee schedule for the firm’s personnel
• References from other government agencies
• The number of capital projects completed
• Experience with grant funded capital projects
After the evaluation of each SOQ, staff is recommending awarding professional
services contracts to seven (7) civil engineering and/or construction management
and inspection firms. Staff is recommending that three of the five civil engineering
firms that had contracts with the City, CBM Consulting, Inc., of Torrance, Paller-
Roberts Engineering of Culver City, and KDM Meridian of Lake Forest, be approved
again so they can compete and continue to provide support to staff for the City’s
capital improvement program. Staff is recommending not continuing working with
Hall and Foreman and Bureau Veritas (formerly Berryman and Henigar) due to
critical staff turnover and much higher fee proposals than the other consultants.
City of Culver City, California
City Council Agenda Item Report
Staff is recommending the following additional companies, Norris-Repke of Santa
Ana, Psomas of West Los Angeles, Nickerson Company of Manhattan Beach, and
APD Consultants, Inc. of Irvine to provide support to staff for the City’s capital
improvement program. With the four additional firms, the competitive process
amongst the proposed seven firms will become very beneficial to the City. These
seven engineering and construction management and inspection companies have a
wealth of experience working with local cities on capital projects.
All seven firms may receive a request for proposal for each capital project depending
on their availability and expertise. Each proposal will be then be reviewed based on
the proposed services, time to complete the work, and fee, and then one firm can be
selected (not necessarily based on lowest proposed fee) and approved
administratively by the Public Works Director/City Engineer. Having this process will
ensure that services and costs are efficient and in the best interests of the City.
Having seven exclusive contracts, as recommended by staff, will save time so that
staff will be better able to focus on completing capital improvement projects.
These consulting firms are capable and will provide errors and omission and liability
insurances at $1 million each. The City retains the right to terminate these
agreements upon thirty days notice and any time during the term of agreements.
Also, the City will have the right to contract with other consultants when it is in the
City’s best interest.
Staff is estimating that a total aggregate not-to-exceed cost of $675,000 for the
consultants will be sufficient to support the capital improvement program for Fiscal
Years 2007/08 and 2008/09. Staff reviewed and determined which capital
improvement projects may require the support from these consultants and calculated
the total of the project budgets to be $6,750,000. It is recommended that the
contracts expire on June 30, 2009.
FISCAL ANALYSIS:
The consultants would be paid for their services using funds already set aside for
engineering costs within the adopted 2007-08 capital project budgets of each capital
project. The Purchase Order process is one budgetary control tool which also
allows staff to keep track of the expenditure for each consultant service.
ATTACHMENTS:
• CBM Consulting, Inc. Statement of Qualifications
• Paller-Roberts Engineering Statement of Qualifications
• Norris-Repke Statement of Qualifications City of Culver City, California
City Council Agenda Item Report
• Psomas Statement of Qualifications
• KDM Meridian Statement of Qualifications
• Nickerson Company Statement of Qualifications
• APD Consulting Statement of Qualifications
MOTIONS:
That the City Council:
1. Approve professional services agreements with CBM Consulting, Inc., Paller-
Roberts Engineering, KDM Meridian, Norris-Repke, and Psomas, for General
Civil Engineering services (Design, Construction Management, Inspection,
and Survey), and with Nickerson Company and APD Consultants, for
Construction Management and Inspection services for a total aggregate not-
to-exceed cost of $675,000 and expiring on June 30, 2009; and
2. Authorize the City Attorney to prepare the necessary documents and
authorize the City Manager to execute such documents on behalf of the City.
OR
3. Direct staff to prepare Request for Proposals for General Civil Engineering
services for each Capital project and seek City Council authorization for
release of RFP and for contract award.
MEETING DATE : July 23, 2007
AGENDA ITEM : Authorization to Award Professional Services Agreements
with CBM Consulting Inc., Paller-Roberts Engineering, Inc., KDM Meridian,
Norris-Repke, and Psomas for General Civil Engineering Services, and
Nickerson Company and APD Consultants for Construction Management and
Inspection Services
ATTACHMENTS
Pages
1. CBM Consulting, Inc. Statement of Qualifications 1-11
2. Paller-Roberts Engineering Statement of Qualificationsl 2-18
3. Norris-Repke Statement of Qualifications 19-28
4. Psomas Statement of Qualifications 29-39
5. KDM Meridian Statement of Qualifications 40-46
Nickerson Company Statement of Qualifications 47-51
7. APD Consulting Statement of Qualifications 52-59June 18, 2007
CBM Consulting, Inc . Building the Future
Project Management ? Construction Management ? Civil Engineering
Lee Torres
Associate Engineer
City of Culver City
9770 Culver Boulevard
Culver City, CA 90232
RE: STATEMENT OF QUALIFICATIONS FOR GENERAL CIVIL ENGINEERING SERVICES
Dear Mr. Torres:
CBM Consulting, Inc. is pleased to submit our qualifications to the City of Culver City for your consideration.
We are committed to working seamlessly with your staff and project team to ensure the successful delivery of
this project.
The CBM Consulting team, our project systems, and our entire management structure are geared to providing
flexible services to agencies such as yours. We are intimately familiar with projects and the scope of services
requested. Our specialty is providing services, similar to those requested in your Request for Proposals, to
public agencies. We offer flexible, responsive and economically competitive services. This proposal has been
prepared according to the requirements set forth in the RFP.
CBM maintains close attention of the commitments to our clients by tracking our contract budgets and
schedules on a weekly basis . We maintain a six-month look-ahead by project and personnel , in order to
proactively identify resource needs and availability . We assure that our key personnel will be assigned to the
project for its duration and will not be removed or replaced by us without concurrence from the City of Culver
City. Every member of our proposed team is available to be committed to the projects assigned to us beginning
immediately.
Thank you for this opportunity to offer our services to the City of Culver City. Should you have questions
during the selection process , please contact me at (310) 329-0102.
Respectfully,
CBM Consulting, Inc.
Chuck Stephan , P.E. (CA RCE C50481)
President
Headquarters: Los Angeles ? 17601 South Denver Avenue. Gardena, CA 90248 ? Tel: (310) 329-0102 ? Fax: (310) 329-1021
Branch Office: Orange County ? Tel: (714) 565-0648
www, cbmconsulting. cornSTATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
OVERVIEW
CBM Consulting, Inc.
Building the Future
MISSION STATEMENT
CBM consistently implements creative, innovative, and energized civil engineering services to make our
client's project dreams come true. Our associates work with dynamic, optimistic integrity to create and
deliver successful projects.
VISION
We will be the most dynamic group achieving results for our clients and associates beyond all
expectations.
VALUES
• We keep our business fun, energizing, exciting, courteous and engaging. We promote an
upbeat, optimistic team spirit, and the enjoyment and celebration of life.
• We encourage personal and professional development.
• We make our clients look good. Customer service is more important than immediate revenue.
We provide peace of mind, sense of order, and freedom.
• We measure our success and our client's satisfaction through repeat business and referrals.
• We encourage responsible environmental measures and conservation.
• We promote the spirit of equal opportunity involvement.
• We are corporately mindful of the company, maintaining a strong business through client
satisfaction and confident abilities. We share among our associates and provide for the greater
good.
CBM Consulting, Inc.
2MSTATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
EXECUTIVE SUMMARY
CBM Consulting Inc. is a multi-disciplined engineering consulting firm that has been providing Civil
Engineering Design, Project Management, Construction Management and Observation, Grant
Application Processing and NPDES Program Implementation services to private, commercial, industrial
and municipal clients collaboratively for over sixteen years. Our extraordinary team combines a passion
for design and management with a commitment to successful project delivery.
Our award winning projects are a direct result of our strong performance as design and management
professionals for a growing list of satisfied clients. We are committed to using the latest technologies to
improve project delivery and to meet the needs of our clients, improve efficiency, and develop state-of-
the-art documents, designs, and deliverables. Together with our clients, we work to deliver quality-
driven solutions and provide value and results that exceed expectations.
CBM, a California Corporation established in 1989 and incorporated in 1990, has an outstanding track
record on over 500 municipal projects with no unresolved claims.
CBM consistently implements creative,
innovative, and energized civil engineering
services to make our client's project dreams
come true. Our associates work with dynamic,
optimistic integrity to create and deliver
successful projects.
OFFICES Headquarters: Branch Office:
17601 S. Denver Ave. 1111 Town & Country Rd.
Gardena, CA 90248 Orange, CA 92868
Tel: (310) 329-0102 Tel: (714) 565-0648
Fax: (310) 329-1021 Fax: (714) 565-0668
WEBSITE www . cbmconsulting.com
FEDERAL TAX IDENTIFICATION NUMBER 95-4380000
FIRM CERTIFICATIONS California State-Certified Small Business (SB)
CBM Consulting, Inc.STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
RECENT AWARD WINNING PROJECTS
American Public Works Association (APWA) Southern California Chapter
Project of the Year 2006:
• City of Rancho Palos Verdes, Point Vicente Interpretive Center Project
• City of La Habra, La Bonita Park Phase II Improvements Project
Project of the Year 2005:
• City of La Habra Holgate Area Street Rehabilitation and Water Main Replacement Project
(Street and Transportation)
• City of La Habra La Bonita Park, Harbor Boulevard Storm Drain Improvements and La Plaza
Channel Improvements (NPDES Watershed Management)
Project of the Year 2004:
• Alameda Corridor East (ACE) Construction Authority: Jumpstart Safety Program
• City of Long Beach: Emergency Communications and Operations Center
• City of Signal Hill: Spring Street Revitalization Corridor
• City of West Hollywood: Spaulding Parking Lot
Project of the Year 2003:
• CM for City of Long Beach New Fleet Services, Towing/Impound and Refuse Facilities
American Society of Civil Engineers (ASCE ) OC Branch
Project Achievement Award 2005:
• City of La Habra La Bonita Park, Harbor Boulevard Storm Drain Improvements and La Plaza
Channel Improvements
Orange County Engineering Council (OCEC)
Engineering Project Achievement Award 2005:
• City of La Habra La Bonita Park, Harbor Boulevard Storm Drain Improvements and La Plaza
Channel Improvements
CBM Consulting, Inc.STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
CONSTRUCTION MANAGEMENT & OBSERVATION
Construction Management
CBM's construction managers apply many years of experience on Caltrans, municipal, utility and
private construction projects. Our team allows your agency access to some of the most practical
Construction Managers and Technicians available. CBM provides all parties with up to the minute
information, and is sensitive to the special needs of the community.
Construction Observation
CBM provides construction observation services for many types of
projects. CBM construction observers have experience with bridges,
highways, heavy civil projects, roadways, utilities, transportation projects,
rail, wharf and port facilities, federally funded projects, and virtually any
other type of municipal or public projects. Our construction inspectors
bring many years of accrued skills in dealing with contractors and
keeping the projects on track for timely completion.
SERVICES AVAILABLE
Contract Administration
Cost Estimating and Budgeting
Projected vs. Actual Budget Tracking
Scheduling, Monitoring and Tracking
Change Order Evaluation & Negotiation Airports
Document Controls
Submittal, Shop Drawing & RFI processing
Construction Observation
Materials Inspection
Specialty Inspection
As-Built Documentation
Federal Fund Requirements Administration
Public Relations for Fire &
Police Department Projects
Storm Water Prevention Plan Monitoring
Hazmat Abatement Admin. & Coordination
Warranty, O&M Manuals and Training
Claims Avoidance
Full Time Daily Public Works Inspection
Daily and Weekly Reports
Quality Assurance
Photo and Video Documentation
Field Change Coordination
Quantity Measurement and Verification
Manpower and Equipment Tracking
As-Built Documentation
Contract Time Monitoring
PROJECT TYPES
Multi-Prime Projects
Streets & Highways
Building Construction
Marina, Port & Wharf Projects
Municipal Pool Projects
Parking Structures and Lots
Storm Drains & Sewer Systems
Building Renovations
Natural Gas Pipelines
Railroad Grade Separations
Sound Walls & Guard Rails
School Projects
Park Projects
Municipal Building Construction
Earthquake Repairs
CBM Consulting, Inc.
W5STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
CIVIL ENGINEERING DESIGN
CBM's talented staff of Registered Professional Engineers and Designers is complemented with a wide
range of experience in Engineering Design Project, both in the public and private sector. Coupled with
the latest design software tools, CBM provides efficient, cost effective and timely engineering solutions
meeting a variety of project requirements. In addition, CBM draws from a substantial support base of
subconsultants for specialized engineering tasks including traffic signal engineering, structural
engineering, geotechnical engineering and architectural services as needed.
CBM has over 15 years of comprehensive civil engineering experience. CBM works almost entirely with
public agencies, and as such, is uniquely suited to respond to the specific needs of public works
projects. Our highly qualified staff has completed a diverse range of civil engineering projects for many
agencies throughout Southern California.
CBM Consulting has successfully designed and managed the
construction of all aspects of public works construction including
storm sewer, sanitary sewer, and water pipelines; curb, gutter,
and sidewalks; pavement construction; landscaping; structures,
and buildings. CBM Consulting works with both new and existing
infrastructure improvements, but specializes in civil rehabilitation
projects. CBM also provides complete program management
services encompassing all aspect of a project or program from
conception through completion.
SERVICES AVAILABLE
Civil Design
Entitlement & Permitting Services
Public Relations
Agency Processing
Expert Witness and Testimony
As-Built Drawings
Plan Reproductions
PROJECT TYPES
Street Overlay, Reconstruction & Widening
Commercial Land Development Design
Grading/Drainage Design
Hydrology Studies
Traffic Signalization Projects
Parking Lot Layout Design
Traffic Control
ADA Accessibility
Transit Centers
Utility Projects: Water, Sewer, Storm Drain,
Natural Gas, Electrical, Street Lighting, etc.
CAD SOFTWARE
AutoCAD 2000-2007 (R14)
Land Desktop 2004-2007
AutoCAD Sewer 2007
CLIENT PORTAL
We are fully equipped with the latest management
information systems. For up-to-the-minute
information regarding your project, CBM allows
secured access to your project(s) through Remote
Administrator. We'll issue you a User ID
and Password so you can view reports, plans,
contracts and invoices.
= ? CBM Consulting, Inc.STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
Project Highlights
PROJECT HIGHLIGHTS
STREETS
Spring Street Revitalization Corridor
American Public Works Association (APWA) Southern California Chapter Project of the Year 2004
CBM provided design, project management and construction management services for the $5.6 million
Spring Street Improvement project along the border of the City of Signal Hill and the City of Long
Beach. The project included widening and reconstructing the roadway, lowering the grade crest by 17
feet, parkway improvements, intersection improvements, traffic signal upgrades and new installations,
and relocating existing gas , oil, water, sewer and other utility lines. Based on record data and field
exploration, CBM identified in excess of 29 underground utility lines including public utilities, private
utilities and underground oil and gas pipelines. As part of the Spring Street Project, 980 linear feet of
12" diameter sewer line was installed along Spring Street and California Avenue and 1900 linear feet of
30", 24" and 18" diameter storm drain lines were installed along Atlantic Avenue. Landscaped medians
were also constructed along the section of Spring Street between Long Beach Boulevard and Atlantic
Avenue and along the section of Atlantic Avenue between Spring Street and Canton Avenue.
-
CBM Consulting, Inc.
1STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
Project Highlights
Zumirez Drive Realignment
CBM completed design and construction management for the realignment of Zumirez Drive and
construction of a new traffic signal at the intersection with Pacific Coast Highway in the City of Malibu.
CBM prepared the plans, specifications, and estimate; as well as developing a preliminary street layout
and a full legal description for proposed right-of-way for the Zumirez Drive Realignment Project. This
project required extensive coordination with Caltrans. Construction consisted of new asphalt pavement
with decomposed granite walkways, striping, and relocated utilities.|10 10|CBM Consulting, Inc.STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
Project Highlights
Holgate Area Street Rehabilitation
American Public Works Association (APWA) Southern
California Chapter Project of the Year 2005
CBM conducted project management, including
design and preparation of plans, specifications,
and estimate; construction management, and
financial management of this $3.2 million
pavement rehabilitation and water main
replacement project for the City of La Habra. The
project included replacement of water mains,
rehabilitation of local and collector streets with
conventional and asphalt rubber hot mix
pavement, slurry seal, pavement fabric,
sidewalks, driveways, cross gutters, and ADA
curb ramps. This project featured full depth
pulverization and reuse of existing asphalt and
base materials as base for new asphalt pavement
at a significant cost and time savings. It included 20,000 tons of asphalt, 30,000 square feet of
sidewalk, 10,000 feet of water main, and 250 water services.
Pedestrian Improvements Project Round -a-bout
CBM managed a major pedestrian improvement
project in an effort to make the City of Santa
Monica even more pedestrian friendly. Some of
these improvements include street re-pavement,
installation of curb extensions and landscaped
median islands on Wilshire Boulevard and
Broadway, new striping, and the installation of
Santa Monica's first round-a-bout intersection.
The round-a-bout opened in June of 2003 and is
located at the busy intersection of Washington
and 26th Street. This project had a number of
challenging ADA design configurations, which
were resolved by using innovative
implementation.
CostcoNenice Traffic Management
This project in the Los Angeles neighborhood surrounding a Culver City Costco outlet included
updating proposed median designs and irrigation plans in order to divert traffic from this residential
neighborhood. CBM performed verification and drafting of existing conditions, then improved on
existing designs to accommodate ADA requirements.
-X CBM Consulting, Inc.STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
KEY PERSONNEL
CHUCK STEPHAN, P.E.
TITLE: Principal-In-Charge / Design Engineer/ Project Manager
REGISTRATION: CA RCE No. C50481; OR RCE No. 1872PE; HI RCE No. PE-8432(CE)
EDUCATION: B.S. Agricultural Engineering, California Polytechnic State University, San Luis Obispo
PROFESSIONAL AFFILIATIONS: ASCE, APWA
YEARS OF EXPERIENCE: 21
CIVIL ENGINEERING DESIGN
? Cherry Ave Widening Project , Signal Hill , CA: Design Engineer: The project involves the street
widening design for the section of Cherry Ave. between 19th St. and 250' south of PCH. The final
design will increase the number of traffic lanes in addition to increasing the number of turn lanes at
the PCH intersection. The purpose of the project is to alleviate the current traffic congestion on this
section of Cherry Ave. The project involves the facilitation of the design process by the coordination
of the sub consultants and utility companies involved in this project. The project also involves the
selection and coordination of an environmental consultant for the NEPA process on the project.
(Cost:$2M)
? Lambert Road Rehabilitation Project , La Habra , CA: Project Engineer. Provided project
engineering and construction management for the Lambert Road street rehabilitation project. This
Caltrans funded project provides for arterial rehabilitation of pavement, ARHM pavement,
construction of new landscaped medians, curb access ramps, sewer lining, and water
improvements. (Value $800K)
? Lambert Rd/Hacienda Rd Rehabilitation and Waterline Replacement Project, La Habra, CA:
Project engineering/construction management for Caltrans funded arterial rehabilitation of Lambert
Rd and Hacienda Rd, and replacement of water pipelines in the City of La Habra, including ARHM
pavement (Value $2M)
? Lambert Rd Sidewalk Gap Closure Project , La Habra, CA: Project Engineer. Provided project
and construction management services for the Lambert Road Gap Closure project which filled
missing gaps and fully complete the sidewalk system along both sides of Lambert Road across the
entire City. This project includes 15' cast in place concrete retaining walls, right of way acquisition,
curb & gutter, sidewalk, ADA improvements, utility pole relocation, railroad coordination, and
landscape restoration in various locations. The project is partially funded with Safe Route to School
funds administered through Caltrans. (Value $2M)
? Project engineering/construction management for Caltrans funded ("Safe Route to School")
sidewalk construction project in the City of La Habra, including retaining walls and utility relocations
(Value $300K)
? Residential Streets and Alley Rehabilitation and Water Replacements Project , La Habra, CA:
Project Engineer/Project Manager/Design Engineer. Provided Project Engineering, Construction
T
CBM Consulting, Inc.
10STATEMENT OF QUALIFICATIONS FOR CULVER CITY GENERAL ENGINEERING SERVICES
Rates & Fed
RATES & FEE
PROFESSIONAL ENGINEERING
& MANAGEMENT SERVICES HOURLY BILLING RATE
0 Principal-In -Charge/Program Director ................................................................. $ 150.00
0 QA/QC Manager ................................................................................................... 130.00
0 Senior Engineer .................................................................................................. 120.00
0 Senior Project Manager ...................................................................................... 130.00
0 Construction Manager ........................................................................................... 110.00
0 Traffic Engineer..................................................................................................... 130.00
0 Project Manager.................................................................................................. 120.00
0 Resident Engineer .............................................................................................. 110.00
0 Project Engineer ................................................................................................... 110.00
0 Assistant Construction Manager .......................................................................... 95.00
0 Office Engineer ..................................................................................................... 100.00
0 Design Engineer ..................................................................................................... 95.00
0 Assistant Project Manager ..................................................................................... 90.00
0 Associate Engineer ................................................................................................. 90.00
0 Project Controls .................................................................................................... 75.00
0 Construction Observer ........................................................................................... 90.00
0 CAD Technician .................................................................................................... 70.00
0 Technician ............................................................................................................ 65.00
0 Administrative & Clerical Support .......................................................................... 60.00
The rates shown above may be negotiable for long-term, multi-classification contracts and/or
assignments that utilize full-time staff exclusively at the Client's offices or project site.
EXPENSES
Project expenses are billed at cost plus 10%. Project expenses include: Non-commuter
automobile mileage (at $.50 per mile), postage and special courier expenses, subsistence,
reproduction, project related telephone, subcontractor services and other direct project
expenses as requested by the client. Should the. client desire, phone and mileage may be
included in an hourly rate, which shall be negotiated and slightly higher than the billable rates
indicated above.
NON-SOLICITATION
By accepting this proposal, Client agrees not to solicit CBM Consulting, Inc.'s employees for
direct employment with client without the explicit written approval of the CBM Consulting, Inc, for
a period of two years following employee's termination of employment with CBM Consulting, Inc.
Should client desire to arrange for direct employment of CBM Consulting, Inc.'s employment, an
equitable fee will be agreed to by and between CBM Consulting, Inc. and client for CBM's costs
for recruitment, training overhead and other costs associated with employee turnover.
Rates are subject to change. Standard adjustment periods are semi-annually on the 1St of
January and theist of June.
Jan. 1, 2007
1 (PALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
5701 SLAUSON AVENUE, SUITE 208, CULVER CITY, CALIFORNIA 90230 PHONE (310) 641-1853 • FAX (310) 641-1861
STATEMENT OF QUALIFICATIONS
PALLER - ROBERTS ENGINEERING, INC. WAS FORMED IN FEBRUARY, 1980,
BY PHILLIP G. ROBERTS AND JACK D. PALLER (DECEASED 2/83) TO FURNISH
PROFESSIONAL CIVIL ENGINEERING SERVICES TO DEVELOPERS, ARCHITECTS
AND GOVERNMENT AGENCIES.
THE COMPANY'S EFFORTS ARE DIRECTED TOWARD DESIGN OF THE INFRA-
STRUCTURE ELEMENTS REQUIRED FOR THE DEVELOPMENT OF COMMERCIAL,
INDUSTRIAL, RESIDENTIAL AND MUNICIPAL PROJECTS. THE PRINCIPAL AND
KEY STAFF MEMBERS POSSESS
A STRONG BACKGROUND OF TECHNICAL
ABILITY AND PRACTICAL EXPERIENCE AND HAVE A RECORD OF SUCCESSFUL
ACCOMPLISHMENTS IN THE FIELD OF CIVIL ENGINEERING. THE FIRM EMPLOYS
A NUCLEUS OF PROFESSIONAL AND TECHNICAL PERSONNEL CAPABLE OF
EFFICIENTLY COMPLETING ITS ASSIGNMENTS WITHIN SCHEDULED REQUIRE-
MENTS. ALL PROJECTS ARE PERSONALLY SUPERVISED BY THE PRINCIPAL.
I lowPALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
AREAS OF EXPERTISE
• Earthwork and mass grading.
• Analysis and design of complete storm drain systems and water courses.
• Design and coordination of underground utilities.
• Preparation of plans including computations for control of horizontal & vertical
elements of proposed facilities to be constructed above and below ground.
• Preparation of rough and finished grading plans.
• Design of surface improvements for roadway and parking areas including curbs,
paving systems, traffic striping, lighting and landscaping.
• Highway design including street plans, traffic striping, signage, lighting, and
underground utilities.
• Design of sanitary sewer collection systems and sewage treatment facilities.
• Design of complete water distribution systems including piping, tanks and
pumping systems.
• Preparation of storm water quality systems including processing of plans and
reports through local agencies.
• Preparation of utility composite plans to coordinate the location of all utility
systems including joint trenching details.
• Coordination of site improvements with architects and engineers of other disciplines.
Also coordinate and process plans through public agencies for required approvals
and permits.
• Preparation of subdivision maps and legal descriptions.
• Surveying including aerial photogrametry , field measuring of data and ALTA surveys.
• Construction cost estimates.
• Construction administration.
• Technical specifications.
• Preparation of site feasibility investigations and reports.
• Preparation of Civil Engineering studies , investigations and reports.
15,PALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
STATEMENT OF QUALIFICATIONS 11-16-05
CITY OF CULVER CITY
BRIEF LIST OF RECENT REPRESENTATIVE PROJECTS
STREET IMPROVEMENTS
New Streets : Simi Town Center Way - 5,500 ft. in Simi Valley
Jefferson Way - 3,800 ft. in Simi Valley
Street Widening : First Street - 1,000 ft. in Simi Valley
Erringer Road - 500 ft. in Simi Valley
Canoga Ave. -1 block in Los Angeles
Sherman Way -1 block in Los Angeles
Cohasset St. - 1 block in Los Angeles
Highland Ave. - 1 block in Los Angeles
Melrose Ave. - 1 block in Los Angeles
STREET LIGHTING REPLACEMENT
Lindblade & Kreuger - 4 blocks in Culver City
Washington Blvd. - 11 blocks in Culver City
SANITARY SEWER SYSTEM (NEW) - SIMI VALLEY
Approximately 10,000 feet of 6 inch thru 10 inch pipe.
SANITARY SEWER REPLACEMENT - CULVER CITY
Eveward Road, Drakewood Avenue, Whitburn Street and
Flaxton Street.
'WATER SYSTEM (NEW) - SIMI VALLEY
Approximately 30,000 feet of 4 inch thru 16 inch pipe.
Potable and Reclaimed Water including Pressure Reducing Station.
STORM DRAINAGE SYSTEM - SIMI VALLEY
2,100 feet 10 X 10 RCB - Ventura County
13,000 feet public drains 18 inch to 54 inch diameter with a network
of six (6) Detention Ponds.
14PALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
SUMMARY OF PROJECTS
MULTI-FAMILY
Arirang Senior Housing - Los Angeles, CA.
Cherokee Senior Housing - Los Angeles, CA.
Del Amo Apartments - Torrance, CA
One Harbor Drive - San Diego, CA.
Spring Creek Ranch - Jackson, WY.
USC Housing Phase II - Los Angeles, CA.
Van Buren Station Apts. - Riverside, CA.
STATE HIGHWAY IMPROVEMENTS
• Crater Lake Highway widening - Medford, OR.
• New on-&-off ramps at RTE 178 and Oswell
& Mt. Vernon Interchanges - Bakersfield, CA.
• 1-25 Off-ramp at County Line Road - Denver, CO.
• Hawthorne Blvd. & Artesia Blvd. widening - Redondo Beach, CA.
• Lakewood Blvd. at Candlewood Avenue - Lakewood, CA.
STREET IMPROVEMENTS
• County Line Road widening - Denver, CO.
• Yosemite Street widening - Denver, CO.
• Main Street widening - Santa Ana, CA.
• Candlewood Ave. - Lakewood, CA.
• Fletcher Parkway widening - El Cajon, CA.
• Johnson Ave. widening - El Cajon, CA.
• Central Ave . & Moreno St . widening - Montclair, CA.
• W.T. Harris Blvd. widening - Charlotte, N.C.
• Century Park W. widening - Los Angeles, CA.
• Pico Blvd. widening - Los Angeles, CA.
• Santa Rosa Blvd. widening - Santa Rosa, CA.
• Slauson Ave. widening - Los Angeles County
• Bear Valley Rd. & Hesperia Rd. widening - Victorville, CA.
• Overland/Jefferson intersection - Culver City, CA.
• Washington & Culver Blvd. improvements - Culver City, CA.
• Ince Blvd. replacement - Culver City, CA.
• Fairfax Ave. widening - L.A. County
• Beach Blvd ., Manchester Blvd. & Commonwealth Ave.
Improvements - Buena Pk. CA.
• Melrose/La Cienega improvements - W. Hollywood, CA.
• Harbor Blvd.- Anaheim, CA.
15PALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
PHILLIP G. ROBERTS
RESUME
EDUCATION
Bachelor of Science/Mechanical Engineering, 1971,
Michigan State University
REGISTRATION
Professional Civil Engineer in California (C27269, 7-14-76)
Oregon, Virginia, North Carolina , Colorado and Nevada.
PROFESSIONAL AFFILIATIONS
Member - American Society of Civil Engineers
Member - National Society of Professional Engineers
EMPLOYMENT HISTORY
1980-PRESENT Principal Paller-Roberts Engineering
Culver City, CA
1973 - 1980 Progressed from
Gruen Associates,
1972 - 1973
Designer to Project
Engr. to Chief Civil Engr.
Packaging Engineer
Los Angeles, CA
Rockwell International
1970 - 1972 Draftsman and Surveyor
El Segundo, CA
Bol-Mac Engineering,
Lansing, MI
EXPERIENCE SUMMARY
Mr. Roberts has over 30 years experience in Civil Engineering consulting practice. He has
managed a staff of engineers and designers in the preparation of civil engineering studies,
reports, plans, subdivision maps and other documents for numerous commercial, industrial,
residential and municipal projects. His technical abilities and management skills have led
Paller-Roberts Engineering to successful completion of numerous complex and challenging
projects over the past years. Due to Mr. Roberts' leadership and high standards, the firm
enjoys a reputation for providing top quality service to its clients. To illustrate this point, the
majority of the firm's clients have been dealing with the company repeatedly.PALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
PHILLIP G . ROBERTS' RESUME
A sampling of commercial projects include large mixed use developments such as: Horton
Plaza in San Diego, CA. and Glendale Galleria II in Glendale, CA. Regional Shopping
Centers include: North County Fair in Escondido, CA, the Fashion Show in Las Vegas, NV.,
Media City Center in Burbank, CA., University Place in Charlotte, N.C., Park Meadows in
Denver, CO., and Santa Rosa Marketplace, in Santa Rosa , CA. Office buildings include:
the La Cienega-Slauson Business Park in Los Angeles, CA; Hewlett Packard Regional
Headquarters, N. Hollywood, CA; Disney Corporate Headquarters in Burbank, CA and
Buena Park Business Plaza in Buena Park, CA.
Specialty Commercial projects include: the Pacific Design Center, Phases 1 and 2 in W.
Hollywood, CA., Olympic Villages at UCLA and USC for the 1984 Summer Olympics in Los
Angeles, CA. and studies for the renovation of the L.A. Coliseum in Los Angeles, CA.
Municipal/Public Works projects include: approximately 3.5 miles of new streets and utilities
to serve a segment of commercial and residential property in the City of Rancho Cuca-
monga, CA., Street widening and new freeway on and off ramps in Bakersfield, CA; a major
storm drainage/flood control system in Las Vegas, NV.; Victorville Post Office in Victorville,
CA., La Quinta Civic Center in La Quinta, CA., Rialto Civic Center in Rialto, CA.
Institutional projects include: the addition of 3 dormitory buildings housing 1200 students
with student center, auditorium, and underground parking on the campus at UCLA; Armand
Hammer Museum in Westwood, CA. and Phases 1 and 2, expansions of Loyola Law School
in Los Angeles, CA.
Residential projects include: One-Harbor Drive, a 200 unit high-rise condo development with
parking structure and retail on the first 2 floors in San Diego, CA; Phases 1 and 2 of faculty
housing complexes for USC located near the campus in Los Angeles, CA., Spring Creek
Ranch, a complex of multi-phased condominiums with common facilities in Jackson, WY.
and Navy Bachelor Enlisted Quarters in San Diego, CA.
Recreational projects include: the Industry Hills Complex mass grading, drainage, roadways
& utilities for the 36 hole golf course, convention center, Sheraton Hotel and swimming and
tennis complex in Industry, CA. This project won the ASCE Project of the Year award. Mr.
Roberts was an engineer involved with the actual design of the complex while he was with
Gruen Associates.
As a Principal for Paller-Roberts Engineering, Inc., Mr. Roberts' responsibilities include
administrative duties and marketing, project management, supervision of office staff and
quality control.
11PALLER -ROBERTS ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS
5701 SLAUSON AVENUE, SUITE 208 , CULVER CITY, CALIFORNIA 90230
FEE SCHEDULE
(Effective January 1, 2007)
PHONE (310) 641 - 1853 • FAX (310) 641-1861
Hourly Rate
Principal $150.00
Project Director 130.00
Senior Engineer/Project Manager 120.00
Engineer 110.00
Engineer Designer 100.00
Draftsman 85.00
Report Typing 65.00
Legal Testimony and Depositions
(Principal Time Only - 4 hr min.) 300.00
Two-Man Survey Crew 205.00
Reimbursable Expenses
Printing, copying, long-distance telephone,
faxes, messenger travel, and other expenses. AT COST +10%
These fees are in effect until January 1, 2008 and are subject to revisions thereafter.
NOTES
1. Invoices will be submitted monthly on the basis of actual time spent.
2. Paller-Roberts Engineering, Inc. maintains insurance for professional liability,
general liability and worker's compensation. Certificates of insurance will be
provided upon request.
3' Accounts overdue more than 60 calendar days from date of original invoice
shall be subject to an interest charge at the current bank prime rate.
4. Limitation of Liability - Engineer's liability to client due to negligence, errors or
omissions of Engineer, shall be limited to $50,000 or the fee amount,
whichever is greater. Higher liability coverage is available upon request prior
to contract authorization.
IsJune 18, 2007
Mr. Lee Torres, Associate Engineer
CITY OF CULVER CITY
Engineering Division ; 2nd Floor
9770 Culver Boulevard
Culver City, CA 90232
RE: REQUEST FOR STATEMENT OF QUALIFICATIONS FOR GENERAL
CIVIL ENGINEERING SERVICES
Dear Mr. Torres:
Norris-Repke is very pleased to submit this Statement of Qualifications (SOQ) and is excited about the
opportunity to serve the City of Culver City in all of the General Civil Engineering Services (Design, Survey,
Construction Management and/or Construction Inspection). We are prepared to provide the resources and
quality services you are seeking for to support the City's Capital Improvement Program or as directed by the
City. We understand the level of support that will be necessary to meet the demands of each service area, the
uniqueness of each project and the expectations of the City. We are excited about demonstrating why we are
known as one of the best in delivering the professional services that you are seeking and look forward to the
prospect of being part of the "Culver City team".
Norris-Repke has specialized in providing consulting services similar to those you are seeking to municipal and
public works agencies for over 23 years. To date, we have successfully served over 80 public agencies with the
majority of them remaining as ongoing clients. Norris-Repke has delivered over 60 projects in the past 5 years
in related to the services you are seeking. By selecting Norris-Repke the City will receive an experienced,
knowledgeable team with a proven track record of delivering the services you are seeking. Our approach
includes:
Open communication with the City of Culver City staff;
A commitment to providing a highly qualified team;
Assurance that the resources are available as promised;
Sensitivity to quality, costs and schedules; and
Attention to "details, details, details"
We believe that we are uniquely qualified to serve the City of Culver City for the following reasons:
â Our successful and proven track record in providing similar services to municipal
agencies. We currently provide these services on an as needed basis for several
cities.
â A turnkey approach in which you can have confidence in our responsiveness and
the quality of services you receive.
â Qualified and experienced staff large enough to meet the City's requirements on
short notice.
Our goal is to exceed your expectations and to always demonstrate a benefit to the City in utilizing our firm in
delivering any service. We look forward to working with you and the staff.
TEL: 714-973-2230 FAX: 714-973-2263 WWW: www.norrisrepke.com
400 North Tustin Avenue. Suite 230. Santa Ana, CA 92705
IqSECTION 1: GENERAL BACKGROUND AND QUALIFICATIONS
FIRM BACKGROUND
SINCE 1984
Norris-Repke is a multi-disciplined engineering firm headquartered in Santa
Ana, California that believes anticipating and responding to your needs is
fundamental to maintaining a leading position in the marketplace. For over 22
years, Norris-Repke has provided quality services to a variety of municipal and
public works agencies in the Southern California area.
WHO WE ARE
Since 1984, Norris-Repke has successfully served a variety of clients. Areas of service include city
engineering, surface transportation, water resources, wastewater collection, land surveying, subdivision
mapping, GIS services, as well as construction administration, public works observation and building
and safety. Our in-house staff of engineers, surveyors and specialized support personnel enables us to
respond quickly to demanding assignments, project schedules and changing project scopes.
OUR PHILOSOPHY
Our philosophy is based on providing cost-effective municipal contract services to our clients by serving
as an extension of their staff on a full or part time basis. Our staff has significant experience working
directly for various municipalities and governmental agencies and we have designed our company from
the ground up to provide services to municipal clients.
OUR SERVICES
Our experienced personnel are ready to assist you by serving as your support staff on a part-time to
full-time basis depending upon your unique needs and requirements. Our staff is trained in a wide
variety of disciplines and are available to provide a broad range of services - tailored to meet your
particular needs and circumstances in the following areas:
• Public Works/Civil Engineering/Surveying
• Development and Plan Review
• Construction Management and Inspection
• Municipal Consulting
20
Services offered within each area include:
• Public Works/Civil Engineering: Turnkey Civil Engineering Design, Master Plans for
Drainage, Water and Sewer, PS&E, Street and Road Rehabilitation, Surface Transportation,
Water Resources, Wastewater collection, Land Surveying, Subdivision Mapping, NPDES
Support, Project Scheduling and Management and GIS Services.
• Development and Plan Review: Civil Plan Review, Map Review, Capital Improvement Project
Plan Review, Quality Assurance and Control, development engineering and Constructability
Review.
• Construction Management and Inspections : CIP Planning and Programming, CIP
Program/Project Administration and Oversight, Construction Observation, Financial Oversight
and Risk Mitigation.
• Municipal Consulting: Staff Augmentation, Interim Staff Support, Contract Administration,
Independent Management Evaluation and building and safety support and code compliance.
City of Culver City
General City Engineering ServicesSECTION 1: GENERAL BACKGROUND AND QUALIFICATIONS
CORPORATE INFORMATION
GENERAL CONTACT INFORMATION
Name : George Wentz
Title: Principal
Address : 400 N . Tustin Avenue , Suite 230
Santa Ana , CA 92705
Phone : 714-973-2230
FAX: 714-973-2263
LEGAL ENTITY
Corporation Name: Norris-Repke, Inc.
State of Incorporation : California
Federal Taxpayer ID No: 33-0061609
HOW WE CAN ASSIST YOU
Our experienced personnel assist you by serving as your staff on a part-time to full-time basis,
depending upon your unique needs and requirements.
We offer and make available to the City of Culver City an experienced team that possesses the diverse
skill set needed to address the anticipated workload for the City's improvement projects . This skill set
includes knowledge and experience with:
• Civil Engineering Design
• Pavement Rehabilitation Design
• Capital Improvement Program and Public Works Project Management
• Street, Sewer, Storm Drain and Water Pipeline Design
• Construction Management
• Public Works Observation
• Contract Administration and Management
• Quality Control and Quality Assurance
• Constructability Review
• Pavement Management Programs
• Design and Construction Surveying
• NPDES and SWPPP
• CAL TRANS and Federally Funded Projects
• AutoCAD and Microstation
• Public Relations and Communications
• GIS and Technology Related Services
City of Culver City
General City Engineering ServicesSECTION 2: STAFF QUALIFICATIONS
ORGANIZATION CHART
Vice President
Engineering Services
Kamran Saber, PE
Design Manager
Buddy Hines
Project Manager
Bruce Blank, PLS, PE
Project Manager
Blane Frandsen, PE
I
Project Manager
Warren Repke, PE
I
Project Manager
Kamren Saber, PE
Project Manager
Ludwig Smeets, PE
ti
Survey Manager
1 ti
President
Ludwig Smeets, PE
Quality Control
Agency Services Manager
Kamran Saber
I
Business Development Mgr.
George Wentz
1111111
Engineer 11 Lead Project Designer Party Chief Senior Building Inspector AdministrationllT Manager Finance/Accounting Manager
Vince Cruz, EIT Ding Martinez Mike LaFontaine Bill Tadn
'
Bill Repko
I
Bill Repke
Engineer) Project Designer SURVEY TECHNICIAN N Snr. Public Works Observer Administrative Assistant ccountant Senior
Gil Bermejo, EIT Mark Moreno Michelle F
1 1 1 I
Charlie Clark (IC)
1 I
Jamie Arnold
I A
Poll Sheen
Planner I Technician 1 Instrument Operator I L^ Snr. Public Works Observer
Jason Carson Alvin Abed|1010|William Murray I Craig Stubbs (IC)
Engineering Intern
Justin Streets, EIT
HydrologylHydraullca Engr.
Noel Torkelson, PE
Vice President
Admin. Finance & Marketing
Warren Repke, PE
City of Culver City
General City Engineering ServicesINORROVAM
SECTION 3: PROJECT UNDERSTANDING , EXPERIENCE AND SUCCESS
Below is a list of sample projects that Norris -Repke has successfully completed which
relate to the DESIGN services requested by the City of Culver City.
City of San Gabriel
San Gabriel Blvd. Improvement Project
San Gabriel Boulevard serves as a major regional four-lane north /south arterial commuter
link between 1-10 and 1-210 with high traffic and intensive commercial development and
driveway access through the corridor . This STP-L funded project consisted of the
rehabilitation and reconstruction of 3,900 LF of poor condition roadway including localized
removal and replace areas , curb , gutter and sidewalk repair , the addition to gutter plate
and cross gutters , the addition of curb ramps and the reconstruction of driveway aprons
where needed . Due to the intense commercial activity in the area , community outreach
and proactive communication with local businesses was critical.
Norris-Repke successfully provided design and construction surveying , and construction management and inspection services
to this project in addition to design.
City of Rancho Cucamonga
Carnelian Street Storm Drain
Norris-Repke successfully provided design assistance for the creation of a 6 ,000 LF storm drain mainline to connect a
previously constructed 78-inch City segment connected to the Cucamonga Creek Channel and a 96 -inch segment previously
constructed by SANBAG in conjunction with the construction of the 210 Freeway . A major part of this project included the
review and resolution of conflicts and discrepancies from the City Master Plan of Drainage and various other
Hydrology/Hydraulic reports in addition to the drainage study prepared by SANBAG for the construction of the 210 Freeway.
City of Villa Park
Mesa Drive Widening
This project consisted of the widening of 1,000 LF of a collector street within an upscale residential neighborhood . The project
design and construction were complicated by the existing conditions of terrain , driveways , walls and utilities . Norris-Repke
provided survey , design and construction management and inspection services.
City of Irvine
Culver and Walnut Widening Project Report
Culver Drive is a major arterial highway located less than 1/4 mile of the 1-5 freeway in the
City of Irvine. Norris-Repke prepared design concepts and project report for the proposed
addition of a northbound lane on Culver Drive and an eastbound lane on Walnut Avenue
to increase the intersection capacity and reduce congestion in the area . Construction was
estimated to be at $2 . 3 M. Important elements in determining the design concepts
City of Westminster
Westminster Boulevard Raised Median Design
Norris-
Repke successfully provided engineering design services for the installation of raised medians of this major east/west
arterial highway from Newland to Boushard , approximately 5,800 LF . The design of these medians utilized an innovative
"dowel-on" curb approach to minimize design and construction costs.
City of Stanton
Sewer Improvements at Various Locations
Norris-Repke successfully provided design engineering services for the construction of 6,000 LF of parallel relief lines along
five separate City sewer segments identified as high priority by the City's Sewer Infrastructure Analysis Update . Construction
management and observation as well as construction staking were provided in addition to design services.
City of San Gabriel
Master Plan of Sanitary Sewers
Norris-Repke successfully prepared a sanitary sewer system update for the City of San Gabriel 's Master Plan of Sewers that
included the inventory and assemblage of all existing sewer maps , plans , field books , service cards , maintenance records, as
well as the preparation of new digital atlas maps and new master plan data . System analysis was performed on the trunk
City of Culver City
General City Engineering Services4bMMMP-K-9
SECTION 3: PROJECT UNDERSTANDING , EXPERIENCE AND SUCCESS
sewer system to identify deficiencies and a final report was prepared to recommend mitigation measures and future
improvement programs.
City of Rancho Cucamonga
Lower Hermosa Storm Drain and Street Widening
Norris-Repke successfully completed the engineering design of 500 LF of street widening,
railroad crossing upgrades , drainage study and design, the installation of a new traffic
signal , sidewalk , curb and pavement rehabilitation , undergrounding of existing utility lines,
street lighting , the removal of an existing channel and outside agency processing for this
storm drain improvement project.
City of Villa Park
Villa Isle Storm Drain
Norris-Repke successfully developed the engineering design of 1 ,000 LF of 45" HDPE storm drain within an existing natural
channel .
Special design considerations were required due to the shallow cover and existing flows within the natural channel.
Norris- Repke also provided design and construction surveying as well as project and construction management and inspection
services.
City of Buena Park
Commonwealth Avenue Improvement Project
Norris- Repke provided engineering design for the preparation of plans , specifications, and
estimates for the improvement of Commonwealth Avenue from Indiana Avenue to the
easterly City limit (2,180 LF). This project including AC removals and replacement, ADA
improvements , traffic striping and traffic signal modification , as well as design and
construction surveying.
City of Westminster
19th, 20th, 21st & 22nd Street Improvements
Norris-Repke successfully prepared construction plans , specifications, cost estimates , and contract bid documents for the
rehabilitation of several local streets totaling $1 . 1 M in construction costs in the City of Westminster . This project included AC
removals and replacement , sidewalk replacement , drive approach replacement , ADA improvements.
City of Irvine
Campus Drive Rehabilitation
Norris-Repke successfully prepared construction plans , specifications , cost estimates , and contract bid documents for the
rehabilitation of Campus Drive from Culver Drive to Turtle Rock Drive (2000 LF), including AC removals and replacement,
ADA improvements , traffic striping , and median curb replacement . This project also included a review pavement report,
recommendations based on the report , and further analysis of raw data , R-values , and traffic ADT to make design more cost
effective (Value Engineering).
City of Irvine
University Drive Rehabilitation
Norris-Repke successfully prepared plans , specifications , cost estimates , and related construction documents for the this
Federally funded project with limits from Campus Drive to 650 feet easterly.
204
City of Culver City
General City Engineering Services4bRMSAM ME
SECTION 3: PROJECT UNDERSTANDING, EXPERIENCE AND SUCCESS
Below is a list of sample projects that Norris-Repke has successfully completed which
relate to the CONSTRUCTION MANAGEMENT AND INSPECTION requested by the City
of Culver City.
City of Diamond Bar
2006 Area I and Area 2 Slurry Seal Projects
Norris-Repke successfully provided construction management and inspection and engineering design for the
annual $ 1.2 M City of Diamond Bar slurry seal and improvement projects . A proactive approach to community
outreach and involvement was critical to achieving community support of the application of a Cape Seal on their
local streets.
City of San Gabriel
Millennium Miles Street Improvement Program 2000-2005
The City of San Gabriel developed a street improvement program spanning five years to address the needs of its
rapidly deteriorating street system and limited public works improvement budgets . Norris-Repke provided a cost
effective engineering design , project management and construction management and inspection service program
for the five-year citywide annual street improvement program.
City of Lake Forest
FY 2001- 2002 Street Resurfacing and Slurry Seal Projects
Norris-Repke provided construction management , inspection and design services for over the rehabilitation of
over 120 street segments in the City. This project required close coordination with all parties involved , including
local businesses and residents as the project included a busy commercial area.
City of Villa Park
Annual Citywide Maintenance and Improvement Projects
Norris-Repke has provided design and construction management and inspection services for the annual citywide street
maintenance and improvement projects for the City of Villa Park for the past four years . These projects involve the yearly
selection of candidate streets for overlay or slurry seal application using the City Pavement Management Program, the
preparation of separate bid packages for overlay and slurry seal projects and the determination of removal and replace areas,
and construction management and inspection from bidding and award through final construction.
NOTE: Norris-Repke is pleased to provide additional projects to demonstrate our
success in delivering in each of the service areas.
City of Culver City
:Z6
General City Engineering Services4bRMS4E-R --M
SECTION 4: REFERENCES
For over 22 years , Norris-Repke has provided or prepared project reports , design , PS&E documents,
land surveying and mapping , and construction assistance for hundreds of engineering projects.
Currently Norris-Repke provides civil engineering services similar to those requested by the City for
several agencies , references are provided below.
Name : City of San Gabriel
Contact : Bruce Mattern, City Engineer
Contact Information : Bruce Mattern
City of San Gabriel
425 S. Mission Drive
San Gabriel, CA 91776
Phone (626) 308-2800
Fax (626) 458-2830
Length of Relationship : 10 years
Name : City of Villa Park
Contact: Ken Domer, City Manager
Contact Information : Ken Domer
City of Villa Park
17855 Santiago Boulevard
Villa Park, CA 92861
Phone (714) 998-1500
Fax (714) 998-1508
Length of Relationship : 10 years
Name: City of Diamond Bar
Contact : David Liu, City Engineer
Contact Information: David Liu
21825 Copley Drive
Diamond Bar, CA 91765
Phone (909) 839-7000
Fax (909) 861-3117
Length of Relationship : 11 years
Name : City of Lake Forest
Contact: Gene Foster, Associate Engineer
Contact Information : Gene Foster
25550 Commercentre Drive, Suite 100
Lake Forest, CA 92630
Phone (949) 461-3400
Fax (949) 461-3511
Length of Relationship : 9 years
NORRIS-REPKE IS PLEASED TO PROVIDE ADDITIONAL REFERENCES UPON YOUR REQUEST.
City of Culver City
General City Engineering ServicesSECTION 7: APPENDIX
George A. Wentz, PE
Principal-In-Charge
Mr. Wentz recently joined the Norris-Repke team as a Vice President and Principal of
the firm. He has over 30 years of public sector experience. His broad range of
knowledge includes managerial, administrative and technical responsibilities.
He has direct experience as a City Manager , Assistant City Manager , Public Works
Director, City Engineer, Building Official, Traffic Engineer and Redevelopment Agency
Engineer.
Mr. Wentz worked directly with the County of Orange during the incorporation of the
City of Rancho Santa Margarita from 2000 thru 2005. During that period, he also had
direct involvement representing the City with the development community, including
the Rancho Mission Viejo Company.
Relevant experience includes:
• Lead and develop services related to governmental consulting , building and
safety, construction management , program management , engineering design
and civil plan review and code compliance.
• Serve in various contract services roles such as Interim City Manager,
Assistant City Manager, Director of Public Works/City Engineer, and Building
Official.
• Lead economic development efforts and work directly with commercial and
residential developers to facilitate and bring meaningful development to
various communities.
• Work directly with City Councils and City Managers to develop short and
long range strategic plans and to expand service opportunities.
• Prepare and manage annual operating budgets and multi-year capital
improvement programs.
• Work with various communities and regional agencies including County of
Orange, OCTA, CALTRANS, RCFC, RCTD, CVAG, FHWA , FEMA and
Army Corp of Engineers.
• Serve as the Assistant City Manager and then Interim City Manager in the
City of Rancho Santa Margarita during approximately a 5 year period.
• Negotiate contracts with solid waste companies, cable providers, utility
providers , developers and other agencies.
• Interact regularly with City Councils, Commissions, Agency Boards,
Committees, Community Groups and Service Organizations.
• Conduct various organizational audits and studies.
• Lead technology improvements to improve operations and to better serve
clients.
Education
Master of Public Administration
BS Civil Engineering
Registration
Civil Engineer, California
Civil Engineer, Colorado
Civil Engineer, Michigan
Licensed Contractor - Class A
Years of Experience
35 years+ in Civil Engineering and loci
government management
Professional Affiliations
Member
American Public Works Association
Member
American Society of Professional
Engineers
Member
International City Managers Associatio
1*1SCHEDULE OF STANDARD HOURLY RATES
Effective Januarr 1, 2007 through December 31, 2007
MANAGEMENT , ENGINEERING & LAND PLANNING
Principal/Project Advisor ....................................................................................... $ 170 - 185
Senior Project Manager ...................................................................................... 150 - 170
Project Manager ................................................................................................ 140 - 160
Project Engineer ................................................................................................ 110-125
Senior Project Designer ....................................................................................... 100 - 120
Engineer III, Designer III, Planner III .................................................................. 95 - 115
Engineer II, Designer 11 , Planner 11 .................................................................... 90 - 110
Engineer I, Designer I, Planner I, Senior CADD ................................................ 85 - 100
CADD Technician II ............................................................................................. 70 - 85
CADD Technician I ............................................................................................ 65 - 75
Engineering Aide ................................................................................................. 55 - 65
STAFF AUGMENTATION
City Engineer ....................................................................................................... $ 140 - 170
Project Manager ................................................................................................... 130 - 160
Associate Engineer (Registered) ......................................................................... 110-130
Assistant Engineer ............................................................................................... 100 - 120
Senior Plan Checker .......................................................................................... 115-125
Engineering Technician ....................................................................................... 60 - 80
CONSTRUCTION MANAGEMENT
Construction Manager ......................................................................................... $ 140 - 150
Resident Engineer ............................................................................................... 115-125
Senior Public Works Observer .......................................................................... 80 -110
Public Works Observer ...................................................................................... 85 - 95
LAND SURVEYING , MAPPING & GIS SERVICES
Survey Party 3 Person ......................................................................................... $ 245.00
Survey Party 2 Person ......................................................................................... 210.00
Survey Party 1 Person ......................................................................................... 150.00
Survey Manager .............................................................................................:.. 150.00
GIS Specialist ..................................................................................................... 100.00
Survey Technician ............................................................................................... 90.00
BUILDING & SAFETY
Building Official .................................................................................................. $ 100 - 120
Senior Building Inspector ..................................................................................... 80 -110
Building Inspector .............................................................................................. 80 - 95
ADMINISTRATIVE SERVICES
Senior Administrative Assistant ........................................................................... $ 70 - 85
Administrative Assistant/Clerk ............................................................................. 50 - 60
Services performed by sub-consultants are billed at cost plus an additional management,
coordination , insurance and consultation fee of 15%
Outside agency, printing or reproduction costs , messenger service , equipment rental , special supply
purchases or other direct expenses are billed at cost plus an additional administrative overhead fee
of 10%.
NOTE: Norris Repko also provides services a Fixed Fee , Not-to-Exceed and Lump Sum
basis as negotiated with the City.
City of Culver City 6/18/07
General Civil Engineering Services SOQP S 0 M A
June 18, 2007
Lee Torres , Associate Engineer
CITY OF CULVER CITY
Engineering Division , 2d Floor
9770 Culver Boulevard
Culver City, CA 90232
Subject : Statement of Qualifications for General Civil Engineering Services
Dear Mr. Torres:
Psomas is pleased to provide our proposal for civil engineering, design, survey,
program/construction management and construction inspection services for the City of Culver
City under an "on call" contract basis.
Psomas has built a foundation of excellent client service that is apparent through our multiple on-
call civil engineering contracts . Psomas has designed and managed construction on award-
winning projects for cities such as yours . Our focus is on the needs of public agencies and
assisting them in completing their Capital Improvement Programs.
On-Call Contract Experience: Psomas has extensive background in performing wide-ranging
civil engineering , surveying, and program/construction management and construction inspection
services through on-call contracts throughout California . A listing of our recent on-call civil and
construction managementlinspection contracts and profiles of relevant projects are included in the
Project Experience section of this SOQ.
Staffing and On-Call Resources: In 2007, Psomas was ranked among the top 100 CM and
design firms by ENR Magazine, and ranked 4th best place to work in the nation among large
engineering firms by CE Magazine. Accordingly, Psomas is recognized as an industry leader in
engineering and construction management , as well as a firm that has the ability to attract and keep
the best and brightest in the industry. Our business is structured to serve public agency needs and
our managers have developed a high proficiency for balancing resources to successfully deliver
capital improvement projects to our on-call clients.
In addition to the team members proposed , Psomas provides the strength of over 800 employees
companywide , accordingly , we are confident that Psomas Team members will be available when
needed to successfully deliver the City's projects.
Key Psomas staff with extensive relevant experience is highlighted in the Team Qualifications
section of this SOQ.
1'IMr. Lee Tones
June 18, 2007
Program and Construction Management Services : In Southern California alone, Psomas has
assisted clients in managing over $250 million in construction this past year and has managed
more than $600 million in public construction projects in the state of California.
To Psomas, Construction Management (CM) is the process of professional management applied
to a construction project for the purpose of managing time, cost, scope, and quality.
Psomas' construction manager acts in a fiduciary role as the City's agent. These interests include
timely completion of the project within budget and in conformance with the contract documents.
The construction manager administers the construction contract and provides immediate
resolution to construction constraints while representing the City's interests.
The essence of good construction management is professionalism, teamwork, CM technology,
and keeping you, the City, informed of all phases of the work throughout the project.
Our local Southern California Construction Management Team has significant construction
management resources in the area. Dino D'Emilia, PE will be the primary contact for the on-
call contract, and will leas the program and construction management services. Dino has
extensive experience successfully delivering CIP projects for the City of Culver City, as well as
many other Southern California public agencies. Dino is supported by more than 30 local
construction management staff.
Civil Engineering Services : Psomas is confident you will find that we have the expertise,
experience, and commitment to provide the comprehensive civil engineering services you require
for your projects.
Effective team organization, quick response, and management are the key to successfully
accomplishing the objectives of each project and achieving quality service. Psomas will use a
management approach that is tailored to the needs of the City's "on-call" contract and each
project assignment. This approach will provide the City with a project manager who will handle
the needs of any project and provide the City with the right resources to fit the task.
Harvey Gobas, PE, will oversee water/wastewater design services, Tom Herbel, PE, will oversee
transportation/roadway design services, and Catherine Tyrrell, LEED AP, will oversee NPDES
permit management services for work under this "on-call" contract. These managers and their
teams have extensive relevant experience in successfully delivering the same services on nearly
identical projects for other local agencies.
Survey Services: Psomas is well known as an industry leader in providing design and
construction survey services.
Matt Rowe, PLS, will lead the survey team for the Culver City on-call contract. Matt and his
team have extensive experience performing survey work in and around the Culver City area.
High-Tech Tools: Psomas strives to stay on the leading edge with the tools it uses to deliver
engineering, construction management, and survey services. In particular, Psomas has developed
its own web-based company intranet and project web systems to enhance project and client
contract management capabilities. Additionally, we have our own in-house construction
management software called "Project at a Glance" to assist in tracking project documentation, a
3DMr. Lee Tones
June 18, 2007
very important tool in construction management. This tool allows Psomas to provide better
project documentation than other methods.
Psomas can provide access to City staff to directly see (from their City office) the status of
important project information such as constructability reviews, submittals, RFIs, potential change
orders, change orders, correspondence, and many other project facts. This tool has helped
alleviate many claims and additional project costs.
Psomas has also developed its own Construction Management Action Plan (CMAP), which
provides industry-accepted procedures for managing construction projects. Psomas will use the
CMAP system to supplement the City's procedures. The end result is a service that meets and
exceeds the City's requirements and guarantees proper documentation for funding
reimbursement.
Psomas will provide all services and project management locally from our Costa Mesa and West
Los Angeles offices. Staff and other resources from our other offices can also be made available
as needed.
Public Agency Emphasis: Much of our work has been performed directly for public agencies and
can provide a wide range of engineering disciplines required for the City's specific services. We
know the special concerns of city public works departments such as yours. Our staff is
accustomed to acting as extensions of City staff, and thus, will minimize your oversight burden.
We are sensitive to community impacts, understand the need for effective coordination with all
stakeholders, and know the importance of performing biddability and constructability reviews.
We also have experience in processing projects in compliance with Caltrans requirements, as well
as those of the Federal Highway Administration to assure project funding reimbursement.
QA/QC Program: Psomas is dedicated to technical excellence and professional quality,
implemented through a proactive quality assurance/quality control (QA/QC) program on its
projects. Quality is a company-wide commitment. The addition of a highly qualified professional,
experienced exclusively in project management, will enhance the performance of the Project
Team. The QA/QC Manager will interact with the Project Team and City staff to provide advice
and will help prevent problems before they occur.
We are eager to offer our significant resources to the City and to become a partner with you in
delivering your CIP Program. Should you have any questions about these qualifications or our
other services, please do not hesitate to contact me at (310) 466-3144.
Sincerely,
PSOMAS
Dino D'Emilia, PE
Associate
31City of Culver City
Statement of Qualifications for
General Civil Engineering Services
Team Qualifications
Protect Team
Psomas has assembled a team of highly qualified and enthusiastic professionals to
provide the City of Culver City with a broad base of expertise for all CIP on-call
project requirements. The Psomas Team shown below is only a sample of the depth of
resources Psomas can provide, with over 800 employees, company-wide. Brief resumes
for all the individuals listed are provided on the following pages. Upon request, Psomas
will provide additional resumes for the City's review.
Program and Construction Management
Dino D'Emilia, PE- Officer-in -Charge, QA/QC
John Reidinger- Project Manager
Yuri Boiarsky- Project Manager
Gary Bradshaw, PE, ASLA - Project Manager
Tom White - Resident Engineer
Dana Hutchins- Resident Engineer
Joe Ruzicka Resident Engineer
Glenn-Mari Paras- Office Engineer
John Barrett-Sr. Inspector
Jay Kalan - Sr. Inspector
Manuel Rivas- Inspector
Water and Wastewater/Design Engineering
Harvey Gobas, PE - PIC, QA/QC
Joe Boyle, PE - Project Manager/Sewer Pipeline and Lift Stations
Mike Swan, PE - Project Manager/Sewer Rehabilitation
Vernon Weisman, PE - Project Engineer/Sewer Pipeline
Greg Watanabe, PE Project Engineer/Sewer Pipeline
Dennis Phinney, PE - Project Engineer/Lift Stations
Neha Gajjar, PE - Project Engineer/Sewer Rehabilitation
Carlos Ramirez - Staff Engineer/Sewer Rehabilitation
Transportation/Roadway Improvements Design Engineering
Thomas Herbel, PE - PIC, QA/QC
Nancy Boyer, PE - Project Manager
AnissaVoyiatzes, PE - Project Engineer
MarkVerrengia, PE - Project Engineer
Larry French - Design Engineer
N PDES/Stormwater
Catherine Tyrrell, LEED AP - Project Manager
Survey
Matthew Rowe, PLS - PIC, QA/QC
John Chiappe, Jr., PLS - Project Manager
David Moritz, PLS - Project Surveyor
Douglas Howard, PLS - Project Surveyor
Christopher Hanson, LSIT - Certified Party Chief
P S O M A S
Team Qualifications
3ZCity of Culver City
Statement of Qualifications for
General Civil Engineering Services
Dino
D'
Emilia, PE
Officer-in-Charge and QA/QC
Education
BS/ 1991 /Civil Engineer/
Northeastern University
Registration
Registered Civil Engineer/CA
#C55453
Affiliations
American Public Works
Association (APWA) - So. Cal.
Chapter, Director and Education
Committee Chair since 2000
American Society of Civil
Engineers (ASCE)
City and County Engineer's
Association (CCEA)
Women In Transportation
Seminars (WTS)
P S O M A S
Team Qualifications
Program and Construction Management
Mr. D'Emilia has over 19 years of experience in managing large-scale construction
programs for various public entities with significant success managing multi-million
dollar projects during design and construction phases. His responsibilities have
included managing capital construction projects ranging from small projects to major
projects with construction values up to $300 million. His duties have included hiring
consultants for testing, inspection and resident engineering as needed and personally
performing these same duties for key projects, while managing schedule, budget and
critical issues for all projects. He has provided monthly report and presentations for
status of all projects.
Relevant Project Experience
CIP Project Manager, City of Culver City, CA: Worked under the Director of Public
Works over a four-year period managing multiple CIP projects from various starting
stages through successful completion. Several of the specific projects were:
City-Wide Energy Efficiency Initiative , Culver City, CA: Project and Construction
Management. A $4 million retrofit of lighting, HVAC, building energy management,
sewer pumping station improvements, street lighting replacement, and energy
cogeneration at multiple Culver City Facilities. Served as the City's Project Manager and
responsible for organizing the project, negotiating a performance contract, negotiating
finance agreements, presentations to City Council, and construction management.
Management efforts resulted in over $600,000 in potential claims resolution.
New Fleet Services, Towing/Impound and Refuse Facilities , Culver City, CA:
Construction Management of this $30 million Raze and Rebuild project. Served as the
City's Onsite Construction Manager coordinating the City's Departmental needs and
requirements with the project design/build team and other consultants and contractors.
Maintained jobsite records and provided overall project coordination on the City's
behalf.
New Transportation and Public Works Facilities , Culver City, CA: This was a $21
million relocation of the City's Public Works forces to a newly purchased property and
a reconstruction of the City's Bus Transportation Facility. Served as the City's Public
Work's Representative coordinating the Public Work's Department and Engineering
Division's needs and requirements with the project design team, construction manager,
and contractor.
On-Call Construction Management Services, City of Long Beach , CA: Principal-
in-Charge overseeing annual CM on-call services contract valued at $1 million per year.
Implemented CM services on multi-departmental (Police, Fire, Parks & Recreation,
Health Services, Library, Public Works) Capital Improvement Projects (CIP) through
the Public Works Department Project Manager. Responsibilities included hands-on
performance of CM services on high profile projects, as well as overseeing CM and
inspection staff and providing training, QA/QC, mentoring and issues resolution
activities, staffing, and overall management of work force.
Team Qualifications - Program and Construction Management
33City of Culver City
Statement of Qualifications for
General (:ivil Engueer ng Services
Client/Contact
City of Culver City
James S. Davis
Public Works Director (Retired)
(310)839-3572
"Project completed by Dino D'Emilio
prior to Psomas
Project Experience
Program and Construction Management
Culver City Police Department Expansion
Culver City, CA
Project entailed the addition of
approximately 10,000 sq. ft. of new
space and renovation to balance of the
building, including jail and evidence
areas. Building received a completely
new energy efficient facade and art work.
Dino D'Emilia coordinated supplemental
projects that upgraded the existing police station including an energy retrofit of the
including cogeneration with heat absorbtion chillers, HVAC unit replacements , interior
remodeling and painting , landscaping and telecommunications projects.
Client/Contact
City of Culver City
Steve Cunningham
Department Transportation
Director (3 10) 253-6540
* Project completed by Dino D'Emilia
prior to Psomos
Culver City Transportation Facility Demolition
and Construction
Culver City, CA
Dino D'Emilia served as Public
Works and Engineering representative
on this $18M transportation project,
which involved demolishing the
existing City Yard and constructing
new transportation, fuel and bus
wash facilities. Worked with project team consisting of the Culver City Transportation
Department, Architects and a Construction Manager. Provided oversight, value
engineering, bidability and constructability reviews and assisted in professional services
selection and fee negotiations. Dino also provided design and construction support
services for the security system installed as part of the new Transportation Facility.
Client/Contact
City of Culver City
Michael Thompson
Fire Chief
(310) 253-5900
* Project completed by Dino D'Emilia
prior to Psomas
Culver City Fire Station Design De
Culver Cir CA
Managed the initial feasibility and
design development for renovation/
addition to this 4500 sq. ft. fire station,
which had outgrown its effectiveness
since its construction in 1955.
Coordinated and expedited the selection
of the initial feasibility and design
development architects. Cost benefit analyses were utilized to determine the preferred
concept. Prepared a funding application to the Department of the Architect. Project is
currently pending funding.
P S O M A S Project Experience - Program and Construction ManagementCity of Culver City
Statement of Qualifications for
General Civil Engineering Services
Client/Contact
City of Lake Forest
23 161 Lake Center Drive
Suite 100
Lake Forest , CA 92630
Gene Foster
Civil Engineering Associate
(949) 461-3490
Project Experience
rograrn and Construction Management
The Arbor on El Toro Road --® Construction Management
and Inspection Services
Lake Forest, CA
Psomas provided construction management and inspection services for the $27
million El Toro Road Traffic and Landscape Improvement project for the City of Lake
Forest. Psomas staff were responsible for conducting bi-weekly construction progress
meetings; reviewing, processing, tracking, and filing submittals and RFI's; negotiating
change orders; reviewing and approving progress pay estimates; administering certified
payroll submittals; interviewing workers to assure prevailing wage confirmation;
observing a/c and concrete placement; reviewing a/c and concrete tickets for
compliance; reviewing traffic control for compliance with applicable plans; and
authorizing revisions to the traffic control plans to suit current traffic conditions.
Psomas also served as a liaison between the residents, shop owners, City and
Contractor, and assured that the contractor documented all field changes.
Previously, Psomas engineering staff led the multi-discipline consultant team to design
the streetscape and traffic improvements for this project. The purpose of the project was
to provide a catalyst for the redevelopment of the downtown core. The roadway was
widened to provide up to nine travel lanes, and intersections were improved to reduce
congestion and improve traffic flow.
Significant right-of-way acquisition was required to construct the project
improvements. The Psomas Team provided appraisal and acquisition services for full
and partial takes, as well as relocation assistance for both residential and business
properties.
Other key components of the project included defining an urban design
theme and design of streetscape improvements; traffic signalization and
interconnect systems design; drainage design; right-of-way engineering
and acquisition services; public information and community involvement
services; Caltrans coordination; design of a modified on-ramp; and agency
coordination.
Due to the sensitive nature of the
project, which is in the Aliso Creek
Watershed, Psomas included a storm
water runoff management plan
(RMP) to address the impacts of the
improvements and mitigation for the
project.
P S O M A S Project Experience - Program and Construction Management
35City of Culver City
Statement of Qualifications for
General Civil Engineering Services
Client/Contact
South Coast Water District
3 1592 West Street
Laguna Beach, CA 92651
Joseph McDivitt
Director of Operations
(949) 499-4555 ext. 122
*Project completed by Daniel Boyle
Engineering prior to merger with Psornas
Client/Contact
City of Oceanside
300 North Coast Highway
Oceanside, CA 92054
Mr. Greg Blakely
(760) 966-4867
*Project completed by Daniel Boyle
Engineering prior to merger with Psomas
Client/Contact
South Coast Water District
31592 West Street
Laguna Beach, CA 9265 I
Mr. Mike Dunbar
(949) 499-4555
*Project completed by Daniel Boyle
Engineering prior to merger with Psomos
Project Experience
Water and Wastewater/Des ign Engineering
Lift Statio n No. 8 Upgrades-
Dana Point, CA
Responsibilities for this project included preliminary design, final design, permit
processing, bidding phase services, and construction phase services.
Project Scope includes the following:
? Replacement of Two (2) 30 hp, 550 gpm Dry-Pit Submersible Pumps
? Replacement of Mechanical Piping, Fittings and Valves
? Installation of Variable Frequency Drives and New Control Panels
? Conversion of Power Supply from 240 kv to 480 kv
? CMU Block Retaining Wall to Provide Access to New Control Panels
? Bypass Connection, Tee and Valves for Force Main Bypass Pumping
? Rehabilitation of suction force main piping with CIPP
Mission Avenue Lift Station-
Oceanside, CA
This $4.
2 million lift station included a reinforced concrete rectangular covered basin
for emergency off-line storage, 450 KW standby generator, odor control air scrubber
and four 150 HP variable speed drive dry well sewage pumps. Handicap access was
provided into the ground level of the three level architectural building. DBE was
responsible for the pre-design report , site survey, final design , construction plans &
specifications , permitting , easements , and construction support for this project . Another
component of this project was the relocation of 600 feet of 24-inch and 30
-inch gravity
sewer mains.
State Park Sewer Lift Station Rehabilitation-
Dana Point CA
Responsibilities for this project included survey existing facility, preliminary design
report, final design, construction plans & specifications, and construction support.
Project Highlights:
? Adjacent to Waterfront Residences in Doheny Beach State Park
? Complete Underground Construction
/ Wet/Dry Well Design
Two (2) 7.5 hp Submersible Duty Pumps in Dry Well
? Replace All Electrical/Controls
? Replace All Mechanical Equipment
/ Upgrade to Meet Current Codes
? Failsafe System to Protect Beach Community
P S O M A S Project Experience - Water and W CONSULTANTS, INC.
Public Works Services
APD Consultants, Inc. (APD) provides a wide variety of public sector services. These
services include but not limited to: preparation of street, sewer, water and storm drain plans,
preparation of specifications and cost estimates, plan check consulting, on-call services,
hydrologic and hydraulic analysis, and project management.
Services:
• Capital Improvement Projects
• Water Pump Station Design
• Sewer Lift Station Design
• Drainage and Flood Control Design
• Plans, Specifications and Estimates
• Sewer and Water Improvements
• Plan Check Consulting
• Hydrology/ Hydraulics Studies
• Water Quality Engineering
• Government Grants/Funding
• Contract Administration
• Community Relations/Outreach
• Utility Underground Districts
54PA-P-13-
> CONSULTANTS, INC.
Municipal Engineering Services
APD Consultants, Inc. (APD) team has the experience and expertise to work with the
agency's staff and be an extension of its team. APD can assist in plan checking services,
constructability reviews, public counter support, and project management.
Services:
• Project Management
• Plan Checking Services
• Public Counter Support
• Constructability Reviews
• Tentative Map Reviews
• Construction Management
• Planning and Design
• Utility Underground Districts
51PED^>
CONSULTANTS, INC.
Staffing and Key Personnel
Robbie Mahmood, P.E. - Principal
Mr. Mahmood has a Masters Degree in Civil Engineering and more than 20 years
of experience in civil engineering design and construction management in
Southern California . Mr. Mahmood is a Professional Licensed Civil Engineer in
California , and has a Project Management Certificate from the University of
California at Irvine (UCI). His expertise includes the design of roadways,
drainage , hydrology , sewer , water, grading , and construction management. Mr.
Mahmood has been managing projects in the public work sector as well as the
private sector in Southern California . He has strong project management skills
and can prove to be invaluable to any project.
Michael Palzes, P.E. - Principal, PRP Engineering
APD is joint venturing with PRP Engineering for domestic and reclaimed water
pump station design , and sewage lift station design services . Mr. Palzes is a
registered civil engineer in the State of California with over 23 years of
experience in the field of civil / mechanical engineering , specializing in pump
station and lift station projects . Mr. Palzes' roles and responsibilities include
project management , quality control , design , and coordination with the agencies'
staff for design reviews , scheduling and budget control.
Connie Ramirez -Project Manager
Ms. Ramirez has a Bachelor of Science Degree in Civil Engineering and Project
Management Certificate from UCI, Irvine CA. Ms. Ramirez has over 19 years
experience in the field of civil engineering for public and private sectors . She has
been responsible for civil engineering design and agency processing . She has
direct project management and design experience for various infrastructure
components including streets , sewer , water, drainage , grading and site
development. Ms. Ramirez has also been responsible for the preparation of
construction quantity and cost estimates , and providing development plan check
services for municipal clients.AXS)^^)o CONSULTANTS, INC.
Effective January, 2007
HOURLY RATE SCHEDULE
Project Manager
$ 135.00/Hour
Project Engineer $ 120.00/Hour
Staff Engineer $ 1 10.00/Hour
Designer $ 95.00/Hour
Drafter/CADD Technician $ 80.00/Hour
Clerical/Word Processing $ 55.00/Hour
Construction Manager/Resident Engineer $ 125.00/Hour
Inspector $ 85.00/Hour
Note:
Cost of printing, mileage, telephone, mailing and other expenses are incidental to the main
items of the Engineering Services included in the hourly rate and no additional charges will
be requested by APD Consultants, Inc. A Sub-consultant Management Fee of fifteen-
percent (15%) will be added to the direct cost of all sub-consultant services to provide for
the cost of administration, sub-consultant consultation and insurance.
56iNICKERS ON
COMPANTY
CUNSTRUCTiON MAhAGGEMENT & iNSPECTICN SERVICES
REFERENCES
Project Name:
Owner's Name:
Address:
Current Telephone Number:
Project Manager:
Project Name:
Owner's Name:
Address:
Current Telephone Number:
Project Manager:
Project Name:
Owner's Name:
Address:
Current Telephone Number:
Project Manager:
Washington Boulevard Resurfacing
City of Culver City
9770 Culver Boulevard, Culver City, CA 90232
310-253-5600
Lee Torres, Associate Civil Engineer
Residential Overlay
City of Culver City
9770 Culver Boulevard , Culver City, CA 90232
310-253-5600
Elaine Jeng , Associate Civil Engineer
General Civil Engineering Services
City of Culver City, Culver City, CA 90232
9770 Culver Boulevard , Culver City, CA 90232
310-253-5600
Andy O'Connell, Senior Civil Engineer
51ACYi"Cl/ CONSULTANTS, INC .
June 18, 2007
Mr. Lee Torres
Associate Engineer
City of Culver City
Engineering Division; 2nd Floor
9770 Culver Blvd.
Culver City, CA 90232
Re: Statement of Qualifications for General Civil Engineering Services
Dear Mr . Torres:
APD Consultants, Inc. (APD) is very pleased to provide the firm's Statement of
Qualifications (SOQ) for professional civil engineering and construction
management / inspection services. APD is a certified Small Business Enterprise
(SBE) company with a coalition of Southern California Public Agencies. The
following packet includes APD's brief company overview, detailed services, and
summary of key personnel.
APD provides the following services: Preparation of plans, specifications, and
estimates (PS&E), municipal engineering and plan checking, planning and
design of roads, drainage, hydrology and hydraulics, grading, water quality,
sewer and water projects including domestic and reclaimed water pump station
design and sewer lift station design, and topographic survey, mapping, and
construction staking. In addition, APD has the qualified personnel to provide
construction management and inspection services.
APD has assigned Robbie Mahmood P.E. as the daily point of contact. Mr.
Mahmood has worked with the City of Culver City and knows the City's staff,
criteria and requirements. The City of Culver City can rely on Mr. Mahmood to
manage their projects successfully. APD Daily Point of Contact information is as
follows:
Robbie Mahmood, P.E.
Principal
188 Technology Drive, Suite B
Irvine, CA 92618
Tel: (949) 336-6336, Fax: (949) 336-6338
Email: robbiem(@apdcon.com
188 Technology Dr., Suite B, Irvine, CA 92618. Tel: (949)336-6336, Fax: (949)336-6338, www.apdcon.comL3fYi'CJ /CONSULTANTS, IN C.
Currently, APD is on the On-Call Professional Civil Engineering and Construction
Management list in the City of Corona and the County of Orange. APD is working
with different public agencies and has the experience and the personnel to
accomplish the work in a timely manner and on budget.
APD is interested in providing the City with our services and look forward to
working with you on future projects.
Should you need any further information, please call APD directly at (949) 336-
6336, or at my cell phone (714)488-2240.
Sincerely,
APD Consultants, Inc.
Robbie Mahmood, P.E.
Principal
53
188 Technology Dr., Suite B, Irvine, CA 92618. Tel: (949)336-6336, Fax: (949)336-6338, www.apdcon.comJk
-';VPTD714V CONSULTANTS, INC.
Company Profile
APD Consultants, Inc. (APD) is a privately held planning and engineering firm
providing consulting services for private and public sector clients in Southern
California. APD provides extensive experience in preparation of street, sewer, water
and storm drain plans, preparation of specifications and cost estimates, plan check
consulting, on - call services, hydrologic and hydraulic analysis, domestic and
reclaimed water pump station design, sewer lift station design, due diligence,
preparation of tentative maps, preparation of rough and precise grading plans, liaison
with public agencies for plan approvals and permits, infrastructure funding, water
quality management, and construction support.
Technology
Primary softwares that APD use are AutoCAD 2007, AutoDesk Land Desktop,
HEC-2, HEC-RAS, Civil design, WSPG, Flow Master, Retain Pro, MS Project, MS
Office and Adobe Photoshop.
Professional Affiliations
• APWA
•ASCE
• BIA
• CELSOC
• ULI
Insurance Requirements
APD is fully insured and is incorporated in the state of California. Insurance
requirements requested by client will be satisfied prior to commencement of any
project.
54CONSULTANTS, INC.
Corporate Values Statement
Our Standards
Quality
APD Consultants, Inc. (APD)
is committed to providing high quality products and
services . The day-to-
day involvement of the principal in the company ensures a high
level of quality assurance/quality control (QA/QC) in all products prepared by the
company. Our work tasks are designed to produce high quality and cost effective
results tailored to the specific needs of the project.
Ethics
APD's core values include integrity, respect, open and honest communication with
clients as well as among its employees.
Technical Excellence
APD's technical staff has collectively over 130 years of professional experience. The
principal and project manager are registered professional civil engineers and our
technical staff hold advanced degrees.
We are committed to excellence and
professionalism.
We provide recommendations and solutions to expedite public
approvals.
Low Overhead
APD's policy is to maintain low overhead, thus keeping our rates very competitive
without jeopardizing quality of work. We know the importance of schedule to clients,
so we work effectively to accomplish our tasks in a timely manner and satisfy their
critical time schedules.CONSULTANTS, INC.
JN-11
APD Consultants, Inc. (APD) provides a wide variety of public sector services. These
services include but not limited to: preparation of street, sewer, water and storm drain plans,
preparation of specifications and cost estimates, plan check consulting, on-call services,
hydrologic and hydraulic analysis, and project management.
Services:
• Capital Improvement Projects
• Water Pump Station Design
• Sewer Lift Station Design
• Drainage and Flood Control Design
• Plans, Specifications and Estimates
• Sewer and Water Improvements
• Plan Check Consulting
• Hydrology/ Hydraulics Studies
• Water Quality Engineering
• Government Grants/Funding
• Contract Administration
Community Relations/Outreach
• Utility Underground Districts
SloCONSULTANTS, INC.
Municipal Engineering Services
APD Consultants, Inc. (APD) team has the experience and expertise to work with the
agency's staff and be an extension of its team. APD can assist in plan checking services,
constructability reviews, public counter support, and project management.
Services:
• Project Management
• Plan Checking Services
• Public Counter Support
• Constructability Reviews
• Tentative Map Reviews
• Construction Management
• Planning and Design
• Utility Underground DistrictsCONSULTANTS, INC.
Staffing and Key Personnel
Robbie Mahmood, P.E. - Principal
Mr. Mahmood has a Masters Degree in Civil Engineering and more than 20 years
of experience in civil engineering design and construction management in
Southern California. Mr. Mahmood is a Professional Licensed Civil Engineer in
California, and has a Project Management Certificate from the University of
California
at Irvine (UCI). His expertise includes the design of roadways,
drainage, hydrology , sewer, water , grading , and construction management. Mr.
Mahmood has been managing projects in the public work sector as well as the
private sector in Southern California. He has strong project management skills
and can prove to be invaluable to any project.
Michael Palzes, P.E. - Principal, PRP Engineering
APD is joint venturing with PRP Engineering for domestic and reclaimed water
pump station design , and sewage lift station design services . Mr. Palzes is a
registered civil engineer in the State of California with over 23 years of
experience in the field of civil / mechanical engineering , specializing in pump
station and lift - station projects. Mr. Palzes ' roles and responsibilities include--
project management , quality control , design , and coordination with the agencies'
staff for design reviews , scheduling and budget control.
Connie Ramirez - Project Manager
Ms. Ramirez has a Bachelor of Science Degree in Civil Engineering and Project
Management Certificate from UCI, Irvine CA. Ms. Ramirez has over 19 years
experience in the field of civil engineering for public and private sectors. She has
been responsible for civil engineering design and agency processing. She has
direct project
management and design experience for various infrastructure
components including streets, sewer, water, drainage, grading and site
development. Ms. Ramirez has also been responsible for the preparation of
construction quantity and cost estimates, and providing development plan check
services for municipal clients.ABED^^,o CONSULTANTS, INC.
Effective January, 2007
HOURLY RATE SCHEDULE
Project Manager $135.00/Hour
Project Engineer $120.00/Hour
Staff Engineer $110.00/Hour
Designer $ 95.00/Hour
Drafter/CADD Technician $ 80.00/Hour
Clerical/Word Processing $ 55.00/Hour
Construction Manager/Resident Engineer $125.00/Hour
Inspector $ 85.00/Hour
Note:
Cost of printing, mileage, telephone, mailing and other expenses are incidental to the main
items of the Engineering Services included in the hourly rate and no additional charges will
be requested by APD Consultants, Inc. A Sub-consultant Management Fee of fifteen-
percent (15%) will be added to the direct cost of all sub-consultant services to provide for
the cost of administration, sub-consultant consultation and insurance.
orq
|