File #: 15-739    Version: 2 Subject: Traffic Monitoring CCTV System Gap Closure Project,
Type: Minute Order Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 5/9/2016 Final action:
Title: CC - (1) Approval of the Plans and Specifications for the Construction of the Traffic Monitoring CCTV System Gap Closure Project, PL-004; and (2) Authorization to Publish a Related Notice of Inviting Bids.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

CC - (1) Approval of the Plans and Specifications for the Construction of the Traffic Monitoring CCTV System Gap Closure Project, PL-004; and (2) Authorization to Publish a Related Notice of Inviting Bids.

 

body

Contact Person/Dept: Hong Wang, PW/Engineering

Phone Number:  310.253.5604

 

Fiscal Impact:  Yes [x]    No []                                                                             General Fund:  Yes [x]     No []

 

Public Hearing:  []                               Action Item:                     []                       Attachments:   Yes []     No [x]   

 

Commission Action Required:     Yes []     No [x]    Date:

Commission Name:          

 

Public Notification:   (E-Mail) Meetings and Agendas - City Council (05/03/16);  

 

Department Approval:  Charles D. Herbertson, P.E., Public Works Director/City Engineer (04/22/16)

______________________________________________________________________

 

 

RECOMMENDATION

 

Staff recommends the City Council (1) approve the plans and specifications for the construction of the Traffic Monitoring CCTV System Gap Closure Project, PL-004; and (2) authorize staff to publish a related Notice of Inviting Bids.

 

 

BACKGROUND

 

The City of Culver City was awarded funding by Los Angeles County Metropolitan Transportation Authority (Metro) for a Traffic Monitoring CCTV System Gap Closure Project, (the “Project”).   The Project will install a real-time closed circuit video monitoring system along selected regional arterial streets to close the gap in the City’s existing traffic monitoring camera system.  This Project is a key element of the City’s existing advance traffic management system.  The Project will improve traffic mobility and safety along the identified routes by enabling the City to respond more quickly and effectively to planned special events, reported traffic problems and emergencies. 

 

The Project involves the design and installation of closed circuit monitoring cameras and/or approximately four miles of fiber optic communication cable at 18 locations, along with hub switching equipment and software, and new auxiliary equipment in the City Hall building.  The 18 project locations will supplement the existing 14 camera locations operated by the City and 10 other camera locations that are shared with the City of Los Angeles.  The new CCTV camera locations and associated fiber communication connections are as follows:

 

Washington Boulevard at:

 

1.                     Glencoe Avenue

2.                     Centinela Avenue

3.                     Washington Place/Tilden Avenue/Harter Avenue

4.                     Duquesne Avenue/Hughes Avenue

5.                     Ince Boulevard

6.                     Kensington Avenue

 

Sepulveda Boulevard at:

 

1.                     Ballona Creek

2.                     Culver Boulevard

3.                     Bankfield Avenue

 

Sawtelle Boulevard at:

 

1.                     Washington Boulevard

2.                     Overland Avenue

3.                     Culver Boulevard

 

Slauson Avenue at:

 

1.                     Hannum Avenue

2.                     Buckingham Parkway

 

Bristol Parkway at Hannum Avenue

National Boulevard at Hayden Avenue

Jefferson Boulevard at Leahy Street/College Boulevard

Centinela Avenue at Green Valley Circle

 

 

DISCUSSION

 

A Request for Proposals (RFP) was released for the design of this Project to the firms on the City Council approved on-call traffic engineering consultant list.  Staff administratively selected Advantec to design the CCTV camera improvements.  Plans and specifications for the Project have been completed, and staff is prepared to publish a Notice of Inviting Bids.

 

A copy of the proposed plans and specifications are posted on the City’s website and may be reviewed or downloaded from <http://www.culvercity.org/city-hall/city-government/city-departments/public-works.>  A hardcopy is available for review at the Public Works counter on the second floor of City Hall, 9770 Culver Boulevard.

 

 

FISCAL ANALYSIS

 

Funding is available in the City Council Adopted Budget for Fiscal Year 2015/2016 to fund the estimated Project costs, of which 80% ($2,438,352) are funded by the Los Angeles County Proposition C sales tax through a grant from Metro.  The actual costs of Project construction will be discussed in more detail in the staff report presented to the City Council at the time of recommendation of a construction contract award.

 

 

ATTACHMENTS

 

None

 

 

RECOMMENDED MOTIONS

 

That the City Council:

 

1.                     Approve the plans and specifications for the Construction of Traffic Monitoring CCTV System Gap Closure Project, PL-004; and,

 

2.                     Authorize staff to publish a related Notice Inviting Bids.