File #: HIST-17738    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 9/12/2011 Final action: 9/12/2011
Title: Award of a Contract to Structural Group, Inc. for the Culver City Transfer Station Tipping Floor Repair Project, P-948.
Attachments: 1. Award of a Contract to Structural Group, Inc. for - C-3__11-09-12__PW-ENG__CITY COUNCIL__Award of Transfer Station Tipping Floor Repair Contract - FINAL.doc, 2. Award of a Contract to Structural Group, Inc. for - 11-09-12__PW-Eng__CITY COUNCIL__Award of Transfer Station Tipping Floor Repair Contract__Attachment with cover.pdf
City of Culver City, California Agenda Item Report Meeting Date: 9/12/2011 Item Number: C-3 CITY COUNCIL AGENDA ITEM: Award of a Contract to Structural Group, Inc. for the Culver City Transfer Station Tipping Floor Repair Project, P-948 Contact Person/Dept.: Hong Wang/PW Phone Number: (310) 253-5604 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [] Date: _______________ Public Notification: (E-Mail) Meetings and Agendas – City Council (09/07/11); (E-Mail) Structural Group, Inc. (09/07/2011); Department Approval: Charles D. Herbertson(09/02/11) City Attorney Approval: Carol A. Schwab (by H. Baker) (09/08/11) Chief Financial Officer Approval: Jeff Muir (09/07/11) City Manager Approval: John M. Nachbar (09/08/11) RECOMMENDATION: Staff recommends the City Council award a contract to Structural Group, Inc. in the amount of $125,000 for the Culver City Transfer Station Tipping Floor Repair Project, P-948. BACKGROUND: The transfer station is a two-story reinforced concrete structure located adjacent to Ballona Creek at 9255 Jefferson Boulevard. Collection trucks dump their loads on the upper level tipping floor, and a large tractor loader pushes the material through an opening in the tipping floor and into transfer trucks parked on the lower level. These loading activities wear the surface of the tipping floor requiring that the floor be repaired approximately every 10 years. Presently, the tipping floor surface is showing significant wear, and it is recommended that a repair effort be conducted at this time. The last repair was conducted in 1999. DISCUSSION: The recommended repair will consist of the application of a special high-strength metallic concrete overlay on the worn portions of the tipping floor. Structural Group has indicated to staff that they have developed a proprietary installation process that allows them to pour an additional layer of iron aggregate concrete over the existing flooring material with minimal floor preparation time and cost. Their proprietary topping material, Deltatop 404, manufactured exclusively for them by the Euclid Chemical Company, is designed specifically for transfer station tipping floors. DeltaTop 404 exceeds by eight (8) times the abrasion resistance of plain concrete, and it can provide better resistant to microbiologically influenced corrosion. Additionally, because the transfer station facility is in nearly continuous use from City of Culver City, California Agenda Item Report Monday through Friday, the entire repair project needs to be completed over a weekend. The DeltaTop 404 topping material will enable the floor to be returned to normal service within 48 hours of placement. Section 3.07.085(C)(6) of the Culver City Municipal Code (CCMC) provides for exemption to the City’s standard formal competitive bidding process where services are provided for “repair and maintenance service for City-owned or occupied real property and buildings”. Additionally, Section 3.07.045(A) of the CCMC provides an exception to bidding requirements “when the equipment, supplies or services…are proprietary items of original equipment manufacturers and/or their authorized exclusive distributors.” In this case, Delta Pacific Builders, which was acquired by the Structural Group in 2007, installed the original tipping floor overlay system in 1999, and the propriety process/product allows quick installation and curing while ensuring that iron aggregates remain suspended in the material for maximum abrasion and impact resistant. Structural Group, Inc. is a licensed contractor based in Huntington Beach and is in good standing with experience on numerous similar tipping floor repair projects in California and throughout the country. Other agencies that hired Structural Group, Inc. were contacted by staff and all of them indicated that the contractor is competent, fair and diligent FISCAL ANALYSIS: Sufficient funding for this project is available in the Public Works Department, Sanitation Division Account No. 20200948.730100. ATTACHMENTS: 1. Proposal received from Structural Group, Inc. MOTIONS: That the City Council: 1) Award a contract to Structural Group, Inc. in the amount of $125,000 for construction of the Culver City Transfer Station Tipping Floor Repair Project, P- 948; and,. 2) Authorize the Public Works Director/City Engineer to approve change orders, if necessary, in an amount not to exceed $25,000 (20%); and, 3) Authorize the City Attorney to review/prepare the necessary documents; and, authorize the City Manager to execute such documents on behalf of the City. MEETING DATE: 09/12/11 AGENDA ITEM: Award a Professional Services Contract to Structural Group, Inc. for the Culver City Transfer Station Tipping Floor Repair Project, P-948 ATTACHMENTS Pages 1 Proposal from Structural Group, Inc. 1-2 struclurral 15552 Commerce Lane Huntington Beach, CA 92649 Phone 714-891-9080 Fax 714-897-0163 www.structural.net Structural Group, Inc. CA License #:776932 September 2, 2011 Hong Wang Culver City 9770 Culver Blvd Culver City, CA 90232 Re: Culver City Transfer Station — Tipping Floor Restoration Dear Mr. Wang: Thank you for giving Structural Group, Inc. (SG) the opportunity to prepare a repair proposal for the above referenced project. We propose to furnish all necessary labor, material, equipment and supervision except as noted below to perform the following items of work: 1. Deltatop 404 — Based on approx 2500 sf at an average thickness of 2 1/2 inches by volume. Structural Group estimates that this project will require 32 bulk bags of product. $125,000 - $50 per square ft. Materials required above and beyond this amount will be charged at $3900 per 3000 lb super sack of material. SCOPE OF WORK: 1. Saw cut and chip to create key at all termination points of the new flooring system. 2. Chain drag to sound and remove any loose or questionable materials. 3. Scabble as required to remove any fractured aggregate. 4. Shot blast as required to remove any surface laitance and enhance bonding profile. 5. Set up screed system to specified thickness 1 'A inch minimum. 6. Mix and install 100% solids epoxy bonding agent and scrub into base slab as required. 7. Mix place and finish desired floor topping system as required. 8. Install control joints as required where required. 9. Install curing compound as required. 10. Install carpet and or like material for wet cure process. Usually provided out of owners waste stream. 11. Price is based on weekend or night pay rates. SUPPORT BY OTHERS (at no cost to SG) SHALL INCLUDE THE FOLLOWING: I. Accessibility to work areas by others 2. Area to be received in clean, dry, sound condition. 3. Existing slope may be altered and or possibly improved when topping is installed. 4. Price based on 1 move in. 5. Price based on normal, non signatory pay rates. 6. Area to be free of foot traffic for up to 24 hour upon completion. ATLANTA • BALTIMORE • BATON ROUGE • BIRMINGHAM • CHICAGO • CINCINNATI • DALLAS • DENVER • DETROIT • FT LAUDERDALE • GREEN BAY • HARTFORD • HOUSTON KANSAS CITY • LAKE CHARLES, LA • LOS ANGELES • NEW YORK • PHILADELPHIA • PHOENIX • PITTSBURGH • SALT LAKE CITY • WASHINGTON, Des WEST FLORIDA A Structural Group Company Title Date Authorized Signature Culver City September 2, 2011 Page 2 7. Power to be supplied by others. 8. Dumpster and washouts to be provided by others. 9. Adequate lighting to be provided by others. 10. Parking to be provided by others. 11. Lay down area to be provided by others. 12. Water to be provided by others. 13. Vehicle access to work area is required. 14. Restroom facilities by others 15. This proposal becomes part of any future contracts or agreements. 16. Any unforeseen complications not resolved in this contract will be negotiated at the time of discovery. 17. We exclude plans, permits, fees, testing, inspections, surveys, bonds and engineering. 18. There shall be provided to us at no expense the use of an elevator if required, water, heat, lights, warm and protected dry storage and suitable electric power required for the proper execution of our work. 19. Customer to accept and store materials in a dry protected area. 20. See attachmeut A which is included as part of this proposal and any Contract that results from it. SCHEDULE: To be arranged. Structural Group feels that this work can be completed in 3 days. Friday — 3:00 PM prep and prime, Saturday install, Sunday cure all day, Monday reopen at 6:00 AM PRICE:- All work shall be paid for in accordance with the following schedule of values: The price to perform the work as outlined above. $125,000 PAYMENT TERMS: 1. 100% upon completion. 2. One and one-half (1.5%) interest due on unpaid balance after thirty (30) days. GENERAL CONDITIONS: See Attachment "A" EXPIRATION: This proposal may be withdrawn if not accepted within thirty (90) days. Very truly yours, Esi Liege Structural Group, Inc. ACCEPTANCE OF PROPOSAL: The above Conditions, Specifications, Prices and General Conditions are hereby accepted. This proposal, once signed, acts as the only agreement between the parties. You are authorized to proceed to do this work and payment will be as stated above. ACCEPTED BY: