RECOMMENDATION:
Staff recommends the City Council (“Council”) determine that demolition and
asbestos abatement of the two apartment buildings at 12811 and 12813 Washington
Boulevard be deemed to be “of urgent necessity for the preservation life, health or
property” pursuant to Section 1304 of the Culver City Charter; and to award a
contract for asbestos abatement and demolition of the aforesaid properties to Viking
Equipment Corporation for a cost of $58,400.
BACKGROUND:
The Culver City Redevelopment Agency (“Agency”) owns all of the properties on the
north side of the block of Washington Boulevard from Meier Street to Moore Street.
These properties were acquired for the purpose of eliminating blight in the area. The
new use proposed for this block by Urban Equity Partners is 12 live/work units plus
12 loft housing units. The Agency will be required to deliver a cleared site to Urban
Equity Partners under the terms of the Disposition and Development Agreement now
being drafted. Towards this end, on October 24, 2005, the Council awarded a
contract to Marcor Remediation, Inc., for the demolition of the Baldwin Motel at
12823 Washington Boulevard. The work was completed the following month.
The structures that remain on the block are two four-unit apartment buildings (12811
and 12813 Washington Boulevard) and one multi-tenant commercial building 12803-
Meeting Date: 2/21/06 Item Number: J-1
AGENDA ITEM:
Joint City Council/Redevelopment Agency Consideration to Waive Advertising
For Bids and the Public Hearing and to Award a Tri-Party Contract to Viking
Equipment Corporation for Asbestos Abatement and Building and Site Demolition
of the Properties at 12811 and 12813 Washington Boulevard.
Contact Person/Dept.: John Fisanotti
(CDD/Redev) / Andy O' Connell (PW)
Phone Number: (310) 253-5767
(310) 253-5606
Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X]
Public Hearing: [] Action Item: [X] Attachments: [X]
Public Notification:
All proposing companies were notified by mail on February 9, 2006. Master Notification
List (02/15/06)
Department Approval:
Charles Herbertson (02/01/06)
Susan Evans (02/01/06)
CAO Approval:
Martin R. Cole for Jerry B. Fulwood
(02/15/06)
City Controller Approval:
Marlee Chang (02/13/06)City of Culver City, California
City Council Agenda Item Report
07 Washington Boulevard). At about 3:30 am on January 22, 2006, a fire broke out
in Apartment D at 12811 Washington Boulevard. The building had tenants
occupying Apartments B and D. The tenants in A and C had been previously
relocated. Fortunately everyone got out safely during the fire. The building was
damaged and has been red-tagged by the City’s Building Official. The fire damaged
building has been boarded up and fenced as a precaution. The fire damaged
building represents an obvious hazard that should be demolished as soon as
possible. The adjoining apartment at 12813 Washington Boulevard was not
damaged by fire. Although much of this building is boarded up, staff has had to
remove homeless people from the site and there are at least three locations actively
used by the homeless. This too represents a health and safety hazard, including a
further risk of fire.
DISCUSSION:
The apartment that burned was purchased by the Agency 11 days prior to the fire,
and an asbestos survey of the building had not occurred yet. In contrast, the
apartment at 12813 Washington Boulevard was purchased on March 2, 2005. It has
been sampled for asbestos and the report was made available to the proposing
contractors. The proposing contractors will also be responsible for the proper
abatement of the asbestos containing material. To achieve an economy of scale
when obtaining proposals, and to eliminate health and safety hazards, staff is
recommending that the demolition project encompass both buildings.
Because of the urgent, emergency nature of the work, staff obtained proposals
without preparing a formal bid package or advertising for bids. Staff walked the site
with four abatement and demolition companies (including the three which bid on the
Baldwin Motel demolition last October) to assess the work to be done. Staff solicited
four proposals in an attempt to obtain a competitive price.
Asbestos abatement in 12813 Washington Boulevard will be pursuant to the
previously completed asbestos survey. Asbestos abatement in the fire damaged
building at 12811 will be pursuant to SCAQMD approved Procedure Five plan, to be
prepared by CTL Environmental. CTL Environmental is the consultant hired by the
Agency to monitor the abatement of the asbestos such as during the demolition of
the Baldwin Motel. CTL Environmental will again be providing abatement monitoring
services and, in the case of the fire damaged apartment, will conduct a sampling
survey, write the Procedure Five plan for abatement of asbestos containing
materials within the building, and submit the plan to SCAQMD for approval.
The results of the proposals are shown on the following page.City of Culver City, California
City Council Agenda Item Report
Name of Firm Cost Proposal
1. Viking Equipment
Corporation, of Glendale, CA
$58,400
2. TEG/LVI Environmental, Inc. of
Santa Fe Springs, CA
$82,091
3. Marcor Remediation, of
Cerritos, California
$86,598
4. K.G. Mullen, Inc. of Culver
City, CA
$136,941
Staff recommends the Council award a contract to Viking Equipment Corporation,
in the amount of $58,400 for the abatement and demolition services as the lowest
and most responsive cost proposal and also recommends that staff have
authorization to approve change orders for unforeseen conditions not to exceed an
additional $15,000. Unforeseen conditions are common when demolishing
structures because subsurface infrastructure in particular is difficult to identify
beforehand. Also, in this instance, the final asbestos abatement process for the
fire damaged building was not available to all proposing companies prior to
submitting proposals.
The work is expected to commence within ten days of contract award and be
completed within approximately 15 working days. Construction management will
be performed by the Public Works Department and CTL Environmental will monitor
the abatement process under an administratively approved contract.
The City and Agency are authorized by the Community Redevelopment Law to
cooperate in carrying out the Agency’s activities. Pursuant to Article XIII, Section
1304, of the City Charter, if four fifths of the City Council deems the work to be of
urgent necessity for the preservation of life, health or property, the contract may be
awarded without complying with the bidding procedures, including advertising and
a public hearing, which otherwise would apply. Given the situation with the red-
tagged, fire damaged building and the break-ins by homeless at the other building,
staff recommends the Council make this determination. As part of the City’s
ongoing cooperation with the Agency to assist with the redevelopment of the
community, staff recommends the Agency and City enter into a three-party
agreement with Viking Equipment Corporation for the asbestos abatement and
demolition of the above described structures. Pursuant to that agreement, the City
will manage the contract and the Agency will pay for the contractor’s satisfactory
services.City of Culver City, California
City Council Agenda Item Report
FISCAL ANALYSIS:
The cost of a contract with the proposed bidder is $58,400. There is a balance of
$114,979.00 presently available in account number 55392630.710150 (Baldwin
Motel Block – Demolition of Structures) to provide for this expense.
ATTACHMENTS:
1. Copies of the four proposals received
MOTION:
That the City Council:
Four fifths (4/5) vote needed:
1. Determine that the work is of urgent necessity for the preservation of life,
health or property, and that the contract may be awarded without advertising
for bids or conducting a public hearing,
Majority vote needed:
2. Award a tri-party contract to Viking Equipment Corporation in the amount of
$58,400 for the demolition and asbestos abatement of the buildings and site
improvements at 12811 and 12813 Washington Boulevard;
3. Authorize the Public Works Director/City Engineer to negotiate any change
orders at a total not-to-exceed amount of $15,000; and
4. Direct the City Attorney to prepare the necessary documents and authorize
the Chief Administrative Officer to execute the documents.
That the Culver City Redevelopment Agency:
1. Authorize the Assistant Executive Director to execute a tri-party contract with
Viking Equipment Corporation; and
2. Authorize payments to the contractor pursuant to the agreement plus any
change orders approved by the Public Works Director/City Engineer not to
exceed $15,000.
MEETING DATE 02/21 '06
AGENDA ITEM Joint City Council/Redevelopment Agency Consideration to
Waive Advertising For Bids and the Public Hearing and to Award a Tn-Party
Contract to Viking Equipment Corporation for Asbestos Abatement and Building
and Site Demolition of the Properties at 12811 and 12813 Washington
Boulevard
ATTACHMENTS
Pages|109| Copies of the four proposals received 1-14A.
Jan 25 2006
Viking Equipment Corp.
DEMOLITION CONTRACTORS
NATIONAL
DEMOLITION DEMOLITION
ASSOCIATION
,.. .„, ..._
P 0 BOX 251257 GLENDALE CALIFORNIA 91225 1257
(818) 500 9447 FAX (818) 500 9630
State License No C21 310852
www vilungdemo corn
JOHN FISANOTTI
City of culver city
Dear John
Enclosed is our demolition and asbestos removal proposal for the two buildings on
Washington blvd Based on conventional asbestos removal procedures
If the decision is made to remove under procedure 5 the additional cost will be $7 500
This is based on getting approval from the AQMD to demolish the buildings, pick out the
visible asbestos and dispose of the remaining debris as construction debris
Thank you for the opportunity to bid on this project
I —
—
1Viking Equipment Corp.
DEMOLITION CONTRACTORS
P0 BOX 251257 GLENDALE CALIFORNIA 91225 1257
(818) 500 9447 FAX (818) 500 9630
State License No C 21 310852
WWW vilangdemo corn
ILNATIONAL
VDEMOL/T/ON
ASSOCIATION
PROPOSAL AND CONTRACT
JOHN FISANOTTI
PROPOSAL 13136
TO CULVER CITY, CITY OF
DATE 01/25/06
9770 CULVER BLVD
PHONE 310/253-5767
CULVER CITY, CA 90232
FAX 310/253-5779
JOB DESCRIPTION
JOB ADDRESS WASHINGTON BLVD, 12811-12813, CULVER CITY,
The undersigned agrees to furnish and provide necessary labor,
materials, and to perform and complete in a good workmanlike
manner the following
1 REMOVAL AND DISPOSAL OF ALL ASBESTOS CONTAINING
MATERIALS AS LISTED ON SURVEY DATED 2 MAKE ALL APPLICABLE NOTIFICATIONS AS REQUIRED BY LAW
3 PROVIDE ALL ISOLATION MATERIALS, SAFETY EQUIPMENT,
LABOR AND DISPOSAL
IT
4 CLEAN ALL VISIBLE ASBESTOS CONTAINING DEBRIS FROM THE
WORK APEA COVERED BY THIS CONTRACT
5 ENCAPSULATE, WET WIPE AND HEPA VACUUM ENTIRE WORK AREA
AFTER REMOVAL AS APPLICABLE
6 PROVIDE AIR MONITORING BEFORE, DURING AND AFTER
dl i n •
An HAZARDOUb maLerials, propeicy line fercing, dna work
on public property IS EXCLUDED unless specifically listed above
In the event an action is brought to enforce any of the terms
of this agreement, the prevailing party shall be entitled to
reasonable attorney's fees
All work to be completed for the sum of $ 50900 00
TERMS of payment are 100% ON COMPLETION
This price quotation good for 45-Days
Respectfully submitted
PAGE # 1 CONTINUED ON PAGE # 2
REMOVAL OPERATIONS
CT S I _ sa DAP pQbr
TAL
•
t.
8 FINAL CLEARANCE LEVERL TO BE 01 OR BETTER
9 REMOVAL AND DISPOSAL OF BUILDINGS, CONCRETE, TREES,
SHRUBS AND DEBRIS OBTAIN ALL NECESSARY DEMOLITION
PERMITS CAP SEWERLit 1
-e orp!Al
ACCEPaANCE
BERGE
Viking Equipment Corp.
DEMOLITION CONTRACTORS
P 0 BOX 251257 GLENDALE CALIFORNIA 91225 1257
(818) 500 9447 FAX (818) 500 9630
State License No C 21 310852
wWW vilungdemo corn
ANNATIONAL
V A DEMOLITION
ASSOCIATION
PROPOSAL AND CONTRACT
PAGE # 2 CONTINUED FROM PAGE # 1
PR POSAL 1'I36 FOR JOB ADDRESS WASHINGTON BLVD, 12811-12813
You are hereby authorized to complete the work as described
in the above proposal for which I/we agree to pay the amount
as mentioned in the above proposal and in accordance with the
terms as indicated above
SIGNED DATE CONST LENDER
NAME OF PROPERTY OWNER/S
ADDRESS01 / 31 / 2E105 1 ='• 59 5624070571 TEG/LVI PAGE 01/05
TEGAVI
eNvinommenn SERVICES INC
January 31, 2006
Via FAX [310] 253-5779
Telephone [310] 253-5767
John Fisanotti
Culver City
Redevelopment Agency
9770 Culver Boulevard
SUBJECT Asbestos Abatement & Demolition Proposal
12811 & 12813 Washington Boulevard
Proposal Number [A06-016] Revised 1/31/06
Dear Mr Fisanotti
TEG/LVI Environmental Services, Inc. is pleased to present this proposal for asbestos
abatement and demolition at the above referenced location. This proposal has been prepared in
accordance with Executive Environmental Services Corporation dated September 6 2005
SCOPE OF WORK
12813 Washington
The scope of the work includes the removal and disposal of the identified asbestos tnatenals on
the survey and also the demolition of building, slabs, footings, trees and site improvements,
remok e debns from site The work will be performed as described on CTL Enviromuental
Services sqe letter dated January 27, 2006
12811 Washington
The scope of work includes the remok al of the fire damaged building The building will be
removed under a Procedure 5 All debris will be disposed of as asbestos debns
PROCEDURES
Mobilization The mobilization phase will commence upon receipt of a Notice to Proceed
Mobilization includes
Agency Notification This regulatory notification includes submission of properly
executed notification forms and fees to applicable agencies Typically, 10 working days
notification is required
Hazardous Remediation & Demolition Services
13320 CambnJgP Street Santa Fe Spnngs CA 90670 (562) 407 05-10
C Mail LA@LVISSPVICES COM Website WW‘As LV15ERVICES COM
- FAX (552) 407 0571
State Lic 4174335101 /31/ 2006 13 59 5624070971
TEG/LVI
PAGE
02/05
12811
a. 12813 Washington
A.B06 016 ReviKed
1/31/06
Page 2 of 5
Staging of Supplies and Waste Dumpster Supplies will be staged in a neat and orderly
manner and will be coordinated with the designated Owner's Representative Dumpster
will be located as close as possible to the designated waste egress, and coordinated with
the Owner's Representative
Preparation
Non-Friable Materials
All openings will be sealed with one layer of 6-mil polyethylene and splash guards vkill be
installed up to 4 feet high. A two-stage dry type decontamination unit will be utilized
Negatts, e Air Filtration Units will be set up within the containment, exhausted directly to the
outside of the facility to filter the air and create a pressure differential beta een the
containment and the outside area At a minimum, the units %Ill supply one air change mere
fifteen (15) minutes
Removal All asbestos material will be remoNed utilizing wet methods Material will be wetted
utilizing an amended v ater solution, remmed from the substrate in manageable sections and
placed into properly labeled 6-mil polyethylene bags These will then be closed, rinsed and
double bagged for removal from the work area.
Cleaning Following removal, the substrate will be detail cleaned This involves the removal of
residual material from the substrate utilizing hand-brushing and wet-wiping the surface Detail
cleaning will continue until all visual residue has been rerricoyed
Visual Inspection Following cleaning, a visual inspection will be made by a TEG/LVI
representative and the Owner's Representatn e Alter approval, the surfaces will be sprayed with
a liquid encapsulant to lock down any residual fibers
Clearance Clearance air monitoring will be performed by owner s independent air sampling
professional
Transportation and Disposal All asbestos materials remmed from the site will be bagged and
properly labeled prior to being placed into a sealed disposal bin for transport to an authorized
disposal site The .% aste material will be manifested prior to removal from the project site and
signed for by an authorized representatne of the Owner Asbestos-containing material will be
removed from the site by a licensed and certified hazardous waste hauler and properly placed into
an EPA approved landfill
Special Note Before TEG/LVI can place durnpsters on the job site, we must have the Owners
EPA Generator Number and their Excise Tax 11) Number01 /31/2006 13 59 5624070571
TEG/LvI
PAGE 03/ 05
12811 4E4 12813 Waslungton
ABO6 016
1131/06
Page 3 of 5
Worker Protection
Personal Air Monitoring Personal air samplmg is conducted during renovation or
abatement projects to determine employees' exposure (outside any respirator) to airborne
fibers Representative, daily personal monitoring during abatement projects is required
by OSHA Asbestos Standard (29 CFR 1926 1101) and TEG/LVI s work policy
Moreover, every TEGrLVI worker shall have the right to know the asbestos
coocentranons to which they are exposed and what measures are being taken to protect
them Results of personal air sampling shall be used to select proper respiratory
protection for the abatement worker Data from personal au monitoring can used as an
indication of effective removal engineering techniques which result in the lowest
employee exposure
Employee Protection For this project, workers will utilize half-face protection Higher
levels of protection will be unheed if necessary based upon sampling levels
Additionally, all personnel on site will be required to wear proper protective clothing,
including hooded Tyvek suits, gloves and boots
Decontamination All personnel working within a contaminated space will be required
to decontaminate prior to exiting via a personnel decontamination unit The
decontamination unit is a three chamber passage consisting of a contaminated changing
room shower and a clean mom All water generated from the unit will be filtered prior to
being discharged to a sanitary system
SCHEDULE
Work la, Ili proceed 10 working days following submission of notification to regulatory agencies
Work will be substantially complete within approximately 9 working days
HEALTH AND SAFETY TEG/LV I employs a full time Director of Health and Safety who
is responsible for dea elopmg implementing and enforcing our quality assurance program
INSURANCE AND BONDING
TEG/LVI carries standard General Liability Insurance in the amount of $2 million per
occurrence, $5 million general aggregate and a $20 million umbrella with Commerce and
Industry Company an A10 Company, Best Rated 43,-H-15 Bonds are provided at owner's
account by National Union Fire Insurance Company of Pittsburgh, Best Rated A-H-1501./
W2006 13 59 5624070571
TEG/LVI
PAGE 04/05
12811 & 12813 Washington
ABM-016
1/31/06
Page 4 of 5
ATTORNEI 'S FEES
If a dispute arises relating to the performance of the services covered under this agreement, and
legal or other costs are incurred it is agreed that the prevailing party shall be entitled to recovery
of all reasonable costs incurred in the prosecution or defense of a claim including staff time at
current billing rates, court costs, attorney a fees and other claim related expenses
TERMS 4.M) CONDITIONS
Inclusions
All salvage is the property of TEGLVI Environmental Sex-laces, Inc
Exclusions The following is specifically excluded from this work
My asbestos outside the Scope of Work as defined herein
Removal of any other hazardous material whether contaminated with asbestos or not
Replacement of fixtures or funnture moved to access asbestos
Replacement of any asbestos materials removed whether asbestos materials or not, unless
specifically noted otherwise in the Scope of Work
Damages to surfaces caused by installation of containment or removal procedures
Adherence to Specifications or Procedures submitted to TEG/LVI after proposal
submission
Re-strapping or re-hanging of any items to meet code, or any other code upgrades
Costs or conditions caused by delays by others beyond TEG/LVI's control
Inaccessible asbestos
Costs for added work caused by hidden obstruction caused by floors, walls slabs or
ceilings not shown on drawings
Cify waste hauling franchise fee, Taxes/Surcharges for waste disposal at landfill sites use
of franchise haulers, sidewalk control and protection, dewatermg, SWPP, site secuntv,
staking and layout, diseon.nect, excavation of footings below 3 feet, back fill, sand bags
Performance and/or Payment Bonds 2re
Union labor or overtime costs, unless specifically noted o/ c() ( tti 6_e_
Floor Tile
More than one layer of tile
Damages to or removal of leveling compounds
Tile concealed below carpet
RA( A-
I 6/de c/01'31/2006 13 59
5624070571
TEG/Ur I
PAGE 05/05
12811 & 12813 Washington
A1306-016
/131/05
Page 5 of 5
Unforeseen grooves or other conditions that prohibit the use of "bead-blastmg" or
chemical removal of mastic
Damages to substrate caused by "bead-blasting", including re leveling substrate,
or to wood substrates
Owner/Agent ResponsKbilthes The Owner or his designated agent is responsible for providing
to TEG/LVI the following
Water power (including assistance to hook up temporary power) and HVAC lockout
Staging areas for equipment and dumpsters (dock access)
Access to the work area
Sanitary facilities
Parking for work force
Removal of trash or tenant items, leaving tlac area "broom clean", prior to mobilization
Designate those items to be left or saN, ad prior to TEG/LVI mobilization
TERMS OF PAYMENT
Payment will be progressive, net 30 days upon substantial completion Substantial completion is
defined as complete visual removal of asbestos materials and acinet . ernent air clearance
PRICING
For the scope of work as specified herein $79,700 00 -{ S"), Oq(
Thank you for this opportunity to submit our proposal on this project If you have any questions
or require any additional information, please do not hesitate to contact me at 562-407-0570
Respectfully Submitted,
TEG/LVT Environmental Services, Inc.
9ose Arany°
Account Manager/Estimator!I P :1;r; I
MARCOR Remediation, Inc
16027 Carmenita Rd
Cemtos, CA 90703
800-237-6271
Fax 562-921-2383
FAX COVER SHEET
Please Deliver The Forthcoming Pages a
k of Name )
/;2 AM I/
Firm/Department 644," e .44 162,440t6t17/1110A.4
Fax Machine Number 2
From ZYt, leo'hiert)
/ "la Date
Transmission Includes Page (s) - Including this cover sheet.
If you do nor receive all the pages indicated above please call (562) 921-2733
*** ** sew • SWAPS ****** • *S
MARCOR RernazGabon, Ina aims supenor turnkey environmental contracting services with a complete
range of setwces (or any sae project such as
Asbestosaead Abatement
Decommissioning & Demolition
Gun Range Rentedlation
IndoorAlr QualltylDuct Cleaning
Industdal Cleaning & Vacuuming
Emergency Spill Response
Hazaidous Waste Management
Groundwater & Soil Remecffation
Building Dry Down/Mold
Comments end/or Special Instructions
"Confidentiality Nonce"*".'••••
The documents accompanying this telecopy transmission contain confidential information belonging to the sender which is legally
privileged The information is intended only far the use of the indhridual or entity named above If you are not the intended recipient
you are hereby notified that any disclosures copying distribution or the taking of any action in reliance on the contents of this
telecopied information is strictly prohibited It you have received this telecopy In error please Immediately notify us by the telephone
to arrange For the return of onginal documents to us.
Austin DC *Atlanta, GA` Eialtimore MD Boston MA-
Cerritos, ce Norfolk, VA Philadelphia PA* Rochester NY' Salisbury MD
Dublin CA
ci
Z/ 30Vd criV170 14 90 SZ tor `eeez Z6Z9S ONI 1:1001:1VM AS 11'Via fax 1-310 263 6779
362 921 2731
567 991 7'483 (FAX}
BOO 237 6271
www =icor corn
MARCOR Rernschation Inc
16027 Carmel-lira Road
Cerritos CA 90703 2208
MARCOR Remediation Inc
Agreed to this day of 2005
(signature)
(Title)
Mr John Fisanotti
Culver City Redevelopment Agency
9770 Culver Boulevard
Culver City Ca 90232
Re Asbestos Abatement & Demolition Proposal
Vacant Apartment Buildings
12511 12813 Washington Boulevard
Culver City CA 90232
MARCOR Proposal # IOG 056 Rev 1
Dear Mr Fisanoth
Thank you ror allowing MARCOR RernediatIon Inc (MARCOR) to submit a proposal for the above mentioned project We
look forward to working with you on this and future projects
The Scope of Work includes
Asbestos abatement and Lot Clearing at 12811 12813 Washington Boulevard Demolition is to include all
buildings trees block walls sidewalks asphalt it alley footings and the pre demolition removal of all asbestos
containing matenais as Identified in the building survey by Executive Environmental Services Corporation dated
September 8 2005 including the following I) 375 sq ft 9x9 tile and mastic apartment A 2 ) 150 Eq ft 9x9 tile tile
and mastic Apart. A 3 ) 80 Eq ft Linoleum ( Friable ) Apart A e ) 80 sq ft. Linoleum Apart B S ) 160sq ft 0x9 Tile
and mastic Apart B 6 ) 80 sq ft 9E9 tile and Mils& Apart B 400 sq rt Linoleum Aparts s C and D 7 ) Exterior
Stucco and Drywall faint Compound in the apartment buildings contain leas than 1% asbestos and will be
demolished with the buildings B ) 80 lin ft window putty in unit C 9 ) 80 sq ft roof penetration mastic Pricing
Includes the identical materials listed as being located in both buildings and that the rrietteiale Will be removed
prior to budding demolition under a Procedure S work plan Final pncing would be based on the contents and
procedures prescribed in said Procedure 5
MARCOR will isolate the work area from etl -joining areas by installing critical barriers at all openings and covering walls arid
horizontal surfecce with polyethylene sheeting as required The work Brea will br Plat-Cd uncle, rtagahva pressure Of
required) to prevent contamination of adjacent arcae Wails will be removed in manageable sections using wet methods
and properly packaged for disposal/treatment at an EPA approvori I-mall/recycling facility MARCOR will require acce--s to
electrical power and potable Water for worker decontamination/clean up as rcouircd by CaUOSNA Air Monitoring Of
MARCOR proposes to complete this project In 10 eight hour shifts for the once of $136 598 00 /Ls
Assumptions/conditions
Mutually agreeable contract terms & conditions of MARCOR s Standard Proposal/Environmental Micas Agreement
Reaching mutually agreeable contract terms with both our etistornor and vendor(s)
This proposal includret Prevailing Wage Rates
This proposal excludes work on Public Properly
This proposal assumes no demolition lower than three (3) foot below exisUng grade
The Scope of Work and site conditions as we understand them at time of bid
The cost and availability of resources remaining consistent from time of bid through the completion of the project
Our proposal is valid for de days
Please do not hesitate to contact me at (562) 921 2733 if you have any qucetions or require addittenul infoimation
Respectfully Submitted ACCEPTANCE
t
ASLitSTOS LFAD MOLD PCBs Tams HA7WAS1E COATINCS Snii
GEOUNfMNATER DEC OMMISSIONING DEW.) DI,A0TERS
30Vd '11VV0 90 SZ Nvr 'E8SZI.Z6Z9S ONI 'NOUVI031131:1 UO3UVIN A9 VOctober 3, 2005 Page 1 of 4
Rsanoth, John
From Sammy [Sammy@sti motorsports corn]
Sent Tuesday January 24 2006 6 18 PM
To Asanotti John
Subject Demo Proposal SAmmy doc
Here is the demo bid for washington
please call if any question
thanks sammy 310 901 8080
1,0.111111N INC
CA License #650730
5895 Washington Blvd
Culver City ca 90232
(310)901 8080
January 24, 2006
Mr John L Fisanotti
Culver City Public Works
9770 Culver Boulevard
Culver City, CA 90232
RE DEMOLITION OF APARTMENT BUILDING WITH GARAGES
12811-12813 WASHINGTON BLVD
CULVER CITY, CA
Dear Mr Fisanotti
K G Mullen, Inc is pleased to present our proposal for Demolition at the above reference location Our prop(
been prepared in accordance with today's tour
SCOPE OF WORK
The scope of work includes
1) All asbestos materials shall be removed by a certified asbestos removal contractor Remove all t
material including all framing, utilities, finishes, foundations, etc 2) Cap all utilities at the property line 3) Al
boxes or meters shall remain, which shall be marked clearly 4) Remove all sidewalks, landscaping, uncle]
utilities, etc Cap all utilities at the property line
Removal and proper disposal of the following materials 1) 650 sq ft of roof mastic 2) 200sq ft 9x9 ti
mastic in room 101 3) 60sq ft of Brown Linoleum and mastic in room 109 4) Tran site pipe at roof 15 liner ft
sq ft 9x9 tile only in room 108 6) 145 sq ft Tile only in room 104 7) 220 sq ft tile only in room 105 8) 605 s(
only in Apt A 9) 290 sq ft of tile only in Apt B 10) 400sq ft linoleum in units C & D kitchens and baths
01/25/2006
I(October 3, 2005 Page 2 of 4
liner Ft window putty 12) 50sq ft penetration mastic on roof 13) 4500 sq ft of exterior stucco this contains 1(
1% asbestos
Removal and proper disposal of the following materials 1) 375 sq ft of floor tile and associated mastic
sq ft of brown floor tile and associated mastic, 3) 80 sq ft of orange linoleum, 4) 1180 sq ft of light brown linol,
80 sq ft of green linoleum and brown floor tile and associated mastic under linoleum, 6) 150 sq ft of white an
floor tile and associated mastic, 7) 60 sq ft of speckled floor tile and associated mastic, 8) 400 sq ft of brown
linoleum, 9) 1600 sq ft of 1 ceiling tile and associated mastic, 10) 4,500 sq ft of exterior stucco, 11) 160 sq
ceiling tile and associated mastic, 12) 6,000 asphalt roof shingles This bid includes the removal and disposa
exterior stucco as non-hazardous construction debris At the completion of the removal process K G Mullen,
remove all site improvements per the plans and specifications
MOBILIZTION PROCEDURES
Mobilization will commence upon receipt of acceptance to this proposal of issuance of Notice to Proce(
regulatory notification includes submission of properly executed notification forms and fees to applicable ag
Typically, 10 working days notification is required Supplies will be staged in a neat and orderly manner and
coordinated with the designated Owner's Representative Dumpster will be located as close as possible
designated waste egress and coordinated with the Owner's Representative
SCHEDULE
Work will proceed 10 working days following submission of notification to regulatory agencies Work
substantially complete within approximately 15 working days A detailed schedule, showing task sequence and
dates will be submitted upon request
HEALTH AND SAFETY
K G Mullen, Inc employs a full time Director of Health and Safety who is responsible for developing, impler
and enforcing our quality assurance program
GOVERNING REGULATIONS,
All work performed by K G Mullen, inc, Inc will be in accordance with written procedures, and all applicabb
rules and regulations In conducting our research, we have collaborated with governmental regulatory a
including the U S Occupational Safety and health Administration (OSHA), the State of California Departr
Health Services (DOHS), the California Department of Industrial Relations Division of Occupational Safety and
(Cal/OSHA) and the National Institute of Occupational Safety and Health (NIOSH) Our work procedures are p
documented and performed in compliance with the following regulations and specifications
Code of Federal Regulations (CFR Publications
29 CFR 1910 134— Respiratory Protection
29 CFR 1910 145 — Specifications for Accident Prevention — Signs and Tags
29 CFR 1910 1001 Asbestos
40 CFR 61 Subpart A — General Provisions
40 CFR 61 Subpart B — National Emission Standards for Hazardous Air Pollutants (NESHAP)
California Code of Regulations ((CCR)
Title 8
8 CCR 341 6 to 341 15
8 CCR 1529
American National Institute (ANSI) Publications
ZP 279 — Fundamentals Governing the Design and Operation of Local Exhaust Systems
ZP 280 — Practices for Respiratory Protection
American Society for Testing and Materials (ASTM)
Nation Institute of Occupational Safety and Health (NIOSH) 77 173
Occupational Exposure Sampling Strategy Manual
South Coast Air Quality Management District (SCAQMD) Rule 1403
01/25/2006
I 2-October 3, 2005 Page 3 of 4
INSURANCE AND BONDING,
K G Mullen, Inc carries standard General Liability insurance in the amount of $1 million per occurrence/$2
aggregate with EMC Insurance Company, Best Rated A+15, K G Mullen, Inc is capable of obtaining an umbre
EMC Insurance Company at coverage amounts of either $10 million or $20 million if required ( at additional co
TERMS AND CONDITIONS
INCLUSIONS
• All equipment, scaffolding, cranes, required to complete the scope of work
• All salvage is the property of K G Mullen, Inc
• Notifications/fees to SCAQMD and CA/OSHA
• All misc concrete slabs and footings to 3 ft — 0" below grade
• Pricing is valid for 60 days
EXCLUSIONS
The following is specifically excluded from this work
• Any Hazardous Materials,
• Removal of any other hazardous material except as noted in scope of work,
• Replacement of any materials removed unless specified in the scope of work
• This proposal excludes work on public property
• This proposal excludes demolition of items beyond three (3) foot below existing grade except a
above
• Minor damages to surfaces caused by installation of containment or removal procedures
• Adherence to Specifications/Procedures submitted to K G Mullen, Inc after proposal submissior
• Costs or conditions caused by delays by others beyond K G Mullen, Inc control
• Layout, excavation, backfill and compaction except as noted above
• Unknown items below ground
• Performance and/or Payment Bonds Add 2% to pricing if Bonds are required
• Side Walk Canopy City to coordinate and close sidewalk during demolition
OWNER/AGENT RESPONSIBILITIES
The owner/agent is responsible for providing the following
• Water, power (including assistance to hook up temporary power)
• Staging areas for equipment and dumpsters (dock access)
• 24 hour access to the work area
• site security
• Parking for work force (free of charge)
• Designate those items to be left or saved prior to K G Mullen, Inc mobilization
• Identification of underground utilities to be protected in place
• Coordination of Utilities shut off and disconnect
TERMS OF PAYMENT
Payment will be progressive, net 10 days upon substantial completion Substantial completion is del
complete visual removal of asbestos material and achievement air clearance
PRICING
Per the Scope of Work as specified herein (price valid for 60 days)
$84,660
Per Abatement Survey
$52,281
TOTAL FOR ALL WORK $136,941
01/25/2006October 3, 2005 Page 4 of 4 1
-
Thank you for the opportunity to submit this proposal for this project If you have any questions or require ad
information, please do not hesitate to contact me on my cell at 310-901-8080 This quote is based on prevai1n4
and certified payroll
Respectfully Submitted ACCEPTANCE
K G Mullen, Inc Agreed to Samir Sayegh
Project Manager
Signature Date
l'i 01/25/2006