eComments During Meetings: When available, click here to submit eComments during a live meeting | Attendees must register here to attend all virtual meetings.

File #: 24-103    Version: 1 Name: Approval of an Extra Work Change Order, in the Amount of $12,217.21, to the Existing Contract with MMJ Contracting, Inc. for the Phase 1 Build- Out of Female Dorms at Fire Station #1, Project, PF-013
Type: Minute Order Status: Consent Agenda
File created: 7/19/2023 In control: City Council Meeting Agenda
On agenda: 8/14/2023 Final action:
Title: CC - CONSENT ITEM - Approval of an Extra Work Change Order, in the Amount of $12,217.21, to the Existing Contract with MMJ Contracting, Inc. for the Fire Station #1, (Located at 9600 Culver Boulevard), Phase 1 Build-Out of Three New Dormitory Rooms, Project, CIP No. PF-013.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

CC - CONSENT ITEM - Approval of an Extra Work Change Order, in the Amount of $12,217.21, to the Existing Contract with MMJ Contracting, Inc. for the Fire Station #1, (Located at 9600 Culver Boulevard), Phase 1 Build-Out of Three New Dormitory Rooms, Project, CIP No. PF-013.

 

body

Meeting Date:                      August 14, 2023

 

Contact Person/Dept:                     Hong Wang, Public Works/Engineering

                     Christopher Evans, Public Works/Engineering

 

Phone Number:                       310.253.5604

                     310.253.5621

 

Fiscal Impact:  Yes [X]    No []                                                                General Fund:  Yes [X]     No []

 

Public Hearing:  []                     Action Item:                     []          Attachments: []   

 

Public Notification:                      (E-Mail) Meetings and Agendas - City Council (08/09/2023).

 

Department Approval:                       Yanni Demitri, Public Works Director/City Engineer (08/02/2023)

 

 

RECOMMENDATION

 

Staff recommends the City Council’s approval of an extra work change order, in the amount of $12,217.21, to the existing contract with MMJ Contracting, Inc., (MMJ), for Fire Station #1, (located at 9600 Culver Boulevard), Phase 1 build-out of three new dormitory rooms, Project, CIP No. PF-013.

 

 

BACKGROUND/DISCUSSION:

 

In May 2022, the City Manager administratively approved a construction contract with MMJ Contracting, Inc., in the amount of $49,886.00, for the Fire Station #1, (located at 9600 Culver Boulevard), Phase 1 build-out of three new dormitory rooms. During construction, per the direction of the Fire Department, the existing First-in Fire Station Alerting System was expanded, to cover each of these new dorm rooms. The cost to purchase and install this system in each of the three dorm rooms was negotiated at a fair and reasonable cost of $12,217.21.

 

Westnet's First-In Fire Station Alerting System is a zoned notification system utilizing a series of remote alerting modules placed strategically throughout the fire station to notify fire and EMS personnel of an emergency call in the quickest, safest, and most advanced means possible.

 

Per CCMC section 3.07.050.B, the City Manager has the authority to approve contracts under $50,000.  The extra work change order amount of $12,217.21 exceeds the City Manager’s authority due to the original contract amount having been $49,886.  Therefore, staff recommends that the City Council approve the extra work change order to MMJ’s contract.

 

 

FISCAL ANALYSIS

 

The MMJ contract amount is $49,886.00. With the approval of the extra work change order in the amount of $12,217.21, the total contract amount will be increased to $62,103.21. Sufficient funds to cover the cost of the extra work were included in the Revised Budget for Fiscal Year 2022-2023 in CIP No. PF013 (Fire Station Renovations).

 

 

ATTACHMENTS

 

None

 

 

MOTION

 

That the City Council:

 

1.                     Approve an Extra Work Change Order in the amount of $12,217.71, to the existing contract with MMJ Contracting, Inc., for the Fire Station #1, (located at 9600 Culver Boulevard), Phase 1 build-out of three new dormitory rooms, Project, CIP No. PF-013, and,

 

2.                     Authorize the Public Works Director/City Engineer to execute the extra work change order on behalf of the City.