Legislation Details

File #: HIST-2458    Version: 1 Subject:
Type: Historical Status: Action Item
In control: City Council Meeting Agenda
On agenda: 5/8/2006 Final action: 5/8/2006
Title: Consideration of a Budget Amendment and Acceptance of Work Performed by PCN3, Inc. and Authorize Filing a Notice of Completion for the Teen Center Remodel Project, P-819.
Attachments: 1. A-7_06-05-08_PW-Eng_Teen Center Remodel Project - NOC(2).doc, 2. A_7 PCN3.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: Staff recommends that the City Council: 1) accept the work performed by the contractor, PCN3, Inc., and authorize filing a Notice of Completion for the Teen Center Remodel Project, P-819. It is also recommended that retention funds in the amount of $35,511 be released to the contractor after the thirty-five day lien period. 2) approve a budget amendment to transfer $7,361.56 from the El Marino Park Ceramics Hut Rehabilitation Project, (P-827) to the P-819 budget. A four-fifths affirmative vote is required to amend the budget. BACKGROUND: On October 10, 2005 the City Council awarded a construction contract to PCN3, Inc., (PCN3) for the Teen Center Remodel Project, P-819 (Project), in the amount of $257,619 (Base Bid) and authorized the Public Works Director/City Engineer to negotiate to accomplish as many of the alternate bid items as possible in order to expend the entire budget amount. The scope of work consisted of the remodeling of the existing facility (former Senior Center) in order to enhance its use as a Teen Center. The proposed remodel included the following elements: 1. Bring the restrooms into ADA compliances. 2. Install new vinyl and carpet tile flooring over existing flooring. 3. Installation of sound attenuation materials to create a Music Room. Meeting Date: 05/08/06 Item Number: A-7 AGENDA ITEM: Consideration of a Budget Amendment and Acceptance of Work Performed by PCN3, Inc. and Authorize Filing a Notice of Completion for the Teen Center Remodel Project, P-819 Contact Person/Dept: John Rivera/PW Phone Number: (310) 253-6423 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [X] Attachments: [X] Public Notification: PCN3, Inc. (05/04/06), City Treasurer Crystal Alexander (05/04/06); Master Notification List (05/04/06) Department Approvals: Charles D. Herbertson (04/27/06); William LaPointe (05/04/06) CAO Approval: Martin R. Cole for Jerry B. Fulwood (05/04/06) City Controller Approval: Marlee Chang (05/04/06)City of Culver City, California City Council Agenda Item Report 4. Repair/patch and prepare for painting or coating all wall surfaces. 5. Install doors between the main Multi-Purpose Area and the Game Room; install a new Emergency Exit from Game Room to building exterior; and, install new Kitchen pass-through roll-up service window. 6. Install sign at front of building adjacent to Overland Avenue entrance. 7. Provide electrical upgrades/modifications related to Kitchen expansion and Restroom remodel, and upgrading certain building lighting operations. 8. Remove walls to convert former RSVP Offices into Music Room; expand Kitchen to incorporate an adjacent office; and, expand restrooms to achieve ADA compliance. 9. Install Recreation Equipment (sound system and television). 10.Construct partition walls to create a TV Room and secured Storage Room for tables and chairs. 11.Install safety laminate on interior Game Room windows. The Fiscal Year 05-06 Capital Improvement Budget includes the Teen Center Remodel Project, P-819 (Project). The City was awarded a grant in the amount of $262,500 for the Teen Center Remodel Project from the Murray-Hayden Urban Parks and Youth Service Grant. The City was required to provide matching funds in the amount of $112,500 authorized from the General Fund by City Council for total grant project of $375,000. Subsequently staff determined the roof of the Teen Center was failing and could ultimately leak into the Teen Center rooms. The project scope was revised to include roof improvements and was added to Fiscal Year 05-06 Capital Improvement Budget and approved by City Council. With the $60,000 for roof improvements, the total approved project budget was $435,000. Other actions taken by City Council regarding the Teen Center Remodel Project are as follows: 1. On May 31, 2005 the City Council authorized a professional services agreement with Wolcott Architecture - Interiors to provide architectural and construction management services for the Project. 2. June 13, 2005 the City Council approved the conceptual design plans and materials for the Project. 3. July 25, 2005 the City Council approved the Final Plans and Specifications and Authorized for Bids for the Teen Center Remodel Project.City of Culver City, California City Council Agenda Item Report 4. August 22, 2005 City Council authorized entering into a professional services agreement with Castlerock Environmental, Inc. to complete necessary environmental abatement work for the Teen Center Remodel Project. 5. October 24, 2005 City Council authorized a change order to the Castlerock Environmental, Inc., contract in the amount of $12,250 for additional asbestos abatement of the Teen Center flooring. 6. December 5, 2005 and subsequently revised on January 30, 2006, City Council authorized use of Proposition 40 funds for the Teen Center Remodel Project roofing improvements. At the December 5, 2005 meeting, the City Council authorized a total allocation of $50,000 ($25,000 for Teen Center Floor Finishing/Janitor Room Relocation and $25,000 for professional services/construction contingencies) to the Project; and, authorized the City Council Subcommittee (Councilmembers Corlin and Gross) to approve project changes up to the additional $25,000. Subsequently, staff learned that the proposed flooring work would not be eligible for Proposition 40 Funds and that the roofing improvements would be considered more favorably by the State. On January 30, 2006, the Council authorized staff to submit an application for Proposition 40 per Capita Funds in the amount of $50,000 for the Teen Center roofing improvements, which would increase to total approved project costs $485,000. DISCUSSION: PCN3 began work on the Project in October 2005 and successfully completed the work and selected alternate bid items as required in the contract. However, during the course of construction, unanticipated building conditions and design issues were encountered. These unanticipated issues resulted in the need for the Public Works Department to issue thirty-four (34) change orders which have resulted in increased construction costs of $62,886.86. Attachment No. 1 provides a table describing each change order and the associated costs. PCN3 successfully completed the change orders as required. The unanticipated building conditions and design issues also resulted in the need for Wolcott Architecture - Interiors (Wolcott) to perform architectural design and construction management work beyond the anticipated scope of the original project. These unanticipated issues resulted in increased project design and construction management costs. The Council approval of the original Wolcott contract on May 31, 2005, authorizes the Public Works Director/City Engineer to increase the agreement by an amount not to exceed $5,000, for a total of $32,500. However the scale of the added design and construction management work has resulted in City of Culver City, California City Council Agenda Item Report Wolcott requesting an additional $9,482.81 for a revised total of $36,982.81. The Public Works Director/City Engineer approved the additional $5,000. The remaining additional amount is $4,482.81. Attachment No. 2 is a copy of the April 19, 2006, invoice from Wolcott describing their services provided and the associated costs. Wolcott satisfactorily performed the additional tasks as required. Wolcott; Park, Recreation and Community Services Department (PR&CS); and, Public Works Department (PWD) staff conducted construction management on the Project. Construction inspection services were performed by Building Safety Division, Fire Prevention, PR&CS, and PWD staffs. The Project inspections have been completed and accepted. FISCAL ANALYSIS: As stated previously, the City received a Murray-Hayden Urban Parks and Youth Service Grant under the Proposition 12 grant process. The grant is a $262,500 reimbursement grant, with an additional $112,500 in City matching funds. The City has allocated funds in the Capital Improvement Program (CIP) Budget as the Teen Center Remodel Project P-819, Accounts No. 41900819 and No. 42300819. The original total Project allocation was $375,000. The City Council subsequently revised the project scope to include $60,000 for roof improvements and added the funds to the Fiscal Year 05-06 Capital Improvement Budget. With the addition of roof improvements, the total approved Project budget was $435,000. On December 5, 2005 and subsequently revised on January 30, 2006, the City Council authorized use of $50,000 of Proposition 40 funds for the Project roofing improvements. With the addition of Proposition 40 roof improvements the total approved Project budget was $485,000. Funding Description Amount of Funding Murray-Hayden Urban Parks Grant $262,500 General Fund Grant Matching Funds $112,500 General Fund Capital Improvement Funds $60,000 Prop. 40 Per Capita Funds $50,000 TOTAL PROJECT Funds: $485,000 The City Council awarded the contract to PCN3 in the amount of $257,619 (Base Bid) and authorized the Public Works Director/City Engineer to negotiate to accomplish as many of the alternate bid items as possibly in order to expend the City of Culver City, California City Council Agenda Item Report complete project amount. Three alternate bid items were accomplished (A2 Kitchen Windows; A6 New Ceiling Tiles; and, A9 Retro-Fit Lighting Ballast) totaling $34,600. As a result of unanticipated building conditions, and design issues the Public Works Department issued thirty-four (34) change orders which have resulted in increased construction costs of $62,296.96. The revised total PCN3 charges for the Project, including Base Bid, alternate bid items and change orders is $354,515.96. Wolcott’s original contract to prepare the construction plans and specifications for the Project and provide construction management was $27,500. The City Council’s approval of the Wolcott contract also authorizes the Public Works Director/City Engineer to increase the agreement by an amount not to exceed $5,000, for a total of $32,500. However the scale of the added design and construction management work has resulted in Wolcott requesting an additional $9,482.81 for a revised total of $36,982.81. REVISED Project Costs Amount Base Bid $257,619.00 Alternate Bid items $34,600.00 Change Orders $62,296.96 Wolcott A-I Design/Construction Management $36,982.81 Moving/Storage Furnish. $2,235.00 Signage $2,763.00 Recreation Equipment $26,634.79 Roof Rehabilitation $56,980.00 Asbestos Abatement – Change Order $12,250.00 Sub-Total Project Costs $492,361.56 Total Project Funds $485,000.00 Sub-Total Project Costs ($492,361.56) TOTAL PROJECT DEFICIT ($7,361.56) As a result of the Project change orders there is a budget deficit. Therefore, in order to sufficiently fund the final project cost, there needs to be a transfer of $7,361.56 from another funding source. The PR&CS Director has advised PWD that there is currently $7,361.56 in unexpended funds in the El Marino Park Ceramics Hut Rehabilitation Project, (P-827) that can be used on this project (a reduction in the scope of the Ceramics Hut Project is being proposed for the FY 06/07 budget). Staff recommends that the City Council approve a budget amendment to transfer $7,361.56 to the project budget. A 4/5 ths vote is required to approve the budget amendment.City of Culver City, California City Council Agenda Item Report The grant requires that all construction be complete and reimbursement paperwork finalized no later than June 30, 2009. Asbestos remediation work in the interior remodel area and roof cost $46,787.50, of which $34,537.50 was funded by P-132, Building Repairs project funds (#42000132) and $12,250 by Project funds. Maintenance and operational costs for the Teen Center in fiscal year 05/06 are estimated to total about $11,000 and are not anticipated to increase as a result of the remodeling project. ATTACHMENTS: 1. April 25, 2006, PCN3, Inc. Change Order Table. 2. April 19, 2006, Wolcott Architecture – Interiors invoice. 3. Teen Center Space Plan & Room Legend. MOTIONS: That the City Council: 1) Accept the work performed by the contractor, PCN3, Inc., for the Teen Center Remodel Project, P-819 as complete; 2) Authorize the Public Works Director and City Engineer to sign and submit a Notice of Completion form to the Los Angeles County Recorder’s Office; 3) Authorize the release of $35,511 to PCN3, Inc., following the 35-day lien period; 4) Authorize an additional payment to Wolcott Architecture - Interior of $4.482.81; and 5) Authorize a budget amendment to appropriate El Marino Park Ceramics Hut Rehabilitation Project, (P-827) funds in the amount of $7,361.56 to the Project and transfer $7,361.56 to project expenditure line item 42300819.720100 Teen Center Remodel Project. A 4/5 ths vote is required to approve the budget amendment. MEETING DATE 05/08106 AGENDA ITEM Consideration of a Budget Amendment and Acceptance of Work Performed by PCN3, Inc and Authorize Filing a Notice of Completion for the Teen Center Remodel Project, P-819 ATTACHMENTS|109| April 25, 2006, PCN3, Inc Change Order Table|109| April 19, 2006, Wolcott Architecture — Interiors Invoice Paws 1 - 2 3 — 8|109| Teen Center Space Plan & Room Legend 9-10TEEN CENTER REMODEL PCN3 CHANGE ORDERS PROJECT P-819 No Description Cost Date Approved 1 Removal of cabinet in room 123 salvaging cabinet in room 124 and 116 removal of 50 If of soffit In rooms 109 and 110 (RFI#24) _ . $792 89 11/17/2005 2 Deduction for asbestos contractor prior removal of restroom tile walls/floors and fixtures (RFI#25) ($1 736 50) 11/17/2005 3 Remove existing drinking fountain and patch return grills in bnck wall at restroom entrances (RFI#32) $24696 2/27/2006 4 Revise locatIOn of new emergency exit in room 105 and construct ADA ramp with handrails (RFI#36) $4 312 00 1/11/2006|1010|, InstallatiOn of c*Wall on west wall of room 108 (24'X 12') (Rri#28) $70600 11/17/2005 6 Provide drywalipiling above west interior entryway (RFI#30) $3,375 00 . 11/17/2005 7 Change thicknriSS of metal-studs used throughout project from 2-518" to 3-5/8" to provide add clearances (RFI#33) $1,000 00 12/12/2005 8 Change finish flooring in rooms 101 105 and 108 from Linoleum to stained concrete (RFI#341 $17 698 50 _ 12/5/2005 , 9 Replace drywall rernoved by asbestos contractor on extenor of rooms 103 and 104 (RF1#381 $610 00 11/17/2005 10 Remove ceiling tfies, lights and ductwork in room 111 installation of lighting and switchs (fixtures Wind ) and drywall ceiling - l#39 9 $2,995 25 12/12/2005 11 Remove/replica electrical conduit exposed by demo of freestanding cabinetwith 2 new floor boxes w/covered outlets (RFI#39 6) Also deni,/replace conduit w/floor box at north wall 'of room 108 exposed* demo of bookshelves $2 700 00 2/27/2006 12 Remove wood paneling on wdenor of room 126 adjacent to west entry and replace with drywall Also remove carpeting from room 124 (tF1039 3)) $186 00 12/12/2006 13 Remove acoustical tile soffit from above rooms 101 and 104 and replace with drywall/framing (RFI#39 2) $1,483 00 12112/2006 14 Relocate ceiling lights in room 110 due to wall new wall being constructed $766 94 11/17/2005 15 Relocate tanitors Sink from room 119 to room 113 $2,807 68 12/12/2006 16 install attic access in room 110 $41296 12112/2005 17 Install fights/switches for attic access in rooms 110, 111 112 and 122 $2,359 80 12/12/2005 18 Install 3 electrical outlets on counter of 111 $1 415 88 12/12/2005 19 Install wood trim around 3 door frames along south side of rooms 105 (1) and 108 (2) $69383 _ 12/12/2005 -, - — $000 12/12/2005 21 Engin - umbing Permit .Mechanical _ $1,769 85 12/12/2005 22 Structural Enginee ! omen's Restroom-new door $1 887 84 12/12/2005 23 Structural reinforcement around door opening to Women's Restroom $2 445 93 2/6/2006 24 Capping doorway from eiectncal room (former janitor room) to Women's Restroom , $82800 2/6/2006 25 Replace bad electronic balast in 11 fluorescent light fixtures in Multi-purpose Room not covered as a part of Bid Alt #9 $1 265 00 216/2006 26 Provide 5 new light switches on 8-circuits in Multi-purpose Room $4,370 00 4/21/2008 Revised 04-25-06 1TEEN CENTER REMODEL PON3 CHANGE ORDERS PROJECT P-819 27 Furring out wail in Women s Restroom and modify the rough-in light switches $11500 4/21/2006 28 Repaint walls to be accent walls in Rooms 105 108 109 and 123, plus doors and door frames $3 061 26 4/21/2006 29 Replace broken glass Room 108 IQ patio, Install MDF in Room 110 and chance type of outlet covers $1,003 89 4/21/2006 30 Window Blkida- Classroom 1 $1,700 00 2/2/2006 31 Eliminate RiBcitkm Desk from project scope 41,30( 00) 417/2006 32 Knee uards w/ plumbing boots _Replace 0400 OCIL 4/21/2006 33 Install Type K Fire F.xtingusher sign for main door and cap interior fire lose connection $71500 4121/2006 34 install exit/emergency lighting to meet Electrical & Fire Inspectors requirements _ _ $2,800 00 4/21/2006 I TOTAL $41380 a Revised 04-25-06|1010|2.February 28 2006 Architecture • Interiors To John Rivera City of Culver City ---9770-Oulver-Boulevand - P0 Box 507 Culver City, CA 90232 RE Culver City Teen Center Remodel 4153 Overland Ave Culver City CA 90230 WORK AUTHORIZATION NO Wolcott Architecture • Interiors agrees to perform the following work Tenant Teen Center Remodel U S F 9,020 USF Project No 05-196-100 WAI Fee Lump Sum $9,482 81 Authorized Services (denoted by *X") Budding Standards (hourly) S F Calculations Project Meetings Marketing Plans Public Areas Pricing Plans Tenant Standards (as noted) Space Plan (architectural only) Construction Documents Plan Check/Permit (hourly) X Over Standard (see remarks and back up spreadsheet) Remarks WAI has preformed the following tasks that are considered supplemental services and not part of the approved contract work 1 Additional client meetings to pre present the design concepts 2 Additional scope added to Construction Documents as alternates cost that were not outlined in the original scope (le fire suppression system upgrade AN infrastructure site work due to exterior door, ceiling work in kitchen to expose existing windows and extension of work area into back offices 3 Reformatted and revised Construction Documents to accommodate City of Culver City title block on mylar after the set was complete 3859 Cardiff Avenue Culver City California 90232 Tel 310-204-2290 Fax 310 838-6109 Email design@wolcoftai corn 41k--mmomilinsfr "1"1/11111"1111M irk ill=77o 1 Culver City Teen Center Remodel February 28 2006 Page Two Wolcott Architecture Interiors 4 Reprinted and coordinated with General Contractor's to allow for additional bidders and extension of bid process 5 Due to unknown field conditions and schedule extension of eight weeks, WAI conducted additional Construction Administration including numerous site visits the coordination of RFl responses (1-40), Additional Change Order (1 27) review due to scope changes and held issues Due to schedule and lead _time issuesT-WAI reviewed addittonaFsubmittatcprriPC19:r & -elattic -hii— ci-SK 4- 6 & 7 6 uoordinated flooring research for new finis/led concrete finishes Revised pattern and colors See attached floor finish plan (Sheet A2 4) 7. Coordinated-14e . =.4 :m=reAciesigrAnclutling-revi and SK-11 8 Relocation I design of utility sink See attached 5K-8 9 Structural Engineer coordination and follow up See attached Invoice 10 Coordinated reselections of accent paint colors due to floonng change and represented to staff and sub-committee members 11 Reimbursable expenses including prints and plots for bidders and Design Presentation board See attached back up Work Authorization No 1 is subject to Terms and Conditions as stated in Wolcott/City of Culver City Approved Contract - Contract Number 2005 091, dated July 28, 2005 - z F.; z Submitted by Authorized by Date Amanda Kaleps Amanda Kaleps John Rivera Wolcott Architecture • Interiors 3859 Cardiff Avenue Culver City, California 90232 Tel 310 204 2290 Fax 310 838 6109 Email awildere wolcottai corn cc A-J Wilder Jim Stefanucci Nkspot‘in_progress105 196 Culver City Teen Center\Documentskl 5 Project Auth‘Work Authonzationl 022806 doc 3859 Cardiff Avenue Culver City California 90232 Tel 4ip.204.2290 Fax. 310 838 6109 Email glesign@wo/cotteLoom 4Teen Center Remodel Over Standard Work Preformed (Refer to Work Authorization No 1 for further description of services preformed ) item # Date of Service Service Preformed Service Preformed by Hours L -n HD rly Rate Totals 1 06 08 05 Meeting with Sub-committee Joe Camp -Job Captain 2 . $8500 $17000 1 06 08 05 Meetmwith Sub-committee Amanda Kaleps-Senior Prowl Manager 2 $13000 $26000 2 05 18 05 Plan revisions / alternates Joe Campi -Job Captain 15 1 $8500 $1,275 00 2 05 18 05 Plan revisions / alternates Amanda kaleps-Senior Pr_olect Manager 2 . '13000 $26000 3 07 28 05 Title Block -See note #3 Joe Campi Job Captain 3|1010|$8500 $25500 3 07 28 05 Title Block See note #3 Amanda Kaleps Senior Project Manager 1 1 130 00 -I $130 00 4 09 01 05 . Bid extension/ Contractor Walk L Joe Campi -Job Captain 8 i 85 00 _ $680 00 5 11/05 -02/15 ' Extended Schedule by 8 weeks I Unknown field conditions Joe Cam_pi -Job Captain 31 00 $2 635 00 -,- 5 11/05 02/15 , Extended Schedule / Unknown field conditions _ _ Amanda Kaleps-Senior Project Manager 5 . ' 130 00 $650 00|1010| 11/05- 02/15 flooring redesign / reselectiOn . Joe Campi -Job Captain , 10 _ , 00 7 11/05 02/15 _ Restroom Tile re-design e Joe Camp, -Job Captain 5 V 00 $42500 8 11/05 02/15 Relocation of Utility Sink Joe Camp! -Job Captain 5 , 00 $425.00 9 11/05 02/15 Structural Engineer Consultation Sam Moon 1 .L. $'00 00 $30000 10 11/05 - 02/15 ,Colors Reselection of Accent Paint Joe Campi Job Captain 4 _L, 00 $34000Teen Center Remodel Over Standard Work Preformed (Refer to Work Authorization No 1 for further description of services preformed ) i Item # Gate of Service Service Preformed Service Preformed b Hours ouriy Rate Totals Ell 11/05 02/15 Reimbursable expense WAI 1111 $927 81 $527 81 1111111 N 111 1 $9 482 81MISCELLANEOUS EXPENSES Mileage Joe Camp 9 Nov-05 $3 17 Joe Campi 12/1/2005 $7 92 Joe Carnpi 2/9/2006 $6 34 United Express_Messenger 8/30/2005- —$2_340 United Express Messenger 12/612005 $10 18 —Faxes - 9 © $1-00 — ---S9-0 Copies - 1121 @$ 10 $11210 Bond Prints - 164 @ $4 00 $656 00 Total $827 81 Wolcott Architecture interiors 1Invoice Moon & Associates, Inc 12304 Santa Monica Blvd Ste 222 Los Angeles, CA 90025 Invoice # Data 11/21/2005 4 R EC E l v ki 9 2005 ------gcruFtwirrremoRs--- BID To Wolcott Al Ma Soo Campi. • City, CA 90232 P 0 No Terms Project Quantity _.- I Description i Rats Amount 1 Prelimbaary site inspection on 10/27/05 of as-built brick wall to accommodate the proposed opening of C.C. Teen Center 2 hrs x $150/hr- Culver City Teen Center 300 00 300 00 VI••n••n•nn.n•n•""..... - Thank you for your busmen Payment due 1224-05 . * --, Total $30000i C 03 0- a) o CU Q. CDih ROOM LEGEND 101 102 163 104 105 ENTRY Homeroom< ROOM emsnm OFFICE COSTING OFFICE CAME ROOM 178 117 116 119 120 EXISTING OFFICE MENS RESTROOIA WOMENS RESTROOM EXISTING untffy ROOM (4IC) EQUIP/MECHANKAL ROOM (NIC) 106 orna (NC) 121 EXISTING Pm 0,90 107 EXISTING PATIO (NIC) 122 BACK ENTERANCE 108 MUCff—PURPOSE ROOM 123 MUSIC ROOM 109 TELEASION ROOM 124 CONFERENCE ROOM 110 =RAGE 125 EXISTING HALLWAY (41C) 111 KIT PREP/SERVING ROOM 126 EXISTING ofra (ric) 112 KITCHEN 0410 127 EXISTING OFFICE NC 113 STORAGE (NIC) 128 EXISTING orna hic i 114 115 OFFICE/STORAGE (NIC) EXISTING OFFICE 129 exlsmo onlcE NIC Architecture • interiors 3059 Cord* Maw 0.6or City CeOcoee 90232 Tel 310.204.2290 Fec 310436.6109 Deck desicrOwelcottat.com