RECOMMENDATION:
Staff recommends the City Council: (1) accept the work performed by the
contractor, Malcolm Drilling Company, Inc., (2) authorize filing a Notice of
Completion for the Reconstruction of the Slope Adjacent to Cranks and Tellefson
Roads Project, P-867, (3) authorize release of the retention funds in the amount of
$331,166.51 to Malcolm Drilling Company after the thirty-five day lien period
expires, (4) approve a budget amendment to transfer $6,781 into the P-867
account for outstanding invoice balance for the project geotechnical engineer,
Geo-Environmental, Inc.
A 4/5th vote is required to approve the budget amendment.
BACKGROUND/DISCUSSION:
Several previous City Council reports containing detailed background information
are attached. The following is a brief summary:
On February 12, 2005, after near-record rainfall, the slope on the properties at
10747 and 10751 Cranks Road failed. The following properties were subsequently
red-tagged by City staff: 10745, 10747 and 10751 Cranks Road and 5722 and
5724 Tellefson Road. Additionally, Tellefson Road from Bernardo Road to Cranks
Road was closed to through traffic.
After significant meetings between the City, the residents, the State Office of
Emergency Services (OES), and the Federal Emergency Management Agency
(FEMA), on May 22, 2006, the City Council approved entering into a professional
Meeting Date: 11/10/08 Item Number: A-6
AGENDA ITEM: FOUR-FIFTHS VOTE REQUIREMENT - Accept the Work Performed
by Malcolm Drilling Company, Inc., for the Reconstruction of the Slope Adjacent to
Cranks and Tellefson Roads Project, P-867
Contact Person/Dept.: Sammy Romo/PW Phone Number: 310-253-5619
Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No []
Public Hearing: [] Action Item: [X] Attachments: [X]
Public Notification: Master E-Mail Notification List on (November 5, 2008). Malcolm Drilling
Company, Inc., Geo-Environmental Inc., property owners of 10747 and 10741 Cranks
Road, property owners of 5722 and 5724 Tellefson Road, and Culver Crest Neighborhood
Association were notified by e-mail on (November 5, 2008).
Department Approval:
Charles Herbertson (11/04/08)
City Attorney Approval:
Heather Baker (11/05/08)
Chief Financial Officer Approval:
Jeff Muir (by M. Noller) (11/05/08)
City Manager Approval:
Jerry B. Fulwood (11/05/08) City of Culver City, California
City Council Agenda Item Report
services agreement with Geo-Environmental, Inc. for the design of the slope repair
and construction inspection services.
A settlement agreement was approved by the City Council with the property
owners in January 2007 for the construction of a 3-tiered soldier pile retaining wall
system for the subject properties.
On August 30, 2007, the City Council awarded a construction contract to Malcolm
Drilling Company, Inc., for reconstruction of the subject slope. In October 2007,
reconstruction of the subject slope commenced. The residential structures at
10745 and 10747 Cranks Road were demolished to accommodate a 200-foot long
crane and other heavy construction equipment. Also the overhead utility lines
were relocated.
Heavy construction began in February 2008 with placement of 50 foot long steel I-
beams to structurally support the reconstruction of the slope. Subsequently, wood
boards were installed between the steel beams. In May and June 2008, the
construction of reinforced concrete caissons and a bridging structure occurred to
protect the City of Los Angeles’ 100 inch diameter North Central Outfall Sewer
(NCOS) main. This work was completed in July 2008.
In August and September 2008 the soil on the slope was graded and compacted
behind the new retaining wall system. Also safety cable rails were installed on top
of the walls. Finally the slopes behind the walls were sprayed with hydroseed for
erosion control.
FEMA Funds
Currently, staff anticipates reimbursement of $909,296 from FEMA/OES for the
design and construction of the project. Staff is currently preparing the application
to obtain the reimbursement funding. Also, it is the opinion of the project
geotechnical engineer that the slope failure encompassed a larger area than
what was originally assumed. Accordingly, staff is seeking additional
reimbursement from FEMA/OES for a greater portion of the total cost of the
project.
FISCAL ANALYSIS:
The original contract amount with Malcolm Drilling Company, Inc. was $3,207,700,
This amount was increased by $103,965 (3.24% of initial contract amount) due to
change orders. Therefore, the final contract amount is $3,311,665. The change
orders were for the relocation of power lines, asbestos abatement for the City of Culver City, California
City Council Agenda Item Report
demolition of the house at 10745 Cranks Road, revisions to the construction plans
to comply with the City of Los Angeles’ requirements for construction over their
NCOS line, hydroseeding, and additional excavation for placement of the retaining
wall subdrain system. The final project costs are shown below.
Final Project Costs
Design – Geo-Environmental, Inc. $125,000
Construction – Malcolm Drilling
Company, Inc.
$3,311,665
Geotechnical Construction
Observation and Materials Testing
Services
$232,895
Total Project Cost $3,669,560
At the meeting of August 30, 2007, the City Council authorized the Public Works
Director/City Engineer to increase the construction contract with Malcolm Drilling
Company, Inc. and the professional services contract with Geo-Environmental, Inc.
by an aggregate amount not to exceed $300,000 due to unforeseen conditions.
The final invoice from Geo-Environmental, Inc. exceeds this contingency amount
by $6,781. Therefore, staff requests the City Council increase the contingency
amount by $6,781 to account for this increase via budget amendment. A four-fifths
affirmative vote is required to amend the budget.
ATTACHMENTS:
1) Staff Report for May 22, 2006 Council Meeting
2) Staff Report for May 21, 2007 Council Meeting
3) Staff Report for August 30, 2007 Council Meeting
MOTIONS:
That the City Council:
1) Accept the work performed by the contractor, Malcolm Drilling Company, Inc.,
for the work performed on the Reconstruction of the Slope Adjacent to Cranks
and Tellefson Roads Project, P-867; and,
2) Authorize the filing of a Notice of Completion; and,
City of Culver City, California
City Council Agenda Item Report
3) Authorize the Public Works Director/City Engineer to sign and submit the
necessary documents to the Los Angeles County Recorder’s Office; and,
4) Authorize the release of retention funds in the amount of $331,166.51 to
Malcolm Drilling Company, Inc., for the Reconstruction of the Slope Adjacent to
Cranks and Tellefson Roads Project, P-867, following the expiration of the 35-
day lien period; and,
5) Approve a budget amendment to transfer $6,781 from the Self Insurance Fund
reserve to project account number 42000867;
6) Authorize the Public Works Director/City Engineer to approve an additional
change order to Geo-Environmental in an amount not-to-exceed $6,781
A 4/5th vote is required to approve the budget amendment.
MEETING DATE: 11/10/08
AGENDA ITEM: Accept the Work Performed by Malcolm Drilling
Company, Inc., for the Reconstruction of the Slope
Adjacent to Cranks and Tellefson Roads Project,
P-867
ATTACHMENTS
Pages|109| Staff Report for May 22, 2006 Council Meeting 1-44|109| Staff Report for May 21, 2007 Council Meeting 45-48|109| Staff Report for August 30, 2007 Council Meeting 49-55Department Approval:
Charles D. Herbertson
City Controller Approval:
Marlee Chang 5/16/06
CAO Approval:
Jerry Fulwood 5/18/06
City of Culver City, California
City Council Agenda Item Report
Meeting Date: 5/22/06
Item Number: A-4
AGENDA ITEM: Consideration to Approve a Budget Amendment and a
Professional Services Agreement with Geo-Environmental, Inc. for the final
design of slope repairs at the rear of the properties located at 10745, 10747, and
10751 Cranks Road and 5722 and 5724 Tellefson Road
Contact Person/Dept.: Charles Phone Number: 310.253.5635 and
Herbertson/PW and Mate Gaspar/PW 310.253.5602
Fisca.I Impact: Yes pig No General Fund: Yes [X] No []
Public Hearing: Action Item: g Attachments: [X]
Public Notification:
Master Notification List emailed on May 17 and residents of 10745, 10747, and 10751
Cranks Road and 5722 and 5724 Tellefson Road and their respective attorneys were
notified by e-mail on May 17
RECOMMENDATION:
Staff recommends that the City Council approve a budget amendment of $44,904
and a professional services agreement with Geo-Environmental, Inc. for the final
design of the slope repair behind the properties located at 10745, 10747, and
10751 Cranks Road and 5722 and 5724 Tellefson Road.
A four-fifths affirmative vote is required to amend the budget.
BACKGROUND:
On February 12, 2005 a landslide occurred on the slope in the rear of the
properties located at 10747 and 10751 Cranks Road and 5724 Tellefson Road.
After consultation with a geotechnical firm, the Public Works Department and
Building and Safety Division deemed five properties (including 10745 Cranks Road
and 5722 Tellefson Road) to be unsafe for human habitation and all were 'red-
tagged.' Also due to the imminent threat of further sliding, Tellefson Road was
closed between Cranks Road and Bernardo Road.
Portions of this slope were subjected to landslides in the 1960's, 1978, late 1980's,
and in 1993. There have been several variations of repairs conducted throughout
the years that were funded by the Federal Emergency Management Agency
(FEMA) and the property owners. The most recent repairs to the slope occurred in
zet
-11JCity of Culver City, California
City Council Agenda Item Report
1993 when a soldier-beam pile system consisting of three walls, a series of
terraces, and concrete gunite were installed.
The failure occurred under the concrete gunite that was placed in the rear
properties at 10749 and 10751 Cranks Road and 5724 Tellefson Road. The slope
further east at the rear properties of 10745 Cranks Road and 5722 Tellefson Road
did not fail; however, it was the opinion of the City's consulting geotechnical
engineer that there was an imminent threat for a slide to occur there.
March 2005 to June 2005
There were several meetings held with FEMA representatives and the property
owners regarding repairing the slope. FEMA stated that the February 12, 2005
event was included under the federal emergency declaration of the January 2005
storms. Also, they recommended that an extension be filed to ensure that the
window of receiving possible federal reimbursement for the repair work did not
expire after the first 6 months following the date of the disaster declaration (August
4, 2005). Staff filed a twelve month extension to complete the repair work. At the
same time it was determined that a geotechnical and geologic investigation of the
slope should be conducted.
On June 10, 2005, the City Council approved a budget amendment of $35,000 and
a professional services agreement with Zeiser Kling Consultants, Inc. for the
geotechnical and geologic investigation of the slope behind the five properties
The work consisted of the following:
1. Research existing geotechnical reports, geologic maps and reports, aerial
photographs, and meetings with staff.
2. Borings to a maximum depth of 80 feet.
3. Laboratory testing to determine pertinent engineering properties.
4. Engineering and geologic analyses to develop a geologic map and cross
sections for input into slope stability analyses and develop design parameters
for a soldier pile retaining system similar to existing walls.
5. Final Report and preparation of an RFP.
dune 2005 to November 2005City of Culver City, California
City Council Agenda item Report
After two months of negotiations between the City and two property owners to
allow the contractor access to their private properties, exploratory drilling was
performed in August 2005 and a draft report was submitted to the City by its
geotechnical consultant on November 27, 2005. The report revealed that the main
cause of the slope failure was loss of friction between soil strata as a result of
percolation of large amounts of rain water during record storms in December 2004
and January 2005. The report recommended that a three soldier pile wall system
be constructed, (similar to the system of walls constructed on the adjacent slope in
1993), and extended across the properties at 10745 Cranks Road and 5722
Tellefson Road.
Meanwhile, staff continued to meet with FEMA and OES representatives regarding
the subject matter. FEMA's review of the draft geotechnical report resulted in
questions regarding the reason for extending the repair across the slope where
there was no failure. Since the initial slope failure, the slope has not failed,
however, the Public Works Director/City Engineer and Building Official continue to
keep these two properties red tagged due to a possibility of failure and as
recommended by Zeiser-Kling. The response to FEMA was prepared by Zeiser-
Kling and in summary stated that the adjacent slope experienced headward
enlargement or escarpment due the adjacent slope failure, as evidenced by a
growing widening cracks on the property line walls between 10743, 10745 and
10747 Cranks Road. Also, Zeiser Kling conducted a slope stability calculation and
determined that the slope behind the properties at 10745 Cranks Road and 5722
Tellefson Road has a factor of safety of less than 1.5 and with an elevated
groundwater level, would reduce to less than 1.0, similar to the condition of the
adjacent slope prior to failure. In addition it was concluded that the slope is
experiencing ongoing creep.
December 2005 to May 2005
Staff requested Zeiser Kling to submit a proposal for the final design of the soldier
pile system and submit a construction cost estimate. Zeiser-Kling, along with their
civil engineering sub consultant, Fuscoe Engineering of Irvine, California,
submitted a $425,000 cost proposal for the final design of slope repair. Also, they
estimated that the slope repair will cost about $1 million.
Because the proposal for design from Zeiser-Kling was much more costly than
anticipated, staff decided to request multiple proposals and issued a Request for
Proposal (RFP) to fifteen geotechnical design firms for the final design of the slope
repair. Only two firms responded, David Lee Associates and Geo-Environmental,
Inc. The other design firms were contacted and they declined to submit a proposal
due to their current full workload.|1010|52Ut
City of Culver City, California
City Council Agenda Item Report
Upon review, David Lee Associate's proposal was determined to be non-
responsive because it did not include a final design of the repair and focused only
on the geotechnical analysis. Geo-Environmental's proposal was found to be
responsive and complete and they provided a total cost proposal of $118,000. The
proposal included material testing and inspection services during construction in
the amount of $30,080. Staff is recommending that this portion of the work be
awarded at a later date to coincide with the actual construction of the repair. With
this portion of the work removed from the contract, the final total cost proposal is
$88,550.
Under the current project worksheet approved by FEMA, the design is required to
be completed by August 3, 2006. Therefore, it is important to move ahead and
award a contract to complete the final design.
FISCAL ANALYSIS:
It is recommended that funding for this work be allocated from unreserved General
Funds to Other Contractual Services 42300867. A 415 th vote is required to
approve this budget allocation.
FEMA has approved $82,150 as eligible reimbursement costs for design of the
repair of the slope failure. FEMA will fund $61,613.00 or 75% of the eligible cost,
and State OES will cover $15,403.00, approximately 19%. In addition to the
reimbursements just discussed, FEMA and OES have already paid to the City
$3,780.00 as an administrative allowance for the design process.
The City has already expended $6,000 and $32,150 for the preliminary
investigations and analysis by Group Delta Consultants and Zeiser-Kling,
respectively. The remaining total of FEMA/OES eligible reimbursement funds
available is $42,646. An additional $45,904.00 is required to fund the Geo-
Environmental, Inc. contract. The City potentially would need to absorb this
expenditure if an alternative source of funding is not identified. Staff will be
working with FEMA and OES officials in an attempt to get the approved amount of
funding for design services increased through an amendment to the FEMA
approved Project Worksheet. Additionally, a future agreement with the affected
homeowners may include provisions for paying for some or all of the shortfalls in
funding for both desi gn and construction of the repairs.
Future Repair Costs:
The construction of the repairs has also been approved by FEMA and OES for
reimbursement in the amount of $885,413.00. FEMA/OES anticipated
53City of Culver City, California
City Council Agenda Item Report
reimbursements, based on the percentages discussed above, are approximately
$832,280.00. FEMA/OES have also already paid to the City $39,767.00 as an
administrative allowance for the construction process. The City potentially would
again need to absorb an additional expenditure if an alternative source of funding
is not identified.
Also it should be noted that the actual cost of construction has not yet been
identified and it is therefore possible that the construction costs will exceed the
amount currently allocated by FEMA. Additionally, FEMA's approved scope of
work for the project currently differs from the scope of work that the City
recommends. For both of these reasons, there exists the potential for a significant
shortfall in funding for the construction phase. However, FEMA has left the door
open for a future revision to the Project Worksheet for the repair work to both
increase funding and to expand the scope of work. This will be discussed with
FEMA following completion of the design as FEMA has indicated that they cannot
make that determination without a completed design. Also, as stated earlier, in
working out the agreement with the property owners, the possibility exists for the
property owners to pay a portion of or the entire construction cost shortfall.
ATTACHMENT:
1. Proposal from Geo-Environmental Inc.
MOTION:
That the City Council:
1. Approve a professional services agreement with Geo-Environmental. Inc.
for the final design of the slope repair behind the properties located at
10745, 10749, and 10751 Cranks Road and 5722 and 5724 Tellefson Road,
2. Approve a budget amendment to transfer $45,904 from unreserved general
funds to Other Contractual Services 10160500.619800.
3. Authorize the Public Works Director/City Engineer to approve an additional
change order in the amount of $30,080 for material testing and inspection
service to Geo-Environmental, Inc., during the time of construction.
A 4/5-budget vote is required to approve the budget amendment.
54Landslide Repairs a! HiuNafiL VLa ,orrma, taldslide Repair:J .4 Ej .glii:Locations; City of:. Bishop Monliornery Skupe Failure. CIt Li
Calffornia. La Canada Hirt:ridge; California: : California
if ,:Mr: jOhr):Riiief
:
Senior Mairagernbri t:Aric4lyst
Culver City
Public Work$:000ortrOent::
9770 :cply0r :Q900/0fd, : 270 Floor
Culver CitV;CX:90232-0507
Wastowator rniment Plant
•• City of Corona • .• •
GE:1::P06 :05:61:Noir: 06,062
: Grbiindwaair Replenishment Systems
Orange County INatei'Disinct
Slope Stability Evaluation, Shprecliff Golf Course, San
Clemente, Califoinia:
Caltraris Certified So r :ITe..510, , Lalluatc4::
r .:, ,UziErvision/Soils and Materials Testing,
,SR-134 . Olywood Way Ramps Improvements, City of
Burbank
PROPOSAL TO PROVIDE
Final Design of Cranks / Tellefson Road Slope Repair
Culver City Project No. P-867
6 .06a6a666,* el a a 02.6*saasa6666 c4g11-94VIRONMPNIAJ INC. ,.,.no g oaeos eooeeeacs .• aat
Caltrans Certified
OBE Firm
1720 E. Garry Avenue, Suite 215, Santa Ana, CA 92705 • (949) 263-8334 • {949) 263-8338 fax
Email: qeincornPaol.corn • Websjte: www.geo-environmental.com 111111111111
GEO-ENVIRONMENTAL. INC.
Coltrane Certified
DBE Firm
May 8, 2006
Mr. John Rivera
Senior Management Analyst
Culver City Public Works Department
9770 Culver Boulevard, 2nd Floor
Culver City, CA 90232-0507
Subject: Proposal to Provide Final Design of
Cranks / Tellefson Road Slide Slope Repair
City Project No.: P-867
GEI Proposal No.: 06-062
Dear Mr. Rivera:
Geo-Environmental, Inc. is pleased to submit this Proposal or Professional Engineering Services for the final
design of Cranks / Tellefson Road Slide Slope Repair. We are confident that you will find Geo-
Environmental, Inc. and our team of subconsultants well qualified for this project.
Our contact information for this project is: Farhat H. Siddiqi, Ph.D., P.E.
Principal Engineer
1720 E. Garry Avenue, Suite 215
Santa Ana, CA 92705
Tel: (949) 263-8334, extension 22
Fax: (949) 263-8338
Geo-Environmental, Inc. is headquartered in Santa Ana, California. We also operate branch offices in
Riverside and San Diego, California, as well as Las Vegas, Nevada Our Caftans certified soils laboratory
is located in Irvine, California.
Enclosed are completed Standard Form 330 material for our project team of Geo-Environmental, Inc.,
Wheeler & Gray, Inc. and Cabrinha & Hearn Associates.
Geo-Environmental, Inc. has extensive recent experience with similar projects throughout Southern
California. We are committed to providing the City of Culver City with high-quality, responsive professional
services. Should you have any questions about our qualifications package, please call me. We look
forward to hearing from you, and providing the city our professional services.
Sincerely,
Geo-Environmental, Inc.
Farhat H. Siddiqi, Ph.D., P
Principal Engineer
1720 East Garry Avenue, Suite 215 • Santa Ana, CA 92705
(949) 263-8334 • (949) 263-8338 (fax)Table of Contents Culver City
Cranks / Tellefson Road Slide Slope Repairs
PAGE
Cover Letter
Table of Contents
Project Team Identification 1
Team Organization 2
Project Understanding and Approach 4
Geo-Environmental, Inc.
Geotechnical Investigation 6
Testing and Inspection Services 8
Wheeler & Gray
Civil and Structural Engineering 10
Master Design Schedule 11
Construction Estimate 11
Standard Form 330
Part I — Contract Specific Qualifications
Section A-D 12
Section E 13
Section F 22
Section G 26
Section H 27
Part II — General Qualifications 31
DBE Certificates
Geo-Environmental, Inc. 34
Cabrinha Hearn & Associates 36
Cost Proposal Attached as a Separate File
GE! Proposal No. 06-062 I Geo-Environmental, Inc.Project Team Identification Culver City
Cranks / Tellefson Road Slide Slope Repairs
Prime Consultant: Geo-Environmental, Inc.
1720 East Garry Avenue, Suite 215
Santa Ana, CA 92705
Tel: (949) 263-8334
Fax: (949) 263-8338
Email: fsiddiqi@geo-environmental.com
Geo-Environmental, Inc. is a California "C" Corporation
Subconsultants: Wheeler & Gray Consulting Engineers
650 Sierra Madre Villa Avenue, Suite 300
Pasadena, CA 91107
Tel: (626) 432-5850
Fax: (626) 432-5858
Email: jkelly@wheelerandgray.com
Wheeler & Gray is a California "C" Corporation
Cabrinha Hearn & Associates Land Surveyors
408 South Rosemead Boulevard
Pasadena, CA 91107
Tel: (626) 795-6926
Fax: (626) 795-4180
Email: clyde@cabrinhaheam.com
Cabrinha Hearn is a California "C" Corporation
GEI Proposal No. 06-062 1 Geo-Environmental, Inc.
9CITY OF CULVER CIT
PuBLia WORKS DEPARTMENT
mos
GO-ENVIRONMENTAL, INC,
Caltrans Certified
DUE Firm
Farhat H. Siddigi, Ph.D., P.E.
Project Management / Geotechnicai Investigation
CABRINHA HEARN
& ASSOCIATES
Clyde Calarinha, L.S.
Land Surveying and Mapping
101 WHEELER & GRAY
CONSULTING ENGINEERS
Mr. John Kelly, P.E. Mary IGnsler, P.E.
Project! Civil Engineering Project 1 Civil Engineering
CAD Department
Culver City
Team Organization
Cranks / Tellefson Road Slide Slope Repairs
CITY OF CULVER CITY
PUE3.1-IC WORKS DEPARTMENT
Proposal to Provide
Final Design of
Cranks / Tellefson Road Slope Repair
City Project No. P-867
Other City Departments! Other Utility Owners
GEL Proposal No. 06-062
2
Geo-Environmental, Inc.
I0enng
Geotechnicat Engin
Field Observation I
Laboratory Testing
Parviz Sheikhavandi, B.S.**
Roberto Flores, B.S.**
Michael Givens, B.S.**
Jun Cristobal
Jamal Siddi•i, B.S.
Farhat Siddigi, Ph.D., P.E.
Richard Fragaszy, Ph.D., P.E.
Hossein Foroughi, P.E.
Franklin Fong, M.S., P.E., G.E.
L. Fernando Aragon, MS., P.E., G.E.
'Geology, Seismicity, and
Environmental Issues
Frank Kresse, C.E.G.
Sree Akkenapaily, M.S., R.E.A.
Sheldon Medal!, M.S., C.E.G.
Mark Doerschlag, C.E.G.
Project Manager
Cabrinha Hearn & Associates Geo-Environmental Inc- Inc. Wheeler:Si-0:
Clyde C. Cabrinha
Camden Cabrinha
Farhat H. Siddicii, Ph.D., P.E.
Project Manager I Primary Contact
John Kelly, P.E.
Mary Kinsler, P.E.
Ted-mica/ Review
Richard J. Fragaszy, Ph.D., P.E.
s:TOlitto.s::Cert!frO4DBZ:
4 *Caltrans Certified
.1 .Tethniciáfl::
Culver City
Team Organization
Cranks / Tellefson Road Slide Slope Repairs
Organization Chart
We have assembled our project team of highly qualified professionals as shown in the Organization Chart below.
Detailed resumes of proposed staff members have also been included as an attachment for your review.
TEAM ORGANIZATION CHART
City of Culver City
Final Design of Cranks I Tellefson Road
Slide Slope Repair
City Project No. P-867
GEL Proposal No. 06-062
3
Geo-Environmental, Inc. tiProject Understanding and Approach Culver City
Cranks / Tellefson Road Slide Slope Repairs
PROJECT GOALS
This project will provide repairs to the slope damage caused by the recent storms during the winter of 2004-2005 to
the previously repaired slopes following damage in the 1980s and 1990s. Geo-Environmental, Inc., in coordination
with its subconsultants, Wheeler & Gray, Inc. and Cabrinha Hearn & Associates, will provide engineering and
support services for the preparation of construction contract documents for public bidding for the projects.
The project site consists of a 30 to 75 foot slope between the City streets and residential lots located at 10743
through 10751 Cranks Road, and 5722 and 5724 Tellefson Road. The majority of the proposed repair areas are
owned by the private property owners. Based on the recommendations of the City's previous Geotechnical
Engineers, the Construction project will involve the demolition of the remaining slope facing construction of a two-
tier Cantilever Soldier Pile retaining wall system, backfill of the Soldier Pile wall, reconstruction of slopes as geogrid
reinforced slopes, construction of terrace drains, repairs of the existing undermined and damaged terrace drains as
well as repair of any damage to the existing Soldier Pile wall panel. However, the validity of the choice of the
provision of the two-tier Cantilever Soldier Pile retaining wall system as the most cost effective and prudent method
of slope repair will be independently verified by Geo-Environmental, Inc.
CRITICAL ISSUES
Critical issues for these projects are maintaining the construction budget within the available funds. According to
the City's RFP, the project budget for the restoration and rehabilitation of the damaged slopes, inclusive of all costs
of design, engineering, construction, permitting, fees, supervision and management is estimated to be $1.2 million.
The project site lies both within the City limits as well as private properties requiring polite interaction with the
property owners.
PRELIMINARY SCHEDULE
A preliminary schedule is attached at the end of this section.
ACCELERATION OF DESIGN AND CONSTRUCTION
Acceleration of the project schedule is best handled during design by determining construction methods and
techniques, project phasing, and project combinations that will serve to eliminate duplication of tasks, down time for
contractors' crews and equipment, and conflicts between critical path tasks during construction.
SCOPE OF SERVICES
Geotechnical Engineering
Geotechnical engineering will be conducted by Geo-Environmental, Inc. This task will independently determine the
cause or causes of failures with the purpose of designing repairs and restoration to eliminate, to the extent feasible,
the possibility of a similar failure in the future. In this process, the recommendations made by the City's previous
Geotechnical Engineer will either be validated or modified.
Environmental Documents
it is expected that this project will be categorically exempt under California Environmental Quality Act (CEQA) and
categorically excluded under the National Environmental Protection Act (NEPA). Our fees in the Cost Proposal|109| Geo-Environmental, Inc.
GO Proposal No. 06-062Project Understanding and Approach Culver City
Cranks / Tellefson Road Slide Slope Repairs
portion of this proposal are based on this assumption.
Engineering Survey
Topographic Survey will be performed by our subconsultant Cabrinha Hearn and Associates. Our subconsultant
Wheeler and Gray will research the City's records and research the utilities in the area. As a part of the utility
research, we will also ascertain if the utility purveyors have any future work that will impact construction.
Right-of-way Engineering and Acquisition Services
It is expected that no permanent new rights-of-way or easements will be necessary for the completion of this
project. Our fees in the Cost Proposal portion of this proposal are based on this assumption. Permission for entry
and temporary easements for construction are expected to be needed. Our subconsultant Wheeler & Gray will
prepare mapping and legal descriptions and Geo-Environmental, Inc. will conduct communication with affected
parties.
Preliminary Design
Our subconsultant Wheeler & Gray will prepare preliminary documentation to the extent necessary to prepare
environmental documentation, construction cost estimates, and provide review material for the City on which to
comment.
Final Design — Plans, Specifications and Cost Estimates
Final design will consist of completion of all documentation necessary to conduct a public bidding of the project,
including drawings, specifications, engineers construction cost estimates, right-of-entry permissions, and
environmental documents.
Geo-Environmental, Inc. will meet with the City of Culver City staff as required to review submittals and keep the
City continually updated on the progress and the status of the plans and work.
Our subconsultant, Wheeler & Gray, will contact utility firms and transmit preliminary drawings early in the project to
coordinate their anticipated work in the near future and to coordinate any potential conflicts.
Construction and Engineering Management
Gee-Environmental, Inc. will provide construction management and engineering services with the purpose to
ensure adherence to the design intent and timely prosecution of the work.
Materials Testing and Inspection
Testing and inspection in the field will be conducted by Geo-Environmental, Inc: on an as-needed basis in
accordance with the estimate of cost included in this proposal.
GEI Proposal No. 06-062 5 Gee-Environmental, Inc.Project Understanding and Approach Culver City
Cranks / Tellefson Road Slide Slope Repairs
GEOTECHNICAL INVESTIGATION — SLOPE STABILITY EVALUATIONS
CRANKS I TELLEFSON ROAD SLIDE SLOPE REAPA1R
CITY PROJECT NO. P-867
PURPOSE
GEI proposes to perform a soils investigation on the damaged slopes located at different locations to investigate the
cause of slides and provide recommendations for their stabilizations. This investigation will include the collection of
bulk and undisturbed soil samples from the site by drilling bucket-auger borings, laboratory testing to determine
pertinent geotechnical parameters, engineering analyses (slope stability evaluations) and preparation of a report
presenting recommendations for slope stabilization. The soil investigation reports will also identify any clayey
cushion, subsurface soil and bedrock conditions, which may be detrimental to the rehabilitation of the slopes. Our
scope of work is described in more detail below.
SCOPE OF WORK
The scope of our investigation to evaluate slope stability will consist of five tasks: (1) Background Data Review, (2)
Field Investigation, (3) Laboratory Testing, (4) Data Analysis, and (5) Report Preparation. These tasks are briefly
described below.
Task I - Data Review - Available geotechnical data regarding the subject site and surrounding areas will be
reviewed to assess the expected soil conditions at the site. The data review will include review of published
geologic maps, stereoscopic aerial photographs, and other information contained in our in-house files, and
City/County files.
Task 2 - Field Investigation - The field investigation will consist of advancing two (2) 24-inch diameter limited
access bucket-auger borings to an estimated depth of 30 feet below the ground surface. Based on our initial site
visit the heights of the slopes are estimated to be approximately between 30 to 75 feet. GE' will prepare benches on
the slopes to accommodate limited access drill rig. The boreholes will be downhole logged for in-situ soil and
bedrock conditions by a Certified Engineering Geologist. During our downhole logging, we will note the orientation
of the bedding planes and potential failure zones.
During drilling, we will collect bulk and relatively undisturbed drive samples of the subsurface soils. The drive
samples will be collected at approximately 5-foot intervals with a modified California split-tube sampler or a
standard penetration sampler. Bulk samples will be collected from soil cuttings generated during drilling. The
samples from the borings will be tested in the laboratory as described in Task 3.
Task 3 - Laboratory Testing - Samples collected during the proposed field investigation will be examined in the
laboratory to confirm field classifications. Selected samples from the proposed borings will be tested to help
evaluate engineering properties. The numbers and types of tests will depend upon the type of soils encountered.
For a list of anticipated laboratory testing please refer to Table 1- Fee Estimate.
GEF Proposal No. 06-062 6 Geo-Environmental, Inc.Project Understanding and Approach Culver City
Cranks / Tellefson Road Slide Slope Repairs
Task 4 - EnAjneering Analyses - Results from the field and laboratory data and GEN experience will be the basis
for the engineering analyses. GE! will provide engineering conclusions for the following:
? Type and extent of materials encountered,
• Sliding zones and the potential for larger sliding in the near future,
• Compaction characteristics of on-site soils,
• Presence of groundwater or seepage,
• Suitability of onsite materials for use for slope rehabilitation,
? Nature of bedrock and soil strength characteristics, and
• Recommendations for slope stabilization
Task 5 - Report Preparation - GEI's conclusions, recommendations and supporting field and laboratory test results
will be presented in an engineering report. A draft report will be submitted to you for review and comment The
final report will address and incorporate the review comments as appropriate.
The report will present drawings depicting construction details with sufficient information for the contractor to
implement the most cost effective alternative for the slope repairs.
GE] Proposal No. 06-062
7 Geo-Environmental, Inc.
sProject Understanding and Approach Culver City
Cranks I Tellefson Road Slide Slope Repairs
MATERIAL TESTING AND INSPECTION SERVICES
CRANKS I TELLEFSON ROAD SLIDE SLOPE REPAIR
CITY PROJECT NO. P-867
PURPOSE
The City intends to restore and reconstruct portions of the slopes and roadways located at different locations in the
City (10743 through 10751 Cranks Road, and 5722 through 5724 Tellefson Road). The reconstruction program
includes the removal of debris, damaged sections and all disturbed soils. The restoration of the slopes and
roadways will include the construction of two-tier canilever soldier pile retaining wall, which include some other
pertinent small structures as curbs and gutters. GEI will provide geotechnical observations and soil testing services
during the reconstruction of the retaining wall and pertinent structures.
SCOPE OF WORK
Task '1 - Field Observations and Soils Testing
2.1.1 Evaluation of excavation: GEI's Engineering technician shall inspect the bottom of excavations for the
keys and benches to ensure that competent material has been exposed for the placement of the fill.
2.1.2 Evaluation of earth material to be used as fill: GEI's engineering technician will collect samples of the
proposed fill material and take them to the soils laboratory. Appropriate soil tests will be performed to
determine whether the fill material is appropriate for use in the reconstruction of the slopes and for the
new pavement sections.
2.1.3 Evaluation of compaction procedures: GEI's engineering technician shall evaluate the compaction
procedure for the backiiii of the slopes to ensure that the project specifications have been followed.
(Appropriate thickness of lift, proper compaction method, etc.).
2.1.4 Testing of compaction, moisture content, etc.: GEI's engineering technician shall conduct compaction
tests by Sand Cone Test Method (AS•M D1556) and Nuclear Method (ASTM D 2922-01) to determine
the relative compaction of the fill material placed for the restoration of the slopes and roadways.
During the progress of our work, our field technician will prepare daily field reports. A copy of these reports will be
submitted to the Inspector from the City of Culver City on a daily basis. The report will include a written summary of
the day's activities, a summary of all field-testing performed, and a listing of outstanding failing tests which have not
been reworked/retested. In addition, the location of all field density tests taken during the project will be plotted on
a set of plans that is maintained by the field technicians. The Contractor will be asked not to place any backfill
material that does not meet project specifications.
Testing time and the associated fees can be minimized by proficient and timely work by the contractor and by
coordination among project superintendent, the City Inspector and GEI engineers and technicians. When a larger
number of tests are scheduled at one time, greater efficiency can be achieved, resulting in lower overall fees.
GEI Proposal No. 06-062
8 Geo-Environmental, Inc.
uOProject Understanding and Approach Culver City
Cranks / Tellefson Road Slide Slope Repairs
Task 2 - Laboratory Testing - The following tests shall be conducted in the soils laboratory to determine the
engineering characteristics of the soils used for fill:
1. Soil Classification:
Grain Size Distribution (ASTM D422):
Atterberg Limits Tests (ASTM D4318-D84)
6 Tests
6 Tests
2. Modified Proctor Tests to determine Max. Dry Density & Optimum Moisture Content (Native and
Imported Material):
Modified Proctor (ASTM D1557-91 Methods A & 8): 30 Tests
3. Modified Proctor Tests to determine Max. Dry Density & Optimum Moisture Content (Aggregate
Base):
Modified Proctor (ASTM D1557-91 Method C): 3 Tests
4. Resistance-Value (R-Value) Tests for Soils and Aggregate Base: 2 Tests
Task 3 - Technical Management -
GEI's Project Engineer will attend all construction meetings. Then, after
consulting the Principal Engineer, he will provide guidance and recommendations to the field staff. The Senior
Engineering Technician will implement all of the decisions made during the construction meetings. The field
compaction procedures will be evaluated and recommendations made where appropriate.
Task 4 - Report Preparation - At the completion of our services, GEI will prepare a report, which will summarize all
of the work performed on the project. The report will include our observations during construction, results of our
field and laboratory testing, and a conclusion as to the project's compliance with the contract plans and
specifications. Three copies of the report will be provided.|10 9| Geo-Environmental, Inc.
GB Proposal No. 06-062
flProject Understanding and Approach Culver City
Cranks Tellefson Road Slide Slope Repairs
CIVIL I STRUCTURAL ENGINEERING PERFORMED BY
WHEELER & GRAY CONSULTING ENGINEERS
CRANKS! TELLEFSON ROAD SLIDE SLOPE REPAIR
CITY PROJECT NO. P-867
Task I — Environmental Documents — It is expected that this project will be categorically exempt under California
Environmental Quality Act (CEQA) and categorically excluded under the National Environmental Protection Act
(NEPA). Our fees in the Cost Proposal portion of this proposal are based on this assumption. Wheeler & Gray will
prepare documentation for a Negative Declaration on a City-provided form in the City format.
Task 2 — Management of Engineering Survey — Wheeler & Gray will provide management of the topographic
survey. The topographic survey will be used as base mapping for the preparation of construction contract
documents.
Task 3 — Utility and Subsurface Facility Research — Wheeler & Gray will research the City's records and
research the utilities in the area. As a part of the utility research, they will also ascertain if the utility purveyors have
any future work that will impact construction.
Task 4 — Right-of-way Engineering — It is expected that no permanent new rights of way or easements will be
necessary for the completion of this project. Our fees in the Cost Proposal portion of this proposal are based on
this assumption. Permission for entry and temporary easements for construction are expected to be needed.
Wheeler & Gray will prepared mapping and conduct communication with affected parties.
Task 5 — Preliminary Design — Wheeler & Gray will prepare preliminary documentation to the extent necessary to
prepare environmental documentation, construction cost estimates, and provide review material for the City on
which to contract.
Task 6 — Final Design — Wheeler & Gray will meet with the City of Culver City staff as required to review submittals
and keep the City continually updated on the progress and the status of the plans and work.
Task 7 — Construction Engineering and Management — Wheeler & Gray will provide construction management
and engineering services with the purpose of ensuring adherence to design intent and timely prosecution of work.
Task 8 — Preparation of Record Drawings and Documentation — Wheeler & Gray will prepare record drawings
based on marked up record drawings kept on site by the contractor.
GEI Proposal No. 06-062 10 Gee-Environmental, inc.Culver City
Cranks / Tellefson Road Slide Slope Repairs
Project Understanding and Approach
MASTER DESIGN SCHEDULE
City of Final Design of
!N C.
Culver City Cranks I Tellefson Road
Slide Slope Repair
GEO-ENVIRONMENTAL,
nomi
Caitrans Certified
DBE Firm
ID TASK NAME
DURATION
1 Notice to Proceed
1 day
2 Geotechnical Engineering
15 days
3 Environmental Documentation
30 days
4 Engineering Survey
15 days|1010|Right-of-way Engineering and Acquisition Services
30 days
6 Preliminary Design
15 days
7 Final Design
15 days
8 Construction Engineering and Management
30 days
CONSTRUCTION ESTIMATE
We contacted the Contractors who worked on slope repair projects for the Cities of Corona and Torrance under
supervision of Geo-Environmental, Inc., including Moore & Taber of Anaheim. For the currently-suggested method
of repairs as recommended by the City's previous geotechnical engineer, the Construction Cost is estimated to be
$115,000.00.
11 Geo-Environmental, inc.
GEI Proposal No. 06-0623. SOLETiCATION OR PROJECT NUMBER'
City Project No. P-867
" 2:- PUBLIC NOTICE DATE'
April 3, 2006
B. ARCHITECT-ENGINEER POINT OF CONTACT
NAME AND TITLE
Farhat H. Siddigi, Ph.D., P.E. Principal Engineer
11. ROLE IN CONTRACT
Prime Contractor|1010| Project Administration &
Management
Geotechnical Exploration,
Reporting and Testing
i Civil Engineering
Structural Engineering
Surveying
Culver City
Standard Form 330
Cranks / Tellefson Road Slide Slope Repairs
ARCHITECT - ENGINEER QUALIFICATIONS
PART I - CONTRACT-SPECIF1C QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City end Stet-0
Final Design of Cranks / Tellefson Road Slide Slope Repair, Culver City, California
5. NAME OF FIRM
Geo-Environmental, Inc.
TELEPF100E NUMBER
(949) 263-8334 X 22
(714) 206-0028 cell
7, FAX NUMBER
(949) 263-8338
•8. E-MAIL ADDRESS
fsiddigiPoeo-environmental.com
aeincoroaaol.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)|1010|'
CL i
9. FIRM NAME 10. ADDRESS
Geo-Environmental, Inc.
0 CHECK IF BRANCH OFFICE '1720 E. Garry Avenue
Suite 215
Santa Ana, CA 92705
Frd
Wheeler & Gray Consulting Engineers
El CHECK IF BRANCH OFFICE
650 Sierra Madre Villa Avenue
Suite 300
Pasadena, CA 91107
12]
Cabrinha Hearn & Associates Land Surveyors
CHECK IF BRANCH OFFICE
408 South Rosemead Blvd.
Pasadena, CA 91107
LI
P CHECK IF BRANCH OFFICE
0 CHECK IF BRANCH OFFICE
0 CHECK IF BRANCH OFFICE
GEI Proposal No. 06-062
12
Gee-Environmental, Inc.
20Culver City
Standard Form 330
Cranks / Tellefson Road Slide Slope Repairs
• E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12 NAME
FARHAT H. SIDDIQI, PE-.D., P.E.
13. ROLE IN THIS CONTRACT
Principal Engineer
14. YEARS EXPERIENCE
a - TOTA
37
I b. WITH CURRENT FIRM
12
15" . FIRM NAME AND LOCATION (City and &We)
Geo-Environmental, Inc., Santa Ana, California
16.EDuCATI ON (DEW . eEg ANC SPECIALIZATION)
PhD., Geotechnical Engineering, 1984
M.S., Geotechnical Engineering, 1971
B.S.E., Civil Engineering, 1965
B.Sc., Physics & Math, 1961
17. CURRENT PROFESSIONAL koISTRAtio , 19, (.7 ,1 -1-0 AND 04eipilt&-E)y
Professional Civil Engineer, California, C25287, 1075
18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, arc.)
American Society of Civil Engineers; Earthquake Engineering Research Institute; International Society of Soil Mechanics and Foundation
En 'rteerin ; Associate of State Dam Safe Officials; National Center for Earth. uake En 'neerin Research; Various Publications
9. RELEVANT PROJECTS
(1) TITLE AND LOCATION pi/yaw State)
190TH STREET REHABILITATION PROJECT
TORRANCE, CALIFORNIA
(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.)ANIEISPECIFIC ROLE
. - El Check iprujec:t performed' with ament firm
Role: Principal Engineer/Project Manager/ Scope: Independent Assurance Soils and Materials Testing - The project was a federally-funded project requiring the
construction operations to meet the City of Torrance, Federal and Callrans specifications. The City's Quality Assurance Program (OAP) was implemented during construction.
In this prolect, we were assigned to perform the Independent Assurance Sampling and Testing (IASI) to verify the Accepting Testing (AT) performed by another geotechnical
firm to ensure their conformance with Caltrans QAP requirements.
(1) TITLE AND LOCATION (City and Slate)
91 FREEWAY! MAIN STREET INTERCHANGE RAMP IMPROVEMENTS
CORONA, CALIFORNIA
(2) YEAR COMPLETED •
pROFESVONAL SERVICES • CONSTRUCTION IV appiimbie)
2D02 2002
(3) BRIEF DESCRIPTION (Brief scope, size, cost, eta,lAtIOSPECIFIC ROLE _EA Check if project performed , with ci,79ttym
Role: Principal Engineer/Project Manager Scope: Construction Observation, Batch Plant Inspection, and Materials Testing Project involved configuring the
interchange to a 'diamondr configuration, eliminating the eastbound to northbound Main Street loop and signalizing the intersection of the eastbound off ramp. The main
objectives were to improve and enhance the interchange at 91 Freeway and Main Sheet
b.
(1) TITLE AND LOCATION (Pf4
f and StaN
SR-134 HOLLYWOOD WAY, RAMPS IMPROVEMENTS
BURBANK, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION Of applicable)
2003 2003
(3) BRIEF DESCRIPTION (Brief scope, size co4 etc), ANRSPECIFIC ROLE pmtect perforined current flap ,
Role: Principal Engineer/Project Manager/ Scope: Construction Supervision, Soils and Materials Testing —The proposed improvements consisted of the relocation of
existing on/off ramps, construction of retaining waifs up to six feet high, and an additional 10 feet of screen wall at the top dwell for the relocation of the ramps. GEl provided
soils and concrete testing services as well as supervision during construction. Project required meeting specifications of both the City and Caltrans.
(1) TITLE AND LOpATiON (City arid State)
PAVEMENT EVALUATION OF PIGEON PASS ROAD AT FREEWAY 60
MORENO VALLEY, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTI ON (If applicable)
2001 2001
(3) BRIEF DESCRIpTiChl (Brief scope, size, cost, etc.) AND SPECiFIC 1304 la Check: if p r:.7 Performed' with current firm
Role: Principal Engineer/Project Manager/ Scope: Geotechnical Investigation, Pavement Evaluation and Recommendations — This is a federally-funded undertaking
involving a detailed evaluation of the existing pavement structure for Pigeon Pass Road which is approximately 1-112 mile in length. GEI performed pavement evaluation,
laboratory testing and provided recommendations for three different strategies for the rehabilitation based upon the condition of the pavement
d.
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
1999 1999
e.
(3) BRIEF DESCRIPTION (Brief save, size cost, etc.) AND SPECIFIC ROLE Check if pruject performed with current firm
Role: Principal Engineer/Project Manager/ Scope: Geotechnical Investigation, Pavement Evaluation, Recommendations and Materials Testing — The rehabilitation
of South Street is between Studebaker Road and % of a mile east of Gridley Road. The west portion of South Street involved crossing Freeway 105 through an overpass,
therefore, requiring interaction with Caltrans.
(f) TITLE AND LOCATION ply and State)
REHABILITATION OF SOUTH STREET AT 405 FREEWAY
CERRITOS, CALIFORNIA
13 Geo-Environmental, Inc
GE! Proposal No. 06-062
11(2) YEAR CDMPLETED:: .
PRMSStpNAL SERVICES j CONS'IRUCTION Of applicahIe):
(1) TITLE AND LOCATION(c16, and Statj e
WATER SUPPLY DAM, BIG SULPHUR CREEK
THE GEYSERS, CALIFORNIA
(2) YEAR COMPLETED
pRossignvq_ sfFvIcEs " CONSTRUCTION. (If Op tebie)
0) TITLE ANDLOCATION (Cifk and State)
COGSWELL RESERVOIR PROJECT
SOUTHERN CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES poils-nRucTioN Of applicable).
. . - .
Culver City
Standard Form 330
Cranks / Tellefson Road Slide Slope Repairs
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME i 3. ROLE IN THIS CONTRACT
FRANK KRESSE
CONSULTING ENGINEER
14. YEARS EXPERIENCE
a. TOTAL b. MTH CURRENT FIRM
40 Consultant
15 FIRM NAME AND LOCATION (City and State)
Geo-Environmental, Inc., Santa Ana, California
16 EDUCATION (DEGREE AND SPECIALIZATION)
17. CURRENT PROFESSIONAL REGISTRATION (STATff AND DISCIPLINE)
B.A., Geology, University of California, Berkeley, 1956
onsulting Engineering Geologist- California 1970, No. 1028
ertified Engineering Geologist - California 1970, No. 406
18 OTHER i=i3oFssioni.Ai.0.44iFictcri:ONs (poribafacrq. Organizalions, Training, Awards ,
19. RELEVANT PROJECTS': :1Yfilmitare.E.11!"1.1
11!
{1) TITLE mo LOCATION (City and SbEe)
RED MOUNTAIN RESERVOIR
FALLBROOK, CALIFORNIA
(2; YEAR COWLETED
pRoirtssioRM. coNsTRyp7rioN (1.r 4.4.diceplo) .
(31 BRIEp OESCFle iriON (06f:scope, cos1;70. ;.)vsegog:K. : (4.44444 urredt
Role: Principal Geologist! Scope: Provided project consultant services for Fallbrook Public Utilities District during construction of 95-foot-high earth clam, including setup
and operation of field, soil, and laboratory testing: concrete substructure emplacement injection; and coordination with the Bureau of Reclamation and the California Division of
Safety of Dams.
a.
. . . .
ERIEF. OESCRIP11q# (tirietscolie, size, cosi etb AND SPECIFiC ROLE fl 0-lectlf .:0.r.060poiarriled:Avith- cuntfirm
Role: Principal Geologist! Scope: Provided consultation to Northern California Power Association for the design of a 130-foot high dam. Project involved evaluation of
seismicity, landslides and other geologic hazards. Area was experiencing subsidence because of steam withdrawal, and survey data was being evaluated with respect to dam
development
b.
C.
CI) "TITLE ANDLOCATION:lcilkieXiState):.;
NORCONIAN DAM
RIVERSIDE COUNTY, CALIFORNIA
131:::6PJEF pESCRIFi1014(Et1efscopp„: Siikdrkkg.I4)ANDSPECI.plcgxkr.:
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION applicable)
Role: Principal Geologist/ Scope: Mr. Kresse was the project consultant to the U.S. Navy for analysis of existing earthfin dam. Project included geotechnical investigation,
project design, and geotechnical monitoring during construction.
(1) TITLE AND LOCATION fOlyzind Slate)
ROCK CREEK DAM
PLUMAS COUNTY, CAUFORNIA
01, p .13iEr pgscRiprioN. (Bri . efsca0, size, cost, etc.) AND SpECIFICROLE .Ciieck it project pe.foi with ccrrell firm
Role: Principal Geologist/ Scope: Participated with Raymond Kaiser Engineers in development of 15-MW hydroelectric facility for Orovil e-Wyandotte Irrigation District on a
tributary of the Feather River. Conducted geological mapping, seismic refraction, rock fracture, and excavation studies for dam, diversion structure, tunnel, surface penstock,
and powerhouse. Presented engineering feasibility data for license approval.
d.
(3) BRIEF DESCRIPTION:04er scope, size cost; otc.) AND SPECIFIC !IDLE El, C:Ok II project performed with =rent firrn
Role: Principal Geologist! Scope: Responsible for technical review and corporate quaiity control of environmental assessment of disposal options for 5.6 million cubic
yards of sediments in Cogswell Reservoir at headwaters of Los Angeles County Drainage Area system. Client: County of Los Angeles, Department of Public Works
e.
GEI Proposal No. 06-062
14 Geo-Environmental, Inc.
2212. NAME
ROBERTO C. FLORES
13. ROLE IN THIS CONTRACT 14.-YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
Culver City
Standard Form 330
Cranks I Tellefson Road Slide Slope Repairs
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Complete one Section E for each key person.) •
Sr. Engineering Technician
11 I 2
15. FIRM NAME AND LOCATION (City and State)
Geo-Environmental, Inc., Santa Ana, California
18. EDUCATION (DEGREE AND SPECIALIZATION)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND pisc11:001
B.S.E., Civil Engineering, Monterey Institute of Technology, 1999
OTHER ' ,PROFESSIONAL QUALIFICATIONS (Publications, Ofganizations, TrafOing,
Ayrard,s,
-Nuclear Gauge Operator Training, #14205
-CALTRANS Independent Assurance Program (Test Methods 105, 201, 202, 216, 217, 226 and 231).
-Course on Cone Penetration Testing (GreggOri gin & Testing, Inc.)
3}" ;• " 19. RELEVANT PROJECTS'v
.
u7 ,. . niir, -ir . -
. it
a.
(1) TITLE AND LOCATION (GO+ and State)
GEOTECHNICAL CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVICES FOR
THE CONSTRUCTION OF MONTIEL PARK (PHASE I)
SAN MARCOS, CALIFORNIA
(2) YEAR COMPLETED
PRCT-ESSIONAL SERVICES
Ongoing
CONSTRUCTION (If applicable)
2004
(3) BRIEF DESCRIPTION (Brief scope, the cost eicj AND SPECIFIC ROLE
-
Role: Field Technician I Scope: Mr. Flores is currently performing grading and concrete inspection.
1.15 miles east of Nordahl Road in the City of Sari Marcos. The project generally consists of the construction
the grading for three pads, a paved parking area for 31 vehicles, sidewalk, driveways, a basketball court
fencing, site furnishings, drinking fountains, water service and meter, as well as related appurtenant structures.
_
El ChecIr ii pled pet-termed/MO currePt firm
The work to be constructed is located on Montle! Road approximately
of Phase I recreation facility on a 9.95 acre parcel which includes
facility, picnic tables, storm drain system, landscaping, irrigation,
b.
(1) TITLE AND LOCATION (CO and State
MONTE VISTA STORM DRAIN
CORONA, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION fif wlicable)
, . _
1999 1999
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Role: Field Technician / Scope: Geotechnical Engineering, Constriction Observation and Testing
configuration, eliminating the eastbound to northbound Main Street loop and signalizing the intersection
enhance the interchange at 91 Freeway and Main Street
0' 4 Check if project e orrnod with
P rf - .
current firm
the interchange to a 4diamond'
objectives were to improve and
.
— Project involved configuring
of the eastbound off ramp. The main
(1) TITLE AND LOCATION (City and Siaff.) , (2) YEAR COMPLETED
SR-134 HOLLYWOOD WAY, RAMPS IMPROVEMENTS PROFESSIONALSERViCES 1 CONSTRUCTION (if applicable)
, ,
BURBANK, CALIFORNIA 2003 2003
(3) BRIEF DESCRI71014 (Brief sce, size, cost, etc.)AIP SPECIFIC ROLE I El Check it projeti . performq _ with current fin .:
Role: Field Technician! Scope: Construction Supervision, Soils and Materials Testing — The proposed improvements consisted of the relocation of existing on/off
ramps, construction of retaining walls up to six feet high, and an additional 10 feet of screen wall at the top of wall for the relocation of the ramps. GEI provided soils and
concrete testing services as well as supervision during construction. Project required meeting specifications of both the City and Caltrans.
d
(1) TITLE AND LOCATION (alyandState) (2) YEAR COMPLETED
DEL AMO STREET TRUNK SEWER REPLACEMENT
CARSON, CALIFORNIA
PROFESSIONAL SERVICES
2002
I
CONSTRUCTION,
Of aPPlicanfe)
2002
(3) BRIEF DESCRIPTION {Brief scope, size, cost etc) AND SPECIFIC ROLE 1
Role: Field Technician / Scope: Geotechnical Investigation — Conducted field investigation in accordance
(CSDLAC) requirements. Proposed trunk sewer is located along East Del Arno Street between Main Street
El Check If project performed Wt.:Ai:rant firm
with County Sanitation Districts of Los Angeles County
and the Dominguez Channel east of the 405 Freeway.
1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
SOUTHERN RADIAL ROAD AND CALIFORNIA EXTENSION pcn FROFESSIONAL SERVICES
IRVINE, CALIFORNIA 2003 I
CONSTRUCTION Of applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost et) AND SPECIFIC ROLE i
Role: Field Technician / Scope: Geotechnical Investigation, Construction Observation/Soils and
project. GEI, as a subconsultant to PBS&I is providing both the design and later construction observation/soils
approximately 18 months. Scope of GEI's work includes a soils investigation to formulate recommendations
proposed roads. This includes site visits, collection of bulk soil samples from the site, laboratory testing,
provide recommendations for the design and construction of the proposed roads.
1 7 14 Check if project performed with current fttm:
construction is a design-build
The duration of the project is
and grading operations for the
of a geofechnical report to
Materials Testing — The proposed
and materials testing services.
for the design, construction
engineering analyses and preparation
Geo-Environmental, Inc.
23
15 GE) Proposal No. 06-06212. NAME 13. ROLE IN THIS CONTRACT
Sr. Engineering Technician
I b. yviTR pLiRRENT FIRM|1010|PARVIZ SHEIKHAVANDI
a. TOTAL
22
14. YEARS EXPERIENCE
Culver City
Standard Form 330
Cranks / Tellefson Road Slide Slope Repairs
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
• Complete one Section E for each key person.)
15 FIRM NAME AND LOCATION (CO and State)
Geo-Environmental, Inc., Santa Ana, California
16. EDUCATION (DEGREE AND SPECIAL. 1110-101s)
B.S., Civil Engineering, 1975
17 pujENT PROFESSIONAL REGISTRATION (STATE AND Dl.SCIptinSE)
18.:: OTHER PROFESSIONAL QUALIFICATIONS (=u4:0:crs, Organizations, Training, At.yords, et.)
.Nuclear Gauge Operator Training
.CALTRANS Inde.endent Assurance Pro ram (Test Methods 216, 533, 539, 540, 217, 231, 375a
19. RELEVANT PROJECTS
;14E14
(1J- TITLE AND LOCATION (Ddy and State)
(2) YEAR COMPLETED
190TH STREET REHABILITATION PROJECT
rppEpspHAI, sErmop I - CONSTRUCTION f acpikaLle)
TORRANCE, CALIFORNIA
2001
2001
(3) BRIEF, DESCRIPTION (Brief scope, size, cost, et) AND SPECIFIC ROLE " amok project performed with current Thin
- - -
Role: Supervising Technician / Scope: Independent Assurance Soils and Materials Testing - The project was a federally-funded project requiring the construction
operations to meet the City of Torrance, Federal and Caltrans specifications. The City's Quality Assurance Program (OAF) was implemented during construction. In this
project, we were assigned to perform the Independent Assurance Sampling and Testing (RST) to verify the Accepting Testing (AT) performed by another geotechnisti firm to
ensure their conformance with Calfrans' OAP requirements.
a.
(I) TITLE MO peppy mop, Stpte).::
91 FREEWAY MAIN STREET INTERCHANGE IMPROVEMENTS
CORONA, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CO1±.ISTRIJDTION (IfOO:cape):
2002 2002
(3):: : BE pESCRIPTION psi-scope, size, cbst,: etc.) AND SPECIFC ROLE Check jct ped
P71„ed curfetfirrn
Role: Supervising Technician I Scope: Construction Observation, Batch Plant Inspection, and Materials Testing — Project involved configuring the interchange to a
'diamond" configuration, eliminating the eastbound to northbound Main Street loop and signet - ming the intersection of the eastbound off ramp. The main objectives were to
improve and enhance the interchange at 91 Freeway and Main Street
b.
(I) TO_E AN.D LooKrIoN . ply and Staid
SR-134 HOLLYWOOD WAY, RAMPS IMPROVEMENTS
BURBANK, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCT:ON ( applicable)
2003 2003
•
(3) , BRIEF DESCRIPTION (Brie f scope,- size; cost; eta] AND SpECIFIC ROLE PPeck 1 1.P.Pieq Perr9Ole.0
Role: Sr. Field Technician Scope: Construction Supervision, Soils and Materials Testing- . The proposed improvements consisted of the relocation of existing ordoti
ramps, construction of retaining walls up to six feet high, and an additional 10 feet of screen wall at the top of wall for the relocation of the ramps. GEI provided soils and
concrete testing services as well as supervision during construction. Project required meeting specifications of both the City and Caltrans.
C.
(1), TITLE AND LOCADON.(Cily &We),.
DEL AMO STREET TRUNK SEWER REPLACEMENT
CARSON, CALIFORNIA
(2) YEAR COMPLETED
eTioFEsstom.t.spwcs . poNsTF4.ippri, (I! Opt/cape):
2002 2002
d. (3 BRIEF DESCRIpTION (Brierscopi:, size, cost; etc) AND SpECWIC ROLE Check km-pied pe110 .170 tlit:1 un1 fi
Role: Sr. Field Technician! Scope: Geotechnical Investigation — Conducted field investigation in accordance with County Sanitation Districts of Los Angeles County
(CSDLAC) requirements. Proposed trunk sewer is located along East Del Arno Street between Main Street and the Dominguez Channel east of the 405 Freeway.
(1) TITLE AND LOCATIO N tptiano St"
SOUTHERN RADIAL ROAD AND CALIFORNIA EXTENSION (UC1)
IRVINE, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCT1oN (it- applicable)
2003
;(3) BRIEF DESCRIPTION OW wood, size, cost, etc) AND SPECIFIC ROLE
Check if project performed *41 current pp,
e.
Role: Sr. Field Technician I Scope: Construction Observation/Soils and Materials Testing — The proposed construction is a design-build project GEL as a
subconsultant to PBS&) is providing both the design and later construction observation/soils and materials testing services. The duration of the project is approximately 18
months. Scope of GEI's work includes a soils investigation to formulate recommendations for the design, construction and grading operations for the proposed roads. This
includes site visits, collection of bulk soil samples from the site, laboratory testing, engineering analyses and preparation of a geotechnical report to provide recommendations
for the design and construction of the proposed roads.
GEI Proposal No. 06-062 16
Geo-Environmental, Inc.
21-k13, ROLE IN THIS CONTRACT
Staff Geologist
Sr. Engineering Technician
Li. WITH CURRENT FIRM|1010|NAME
14. YEARS EXPERIENCE
MICHAEL J. GIVENS, B.S.
a. TOTAL|1010|(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (1fapplicahre)
2005-present
Check if project performed Oh current firm .
(1) TITLE AND LOCATION (Cify anti State)
CULVER DRIVE REALIGNMENT AND WIDENING PROJECT
IRVINE, CALIFORNIA
„
(p) BRIEF DESCRIPTION (Brief sc* size, cost, et). AND SPECIFIC ROLE
Culver City
Standard Form 330
Cranks I Tellefson Road Slide Slope Repairs
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Complete one Section E .kr each key person.)
15. ARM NAME AND LOCATION (City and State)
Geo-Environmental, Inc., Santa Ana, California
16 EDUCATION (DEGREE AND SPECIALIZATION)
B.S., General Geology, California State Long Beach
17. CURRENT pikp-FEssipi4 . 4 FzGlaTrzArp# (STATE AN4DISCIP),INE)
ircsorr-lER !PROFESSIONAL ok.,A0 .9 .calioNs Lr .blicaficyx.s, Organizations, Training„ Awards, etc.)
Nuclear Gauge Operator ID No. 45047, Caftans Independent Assurance Sampling Program, CPT Training from Gregg In-Situ
9. RELEVANTYROJECTS
Role: Field Technician / Scope: Assurance Testing:
The City of Irvine intends to reatign and widen Culver Drive from Campus Drive to Bonita Canyon. For the
completion of a federally aided project. Acceptance Testing {AT) services is required. Mr. Givens is performing acceptance tests on materials incorporated into this
construction project. The services performed include evaluation of excavation, evaluation of imported earth material to he used as fill, evaluation of compaction procedures,
testing of compaction and moisture content asphalt concrete/FCC testing and batch plant inspection.
(1) TITLE AND opviioRpyancr:spiej. , : . .
SOUTHERN RADIAL ROAD AND CALIFORNIA EXTENSION (UCI)
IRVINE, CALIFORNIA
(Ji ., BRIEF DESCRIPTION (Brief scope, size, cost; eta) AND SPECIFIC ROLE
(2) YEAA COMPLETED:
PROFESSIONAL SERVICES .CONSTRUCTION (If at) ,P.I0qe)
2003-2005
Check If project . performed wit! much! _firm
Role: Field Technician / Scope: Geotechnical Investigation, Construction Observation/Soils and Materials Testing —The proposed construction is a design-build
project. GEL as a subconsultant to PBS&J provided both the design and construction observation/soils and materials testing services. The duration of the project was
approximately 18 months. Scope of Mr. Givens work consisted of performing a geotechnical investigation as well as performing all necessary laboratory tests throughout the
project.
(1) TItLE ANO(opATIoNspry.pnystw,.:,.
REHABILITATION OF 27 STREETS FOR 05-06 STREET REHABILITATION PROJECT
LA HABRA, CALIFORNIA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION ePP.P4)1,P)
2005
(3) BRIEF DESCRIPTION (Beret scope, size, cost, etc.) MD SPECIFIC RO La Check ff project performed wilt' currentn7
Role: Field Technician / Scope: Geotechnical investigation -
The purpose of this geotechnical investigation was to explore the subsurface conditions, evaluate the
engineering properties of the on-site soils, and provide recommendations for the rehabilitation of the streets. The subject streets have experienced pavement distress that
has occurred over a period of time and ranged from minor to severe. Mr. Givens supervised the field drilling and soil sampling operations in the field and logged the soil
borings. Later, he performed the pertinent laboratory tests and assisted the Project Engineer in engineering analyses and preparation of the report.
(I
) TITLE AND LOCATION (ay and Stet) I , . (2) YEAR COMPLETED
TRANSMISSION MAIN RELOCATION UNDER SR 60 (1215 FREEWAY I PROFESSIONAL SERVICES I CONSTRUCTION (if appgcayel
RIVERSIDE, CALIFORNIA 2004 1
(3) BRIEF DESCRIPTION (Bnet- scope size, cost etc) AND SPECIFIC ROLE . IL1 Check if project performed with currentfirm
. . , . . ,
Role: Field Technician / Scope: Soils and Materials Testing -
Geo-Environmental, Inc. (GEI) provided geotechnical observation and soil testing services on an as-needed
basis during the relocation of the water transmission mains located under the State Route 60/Interstate 215 Freeway in the City of Riverside. In the field Gas technicians
performed density tests on the compacted soil during the backfilling of the jacking pit and receiving pit at the end of the pipe casings to determine the relative compaction of
the banal soils at the locations. Mr. Givens performed the required laboratory tests for evaluation of the compacted material. in the field, Mr. Givens performed the needed
field density tests to verify that the projects compaction requirements were met.
-(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
SURFICIAL LANDSLIDE INVESTIGATION FOR EIGHT LOCATIONS PROFESSIONAL SERVICES ' CONSTRUCTION (if applicable)
. ,
LA CANADA FLINTRIDGE, CALIFORNIA 2005 •
1
(3) BRIEF DESCRIPTION (Brief scope size, cost etc.) AND SPECIFIC ROLE
. , . I [E] Check if nniliect Perfumed with current
tern
Role: Field Technician Scope:
Several landslides occurred in the City of La Canada Flintridge due to the record-breaking rainfall Southern California received in 2005. The
primary objectives of evaluation by Geo-Environmental, Inc. (GE]) were to characterize the nature of the earth materials in the distressed slopes, identify the mode of failure,
and provide advice and options for restoration of the slope, guardrail, and pavement surface. Mr. Givens assisted the Certified Engineeting Geologist in the field exploration
and soil sampiing operations. The field work included the logging of exploratory tenches, hand-auger and mechanically powered hollow-stem auger borings. He aiso
performed many soil tests in the laboratory, which were needed for the performance of the stability evaluation.
C.
e.
17 Geo-Environmental, Inc.
GEI Proposal No. 06-062Culver City
Cranks / Tellefson Road Slide Slope Repairs
Standard Form 330
tall YEAR O.DINPLETED
California
F.1911MAIIONALEIEFmceo MISTRUCTION eviireii&W
MO4 2661
E FEMMES OF KEY PERSOMEL PROFOSSO FOR THIS CONTRACT
!Cm-Wee ane gerEarr E far ear-1A key-carom)
113i MILLI turs,otorrAker
MaS 1 4t1Fitrelc
Arinetpar-itt Charge, Ciell Engotefog
a. TinTAL 44, MTh CURIEDIT FiT11.4
24
17. minima PrititasSION KOMI- R.471W rE114 MINI; 47.4.7comniv
Calitrimifla,
Arizorter, DWI
Nevada, CAR
Califistro irk Registerearatarmweetattineuzir I
la OTHER FROFFEWONAL IZINALF1CATIONE fr-atIftWErm CS'EaNibribm, Trear cA wimustr. erec.1
Afeaihr, A.ater4'cott Water Works Assoetattna
RIALEVANT PACJ EICTS
/ TITLE MO LOCATION ileffratilfarmutt
121 %Skil OCINPLEIRD
COMMOTION 13/0NolfthIri
.1\fbt
DEMRPTICIN Mee =gm psi 1=4 AWE SPECIP1O ROLE Chtzlc If puE+aus prefamsad with CUM= iirrn
liltader Cb-ety ie pro filing a-110=W ng war-any ere LA. Coon y Dm:nitre& of Par14 and Raertatiart far the replacement
tea litAittra gala= wattir storage ianit a WiMin Hart Part ipir Sento aril& The replacemesl rordreif benorn
exist "ing- tank war damaged cfraiag the MI Norficidge eartiquarte, Anne oapoeity atm Erni t r fa kap' of les valuate ffe
6 1 1V Comaly IV it Department itraziena mist ma restore the rank awl argety. Eitalittilta Mtge:W.4M tfitg: $450,00i1
TifLi VAC! LLOAT/Ori r6Ilv mut us,
CoiCronaria Stole tinireraityNendeldge
Eirdwitake Reowtstruetion
PI ENV 1325 32EIPTION Mir of auxwe, zr Zm ram CM) ADX1 &I :vont Rau
IIINAINSIONAL =VMS 00141ffikUCTICK4 4YrApktarge
It01
2a0t)
UMW DOISoturrorc ?Me am://e. sr az. out oral Aro IFSCIRC ROLE Check proieut mental-tart with Damn item
Lliesign fap,enpaa144aely Zefigkregi retioforta gmuli- tx # 44' abirfrhar Akirta & rain. Thr aritiaal rearm drain ' Isew a trapazaidal
open wi!deetftp iontw about 4909 CM The we draittailoweecontiruerttan afrtlad7 ard parking sazadares fur
,ato daoiateiseeeeL Pmfect eakrtstrardwo =kW, traitnt.
IL NAM
JeKA Kegp
/U:PIRM MO LOCATION Ireer did Satrj
Witeefer & Gray Cemsaidnr
711. EDUCATION ID f rOBEE.410 SIPECIOAU
Raelieke- Sawa CJtErirg
Utifftilky jSithi CaPilift
Waihne 5', Bari Ark Tomicitepiacemalt, Sada 'Smelt Ciareft CriftforekFa
tietkjotrt port-griticat *Mt worm* liteo
.Eagewerfete-piattttittl e atte.attigts tereimileethe redonroaretion ofrorrds,, parektv &gel wer ‘be.ays:, emote fieltrx. ragramptiv -
sad afi fiervIejitalaSestot tottplet C - Aferule Mate Vittirent4 Mtn/trite. Tlec rantpas was dassaged frtensilttly .1011114
Igartitrike earthguakai Reannettataaa leaf teasater eijiirt mad war phaxee to minimize dimptiao W ain operatic ' s trin
cantina& The Vantat evert a • Ogly 3 .85 ewq, !Jife reliardialteesix were upon:FS:1=64r VS miff=
TI1W2 AND LOCATION_ /Oitv gt*, 121 YEAR CiliiiR.41011
Kelvin Miami Rendo, Califorale
MEMO LaanalOtti gli tylioni Suit
(21 YEAR COMRETED
FaiSIONAL SEMMES COUSTFR.FEWN (ff witact*
2-497
fAWF GESTRiPTIO1 ftWrot scapr, et;c f Arttr SP=IFIC FO U eit akIf friaf&trt oOrf•MI 4±-RI
Dic,SigN f replacement a I a heaak4ide !father riatha -priveari wag 0.41,41. feiet,g. 27,to carafflian of thr rixibittr 14WS
arealesting. Blarcent _straws and =WI= in rhaprarge The Figti WW1 1141t itatgliiid tit ft coir.Intgritte retrifigta
tatitreur redoing etrartareozafaandatiert system ofcast4n-pfate frietiet uffeswidufr ireana warming- &Amen each pite.
Aeolea caariradia ' n cast apprar $6511,011
r21-'rEAR
CUraTii3XTP,P4 PAWPAW!
2602 20.0
Chkif rwrinct parforrnad with mihrant ffra-n
,,
urgillagE Strtdy af Let CaaaVs Tr:al Verrefa Ciamangity riVialtd Park arrunk frazdhrg probterm a eurkil Lary Saila beam
lespliatearthaa of au impriVeareatpagranc. Thum* is stehjecia r flaedfreir ea au animal bariz flaarVIT
ddtrir dnj p tiratrevar . ca01), ileoc-ay effam mu year. Sardy eittwams w1z iefentfh tha soma . rad awes of
ileatifaz rratalwaue =paddy& afetagirg: storm tire& farilitiat, az:Irmo-amend satailaal. Said, y fee! $25,1109
— 5174E4DAFIE) FORZA 331:1 rSINCIT41 PACE 2
4ppimt WayRetainittg Haft Mttealfeuica, CarYorala
I 1, Tana R WI LOC &MEIN Mitt Me Stattril
vat venrgReziewffi carrvirmitb, Park i-MTLiAagff VA1 Verde, Calor-
Site*
Oil MEP LIZEScitIFFtON arriridag, GDA, cre,,E ANT, setc. ame
GEL Proposal No. 06-062 18 Geo-Environmenlaf, Ina
26E. RFSWES CF XEY PEISCIVNEL PRO PPCISED FOR T h.5C
awl: A-far-9 rem $octirm5 far eat.ci kay person.,1
.1 zl. PULE IN THIS CONTELACT
:; .41 Extertoor
14, v9:444 - ft EXP,O1Mr .d.CE" .
TEUAL • b: W117-.1uwrr FIrk
• I
IS: PIM FIA16.1E kAt3 LOCreArtoi in°,7 affe sor0
4746ear Cing Om:taw tagfraw
l@ OLICATIV4 PECALW