Legislation Details

File #: HIST-16515    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 4/11/2011 Final action: 4/11/2011
Title: (1) Acceptance of Work Performed by All American Asphalt; (2) Authorization to File a Notice of Completion; and (3) Authorization to Release the Retention Payment after the Expiration of the 35-Day Lien Period for the 2010 Pavement Overlay Project, P-863, P-903, P-921.
Attachments: 1. (1) Acceptance of Work Performed by All American A - C-4__11-04-11__PW-Eng__CITY COUNCIL__Accept Work 2010 Pavement Overlay Project - FINAL.docx
City of Culver City, California Agenda Item Report Meeting Date: 04/11/11 Item Number: C-4 CITY COUNCIL AGENDA ITEM: (1) Acceptance of Work Performed by All American Asphalt; (2) Authorization to File a Notice of Completion; and (3) Authorization to Release the Retention Payment after the Expiration of the 35-Day Lien Period for the 2010 Pavement Overlay Project, P-863, P-903, P-921 Contact Person/Dept.: Sammy Romo/ Public Works Department Phone Number: (310) 253-5619 Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No [] Public Hearing: [] Action Item: [] Attachments: [] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (04/07/11), (E-Mail) All American Asphalt (04/07/11) Department Approval: Charles D. Herbertson(04/05/11) City Attorney Approval: Carol Schwab (by H. Baker) (04/05/11) Chief Financial Officer Approval: Jeff Muir (by K. Marsden) (04/06/11) City Manager Approval: John M. Nachbar (04/06/11) RECOMMENDATION: Staff recommends the City Council accept the work performed by All American Asphalt and authorize the filing a Notice of Completion for the 2010 Pavement Overlay Project, P-863, P-903, P-921. It is also recommended that retention funds in the amount of $90,446.81be released to All American Asphaltafterthe thirty-five day lien period. BACKGROUND/DISCUSSION: On July 26, 2010, the City Council approved a construction contract with All American Asphalt. The project consisted of grinding between 0 and 3 inches of existing asphalt concrete (AC) pavement and replacing it with 2 to 3 inches of new conventional asphalt and rubberized asphalt concrete hot-mix pavement on the following street segments: 1. Adams Boulevard: Washington Blvd. to 140 feet west of Hines Ave. 2. Barman Avenue: Coombs Avenue to Overland Avenue 3. Corryne Place: Slauson Avenue to cul-de-sac 4. East Boulevard: Washington Boulevard to City Limit 5. Eastham Drive: Higuera Street to Steller Drive 6. Girard Avenue: Washington Place to Venice Boulevard 7. Hubbard Street: Ince Boulevard to cul-de-sac 8. Jean Place: Washington Boulevard to cul-de-sac 9. Lenawee Avenue: Ivy Way to City limit 10. Motor Avenue: Braddock Drive to Culver Boulevard City of Culver City, California Agenda Item Report 11. Pearson Street: Jefferson Boulevard to cul-de-sac 12. Perry Avenue: La Cienega Boulevard to Fairfax Avenue 13. Poinsettia Court: 370 feet west of Higuera Street to Ince Boulevard 14. Sawtelle Boulevard: Matteson Avenue to Venice Boulevard 15. Washington Place: Sawtelle Blvd to Sepulveda Blvd. 16. Washington Place/Grandview Blvd. Intersection 17. Washington Place: Albright Avenue to Sawtelle Blvd. 18. LeBourget Ave: Culver Boulevard to Braddock Drive 19. Motor Avenue: Park Avenue to Braddock Drive 20. Park Avenue: Motor Avenue to Le Bourget Avenue Additionally, the scope of work included striping new bicycle lanes on Washington Place from Sepulveda Boulevard to Albright Avenue, re-striping of pavement markings with thermoplastic paint, installing raised pavement markers and traffic loop detectors, and re-paving and re-striping the parking lot at Fire Station #2. All American Asphalt successfully completed the work as required in the executed contract dated August 19, 2010. There is a one year warranty on the work product for any potential defects. The construction management was performed by staff, andconstruction inspection was performed by Civil Source, Inc. through the on-call general civil engineering contract. Construction geotechnical service was performed by Associated Soils, Inc., through the on-call general geotechnical engineering contract. FISCAL ANALYSIS: The approved construction contract amount was $924,120 and the Public Works Director/City Engineer was authorized to approve change orders in the amount not to exceed $95,412. The final construction expenditure amount was $931,488. Project Budget Funding Source Amount P-863 Prop 42 (43000863) $70,498 P-903 Prop 1B (42900903) $606,427 P-921 General Funds (Fire Station Parking Lot, 42000921) $10,000 P-863 General Funds (42000863) $362,607 Total $1,049,532 City of Culver City, California Agenda Item Report Final Project Expenses Construction of Residential Overlay Project, P-863, P-903, P-921 $931,488 Construction Inspection Services $27,021 Geotechnical Construction Services (Observation & Testing) $12,247 Total $970,756 Remaining general funds in the amount of $78,766 will be used for future residential street resurfacing projects. MOTION: That the City Council: 1) Accept the work performed by the contractor, All American Asphalt, for the 2010 Pavement Overlay Project, P-863, P-903, P-921; and, 2) Authorize the Public Works Director/City Engineer to execute the Notice of Completion and submit it to the Los Angeles County Recorder’s office for recordation; and, 3) Authorize the release of $90,446in retention funds to All American Asphalt following the expiration of the thirty-five day lien period.