Title: Budget amendment to appropriate $400,000 to the Plunge Building Reconstruction Project. Requires a 4/5ths vote.
Attachments: 1. 08805 Plunge Reconstruction A-5.doc, 2. A-5.pdf
City of Culver City, California City Council Agenda Item Report RECOMMENDATION: That the City Council approve a budget amendment to appropriate $400,000 from the General Fund Fund Balance to Capital Improvement and Acquisition Fund #42000850.720100 and $20,000 from Proposition 12 Per Capita Funds to the Grants Account #42300850.720100 for the Plunge Building Reconstruction Project. A 4/5ths vote is required to approve the budget amendment. BACKGROUND: The City Council in conjunction with the City’s Redevelopment Agency approved rehabilitation of the Culver City Plunge (Plunge Building Reconstruction Project) and allocated $1.25 million of redevelopment funds towards the project on February 17, 2003. The Plunge Building was built in 1949 and the reconstruction project was considered necessary to deal with the current Health and Safety Code requirements, Americans with Disabilities Act requirements, increasing energy costs and operational needs. On May 3, 2004 the City applied for a Land and Water Conservation Fund (LWCF) Grant in the amount of $400,000 for the Plunge Building Reconstruction Project. The City received notification in October 2004 that it was awarded the grant in the amount of $405,960. Meeting Date: 08/08/05 Item Number: A-5 AGENDA ITEM: Approval of a Budget Amendment to Appropriate $400,000 From the General Fund Fund Balance to Capital Improvement and Acquisition Fund #42000850.720100 and $20,000 From Proposition 12 Per Capita Funds to the Grants Account #42300850.720100 for the Plunge Building Reconstruction Project. Contact Person/Dept.: Andy O'Connell, Public Works and Marty Nicholson, PRCS Phone Number: (310) 253-5606 (310) 253-6662 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [] Action Item: [X] Attachments: [X] Public Notification: Parks and Recreation Commission (8/2/05), Pool User Groups (8/2/05), Master Notification List (8/3/05) Department Approval: Charles Herbertson, PW Director Bill LaPointe, PRCS Director 7/18/05 CAO Approval: Jerry Fulwood 8/3/05 City Controller Approval: Marlee Chang 8/3/05City of Culver City, California City Council Agenda Item Report Subsequently, the City entered into a project management contract with RTI Consulting, Inc. to oversee the reconstruction project. On November 8, 2004 the City approved a design/build contract with RM Lane Company General Contractors. Total anticipated cost of the project was estimated at $1,655,960 which included both the redevelopment and grant funds. Attachment 1 is a copy of that report. DISCUSSION: The Plunge Building Reconstruction Project has been under construction since November 2004 and it is anticipated the project will be near completion or completed by the July 25, 2005 City Council meeting. There are two allocations of funds that need to be considered by City Council in order to be able to process necessary payments. They are: 1) LWCF Grant replacement funds and 2) Proposition 12 Per Capita Funds. Land and Water Conservation Fund Grant Replacement Funds Due to the age of the Plunge Building additional historical documents have been requested by the State which was not required of previous grant applications in order to process the LWCF Grant contract. Under standard operating procedures the grant contract is signed and then, the Budget & Finance staff appropriates the funds for use. Since the contract had not been signed, the funds have not been appropriated from the LWCF. Staff has been working on producing the historical information needed to process the grant contract. In the meantime, the City must allocate funds in the amount of $400,000 in order to pay the construction costs that have already accrued. Staff is requesting that the City Council authorize funds in the amount of $400,000 from the City’s General Fund Fund Balance. There is a small possibility that the State of California will not accept the historical review findings and if that were to happen, then the City could either not accept the grant or make some revisions to the building in order to be eligible for the $405,960 in Land and Water Conservation Grant funds. In the unlikely event that was to occur the City’s General Fund would be the funding source. Proposition 12 Per Capita Funds The design/build timeline for the Plunge Building Reconstruction Project was an extremely ambitious schedule for several reasons including using the new design/build process and weather unknowns. The Design/Build process is being used by the City for the first time with the Plunge Building Reconstruction Project. The Design/Build process can be a very effective process. However, our project bids were higher than the funds allocated therefore, staff spent additional time with RM Lane Company findings solutions to reconcile City of Culver City, California City Council Agenda Item Report those differences. As a result, the final project plans were completed later than originally anticipated. Also, during the Spring 2005, our region experienced above normal rainfall which had an impact on the project. Due to the desire to complete the project before the summer, the Pool Locker Room Subcommittee agreed to authorize the contractor to provide weekend work. Funds to cover the additional costs for overtime related to weekend work has been identified in Proposition 12 Per Capita funds. Attachment 2 shows a breakdown in the Proposition 12 Per Capita funds and the remaining balance. Staff is requesting that the City Council allocate $20,000 from the Proposition 12 Per Capita funds towards the Plunge Building Reconstruction Project to fund the additional expenditures. FISCAL ANALYSIS: Approval of a budget amendment to appropriate $400,000 from the General Fund Fund Balance to the Capital Improvement and Acquisition Fund Account #42000850.720100 may result in the General Fund decreasing by $400,000 on a permanent basis should the State of California reject the historical review and process a finding that the City does not comply with the requirements of the LWCF grant application. Staff believes the State is working with the City to process the grant contract and the chances of the City being found ineligible is extremely slim. In addition, if the City did not comply with the historical requirements of the grant, the City could make alterations to the building in order to comply. Any alterations may have additional costs associated with it. Allocating $20,000 of the Proposition 12 Per Capita Funds will reduce the amount of funds available for other projects in the Proposition 12 Per Capita Funds. The additional funds may not be required depending on the final accounting of all invoices as the project does have a contingency fund. At this point, staff is requesting approval of the allocation so the project and payments are not stalled. If the funds are not required, the City can reallocate the funds to other City park projects at a later date. Allocating $20,000 from the Proposition 12 Per Capita Funds will not affect any other current park projects. Staff will be bringing back a recommendation for allocating the remaining $60,650 of Proposition 12 Per Capita Funds for other park improvements.City of Culver City, California City Council Agenda Item Report ATTACHMENTS: 1. Agenda Item dated November 8, 2004, entitled “Public Hearing and Consideration to Award a Design-Build Contract to RM Lane Company General Contractors for the Plunge Building Reconstruction Project”. 2. Summary of Proposition 12 Per Capita Funds MOTION: That the City Council: 1. Authorize an allocation of $20,000 from Proposition 12 Per Capita Funds to Grants Expenditure Account #42300850.720100 and Grants Revenue Account #42300850.340860 for the Plunge Building Reconstruction Project, P-850; and 2. Authorize a budget amendment to appropriate $400,000 from the General Fund Fund Balance to the Capital Improvement & Acquisition Fund for Expenditure Account #42000850.720100 for the Plunge Building Reconstruction Project, P-850; and 3. Upon receipt of grant monies from the Land and Water Conservation Fund grant, authorize staff to make journal entries to record the grant receipt and project expenditures. A 4/5ths vote is required to approve the budget amendment. MEETING DATE 8/8/05 AGENDA ITEM Approval of Budget Amendment to Appropriate $400,000 From the General Fund Fund Balance and $20,000 From Proposition 12 Per Capita Funds in the Grants Account #42300850 for the Plunge Building Reconstruction Project ATTACHMENTS Pages 1 Agenda Item dated November 8, 2004, entitled 1-5 Public Hearing and Consideration to Award a Design-Build Contract to RM Lane Company General Contractors for the Plunge Building Reconstruction Project 2 Summary of Proposition 12 Per Capita Funding 6City of Culver City, California ATTACHMENT 'I City Council Agenda Item Report Meeting Date 11/08/04 Item Number G-1 AGENDA ITEM Public Hearing and Consideration to Award a Design-Build Contract to RM Lane Company General Contractors for the Plunge Building Reconstruction Project Contact Persons/Dept Phone Number Andy O'ConnelVPW 1310) 253-5606 Fiscal Impact Yes [X] No [ ] General Fund Yes [X] No [1 Public Hearing [X] Action Item [ ] Attachments [X] Public Notification Master Notification List on November 3, 2004 All affected businesses and residents within a 500-foot radius of the Plunge, Culver City Homeowners' Association, East Culver City Neighborhood Alliance, and Stakeholders (pool users & interested parties) (426 total) were mailed on October 21st via First Class Postcard Public Notification Advertisement in the Los Angeles Times, California Section, on October 29, 2004 and in the Culver City News on November 4, 2004 Department Approval Charles D Herbertson 10/28/04 CAO Approval Jerry Fulwood 11/3/04 City Controller Approval Eric Shapiro 11/2/04 RECOMMENDATION staff to negotiate and enter into a Company General Contractors for the located at 4175 Overland Avenue, of $1,300,000 and enter into a Design-Build Services of Intent will be issued requiring the final construction drawings for the Plunge final construction drawings by the City's received by RM Lane Company, a formal construction for a GMP that may be less the affidavit and notice of publication and and calls upon the public for comment Hearing arrives at its decision|1010|Staff recommends that the City Council authorize Design-Build agreement with RM Lane reconstruction of the Municipal Plunge Building for a Guaranteed Maximum Price (GPM) If Council authorizes staff tonight to negotiate agreement with RM Lane Company, a Notice RM Lane Company to proceed with the Building renovation Upon approval of the Project Team and firm bids have been agreement will be executed for the project than, but will not exceed $1,300,000 PROCEDURE|109| Mayor seeks motion to receive and file mailing|109| Mayor calls on staff for a brief report|109| Mayor declares the Public Hearing open,|109| Mayor seeks a motion to close the Public|109| City Council discusses the matter andCity of Culver City, California City Council Agenda Item Report BACKGROUND/DISCUSSION On October 11, 2004 Council authorized staff to negotiate with RM Lane Company in order to reach an agreement for the reconstruction of the Plunge Building for a Guaranteed Maximum Price (GMP) that will not exceed $1,300,000 and authorized the maximum payment of $20,000 in design fees for design services to determine more accurate construction cost If Council approves the contract tonight, this design fee will not increase the budget and will be incorporated into the GMP Since the October 11, 2004 Council meeting, RM Lane Company hired additional consultants to prepare a more detailed conceptual design of the proposed renovation, which has generated more accurate estimated construction costs In the past six months, the cost of construction materials have dramatically increased and this has created a challenge for the design-build team to design the renovations within the approved budget The RM Lane Company has submitted a 'Conceptual Design Program Update' letter that summarizes the major construction renovations that will definitely be covered under the GMP and those renovations that are still under design review having estimated costs that would exceed the GMP These items are briefly listed below (See attachment) Items Within Budget Seismic upgrade of roof structure New building fire sprinklers Chlorine room upgrade New solar pool heating New locker rooms with lockers New shower rooms Energy efficient fixtures New offices for cashier, pool manager, and aquatic coordinator New staff break room New life guard changing room New conference room Reconfigured storage rooms Upgrade of entry area New wall finishes Items Exceeding Budget Removal and reconstruction of roof Radiant floor heating Recycled plastic lockers Separate room for acid storage Air conditioning of entire building New restroom by conference room Plumbing of staff break room Finish of new conference room Exterior shower Tile floor coverings If Council authorizes tonight that staff negotiate and enter into a Design-Build Services agreement with RM Lane Company, a Notice of Intent will be issued requiring the RM Lane Company to proceed with the final construction drawings for the Plunge Building renovation based on the submitted 'Conceptual Design Program Update' letter Upon approval of the final construction drawings by the City's Project 2City of Culver City, California City Council Agenda Item Report Team and firm bids have been received by RM Lane Company, a formal agreement with RM Lane Company will be executed for the project construction for a GMP that may be less than, but will not exceed $1,300,000 Project Schedule Pool operations at the Plunge have officially ended and Operation and Maintenance Division staff of the Public Works Department are currently removing fixtures and other building assets that are worth salvaging as replacement parts for use in other PR & CS Department buildings Winzler and & Kelly Consulting Engineers have completed the lead and asbestos survey of the Plunge Building and prepared a scope of work for the abatement work Five contractors have submitted proposals for the abatement work If Council authorizes staff to enter into an agreement with the selected abatement contractor, it is anticipated that this work can be completed by the middle of December Where possible, the abatement work and required demolition by the RM Lane Company will be done concurrently Construction is scheduled to be completed by June 1, 2005 Public Notification All businesses and residents within a 500-foot radius of the Plunge Building, all stakeholders involved in the design of the Plunge Building Improvement Project, Culver City Homeowner's Association, and the East Culver City Neighborhood Alliance were notified on October 21, 2004 via postcard totaling 426 at a cost of $97 98 RM Lane Company General Contractors were personally notified on October 25, 2004 A Notice of Public Hearing was placed in the Public Notice Section of the October 28 th and November 4th , 2004, issue of CC News at a cost of $150 FISCAL ANALYSIS The amount budgeted in Fiscal Year 2004-2005 by the Redevelopment Agency for the City's Plunge Building Reconstruction Project is $1,250,000 A federal grant in the amount of $405,960 has been awarded from the Land & Water Conservation Fund (Proposition 40) The project is also included in the adopted Capital Improvement Budget for Fiscal Year 2004-2005 A total construction budget will be comprised of $1,000,000 from the Agency Funds and $300,000 from the Land & Water Conservation Funds The remaining funds will be used for soft costs and additional construction costs The total project budget is depicted below 3City of Culver City, California City Council Agenda Item Report Budget Redevelopment Agency Funds $1,250,000 Land & Water Conservation Fund $ 405,960 Total $1,655,960 Estimated Cost Summary RTI, Construction Management $ 131,650 KBB, Legal Counsel $ 21,350 RFP Stipend $ 16,000 Design-Build (Including 10% contingency) $1,000,000 Energy Efficient Elements to Design- $ 405,960 Build Environmental Mitigation $ 50,000 Arts in Public Places Program $ 10,000 Furniture & Equipment (allowance) $ 21,000 Total $1,655,960 The estimated savings to the City's General Operations of keeping the pool closed during It is anticipated that the renovation of the Plunge to the City in the form of reduced energy and have been completely identified staff will appropriating funds from the Innovation savings to provide for additional construction ATTACHMENTS Fund for the cost of Maintenance and construction is about $ 100,000 Locker Room will generate savings staff costs After these future savings be requesting that Council approve Fund of up to three years of the future items, if necessary Program Update Letter October 21, 2004 2004 without attachments|109| RM Lane Company's Conceptual Design|109| Public Notification Advertisement and Postcard,|109| Council Agenda Report dated October 11, 4City of Culver City, California City Council Agenda Item Report MOTIONS That the City Council 1 Authorize staff to negotiate and enter into a Design-Build Contract Agreement with RM Lane Company General Contractors for the Plunge Building Improvement Protect for a Guaranteed Maximum Price not to exceed $1,300,000 2 Direct the City Attorney to prepare the appropriate agreement, and authorize the Chief Administrative Officer to execute the agreement on behalf of the City, 3 Authorize the Public Works Director and City_ Engineer to increase the agreement by an amount not to exceed 10%, if necessary, and within the available budget 5ATTACHMENT 2 Summary of Proposition 12 Per Capita Funds TOTAL PROP 12 ALLOCATION Project Name Tellefson Park Irrigation [Turf Replacement El Marino Playground Rehabilitation Blair Hills Playground Rehabilitation Carlson Park Im rovement $388,000 37,020 30,110 28,468 88 674 Project No P-790 P-791 P-803 P-814 Remaining Prop 12 funds as of 7111/05 1Th|1013|