Legislation Details

File #: HIST-2128    Version: 1 Subject:
Type: Historical Status: Action Item
In control: City Council Meeting Agenda
On agenda: 3/27/2006 Final action: 3/27/2006
Title: Discussion of a Proposal to Develop a Local Solar Initiative for Culver City.
Attachments: 1. A-7__06_03_27_CC Solar Initiative.pdf, 2. Solar Improvements.pdf
City of Culver City, California City Council Agenda Item Report Meeting Date: March 27, 2006 Item Number: A-7 AGENDA ITEM: Discussion of a Proposal to Develop a Local Solar Initiative for Culver City. Contact Person/Dept.: Craig Johnson Phone Number: 253-5802 Fiscal Impact: Yes [X] No [] General Fund: Yes [_] No [X] Public Hearing: [] Action Item: [] Attachments: [X] Public Notification: Master Notification List (03/22/06) Legal Notification: Not Required Non Legal Notification: Publication in the Culver City News on (03/09/06). Department Approval: Susan Evans (02/21/06) CAO Approval: Martin R. Cole for Jerry B. Fulwood (03/23/06) City Controller Approval: Marlee Chang (03/22/06) City Attorney Approval: Elaine Hirohama for Carol A. Schwab (03/22/06) RECOMMENDATION: Staff recommends the City Council consider a proposal related to implementation of a local solar initiative and direct staff as deemed appropriate. BACKGROUND: Energy use of buildings is particularly important with buildings in the United States consuming 39% of the nation's primary energy and 71% of the nation's electricity. Californians are slowly becoming more energy efficient. The California Title 24 Energy Requirements for New Construction were revised upward in October 2005, making them one of the strictest standards in the nation. Californians are 50th out of 50 states in terms of energy use per capita, the most efficient in the nation. From 1990 to 2000 the overall population of California rose 13.8%, but the overall energy use rose only 1.2%. Staff brought a Green Building discussion item to the City Council in February, 2005. The Council gave a general recommendation for a limited program that would require one additional full time staff member in the Building Safety Division. Due to budget constraints that position was not added. The Building Safety Division currently has two voluntary green building information handouts available to the public on the 2nd floor of City Hall. These handouts are titled 1) Top 20 no or low cost Green Building Strategies, and 2) Recommended Sustainable Building Measures. City of Culver City, California City Council Agenda Item Report The Building Safety Division currently has three Green Building presentations on the Building Safety Division web page. These presentations are titled 1) Solar Energy Presentation to the Culver City Planning Commission, 2) Green Building Tour, and 3) Green Building in Southern California. To date there has been one voluntary green building residence constructed in Culver City, and several small voluntary solar photovoltaic systems are installed in Culver City each year. In 2005, the Culver City Plunge Pool underwent a general renovation which also added a solar hot water heating system for the swimming pool water. DISCUSSION: Most states in the nation, including California, have a "net metering" or “grid-intertie" law in place. The law in California, similar to other states, requires all electrical utilities to buy back energy produced by consumers at the same rate the consumer is charged for the energy. A typical grid-intertie system works the following way: • A solar photovoltaic panel is installed on the roof of a structure. • A connection to an inverter is usually located close to the main electrical panel. • A connection is made from the inverter to a disconnect and then a connection from the disconnect to the main electrical panel is made. All power from a utility to a consumer and also power from self generation (a solar photovoltaic system) is routed through a consumer's individual power meter. When the consumer uses more power than they are generating, the power meter turns normally, though more slowly. When a consumer generates more power than they are consuming, the meter runs backward. Efforts to lower electricity use are particularly important; approximately 10% of all electricity produced is wasted in transmission losses. Staff proposes two new solar initiatives for the City of Culver City: 1. A mandatory grid-intertie system requirement for new construction in Culver City • This would require a 1 kilowatt grid-intertie solar photovoltaic system for each 10,000 square foot of new multifamily residential or new commercial construction. City of Culver City, California City Council Agenda Item Report • A 1 kilowatt solar grid-intertie system is currently the smallest practical building based system that can be put in place. The smallest standard inverter available is for an approximately 1 kilowatt system. • The requirement would apply only to new occupiable space, not parking garages. • The requirement would not apply to new or remodeled single family homes or duplexes. The requirement would not apply to remodeled or renovated multifamily or commercial construction. • A 1 kilowatt solar photovoltaic grid-intertie system requires approximately 80 square foot of roof area, and has a current total installed cost of approximately $8,000. A $2000 federal tax credit is available, bringing the overall cost of a 1 kilowatt system down to approximately $6,000. • The California legislature also passed a solar subsidy plan in January 2006. The plan establishes subsidies to promote the installation of 3,000 megawatts of solar power in California over the next 11 years. • The added cost to the consumer for this requirement is estimated to not exceed 1/2 of 1% of the overall cost of construction. A 1 kilowatt solar photovoltaic system in the Culver City area will generate approximately $250 worth of electricity per year. The same system will also result in a reduction of 50 pounds of carbon emissions to the environment each year. Private construction projects in Culver City that propose new construction of 10,000 or greater square feet generally must complete a discretionary review procedure by the Culver City Planning Division prior to applying for construction permits. Staff proposes that if the solar requirement is made mandatory for new construction, each applicant involved in a Planning discretionary review be given an informational handout defining the solar system requirements that would apply. Staff is proposing no additional personnel to administer a mandatory solar requirement for new construction in Culver City. 2. Solar Improvements for City Hall • When City funding permits, staff recommends making green building improvements to City Hall. • These improvements would include $5,000 for electrical engineering and $40,000 for a new approximately six kilowatt solar photovoltaic system to be installed on top of City Hall. City of Culver City, California City Council Agenda Item Report Solar photovoltaic systems have proven to be a reliable, trouble-free source of electricity over the last 45 years, and the costs of solar systems have come down in recent years. A mandatory solar requirement for new construction in Culver City would reduce energy use in Culver City, would contribute to a cleaner environment, and can be administered by the current Building Safety Division staff. Next Steps In order for a solar initiative to be implemented in Culver City a local amendment to the 2001 California Building Code would need to be adopted. This code is mandatory throughout California and is adopted in Culver City. Local amendments that are stricter than the California code are allowed through a review process with the California Building Standards Commission. If the City Council directs staff to proceed with this item, staff will work with the California Buildings Standards Commission on implementing this program. After working with the California Building Standards Commission, staff will bring a California building Standards Commission approved local California Building Code Amendment to the City Council for consideration. All contractors, architects, engineers, realtors, and developers licensed in Culver City will be noticed of this item. FISCAL ANAYLSIS Please note that solar installations would reduce the utility tax revenue to the City of Culver City, but the reduction would be insignificant. ATTACHMENTS: 1) Green Building Discussion Item Staff Report from February, 2005 2) Diagram of a 1 Kilowatt Grid-Intertie Solar System City of Culver City, California City Council Agenda Item Report MOTIONS: That the City Council: Consider a proposal related to implementation of a local solar initiative and direct staff as deemed appropriate. MEETING DATE 3/27/06 AGENDA ITEM Discussion to Direct Staff to Work with the California Building Standards Commission to Develop a Local Initiative and Direction on Whether to Pursue Funding for Solar Improvements for City Hall ATTACHMENTS Pages 1) Green Building Discussion Item Staff Report 1-60 from February, 2005 2) Diagram of a 1 Kilowatt Grid-Intertie Solar System 61City of Culver City, California City Council Agenda Item Report Meeting Date February 14, 2005 Item Number A-7 AGENDA ITEM Discussion of Options for Future Green Building Standards in Culver City Contact Person/Dept Craig Johnson Phone Number 253-5802 Fiscal Impact Yes [X] No 0 General Fund Yes [X] No 0 Public Hearing a Action Item [X] Attachments [X] Public Notification Legal Notification Not Required Non Legal Notification Publication in the Culver City News on February 3 rd and 10th, Master Notification List on February 10, 2005 and a mailing of 495 postcards to all City licensed design professionals (architects and engineers) and all City licensed general contractors and City licensed realtors Department Approval Susan Evans 2-2-05 GAO Approval Jerry Fulwood 2/9/05 City Controller Approval Jim Lavery 2/9/05 RECOMMENDATION a future Green Building Program and using an integrated framework of design, practices that encompasses the of buildings Green Building practices and built environments and seek to other natural resources and provide a providing more natural light, cleaner air California have adopted a Green programs have been implemented by cities reduce solid waste during construction, natural resources Several cities practices into the construction of city decision as these buildings require to their specific community needs and address one or both of the following 38 That the City Council discuss its options for provide direction to staff BACKGROUND A Green Building is described as one construction, operations and demolition environmental and economic impacts recognize the interdependence of the natural minimize the use of energy water, and healthy productive indoor environment by improved health comfort and productivity In recent years several municipalities throughout Building program (Attachment 1) These seeking ways to be more energy efficient, reduce environmental pollution, and conserve have found that integrating Green Building buildings has proved to be a sound financial lower energy, waste disposal and water costs Most municipalities tailor their programs goals However, all Green Building programs|109| Energy efficiency measures, and ICity of Culver City, California City Council Agenda Item Report 2 Water, materials, and interior environment measures_ A building's energy use is particularly significant because buildings in the United States consume 39% of the nation's primary energy and 71% of the nation's electricity The remainder of energy is consumed by transportation and industry Based on the impact of energy use, this staff report will focus more on the concept of a Green Building program that addresses energy efficiency measures instead of one that focuses on water materials, and interior environment measures Currently, Culver City's development and construction standards are no more restrictive in terms of Green Building standards than what is mandated by California State Code Despite this fact, the City s Building Safety Division has two (2) educational handouts available to the public concerning Green Buildings (Attachment 2), which has led to Green Building measures being voluntarily taken by residents resulting in an average of three (3) new solar photovoltaic installations in the City per year In addition, the City s Sanitation Division has adopted various recycling measures which are also a part of a Green Building program Through these efforts the Sanitation Division has surpassed, by 7%, the California Integrated Waste Management Board s requirement that 50% of all solid waste be diverted to recycling Energy use of new buildings is regulated nationwide, with California currently having the most restrictive requirements In California, building energy efficiency is regulated by Title 24, Part 6, of the California Code of Regulations California's Energy Efficiency Standards for Residential and Nonresidential Buildings The 2001 Title 24 Standards are scheduled to be made more restrictive in October 2005 per the California Building Standards Commission The adopted standards are mandatory for all new and remodeled construction in California with several minor exceptions The standards may be met through either a prescriptive approach, specifying building features' energy performance, or a performance approach meeting a maximum energy usage allowed The standards are enforced by all jurisdictions in California through standardized forms and computer analysis that is submitted with the construction drawings as part of a construction permit application The construction is inspected in the field to verify compliance with the approved plans As a result of this process California ranks 48th in energy consumption per capita 39City of Culver City, California City Council Agenda Item Report DISCUSSION When determining the parameters of a Green Building program for the City, there are numerous policy questions that should be addressed 1 What level of upgraded standards should be mandatory? 2 Should there be tougher standards for City and Redevelopment Agency projects than private construction'? 3 If upgraded standards are instituted, should they apply to all construction or only projects of a certain size and scope'? 4 What are the estimated additional costs of construction for various standards'? 5 What are the estimated energy savings and reduced pollution that may be realized'? 6 What will be the cost to the City general fund to institute new standards'? 1 What level of upgraded standards should be mandatory'? The following are four (4) different potential programs that could be implemented in Culver City All of the following options are more restrictive than the current California Title 24 requirements Option 1 is the least restrictive program while Option 4 is the most restrictive program Option 1 Current Culver City Building Safety Voluntary Measures Model • No change to current Code • Voluntary adoption of Green Building Measures • Staff would continue providing educational handouts at the Building Safety counter on energy efficiency measures and sustainable building measures Option 2 California Department of General Services/ Real Estate Services Division Model • The goals of the State of California are to site, design, deconstruct construct, renovate operate and maintain State buildings that are models of energy, water and materials efficiency through mandating that all projects are designed in accordance with Title 24 and Government Code Sections 15814 30-31 40City of Culver City, California City Council Agenda Item Report • This involves a requirement that all projects be designed to exceed the applicable Title 24 Energy Efficiency Regulations, Whole Building Appropriate, at initiation of preliminary plans by a minimum of 10%, unless documented by a consultant to the satisfaction of the State that it would not be cost effective In such case, the project shall be designed and constructed within the initial project budget to exceed the energy efficiency requirements of Title 24 Part 6, California Energy Code by the maximum amount that is determined by the consultant to be cost effective • Consultant shall perform analyses of the US Green Building Council s (USGBC) Leadership in Energy and Environmental Design (LEED) criteria as it applies to the design and construction of a project While it is not required that an official USGBC certification and rating be obtained, the equivalent score of a certified rating, or better, is required for a project Option 3 City of Santa Monica Green Building Model • Excluding single family dwelling units and duplexes, Santa Monica s ordinances related to Green Building standards require all projects (public and private development) to achieve better than Title 24 efficiency and use a minimum of four (4) major building materials with recycled content along with a series of other requirements regarding 1 Siting and form 2 Landscape 3 Transportation 4 Envelope 5 Materials 6 Water systems 7 Construction management 8 Energy requirements Option 4 Leadership in Energy and Environmental Design Green Building Model (LEED) • The USGBC has developed the LEED Green Building Rating System which is a voluntary, consensus-based national standard for developing high-performance sustainable buildings LEED promotes green building through a comprehensive system offering project certification, professional accreditation, training and practical resources 41 (ICity of Culver City, California City Council Agenda Item Report • The current LEED Rating System can be made applicable to new commercial construction and major renovation projects, existing building operations, commercial interiors projects, core and shell projects, homes and neighborhood development • The LEED Rating system addresses location, site design, landscape features, construction materials energy systems and performance, recycling, emissions, water reduction and other development features • Under the LEED rating system, a project is awarded points based on the incorporation and implementation of green building elements Projects can be awarded one of four levels of status 'certified,' silver, gold or "platinum, depending on the number of points achieved Option 5 Hybrid Model • A combination of different aspects of each model 2 Should there be tougher standards for City and Redevelopment Agency projects than private construction'? The following are four (4) different options regarding standards Option number 1 is the least restrictive while option number 4 is the most restrictive Option 1 • Current Culver City voluntary measures be made mandatory for public construction Option 2 • Current Culver City voluntary measures be made mandatory for private construction and all public projects meet a LEED standard Option 3 • Private construction meet the State Real Estate Services Division guidelines and public construction meet a LEED certified standard Option 4 • Private construction meet a LEED certified standard and public construction meet a LEED gold standard 3 Should upgraded standards apply to all construction or only projects of a certain size and scope'? 42 5City of Culver City, California City Council Agenda Item Report The following are three (3) different options regarding size and scope Option number 1 is the least restrictive while option number 4 is the most restrictive Option 1 • Upgraded standards would apply to all new commercial buildings over 10,000 square feet, all multifamily projects with eleven units or greater, and new single family home development • Standards would not apply to commercial buildings 10,000 square feet or less, commercial addition or renovation projects, multifamily projects of three (3) units or less or single family homes Option 2 • Upgraded standards would apply to all new commercial buildings and all multifamily projects Option 3 • Upgraded standards would apply to all new commercial buildings, major additions or major renovations and to all multi-family buildings Option 4 • Upgraded standards would apply to all new commercial buildings major additions or renovations, and to all single-family buildings 4 What are the additional costs of construction for mandating various standards" The following are three (3) different options relating to costs and standards Option number 1 is the least restrictive while option number 4 is the most restrictive Option 1 10% energy efficiency improvement • This option would add an estimated 2% to the total cost of construction • Examples of items that would be impacted by these standards include lighting, insulation, heating, ventilating, and air conditioning equipment • A new 8 000 square foot commercial building may cost $140/ s f = $1 120 000 million • To improve the energy efficiency by 10% may increase the building cost by 2% $22400 43 J,City of Culver City, California City Council Agenda Item Report Option 2 15% energy efficiency improvement would add an estimated example above this would Gold Certification 2 5% to the total cost of construction increase the building cost by 2 5%, 4% to the total cost of construction would involve much more than would increase the building cost by 4%, and reduced pollution that may be examples presented in policy question • This option • To use the $28,000 Option 3 A LEED • This option would add an estimated • LEED certification, as noted previously improving energy efficiency • To use the example above this $44,800|109| What are the estimated energy savings realized" The following is based on the same three number 4 above Annual British Thermal Units ("btu") Annual Energy Cost Annual Carbon Emissions Base 8,000 sq ft office building 680 800,000 btu $9 680 15 tons 10% energy efficiency improvement 612 720,000 btu $8,712 13 5 tons 15% energy efficiency improvement 578,680,000 btu $8,228 12 7 tons 20% energy efficiency improvement 544 640 000 btu $7744 12 tons|109| What will be the cost to the City's general fund to institute various standards" City costs may be divided into a one-time program set-up cost, annual costs or costs per individual project See elaborated discussion under financial impact 44 7City of Culver City, California City Council Agenda Item Report SUMMARY Green Building energy efficiency measures are generally much more objective and simpler to establish and measure than building materials and interior environment measures Efforts to minimize electricity use in particular is very important to the environment Two thirds of all electricity produced is wasted through generation or transmission losses One watt of electricity saved at the point of use corresponds to a savings of the raw materials required and pollution produced by the generation of 3 watts of electricity Buildings themselves (and the equipment/appliances within them) consume 71% of the annual electricity production, the remainder goes to business and industry functions In determining what types of projects should be included in a Green Building program it is important to take into consideration that currently no jurisdiction applies mandatory Green Building standards to single or two family renovations or new construction Applying mandatory standards to residential renovations would be very difficult, and applying mandatory standards to new one or two family homes would not create a significant environmental improvement in Culver City as only a few such homes are built here annually The majority of construction projects in Culver City are renovations of some type Applying mandatory Green Building standards to renovation projects in general either multi-family residential or commercial, is possible but would be very involved and may be very costly because it would involve hiring a full time staff person who would be responsible for monitoring all renovation projects based on their full understanding of the mandatory standards It would be feasible to apply mandatory Green Building standards to new multi-family and commercial construction They are new generally freestanding buildings and Green Building upgrades could be incorporated into the design from the beginning All new multi-family and commercial construction in Culver City must complete a Planning discretionary review process prior to applying for a construction permit The applicant could be advised of the mandatory Green Building standards at this early stage in the design process In determining what type of program is right for Culver City it is important to take into consideration staffing abilities A custom designed program, such as the City of Santa Monica program, would require a consultant and increased community involvement to establish, and would require highly qualified City staff members to monitor and enforce such a program 45 TCity of Culver City, California City Council Agenda Item Report Adopting a LEED standard could be consultants Any project intending to LEED accredited architect, or would project The LEED consultant would follow and advising on every aspect of the coordinate the "building commissioning" verifying performance and instructing the building), and would also submit the applications certification The USGBC is the final determiner standard Any Green Building program that the City current Planning discretionary review permitting, construction inspection, and FISCAL ANALYSIS implemented by utilizing outside LEED meet a LEED standard would initially hire a add a LEED accredited consultant to the the project from start to finish, monitoring project The LEED consultant would also after the project is finished (fine tuning and building managers in the operation of the to the USGBC requesting LEED of whether a project meets a LEED adopts must be integrated into the City's construction permit review construction certificate of occupancy processes of several potential program models and Building program The following are cost comparisons additional costs associated with a Green One time set-up cost Annual cost (to the City or Agency) Cost per project (to the City or Agency) A 10% energy efficiency improvement for all maj or private $50,000 consultant $120,000 for one permanent contract plan reviewer/ inspector None construction A full Green Building program for all major private $300000 $360 000 for three permanent or contract plan reviewers/inspectors None construction (The City of Santa Monica Model) A full Green Building program for all major City $300 000 consultant (note this would not be in addition to the $300,000 listed above for private construction $120 000 for one permanent contract plan reviewer/inspector Would vary per project, probably a minimum of 2 5% additional construction cost per project construction (The City of Santa Monica Model) A LEED Gold standards for all None None Would vary per project, probably 46 II|1010|City of Culver City, California City Council Agenda Item Report major City a mmimum of construction 4% additional construction cost per project Additional costs associated with a Green Building program involve the following Workshops and Training Workshops and training could be provided for staff, Planning Commissioners and City Council members by an outside consultant The estimated cost for these workshops is are approximately $1 000 each for a total cost of $3,000 for an estimated need of three workshops Community Outreach To encourage green private sector development in a voluntary program or if the program is mandatory for the private sector, workshops should be provided for community members A non-profit organization can provide these workshops to the public at an estimated cost of $1,000, for a total cost of $2,000 for an estimated need of two workshops Additionally, a brochure and handouts would be developed to explain the program to the public at an estimated cost of $1,000 for development and printing Incentives Some jurisdictions offer partial fee rebates, expedited permit processing, or recognition by the City Council to encourage private construction projects to meet voluntary Green Building standards ATTACHMENTS 1 Other Municipality Green Building Comparison 2 Culver City Green Building Handouts 3 State of California Real Estate Division Energy Efficiency Checklist 4 LEED Description 5 Santa Monica Green Building Program Introduction and Required and Suggested Practices 6 Potential Culver City Green Building Model MOTION That the City Council Discuss its options for a future Green Building Program and provide direction to staff 47MEETING DATE 2/14/05 AGENDA ITEM Discussion of Option for Future Green Building Standards in Culver City ATTACHMENTS Pages 1) Other Municipality Green Building Companson 1 2) Culver City Green Building Handouts 2-9 3) State of Califorma Real Estate Division Energy Efficiency 10-27 Checklist 4) LEED Descnption 28-32 5) Santa Momca Green Building Program Introduction and 33-47 Required and Suggested Practices 6) Potential Culver City Green Building Model 48-49.er City of Pleasanton Commercial and Civic Green Building Ordinances Planning Department Modified LEED/ ACWMA City of San Jose Green Building Program Environmental Services Department Modified LEED City of Santa Monica Sustainable Development Guidelines Environmental Programs Division Green Building Design and Construction Guidelines City of Los Angeles Sustainable Development Guidelines Bureau of Engineering Architectural Division City projects 7 500 s f or larger evaluated by LEED certified designers in the Bureau of Engineering Alameda County Construction Debns Management and Green Building Practices General Services Agency and Public Works LEED Required to achieve LEED silver rating Eligibility evaluated by staff Eligibility evaluated by staff not required development over 20k s f must public sector development over qualify for LEED certified rating 10k s f must qualify for San no formal certification required Jose/ LEED certified rating no formal certification required Utt, VVZ, CITY BUILDING SAFETY DIVISION Other Cities Comparison City of Calabasas Name of program Green Building Ordinance Lead Agency Planning and Environmental Programs Division Evaluation Standards Modified LEED Any LEED requirements Eligibility evaluated by staff development up to 5k s f to qualify for Calabasas/ LEED certified rating over 5k s f to qualify for Calabasas/ LEED silver rating no formal certification required Public Sector Mandatory for development over Mandatory for development to Mandatory for development Mandatory for development Mandatory minimums more City projects 7 500 s f or application 500 s f achieve LEED silver over 20k s f over 10k s f green when cost effective larger Private Sector Mandatory for development over Voluntary Mandatory for development Voluntary Mandatory energy and Voluntary application 500 s f over 20k s f recycling further measures voluntary Application to Yes Commercial projects Application to No Residential projects Staff training Workshop with outside requirements consultant Staff LEED Several members intend to Accreditation complete accreditation process Program staffing Allocation of existing staff time requirements Voluntary Voluntary (No information) One staff member currently accredited Yes Building/ City Engineering staff have attended two training workshops One Planner currently accredited Voluntary (No information) Several Public Works staff members currently accredited Yes Multifamily only A senes of workshops Eight City engineers currently accredited Voluntary Voluntary A senes of workshops Four City designers in Bureau of Engineenng currently accredited No unless the project is a Voluntary PUD (planned Unit Development) Allocation of existing staff time Allocation of existing staff time (No information) One full time staff member (No information) allocation of other existing staff time Outside consultants Hired for staff workshop Attorney hired to write Hired for staff workshops (No information) Hired for staff and community (No information) ordinance workshops Length of program (No information) 6 months (No information) 2 years 7 months 7 years 6 years development Additional comments aWebsite www cityofcalabasas org Alameda County Waste Management Authonty has developed own Guideline (www stopwaste org) www acgov org/admin/ www a pleasonton ca us/ admincode/Alameda_County_ planning_commdev html Administrative _Code/Title4/38/ City received $60k grant to create a position to oversee development of program www ci san jose ca use/esd/ GB HOME HTM City helps fund Green Building (No information) Resource Center run by Global Green http //greenbuildings santa monica org/ index html, ' n TIOCAlo"0.451--- /V0 Top 20 no or low cost Green Building Strategies From Global Green USA Globalgreen org Energy ., LW, CR 17,,,J1-1- - etteetteit CITY 1 Orient building to maximize natural daylighting Description natural daylighting is usually available to the east, south and west facades 1 Benefits maximizing natural daylighting reduces the need for artificial light, thus reducing energy consumption and utility bills Dwellings that have good natural daylighting are also more pleasant for the residents 2 Place windows to provide good natural ventilation Description natural ventilation systems take advantage of prevailing winds and thermal convection to ventilate living spaces Benefits placing windows to take advantage of natural ventilation reduces the need for air conditioning, saves money on energy bills, and can make homes without air conditioning more comfortable 3 Select a light colored "cool roof" Description dark roofing materials absorb heat, making the house warmer in summer months, whereas light colored roofing reflects heat away from the building Benefits light colored roofing reduces heat build-up through the roof, thus increasing occupancy comfort and decreasing air conditioning bills Light colored roofing can also last longer because it does not thermally expand and contract as much as darker colors 4 Provide overhangs on south facing windows Description overhangs or screens on south facing windows are one component of a natural cooling system Benefits shading south facing windows reduces heat gain by screening the summer sun during the hottest periods of the day 5 Install whole-house fans or ceiling fans Description whole-house and ceiling fans improve interior comfort by circulating cold and warm air They can be adjusted to either draw warm air upward during summer months or push it downward during the winter Benefits fans can reduce the need for air conditioning and heating by circulating air effectively and on average uses one tenth the electricity of an air conditioning unit 6 Eliminate air conditioning Description after the refrigerator, air conditioning is the second biggest consumer of electricity in an average household Benefits eliminating air conditioning will significantly reduce a )|1010|CRAIG JOHNSON RA CI30 BUILDING OFFICIAL BUILDING SAFETY DIVISION TEL 310 253 5800 FAX 310 253 58242 household's electricity bill 7 Provide combined-hydronic heating Description combined-hydronic heating uses hot water stored in the water heater to operate radiators typically installed in baseboards Benefits combined-hydronic heating saves energy by using hot water already produced and stored in the water heater, and eliminating the need for a separate furnace (note may not always apply to Southern California, consult a mechanical engineer for further information) 8 Install fluorescent lights with electronic ballasts Description interior fluorescent bulbs and fixtures produce light quantity and quality that is comparable to incandescents, while expending less energy Electronic ballasts also improve efficiency and reduce flickering Benefits energy efficient light reduces energy consumption and lowers utility bills One compact fluorescent bulb will pay itself back over ten times over the course of its life through reduced energy use 9 Install high R-value insulation Description insulation provides a continuous thermal barrier to minimize heat flow through the walls floor, and ceiling The higher the R-vatue, the greater the material's ability to insulate Benefits installing higher R-value insulation improves comfort, decreases demand for air conditioning and heating, saves money, and makes the home quieter 10 Select Energy Star Appliances Description refrigerators and freezers are among the largest largest users of electricity in most homes They can account for up to 25% of household energy use Energy Star appliances use 10-15% less energy and water than standard models Benefits Energy Star refrigerators can save over 10% of the total annual electrical bill in a home Check with the local utility company for rebate programs Water 11 Design water-efficient landscapes Description low-water landscape designs (such as xenscape) reduce water use by emphasizing native and/ or drought tolerant plants, eliminating turf areas, and minimizing maintenance Efficient irrigation systems such as drip and micro irrigation place the correct amount of water directly at the base of each plant thus reducing water use and waste from over watering Benefits water efficient landscape and irrigation systems help plant growth and overall health by eliminating over watering or excessive drying They also lower water bills and reduce impacts on water supply infrastructure 12 Install water-efficient toilets and fixtures Description new toilets use 1 6 gallons per flush compared with the old toilets that require 5-7 gallons per flush Flow reducers fit into the aerator at the tip of the faucet and reduce3 the rate of water flow through the faucet Low-flow showerheads replace standard showerheads Benefits low-flow toilets can save 22,000 gallons of water per year for a family of four Flow reducers can cut water usage of faucets and showers by as much as 40% with little noticeable effect 13 Use permeable paving materials Description permeable paving allows stormwater to percolate t into the soil Benefits permeable paving allows on-site percolation, thus reducing the volume of polluted water that flows into rivers or bays, while replenishing soil moisture and local aquifers Additional benefits include reduction in irrigation requirements and a lower risk of flooding Materials 14 Use 30%-50% flyash in concrete Description flyash is a byproduct of coal burning power plants and can be an inexpensive substitute for 15%-40% of the Portland cement used in concrete Benefits flyash increases the strength and durability of the concrete Using flyash also reduces the amount of cement needed, thereby decreasing the overall environmental impacts of cement production (mining and energy consumption) (consult a structural engineer for further information) 15 Use engineered wood for header, joists, and sheathing Description solid sawn lumber in sizes of 2x10 or greater typically comes from old growth forests Engineered lumber products, however, come from small diameter and fast growing plantation trees Large size lumber can often be replaced with engineered lumber Wood !- joists are an alternative to 2x members used as floor and roof joists Benefits reducing demand for large dimensional lumber decreases pressure to cut down old growth forests Engineered lumber uses wood fiber more efficiently than conventional lumber (consult a structural engineer for further information) 16 Use recycled content insulation, drywall, and carpet Description recycled content insulation, drywall, and carpets are made from recycled paper, plastic and glass bottles, recycled wool or cotton They don't differ in appearance or performance and the prices are comparable to conventional products Benefits recycled content materials save resources and divert waste from landfills Approximately 40 two liter soda bottles may be recycled into a square yard of carpeting Recycled content insulation may contain up to 30% recycled glass Indoor Air Quality 17 Use low or no-VOC paint Description No-VOC paint does not emit odors related to volatile organic compounds (VOC's) Organic chemicals are widely used as ingredients in household products like paint adhesives cleaning supplies etc No-VOC paint is used exactly like conventional paint No-VOC paints are most suitable for indoor useBenefits use of low or no-VOC paint can eliminate eye, nose, and throat irritation 18 Use formaldehyde-free or fully sealed materials for cabinets and counters Description particleboard typically contains formaldehyde, which can offgas for 10-15 years EPA ranks formaldehyde as a probable human carcinogen Benefits elimination of formaldehyde based materials reduces exposure to residents, particularly children who are most susceptible Sealing with a flat latex based primer or other suitable material cap prevent the offgasing of formaldehyde 19 Vent the rangehood to the outside Description steam gases, smoke, and other combustion by-products (such as unburned hydrocarbons) can result from cooking Stovetop range hoods expel these by-products to the outside Benefits range hoods improve indoor air quality, prevent overheating, and reduce moisture build-up 20 Install carbon monoxide detector Description carbon monoxide detectors monitor the level of this gas in individual dwelling units Benefits carbon monoxide detectors can reduce harmful health effects of carbon monoxide, a common indoor air pollutant created by the combustion of natural gas from stoves and heaters 2003 Global Green USA globalgreen org|1010| ii)Recommended Sustainable Building Measures Voluntary Energy Efficiency Measures Energy Efficiency Performance Space conditioning and ventilation EProject shall be designed to exceed the applicable Title 24 Whole Building Approach, in effect at time of permit application, by 5% Motors .All motors shall be NEMA rated premium motors Cooling Towers Boilers Chilled Water System mDegree of approach at 8 d F or less at design temp mMultiple or variable speed tower fan motor mBoiler and Furnace units to have a min combustion efficiency of 90% •Automated staging of multiple boilers E Chillers to exceed applicable T 24 Energy Efficiency Stds by at least 10% . Plate and frame heat exchanger mAutomated staging of multiple chillers Air Conditioners and Heat Pumps EMust exceed applicable T 24 Energy Efficiency Stds by at least 10% EEvaporative pre-cooled condensers on all roof-top package units over 20 tons ENO direct evaporative cooling Distribution Systems mMastic or UL approved sealant for all joints of all air distribution systems (no cloth backed tape) mDuct leakage shall be 3% or unless the ducts are contained 100% within the conditioned CRAIG JOHNSON RA GBO BUILDING OFFICIAL BUILDING SAFETY DIVISION TEL 310 253 5800 FAX 310 253 5824 if.space (duct testing required) ' Variable speed pumping on chilled and hot water loops over 300 gpm (variable speed on either primary or secondary is acceptable) Lighting "Carbon Monoxide (CO) controlled exhaust ventilation for enclosed garages requiring ventilation ' Demand control variable exhaust ventilation with CO2 sensors on units serving spaces with an occupant load of 100 or greater and where the occupant density is intermittent ' Constant air volume conversion to variable air volume (subject to health stds / outside air) "Power density (watts/ sf) for office spaces greater than 250 s f must be lower than the applicable T 24 Stds by at least 10% "Exit lights, Input rating of 5 watts or less per illuminated face "Light colored interior finishes "linear fluorescent lamps, min system efficiency of 76 lumens per watt ' compact fluorescent systems, min system efficiency of 50 lumens per watt "Daylighting must be provided in all rooms adjacent to exterior walls or roofs Ventilation t Point use controls .365 day digital time clocks with battery backup ' Programmable thermostats ' Occupancy sensors for lights in all spaces with intermittent use Energy Management System 'Energy Management System (EMS) to include programming, commissioning, and training to optimize energy usage ' Provide real-time energy metering Load Shifting or Shedding 'Provide thermal energy storage for facilities on time-of- use rates with chillers ' Provide building load cycling - remote metering and controls for demand responsiveness ' Install control options that allow the building energy using systems to shed load (onsite) ' Provide on demand water heating Envelope 'Windows with metal frames shall have a thermal break or use non-metal frames|1010|V 11ERoof, wall, and floor insulation shall exceed applicable T 24 Energy Efficiency Stds by 10% mAll low slope roofs must use cool roofing materials that meet either of the following requirements a An initial reflectivity of at least 65% and an emissivity of at least 80%, or b a min solar reflectance index (SRI) of 75%, calculated using ASTM E-1980 for moderate wind conditions Misc Energy Efficiency mAll appliances must be energy star rated Alternative Transportation •Provide suitable means for securing bicycles, with convenient changing/ shower facilities, for min 5% of total building occupant load Voluntary Sustainable Building Measures, Water, Materials, Interior Environment Landscaping/ Exterior Interior Commercial Kitchens Recycling . All landscaping must be low-water/ drought tolerant alrngation system must be designed for water efficiency high distribution uniformity, zero runoff "'Automatic irrigation controllers shall be programmed in coordination with rain sensors ? Specify urban or locally derived compost and mulch . All benches or site furnishings must be recycled content/ plastic lumber mAll toilets shall be low-flow 1 6 gallon per flush, all shall be low-flow 1 gallon per flush (or waterless) mAll lavatory faucets shall not exceed 5 gallons per minute flow mAll lavatory faucets must be automatic shut off type mAll showerheads shall not exceed 1 5 gallons per minute flow mAll hot water pipes between water heater and faucets shall be insulated mAll hoses for maintenance or dishwashing shall be automatic shut-off EDishwasher final rinse cycle water shall be recycled to pre-wash cycle EGarbage dispoSal water must be auto-shut off ESpray rinses at sinks shall have a manual control "dead man" shut-off mAll dishwasher pre-rinse nozzles shall be low-flow EProvide dedicated space in and outside the building(s) )|1010| % D,C)for the collection, storage, and loading of recyclable materials Construction waste, min 50% shall be diverted to recycling centers vs landfills Materials selection mAll parking area wheel stops shall be 100% recycled content mAll pressed wood products shall be low-formaldehyde emitting mAll thermal and/ or acoustical insulation shall be zero or low-formaldehyde emitting nAll acoustical ceiling tiles shall be min 50% recycled content mAll carpet and padding shall be low VOC emitting, and/ or 25% recycled or refurbished content mAll toilet partitions shall be min 25% recycled content mAll interior latex paint shall be low or zero VOC, zero formaldehyde, water based mAll fabric wall panels shall have at least a partial recycled content mAll (non-ceramic) floor tiles shall be low-VOC emitting and/ or recycled or refurbished or renewable content sAll interior sealers (including concrete sealers), adhesives, finishes, coatings, and fire-proofing shall be low-VOC emitting Interior Environmental Quality mAll exterior windows shall have an operable section sAll outside air intakes shall be located min 10' from potential sources of contamination .All air distribution filters shall be high efficiency 85% flow per ASHRAE Std 52 1-1992 "'Insulation at the interior of ducts is not permitted "'Provide proper slope at condensate pans to avoid accumulation of water For further information please consult U S Green Building Council Energy Star California Integrated Waste Management Board Development Center for Appropriate Technology National Association of Homebuilders - Energy Efficiency, Green Building, & the Environment Building Industry Institute California Green Builder Program usgbc org energystar goy ciwmb ca gov/greenbuilding/Design/ costissues htm dcat net nahb org/reference_list aspx7sectionID =222 thebii org/cgbp asp 4ilt*0SAIMQ.e\t' State of California Page 1 of 18 Exhibit C — Tiers N 0 --; Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Title Project Director ENERGY EFFICIENCY AND SUSTAINABLE BUILDING MEASURES The goals of the State of California are ' to site design deconstruct construct, renovate operate and maintain state buildings that are models of energy water and matenals efficiency while providing healthy productive and comfortable indoor environments and long-term benefits to Californians The objectives are to implement the sustainable building goal in a cost effective manner while considering externalities identify economic and environmental performance measures determine cost savings use extended life cycle costing and adopt an integrated systems approach Such an approach treats the entire building as one system and recognizes that individual building features such as lighting windows heating and cooling systems or control systems are not standalone systems (Governor s Executive Order D-16-00 in part) It is further ordered that sound and smart growth patterns shall receive maximum support consistent with the foregoing state pnonties including the following considerations • Proximity to public transit and other needed infrastructure • Proximity to affordable and available housing • Pedestnan access to retail and commercial facilities and exploiting opportunities for mixed use • Communication with residents property owners and businesses regarding local concerns • Advice and recommendations of local elected officials and their staff with consideration to any incentives offered by local government (Governor s Executive Order D 46-01 in part) DESIGN WORK A Project shall be designed in accordance with all applicable laws and regulations including but not limited to the following 1 California Code of Regulations Title 24 Part 6 California Energy Code — Current Edition 2 Government Code Section 15814 30 31 B The State has developed and attached the following lists of possible energy efficiency and sustainable building measures 1 Energy Efficiency Measures — Tier 1 List 2 Energy Efficiency Measures — Tier 2 List 3 Sustainable Building Measures — Tier 1 List 4 Sustainable Building Measures — Tier 2 List Approved August 2 2002 1State of California Page 2 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 C Inclusion of Tier 1 items in project design|109| It is anticipated that all applicable items from both Tier 1 lists should be included in the 1 project within the established project scope design budget construction budget and schedule D Inclusion of Tier 2 items in project design 1 Items from both Tier 2 lists shall be considered by the Consultant for inclusion in the project If any of these items appear to be feasible the Consultant shall notify the State in writing of any additional design and/or construction costs and benefits of incorporating each such item into the project E Consultant shall submit the following at the completion of Preliminary Plan (PP) phase and Working Drawing (WD) phase as indicated 1 Completed Tier 1 and 2 Energy Efficiency Measures checklist (PP and WD) 2 Completed Tier 1 and 2 Sustainable Building Measures checklist (PP and WD) 3 Written report including drawings sketches charts calculations life cycle cost analysis etc that describes and documents any included Tier 2 item justification (PP and WD) 4 Summary Report from the Title 24 compliance software run (WD) 5 Compliance forms as required by Title 24 (WD) 6 Additional submittal information a) These submittals are in addition to any other requirements for submittals indicated elsewhere in this contract b) Complete and submit the Tier checklists at the Internet address provided by the State If the Consultant is not able to access the on-line versions of the documents contact the State c) Once a checklist has been submitted subsequent update submittals shall be made using the previously submitted checklist as a basis Go to the Internet address insert the project number and the previously completed checklist will open Update this checklist and resubmit d) The electronic version of the lists contain Internet links to reference materials that are for informational purposes only and do not represent endorsement by the State either actual or implied of the products contained therein The links should appear as highlighted text depending upon the configuration of the Consultant s computer Approved August 2 2002 o D- 3State of California Page 3 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed ITEM ., INCLUDED IN DESIGN? IF "No n, INDICATE REASON(S) Yes No EiTERGy EFFICIEKCY PERFORMUCE,|1010|This project shall be designed within the project budget, to exceed the applicable Title 24 Energy Efficiency Regulations, Whole Building Approach, in effect at initiation of Preliminary Plans, by a minimum of 10% To be completed by designer This project is designed to exceed Title 24 Energy Edition (insert year) by a minimum of NOTE For projects that include whole building energy modeling to determine the level of Title 24 compliance only complete item #1 of Tier 1 Energy Efficiency Measures (EEM) along with all of Tier 2 EEM and Tiers 1 & 2 Sustainable Building Measures (SBM) All other projects shall complete all of Tiers 1 & 2 of EEM and SBM These lists have items that may pertain to new construction renovations or both Not all items may be applicable to a project For all Tier 1 items the Individual completing the form must indicate the reason(s) why a particular item is not included SPACE CONDITIONING AND VenTILATIDIsi 'a.i '0,'"e ,4 , Motors 2 National Electrical Manufacturers Association rated premium motors Cooling Towers 3 Degree of approach at 8° F or less at design temperature 4 Multiple or variable speed tower fan motor Boilers 5 Efficient boiler and furnace units with a minimum combustion efficiency of 80% 6 Automated staging of multiple boilers Chilled Water System 7 Chillers to exceed applicable Title 24 Energy Efficiency Standards by at least 10% 8 Plate and frame heat exchanger 9 Automated staging of multiple chillers Air Conditioners and Heat Pumps 10 Must exceed applicable Title 24 Energy Efficiency Standards by at least 10% 11 Evaporative pre cooled condensers on all Rooftop Package Units over 20 tons in Climate Zones 11 15 where applicable 12 Avoid direct evaporative cooling Approved August 2 2002State of California Page 4 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed|1010|ITEM 1K INCLUDED IN DESIGN9 IF "No", INDICATE REASON(S) Yes No Distribution Systems 13 Leak repair Use mastic or UL approved sealant for air distribution system (1998 CMC Section 601 604 & std 6 3) Cloth backed tape shall not be used Duct leakage shall be 3% or less at 25 Pascal for both supply and return ducts (ASHRAE std 152P) 14 Variable speed pumping on chilled and hot water loops over 300 GPM (Variable speed on either primary or secondary is acceptable) Ventilation 15 Carbon monoxide (CO) controlled exhaust ventilation for enclosed garage applications 16 Demand control variable exhaust ventilation with CO 2 sensors on units serving spaces with at least 100 people and where the occupant density is intermittent I 17 Constant air volume conversion to variable air volume (subject to health standard requirements/outside air) LIGI4TING' g..., ., _ General 18 Power density (watts/s f) for office spaces greater than 250 square feet must be lower than the applicable Title 24 Energy Efficiency Standards by at least 10% 19 Exit lights Input rating of 5 watts or less per illuminated face 20 Light colored interior finishes Fluorescent 21 Linear fluorescent lamps Minimum system efficacy of 76 lumens per watt Demand Control Ventilation is defined in Title 24 Energy Efficiency Standards Section 121 (c) 3 & 4 Approved August 2 2002State of California Page 5 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed ITEM INCLUDED IN DESIGN? It : IF "NO", INDICATE REASON(S) Yes No 22 Compact fluorescent systems Minimum system efficacy of 50 lumens per watt Daylighting 23 Shading systems to reduce solar glare utilize daylighting and minimize solar heat gain 24 Building orientation aspects for utilization of daylighting and minimizing solar heat gain °fait WA - el/RES kv, . Point Use Controls 25 365 day digital time clocks with battery backup 26 Programmable thermostats 27 Occupancy sensors for lights in spaces with intermittent use Energy Management System 28 Energy Management System (EMS) — include programming commissioning and training to optimize energy usage Envelope 29 Windows with metal frames shall have a thermal break or use non metal frames 30 Increase roof wall and floor insulation so that it exceeds applicable Title 24 Energy Efficiency Standards by at least 10% where feasible 31 Except in Climate Zone 1 for low slope and flat roofs use cool roofing materials on the Energy Star Cool Roofs list that meet either of the following requirements a) an initial reflectivity of at least 65% (ability to reflect sunlight) and an emissivity of at least 80% (ability to shed heat) or b) a minimum solar reflectance index (SRI) of 75% (calculated using ASTM E 1980 for moderate wind conditions) Miscellaneous 32 Energy Star equipment and appliances 33 Gas appliances Approved August 2 2002State of California Page 6 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed ITEM INCLUDED DESIGN9 IF "No", INDICATE REASON(S) IN Yes No 34 Variable frequency drive fume hood interlocked with sash operation (in laboratories 35 To be completed by designer Tar2et interior design temperatures shall be M degrees for cooling and degrees for heatin • 36 Investigate existing financial incentive programs such as utility sponsored programs (e g Savings by Design) rebates etc LIST 671: 1ER EirEW6VEFM -61ENOMEAgUifi g iNCEUT)E75 IV DESIGATTHAt WEET WI 'I ek7fd14 'It 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Approved August 2 2002State of California Page 7 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed ITEM INCLUDED IN DESIGN? IF "Yes", SEE EXHIBIT C - E 3 Yes No SPACE COaDITIONING AND VENTILATION|1010|Boiler NOx emissions 9 ppm NOx at 3% 02 for commercial and institutional gas fired boilers in areas where air quality minimums are higher 2 Heat recovery from chillers 3 Variable speed chillers 4 Ground source and/or Geo thermal heat pumps LIal4TING k,|1010|Indirect lighting options 6 Skylights and/or solar tubes with lighting controls 7 Full cutoff luminaires for exterior lighting ' OTHER MEASURES Controls 8 CO2 monitors for high occupancy areas exceeding one person per 10 ft2 Maintain a maximum CO2 concentration of 800 ppm as per Title 24 Energy Management System 9 Real time energy metering I Load Shifting or Shedding 10 Thermal energy storage for facilities on time of use rates with chillers 11 Building load cycling — remote metering and controls for demand responsiveness 12 Install control options that allow the building energy using systems to shed load (onsite) 13 On demand water heaters Energy Sources 14 Cogeneration/generation systems consider for facilities that have constant year round electrical and thermal loads 15 Utility distribution upgrades 16 Passive solar space & water heating 17 Photovoltaics 18 Other renewable energy Approved August 2 2002State of California Page 8 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by PI-oject Director Date Completed ITEM INCLUDED IN DESIGN? MN IC x,‘ ft IF "Yes", SEE EXHIBIT C - E 3 Yes No Miscellaneous 19 Substation purchase and rate change 20 Electrical supply and account aggregation 21 Performance verification Whole building and indoor air quality commissioning Alternative Transportation 22 Provide suitable means for securing bicycles with convenient changing/shower facilities for cyclists for 5% or more of building occupants (Also see State Administrative Manual section 4189) 23 Install alternative fuel refueling station(s) for 3% of the total vehicle parking capacity of the site (includes zero emission vehicles) Liquid or gaseous fueling facilities must be separately ventilated or located outdoors , LIST OTHER ENERGY EFFICIENCY MEASURES Waled) Iti DISIGWTHAT Add TIER 2 akITERIA l': 24 25 26 27 28 29 30 31 32 33 34 35 DESIGk ADVISORIES FOR CONSIDERATJOM BY DESIGNER 1 Distribution systems Reduced headloss and/or friction designs for water pipes and air ducts 2 Energy Management Systems and other controls Sequence equipment operation to minimize demand charges Approved August 2 2002 I alState of California Page 9 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed ITEM -', .a. c-, 1 _ IF "No", INDICATE REASON(S) (Designer to fill in blanks as applicable)|1010|INCLUDED IN DESIGN? Yes No WATER ',,az _ TY7''''' 4 • Landsca . in •/Exterior|1010|Dedicated, State-owned sub meter(s) for landscape water budgeting and leak detection|1010|Performance Goal Design and install landscapes at no more than 80 percent of ETo (reference evapotranspiration) Local . ermits not re•wred Landscape is designed for c/o of ETo (reference evapotranspiration)|1010|Landscape and ornamental water use conform to local Water Efficient Landscape Ordinance Local iermits not re•uired|1010|Irrigation systems for water efficiency include hydrozones high distribution uniformity and zero runoff Local •ermits not re uired 5 Appropriate plant selection and placement (considering mature plant size and building locations desi•ri b h drozones|1010|Specify urban or locally derived compost and mulch in landsca • e areas 7 Automatic irrigation controllers programmed in coordination with local historical evapotranspiration records Local •errmts not re• Limed Interior|1010|Ultra low flush toilets and low flush urinals 1 6 gal per flush toilets 1 gal per flush urinals or as required by local ordinance Local •ermits not re•uired 9 Lavatory faucets not to exceed 0 5 gallons per minute and use laminar flow restnctors to retrofit old fixture 10 Automatic shut off lavatory faucets 11 Showerheads using 1 5 gallons per minute or as required by local ordinance Local ermits not re uired Approved August 2 2002 IxyState of California Page 10 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed . • -,' ITEM - • . INCLUDED IN DESIGN9 , IF "No", INDICATE REASON(S) (Designer to fill in blanks as applicable) YES NO 12 Insulated water pipes between hot water sue el and faucets 13 Water and energy efficient clothes washers Ener• Star or better 14 Automatic shutoff nozzles on hoses for maintenance and dishwashing 15 Use water softener only where needed such as water heater feed water Kitchens 16 Recycle dishwasher final rinse water to ire wash c cle 17 Install manual controls on garbage disposal water so it does not run when not bein • used 18 Spray rinses at sinks should have manual control dead man" shut off 19 Install low flow pre rinse nozzles 20 Use appropriate nozzles to direct rinse and cleanine sera s accuratel Coolin • Towers 21 Control cooling tower to bleed off water (sump filters etc ) and make up water with conductivity meters or other water quality measurement MATERIALS Desi • n Features 22 Provide for dedicated space in and outside building for the collection storage and loading of recyclable materials per Public Resources Code Section 42924 (c) Check for local ordinance about recycling s•ace Rec clin • 23 Construction waste recycling plan/program 50% or better diversion of demolition and construction materials from landfills Specified requirement for diversion of materials from landfills is % Approved August 2 2002State of California Page 11 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed • ',W... V . ', :r .1. I' 5.7er ,.77-7.1! ITEM ffillt.. INCLUDED IN DESIGN? t ' If IF "No", INDICATE REASON(S) (Designer to fill in blanks as applicable) PC = postconsumer content2 PI = postindustrial content3 Yes No Materials Selection for Materials Efficiency4 and Indoor Environmental Quality 24 Specified products can be maintained with non toxic cleaning products (i e cleaning /maintenance products on DGS Environmentally Preferred Products list) 25 Aggregate base Class II recycled content recycled and reused onsite % PC % PI 26 Wheel stops recycled content % PC % Pi 27 Steel and aluminum products with high recycled content % PC % PI 28 Pressed wood products low formaldehyde emitting 29 Partitions low VOC emitting and refurbished or bio harvested renewable material content % PC % PI 30 Thermal and acoustical insulation zero or low formaldehyde emissions 31 Acoustical ceiling tiles calculated formaldehyde building concentrations from acoustical ceiling tiles should not exceed current statewide ambient levels (4 0 ug/m3) low VOC (other than formaldehyde) emitting recycled content or bio harvested renewable material content % PC % PI 32 Carpet and carpet padding low VOC emitting recycled or refurbished content % PC % PP 33 Latex paint interior applications low or zero VOC zero formaldehyde water based paints 34 Latex paint reprocessed latex paint made from post consumer paint (Exterior applications or non enclosed spaces when medium grade is acceptable) % PC % PI|1010|Postconsumer (PC) material that has been previously used by consumers and is then recycled|1010|Postindustrial (PI) material fragments or by products of the manufacturing process that are then recycled|1010|To qualify as a recycled content product under the State Agency Buy Recycled Campaign (SABRC) a product must have a minimum of 50% recycled content 10% postconsumer except tire denved products which must have 50% postconsumer content and steel which must have 25% recycled content For a product to count toward the recycled content requirements for both LEED" and SABRC seek at least 20% postconsumer content except tire derived products which must have 50% postconsumer content for SABRC Approved August 2 2002State of California Page 12 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed i i 1,, "' • , i , 1:,q nn - '.1- I t A ' . .-, it - IF "No", INDICATE REASON(S) (Designer to fill in blanks as applicable) PC = postconsumer content5 PI = postindustrial content° • '. cii.i...- INCLUDED IN DESIGN? ITEM Yes No 35 Wall panel fabrics with recycled content % PC % PI 36 Floor tiles low VOC emitting and refurbished or No harvested renewable material content % PC % PI 37 Sealants (including concrete sealers) adhesives finishes coatings and fireproofing that are low VOC ernittin e INDOOR ENVIRONMENTAL QuAlitYf Des'. n Features 38 Ventilation Operable windows (consider for smaller buildines 39 Locate outside air intakes upwind and away >25 feet from sources of contamination 40 Provide local exhaust ventilation to areas where indoor air pollutant build up could be a eroblem such as cosier rooms shoes etc 41 Installed exterior duct work other than that for dedicated exhaust systems shall be protected from the weather by an architectural weathertight cover/enclosure that maintains duct access for maintenance/re • air 42 Specify high efficiency filters (at least 85% accordin e to ASHRAE Standard 52 1 1992 43 Use exterior wrap for duct installation 44 Avoid interior insulation in ducts unless required for acoustical attenuation Consider non fibrous liners in areas where insulation is required for acoustical attenuation Use matenals that do not eromote mold erowth 45 Provide convenient maintenance accessibility to all HVAC components including critical areas of the ductwork 46 Specify proper slope for condensate pans to avoid accumulation of standin e water 5 Postconsumer (PC) material that has been previously used by consumers and is then recycled 6 Postindustrial (Fl) material fragments or by products of the manufacturing process that are then recycled Approved August 2 2002State of California Page 13 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed I= ' L t'_-i 1 - ,_,...... .:,.. 9, I , - I , ITEM ,. . m b L. 0 i L . D k , i k -0 INCLUDED IN IF "No", INDICATE REASON(S) DESIGN? (Designer to fill in blanks as applicable) Yes No Materials Selection See Materials Selection section in MATERIALS Construction Practices 47 Specify to remove all debris and oily residue from air ducts after manufacturing and 'nor to installation 48 Specify that all openings in duct work shall be covered and sealed during trans•ortation stora.e and installation 49 Specify moisture content testing of concrete floors prior to installation of new flooring to verify compliance with flooring manufacturer reouirements Installation Practices 50 Specify that the contractor sequence installation of finishing materials to avoid absorption of VOCs by porous materials such as carpets fabrics insulation spray on fires roofin. materials etc 51 Specify outside air ventilation is required during application of wet systems in the building to reduce absorption by porous materials 52 Specify to flush out buildings continuously at maximum feasible outdoor airflow rates for 30 days or as many days as possible before occupancy Install new filtration media after completion of flush out Length of flush out can be adjusted based on building air sampling (Building bake outs are not advised ) Number of da s s ecified for flush out prior to occupancy = LIST OTHER SUSTAINABLE BUILDING MEASURES INCLUDED IN DESIGN THAT MEET TIER 1 CRITERIA 53 54 55 56 57 58 59 60 Approved August 2 2002State of California Page 14 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed t ITEM INCLUDED IN DESIGN? IF "Yes", SEE EXHIBIT C - E 3 Yes No WATER ), w Recycling 1 Recycled water used in landscaping toilet flushing or cooling towers 2 On site water treatment and reuse Landscaping/Exterior 3 Rain shut-off device 4 Diagnostic circuitry to notify user when a station is shorted or a power failure has occurred 5 Pool covers 6 Site irrigation using reclaimed (recycled) water 7 Use of evapotranspiration based irrigation controllers that are regularly updated electronically through an automated management system Interior 8 Exceed water efficient standards for plumbing fixtures and fittings within code 9 Vacuum aided toilets 10 Dual flush toilets which allow user to select one of two different quantities of water (low rise buildings) 11 No water' urinals Kitchens 12 High efficiency dishwashers 13 Connectionless food steamers instead of steam generator Space Conditioning and Distribution 14 Evaluate closed loop cooling systems Storm Water 15 On site rainwater collection systems for stormwater control and non potable water uses 16 Filtering storm water runoff via holding ponds and natural wetlands 17 Green roof 18 Storm water filters and debris separators Approved August 2 2002State of California Page 15 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed , . L L ) A e . — r" N V • , ITEM j ',Al , RO iilLEk1. IF "Yes", SEE EXHIBIT C - E 3 (Designer to fill in blanks as applicable) PC = postconsumer content' PI = postindustrial content8 3TLJA 1. INCLUDED IN DESIGN? Yes No MATERIALS Rec clin 'Meuse 19 Construction waste recycling plan/program 75% or better diversion of demolition and construction materials from landfills Specified required diversion of materials from landfills is % 20 Reuse large portions of existing structures durin. renovation or rehabilitation ero ects Materials Selection for Materials Efficienc ' and Indoor Environmental Quali 21 Agreement that manufacturer will take product back at end of its useful life (e g care et ceilin• tile etc Products with take back agreement 22 HCFC free and CFC-free chillers 23 Specify building materials manufactured within 500 mile radius of sr° ect site 24 Rubberized asphalt concrete % PC % PI 25 Aggregate base with recycled content % PC % PI 26 Porous paving (also consider recycled % PC % PI content 27 Outdoor benches or furnishings made with % PC % PI rec cled content elastic lumber 28 Playground surfaces made from tire derived materials % PC % PI 29 Corrugated plastic drainpipe % PC % PI 30 Concrete containing high volume of fly ash or other eozzolanic material % PC % PI 31 Stained concrete floor slab as alternate to floor coverin I, 32 Mineral oxide pigments 33 Zero VOC form release agents 7 Postconsumer (PC) material that has been previously used by consumers and is then recycled a Postindustrial (PI) material fragments or by products of the manufacturing process that are then recycled 9 To qualify as a recycled content product under the State Agency Buy Recycled Campaign (SABRC) a product must have a minimum of 50% recycled content 10% postconsumer except tire denved products which must have 50% postconsumer content and steel which must have 25% recycled content For a product to count toward the recycled content requirements for both LEEDim and SABRC seek at least 20% postconsumer content except tire derived products which must have 50% postconsumer content for SABRC Approved August 2 2002State of California Page 16 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed - -- - — ITEM - INCLUDED IN DESIGN? IF "Yes", SEE EXHIBIT C- E 3 (Designer to fill in blanks as applicable) PC = postconsumer contentl° PI = postindustrial content" Yes No 34 Reuse salvaged brick and/or stone 35 Formaldehyde free Medium Density Fiberboard MDF 36 Toilet partitions Solid plastic model made with eost consumer HDPE . lastic % PC % PI 37 Light transmitting panels 38 Pre finished panels recycled content % PC % PI 39 Use of polyethylene plastic piping in lieu of PVC own. 40 Use of certified sustainable wood products in accordance with the Forest Stewardship Council 41 Roofing materials containing recycled rubber or other rec cled content materials % PC % PI 42 Fiberglass batt insulation formaldehyde free 30% recycled content or Blow in/sprayed cellulose or cotton batt insulation formaldehyde free 85% recycled content % PC % PI 43 Acoustical ceiling tile High performance formaldehyde free more than 75% recycled content % PC % PI 44 Carpet tiles instead of roll carpeting low VOC % PC % PI emitting 45 Wood flooring made from salvaged wood 46 Resilient flooring low emitting bamboo cork natural linoleum tire derived or other recycled content or ref id renewable floonne material % PC % PI Life expectancy (yrs ) 47 Ceramic tile at least 10% postconsumer % PC % P1 .lass 48 Signage Recycled content % PC % PI 49 Auditorium seating refurbished _____% PC _% PI 50 Entry Mats with recycled content —% PC °hi P1 ____ io Postconsumer (PC) material that has been previously used by consumers and is then recycled Postindustrial (PI) material fragments or by products of the manufacturing process that are then recycled Approved August 2 2002State of California Page 17 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Project # Project Phase Project Title Completed by Project Director Date Completed .1. L) :. 1,n P I ., n i ' ' ' i P4, -r: ITEM -|1010|I ') I INCLUDED IN DESIGN? e k "0 .L: J! 7 i '.!: ,l', MI, g. UTF.0 IF "Yes", SEE EXHIBIT C - E 3 (Designer to fill in blanks as applicable) PC = postconsumer contentu PI = postindustrial content13 Yes No 51 List all other products not previously addressed in Materials section included in design that have recycled content or contain rapidly renewable materials % PC % PI b _% PC % PI Ell d _% PC % PI _% PC % PI WM Ell _% PC % PI % PC % PI gm tall % PC % PI _% PC % P I IRE Ilia INDOOR _% PC °/0 P I ____% PC _ oh p 1 ENVIRONMENTAL QUALITY Des'. n Features 52 Built in entry way mats with drop pans and ade•uate drains to catch dirt off shoes 53 Consider design to accommodate future needs such as space for equipment and conduits to facilitate technology upgrades alternative uses for spaces higher occu• anc and facilit ex•ansion etc 54 Provide a separate minimum outdoor airflow measuring station for each HVAC system to ensure that design minimum outdoor airflow is supplied under all o•eratin • conditions LIST OTHER SUSTAINABLE BUILDING MEASURES INCLUDED IN DESIGN, (EXCEPT THOSE LISTED IN #51), THAT MEET TIER 2 CRITERIA - ro 55 56 57 58 59 60 61 12 Postconsumer (PC) material that has been previously used by consumers and is then recycled 13 Postindustrial (PI) material fragments or by products of the manufacturing process that are then recycled Approved August 2 2002State of California Page 18 of 18 Exhibit C — Tiers Real Estate Services Division Tier 1 and Tier 2 Energy Efficiency and Sustainable Building Measures Checklists July 1, 2002 Resources (for informational purposes only) Reference Specifications for Energy and Resource Efficiency a sample specification prepared under the auspices of the California Energy Commission Public Interest Energy Research (PIER) 2001 downloadable at http //www elev corn/specs/index htm See segtion 1350 for materials and installation practices Matnx Overview of Recycled Content Levels and Product Availability by the California Integrated Waste Management Board 2001, provides examples of recycled content products used on other California construction projects and has information on availability http //www ciwmb ca qov/GreenBuildinq/Matenals/Matrix htm LEED Supplement for California State Facilities based on US Green Building Council LEED 2 0 http //www ciwmb ca qovkireenbuildinq/Desion/LEEDforCA doc http //www usqbc orq/LEED/LEED main asp Sustainable Building Tool Kit http //www ciwmb ca gov/oreenbuildingiToolkit htm Tier 1 A New Energy Standard for State Buildings prepared by Eley Associates for the California Energy Commission March 2000 This document provides context for the Energy Efficiency Items Approved August 2 2002`±- Meet tl 'SGBC - Programs Page -1- of 4 why build green? 0. who we are programs I. member list OUT sponsoiS committees I. management boaid members jobs Programs LEED® Green Building Rating S).stein Developed by the USGBC membership, the Leadership in Energy and Environmental Design (LEED) Green Building Rating System is a national consensus-based, market-dnven building rating system designed to accelerate the development and implementation of green building practices In short, it is a leading-edge system for designing, constructing and certifying the world s greenest and best buildings The full program offers training workshops, professional accreditation, resource support and third-party certification of building performance LEED for New Construction and Major Renovations (LEED-NC), was launched in March 2000 following review by the entire USGBC membership and a national pilot testing program LEED- NC is designed for rating new and existing commercial and institutional buildings LEED for Existing Buildings (LEED-EB), was launched in November 2004 following ballot approval by the entire USGBC membership and a national pilot testing program LEED-EB is designed for rating the operations, maintenance and systems retrofits of buildings LEED for Commercial Intenors (LEED-CI) was launched in November 2004 following ballot approval by the entire USGBC membership and a national pilot testing program LEED-CI is designed for rating tenant improvement projects Detailed information about building certification and resources is available on the LEED Fromepae See below for information about I,EED development committees Outi each GreenbuddMeet the USGBC - Meet the USGBC Page 1 of 2 t k 1, why build green9 1 1' who we are programs member list M' our sponsors 0. committees ). management bow d members lb, jobs Meet the USGBC Mission Statement The U S Green Building Council is the nation's foremost coalition of leaders from across the building mdustry working to promote buildings that are environmentally responsible, profitable and healthy places to live and work What is the U S Green Building Council' • The U S Green Building Council (USGBC) is leading a national consensus for producmg a new generation of buildings that deliver high performance inside and out • Council members work together to develop LEED ® products and resources&, the Gieenbuild annual International Conference and Expo, policy guidance, and educational and marketing tools that support the adoption of sustainable building • Members also forge strategic alliances with key industry and research organizations and federal, state and local government agencies to transform the built environment Council programs are Committee-Based, Member-Dn‘.in and ( on ,nmis Focuso.I As the leading organization representing the entire industry on environmental building matters, our unique perspective and collective power provides our members with enormous opportunity to effect change in the way buildingsMeet ay. ' TSGBC - Meet the USGBC Page__&ot 2 are designed, built and maintained Who We Are" Meet Board Members Meet the Management Team A ti Contact I Pnvacy Policy I Terms and Conditions I Search I Site Index VW Copyright (c) 2003 U S Green Buildmg Council All Rights Reserved„.„ LEED-NC Version 2 1 Registered Project Checklist << enter project name >> << enter city state, other details >> Yes No Prereq 1 Erosion & Sedimentation Control Credit 1 Site Selection Credit 2 Development Density Credit 3 Brownfield Redevelopment Credit 4 1 Alternative Transportation Public Transportation Access Credit 4 2 Alternative Transportation Bicycle Storage & Changing Rooms Credit 4 3 Alternative Transportation Alternative Fuel Vehicles Credit 44 Alternative Transportation Parking Capacity and Carpooling Credit 5 1 Reduced Site Disturbance Protect or Restore Open Space Credit 5 2 Reduced Site Disturbance Development Footprint Credit 6 1 Stormwater Management Rate and Quantity Credit 6 2 Stormwater Management Treatment Credit 7 1 Landscape & Exterior Design to Reduce Heat Islands Non Roof Credit 7 2 Landscape & Exterior Design to Reduce Heat Islands Roof Credit 8 Light Pollution Reduction Required|10101010101010101010|Yes ? No E—T—ReFIF I Credit 1 1 Water Efficient Landscaping Reduce by 50% Credit 1 2 Water Efficient Landscaping No Potable Use or No Irrigation Credit 2 Innovative Wastewater Technologies Credit 3 1 Water Use Reduction 20% Reduction Credit 3 2 Water Use Reduction 30% Reduction Yes 9 No "tl:rrAl Prereq 1 Fundamental Building Systems Commissioning Prereq 2 Minimum Energy Performance Prereq 3 CFC Reduction in HVAC&R Equipment Credit 1 Optimize Energy Performance Credit 2 1 Renewable Energy 5% Credit 2 2 Renewable Energy 10% Credit 2 3 Renewable Energy 20% Credit 3 Additional Commissioning Credit 4 Ozone Depletion Credit 5 Measurement & Verification Credit 6 Green Power Required Required Required 1 to 10|10101010|continuedYes ? No nvirconIlle . le • •• . ;Prri Yes ? No Yes / No Yes ? No Prereq 1 Storage & Collection of Recyclables Credit 11 Building Reuse Maintain 75% of Existing Shell Credit 1 2 Building Reuse Maintain 100% of Shell Credit 1 3 Building Reuse Maintain 100% Shell & 50% Non Shell Credit 2 1 Construction Waste Management Divert 50% Credit 2 2 Construction Waste Management Divert 75% Credit 3 1 Resource Reuse Specify 5% Credit 3 2 Resource Reuse Specify 10% Credit 4 1 Recycled Content Specify 5% (post consumer + 1/ 2 post industrial) Credit 4 2 Recycled Content Specify 10% (post consumer + 1/ 2 post industrial) Credit 5 1 Local/Regional Materials 20% Manufactured Locally Credit 5 2 Local/Regional Materials of 20% Above 50% Harvested Locally Credit 6 Rapidly Renewable Materials Credit 7 Certified Wood Required|1010101010101010101010101010|Required Required|10101010101010101010101010101010|Prereq 1 Minimum IAQ Performance Prereq 2 Environmental Tobacco Smoke (ETS) Control Credit 1 Carbon Dioxide (CO2 ) Monitoring Credit 2 Ventilation Effectiveness Credit 3 1 Construction IAQ Management Plan During Construction Credit 3 2 Construction IAQ Management Plan Before Occupancy Credit 4 1 Low Emitting Materials Adhesives & Sealants Credit 4 2 Low Emitting Materials Paints Credit 43 Low Emitting Materials Carpet Credit 4 4 Low Emitting Materials Composite Wood & Agnfiber Credit 5 Indoor Chemical & Pollutant Source Control Credit 6 1 Controllability of Systems Perimeter Credit 6 2 Controllability of Systems Non Perimeter Credit 7 1 Thermal Comfort Comply with ASHRAE 55 1992 Credit 7 2 Thermal Comfort Permanent Monitoring System Credit 8 1 Daylight & Views Daylight 75% of Spaces Credit 8 2 Daylight & Views Views for 90% of Spaces j.....42415aaama. .vj oi Credit 11 Innovation in Design Provide Specific Title Credit 1 2 Innovation in Design Provide Specific Title Credit 1 3 Innovation in Design Provide Specific Title Credit 1 4 Innovation in Design Provide Specific Title Credit 2 LEEDTM Accredited Professional • r 9 Points Certified 26 32 points Silver 33 38 points Gold 39 51 points Platinum 52 69 pointsPhg 1 of 2 Santa Monica Green Building Program Santa Monica Green Building Program Consei ve toila \ , pi esen e tomon ov|1010|I Home v,),„-atts: New . I '1")[,,clo Atiu=zu r Eneruy Coirip11_111.Lu Guluu14113z.z. in PDF Cul 4.40 UE, Sae, Map Santa Monica Green Building Program The City of Santa Monica has a commitment to protecting the environment improving quality of life and promoting sustainability In order to fulfill this commitment the City has adopted a set of requirements and recommendations to encourage the development of green buildings without forcing excessive costs or other burdens upon developers building owners or occupants The City has also developed Green Building Guidelines to explain possible ways of achieving green building goals This site contains information both on what you must do and what you might consider doing in order to achieve Santa Monica s standards of excellence in green building design and construction For information on green techniques in general and strategies for both Required and Suggested practices see the Green Building Design and Construction Guidelines link The Introduction to the Guidelines contains background information on Santa Monica s Green Building Program as well as explanations of the green building design process For information on city requirements for all building projects in Santa Monica see the Green Building Program Requirements Search Help Advanced lloGreen Building ReQuirements Guidelines Case Studies Additional Resources Site MapSanta Monica Green Building Program conserve toda), preserve tomorrow Hume Des,gri Advisor nergy Co7ripl Cit_ocleVria$ PDF . I Ccrita .LI Us sa.8 C ntentu Suggested Practices Siting & Form Envelope & Space Planning Electrical Systems Construction Management Landscape Materials HVAC Systems Commissioning Transportation Water Systems Control Systems Search Help Advanced Green Budding Requirements Guidelines Introduction Acknowledgements What is a Green Building? VVhy Green Design? Green_Design Process Green Design Strategies Performance Ordinances Using these Guidelines Required Practices FlioSuggested Practrces Siting and_Forni Landscape Transportation Envelope and Space Planning Materials Water Systems Electrical Systems Suggested Practices Environment Ease of Use Benefits Capital Cost Siting & Form SF1 - Use Narrow Floor v'' V V V ./ v d V V vo $$ Plates for Access to Daylight Views & Natural Cooling SF2 - Locate & Orient the Building to Control Solar Cooling Loads V v. w 4 wNo 0 $ SF3 - Locate & Orient the vrwo vo 141 V t/ 4 $ Building for Passive Solar Heat in Winter SF4 - Shape Orient the Building for Exposure to V V V d ,. V gi V 4 $ $HVAC Systems Control Systems Construction Management Commissioning Appendices Case Studies Additional Resources Site Map|1010|J._ Prevailing Winds SF5 - Shape the Building vv.' wo v vv" $$ to Induce Buoyancy Airflow Into & Out of Interior Spaces SF6 - Shape the Building for Solar Energy Collection wfv, yo Vd 11 YOr $$ Landscape LA1 - Locate Landscaping V4 Mf VIVW. V.400 $ & Landscape Structures to Shade Buildings LA2 - Use Landscape wo kor vv. kr si If $ Design to Modify VVind Patterns & Enhance Building Ventilation LA3 - Apply Environmental vv,i0 ievy0 'iv $ Landscape Design Principals LA4 - Incorporate Areas for Urban Agriculture & Rooftop/Balcony Gardens vv, v v No Ike $$ LA5 - Provide Shelter & wfv, vo wry, vo ., wr $ Habitat for Urban Wildlife Through Landscape Design LA6 - Provide On-Site Composting Facilities vo 4 # vv. V V vi $ LA7 - Use Recycled v./ vv.," vvvo $|1010|Landscape Products & Materials Transportation TR1 - Match the Area & wov vo %, k# n0 10 $ Type of Paved Surfaces to their useTR2 - Create a Safe & Comfortable Environment for Pedestrians vo krr vo ti v 's' wo $ 11R3 - Provide Changing Rooms Lockers & Showers for Cyclists & Joggers vo 4.1, 0 V 4,0 V $ TR4 -. Place Automobile V 1.1 v0 vo $$ Parking Fully or Partially Underground TR5 - Share Parking Between Occupancies in Mixed-Use Projects V V 0%.0 $ TR6 - Provide Convenient tio v v V $ Parking & Charging Facilities for Electnc Vehicles Envelop EN1 - Design Windows to wfv,w0 •., vf V V 4, $$ Maximize Daylighting & Views EN2 - Shade Windows Dunng Cooling Periods to, to, 0 %of 4, v $$ EN 3 - Use Roof Monitors for Daylighting Upper Floors *IV V V V V V v d $$ EN4 - Design Windows to Maximize Natural Ventilation .0 if %, if o w $$$ EN5 - Shape & Plan the v kf v., ... V0 4+ $$ Interior to Enhance Daylight & Natural Airflow Distribution EN6 - Incorporate Thermal Mass Into Building Structure 4.0 4f 0 he s' s' 4.1 $ Ih h F-6) -|1010|EN7 - Select Light Colors for Exterior Finishes 00 0.0 %.40 0 0 $ . Matenals MA1 - Restore & Incorporate Portions or Entire Existing Buildings in New Designs wfv. 0 V 00 $$ MA2 - Specify Reuse of Salvaged Building & Landscape Materials 00 0 V 00 $ MA3 - Design with Panel Precut & Engineered Construction Products to Minimize Waste 0 4.0 .0.0 0 0 $ MA4 - Specify Durable vv, 0 v# w V $$$ Exterior & Interior Finishes MA5 - Design Interior 0 v vo wf J%.# $$ Building Components for Future Disassembly Reuse & Recycling MA6 - Specify Wood from 0 0 46 40 'di %iv 0 $ Sustainably Managed Sources MA7 - Use Low-Emission 000 o v 0 v $$ Finishes & Interior Materials to Reduce Indoor & Environmental Pollution Water Systems WS1 - Specify & Install 00 'dl vvv $$$ Water- & Energy- Conserving Appliances WS2 - Reuse Graywater for Outdoor Landscaping Irrigation 0 0 0 0 V $$WS3 - Collect Rainwater for Outdoor Landscaping Irrigation v, v 0 0.00 0 $ WS4 - Select High- Efficiency Service Hot Water Heaters & Boilers 0 v ''d V - $$ WS5 - Install Heat- Ii v." v v $ Recovery Systems on Wastewater Plumbing WS6 - Use Solar 000 0 to 00 $$ Collectors for Service Hot Water Heating Electrical Systems ES1 - Select Electrical uf ... vo ,,,,00 00 $$$ Equipment for Reduced Energy Demand & Consumption ES2 - Select Lighting Equipment for Reduced Energy Demand & Consumption ... v. 0 0 0 vv 0 $ ES3 - Integrate Daylighting 0 wir %iv vv,0 $$ & Electric Lighting in Task Oriented Spaces for Productivity & Comfort ES4 - Integrate Daylighting v 0 0 v v v v $ & Electnc Lighting in Task- Oriented Spaces for Productivity & Comfort E85 - Maximize Impact in Sales Area with Efficient Lighting Strategies v, vi 0 v .. vv. vo $ ES6 - Integrate Daylighting & Electnc Light in High- Bay Manufacturing & Color-Critical Areas v.00 v.., 0 0 ut $$ES7 - Incorporate Photovoltaic Electricity Systems into the Building Fabric .t 1 4.0 0 V° 0 we $$$ ES8 - Provide for Future v te V +I 4i0 vol $ Electric Vehicle Charging Stations HVAC Systems HS1 - Eliminate of t/ 4 V V V. gif *I 41 $1.$ Mechanical System Sources of Indoor Air Pollution HS2 - Isolate & Exhaust v v too vvv vtvv $S Indoor Point Sources of Air Pollution HS3 - Separate Outdoor Intakes from Air Pollutant Sources V V V V 4, vrv vo $ HS4 - Provide for v4 ve v• v., 4 4, 40, is $ Additional Outdoor Air Supply Quantities in the Future 1-155 - Filter or Treat Ventilation Air Supplies V %, v, vo $ HS6 - Provide Effective Ventilation Air Distnbution V %I1 V i, $$ HS7 - Reduce or Eliminate the Use of CFCs & HCFCs in Cooling Equipment V V v 4 *, V ,k1 v $ HS8 - Select High- %IVO V w" 41 'v + +. 0 $$ Efficiency Heating & Cooling Equipment to Reduce Energy Consumption & DemandControl Systems CS1 - Use Digital Electronic Control of Lighting & HVAC Systems for Energy & Demand Savings vv,0 oie , v $$ CS2 - Incorporate Daylighting Controls in Architecturally Daylit spaces v v. .00 voke v.," $$ CS3 - Incorporate vvvi wf v v n V $$ Occupancy Controls in Zones with Intermittent Use CS4 - Use Variable-Speed Motor Controllers for Fans & Pumps with Modulating Flows out o v 4 u• o o $$ CS5 - Cool Building Mass wf v %do v, v. 'dl S. at Night for Energy & Demand Savings I I Construction Management CM1 - Crush Waste vv., vv./ vd $ Concrete & Masonry for Reuse CM2 - Use Material- V v...00 vus. $ Conserving Construction Practices CM3 - Select Safe Materials for Use On-Site vik• ov vike $$ CM4 - Use Integrated Pest Management (IPM) to Minimize Pesticide Use in Construction vvo vo $$ CM5 - Use Energy-Efficient ISite Lighting & Controls & Low-Pollution Equipment V we v., 0 v v $$ CM6 - Isolate Construction in Occupied Buildings to Protect Occupants V' t, +1 wo V V V $ CM7 - Schedule Potential Air-Polluting Operations to Reduce Occupant & Worker Exposure 4 kr vo uf .,", o $$ CM8 - Flush with Full v v v v V $$ Outdoor Air for Seven Days Prior to Occupancy to Protect Occupants CM9 - Thoroughly Clean V utv4 vo V 0 0 $ Interiors Building Cavities & HVAC Systems Prior to Furniture Installation & Occupancy Commissionin • CO1 - Prepare & Follow a V./ +.4 use '# ue vo vo $$ Formal Commissioning Plan CO2 - Pretest & Functionally Test All Equipment to be Commissioned & Correct Deficiencies %rv. uf .40 40 vo $ CO3 - Provide Operation & Maintenance Training for Staff V' t/ 0 *I V V V V $$ C04 - Provide a Complete Final Commissioning Report to the Owner & Building Management v v v v v ., $Santa Monica Green Building Program Conserve toda3 peserl e tomorrow Wnat';.; Haw I 0 -cin I Fnergy Cornpkine, Ci 612,1 ne6 CLnt, c1 L} I Situ tv1.-ip Contents Search Required Practices Siting & Form Landscape EnvelopQ& Space Planning Materials Construction Management Transportation Water Systems Help Advanced Green Building Requirements Guidelines Introduction Acknowledgements What is a Green Building2_ Why Green Design? Green Design Process Green Design Strategies Performance Ordinances Using these Guidelines *Required Practices Suggested Practices Siting and Form Landscape — Transportation Envelope and Space Planning Materials Water Systems Required Practices Environment Ease of Use Benefits Capital Cost Siting & Form SFa - (SMMC 7 10 050) .," vo o vv." vvy# $$ Submit an Urban Runoff Mitigation Plan to the Engineering Division Landscape Environment Ease of Use Benefits Capital Cost LAa - (SMMC 7 10 050) wfvoN, v v vo *0 $ Minimize stormwater runoff to impermeable areas LAb - (SMMC 7 16 020) v ...0 0 wr "4.0 v v wo $ Specify & Install Water- Efficient Irrigation SystemsElectrical Systems HVAC Systems Control Systems Construction Management Commissioning Appendices Case Studies Additional Resources Site Map J._ LAc - (SMMC 7 16 020) v n./ V $ Restrict the Use of Water Features & Fountains Transportation Environment Ease of Use Benefits Capital Cost TRa - (SMMC 520 080(c) (2)_) Install Clarifiers or Oil/Water Separators on Drains from Service Bays & Parking Areas vv 0 v v v V $ TRb - (SMMC 904 10 08 0501Provide Secure & Accessible Bicycle Storage for Visitors & Occupants v v 0 vv, vv., $ TRc - (SMMC vv" vv., v v v $ 904 10 08 050) Provide Facilities for Shared Vehicle Transportation Envelope Environment Ease of Use Benefits Capital Cost ENa - (SMMC 904 10 02 v v V vv./ vv 0 $ 150-151) Provide Space for Recycled Material Storage & Handling Systems Materials MAa - (SMMC 7 60) Require Recycling of Demolition & Construction Waste in Construction Contracts v v yo v v 0 V $ MAb - (SMMC 8 108 050) Specify Recycled Productsper EPA purchasing guidelines vv. v v.- v yo V V V Water Systems Environment Ease of Use Benefits Capital Cost WSa - (SMMC 7 18 070) I, V $ Specify & Install Water- Conserving Plumbing Fixtures & Fittings WSb - (SMMC 8 108 060) V V 4 V V V V $$ Reduce Hot Water Heat Loss with Insulation & Heat Traps WSc - (SMMC 8 108 060) v v 0 V V vl° V V YO Heat Swimming Pools & Preheat Process Hot Water with Unglazed Solar Collectors WSd - (SMMC 520 080Lc) V NO V V so 40 V (1)) Eliminate Lint from Sanitary Sewers in Professional Cleaning Facilities WSe - (SMMC 5 20 080(c) vf n l v f V' v J V (1) & (c)(4)) Eliminate Grease from Sanitary Sewers in Food Preparation & Meat Retailing Facilities WSf - (SMMC 520 080(cl V v. 0 V V ki V (5)) Eliminate Silver from Sanitary Sewers in Photo- Finishing Facilities Construction Environment Ease of Use Benefits Capital Cost Management CMa - (SMMC 7_60) Prepare a Demolition &Site Protection Plan • I ' v. vi V vo n 40 V' V uo $ CMb - (SMMC 7 60) Salvage Reusable Materials & Separate Recyclables from Demolition (Recommended as part of Demolition and Site Protection Plan Not Required) vv.," vf vo vs, vivo vo $ CMc - (SMMC 760) ,,,,,ovo vvvo • ... v o $ Inventory Mark & Protect Topsoil Trees & Vegetation to be Retained (Recommended as part of Demolition and Site Protection Plan Not Required) CMd - (SMMC 7 10 060) %ivy+ vhbo 4.00 V +.0 +.4. $ Prepare a Stormwater Control Program for the Construction Site CMe - (SMMC 760) v.", wr*,,, %/vv.' $ Recycle Construction Waste & Designate a Site Waste-Management Person CMf - (_MMC 5 08 150(b), w f V 4 4. gef g • 0 41 we %," wo $ 7 10 040) Provide Safe Storage Worker Training & Spill Cleanup Procedures for Hazardous Materials Energy Requirements Environment Ease of Use Benefits Capital Cost SMMC 8 108 Improved vv. wo vv, v, v vo $ energy performance above California Title 24requirements Legend Environment how well a Practice addresses environmental health and resource conservation issues Low 'frd Moderate '' 'I High 1 " P4 (Slightly beneficial Beneficial Best practice) Ease of Use how easily a given Practice can be implemented in design and construction Low Moderate High "4" (Easy Moderate Difficult) Benefits benefits of a Practice besides reduced environmental health or resource impacts e g social and livability benefits of pedestrian amenities Low 4° Moderate High 41%/ '1 (Slightly beneficial Beneficial, Best practice) Capital Cost the effect of a Practice on total construction cost relative to current Southern California practice Low 1*" Moderate High `i' (Low cost Moderate cost High cost)Id \— ,—'1" / V (...) Caett02, CITY BUILDING SAFETY DIVISION Potential Green Building Model for City Construction Note program illustrates a LEED Gold Standard New buildings What types of All new City buildings projects the program would apply to Estimated annual 1 to 2 1 to 2 number of buildings the program would apply to Major Remodels All major remodels (project cost over 50% of the value of the existing structure) Example project square footage Estimated average building cost per project Estimated average cost increase for a 20% energy efficiency increase (4% cost increase over base building) Estimated annual energy consumed per base building Estimated annual energy cost per base building Estimated annual energy savings with a 20% efficiency increase (per project) Estimated annual carbon emission reduction with a 10% energy efficiency increase (per project) 8 000 sq ft $1 304 000 ($163/ sq ft ) $52 160 (construction cost increase LEED certified consultant cost and commissioning cost) 680 800 000 btu s (85 100 btu s/ sq ft ) $9 680 ($1 21/ sq ft ) 136 160 000 btu s $1 936 3 tons ( 1 ton of coal= 24 000 000 btu s= 53 ton carbon emissions) 8 000 sq ft $720 000 ($90/ sq ft ) $28 800 680 800 000 btu s (85 100 btu s/ sq ft ) $9 680 ($1 21/ sq ft) 136 160 000 btu s $1 936 3 tons $0 (costs would be borne by) eactLCIty_nrsiiect) Estimated one time cost to the City to set u n_s u_c h_a_prog ram • Estimated annual cost to the City general fund to continue such a program $26k (if the City builds one 8 000 s f building every other year) -tre. SqCaetteit, CI TY BUILDING SAFETY DIVISION Potential Green Building Model for Private Construction Note program illustrates a 10% energy improvement Multifamily buildings Commercial buildings What types of projects the program would apply to Estimated annual number of buildings the program would apply to Estimated average square footage per project Estimated average building cost per project Estimated average cost increase for a 10% energy efficiency increase (2% cost increase over base building) Estimated annual energy consumed per base building Estimated annual energy cost per base building Estimated annual energy savings with a 10% efficiency increase (per project) Estimated carbon emission reduction with a 10% energy efficiency increase (per project) Estimated one time cost to the City to set lip_QI Ich a program. Estimated annual cost to the City general fund to continue such a program All new multifamily buildings with three units or greater 1 to 3 8 000 sq ft (+ garages) ( 4 unit building) $1 120 000 ($140/ sq ft ) $22 400 373 600 000 btu s (46 700 btu s/ sq ft ) $6 080 ($ 76/ sq ft ) 37 360 000 btu s $608 825 tons ( 1 ton of coal= 24 000 000 btu s= 53 ton carbon emissions) $50k (consultant) drism=maz=r1.,r_ $120k (one contract/ permanent plan reviewer/ inspector) All new commercial buildings 1 to 3 4 000 sq ft $652 000 ($163/ sq ft ) $13 040 340 400 000 btu s (85 100 btu s/ sq ft ) $4 840 ($1 21/ sq ft) 34 040 000 btu s $484 751 tons (Note all Green Building plan reviews and construction tn wan! ii integrated with all existing City permitting processes)rev feb 06 tg T -a P a -6 U) ET a a FA .) 4E-|1010|u a a a - E|1010|a |910|ul listed dc disconnect installed per NEC —1/2 emt w/ conductors per manufacturer's reccomendations solar photovoltaic panels mounted per manuf 's recommendations 1 kilowatt min capacity 1/2" emt w/ conductors per manufacturers reccomendations ul listed inverter with capacity to match solar panels note panel configuration may vary due to roof geometry note all roof equipment must be screened from the street consult the Culver City Planning Div note this diagram is illustrative only consult electrical engineer and/ or equipment manufacturers recommendations manufacturers installation instructions and/ or system designers plans & spec s are required to be on site at time of City inspection all work shall be performed by qualified personnel|1010| building electrical panel(s) install per NEC typical min 1 kilowatt solar photovoltaic gnd-intertie system diagram CiliWi I. CITY BUILDING SAFETY DIVISION I .61