RECOMMENDATION:
Staff recommends that the City Council authorize professional services agreements
with CBM Consulting Inc., Paller-Roberts Engineering, Berryman and Henigar, Hall
and Foreman, and KDM Meridian, for General Civil Engineering services (Design,
Construction Management, Inspection, and Survey) to support the City’s Capital
Improvement Program for a total aggregate not-to-exceed cost of $600,000. Staff is
proposing that the contracts expire on June 30, 2007.
BACKGROUND:
The Public Works Department/Engineering Division is responsible for the
management of the citywide capital improvement program. The Engineering Division
has several civil engineering positions that oversee and implement the capital
program such as the Public Works Director/City Engineer, Engineering Services
Manager, two Senior Civil Engineers, two Associate Engineers, and one Associate
Engineer/Stormwater Quality Manager. In addition the Engineering staff has other
responsibilities such as responding to questions at the public counter, working with
other City departments on citywide issues, answering resident inquiries on the
telephone, and other city engineering work. With these work responsibilities along
with the significant capital improvement project workload of $8,000,000, and
occasional resignations or retirements within the Division, it is necessary to augment
Engineering Division staff with consultants, principally for project design services.
To address this need, the City has previously entered into multi-year contracts with
civil engineering firms to support the capital improvement program. These firms
provide the specific technical knowledge and the time to ensure that projects are
effectively designed in accordance with good engineering practice and standards. In
Meeting Date: 11/28/05 Item Number: A-5
AGENDA ITEM: Authorization to Award Professional Services Agreements with
CBM Consulting Inc., Paller-Roberts Engineering, Inc., Berryman and Henigar, Hall
and Foreman, and KDM Meridian, for General Civil Engineering Services
Contact Person/Dept: Mate Gaspar/PW Phone Number: (310) 253-5602
Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No []
Public Hearing: [] Action Item: [X] Attachments: [X]
Public Notification: CBM Consulting Inc., Paller-Roberts Engineering Inc., Berryman and
Henigar, Hall and Foreman, and KDM Meridian, via letter on Nov. 21, William LaPointe,
Director of Parks, Recreation, and Community Services Department on Nov. 21 via e-
mail, and Master Notification List on Nov. 23
Department Approval:
Charles D. Herbertson 11/13/05
CAO Approval:
Martin Cole for Jerry Fulwood 11/21/05
City Controller Approval:
Marlee Chang 11/22/05City of Culver City, California
City Council Agenda Item Report
November 2004, the City Council approved professional services agreements with
three civil engineering firms to support the Engineering Division in implementing the
capital improvement program. The consulting firms successfully designed and
managed many of the capital improvement projects in fiscal year 2004/05. Also, as
authorized by the City Council, the Public Works Director/City Engineer approved
contract extensions for 6-months, until December 31, 2005 so ongoing work on
capital projects can be completed.
DISCUSSION:
There are numerous capital improvement projects approved for design and/or
construction this fiscal year. (Attachment)
In order to continue to support the capital improvement program, staff is
recommending awarding professional services contracts with five civil engineering
firms. In addition to the three original firms that were approved last year, CBM
Consulting, Inc., of Torrance, Paller-Roberts Engineering of Culver City, Berryman
and Henigar of Santa Ana, staff is recommending approving contracts with two
additional firms, Hall and Foreman, Inc. of Irvine, and KDM Meridian of Lake Forest,
to support the capital program. With two additional firms, the competitive process
among a proposed total of five firms will become even more beneficial to the City.
All five engineering firms have a wealth of experience working with local cities on
capital projects. Staff contacted their references and the engineering firms received
favorable and positive comments. CBM, Paller-Roberts, Berryman and Henigar,
Hall and Foreman, and KDM Meridian have assured us that they are capable of
supporting our capital improvement program.
All five firms may receive a request for proposal for each capital project depending
on their availability and expertise. Each proposal will be then be reviewed based on
the proposed services, time to complete the work, experience and reputation of
personnel designated for the project and fee, and one firm can be selected (not
necessarily based on lowest proposed fee) and approved administratively by the
Public Works Director/City Engineer. Having this process will ensure that services
and costs are efficient and in the best interests of the City. Having five exclusive
contracts, as recommended by staff, will save time so that staff will be better able to
focus on completing capital improvement projects.
The proposed agreements are recommended to be valid until June 30, 2007. CBM,
Paller-Roberts, Berryman and Henigar, Hall and Foreman, and KDM Meridian are
capable and will provide errors and omission and liability insurances at $1 million
each. The City retains the right to terminate these agreements upon thirty days City of Culver City, California
City Council Agenda Item Report
notice and any time during the term of agreements. Also, the City will have the right
to contract with other consultants when it is in the City’s best interest. Staff is
estimating that a total aggregate not-to-exceed cost of $600,000 will be sufficient to
support the capital improvement program for the remainder of this fiscal year and
next fiscal year.
FISCAL ANALYSIS:
The consultants would be paid for their services using funds already set aside for
engineering costs within the budgets of each capital project.
ATTACHMENTS:
CBM Consulting, Inc. Statement of Qualifications
Paller-Roberts Engineering Statement of Qualifications
Berryman and Henigar Statement of Qualifications
Hall and Foreman Statement of Qualifications
KDM Meridian Statement of Qualifications
Capital Improvement Project Status Report
MOTIONS:
That the City Council:
1. Approve professional services agreements with CBM Consulting, Inc., Paller-
Roberts Engineering, Berryman and Henigar, Hall and Foreman, and KDM
Meridian, for General Civil Engineering services (Design, Construction
Management, Inspection, and Survey), for a total aggregate not-to-exceed
cost of $600,000 and expiring on June 30, 2007;
2. Direct the City Attorney to prepare the necessary documents and the Chief
Administrative Officer to approve the documents.
OR
Direct staff to prepare Request for Proposals for General Civil Engineering
services for each Capital project.
|1010|STATEMENT OF QUALIFICATIONS 1
Rates
ON-CALL ENGINEERING HOURLY BILLING RATE
0 Program Director / Principal $185 00
0 QA/QC Manager 125 00
0 Senior Engineer 115 00
0 Associate / Civil Engineer 95 00
0 Traffic Engineer 110 00
0 Project Manager 115 00
0 Construction Manager 115 00
0 Project Engineer Scheduler Estimator 95 00
0 Resident Engineer 100 00
0 Assistant Construction Manager Office Engineer 95 00
0 Design Engineer 95 00
0 Construction Observer 88 00
0 Project Controls 75 00
0 CADD Technician 65 00
0 Technician 65 00
0 Administrative & Clerical Support 60 00
COMPUTER AND CAD TIME 40 00
The discounted rates shown above assume full time assignments for a minimum of 3 continuous
months exclusively at the Client s offices These rates may be negotiable for longer duration
assignments Project expenses are billed at cost plus 5% Project expenses include Non-commuter
automobile mileage (at $ 38 per mile) postage and special courier expenses subsistence
reproduction project related telephone subcontractor services and other direct project expenses as
requested by the client Should the client desire phone and mileage may be included in an hourly rate
which shall be negotiated and slightly higher than the billable rates indicated above
Rates are subject to change Standard adjustment periods are semi annually on the 1st of March and
the 1st of September
NON-SOLICITATION
By accepting this proposal Client agrees not to solicit CBM Consulting Inc s employees for direct
employment with client without the explicit written approval of the CBM Consulting Inc for a period of
two years following employee's termination of employment with CBM Consulting Inc Should client
desire to arrange for direct employment of CBM Consulting Inc s employment an equitable fee will be
agreed to by and between CBM Consulting Inc and client for CBM s costs for recruitment training
overhead and other costs associated with employee turnover
‘4 ,
CBM Consulting, Inc
Page 35
37PALLER-ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
5701 SLAUSON AVENUE SUITE 208 CULVER CITY CALIFORNIA 90230 PHONE (310) 641 1853 FAX (310) 641 1861
STATEMENT OF QUALIFICATIONS
PALLER - ROBERTS ENGINEERING INC WAS FORMED IN FEBRUARY 1980
BY PHILLIP G ROBERTS AND JACK D PALLER (DECEASED 2/83) TO FURNISH
PROFESSIONAL CIVIL ENGINEERING SERVICES TO DEVELOPERS ARCHITECTS
AND GOVERNMENT AGENCIES
THE COMPANY S EFFORTS ARE DIRECTED TOWARD DESIGN OF THE INFRA-
STRUCTURE ELEMENTS REQUIRED FOR THE DEVELOPMENT OF COMMERCIAL
INDUSTRIAL RESIDENTIAL AND MUNICIPAL PROJECTS THE PRINCIPAL AND
KEY STAFF MEMBERS POSSESS A STRONG BACKGROUND OF TECHNICAL
ABILITY AND PRACTICAL EXPERIENCE AND HAVE A RECORD OF SUCCESSFUL
ACCOMPLISHMENTS IN THE FIELD OF CIVIL ENGINEERING THE FIRM EMPLOYS
A NUCLEUS OF PROFESSIONAL AND TECHNICAL PERSONNEL CAPABLE OF
EFFICIENTLY COMPLETING ITS ASSIGNMENTS WITHIN SCHEDULED REQUIRE-
MENTS ALL PROJECTS ARE PERSONALLY SUPERVISED BY THE PRINCIPAL
3gPALLER ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
AREAS OF EXPERTISE
• Earthwork and mass grading
• Analysis and design of complete storm drain systems and water courses
• Design and coordination of underground utilities
• Preparation of plans including computations for control of horizontal & vertical
elements of proposed facilities to be constructed above and below ground
• Preparation of rough and finished grading plans
• Design of surface improvements for roadway and parking areas including curbs
paving systems traffic striping lighting and landscaping
• Highway design including street plans traffic striping signage lighting and
underground utilities
• Design of sanitary sewer collection systems and sewage treatment facilities
• Design of complete water distribution systems including piping tanks and
pumping systems
• Preparation of storm water quality systems including processing of plans and
reports through local agencies
• Preparation of utility composite plans to coordinate the location of all utility
systems including joint trenching details
• Coordination of site improvements with architects and engineers of other disciplines
Also coordinate and process plans through public agencies for required approvals
and permits
• Preparation of subdivision maps and legal descriptions
• Surveying including aerial photogrametry field measuring of data and ALTA surveys
• Construction cost estimates
• Construction administration
• Technical specifications
• Preparation of site feasibility investigations and reports
• Preparation of Civil Engineering studies investigations and reports
37
1PALLER ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
STATEMENT OF QUALIFICATIONS
11-16-05
CITY OF CULVER CITY
BRIEF LIST OF RECENT REPRESENTATIVE PROJECTS
* STREET IMPROVEMENTS
New Streets Simi Town Center Way —5 500 ft in Simi Valley
Jefferson Way — 3 800 ft in Simi Valley
Street Widening First Street -
Erringer Road
Canoga Ave
Sherman Way
Cohasset St
Highland Ave
Melrose Ave
1 000 ft in Simi Valley
- 500 ft in Simi Valley
- 1 block in Los Angeles
- 1 block in Los Angeles
- 1 block in Los Angeles
- 1 block in Los Angeles
—1 block in Los Angeles
* STREET LIGHTING REPLACEMENT
Lindblade & Kreuger —4 blocks in Culver City
Washington Blvd — 11 blocks in Culver City
* SANITARY SEWER SYSTEM (NEW) — SIMI VALLEY
Approximately 10 000 feet of 6 inch thru 10 inch pipe
SANITARY SEWER REPLACEMENT — CULVER CITY
Eveward Road Drakewood Avenue Whitburn Street and
Flaxton Street
* WATER SYSTEM (NEW) — SIMI VALLEY
Approximately 30 000 feet of 4 inch thru 16 inch pipe
Potable and Reclaimed Water including Pressure Reducing Station
* STORM DRAINAGE SYSTEM — SIMI VALLEY
2 100 feet 10 X 10 RCB — Ventura County
13 000 feet public drains 18 inch to 54 inch diameter with a network
of six (6) Detention PondsPALLER ROBERTS ENGINEERING INC
CONSULTING CIVIL ENGINEERS
SUMMARY OF PROJECTS
COMMERCIAL
RETAIL
MAJOR REGIONAL MALLS
Arden Fair - Sacramento CA CA
Denver West - Lakewood CO
Downtown Plaza Expansion - Sacramento CA
East Hills Mall - Bakersfield CA
Fashion Place Expansion- Murray UT
Fashion Show — Las Vegas NV
Gallena at South Bay - Redondo Beach CA
Glendale Gallena - Glendale CA
Glendale Town Center — Glendale CA
Horton Plaza - San Diego CA
Koreatown Plaza - Los Angeles CA
Lakewood Mall - Lakewood CA
Macy s at Lakewood Mall — Lakewood CA
Long Beach Plaza - Long Beach CA
Los Cerntos Mall Expansion- Cerritos CA
Main Place - Santa Ana CA
Main Place Phase 2 — Santa Ana CA
Media City Center - Burbank CA
Montclair Plaza - Montclair CA
Robinson's-May Co Expansion — Montclair CA
North County Fair - Escondido CA
Pacific View Mall - Ventura CA
Palm Desert Town Center Exp -Palm Desert CA
Park Meadows - Denver CO
Parkway Plaza Expansion- El Cajon CA
Rogue Valley Mall - Medford OR
Santa Anita Fashion Sq Exp - Arcadia CA
Simi Valley Mall - Simi Valley CA
Sunnyvale Towncenter Expansion- Sunnyvale CA
Topanga Plaza Mall Expansion- Canoga Park CA
Tyler Mall Expansion - Riverside CA
University Town Centre — La Jolla CA
Valencia Town Center - Valencia CA
Westside Pavilion Expansion — W Los Angeles
qrPALLER ROBERTS ENGINEERING INC
CONSULTING CIVIL ENGINEERS
SUMMARY OF PROJECTS - Pape 2
MAJOR RETAIL (NON-MALL)
Barney s Department Store - Beverly Hills CA
Beverly Connection - Los Angeles CA
Birdcage Town Center Expansion - Citrus Heights CA
East Hills Pavilion — Bakersfield CA
Magic Theatre and Expansion - Los Angeles CA
Manna Pacific Retail Bldg — Long Beach CA
Sam $ Club — Charlotte N C
Santa Rosa Marketplace - Santa Rosa CA
Santee Towncenter - Santee CA
Screenland Culver City, CA
Shops @ Palos Verdes - Rolling Hills Est CA
Shops @ Parkway Plaza - El Cajon CA
Studio City Place - Studio City CA
Studio Village - Culver City, CA
Torrance Promenade - Torrance CA
Towncenter West - Santa Mana CA
University Place - Charlotte, N C
Victor Valley Town Center — Victorville CA
Vista Village - Vista CA
Wal-Mart East Hills Center — Bakersfield, CA
Wal-Mart @ University Place - Charlotte N C
NEIGHBORHOOD RETAIL
Barnes & Noble @ Tyler Mall - Riverside CA
Best Buy @ Culver Center - Culver City CA
P F Chang s Restaurant - Denver CO
- Charlotte N C
Crocodile Cafe - Denver CO
DSW Shoe Warehouse - Denver CO
Earl's Restaurant - Denver CO
Fatburger - Los Angeles CA
King s Fish House Restaurant — San Diego CA
Kurumaya Restaurant - Santa Monica CA
Manna Pacifica Retail Bldg — Long Beach CA
Max & Erma's Restaurant - Charlotte NC
Mike s Camera — Denver CO
Mission Valley West — San Diego CA
Red Lobster Restaurant - Denver CO
Sam s Club — Charlotte N CPALLER ROBERTS ENGINEERING INC
CONSULTING CIVIL ENGINEERS
SUMMARY OF PROJECTS - Page 3
Spoons Restaurant - Burbank CA
Tam-O-Shanter Restaurant - Los Angeles CA
Texaco Starmart - Denver CO
United Artists - Bakersfield CA
Zono Sushi — Burbank CA
OFFICE BUILDINGS
ACCO Office Expansion - Glendale CA
Aerospace Corp El Segundo, CA
619 Anzona - Santa Monica CA
Berkshire Travel - La Canada CA
Buena Pk Plaza - Buena Park CA
Bundy-LaGrange - Los Angeles CA
Disney Corporate Office Bldg - Burbank CA
Hewlett-Packard - North Hollywood CA
Home Savings - Woodland Hills CA
Hughes Buildings S-11 and S-37 El Segundo CA 1
Pacific Design Center - Los Angeles CA
Symphony Towers - San Diego CA
Watendge Phases 1 & 2 - L A County
SPECIALTY
AA-LAX Air Freight Facilities LA CA
Family Fitness Center - Bakersfield CA
Mamott Hotel - Century City CA
Shaarey Zedek Temple Exp - No Hollywood CA
SW Bowling Center - Bakersfield CA
UA Flight Kitchen - El Segundo, CA
INSTITUTIONAL
EDUCATIONAL
Armand Hammer Museum - Westwood CA
Cal State Fullerton Classrooms - Fullerton CA
Evergreen Childcare Center - Los Angeles CA
LAUSD Bethune Middle School Resurfacing - LA
Camellia ES Survey & Resurfacing - N Hwd CA
Manhattan ES Resurfacing - LA
N Hwd HS Survey & Resurfacing - N Hwd CA
Reseda HS Resurfacing - Reseda CA
Roscoe ES Resurfacing - Sun Valley CAPALLER ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
SUMMARY OF PROJECTS - Pa ge 4
61' Street ES Survey & Resurfacing - LA
66th Street ES Survey & Resurfacing - LA
68th Street ES Survey & Resurfacing - LA
EDUCATIONAL - continued
Loyola Marymount University Office Bldg — LA
LMU - Law School Expansion - LA CA
Pasadena City College Sports Center - Pasadena CA
UC Irvine Office Bldg - Irvine CA
UCLA - NW Campus - Los Angeles CA
UCLA Powell & Law Libraries - Westwood CA
MEDICAL
Kaiser Permanente - Harbor City CA
Kaiser Permanente — Santa Clanta CA
Manna Care Center - Culver City CA
Oceanview Cony Hospital - Santa Monica CA
St Mary Medical Center - Long Beach CA
MUNICIPAL
Aerospace Museum & Park - Los Angeles CA
Beverly Hills P 0 - Beverly Hills CA
Burbank Airport Projects - Burbank CA
Contra Costa County Justice Center - CA
Denker Park & Community Center - Los Angeles CA
Dockweiler State Beach RV Park - LA CA
GSA Building — Long Beach CA
L A Coliseum Renovation - LA CA
La Quinta Civic Center - La Quinta CA
Navy Enlisted Qtrs - San Diego CA
Pan Pacific Park & Community Center - Los Angeles CA
Rialto Civic Center - Rialto, CA
Van Nuys Airport - Van Nuys CA
Van Nuys Court Bldg - Van Nuys CA
Victorville P 0 - Victorville CA
Yosemite Park & Community Center - Los Angeles CA
Lf- tfPALLER ROBERTS ENGINEERING INC
G INC
CONSULTING CIVIL ENGINEERS
SUMMARY OF I ROJECTS — Page 5
TRANSPORTATION
Crater Lake Hwy lmprc rements — Medford OR
Fox Hills Bus Station
Culver City CA
Westside Center Los Angeles CA
Street Improvements — entury City LA
Charlotte N C
East Hills Mall — Bake' field CA
El Cajon CA
Lakewood Center — L cewood CA
Main Place Roadway Santa Ana CA
Park Meadows Road Littleton CO
Santa Rosa Blvd Wid rung — Santa Rosa CA
Santee Town Center Santee CA
Victona Gardens Offsi — Rancho Cucamonga CA
Westwood CA
OTHER
Olympic Villages at UCLA & U C LA CA
INDUSTRIAL
ACCO Manufacturing San Le ndro CA
Jetro Warehouse Vernon CA
McMaster Can- Facility Phase I Santa Fe Springs CA
RESIDENTIAL
SINGLE FAMILY
Burton Residence Malibu CA
Cypres Residence Los Angeles CA
Giannulli Residence Bel Air CA
Knott Residence Holmby Hills CA
Mastrippolito Residence LA CA
Nolte Residence Malibu CA
Reider Residence Los Angeles CA
Spiegel Residence Beverly Hills CAPALLER ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
SUMMARY OF PROJECTS - Page 7
TRANSIT CENTERS
• Fox Hills Mall Transit Center - Culver City CA
• Montclair Plaza Transit Center - Montclair CA
• South Bay Gallena Transit Center - Redondo Beach CA
LeoPALLER ROBERTS ENGINEERING INC
CONSULTING CIVIL ENGINEERS
PHILLIP G ROBERTS
RESUME
EDUCATION
Bachelor of Science/Mechanical Engineenng 1971
Michigan State University
REGISTRATION
Professional Civil Engineer in California (C27269 7-14-76)
Oregon Virginia North Carolina Colorado and Nevada
PROFESSIONAL AFFILIATIONS
Member - American Society of Civil Engineers
Member - National Society of Professional Engineers
EMPLOYMENT HISTORY
1980 - PRESENT Principal
Paller-Roberts Engineering
Culver City CA
1973 - 1980
Progressed from
Gruen Associates
Designer to Project
Los Angeles CA
Engr to Chief Civil Engr
1972 - 1973 Packaging Engineer
1970 - 1972 Draftsman and Surveyor
EXPERIENCE SUMMARY
Rockwell International
El Segundo CA
Bol-Mac Engineering
Lansing MI
Mr Roberts has over 30 years experience in Civil Engineering consulting practice He has
managed a staff of engineers and designers in the preparation of civil engineering studies
reports plans subdivision maps and other documents for numerous commercial industrial
residential and municipal projects His technical abilities and management skills have led
Paller Roberts Engineenng to successful completion of numerous complex and challenging
projects over the past years Due to Mr Roberts leadership and high standards the firm
enjoys a reputation for providing top quality service to its clients To illustrate this point the
majority of the firm s clients have been dealing with the company repeatedly
Lf 7PALLER ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
PHILLIP G ROBERTS' RESUME - Page 2
A sampling of commercial projects include large mixed use developments such as Horton
Plaza in San Diego CA and Glendale Gallena II in Glendale CA Regional Shopping
Centers include North County Fair in Escondido CA the Fashion Show in Las Vegas NV
Media City Center in Burbank CA University Place in Charlotte N C Park Meadows in
Denver CO and Santa Rosa Marketplace in Santa Rosa CA Office buildings include
the La Cienega-Slauson Business Park in Los Angeles CA Hewlett Packard Regional
Headquarters N Hollywood CA Disney Corporate Headquarters in Burbank CA and
Buena Park Business Plaza in Buena Park CA
Specialty Commercial projects include the Pacific Design Center Phases 1 and 2 in W
Hollywood CA Olympic Villages at UCLA and USC for the 1984 Summer Olympics in Los
Angeles CA and studies for the renovation of the L A Coliseum in Los Angeles CA
Municipal/Public Works projects include approximately 3 5 miles of new streets and utilities
to serve a segment of commercial and residential property in the City of Rancho Cuca-
monga CA Street widening and new freeway on and off ramps in Bakersfield CA a major
storm drainage/flood control system in Las Vegas NV Victorville Post Office in Victorville
CA La Quinta CIVIC Center in La Quinta CA Rialto Civic Center in Rialto CA
Institutional projects include the addition of 3 dormitory buildings housing 1200 students
with student center auditorium and underground parking on the campus at UCLA Armand
Hammer Museum in Westwood CA and Phases 1 and 2 expansions of Loyola Law School
in Los Angeles CA
Residential projects include One-Harbor Dnve a 200 unit high-rise condo development with
parking structure and retail on the first 2 floors in San Diego CA Phases 1 and 2 of faculty
housing complexes for USC located near the campus in Los Angeles CA Spring Creek
Ranch a complex of multi-phased condominiums with common facilities in Jackson WY
and Navy Bachelor Enlisted Quarters in San Diego CA
Recreational projects include the Industry Hills Complex mass grading drainage roadways
& utilities for the 36 hole golf course convention center Sheraton Hotel and swimming and
tennis complex in Industry CA This project won the ASCE Project of the Year award Mr
Roberts was an engineer involved with the actual design of the complex while he was with
Gruen Associates
As a Principal for Paller-Roberts Engineenng Inc Mr Roberts responsibilities include
administrative duties and marketing project management supervision of office staff and
quality controlPALLER ROBERTS ENGINEERING, INC
CONSULTING CIVIL ENGINEERS
ELNOR C ANDAL
RESUME
EDUCATION
Bachelor of Science/Civil Engineering 1967
National University Manila Philippines
EMPLOYMENT HISTORY
1981-PRESENT Project Manager
1972-1981 Project Manager/
Designer
1967 1972 Draftsman/Inspector
PaIler-Roberts Engineering
Culver City CA
Rogoway/Borkovetz Assoc
Los Angeles CA
City of Manila Philippines
EXPERIENCE SUMMARY
Mr Andal has over 30 years of professional civil engineering experience He has been in
charge of projects from their inception to completion He has directed other members of
our staff in the completion of reports and plans to satisfy client needs He has represented
this office at numerous project meetings in a professional manner and has attained a level
of technical competence and knowledge to be able to offer opinions and recommendations
toward solving design or construction related problems
Duties include engineering and project management for various commercial institutional
and municipal projects A sampling of some commercial projects include La Cienega/
Slauson Business Park in Los Angeles CA Media City Center Burbank CA Montclair
Plaza Expansion Montclair CA Disney Corporate Headquarters Building in Burbank CA
the Marnott Hotel in Century City Los Angeles CA, Santa Anita Fashion Park Expansion in
Arcadia CA and Santa Rosa Marketplace in Santa Rosa CA
Institutional and municipal projects include the UCLA-Northwest Housing complex on the
UCLA campus La Quinta Civic Center in La Quinta CA 4-story classroom building on the
campus at Cal State University Fullerton Armand Hammer Museum in Westwood, CA
Van Nuys Municipal Courts Building in Van Nuys CA LAUSD new buildings and
resurfacing projects and Pasadena City College-P E Facilities Pasadena CA
Lit
PALLER ROBERTS ENGINEERING INC 1
CONSULTING CIVIL ENGINEERS
HERMAN NURCANYAN
RESUME
EDUCATION
Bachelor of Science/Civil Engineenng 1976
California State University - Fresno
REGISTRATION
Registered Civil Engineer in California
EMPLOYMENT HISTORY
I983-PRESENT Project Engineer PaIler-Roberts Engrg
Culver City CA
1981-1983 Project Engineer Gruen Associates
Los Angeles CA
1976-1981 Engineer & Surveyor Blair Church Flynn
Clovis CA
EXPERIENCE SUMMARY
Mr Nurcanyan has over 25 years of professional civil engineering experience in all aspects
of the engineering profession His technical ability is strong in all areas He also has the
ability to apply this technical knowledge to solve problems in a practical manner He is
familiar with and uses computers and CADD extensively to aid in the designs required to
complete the assigned project
Duties include the preparation of designs and plans for all aspects of various commercial
and municipal projects A sampling of some commercial projects include Main Place
Phases I and 2 Santa Ana CA North County Fair Escondido CA East Hills Center
Bakersfield CA and Victor Valley Town Center Victory'Ile CA University Place in
Charlotte N C Park Meadows in Denver CO and Santa Rosa Marketplace in Santa
Rosa CA
Municipal projects include approximately 3 5 miles of new streets and utilities to serve a
commercial and residential portion of the City of Rancho Cucamonga CA Street widening
and improvements along numerous streets in Century City required for high-rise office tower
in L A CA Street widening improvements and new freeway on-and-off ramps in Bakers-
field CA and street widening and improvements in El Cajon CA
SoCIVIL ENGINEERING 4 CONSTRUCTION MANAGEMENT # BUILOINd, SAFETY COMPLIANCE
S ement of Qualifications
r As-Needed Professional Eligineering,
Construction Management and
Staff Augmentation Services
Prepared for City of Culver City
For the benefit of business and peopleEMMA
Berryman& Henigat
November 17 2005
Mr Mate Gaspar PE
Project Manager
CITY OF CULVER CITY
Engineering Division 2nd Floor
9770 Culver Boulevard
Culver City CA 90248
Subject Statement of Qualifications for As Needed Professional Engineering Construction
Management and Staff Augmentation Services
Dear Mr Gasper
Bureau Ventas/Bertyman & Hentgars (hereafter known as Berryman & Hewer) professional services have
included assisting public agencies with As Needed design and construction projects As a multi disciplined
consulting firm we are able to focus on providing staff for short and long-term assignments in the field and at
municipal offices for all types of projects We establish a single point of contact to streamline project
management efforts and accountability consistently meet applicable public agency standards and quickly
mobilize qualified staff and necessary equipment for immediate assignments Our assignments have included
engineering design and construction management and inspection for street rehabilitation and new roadways
sewer and storm drains various drainage and flood control studies and traffic control and site engineering We
offer the following benefits
Responsiveness by assigning quality engineers construction managers and inspectors and
maintaining adequate staffing levels in a timely manner
• Quality by utilizing a proven project management approach to provide the right team or person the
right equipment in the right place at the right time Our licensed professionals possess the skills and
training to hit the ground running to deliver timely and accurate services
3 Flexibility by assigning cross trained personnel to perform various roles on different types of
assignments
• Seamless interface with the City by assigning engineers and field personnel who have supported
agencies for as needed requirements by serving as an extension agency staff
Berryman & Herugar staff offers specifically relevant experience to meet your FY 2005 07 project needs
Berryman & Hewer has supported over 25 As needed services contracts most recently providing on call
engineering services for seven contracts including Construction Management and Inspection Staff
Augmentation Services for the City of Fontana and Civil Engineering Services for the City of Laguna Hills
We look forward to discussing upcoming projects with Culver City If you have any questions regarding this
SOQ please do not hesitate to call me at 714 568 7300
Berryman & Henigar
Tim D Zmura PE
Principal in Charge
2001 East First Street Santa Ana CA 92705 • (714) 568 7300 • Fax (714) 836 5906 • www us bureauventas corn
An Equal Opportunity EmployerCity of City of Culver City
Statement of Qualifications
rm OverviBerryman & Henigar a subsidiary of Bureau Ventas a worldwide organization
providing a variety of services For the Benefit of Business and People
supports public agencies through municipal management consulting civil
water/wastewater engineering planning public finance building safety asset
management and program and construction management For 30 years we
have served more than 400 public agencies 80 percent of which are repeat
clients We are committed to providing our clients with personalized services
and as a result of this commitment the firm has grown to a staff of more than
350 professionals and ENR ranks Bureau Veritas 41 of the top 250 engineering
companies in the nation which is impressive since our workload exclusively
consists of public agency consultation
Bureau Ventas is a service company specializing in quality health safety and
environment management with a network that covers 140 countries 600 offices
and laboratories and 18 000 employees Founded in Antwerp Belgium in 1828
the company offers an extensive range of technical services and solutions in the
fields of certification conformity assessment consulting and training It is
recognized and accredited by the world s largest national and international
organizations
Bureau Ventas/Bertyman & Henigar s value added services yield innovative yet
practical solutions that promote cost-effective and timely project delivery while
protecting and enhancing the value of your assets and investments We
understand the funding constraints and requirements placed on each city
through local state and federal funded programs as well as other discretionary funding agencies We work
as an extension of municipal staff because for many cities we are their staff and thus we are confronted with
many of the same design budget and schedule challenges that face our client cities Our strength lies in the
fact that due to our municipal focus we have an intimate understanding of the scope of services required for
the projects we plan design and manage for cities and countries
Firm Services
Our firm provides a wide variety of services, which include
• Asset Management • Municipal Management Consulting
• Building Safety • Civil Plan Review
• Civil Engineering • Program Management
• Community Planning • Public Finance
• Construction Management • Storm water Management
• GASB 34 Compliance • Survey & Mapping
• GIS • Transportation Engineenng
• Manne Engineering • Water! Wastewater Engineenng
PURE A U
VEriT S
Mokpo= &FiardiptRelevant Project Experien
City of Culver City
Statement of QualificationseititititCITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Ocean Avenue Rehabilitation
Construction Management and Inspection
City of Torrance
3031 Torrance Boulevard
Torrance CA 90503
Berryman & Henigar provided full time construction
management and inspection for the $1 6 million
rehabilitation of asphalt street sidewalk and
landscape along more than one mile of Ocean
Avenue from 242 nd Street to Lomita Boulevard
complete removal of existing pavement and
sidewalk excavation of unsuitable soils installation
of aggregate base and asphalt pavement The
project also incorporated the replacement of existing
driveways for residential and business access
During the design process our staff performed constructability and peer reviews of the contract
documents helping mitigate costs and time over runs to the project
3 Identified elevation discrepancies, inappropriate landscape and irrigation materials,
grade discrepancies, stnping, and traffic control issues saving the City $30,000 to
$40 000
We attended public meetings with the City Staff and provided technical support in answering questions
related to the work and traffic control We helped alleviate public concerns over traffic concerns and
inconvenience during construction
3 Relationships developed with the residents and business owners helped us manage
the public s expectations dunng construction and resulted in reduced complaints to
the City
We managed the submittal RFI payment application process change order process and presided over
the weekly construction coordination meetings Several unforeseen conditions were encountered during
the course of construction Very unsuitable soils were encountered resulting in the need to employ geo
fabric for soil stabilization
3 By having solutions developed and approved in advance we were able to save 7
working days and expensive disruption to the project We were able to save $8 000 to
$10 000 in non-productive costs through advance planning
Because of our continuous presence on site and our close relationship with City staff we were able to
develop successful solutions and mitigate extra costs and time to the project We were able to work with
other City staff including the water department to solve water line leaks to limit utility down time to the
public
v We developed a relationship with the City Water Department for the ability to contact
them on a moments notice diagnose and solve problems Water mains and valves
were located in advance to streamline excavation and identify leaks
111:111111133
IMMO=
Dairyman & Henlgar
S-7aka, CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Los Angeles County Courthouse
Construction Management and Inspection
County of Los Angeles
Architectural Engineenng Services
900 South Fremont Avenue 8th Floor
Alhambra CA 91803
Los Angeles County began
construction on a new 382 000 square
foot $113 million facility in Lancaster
which will be the furthermost legal
outpost in the county This structure
consists of four stories above grade
one level below grade a 3 story glass
atrium entry with a concrete panel and
glass exterior over braced steel frame
The site of this structure is on 17 1
acres at the corner of Avenue M and 4th
Street West with parking for 1 105
vehicles including 35 secure spaces
below grade High desert appropriate
landscaping will complete the facility
This structure will house the Superior Court Sheriffs Department Probation Department District
Attorney s Office the Public Defender s Office and the Alternate Public Defenders Office There are
eleven elevators 21 Courtrooms (15 now and 6 future) 33 Judges chambers with secure access to all
courts and chambers and secure parking below grade There are monitoring stations for both the Fire
Department and Sheriffs cooling towers ejector pumps for sewage Jocky pumps for the Fire
Department Sally Port for prisoners a large granite main lobby The entire facitlity contains security
cameras and monitor room The opening of this facility is tentatively planned for September 2003
Berryman & Hewer provided a dedicated staff of four full time project and ICBO combination Building
Inspectors who worked side by side with the Los Angeles County staff to provide expert monitoring for
both contract and code compliance
The County is so satisfied with our services and staff that they have recently assigned our staff to
provide inspection services for the Los Angeles County Sheriffs Station and the USC Medical Center
Berryman & Henigar
6 80
akeit CI 'Ty
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Extension of Public Works Construction Staff
Construction Inspection
City of Fontana, CA
8353 Sierra Avenue
Fontana Ca 92335
For the past three years Berryman & Hemgar has provided Extension of Staff
services to the City of Fontana to provide construction inspection for various public
works projects
We are currently providing inspection to set and pour a
9 x 11 3 500 foot box culvert under Caltrans
specifications This includes grading to subgrade of
the box check of subgrade checking of forms rebar
for spacing and size and checking concrete on the
pour and finishing of the pour Included in this project
are the storm drain pipes coming off the culvert 400
feet of bleeder line with seven catch basins and 14
storm drain pipes connecting to the culvert Backfilling
of the box culvert checking the laying of the storm
drain pipe out of the box culverts 24 RCP to 30 RCP
and check of the catch basin setting and pouring
Responsible to monitor the level of subgrade on the street section check the base asphalt pavement on
the street section curb and gutter bus turnouts sidewalks handicapped ramps and island curbs with left
turn pockets This portion of project was $2 4 million from ground up including all grading before and
after installation and backfill
Also included is the street work above this culvert that consists of monitoring the level of subgrade to
ensure proper thickness and material inspection of the base asphalt along with curb and gutter and
sidewalks Bus turn outs handicapped ramps cross gutters and spandrels traffic signal conduit and
signals in addition to installation of traffic signal foundations island medians with left turn pockets and
landscaping
Mango & Baseline This project included 400+ feet of 12 sewer line three manholes tying into two
existing manholes storm drains CMP pipe grading of subgrade curb and gutter right turn pocket
handicapped ramps sidewalks and driveways and exposed aggregate walkway Also included is base
paving of asphalt over class two base and deep lift asphalt to ensure that lanes would not be closed
overnight
Subdivision Inspection New housing included sewer section of 8 and 6 sewer line manholes storm
drains catch basins curb and gutter sidewalks handicapped ramps grading of street section base
asphalt paving and cap
SU E AU
VE P1TAS
Berryman & Henier6310404, C I TY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
190th Street Reconstruction
Construction Management and Inspection
City of Torrance
3031 Torrance Boulevard
Torrance CA 90503
Berryman & Hemgar provided complete construction
management and inspection services to the City of
Torrance for the 190 th Street Rehabilitation project
Our team of professionals worked along side the City s
staff throughout the entire construction process
providing pre construction services construction
management and inspection services and
management of the project closeout
This $7 5 million road project consisted of complete
reconstruction of 190th Street in Torrance from Prairie
Avenue to Van Ness 190 th Street is a heavily traveled
road used by both passenger and commercial vehicles The road services an oil refinery as well as both
commercial businesses and residential homes Because of the need to keep traffic flowing during
construction two lanes of traffic were kept open for use at all times with all intersections and driveways
accessible The project consisted of two major phases with each phase divided into four phases of
construction
This project included the removal of the existing 24 asphalt road section The new road was constructed
with the use of fabric on native soil 12 of CAB rock 10 of BAR400 asphalt leveling course and 2 1/2 of
rubberized asphalt In addition to the road construction the project included the installation of almost 2
miles of water lines one mile of 12 inch diameter ductile iron domestic water line and one mile of 12 inch
CL 900 reclaimed irrigation line The domestic water line included reconnection of 1 inch and 2 inch water
services fire hydrants and nine side street connections Other utilities were also installed including one
mile of communications duct bank
Key Elements
Included the complete reconstruction of the Crenshaw Intersection which included the installation of
new signals interconnects loops and lighting
1 Both phases of the project required the installation of over 17 000 square feet of sidewalk and 2 500
linear feet of curb gutter and sidewalk and the installation of landscaped street medians
1 Managed the coordination of the testing utility agencies the Contractor and public relations
1 Traffic control techniques included the implementation of the Watch Manual and a detailed and well
designed traffic control plan
Knowledge of the poor soils conditions enabled our staff to have in place mitigation measures before
the poor soils were encountered eliminating delays to the project
ElEIBIERN
Berryman & Hentgar
(,)Caitteit, CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Municipal Engineering
Contract City Management, Program Management,
Construction Management I Inspection,
Plan Check and Map Services
City of Los Alamitos
3191 KateIla Avenue
Los Alamitos CA 90720 5600
Berryman & Hengar is currently providing a variety of contract City Engineer and municipal engineering
services to the City We are providing City Engineer capital improvement administration budget
preparation funding procurement plan and map review design surveying Engineering Department
representative to City Council program management and construction management/inspection services
The City s goal was to obtain the required expertise from a City Engineer to incorporate a program to
facilitate outside grant funding sources for roadway improvements planning programs and land
development reviews as well as provide engineering consultation for various concerns such as traffic
congestions flood control and street signage problems We have recently formulated a City Traffic Plan
to identify vanous residential concerns and are currently waiting approval from City Council
Berryman & Hengar City Engineer has performed extensive research to locate grant funding resources to
assist the City with their roadway improvement projects We have successfully secured $950 000 in grant
funds from the County Transportation Funding Program (CTFP) combined funding program administered
by Orange Country Traffic Association (OCTA) to allocate the appropriate funds towards the City s Capital
Improvement Program
MIR=
IIMEIN6H1
Berryrnim & Henigar
4ilCalWACITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Municipal Engineering
Contract City Management, Program Management
Plan Check, Design, Construction Management
City of Pomona
505 South Carey Avenue
Pomona CA 91766
Berryman & Henigar has provided a variety of services for the City of Pomona since 1975 We have
provided Interim Public Works Director, plan check and map review, construction inspection,
program management, land acquisition, design and project management services
We are currently
providing program management services including land acquisition contract negotiations as well as
attend City Council / Planning Commission meetings for the implementation of the Pomona Valley
Transfer Station
Berryman & Hengar extension of staff Public Works Director organized managed and implemented the
City s $80 million Capital Improvement Programs as well as identified the planning commission A major
project in Pomona was the $2 million Mission Avenue Street Rehabilitation and Streetscape
Enhancement project which included street reconstruction resurfacing and new street trees along the
corridor Intersection enhancements were also included at key arterial crossings
Berryman & Hengar is very knowledgeable and proficient in
resolving the issues and concerns that confront local government
and they understand the importance of following up and following
through in a professional manner
Doug Dunlap, City Manager
City of Pomona
um=
Exsuaisal
Berryman &Finnigan-
(07,eatit tE4 CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
•
Municipal Engineering
Contract City Management, Program Management,
Design, Construction Management
City of Poway
13325 Civic Center
Poway CA 92074
Berryman & Hewer served as the City s first City Engineer for several years after incorporation in 1982
We established procedures and developed an organization within the Public Services Department to
handle the projects and workload previously being performed by the County of San Diego Our firm also
developed design and private development standards performed a management and organizational
study of the Engineering Department and scheduled designed and implemented City Council requested
capital improvement projects to meet Council mandated construction schedules These services
established effective management procedures within the engineering department which then maintained
effective communications with other City staff and City Council before during and after the transition
Currently Berryman & Hewer is providing Capital Improvement Program Management services for $40
million in redevelopment and Capital Improvement Program (CIP) projects We have completed four
projects totaling $1 8 million in construction costs $3 2 million projects currently in the construction
phase and $18 6 million currently in the design phase Various CIP projects include the design and
construction management of major road improvements buildings water/wastewater facilities drainage
and park projects We oversee projects funded from 2001 Tax Allocation Bond proceeds and the projects
must be completed and obligated for construction by July 2003 for the City to be eligible for subsequent
Tax Bond offerings Program management tasks include managing project design either through in
house resources or through the selection of other consultants and advertising award and construction
management/inspection services Key program management and engineering staff is assigned to City
offices
Since the City was incorporated Berryman & Henrgar has provided
high quality and comprehensive development review services When
our City has needed extension of staff assistance Berryman &
Hewer has responded quickly with highly competent staff for both
short and long term assignments at City offices I am most impressed by
the approachable nature of your highly competent staff They always
make certain that our City s goals are met while simultaneously
maintaining excellent working relationships
Javid Siminou
City of Poway
MIER
1E01032011
ilerriman & lientgar
6 6Calt/MCITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Municipal Engineering
Contract City Management, Program Management,
Construction Management, Asset Management,
Building Official, Plan Check and Map Services
City of Rancho Santa Margarita
30211 Avenida de la Banderas Suite 101
Rancho Santa Margarita CA 92688
Berryman & Henigar has provided a variety of services to the City of Rancho Santa Margarita since
incorporation in 2000 We have provided in house City Engineer Building Official funding
procurement Engineering Department representative to City Council program management plan check
and map review design surveying capital improvement administration budget preparation NPDES
compliance GASB 34 compliance asset management and construction management/inspection
services
The City s goal was to establish efficient and cost effective solutions that are responsive to the residents
of the community The Berryman & Henigar team prepared an Action Plan to implement strategies
policies and procedures funding procurements and departmental budgets Capital Improvement
Program as well as created standards and forms not only to measure the Plan s effectiveness moreover
to establish the new City s organization Through our extensive research and ability to work with multiple
agencies we were able to capture $4 6 million in available grants and funds for the City of Rancho
Santa Margarita The CIP Plan has allowed us to provide the City with construction documents and
specifications for a Citywide Slurry Seal Program which is currently in the bid phase as well as the Plano
Trabuco Raised Median project We are currently conducting a Citywide Study for the City to identify
major arterial routes for street upgrades to receive additional grants or funds
Berryman & Hewer team members were also instrumental in gathering additional funding resources
to build Bandaras Bridge Before the City was incorporated the County of Los Angeles had slated this
project for future construction Unfortunately when the City became its own the needed bridge project
diminished Due to the requests from local citizens and City staff members and further research from our
staff we were able to capture an additional $2 6 million over and above the established CIP Program
from the OCTA Transportation Quarter Agency as well as private contributions to construct the bridge
The bridge is located over the 241 toll road in Orange County
ME=
EMMEIE
Berrnnan & HenigarChM, CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Greenflag Drain (Project No 6502 Relief Drain Design)
Design and Construction Support
Los Angeles County
Department of Public Works
900 South Fremont Avenue 6th Floor
Alhambra CA 91803
The Greenflag Drain project totals
approximately 7 100 feet of 10 wide x 8 6
high reinforced concrete box (RCB) 96 to 24
reinforced concrete pipe (RCP) storm drains
including 750 linear feet of a 96 tunnel in the
City of Redondo Beach The project was
designed to relieve the existing Storm Drain
Project No 6502 It is comprised of five relief
storm drain lines and a 120 x160 by 16
reinforced concrete underground flow by
detention chamber and weir structure with a
capacity of 6 acre feet The detention basin is
constructed beneath a 1 2 acre neighborhood park With the pipes being very deep in sandy soil the
contractor had to do grout injections to hold the soil in place The topography of the area and the
compactness of the location required the design of an innovative and self cleaning inline flow by weir This
design has subsequently been used in several other projects by the County of Los Angeles
Los Angeles County Department of Public Works Storm Drain Project No 6502 in the City of Redondo
Beach was built in the 1950 s under a County wide bond issue program Over half the area of the City of
Redondo Beach and portions of Manhattan Beach are tributary to this storm drain Project No 6502
discharges to the Herondo Drain a regional system in 190th Street which serves a very large drainage
area within the Cities of Hermosa Beach Redondo Beach Manhattan Beach and Torrance Due to intense
development within the region the existing storm drainage systems had become inadequate to convey the
storm water runoff A relief storm drain system was badly needed to efficiently handle the storm water The
project was estimated at $8 5 million for which no funds were available
The City of Redondo Beach and the County of Los Angeles met to develop a logical and long term solution
to this challenge The County agreed that the flooding was a regional problem that justified a regional
solution and agreed to provide funds for the design and construction of a relief storm drain system The
City of Redondo Beach provided $2 75 million as a part of the total $10 million cost for the project The
topography separated the area into five separate tributary drainage areas Five separate drains were
necessary for the new storm drain system to function effectively
UM=
EMMEN
Berryman & Henigar
62n5'Cava CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Main Street and East Yale Loop Rehabilitation Project
Street Rehabilitation Design
City of Irvine
1 Civic Center Plaza
Irvine CA 92606
This project consisted of the rehabilitation of 900 feet of Main
Street between Culver and West Yale Loop and 1 600 feet
of East Yale Loop between Barranca and Bnarwood Main
Street was improved by grinding 0 20 feet of pavement
crack sealing and constructing a 0 20 feet asphalt rubber hot
mix overlay Total reconstruction was done to a portion of
the street where the pavement had failed East Yale Loop
was improved by removing the top 0 75 feet of pavement and
base recompacting and constructing a full depth asphalt
pavement consisting of a 0 20 feet rubberized surface
course over a 0 55 foot base course Both projects included
striping and replacement of traffic signal loop detectors The contract documents were prepared in
accordance with the Caltrans Local Assistance Procedures Manual requirements for federally funded
projects
Trabuco Road Rehabilitation
Street Rehabilitation Design
City of Irvine
1 Civic Center Plaza
Irvine CA 92606
Berryman & Hengar provided services for the rehabilitation
of Trabuco Road from Culver Drive to Yale Avenue This
street rehabilitation project had a full depth reconstruction at
the west end of the project between the I 5 ramp and Culver
Drive The rest of the divided roadway was being cold
milled (full section) and overlaid with an Asphalt Rubber Hot
Mix Utility covers were adjusted to grade and the striping
restored This was a federal aid project for which the
contract documents and specifications were prepared in compliance with federal requirements
MUMI
Mann
6G
Berrymsn & Henigar010404, CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
State Route 60 / 71 Interchange
Roadway Design
City of Pomona
505 South Garey Avenue
Pomona CA 91769
Berryman & Hengar provided design and
engineering services for this four level
interchange at the junction of State Routes
60 (Pomona Freeway) and 71 (Corona
Freeway) to alleviate traffic congestion in
South Pomona and provide a vital link
between Los Angeles and Riverside
County The design included the
construction of 11 5 miles of freeway
connectors ramps local streets 14 new
bridges 2 bridge widenings 14 retaining walls 4 soundwalls over 2 6 million cubic yards of excavation
extensive surface and subsurface drainage improvements restoration of two major landslides
development of detailed construction staging erosion control highway lighting signing and delineation
six sets of intersection traffic signals four ramp metering systems and major drainage structures The
fourth level overcrossing used single cell box girders with transverse prestressing Berryman & Henrgar
prepared a drainage study and hydrology report for the nine square mile watershed tributary to Chino
Creek Channel at the Route 60 crossing Final PS&E design included drainage crossing structures
highway drainage and reconstruction of 1 100 feet of Chino Creek Channel On site hydrology and
hydraulics were based on Caltrans procedures and standards The complex geometric design and
construction staging required a challenging coordination of many concurrent design elements
Berryman
& Henigar
assisted the City of Pomona through the myriad of hearings meetings Caltrans coordination
and approvals required Berryman & Henrgar also performed the design survey for the project in
conjunction with pre existing Caltrans control surveys and photogrammetry Using total stations and data
collectors design alignments were profiled and cross sectioned Survey data was downloaded to
computers for computer aided design/drafting and earthwork calculations All scope schedule and
budget goals were met The project was fast tracked to completion two months ahead of schedule
This project was awarded Caltrans Excellence in Transportation Facilities 'Award
Challenge The project was constructed within two separate county lines requiring coordination
with two Caltrans districts two county transportation agencies two county flood control districts
and three cities
Solution Conducted project stakeholders meeting every three weeks Took detailed minutes
and distributed them to all agenciesedetteitCITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Eastern Trunk Sewer
City of Ontario
Prepared the preliminary design report as well as providing design and construction plans and cost
estimates for 37,300 feet of gravity sewer pipeline from 10 to 48 inches in diameter through the City
of Ontario s New Model Colony and City of Chino s Agricultural Preserve Area tying into Inland Empire
Utilities Agency s 54 inch Kimball Interceptor Sewer The project was designed and coordinated with the
Cities of Ontario and Chino Inland Empire Utilities Agency San Bernardino County Flood Control District
and Riverside County Flood Control
District The project included a detailed
Sewer Study to establish alignment
design of siphon under the Corp of
Engineers Cucamonga Creek Channel
and the elimination of three existing sewer
lift stations The project also involved
extensive multi agency coordination
approvals permitting preparation of
plans specifications and estimates
Right of Way acquisition from 11
properties and construction support
Sewer Main
Replacement, CIP
2002-2003
Elsinore Valley Municipal
Water District
Currently completing design and preparation of plans specifications and estimates for the replacement of
existing sewer lines for the City of Lake Elsinore This project consists of approximately 4,500 linear feet
of 6 and 8 inch VCP sewer lines which are designated for replacement Project specifications and
construction notes were prepared to minimize the construction impact and service interruption to
residents and businesses during the construction phase Project also included construction permit
acquisition and agency coordination
IIIIIMEIZEll
EBIBI1131111
(of
Betryntan& HenigarCaett eit CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Imperial Highway/State Route 90
Roadway Design
City of Yorba Linda
4845 Casa Loma
Yorba Linda CA 92686
Berryman & Hentgar investigated five
alternative concepts to prepare the Project
Study Report and Project Report
(PSR/PR) for the BN&SF Railroad
Separation of Imperial Highway at
Orangethorpe Currently 26 railroad
crossings per day cause unbearable
delays at the intersection Railroad activity
is projected to increase to 128 crossings
per day by 2010 further impacting traffic at
Imperial Highway and Orangethorpe
Design concepts to address and resolve traffic delays ranged from an over/underpass raised
intersection depressed railroad and urban interchanges
Berryman & Hentgar prepared geometric plans profiles and a cost estimate in accordance with Caltrans
and BN&SF Railroad requirements for this federally funded project Project documents were prepared in
metric units When completed the overcrossing will greatly relieve traffic congestion and eliminate delays
at the existing intersection
This project had multiple stakeholders and significant impacts to property and access In addition federal
funding had to be obtained after project design was started Bertyman & Hentgar held monthly project
development team meetings and worked with Caltrans to develop a design exception punch list The
team also held numerous community workshops to inform and get input from the community
52113111111062
ISIGEDIEBI
Betrfman & Henigur
?eakettliTY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
10
Manhattan Beach Boulevard Beautification and
Rehabilitation 11
I
Design, Construction Management, and Inspection
City of Lawndale
14717 Bunn Avenue
Lawndale CA 92060
Berryman & Henigar provided the design construction
management and inspection for this $1 6 million dollar roadway
rehabilitation and beautification project for 2 miles of Manhattan
Beach Boulevard Included in the scope of construction services
was extensive traffic control 316 604 square feet of cold planing
and overlay installation of rubberized asphalt cap removal and
replacement of concrete curb and gutter sidewalks driveways
and median islands The project also included the installation of
landscape median islands traffic signals and lighting
Every project encounters unforeseen conditions that require
creative and thoughtful solutions to mitigate cost and time
impacts We made it our priority to look ahead anticipate issues to develop effective solutions We also
kept an eye out for value engineering solutions to maintain the contract value and eliminate cost
escalation
Pre engineered Soils Condition Solution
Prior to commencing construction we anticipated poor soil conditions and recommended that the City
add a pre engineered solution to the contract when poor soil conditions were encountered and include as
a bid item
Coordination with Adjacent Concurrent Project
An adjacent extensive road rehabilitation project was being performed concurrently nearby which
complicated traffic control utility coordination room for lay down and staging and ensuring that finish
products were consistent between the two projects Extensive coordination efforts were made to establish
contacts to maintain communication
Utility Coordination and Railroad and Conflict Resolution
Unidentified utilities and storm structures were encountered during construction We facilitated research
with the County of Los Angeles and aided in the resolution to the conflict
Continuity of Project Management from Design through Construction
Because we were the design firm we had a unique opportunity to provide timely engineering reviews and
solutions Our Construction Management team and Civil Design group worked seamlessly together to
provide the best value to the City
METE=
ignelinZi
Berryman& Hen'gatChet CI TY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Rancho Santa Fe Road Improvements — Construction
Management
City of Carlsbad
Berryman & Henigar recently provided construction
management and inspection for Rancho Santa Fe Road
from Melrose Drive to Island Drive This $13 5 million
project included grading placement of underground utilities
and construction of 5 800 linear feet of Rancho Santa Fe
Road as a divided 4 lane major arterial Traffic signals were
installed on Rancho Santa Fe Road at Melrose Drive
Meadow Lark Ranch Road Redwing Street and Via
Allondra intersections Critical components included
1 coordinating safe and efficient routing of vehicular traffic
through the site to ensure public contractor and project
staff safety during major construction activities
1 maintaining utility services during installation of new
underground utility system
1 mitigating dust and noise to ensure nearby residents were treated with care and respect
1 vigilantly complying with environmental regulations|10 10|IMEWEll
MUM
Bearyman&Henier
1172-
> Resumes of Key Personnel
City of Culver City
Statement of QualificationsCala, C I T Y
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Tim D'Zmura, PE, CBO, AICP
Principal-in-Charge
Education & Certifications
BS Civil Engineenng University of Notre
Dame 1987
Registered Civil Engineer California 1990
#45607
Professional Affiliations
International City Management Association
American Public Works Association
American Society of Civil Engineers
National Society of Professional Engineers
1 15 Years of Municipal Management Experience
I Served as Extension of Staff for 8 Southern
California Cities
1 Successfully Administers State Federal, and
County Funding Programs (STPL, STIP CDBG
FEMA OCTFP)
1 Instrumental in Securing over $10 Million in
Grant Funds for City Agencies
Successfully Secured $950,000 in Grant Funds
for the City of Los Alamitos
Tim has served in a number of capacities in the fields of civil engineering municipal public
works current and advanced planning and building safety inspection and administration He
has served public sector clients as staff public works director, planning director, assistant
city engineer and building official
Tim s background also includes responsibility for leading and managing the successful
delivery of a variety of municipal contract services to numerous cities throughout Southern
California He has dedicated himself to serving the client s needs in the most effective and
efficient manner possible With 15 years of related experience he has developed asset
management systems reviewed geotechnical and environmental processes coordinated
engineering design and construction on infrastructure projects managed the preparation of
traffic calming plans provided construction contract management reviewed plans
implemented capital improvement project plans developed design standards and
ordinances secured funding and prepared feasibility studies
Tim has personally served as staff Public Works Director, City Engineer, Deputy City
Engineer Building Official or Planning Director for the following cities
1 Los Alamitos
Yucca Valley
1 San Gabriel
1 Palos Verdes Estates
1 Hidden Hills
1 Baldwin Park
Rancho Palos Verdes
1 Mission Viejo
EEEMB
MOWN
Betryman & Hangareaglet a TY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Mohammed Rowther, PE
Project Manager
Education & Certifications
M S Structural Engineering California State
Polytechnic University Pomona
B S Civil Engineering California Polytechnic
University Pomona
Registered Civil Engineer California #37127
/
24 Years of Roadway and
Drainage Improvement
Experience
v Extensive Project Management
Expenence
sf
Familiar with County of Los
Angeles Standards
Mohammed has 24 years of experience specializing in the design of roadway improvements
and municipal drainage projects throughout Southern California His experience includes
project management and providing civil and structural design engineering for transportation
storm drainage water and wastewater facilities
Sierra Avenue Widening Project, City of Fontana, CA Project Supervisor for the design of
Sierra Avenue from Baseline Avenue to South Highland Responsibilities include horizontal and
vertical design of roadway storm drain design signing and striping plans and utility
coordination Project also involves multiple design alternatives for the Baseline/Sierra
intersection Funding includes federal state and local funds
Baseline Avenue Widening Project, City of Fontana, CA Mohammed serves as Project
Supervisor for the widening of 3 7 miles of roadway This project is currently under design and
involves a geometric and alignment study channelization and widening of the existing two lane
road to five lanes In addition curb and gutter median driveway realignment design retaining
walls intersection design and construction plan preparation are required elements of the
project
Imperial Highway (State Route 90) Smart Street, City of Yorba Linda, CA Served as
Project Manager for the final design of widening 5 5 miles of Imperial Highway Segments 5 and
7 The federally funded $35 million project included PUC approval for widening of at grade
crossing of BNSF railroad tracks coordination with OCEMA and Corps of Engineers for
relocation of RCB storm drain outlet to the Santa Ana River and was designed per Caltrans
Metric Standards
Sepulveda Boulevard Widening, City of Carson, CA Mohammed served as Project
Manager responsible for the design of the Sepulveda Boulevard widening (50 to 100 feet of
right-of way) between Wilmington Avenue to Alameda Street for the City of Carson
San Gabriel Boulevard Improvement Project, City of San Gabriel, CA Served as Project
Manager for the development of master plan and final design of street drainage street lighting
signal and landscape improvements for approximately 2 miles of San Gabriel Boulevard
EMMGM
MEMO=
1L(
Beurnaut & Hauptea tetta CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Batz Road and Palm Avenue Improvements, City of Hemet, CA Served as Project Manager
for the design of roadway and drainage improvements along Batz Road and Palm Avenue in the
vicinity of MWD s Eastside Reservoir site in Hemet The project design was fast tracked to
expedite the permit processing through Riverside County
State Route 60/71 Interchange, City of Pomona, CA Project Manager responsible for the
design and construction of the four level freeway interchange at State Route 60/71 for the City
of Pomona and Caltrans Districts 7 and 8 This $73 6 million project included the design of over
11 5 miles of roadway 14 new bridges and 2 bridge widenings 15 retaining walls 4 soundwalls
six signal modifications 2 5 million cubic yards of excavation over $10 million in drainage
improvements and extensive construction traffic control The project was coordinated with 9
governmental agencies and completed two months ahead of schedule It received the
statewide Excellence in Transportation Facilities award for project delivery for Caltrans
Garey Avenue Improvement Project, City of Pomona, CA Project Manager for the
development of pavement rehabilitation strategy and contract documents for improvements
along approximately 6 000 feet of Garey Avenue from Lexington Avenue to 7th Street Project
included curb and gutter sidewalk driveways landscape and pavement Improvements
Alameda Transportation Corridor, Los Angeles, CA Project Manager for the preparation of
the Design Hydrology and Concept Design Report for storm drain improvements for the north
end improvement projects Project included the relocation of two LACDPW RCB drains due to
construction of grade separations along Santa Fe Avenue and Washington Boulevard
State Route 241 — Foothill Transportation Corridor, Transportation Corridor Agency,
Orange County, CA Project Manager responsible for the preparation of rough grading plans
hydrology report and final drainage plans for the El Toro Ridge Grading Element Project along
State Route 241 in the City of Mission Viejo for the Transportation Corridor Agency and Caltrans
District 12 Project included over 2 million cubic yards of excavation subdrain systems a
desilting basin and landslide repairs
Master Plan of Drainage, Chino, CA Project Manager for the preparation of Master Plan of
Drainage for the City of Chino Project included the development of hydrologic and hydraulic
evaluation of 34 square mile watershed in the cities of Chino Chino Hills Montclair and Ontario
tributary to U S Army Corps of Engineers Prado Basin and San Antonio Channel and
development of comprehensive digitized master plan for over $90 million in storm drain
improvements
Master Plan of Drainage, City of Yorba Linda, CA Project Manager responsible for the
preparation of master plan of drainage for the City of Yorba Linda Project included inventory of
existing drainage system development of hydraulic evaluation of existing drainage system
facility sizing and preparation of cost estimates
Master Plan of Drainage Chino Agricultural Preserve Area — Sub area 1, San Bernardino
County, CA Project Manager for the preparation of the Master Plan of Drainage for Sub area
1 of Chino Sphere of Influence of the Chino Agricultural Preserve Area for San Bernardino
County Flood Control District Project includes the development of design hydrology
preliminary hydraulics facility sizing and cost estimates for recommended facilities for this 1 800
acre study area
lalaGM
MUNN
Betryntanacliongat
7reati,eit CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Mark Risch, PE
Project Manager
Mark is a roadway design specialist with 20 years of
civil engineering design, planning, subdivisions,
utility relocation, and construction support experience
on transportation corridors throughout Southern
California, including a successful six year track record
with RCTD Committed to delivering value through
cost-effective and timely projects, Mark's
trademark project management style is to provide strong communication and to consistently
track project progress and costs to ensure project momentum and quality is maintained through
completion
Newport Road Extension, Riverside County Transportation Department, CA Project
Manager for the extension and widening of 4 5 miles of six-lane prime arterial roadway plus
a one mile extension of Briggs road, a major roadway The technical components of the $18
million, federally funded project included cost analysis of five separate alignment
alternatives including preliminary hydrology and hydraulics for preliminary sizing of storm
drain facilities, environmental documentation and processing (joint CEQA / NEPA document),
utility investigation and mapping (underground and overhead) and cost analysis of each
preliminary alternative In addition, coordination with property owners, developers and
their engineers was crucial to accommodate the needs of the many proposed developments
along the corridor
Rancho California Road Widening, City of Temecula, CA Project Manager responsible
for widening of Rancho California Road to relieve severe congestion at the intersections of
Rancho California Road with Interstate 15 and Old Town Front Street / Jefferson Street The
scope of work involved three alignment alternatives to study the benefit to cost aspects of
the various configurations The study included detailed traffic volume and intersection
geometry analyses, right of way acquisition options, complete cost estimating for all
alternatives included construction and construction management, right of-way acquisition and
engineering design services This study was completed with cost versus benefit and pro/con
matrices for City determination of the final selected alternative
Valley Center Road, County of San Diego, Escondido/Valley Center, CA Project
Manager responsible for a Preliminary Engineering Report, complete design, exhibits, and
survey oversight of approximately three miles of four lane arterial with median from Woods
Valley Road to Lake Wolford Road Design included hydrology and hydraulic calculations, review
of previous value engineering study, geotechnical study and environmental study The project
involved preparation of specifications and bid documents as well as construction traffic control
plans The project limits were extended 1,800 linear feet into the City of Escondido to join
existing improvements, improve sight distance, and substantiate horizontal curves
1 20 Years of Roadway Expertise
I Completed 20+ Alignment Studies
I 6 Year Track Record with RCTD
I Proven Multi Agency Coordination
I Excellent Working Relationship with All
Stakeholders
re:0)
U .
Winn
MEM=
Berryman & Henigar
77
ToEd Pratt
Construction Inspector
30 Years of Public Works
Infrastructure
Construction Experience
Storm Drain and Sewer
Inspection
Roadway Inspection
Cava CI TY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Ed has more than 30 years of public works infrastructure construction and inspection including
storm drain installation sewer installation public park and community facility development
grading traffic signal installation pavement construction rehabilitation overlay and slurry seal
concrete structures striping landscape and irrigation installation reinforced concrete walls and
block walls His background includes construction management construction supervision public
works inspection expert witness representation change order processing schedule tracking
and municipal bidding processes Additional specialties include construction site traffic control
and staging work site safety OSHA compliance project client liaison federal and state agency
funding requirements and community outreach
190th Street Rehabilitation and Water Main Replacement, Senior Project Inspector, City of
Torrance, CA The scope included curb and gutter sidewalk removal and replacement of
20 000 square feet of sidewalk 3 000 lineal feet of curb and gutter commercial driveways and
bus pads There were roughly 9 000 tons of rubberized asphalt with complete street rehab
consisting of 12 base fabric 12 OV CAB and finish of base asphalt and a
21/2
rubberized cap
The traffic signal work verifying of stripping plans layout checking the sewer storm drain and
water valve raising valves to finish grade The project had 4 000 lineal feet of 12 ductile iron
domestic water line with house service and fire hydrant connections The reclaimed water line
was 2 600 feet of CL900 12 pipe and inspection of the 2 600 feet of communication conduit
with the inner duct Included in this project were two major large landscaped median islands
Street Improvements, Senior Project Inspector, City of San Clemente, CA The project
consisted of asphalt and dirt removal for 12 miles of 12 street section Fabric was installed as
needed laying of base asphalt AHRM two inches thick plus curb gutter handicap ramps and
sidewalks This was a $2 million dollar project with challenges of traffic control to maintain
resident access to their property at all times The street improvements were made up of two
separate projects with two different contractors that needed careful scrutiny
Bandini Boulevard Street Rehabilitation, Senior Project Inspector, City of Bell, CA
Bandini Boulevard was three miles of street rehabilitation and new pipe Asphalt and dirt
removal for an 11 street section was required lay deep lift base asphalt lay AHRM 2 thick
The area was cold planed as required Stripping loops sidewalk replacement and handicap
ramps were incorporated into the project The challenges of this project were traffic control
night work and brought the project in early
Orangethorpe Avenue Street Rehabilitation, City of La Palma, CA Rehabilitation of
Orangethorpe Avenue from Valley View Avenue to SR 91 State Highway including pavement
grinding pavement reconstruction re pavement petromat placement and asphalt pavement
overlay striping traffic control scheduling and community outreach for over 2 500 linear feet
of major arterial as part of the City of Annual Pavement Maintenance Plan
SUREALI
VERITAS
Berryman & Henioreagle& CI TY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Gary Yeo
Construction Manager
Education & Certifications
BS Construction Management California Polytechnic State University San Luis Obispo
MBA Candidate California Polytechnic State University San Luis Obispo
Class B California Contractors License #8492919
Class B Oregon Contractors License
Radiation Safety & Nuclear Gauge Certification #38943
EMT Certification
Mr Yeo has more than 25 years of construction
management experience and currently serves as the Director of Construction Management at
Berryman & Henigar based in Santa Ana His areas of expertise include contract administration
estimating project planning scheduling and progress monitoring project cost management and
control claims resolution and change order management His relevant experience includes
Project Oversight, 190
th
Street Rehabilitation, City of Torrance, CA Provided oversight and
quality control for all services performed by Berryman & Henigar for this $5 million street
rehabilitation and water main replacement project
Project Oversight, City of Laguna Hills, CA Provided and continues to oversee the multiple
projects that are completed or under construction by the City of Laguna Hills These various
projects include the Alicia Parkway Median Landscape and City Entry Monument Improvements
(CIP 307) yearly contract for permit inspection Wetland Mitigation Plan and Turtle Pond Mitigation
encompassing excavation grading soil preparation landscape irrigation drainage placement and
other needed elements of the project Currently Alicia Parkway streetscape improvements and
traffic signal interconnect on Alicia Parkway and Mouton Parkway are in process
Project Controls/Quality Control Manager, Ocean Avenue Rehabilitation, City of Torrance,
CA Provided quality control for all services performed by Berryman & Henigar Provided cost
estimate data for contract change orders Assisted in project close-out
Project Oversight, Chino Avenue Bridge Widening and Street Improvements, City of Chino,
CA The oversight of this unique project brought many challenges bringing together the necessary
participation of multiple agencies including the City of Chino Caltrans San Bernardino County
Flood Control District the U S Army Corps of Engineers the contractor and associated specialty
subcontractors
Construction Manager, City of Paso Robles, CA Provided contract services including
conceptual estimating management of the design process bidding construction management and
controls
Construction Manager, City of Paso Robles, CA Provided contract services for the entire
design and construction process including conceptual estimating management of the design
process constructability and peer design reviews bidding construction management and controls
Mr Yeo was responsible for the overall management of these projects and for overseeing all sub
consultant services utilized
KMZEI
MEM=
Berlyman &Hangar
"P"
3 25 Years of Construction
Management Expenence
/ Multiple Stakeholder
Coordination
s( Storm Drain Channel, Roadway
Construction Managementatitlet CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Howard Weber
Senior Civil Designer
Howard will be the designated Senior Civil Designer
for this project and has more than 35 years of
experience with an emphasis on local and interstate
transportation needs serving the public works sector
Howard brings impressive experience in roadway
design and rehabilitation geometric design road
widening with curb gutter and sidewalk
Qualification Highlights
Years of Experience
1 35
Education
st BA Industrial Arts, California State
University
To
Lakewood Boulevard, City of Downey, CA Project Engineer for the rehabilitation and
widening of Lakewood Boulevard from the 105 Freeway to Telegraph Road through the City of
Downey This multi-million dollar construction project focused on providing joins at existing
properties minimizing right of way takes and on site construction as well as construction of
landscaped median and pertinent utility relocations Completion is expected in 2007
154th Street, City of Lawndale, CA Widening and rehabilitation of a local collector street
which serves two schools and links two major arterial highways Hawthorne Boulevard and
Prairie Avenue This $150 000 project was completed on time and budget
Smith Park Street Rehabilitation, City of San Gabriel, CA Rehabilitation of Broadway Clary
Avenue San Marino Avenue Elm Avenue and Del Marino Place in the City of San Gabriel
Project utilized digout areas as well as pulverization
Millennium Miles, City of San Gabriel, CA The first phase of the Millennium Miles project
entailed the rehabilitation of seven local streets by pulverization addition of gutter plate drive
approach replacement and design of an offset crown line in a relatively steep section of the city
Main Street Rehabilitation, City of Lake Elsinore, CA Main Street a major arterial through
the city was refurbished using R&R overlay and slurry seal Curb and gutter was constructed
where none previously existed and a localized drainage problem was solved
Anaheim Resort Street Rehabilitation, City of Anaheim, CA Harbor Boulevard from
Convention Way to Katella Avenue and Anaheim Boulevard from Cerritos Avenue to Ball Road
in the City of Anaheim consisted of widening and removing and replacing the structural section
for two of the city s busiest streets
Walnut Street, Disney Way, West Street, Harbor Boulevard and Ball Road necessitated
removal and replacement of their structural section curb and gutter sidewalks and driveway
aprons Drainage issues and utility conflicts were solved Storm drains and other utilities were
installed Of note is a sidewalk on Disney Way that when viewed from above is in the
silhouette of Mickey Mouse Tramway and fire access road were designed from the Disneyland
parking structure to Downtown Disney and the park s entrance
MEG=
MEM
Berrirmui & Henigateattta CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Jacki Mem!, PE, TE
Project Manager
Education & Certifications
B S Civil Engineering 1998
Registered Civil Engineer California #64046
• 6 Years of Municipal Management
Expenence
• Served as Extension of Staff for 3
Southern California Cities
1 Manages Multiple Public Works CP
Roadway Improvement Projects
Jacki has over six years of progressive civil engineering construction management and
municipal public works experience She has served as extension of staff for various cities in
Southern California including Los Alamitos Yucca Valley and Buena Park
Assistant City Engineer, City of Los Alamitos, CA Currently managing multiple public
works improvement projects including street widening street realignment reconstructions and
resurfacing installation of new roadways and landscape median islands Also responsible for
all land development plan check and permit processing and approval
Deputy Town Engineer, Town of Yucca Valley, CA Managed multiple public works
improvement projects including street widening street realignment reconstructions and
resurfacing installation of new roadways and landscape median islands These projects were
funded with a variety of Local State and Federal monies which required special project
administration Also responsible for all land development plan check and permit processing and
approval
1 Gateway Industrial Complex a one million dollar street resurfacing and improvement
project including new sidewalk curb and gutter and street lighting
• Fox Trail, a $350 000 new street construction including utility relocations and drainage
mitigation
• Hillcrest Drive, 3 200 lineal feet of street construction including utility relocations
• Onaga Trail, a $280 000 street realignment and widening project including curb and gutter
sidewalk wheelchair ramps and drainage improvements intended to increase pedestrian
safety near a school
Assistant Engineer, City of Buena Park, CA Responsible for plan checking grading street
improvement easement deeds dedications parcel maps tract maps and sewer storm drain
and water plans Also responsible for establishing development conditions for upcoming
projects overseeing NPDES and FEMA compliance as well as issuing permits for private
property grading and right of way improvements
Berryman & lienigarCAW', CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Mike Foreman, PLS
Surveyor
Education & Certifications
Undergraduate Engineering Studies California State
University at Long Beach
Professional Land Surveyor California #5778
Mr Foreman manages Berryman & Henigars West
Coast Field Services Division and is responsible for all
field surveys mapping map checking and right-of-way engineering projects He has been
involved with a variety of survey projects including control surveys using GPS and conventional
methods boundary resurrection and establishment construction topographic geological
monitoring and ALTA surveys
San Gabriel Boulevard Reconstruction, City of San Gabriel, CA Provided design and
construction surveying oversight for the reconstruction of 8 600 linear feet of a four-lane arterial
highway Also included were new storm drains street lighting a new traffic signal street trees
and decorative walks at intersections
Ocean Avenue Improvement, City of Torrance, CA Responsible for the topographic
mapping associated with 8 500 linear feet of street reconstruction and 6 750 linear feet of water
main replacement on Ocean Avenue Newton Street and Madison Street including pavement
rehabilitation strategies storm drains streetscape and public forums
Imperial Highway Improvement Project, City of Yorba Linda, CA Provided design
surveying and right of way engineering oversight and base map development The project
included aerial topographic mapping of approximately 5 miles of Imperial Highway from Rose
Drive southeasterly to Santa Ana Canyon Road Strip topographic mapping was produced along
this reach in digital format and in metric units in compliance with Caltrans Standards Included
in the base sheet information was all record right of way property line and ownership
information along with supplemental roadway cross section survey data collected using
conventional methods for final engineering design Legal descriptions and plats were then
prepared for easement negotiation and acquisition purposes where roadway widening was
required
La Paz Road Improvements, City of Laguna Hills, CA Provided design surveying oversight
for asphalt grinding pavement rehabilitation and overlay modification of median islands and
median landscaping and irrigation improvements for approximately 11 000 linear feet of
roadway
Oso Parkway Improvements, City of Laguna Hills, CA Provided design surveying oversight
for a pavement rehabilitation and overlay project along with median and landscaping for
approximately 8 350 linear feet of a high traffic volume roadway with steep gradient
v 30+ Years Mapping I Map Check
Oversight
./ Manage Map Check Services for
25+ California Agencies
v 14 Years Expert Examiner for
Board of Registration for
Professional Engineers & Land
Surveyors
MEW=
!Berryman Er HungerCava CI TY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Chuck Dompter
Civil/Utilities Inspector
Professional Summary
Chuck has over 30 years of experience in
public works infrastructure construction and on
site construction management/inspection
projects These projects include pavement
construction rehabilitation conventional and
asphalt overlay slurry seals concrete
structures storm drain installation sewer
installation public park and community facility
development grading traffic signal installation
railroad crossings striping landscape and irrigation installation reinforced concrete walls and
block walls His background includes public works field inspection construction management
construction supervision change order processing schedule tracking community and multi
agency interface and municipal bidding processes Additional specialties include construction
site traffic control and staging work site safety OSHA compliance project client liaison Federal
and State agency funding requirements and community outreach
Relevant Experience
On Call Construction Management, Contra Costa County, CA Construction Manager of four
separate roadway reconstruction and sidewalk improvement projects Projects included a $5
million overlay and street reconstruction project throughout Contra Costa County The project
consisted of using rubberized asphalt concrete which required extensive oversight during
placement Oversaw two Pubic Works Inspectors and an Engineering Technician for the
inspection utility coordination construction cost analysis preparation and review of change
orders review of traffic control plans and public relations with local residents
Park Road Roadway Improvements, City of Benicia, CA Construction Manager for roadway
improvements along Park Road between Adams Street and Oak Road Improvements included
an asphalt concrete overlay of the entire project limit dig out and repair of approximately 2 500
square feet of pavement drainage improvements slope stability and safety improvements
The project was funded through the State Transportation Improvement Program
Citywide Roadway Improvements, City of Walnut Creek, CA Construction Manager for
citywide roadway improvements including pavement rehabilitation overlay traffic loops curb
and gutter sidewalk and ADA ramps along main arterials and residential streets
Mill Valley Road Rehabilitation, City of Mill Valley, CA Construction Manager for repair to
28 existing City streets as well as grinding of high spots refilling of cracks and removal and
replacement of bad sections of roadway
Roadway Improvements, City of Mill Valley, CA Construction Manager for frontage road
overlay work including installation of curbs and gutters culvert system and 1 1/2 miles of
asphalt overlay|10 10|A
a
11310110i
Man=
Berryman & Henlgar
834
V 30+ Years Public Works On Site
Inspection and Construction Management
V Multi Faceted Infrastructure! Structures
Construction
V Successful Multi Agency! Community
Outreach Coordination Track RecordCa/WA CITY
Statement of Qualifications
As-Needed Civil Engineering and Construction Management
Shawn Stewart
CivillUtthhesINPDES Inspector
Professional Summary
Shawn has 22 years of progressive construction
management and inspection experience He has
provided inspection for mass grading rough grade and
utility infrastructure storm drains and structures
pedestrian bridges retaining walls sidewalks curbs and gutters asphalt concrete channels parking lots and
underground utilities He has provided SWPPP training inspection and enforcement as well as guest builder
inspections including R value and street structural section inspections He specializes in project management
controls including scheduling estimating document control coordination of testing and inspection services change
orders payment applications RFI process field inspections and general management His experience includes work
on both public works projects as well as private Shawn has provided expert management on infrastructure projects
industrial projects and for buildings both residential and commercial
Relevant Experience
Various Construction Inspection Projects, City of Mumeta, CA Supervising Inspector responsible for 2004 05
Capital Improvement Projects all new signaling intersections for residential and commercial areas coordination and
implementation of NPDES training for 9 city inspectors and enforcement of traffic control Major projects included the
following
I Roadway Construction Projects Murneta Hot Springs Road Widening and Realignment Jackson Avenue
Relocation and Construction Jefferson Avenue Widening Downtown Road Widening Cal Oaks Interchange
Widening
I Private Development Projects Lincoln Ranch Northstar Ranch Creekside Village
I Commercial Projects The Orchard Margarita Square Murneta Spectrum Murneta Marketplace
As Supervising Inspector Shawn trained implemented and enforced City standards of inspection He was also
responsible for inspections of all Capital Improvement Projects representing the Public Works Departments
interests He coordinated with City engineers project managers City officials contractors and the public to ensure
all parties needs were met As the Public Works representative for all signalized intersection conversions Shawn
coordinated with the City s traffic engineers City Manager and the Public Utilities Commission s contractors on
projects involving lane alignment traffic control and timing sheets
As the City s NPDES Coordinator Shawn oversaw training implementation and code enforcement He trained City
employees developers and trade partners This effort was coordinated with both the SRWQCB and the State of
California s NPDES officials to ensure that the City was in compliance with all applicable NPDES and AQMD
regulations for both Capital Improvement Projects and private development projects He developed a partnership with
the code enforcement officials and developed a protocol for NPDES enforcement to streamline the enforcement
process
o
1 22 Years of Progressive Construction
Management and Inspection Expenence
1 Inspector' Assistant Resident Engineer for
10+ Construction Projects Totaling Over $30
Million
Ealingi
innalThai
fLi
Berryman & Henigar
Relevant Experience
SANITARY
SEWER
When a project requires expertise in sanitary sewer
projects, HFI can respond with a well seasoned team of
experts HFI s experience in planning, design and
conditional assessment of sewer systems is listed below
Services.
• Facilities planning and design
• Preparation of plans, specifications, and
estimates
• Lift station design
• Video inspection
• Trenchless technology
• Sewer system rehabilitation strategies
• Public information & involvement program
• Value engineering
• Contract administration
• Program management
• Permitting
• Regulatory compliance strategies
• Funding strategies to leverage available federal
and state funding sources
-|1010|Mr Hall & Foreman, Inc.
Representative Projects:
• Backbone and In tract sewer Ladera Ranch
• Horno Lift Station Force Main Santa Margarita
Water Distnct
• Covington Heights Backbone Sewer Systems
Pulte Homes/Yorba Linda Water District
• Sewer System Modifications at El Cerrito
Avenue Cypress
• Southeast Fontana/Bloomington Master Plan
Rialto
• Sewer Master Plan Yorba Linda Water District
• Plan of Works Report Ladera Ranch/Santa
Margarita Water District
• Sewer Master Plan Fontana
• Foothill/East Avenue Trunk Sewer Fontana
• Backbone and In Tract Sewers, Heritage
Fontana
• Downtown and Imperial Highway Brea
• Antonio Parkway Trunk Sewer Orange County
• State College/Rolling Hills Drive Relief Subtrunk
Sewer Orange County
• Golden City Master Plan Offsite Sewer
Murneta
• El Cajon Trunk Sewer Yorba Linda Water
District
(00Relevant Experience
SURVEYING
& MAPPING
With a combination of state of the art technology and a
well trained, experienced staff, HFI can provide a wide
variety of project surveying services
Services:
• Right of Way Mapping
• Architectural/Engineering Design Surveys
• ALTA/ACSM Land Title Surveys
• Legal Description and Plats
• Subdivision Mapping
• Construction Staking
• GPS Control Networks
• Settlement Monitoring
• Aerial Topographic Surveys
• Condominium Plans
Representative Pnvate Survey Projects
• Triangle Square Shopping Center- Costa Mesa
ALTA, Mapping and Construction Staking
• Simi at the Plaza Shopping Center Simi Valley-
ALTA, Mapping and Construction Staking
• Kaleidoscope Shopping Center Mission Viejo
ALTA, Mapping and Construction Staking
• Covina Town Square Shopping Center- ALTA and
Lot Line Adjustments
• Baldwin Hills Marketplace Redevelopment ALTA,
Mapping, and Construction Staking
• Marr Ranch Simi Valley 226 Lot Subdivision
Mapping and Construction Staking
• Meridian Moorpark 250 Lot Subdivision
Mapping and Construction Staking
• Wolf Creek Temecula 1457 Lot Subdivision
Mapping and Construction Staking
? The Regatta High rise ALTA Mapping and
Construction Staking
• Hollywest Promenade ALTA Mapping and
Vertical Subdivision
Representative Public Survey Projects
• Interstate 5 Right of-Way mapping- OCTA
• Foothill Blvd Surveying and Right of Way
mapping- City of Fontana
• State Route 30 Surveying and Right of Way
mapping SANBAG
• Interstate 405 Right of Way mapping OCTA/
HNTB
• Post Earthquake Design Surveys Cal State
Northridge
• Mountain Street Design Topo and Staking City
of Tustin
• Fairplex Drive Design Topo and Staking-City of
Pomona
• Santa Ana River Improvement Mapping
Counties of Orange, Riverside and
San Bernardino
• Summit Avenue Surveying and Right of-Way
mapping City of Fontana
• Current On Call Surveying Contact Coun of
Los Angeles
• El Centro Gas Line Surveying
and Right of Way mapping
So Cal Gas Co
11,1r Hall Foreman, Inc.Services:
• Plan check review for public agencies in
accordance with NPDES requirements
• Development of permit applications and plans
including WQMPs, SQWMPs, and SWPPPs
• Site inspections and regulatory compliance
• Program development for Water Quality
Management
• Training seminars and workshops with certified
expertise in hydrologic analysis and studies
modeling
• Addressing complex environmental permitting
issues
• Innovative design and expertise of water quality
treatment facilities
• Alternative funding strategies from federal,
state, and local resources
• Water quality management
• NPDES permit compliance
• Development of BMPs
• Water quality treatment facilities design
• Regulatory compliance strategies
• Funding strategies to leverage available federal
and state funding sources
• Public information and involvement program
• Program management
• Inspection services
1111111.a7Z;:
Relevant Experience
NPDES / WATER QUALITY
MANAGEMENT
HFI provides a broad range of professional NPDES/Water
Quality/SWPPP services with an in depth understanding
of technical and regulatory issues for implementation of
storm water quality requirements in accordance with the
NPDES program Expertise has allowed staff to merge
innovative and award winning designs with practical and
cost effective application of Best Management Practices
(BMPs) These benefits have resulted in key relationships
being developed with regional and local authorities
throughout the Southern California area HFI has pro
vided numerous plans for public and private development
for municipal, industrial/commercial, and construction
activities The goal is to integrate regional issues while
considering practical applications and the environment
HFI s professional services in Water Quality Management
have included the development and provision of Best
Management Practices (BMPs) for municipal and Indus
trial/commercial construction activities covered by the
State of California NPDES General Permit, "Standard
Urban Stormwater Mitigation Plans 1 (SUSMP), local
Water Quality Management Plans, and project specific
Runoff Management Plans incorporating water quality
HFI s scope of services include the preparation of
SWPPP's, Erosion and Sediment Control Plans, design of
urban flow (dry weather runoff) interceptor structures,
and vegetated nvenne systems for bioffitration of urban
flows Unique special services include the design of
Water Quality Catch Basin Inlets to intercept dry weather
urban flows as required by NPDES criteria
E IT Halt L Foreman, Inc.
101-MEZMNO
_
Relevant Expenence
NPDES / WATER QUALIFY
MANAGEMENT
Representative Projects
• Water Quality Catch Basin Standard Drawings
Los Angeles County Department of Public Works
• Preparation of SWPPPs Los Angeles, Ventura,
Riverside, San Bernardino &Orange Counties
• Development of NPDES Monitoring and Sampling
Plan Ladera Ranch, Rancho Mission Viejo
• Annual Sediment Control Plan Rancho Mission
Viejo, Ladera Ranch
• Centennial Master Drainage and Water Quality
Concept Plan - Tejon Ranch
• Preparation of Erosion and Sediment Control
Plans Various locations
• The Strand Walkway Improvements Manhattan
Beach
• Ladera Ranch Rancho Mission Viejo
• Rolling Meadows Tejon Ranch
• Renaissance Ranch Renaissance Communities,
11C
• Sycamore Villas Cameo Homes
• Pacific Grove Communities Pacific Grove
Corporation
• Infinity Homes - Infinity Homes
• Chelsea Square The William Fox Group
• Meadows Village Shopping Center - Spehar
Temecula Center
• Seal Beach Village Seal Beach Village, LLP
• Richardson s RV Sales Manifee,
Riverside County
• Falkner Winery Raymond and Loretta Falkner
• Leonesse Winery Stage Ranch Farm Mgmt
/0
my Hall Foreman, Inc.
.1 MirKey Personnel
HFI
TEAM MEMBERS
With a staff of over 180 employees, including 31
registered Civil Engineers, HFI has the team necessary to
provide timely and cost effective engineering services
Brief professional profiles of key HFI team members are
presented below Typical support staff includes project
and staff engineers, designers, CADD operators, clerical,
surveyors and inspectors
John Hogan, P E
Chief Executive Officer/Principal
Mr Hogan s 30+ year civil engineering background
includes experience in all civil engineering disciplines He
has managed design teams on a variety of challenging
commercial, industrial, residential, land planning, and
public work projects Mr Hogan 's design experience
includes grading, sewer, water, street, hydrology/
hydraulics, and drainage The diversity of his past
projects range in size and variety The large scale
projects have given him the experience to perform
feasibility studies, infrastructure planning, and identifying
financing alternatives Other skills include proactive
project communications and the ability to consistently
adhere to budget and schedule requirements Mr
Hogan s involvement in various professional associations
and societies keeps him active and aware of the ever
changing business and technology climates
Jon E Bourgeois, P E
Preside
nt/Principal
Inland Empire Division
Mr Bourgeois has broad based experience in project
management and design of both public works and private
projects including preparation of project specifications
and bid documents, cost estimates, right of way engi
neenng, and contract administration and inspection His
design experience includes streets, highways, storm
drains, sewer and water facilities, and other public works
infrastructure components Mr Bourgeois is responsible
for on call engineering and plan checking services for the
Cities of Brea, Diamond Bar, Tustin, Yucaipa, and the
Counties of Los Angeles and Orange
p ow Hall I:. Foreman, Inc.
Mark Miner
President/Principal- Los Angeles, Ventura Division
Mr Miner has over 15 years of experience in the real
estate development field He has thorough knowledge of
the subdivision process, building permit process, tract map
recordation procedures, public improvement plans,
environmental impact reports and clearances, and other
entitlements He has been involved in a diverse number of
projects including residential and industrial subdivision
condominium conversions, high rise development and
public infrastructure Mr Miner has also managed the
permit approval process associated with these various
developments
Alan Palermo, P E
President/Principal- South Coast Division
Mr Palermo has over 17 years industry experience in
construction management, land development, commer
cial/retail, residential, industrial and institutional projects
for the private sector His expertise in Client relation
ships along with supervising projects from initial
research through the preparation of construction
documents is immeasurable Mr Palermo is a results
oriented professional with strong project management
skills and can prove to be invaluable to any project
Steve C Shambeck, P L S
Vice PresidenVPnnapal- Surveying & Mapping
Mr Sham beck serves as the corporate director for the
Surveying and Mapping Department Mr Shambeck has
over 20 years of surveying, mapping, and land develop-
ment experience in Southern California Mr Shambeck
has earned a reputation for quality right of way map
ping, boundary resolutions, ALTA surveys coordination,
and innovative mapping solutions His involvement in the
surveying associations keeps him current in the field
(0 11Key Personnel
Donald 0 Lohr, P E
President Temecula Division
Mr Lohr possesses over 34 years of civil engineering expe
nence He has been engaged in the marketing, adminis
tration, planning, design, and construction of private and
public projects including land development, residential,
commercial, industrial subdivisions, recreational facilities,
and public works projects for local agencies
Gerald 3 Bard, P E
Vice President/Associate - Temecula Division
Mr Banl has over 41 years experience in the public and
private sectors in Southern California His professional
experience and qualifications include general civil, water
resources, sanitation systems, drainage and flood
control, site development, and transportation projects
He has managed many projects from planning through
design and construction Early in his career, he developed
a complex hydraulic analysis computer program for the
County of Los Angeles and their first hydrology program
Mr Banl also compiled/authored the county's Highway
Design Manual He has served on the committee which
developed the Orange County Local Drainage Manual
Currently, he is preparing Standard Drawings for Water
Quality Catch Basins for Los Angeles County
Fred W Doerges, P E
Vice President/Associate - Temecula Division
Mr Doerges has in excess of 35 years of civil engineering
experience He has been involved in the administration,
planning, design, and construction of projects within both
the public and private domain Assignments include public
works facilities design and funding programs, recreational
development for cities, counties, utility companies, and pub-
lic agencies, and residential and commercial projects
Harold A Garcelon, P E
Vice President, Engineenng/Assooate Inland Empire
Division
Mr Garcelon has over 40 years of experience in Southern
California with private and public sector projects He
worked for the City of Whiner for 15 years Where his
duties included grading, sewer, storm drain, highway
design, and plan checking and construction supervision
Mr Garcelon was the Project Manager for a 12 acre
Wal Mart and McDonald Classic with shop space, a
major design issue was a terraced 14 inch retaining
wall
Eldon C Schierman, P E
Vice President, Engineenng/Associate - Los Angeles,
Ventuta Division
Mr Schierman has more than 26 years of professional
experience in civil engineering and projects throughout
Southern California He has been responsible for the
design and implementation of numerous residential,
commercial, and industrial developments including,
subdivision, mapping and the public improvements
associated with those developments
Robert C Everson, P E
Project Director/Associate South Coast Division
Mr Everson has over 26 years of experience on numer-
ous projects involving all aspects of infrastructure
planning and design His extensive background includes
sanitary sewer and water system designs, hydrology and
hydraulic engineering, grading, street, and storm drain
improvements, detention basins, and extensive coordina-
tion with both wet and dry utility agencies
Anthony Tench, P E
Project Director/Associate - Temecula Division
Mr Tench possesses over 36 years of experience in the
marketing, administration, planning, design, and
construction of projects involving land development, resi
dential, commercial, industrial subdivisions, and public
works His accrued strengths include land planning, devel
opment of raw land and inflll sites development strategy,
governmental coordination, project organization, and de
sign
Robbie Mahmood, P E
Project Director/Associate South Coast Division
Mr Mahmood has more than 18 years of experience in
civil engineering design construction and management
His expertise includes the design of roadways, drainage,
hydrology, sewer, water structures, and construction
management Mr Mahmood has been managing projects
in the public works sector as well as the land develop
ment sector He was the Project Manager for Covenant
Hills at Ladera Ranch responsible for all on-site sewer,
water and street improvements
for
"IMP Hall & Foreman, Inc
j Nor .Key Personnel
Glenn Chung, P E
Project Manager/Associate Inland Empire Division
Glenn Chung, P E holds a Bachelor of Science Degree in
Civil Engineering from the University of Long Beach and
has over 10 years of professional experience in South
ern California His experience as Project Manager
includes land development for commercial, industrial,
and custom lot residential projects and land surveying
and mapping services
Ralph Dominguez, P L S
Survey Manager/Associate Inland Empire Division
Mr Dominguez is responsible for managing and
coordinating all aspects of the field survey and office
support team With over 30 years in the surveying
industry, he has the experience to manage many types
of projects Mr Dominguez provides direct supervision to
HFI surveyors for construction projects, horizontal
control establishment, boundary and ALTA surveys, and
production and safety
Mike Navarro, P L S
Manager of Mapping/Associate South Coast Division
Mr Navarro has been instrumental in the plan prepara
tion of Parcel Maps, Tract Maps, ALTA Surveys, Record of
Surveys and Lot Line Adjustments for various clients,
both private and public His experience also includes
preparation of legal descriptions, topographic surveys
and boundary surveys and analysis Additionally, Mr
Navarro provides plan checking services to the City of
Tustin He is responsible for plan checking all maps in
accordance with the Subdivision Map Act and guidelines
for the preparation of maps currently in acceptance in
the industry Mr Navarro has also provided plan checking
services to the City of Brea, under the guidance of the
Contract City Engineer
Henrik Nazanan, P E
Project Director/Associate Los Angeles, Ventura Division
Mr Nazarian has over 13 years industry experience in
construction management and land development His
design experience in commercial/retail, residential, and
industrial projects include grading, sewer, water, storm
drain, street and hydrology/hydraulic studies Clients will
receive optimum coordination between the design team
and the contractor in meeting the schedule and complet
ing the project under budget, due to Mr Nazarian s
combined construction and design experience
Damal Martin, P L S
Director of Surveying & Mapping Los Angeles, Ventura
Division
A professional land surveyor, Mr Martin has more than
21 years of related surveying experience This expen
ence ranges from property surveys to right of way and
boundary establishment problems and solutions This
includes preparation of legal descriptions, ALTA surveys,
tract maps, exhibit maps, as builts, design and construc
bon surveying for streets, storm drains and other
improvements He has been extensively involved in the
implementation of designed projects and the quality
control of field operations
John Polito
Project Director Los Angeles, Ventura Division
Mr Polito has over 20 years experience in land develop
ment including land planning entitlements, civil design,
final plan, and map approvals His expertise as Project
Director includes hillside developments and master
planned communities His daily contact with public
agency staff in Los Angeles, Ventura, and San Diego
Counties ensures our Clients a direct link to County
resources Mr Polito was responsible for the design,
implementation, and final approval of street designs,
storm drain facilities, sewer infrastructure, and water
infrastructure for numerous master planned community
projects
Hugo H Prestmary, P E
Project Director - South Coast Division
Mr Prestmary is a hands on engineer with over 41 years
of experience, primarily on large-scale master planned
communities Considered one of the preeminent hillside
grading experts in the area, Mr Prestmary s projects
include Nellie Gail Ranch and Ladera Ranch s Covenant
Hills in Orange County, Rancho California and Lake Hills
in Riverside County, and extensive experience in Los
Angeles County
Jerry Veluhalas
Director of Planning Los Angeles Ventura Division
Mr Veluhakis has over 31 years of related experience in
both city and regional planning He has thorough knowl
edge with all aspects of land development planning
including detailed knowledge of regional and local
zoning, land use issues, land development planning and
subdivision regulations He has been involved in numer
ous infill/development projects in Los Angeles
sir Hall & Foreman, Inc
(OG& Foreman, Inc
Key Personnel
Durry Atassi, P E
Project Manager South Coast Division
Mr Atassi has over 17 years of experience in land
development and transportation engineering Mr Atassi
has contributed to the completion and success of many
national and international civil engineering projects His
experience covers all aspects of civil engineering work
including planning, final design, and construction man
agement His experience in transportation design
includes preliminary engineering, geometric design,
route relocation studies, stage construction, traffic
handling plans, and cost estimates
Don Bierman, P E
Project Manager South Coast Division
Mr Bierman has over 35 years of civil engineering
experience in the management and engineering of
drainage projects, site developmet, freeway and airport
drainage projects, commercial, industrial and residential
site improvements His experience also includes design
of plans for sewers, streets, storm drains, water convey
ance and grading, developement of Master Plans of
Drainage, and drainage systems designs
Richard L Bowman, P E
Project Manager Inland Empire Division
Mr Bowman has more than 31 years of professional civil
engineering experience in Southern California He has
prepared numerous plan and specification documents for
streets & highways, sewers, water and drainage & flood
control projects His expertise includes mass, rough and
precise grading design for both large and small site
development projects He has also prepared several
Storm Water Pollution Prevention Plans His experience
includes municipal services for plan checking of various
improvement plans and implementation of ADA and Title
24 regulations
Ronald D Chapman
Project Manager Inland Empire Division
Mr Chapman has over 36 years of experience encom
passing land development for both commercial and
residential projects along with experience on public
works projects throughout Southern California and
Southern Nevada Mr Chapman has coordinated with HFI
staff, governmental agencies, consultants, and private
development companies to process all the documents
necessary for the development of a project
& Foreman, Inc.
F Richard Jones, PE,P LS
Project Manager Los Angeles Ventura Division
Mr Jones has over 27 years experience within the civil
engineering industry as Project Manager, Director, and
Office Manager Mr Jones has managed multi disciplinary
teams of professionals to bring about timely completion
of complicated hillside, residential, commercial, and
industrial projects He has formulated project schedules,
provided cost effective management, timely invoicing,
and managed teams of subconsultants to provide
expeditious approvals for environmentally sensitive
projects Mr Jones has also designed and developed new
business development strategies, computer network
systems, and standards for CAD practices
Ben Macaluso
Project Manager Inland Empire Division
Mr Macaluso has spent more than seven years working
as a project manager for projects throughout Southern
California, Arizona, and Nevada The nature of the
projects included gas stations, fast food restaurants,
single family residential, multi-family residential, and
large commercial retail His experience as a project
manager includes duties such as budget management,
entitlement processing, subcontractor coordination, utility
coordination, and construction support
Mike MacFarland
Project Manager, Entitlements Inland Empire Division
Mr MacFarland has broad based experience in project
management and entitlement He has worked on
projects throughout Southern California, Arizona, and
Nevada Many of his past projects have focused on the
fuel industry These projects have given him the experi
ence to perform feasibility studies, manage and adhere
to strict budget and construction schedules, and repre-
sent Clients at public hearings and throughout the entire
entitlement process The diversity of project locations
has allowed Mr MacFarland to create personal contacts
throughout many governmental agenciesKey Peisonnel
Andrew Powell
Project Manager Temecula Division
Mr Powell has over 24 years experience in residential,
commercial, and industrial site design and five years
experience in public works with an emphasis on water
distribution, plan checking, and Capital Improvements
He served as a Consultant Associate Engineer for the
City of Mumeta and has prepared staff reports and
resolutions to city councils along with map checking and
preparation of specifications and estimates Mr Powell
has extensive knowledge of NPDES and SWPPP regula-
tions, services, and state requirements
Hugo Ramirez
Project Manager South Coast Division
Mr Ramirez has more than 16 years of civil engineering
experience with private land development and public
works projects in Southern California He has been the
project engineer and designer of numerous residential
and planned communities, commercial land industrial
developments
Mark S Reader, P E
Project Manager South Coast Division
Mr Reader has over 18 years of varied experience
within the field of civil engineering His professional
career includes public sector experience performing
freeway design, land surveying, and right-of way
monumentation and private sector experience including
civil engineering design and agency processing for
residential subdivisions, For the last 14 years of his
professional career Mr Reader has provided structural
and civil engineering services for approximately 3,000
projects, which entail custom homes, shopping centers,
automobile dealerships, and retail buildings Mr Reader
is also experienced in project management for the
development of raw land and infill sites He has served
as the investigative lead engineer for insurance
companies and property management companies along
with providing expert witness testimony and depositions
for both the plaintiff and defendant in resolving legal
disputes
Armando Rutledge
Project Manager South Coast Division
Mr Rutledge has over 20 years of municipal experience
in managing a variety of projects He is skilled in
administering diverse projects ranging from capital
improvements-to community workshops and has
successfully secured various federal, state, and local
grants Mr Rutledge also has an excellent background in
critical analysis, communication, construction
management, scheduling, and budgeting
Cindy Shambeck, LSIT
Mapping Manager South coast Division
Ms Shambeck has been instrumental in the map prepa
ration of parcel maps, tract maps, record of surveys,
tentative maps, mergers, condominium plans, parcel
map waivers, and centerline ties for various clients Her
17 years of experience also includes preparation of legal
descriptions and plats, lot line adjustments, covenant,
conditions and restrictions (CC&R), exhibits, annexations
and reorganizations Currently Ms Shambeck provides
plan checking services to the County of Orange and Cities
of Brea, Diamond Bar, and Tustin
Gerald Hofmaister, P E
Senior Project Engineer South Coast Division
Gerald Hofmaister is a Senior Engineer with more than
30 years of subdivision engineering experience Mr
Hofmaister has technical expertise in designs of hillside
residential development, multi family projects, and
commercial subdivisions His strengths include layout of
grading projects, streets, utilities, and drainage design
He has experience in subdivision mapping and site
planning He has also coordinated projects with design
crews, public agencies, and other consultants and
Clients from initial concept to completed as built draw
ings
Lee M Holguin, P E
Senior Project Engineer L A /Ventura Division
Mr Holguin has over 24 years of proven experience in
design, project management, and construction inspec
bon of institutions, maintenance facilities, transportation,
and other significant civil engineering projects Mr
Holguin has expertise in school modernization, roadway,
grading, drainage, and site development design Mr
Holguin has worked extensively throughout Southern
California and has experience working with private
Clients, public agencies, and interfacing with local
municipalities
Er , Hall /I.r . Foreman, Inc.
SKey Personnel
Pavel Horn, P E
Senior Project Engineer South Coast Division
Mr Horn has over 31 years of experience in the civil
engineering profession He has successful hands on
design engineering experience on commercial and
residential development projects as well as public works
projects He has an extensive background in grading,
street, storm drain, sanitary sewer system, and water
design as well as plan checking expertise
Herman S Hovagimyan, P E
Chief Engineer - South Coast Division
Mr Hovagimyan has over 37 years of experience in the
management, planning, design, and construction of
major engineering projects throughout the United States
His expertise is recognized by both construction project
manufacturers and professional organizations Mr
Hovagimyan is responsible for establishing and monitor-
ing design standards, as well as reviewing all civil
engineering designs for structural, storm drain, street
and highway, sewer, and water facilities, commercial,
industrial, and retail sites
Connie Ramirez
Senior Project Engineer South Coast Division
Ms Ramirez has over 15 years experience She has
been responsible for computer aided design and drafting
of tract maps and improvement plans for storm drain,
sewer, street, lighting, signing & striping, grading, and
site development Ms Ramirez has also been responsible
for the preparation of construction quantity and cost
estimates, and providing development plan check
services for HFI's Municipal Clients
au
Nor
" Hall L Foreman, Inc44-
References
_
PUBLIC SECTOR
REFERENCES
City of Arcadia
Contact Phil Wray
City Engineer
(626) 574-5488
City of Baldwin Park
Contact Shafique Nalyer
Public Works Engineer
(626) 960 4011
City of Brea
Contact John Hogan
Assistant City Engineer
(714) 990 7760
City of Cathedral City
Contact Jerry Jack
Public Works Engineer
(760) 770 0329
City of Diamond Bar
Contact David G Liu
Director of Public Works
(909) 860 2489
City of Fontana
Contact Ricardo Sandoval
City Engineer
(909) 350 7613
Contact Felipe Molinos —
Principal Engineer
(909) 350 6641
City of Irwindale
Contact Kwok Tam
City Engineer
(626) 430 2212
City of La Quinta
Contact Steve Speer
Senior Engineer
(760) 777 7075
City of Laguna Beach
Contact Steve May
City Engineer
(949) 497-0351
City of Lake Forest
Contact Robert Woodings
Public Works Director
(714) 461-3480
City of Murneta
Contact James Knley
Director of Public Works
(909) 461 6077
City of Newport Beach
Contact Bill Patapoff
City Engineer
(909) 644-3311
City of Ontario
Contact Tim Mim Mack
Assistant City Engineer
(909) 395-2112
City of Placentia
Contact Warren Siecke
City Engineer
(714) 993 8236
City of Temecula
Contact RonaldJ Parks
Assistant Director of Public Works
(909) 694 6411
City of Tustin
Contact Tim Serlet
City Engineer
(714) 573 3150
or Hall & Foreman, Inc.
(a)Peferences
PUBLIC SECTOR
REFERENCES
City of Upland
Contact Bob Cntchfield
Senior Engineer
(909) 931 4246
City of Yucaipa
Contact Bob Stone
Engineering Manager
(909) 797 2489
Caltrans - District 12
ROW Division
Contact Gregory B Grant
Chief Land Surveyor
(949) 724 2823
Los Angeles County Department of Public Works
Contact Steven Ross, P E
(626) 458 4316
Contact Jim Thurow
Supervising Civil Engineer III ---
(626) 458 7837' —
Contact Simin Agahi
Land Development Division
(626) 458 4915
Orange County, PFRD z
Contact Tom McCabe
Senior Civil Engineer, Road Program
(714) 834 3561
Contact Peter Dalquist /42-
Engineering Manager
(714) 567 6282
Contact Phillip M Jones
Flood Control Design
(714) 834 2599
Riverside County Flood Control District
Contact Warren Dusty'Williams
Chief Engineer
(909) 922 1200
Riverside County Planning Department
Contact Ron Goldman
Deputy Planning Director
(909) 955 3272
Riverside County Transportation Department
Contact George Johnson
Director of Transportation
(909) 955 6740
San Bernardino Associated Governments
San Bernardino, CA
Contact Arlis Childs
Program Manager
(909) 889 8611
Santa Margarita Water District
Contact Jamie Aguilar
Bond Project Engineer
(949) 459 6420
Yorba Linda Water District
Contact Ken Vecchiarelli
Engineering Manager
(714) 777 9593
UP! Hall & Foreman, Inc.kkritt|109| 1 4
1,1 111„1 111 1,11 11111F Hall & Foreman, Inc.
A Civil Engineering -Planning- Surveying - Public WorksCompany 3acKground
COMPANY
FACTS
Year Founded
1961
Office Locations 420 Exchange, Suite 100
Irvine, CA 92602
Phone (714) 665-4500
Fax (714) 665-4501
9130 Anaheim Place, Suite 120
Rancho Cucamonga, CA 91730
Phone (909) 484 9090
Fax (909) 484 9084
43513 Ridge Park Drive
Temecula, CA 92590
Phone (951) 676 6726
Fax (951) 699-0896
20950 Warner Center Lane, Suite A
Woodland Hills, CA 91367
Phone (818) 251 1200
Fax (818) 251 1201
vvww hfinc COM
info@hfinccom
Employees 180 + Employees Including
31 Registered Civil Engineers
8 Licensed Land Surveyors
3 Planners
Disciplines
Land Planning/Entitlement
Residential/Commercial/Industrial Site Development
Construction Staking/Management/Inspection
Land Surveying
Landscape Architecture
Municipal/Public Works Agency Engineering
Investigative Engineering
Principals
John Hogan, PE, Chief Executive Officer
Alan Palermo, PE, President/South Coast Division
Jon E Bourgeois, PE, President/Inland Empire Division
Mark Miner, President/L A , Ventura Division
Don Lohr, President/Temecula Division
Steve Shambeck, P L 5, Vice President/Surveying and Mapping
Lou Ann Frederick, Vice President/CFO
Computer Systems
Fully networked PC s, Client Server
Wide Area Network
. 11. 1.7 Foreman, Inc
Ek6.Professional Services
Aenal Topographic Mapping Control Surveys
Assessment District Engineering
Capital Improvement Projects
Community Planning/Specific Plans
Construction Staking
Construction Management/Inspection
Design, Alignment, and Route Surveys
Entitlement Coordination
Grant Applications, Research, and Design Reports
Drainage and Flood Control Design
Highway/Freeway Engineering
Hydraulics/Hydrology Studies
Investigative Engineering
Infill Development
Land Use Planning
Landscape Architecture
Maintenance District Engineering
Map Check Consulting
Master Plans for Infrastructure
Plan Check Consulting
Plans, Specifications, and Estimates
Redevelopment Projects
Right of Way Engineering
School Facilities
Sewer and Water Improvements
Standards and Specifications
Standard Plans Development
Street Infrastructure Design
SWPPP/NPDES Services
Topographic Surveys
Traffic Engineering
Transportation Planning
Water Quality Management/Engineering
Water Resources Engineering
Company Background
COMPANY HISTORY
& OVERVIEW
For more than 40 years, Hall & Foreman, Inc (HFI) has
provided exceptional engineering, land planning, and
surveying services that have built a better Southern
California
HFI was founded in 1961 byJack Hall, former Assistant
Public Works Director and City Engineer of the City of
Santa Ana The firm incorporated in 1963 after Hugh
Foreman, Santa Ana s former Public Works Director, and
George Shambeck, Orange County Flood Control
District's Senior Right of-Way Engineer, joined Mr Hall
Passed on to a new era of engineers and entrepreneurs,
the company principals currently are, John Hogan, Jon
Bourgeois, Steve Shambeck, Mark Miner, Alan Palermo,
and Lou Ann Frederick George Shambeck remains semi-
active with the firm on the Board and as a consultant to
the survey and mapping department
During the last 43 years, HFI has developed successful
relationships in the Southern California community with
numerous agencies, developers, builders, and other
firms that benefit from quality service HFI provides
extensive experience to Clients including
N IP! Hall & Foreman, Inc
e7Company Background
ADDITIONAL
INFORMATION
Declaration of Heroic Client Services
Clients project success is the focus of HFI's Declaration
HFI strives to understand Clients project expectations
and meet project goals To ensure the success of the
Clients projects, HFI commits to provide the following six
elements of service
Schedule
• HFI establishes a mutually agreed upon project schedule
that identifies milestones for the deliverables and provides
status reports and schedule updates on a regular basis
Client Communication
• HFI communicates with Clients based on their preferences
and expectations
• HFI returns phone calls and e mails within four working
hours
• HFI prepares and distributes minutes of project meetings
Internal Communication
• HFI s project team members meet weekly to discuss
project concerns review project status and communicate
with each other to ensure Clients expectations and project
goals are met
Quality
• HFI s internal QA/QC process ensures accuracy of work
product
• clients projects are reviewed by a senior staff member
prior to each milestone submittal
Completeness
• HFI s completes the project design prior to submitting
the plans to the approving agency in order to minimize
agency review and processing time periods
• HFI discusses with Clients any potential changes to the
design that might impact plan submittal to the approving
agency
Advocacy
• HFI provides Clients with recommendations initiatives
tactics and approaches to best represent Client
interests and ensure the success of the project
• HFI advises Clients of potential cost and/or time saving
options to assist in decision making efforts
Technology
HFI s staff has experience in preparing plans using
Intergraph s Micro Station and AutoCAD Company wide,
HFI has PCs that use Windows operating system HFI has
computer software such as Micro Station, SelectCAD,
AutoCAD, Land Development Desktop, HEC RAS, WSPG,
MS Project, MS Office, and AES hydrology software for
all Southern California Counties
rill"' Hall & Foreman, Inc
1111111P
Quality Assurance Program
HFI has an established Quality Assurance/Quality Control
(QA/QC) Program that applies to all work product
prepared by the firm The emphasis of the program is on
delivering high quality products and services that are
cost effective and timely
HFI s QA/QC Program is closely monitored and includes
the following elements
• A Principal of the Firm responsible for QA/QC
• A thorough evaluation of the projects scope of
work prior to commencing technical work to
establish a work plan and a firm budget, thus
eliminating any "surprises' during the course of
the contract
• Meeting with the Client's Project Manager at
scheduled intervals to review the status of the
project and address issues identified in the
design process and QA/QC reviews HFI stresses
frequent and open communication between the
project team and the Client's representatives
• Frequent technical review sessions with
Principals to evaluate the quality of the work
product
• Utilizing current software to prepare work
product and map out the workflow for timely
completion of services
• Utilizing an in-house computer cost control
system providing project team members with
weekly updates on the project status,
percentage of work completed, and manhour
costs and expenses
ftBPIF
stir.
folunzi.11-
Company 3ackground
ADDITIONAL
INFORMATION
Professional Affiliations
• AIA American Institute of Architects
• APA American Planning Association
• APWA - American Public Works Association
Southern California Chapter
• ASCE American Society of Civil Engineers - Los
Angeles Section, Orange, Riverside/San
Bernardino Counties
• AUGI Autodesk Users Group International
• BDA Business Development Association
Orange County and Inland Empire
• BIA Building Industry Association Orange
County, Los Angeles/Ventura, Baldy View,
Riverside, and Desert Chapters
• CLSA California Land Surveyors Association
• CELSOC - Consulting Engineers and Land
Surveyors of California Orange, Riverside and
San Bernardino Counties
• C3 Civil CAD Consortium
• HBC Home Builders Council
• ICSC - International Council of Shopping
Centers
• NAIOP - National Association Industrial and
Office Properties
• OCEC Orange County Engineering Council
• OCWA Orange County Water Association
• SHC Senior Housing Council
• SHPE - Society of Hispanic Professional
Engineers
• ULI - Urban Land Institute
Financial Condition
HFI, a California corporation, is in good standing and is
fully insured Although privately held and not required by
law, the records and receipts are reviewed annually by a
group of certified public accountants to attest to HFI s
reliability All taxes are paid on time and there are no
judgments or liens outstanding
HFI has a strong credit profile, is able to obtain capital as
needed, and operates in a manner that facilitates the
Client's project needs HFI uses the leading industry
project management/financial software and monitors
costs in order to manage the pricing of contracts
jar Hall Foreman, Inc.
Disadvantaged Business Enterprise
In order to meet the requirements of many public works
projects, HFI maintains relationships with several highly
qualified firms owned by minorities, disabled veterans,
and women As required by various Requests for Qualifi
cations, these firms are provided with opportunities to
perform services on many of HFI's projects HFI supports
this policy both in spirit and with action
Equal Opportunity
HFI maintains an Affirmative Action Plan and provides
education and information to the firm s management to
assure proper implementation of the Plan HFI does not
discriminate against any employee or applicant for
employment because of race, color, sex or national
origin
et?Hall k Foreman, Inc
Company 3ackground
VISION, GOALS,
& CORE VALUES
HFI is a consulting firm providing professional civil engineering, surveying, planning, and landscape architecture
services for the purpose of creating significant tangible value for Clients
Vision
HFI s vision is to grow and be the company of choice by
• Being a Recognized Industry Leader
• Creating Value for Clients
• Creating Long Term Relationships
• Providing a Stimulating and Rewarding Work Environment
• Capitalizing on Opportunities to Strengthen the Company
Goals
HFI is driven by the following goals
• Providing Comprehensive Professional Services to Clients
• Executing HFI's Services to Achieve a Reasonable Profit
• Maintaining a Financially Healthy Firm
• Providing for the Continuity of the Firm
Core Values
HFI s core values include
• Open and Honest Communication
• Respect and Integrity
• Superior Client Service
• Providing an Enjoyable Work Atmosphere
• Recognizing Individual and Team Contributions
• Committing Corporate Resources to Benefit Local Communities44#1004,1.,;14.
Re/evant Eypenence
CONSTRUCTION MANAGEMENT
& INSPECTION
HFI's depth of construction management and inspection
expertise allows us the flexibility and responsiveness to
meet each projects specific requirements HFI has over
23 years of experience managing capital improvement
projects such as roadway, parks, sewer, water, and
stormdrain with local, state, and federal fund require
ments Typical inspection projects include roadway
widening and rehabilitation, parks, skate parks, traffic
signalization, and investigative engineering
Services.
• Constructability reviews
• Pre construction support
• Construction Inspection
• Shop drawing reviews and punch lists
• Identification of construction deficiencies
• Dispute mediation and resolution
• Materials testing and certification monitoring
• Daily inspection logs and detailed project photo
logs
• 'As built" final design drawing revisions
• Construction management
• Federal and state contract and report
compliance
• Wage and benefit compliance monitoring
• Evaluation of change order requests
• Progress payment review
• Contract administration
• Conduct pre bid meetings
• Contract review
• Bid analysis
L ir Hall & Foreman, Inc
Representative Projects:
• Contract Administration Cathedral City
I On Call Services - Yucaipa
• Various Inspection Services - Diamond Bar
• Golden Spring Road Widening/Rehabilitation -
Diamond Bar
• Cedar &Chestnut Water Main Conversion
Long Beach Water Department
• Skate Park Phase II Park Expansion - Yucaipa
• Chapman Heights Development Yucaipa
• LE34 & LB8 Flow Control Valve &Concrete Vault
Improvements Long Beach Water Department
• Sewer Construction & Rehabilitation Projects -
Yorba Linda Water District
• Imperial Highway Widening/Rehabilitation Brea
• Brea Boulevard Widening/Rehabilitation - Brea
• All Local Streets Widening/Rehabilitation - Brea
• Master Plan for Sewer, Water, and Stormdra in
Improvements Brea
• Fairplex Drive Widening/Rehabilitation Pomona
• 12 Phase Water Conversion Project - Brea
• Jeronimo Road Widening - Lake Forest
• Heartwell Park Long Beach Water Department
• El Cajon Trunk Sewer - Yorba Linda Water
District
• The Strand Manhattan Beach
• Pioneer Road Park Tustin
I/Pelevant Expenerdce
DOMESTIC & RECLAIMED WATER SYSTEMS
PLANNING & DESIGN
HFI offers extensive resources and experience in
planning, design and construction administration for
domestic and reclaimed water related projects
Services.
• Citywide master planning
• Water supply planning
• Hydraulic modeling
• Demand analysis
• System sizing and layout
• Preparation of plans, specifications, and
estimates
• Value engineering
• Reservoir alternative siting analysis
• Pump station design
• Permitting
• Contract administration
• Program management
• Regulatory compliance strategies
• Funding strategies to leverage available federal
and state funding sources
Hall L Foreman, Inc
NMI.
0--
9 2,
Representative Projects:
• Alley Conversions Long Beach Water
Department
• Ladera Ranch Plan of Works/Report Rancho
Mission Viejo
• Zone I &II Domestic & Reclaimed Water
Transmission Mains Santa Margarita Water
Distnct
• Transmission Mains and In tract Distribution
Systems Ladera Ranch
• Baseline Domestic Water Transmission Main
Azusa
• City Water Systems Master Plan - Placentia/
Yorba Linda
• Citywide Master Plan - Brea
• Village of Heritage Master Plan Cucamonga
County Water District
• Carbon Canyon Road (SR142) Brea
• Antonio Parkway Domestic Water Transmission
Main Orange County
• Westside Reservoir Brea
• Eastside Reservoir Brea
• Carbon Canyon Pump Station Nos 2 and 3
Brea
• Water Main Replacement Program Anaheim
• Mountain View Business Park Transmission Main
Azusa
• Owl Rock Site Transmission Main Azusa
• Granada Court Ontariolir Hall k Foreman, Inc
Re/e , ant Experience
DRAINAGE
& FLOOD CONTROL
HFI offers management, planning, and design services
Representative Projects:
• Water Quality Catch Basin Standard Drawings -
Los Angeles County Department of Public Works
• Master Drainage Plan - Tejon Ranch, Centennial
• Master Drainage Plan - Fontana
• Master Drainage Plan - Brea
• Covenant Hills Master Plan of Drainage - Rancho
Mission Viejo, Ladera Ranch
• Homo Creek Preliminary Design Report & Final
Design Rancho Mission Viejo/Orange County
• Skyline Drive Storm Drain Phase 1 and 2
Orange County PFRD
• Baldwin Park CIP 621, MTh 1493 Relief Drain
Baldwin Park
• San Sevaine Creek/Etiwanda Creek Double
Channel Fontana
• Imperial Highway Brea
• Village of Heritage Storm Drains Fontana
• Channel Repair Projects Orange County
• Empire Center CFD 90 3 Fontana
• Lomita Boulevard Storm Drain Los Angeles City
• Master Sediment Control Plan Rancho Mission
Viejo, Ladera Ranch
• Covenant Hills Storm Drains Rancho Mission
Viejo, Ladera Ranch
• Master Drainage Plan Marr Ranch, Simi Valley
• Master Drainage Plan Mountain Glen II, Los
Angeles
• Wolf Creek Channel - Riverside County
• Diamond/Crestview Storm Drain Laguna Beach
for drainage and flood control projects
Services:
• Watershed studies and master plan
development
• Hydrologic and hydraulic modeling
• Analysis and design of collection systems and
storage facilities
• Hydraulic structures design
• Sedimentation and erosion control design and
inspection
• Risk management
• Value engineering
• Preparation of plans, specifications and
estimates
• Stormwater management facilities inspection
• Public information and involvement program
• Program management
• Permitting
• Detention basin design
• SWPPPs
• BMP selections
• Regulatory compliance strategies
• Funding strategies to leverage available federal
and state funding sourcesRelevant Experien:e
IN FILL!
REDEVELOPMENT
As vacant land for new developments diminish in
Southern California communities, redevelopment
agencies are encouraging the conversion of commercial
and industrial buildings into residential structures This
renaissance of downtown districts is moving forward
with great intensity Infill and mixed use projects offer
interesting challenges including maneuvering through the
intricate web of city ordinances and regulations, while
working with governmental representatives Major
developers and cities rely on HFI s expertise and capa
bilities to take the lead in these redevelopment pro
cesses HFI is currently playing an integral part in
conversions from commercial/industrial buildings into
upscale living and working units
Services'
• Feasibility Studies
• Entitlement and Permit Expediting
• Boundary and Topographic Survey
• Condominium Plans
• Tentative and Final Maps
• Final Engineering Plans
• Construction Survey
• Agency and Builder Coordination
• Maintenance District Engineering
• Zone Case Development
Hall 1 Foreman, Inc
Representative Projects'
• The Lee Group's Flower Street Lofts- Downtown
Los Angeles UPS building conversion on 12th
and Flower Streets into 91 live in, working
condominium units
• The Lee Group's 11th and Grand- Downtown
Los Angeles UCLA auxiliary
office and classroom building conversion into
live in working condominium units
• Toy Factory Lofts Downtown Los Angeles
Warehouse building conversion into 135 artists
in residence condominium units
• Kor Group's Molina Lofts-Downtown Los Angeles
Warehouse, apartment units, and parking
structure building conversion Into 95 artists in
residence condominium units
• Trammel Crows Alexan Savoy
Downtown Los Angeles 440 new
apartment units on 1st and Alameda
• The Lee Groups Bay City Lofts- Venice Industnal
building conversion into five artists in residence
condominium including two new additions
• RAD Venice s Venice Art Lofts- Venice
Construction of 49 new artists in residence
condominium units on Main Street
• RAD Venice s Dog Town Station- Venice
Construction of 33 new artists in residence
condominium units on Main Street
• The Kor Group s Myra Street Lofts- Hollywood
Construction of 46 new live-in, working
condominium units on Myra Street and Sunset
Avenue
• The Kor Group s Eastern Columbia Building Los
Angeles Adaptive Reuse Project - Exisisting
vacant 13 story office building to remain,
construction of 147 joint live work units located
at 849 Broadway at corner of 9th & BroadwayRepresentative Projects:
• Live Oak/Arrow Highway Reconstruction
Assessment District Irwindale
• Assessment District No 94-05 (Diamond Crest
Sewers) Laguna Beach
I Lighting and Landscape District Brea
• Sewer Maintenance Charge - Irwindale
• Sewer Assessment District Nos 99 01 and 99 02
Yorba Linda Water District
• Community Facilities District No 2000 1 (Rio
Vista) Cathedral City
• Community Facilities District No 1 ( Amenge
Heights) Fullerton
• Landscape Maintenance Districts No 22, 24,27
&32 Calabasas
• Utility Undergrounding Districts Manhattan
Beach
• Assessment Districts Irvine
• Pioneer Road Park Tustin
• Developer Reimbursements Yucaipa
Relevant Experience
INFRASTRUCTURE
FUNDING
HFI assists agencies in selecting the best public financing
solution for funding infrastructure improvements and
maintenance HFI s team is experienced in forming
special financing districts and conducting successful
community relations programs to ensure public support
HFI also provides assistance to agencies to acquire
infrastructure financed by bonds and constructed by
developers
Services.
• Infrastructure assessment districts
• Utility undergrounding districts
• Infrastructure acquisition audit services
• Sewer and storm drain maintenance fees
• Landscaping and lighting maintenance districts
• Storm water maintenance fees
• Government grants/funding
• Feasibility studies
• Capital improvement budgets
• Community relations/outreach
• Contract administration
Hall& Foreman Inc.HFI's public works division provides a full complement of
municipal engineering services to agencies and Clients
The division has catered to public and private sector
Clients on a project specific and an on call basis for over
20 years
Services
• Construction management
• Construction inspection and administration
• Project management
• Funding assistance
• Public counter support
• Plan and map checking
• Tentative map reviews
• Review/provide conditions of approval
• SWPPP reviews
• Storm water management
• NPDES conformance
• Capital Improvement Projects (CIP)
Relevant Experience
MUNICIPAL
ENGINEERING
Representative Projects.
• Nexus Intersection Study Brea
• Master Plan of Arterial Roadway Infill Study
Moreno Valley
• Plan Checking for Public Works and Building
Department -Tustin
• CBDG Access Ramp and Sidewalk Improvement
Design Services Diamond Bar
• Plan Check and Construction Inspection for
Chapman Heights Development Yucaipa
• 8th Street and Avenue' E Safe Route to School
Project Design Services - Yucaipa
• Design of Yucaipa Boulevard Pavement
Rehabilitation from 7th Street to 11th Street
Yucaipa
• Plan Checking for Private Residential Projects
Diamond Bar
• SUSMP Reviews Diamond Bar
• Peer Reviews City of Laguna Niguel
• Preparation of Design Standards and Guidelines
for Grading and Public Works Construction
Yucaipa
• On Call Private Development Plan Checking
Services Murneta
• Pioneer Road Park Construction Management
and Inspection Tustin
• Flow Control Valve and Concrete Vault
Improvements Construction Management and
Inspection Long Beach Water Department
• Alley Water Main Conversion Construction
Management and Inspection Long Beach Water
Department
• Flow Control Valve and Concrete Vault
Improvements Construction Management and
Inspection Long Beach Water Department
• Wardlow Road Transmission Conversion
Inspection - Long Beach Water Department
• WQMP Reviews - Brea and Tustin
• Peters Canyon Trail Realignment Design Services
Tustin
I Assessment District Engineering Services Irvine
• Foothill Boulevard Street Reconstruction
Fontana
cecRelevant Experience
MUNICIPAL
ENGINEERING
• 9th Street Reconstruction Upland
• Assessment District No 2001 01 Cathedral
City
• Assessment District No 95 01 (East Coyote
Hills) Fullerton
• Underground Utility Assessment Districts
Manhattan Beach
• Tentative and Final Map Reviews for the Tustin
Legacy Tustin
• Water Quality Catch Basin Standard Drawings
Los Angeles County Department of Public Works
• District Sewer Engineer - Yorba Linda Water
District
• Sewer Master Plan Update Region - Yorba Linda
Water District
• Covenant Hills/Ladera Ranch Plan of Works for
Sewer, Domestic Water, and Reclaimed Water
Santa Margarita Water District
• Property Corner Surveys Tustin
• Slope/Side Remediation Investigations and
Design Repair
• SWPPP and Erosion Control Plan Design
County of Orange
• SWPPP and Erosion Control Plan Reviews
Yucaipa, Tustin, Brea, Diamond Bar, and
Mumeta
• Part time Counter Support Tustin
• Carbon Canyon Park Entrance Relocation
Design Services Brea/County of Orange
• Map Checking County of Los Angeles
• Map Checking County of Orange
::r
Foreman, Inc.
97Relevant Experience
RIGHT - OF - WAY
ENGINEERING
With a combination of state of the art technology and
well trained, experienced staff, HFI can provide a wide
variety of right of way services to Clients
Services
• Right-of way appraisal and final maps
• Appraisal exhibits
• Legal description and plats
• Surveying Services
Since 1961 HFI has been involved in numerous private
and public works infrastructure projects that have
required detailed right of way engineering services
Many of these projects have also included other civil
engineering services performed by HFI Recent projects
range from local street improvements to major freeway
widening services
Representative Projects:
• On-Call Right of Way Engineering OCTA
• Interstate 5 Right of Way Mapping OCTA/
Caltrans
• Foothill Boulevard Surveying and Right-of-Way
Mapping - Fontana/Caltrans
• State Route 30 Surveying and Right of Way
Mapping SANBAG/CALTRANS
• Interstate 405 Right-of Way Mapping OCTA/
HN113/Caltrans
• Mountain Street Design Topo and Staking - Tustin
• Fairplex Drive Design Topo and Staking - Pomona
• Santa Ana River Improvement Mapping -
Riverside, Orange, and San Bernardino Counties
• Summit Avenue Surveying and Right of Way
Mapping Fontana
• El Centro Gas Line Surveying and Right of Way
Mapping Southern California Gas Co
• Carbon Canyon Road Surveying and Right of Way
Mapping Brea/Caltrans
• Imperial Highway Surveying and Right of-Way
Mapping Brea/Caltrans
• Highway 111 Surveying and Right of Way
Mapping La Quinta/Caltrans
• Washington Avenue French Valley Area of
Riverside County
citRelevant Experience
ROADWAY PLANNING, DESIGN,
& CONSTRUCTION
HFI s roadway experience encompasses the full range of
disciplines necessary for successful project completion
including planning, design, project management and
construction services
Services:
• Preparation of plans, specifications, and
estimates
• Plan check and constructability reviews
• Feasibility studies and report preparation
• Transportation planning
• Design deviations fact sheets
• Traffic signal design
• Construction management and inspection
• Design and construction surveying
• Utility coordination, relocation and design
• Value engineering
• Traffic control and construction staging plans
• Erosion and sediment control planning and
design
• Traffic detour plans
• Right-of-way engineering
Representative Projects:
• The Strand Walkway Improvements Manhattan
Beach
• Carbon Canyon Road SR142 Brea
• Antonio Parkway - Orange County
• Imperial Highway SR90, ISTEA Project Brea
• Chase Drive Improvements Corona
• Jeronimo Road/Rollingwood Road - Lake Forest
• Live Oak Avenue and Arrow Highway -
Irwindale
• Golden Springs Road, 'STEW-I-EA 21 Project
Diamond Bar
• Fairplex Drive/I 10 Street Widening and
Roadway Rehabilitation - Pomona
• Foothill Boulevard SR 66 - Fontana
• Summit Avenue Fontana
• Fairview Road Rehabilitation Costa Mesa
• A,B,C Streets and Mountain View Tustin
• Diamond/Crestview Improvements Laguna
Beach
• HighwaySRlll La Quinta
• Clearglen et al Rehabilitation Los Angeles
County
• Orangethorpe/Rose Drive Intersection - Placentia
• Millikan Avenue Rancho Cucamonga
a lr lur , Hall 4: Foreman, Inc.
19
I
LA
I
KDM MERIDIAN
CIVIL ENGINEERING AND LAND SURVEYING
September 28 2005
KDMM P0509-24
Mr Mate Gaspar
Engineering Services Manager
Public Works Department
City of Culver City
9770 Culver Boulevard
Culver City CA 90232
SUBJECT STATEMENT OF QUALIFICATIONS FOR CONSULTANT SERVICES
Dear Mr Gaspar
Thank you for taking the time to talk with me today KDM Meridian is pleased to present the
attached Statement of Qualifications to the City of Culver City for the purpose of being added to
the City s Request for Proposal Listing for Civil Design Work
KDM Meridian is well suited in providing design work for the City of Culver City Our Design
Manager Mr Strapac, served as a City Engineer for a Bay-Area City and currently provides
CIP Management for a southern-California City as well as design work for various cities This
enables our Civil/Municipal Engineering group not only the ability but also a thorough
understanding of the needs of local agencies specifically cities Having an office with both
surveying and civil engineering eliminates the need for working with a subconsultant The
surveying services we provide are second-to-none in quality and level-of-service Our clients
regard our communication as one of the primary reasons for retaining KDM Meridian we
discuss project matters frequently with clients to ensure all expectations are met
KDM Meridian has a wide range of civil engineering and surveying experience
Engineering
• Street rehabilitation design
• Sewer rehabilitation
• Sewer design • Plan and Map check for cities
• CIP Management • Storm drain rehabilitation
• Storm drain design • Federal-Aid project design and application
Surveying
• Design surveys • ALTA Surveys
• Legal Description and Plat Map preparation • Map check
• Boundary surveys • Topographic Surveys
• GPS surveys
22722 Lambert Street Suite 1710 Lake Forest California 92630
Telephone 949 768 0731 Facsimile 949 768 3731
KDMMendian corn
In-I hard C Maher P L S Steven E Strapac P E
Principal Principal
Mr Gaspar
Page 2 of 2
Statement of Qualifications
P0509 24
September 28 2005
KDM Meridian provides Civil/Municipal Engineering services such as roadway design, sewer
design and design of storm drain systems Federal aid grants preparation CIP management
and staffing augmentation are also available
KDM Meridian is committed to its Clients and their projects and we always begin projects with
a thorough understanding of their objectives and needs The success of each project is based
on this premise accomplished through a partnering relationship with our Clients
KDM Meridian is registered with the State of California as a Small Business Enterprise No
00310704
Thank you for the opportunity to provide these services for your projects We are available to
discuss our qualifications with you and your staff at your convenience
Respecffully
C File|1010|Cid|1010|KDM MERIDIAN
0_3Mr Gaspar P0509 24
Statement of Qualifications September 28 2005
FIRM DESCRIPTION
KDM Meridian is a professional civil engineering and land survey consulting firm specializing in
municipal engineering C I P management civil engineering GPS conventional land surveying
and project mapping
Established in February of 2000 KDM Meridian has rapidly built a growing clientele by offering
professional and technical services to public and private clients ranging from local regional
state and federal agencies to utility agencies development groups private consulting firms
construction firms professional and landscape architects and attorneys
Mr Steven E Strapac P E a principal of the firm has 12 years of experience in civil
engineering Prior to joining KDM Meridian as a principal he worked for the Department of
Transportation in Washington state as project manager for highway and route design corridor
studies construction inspection and lab materials testing This was followed by work for a
California based Civil Engineering firm in both Northern and Southern California He was the
contract City Engineer for the City of El Cerrito in the Bay Area from 1999 — 2001 Mr
Strapac s extensive experience with cities also includes C I P (Capital Improvement Program)
Management DBE Programs GASB34 and pavement management systems Since 2003 Mr
Strapac has been aCIP Manager for the City of Moreno Valley managing signal and roadway
projects and the City s overall RFP process
Mr Richard C Maher PLS a principal of the firm has extensive experience with public works
surveying Prior to founding KDM Meridian Mr Maher worked for 10 years at a local civil
engineering firm that provided public works engineering and surveying to City and County
agencies For the past 5 years Mr Maher and the survey personnel at KDM Meridian have
proven their expertise in surveying for public works design improvement projects by operating
as the survey department or an extension of the survey department for a number of local
prominent public works design engineering firms Additionally the staff at KDM Meridian have
worked directly with City agencies providing topographic and mapping services for the purpose
of public works design improvements A majority of the projects performed by the firm are
directly in relation to public works improvement and the staff at KDM Meridian is well versed in
the requirements and understandings of its objectives and needs
Mr E Keith Klagge PLS a project manager of the firm has considerable experience with
public works engineering and surveying Prior to KDM Meridian Mr Klagge was president of
Klagge-Stevens & Associates in San Diego a civil engineering and land surveying firm
performing public works projects throughout San Diego County that included street design of
curb gutter paving drainage sanitary sewer and grading With KDM Meridian Mr Klagge
has performed numerous large topographic and right-of-way mapping projects in support of
prominent public works design engineering firms for street construction and improvement bike
and pedestrian trails and utility transmission corridors
KDM Meridian is a California corporation with its office located in Lake Forest The KDM
Meridian staff functions as an extension of its client s staff to provide management technical
and professional services in a responsive cost effective and professional manner meeting
their schedules and project goals
.1-
LAI K D M MERIDIAN|1010|0 Troposals\2005 Proposals\P0509 241Firm Description docMr Gaspar P0509 24
Statement of Qualifications September 28 2005
PROJECT TEAM RESUMES
Mr Steve Strapac will be the principal in charge and act as the Project Manager for KDM
Meridian s participation in engineering projects Mr Richard C Maher PLS will be the principal
in charge and act as the Project Manager for KDM Meridian s participation in surveying projects
Mr Strapac will lead the design team of CADD technicians and other staff as necessary Both
Mr Strapac and Mr Maher will act in a quality assurance and quality control role for all facets of
project work Mr E Keith Klagge will act as support to Mr Maher for all surveying related
projects
Brief resumes for these key personnel of KDM Meridian follow Detailed curriculum vitae and
specific project history involvements can be provided on request|1010|Di
KIDM MERIDIAN
I
ter-Mr Gaspar
P0509 24
Statement of Qualifications
September 28 2005
STEVEN E STRAPAC, P E
PRINCIPAL — CIVIL ENGINEERING AND DESIGN SERVICES
Professional Registration
Professional Engineer
California No 57654
Additionally Licensed as a Professional
Engineer in
• Colorado
• Idaho
• Washington
• New Mexico
• Arizona
• Oregon
• Montana
• Maryland
• Hawaii
• Nevada
Education
Bachelor of Science Degree in Civil
Engineering — California State
Polytechnic University Pomona
Professional Seminars
• Subdivision Map Act
Professional Seminar Ontario
CA (2004)
• Land Survey Review — Santa Ana
CA (2005)
• Drainage Law — Buena Park CA
(2004)
• ASCE Sewer Design
(9/2004)
Professional Affiliations
• California Land Surveyors
Association (State)
• American Society of Civil Engineers
• American Public Works Association
• American Water Works Association
Summary of Experience
Mr Strapac is a Professional Engineer registered in the State of California with twelve
years experience in Civil Engineering Mr Strapac brings his extensive experience in
State and Municipal project management as well as City Government knowledge to
the KDM Meridian team His work involving DBE programs CIP GASB34 and
alternative budgeting and funding provides a valuable asset to our clients
Mr Strapac had previously worked at the southern California regional office of Hams
& Associates where he managed design projects for various municipalities from the
City of Yorba Linda to the City of Coachella Since early 2003 he has been a CIP
Manager for the City of Moreno Valley He has managed Signal Projects and
Roadway Projects as well as the overall RFP process
Before transferring to the southern California division office of Harris & Associates Mr
Strapac had worked at their division office in northern California He worked as a
construction engineer for Caltrans freeway projects including construction
management CCO management managing SWPPP and safety programs and
overseeing engineering staff and administrative personnel
From 1999-2001 Mr Strapac was the City Engineer of the City of El Cerrito California
(contract) where he performed the legal duties of a City Engineer ranging from Land
Development functions such as Parcel and Tract Map review managed the design of
all the City s infrastructure rehabilitation and new construction encroachment permit
process implementation of pavement management recommendations Federal and
State Grants implementing the City s DBE program write and review maintenance
contracts and manage maintenance staff managed design projects completed by
outside consultants
He also was a Project Manager (through H&A) for Santa Cruz County Sanitation
District rehabilitation and improvement projects projects he design and managed
included Sanitary Sewer Pipe Repair (I and II) Moran Lake Pump Station 1999
Improvements Arana and Schwan Pump Station Improvements Mr Strapac
supervised of staff technicians and engineers design drafting analysis and testing of
new and retro fitted sanitary sewer utility systems
Mr Strapac began his professional career as a transportation engineer in Spokane for
the Department of Transportation in the state of Washington Mr Strapac was
responsible for the design of state routes arterials and highways route and corridor
studies construction inspection and asphalt laboratory testing
Supplemental Qualifications
• Network Administration — Windows 95 98 2000 ME and XP Operating Systems
• Software Deployment and Centralized Data Protection
• Coordinate Geometry Software ACAD/Softdesk LDD
• General Purpose Software Microsoft Windows Word Excel Access Mail Outlook WordPerfect
• Planning and Scheduling Software Primavera & Suretrack
,
LA
K D M MERIDIAN|1010|Of.Mr Gaspar
P0509 24
Statement of Qualifications
September 28 2005
RICHARD C MAHER, P L S
PRINCIPAL — LAND SURVEYING SERVICES
Professional Registration
Professional Land Surveyor
California No 7564
Education
Civil Engineering University
Curriculum — California State
University Fullerton 1992
Land Surveying Continuing
Education — Coastline Community
College Costa Mesa 1995
Professional Seminars
• Subdivision Map Act
Professional Seminar - Santa
Ana CA (1997)
• California Coordinate System
Professional Seminar — Newport
Beach CA (1998)
• ALTA/ACSM Surveys, Pacific
Land Seminars Pomona CA
(1999)
• The Quasi Judicial Role of the
Land Surveyor — Buena Park CA
(2001)
Professional Affiliations
• California Land Surveyors
Association (State)
• American Congress on Survey and
Mapping
• 2001 Secretary Orange County CA
Land Surveyors Assoc
• 2002 Treasurer Orange County CA
Land Surveyors Assoc
Summary of Experience
Mr Maher is a Professional Land Surveyor registered in the State of California
with twelve years experience in Land Surveying and Civil Engineering Since
1999 Mr Maher has assisted in the review grading and exam development of
the Land Surveyors Yearly Licensure Exams for the CA State Board for
Professional Engineers and Land Surveyors and continues to participate in this
capacity through 2005
Mr Maher s experience includes extensive client relations participating on a
consulting basis as part of a project team or in the management of projects
with over fifty different local county State utility agencies and private clients
In that capacity he has been responsible in whole or in part in project
development right of-way engineering annexations heavy and light
construction design topographic surveys aerial control networks legal
descriptions boundary surveys records of survey and parcel and tract map
preparation Mr Maher s extended involvement in the details of survey
department operations has provided him with working knowledge of state of
the art technology hardware and software used industry wide In doing so
Mr Maher continues to be successful in providing the level of service unique to
each client acting as an extension of their staff understanding their needs
anticipating issues and providing solutions exceeding expectations
More recently Mr Maher fulfilled the function of Survey Department Manager
for a Civil Engineering and Survey Consulting firm in southern California
specializing in Public Works with projects including street sewer water and
storm drain improvements park municipal and building improvements His
responsibilities ranged from the technical aspect of field and office survey
operations project management department staffing and training client
relations and department marketing
Supplemental Qualifications
• Network Administration — Windows 95 98 2000 ME and XP Operating Systems
• Software Deployment and Centralized Data Protection
• Remote Systems Administration
• Coordinate Geometry Software ACAD/Softdesk LDD
• General Purpose Software Microsoft Windows Word Excel Access Mail Outlook WordPerfect Lotus 123
• Sokkia Total Station, Digital Level
• Geodimeter Total Station and Leica Robotic Instruments
• SDR 33 and TDS Data Collector
• Trimble 4600LS, 4700, and 4800 Receivers, TSC 1 Survey Controller
LA
K D M MERIDIAN|1010|/17Mr Gaspar
P0509 24
Statement of Qualifications
September 28 2005
E KEITH KLAGGE, P L S
PROJECT MANAGER — GPS AND TERRESTRIAL LAND SURVEYING
Professional Registrations
Professional Land Surveyor
• California No 4300
• Alaska No 4619
• Nevada No 4733
• Arizona No 15198
• Oregon No 2200
• Washington No 23398
• Idaho No 7855
Education
Civil Engineering University
Curriculum — Morningside College
Sioux City Iowa 1961 1962
Math University Curriculum — San
Diego State University California 1967
Continuing Education
• Land Surveyors Legal Seminar -
University of New Mexico
• Land Surveyors Legal Seminar -
Reno Nevada
• Engineers & Surveyors Business
Seminar San Francisco California
• Advanced Legal Seminar
University of San Diego
• Trimble Navigation GPS Training
Seminars
MicroSurvey CADD Training
Summary of Experience
Mr Klagge is a Professional Land Surveyor registered in seven Western
States with over forty years of experience and continuing education in the
fields of Land Surveying and Civil Engineering Mr Klagge began his
professional career with a focus on boundary cadastral topographic
construction surveying computerized mapping and as an expert witness in
boundary litigation
In the past sixteen years Mr Klagge specialized in Global Positioning System
(GPS) Satellite Surveying directing hundreds of GPS projects involving the
precise positioning of thousands of horizontal and vertical control stations
Many of these projects were large high precision GPS Control Networks for
photogrammetnc mapping and Geographic Information Systems (GIS) for
private developers city and county governments utility districts and
transportation agencies including control and/or cadastral survey networks for
United States Military agencies and Forest Service Districts
Mr Klagge has frequently participated as a member of multi faceted project
teams designed to coordinate the individual efforts of the client and project
consultants by providing a level of service unique to each client acting as an
extension of their staff understanding their needs anticipating issues and
providing solutions exceeding expectations He has performed extensive
Laser Positioning Crustal Strain (Earthquake) Surveys using fixed wing
meteorological monitoring aircraft and jet helicopter transports
During the past 20 years Mr Klagge has provided consulting services for
clients involving boundary disputes breeches of contract terms containing
specific distance limitations — resulting in Expert Witness testimony and written
declarations
Professional Affiliations
• California Land Surveyors
Association
• Western Federation of Professional
Land Surveyors
• Arizona Professional Land
Surveyors
• Nevada Association of Land
Surveyors
Supplemental Qualifications
• Cogo / CADD Software MicroSurvey Trimble Geomatics Office (GPS)
• General Purpose Software Microsoft Windows Word Excel Access Mail Outlook WordPerfect
• Trimble 4600LS, 4700, and 4800 GPS Receivers, TSC-1 Survey Controller
• Co Author — California Boundaty Law 1985|1010|rid K D M MERIDIAN|1010|(leMr Gaspar
P0509 24
Statement of Qualifications
September 28 2005
KEITH M KLAGGE
SENIOR CADD TECHNICIAN/CHIEF OF PARTIES
Summary of Experience
Mr Klagge has over twenty years in Land Surveying and Civil Engineering
Mr Klagge s experience includes project participation on a consulting basis or
as part of a project team with over fifty different local county State utility
agencies and private clients In that capacity he has been responsible in
whole or in part for right-of way engineering annexations heavy and light
construction design topographic surveys aerial control networks boundary
surveys records of survey and network control diagrams GLO corner
searches and corner monumentation / corner maintenance surveys Mr
Klagge s involvement in the details of survey projects has provided him with
working knowledge of state of the art technology hardware and software
used industry wide providing a high level of service acting as an extension of
a client s staff while supporting clear project objectives and always
maintaining quality control of the final product
More recently Mr Klagge fulfilled the function of Survey Crew Supervisor for
Civil Engineering and Survey Consulting firm in southern California
specializing in Public Works with projects including street sewer water and
storm drain improvements parks municipal and building improvements His
responsibilities ranged from the technical aspects of field operations office
survey support and duties field project management field staff training and
client relations
Education
Computer Science Curriculum — San
Diego State University San Diego
Advertising & Marketing Curriculum
— Grossmont College San Diego
Professional Seminars
Trimble Instrument Training — San
Diego
Professional Affiliations
• California Land Surveyors
Association
Mr Klagge began his professional career as a field surveyor and party chief
for a Civil Engineering and Survey Consulting firm in responsible charge of
construction staking topographic survey Global Positioning System survey
and boundary survey cadastral survey and aerial control
Supplemental Qualifications
• Coordinate Geometry / Technical Software ACAD / LDT Sokkia TDS Wildsoft
• General Purpose Software Microsoft Windows Word Excel Access Outlook WordPerfect
• Wild Total Station
• Sokkia Total Station, Digital Level
• Topcon Total Station
• Nikon Total Station
• Trimble 4600LS, 4700, and 4800 GPS Receivers, TSC 1 Survey Controller
• SDR 33, Wild & TDS Data Collection
I
IL-
ig K D M MERIDIAN|1010|1/?Mr Gaspar
Statement of Qualifications
P0509 24
September 28 2005
Summary of Experience
Mr Runels has over twenty years experience in the construction engineering
field performing a wide variety of duties He has worked in design engineering
drafting survey construction management and scheduling He has worked for
private engineering and survey firms in several capacities and has also worked
for a General Contractor performing various duties in engineering and survey
departments
Mr Runels recently worked as the Survey Department Manager for a Civil
Engineering and Survey Consulting firm in southern California specializing in
Public Works with projects including street sewer water and storm drain
improvements park municipal and building improvements His responsibilities
ranged from the technical aspect of field and office survey operations project
management department staffing and training client relations and department
marketing
Mr Runels background in Geotechnical and Design Engineering as well as work
on large and small scale public works construction projects has given him the
experience to provide a wide variety of services to our clients
STEVE RUNELS
SENIOR TECHNICIAN
Education
Construction, Public Works
Inspection & Mathematics
Curriculum — Saddleback Junior
College
Professional Seminars
Softdesk Civil/Survey Applications
Training — Irvine
Pnmavera/Suretrack Training —
Omaha Nebraska
Fundamentals of AutoCAD — Laguna
Hills
Sokkia Software Training — Irvine
Supplemental Qualifications
• Coordinate Geometry Software ACAD/Softdesk LDD TerraModel
• General Purpose Software Microsoft Windows Word Excel Access Mail Outlook WordPerfect
• Trimble 4600LS, 4700, and 4800 GPS Receivers|1010|La
K D M MERIDIAN
iMr Gaspar P0509 24
Statement of Qualifications September 28 2005
DEEPAK S SOLANKI, E I T
Engineer
Summary of Experience
Mr Solank' is an Engineer in Training with 20 years of experience as an engineer on street
sewer grading and flood control projects He has also performed various calculations related to
hydrology and hydraulics earthwork construction staking topographic field and boundary
surveys He is also familiar with preparing cost estimates and legal descriptions He has also
prepared plans using AutoCAD
Below are some of the most recent projects that Mr Solanki has worked on
City of Moreno Valley Currently Mr Solanki is providing engineering services to the City of
Moreno Valley Mr Solanki is serving as a Management Analyst/Project Coordinator for the
Capital Projects Division He is assigned full time to City Hall to serve as an extension of City
Staff to assist in a variety of projects as follows
Research and preparation of a master list consisting of unimproved and unmaintained
streets within the City Streets from the master list are further sorted out using priority
matrix consisting of different criteria under which the streets are ranked
Preparation of a five year Capital Improvement Program for street improvements
Updating and creating new City Standards
Design of a Class II and III bikeway and street widening plans
Preparation of cost estimates for various capital improvement projects The work also
includes working on budgeting and assisting in preparation of applications for various
grants program funds
City of Chino Hills — Mr Solanki prepared plans for approximately 2 000 feet of 20 inchdiameter
water mains in Chino Avenue from an existing 20 inch water main easterly to East End Avenue
The new main crossed a bridge over the San Antonio Creek The proposed water main is a
cement mortar lined and coated steel pipe
City of San Dimas — Mr Solanki prepared plans and specifications for the City s Maintenance
Zone D Project The project consisted of asphalt pavement restoration and overlay of
approximately 2 700 feet on various streets
City of Hermosa Beach — Mr Solanki prepared plans and specifications for the Loma Area Sewer
and Street Rehabilitation Project The project consisted of approximately 8 900 feet of street
rehabilitation and 2 700 feet of sewer rehabilitation for the Loma Area Sewer and Street
Rehabilitation project
Cities of Azusa Covina Glendora Irwindale and West Covina — Preparations plans for six
street rehabilitation projects designated as the Accelerated Road Construction Program
Irwindale Avenue Et Al for the County of Los Angeles Total length is 13 600 feet A Materials
Report was also prepared with recommendations for alternate methods of pavement
rehabilitation Asphalt rubber hot mix was used
Cities of Lancaster and Palmdale Prepared plans for five street rehabilitation projects
designated as the Accelerated Road Construction Program Avenue G Et Al for the County of
Los Angeles The total length is 29 600 feet A Materials Report was also prepared with
recommendations for alternate methods of pavement rehabilitation Asphalt rubber hot mix was
used|1010|LA
K D M MERIDIAN|1010|Professional Registration
Engineer in Training CA 2002
Education
Civil Engineering University
Curriculum
— M S University Faculty of
Technology and Engineering India
B S Civil Engineering 1982
Affiliations
American Public Works Association
American
04Mr Gaspar P0509 24
Statement of Qualifications September 28 2005
RELATED PROJECTS
Project
Agency
Client
Tasks
Description
Year
Project
Agency
Client
Tasks
Description
Year
Project
Agency
Tasks
Description
Year
Project
Agency
Tasks
Description
Year
San Alano Drainage
City of Buena Park
City of Buena Park — City Contact Neda Ghazvini (714) 562-3689
Municipal design services Design Survey (Design modifications to drainage
facilities) and provide bid package to City
Design modifications to residential drainage facilities for the City
2005
Street Rehabilitation Program (City-funded through Water bonds)
City Of Coachella
City of Coachella — City Contact Victor Monz (Currently with City of Hemet)
Managed this $5 million street rehabilitation program consisting of three
separate bid packages
The project consisted of primarily residential and collector streets selected by the
City The first project consisted of pulverization and paving as well as sidewalk
curb and gutter rehabilitation The pulverization and paving process consisted of
several steps the existing asphalt streets were pulverized to a depth of six
inches re-compacting the pulverized material paving two inches asphalt
concrete then paving one inch of asphalt-rubber concrete The other two
phases also consisted of pulverization with additional items such as ARAM-1
2004
Street Rehabilitation Project (Federally Funded STPL)
Town of Tiburon
This federally funded $620 000 street rehabilitation project involved streets
identified by the Town based on their latest Pavement Management System
update
Only one street was a candidate for Federal Funding the rest were identified by
the City and were residential in nature The street work included milling and
inlaying overlaying latex-modified slurry-seals and restnping
2002
SIP Street Rehabilitation Project (Federally/State Funded STPL)
City of Oakley
This State-funded project involved East Cypress Ave and 0 Hara Road in the
City of Oakley $500 000 in state money was dedicated to construction
The City requested a turnkey project handling all issues including public
relations During this time period we managed engineers drafters technicians
sub-consultants as well as all Caltrans documentation Our Project Manager
also created the City s first Disadvantaged Business Enterprise (DBE) Program
in order to qualify for Federal/State dollars He handled all Federal aid
paperwork and communicated with Caltrans This established long term
relationships with Caltrans
2002
( 2-2-Mr Gaspar P0509 24
Statement of Qualifications September 28 2005
Project
Agency
Client
Tasks
Description
San Pablo Ave / Carlson Blvd Rehabilitation
City of El Cerrito
City of El Cerrito — City Contact Bruce King (510) 215-4322
This project was the design of a Federally Funded street overlay project with a
construction cost of $900 000
The project involved the grinding and inlaying of the City-owned portion of San
Pablo Avenue and Carlson Boulevard from San Pablo Avenue to the North City
limits KDM was responsible for
• Federal Aid paperwork
• Complete project delivery
City Street Rehabilitation Project, Phase I
City of El Cerrito
City of El Cerrito — City Contact Bruce King (510) 215-4322
The design of the City s street project in concert with the Pavement Management
System
Using this approach the City maximized the effect of pavement dollars spent on
City streets This job included slurry sealing and thin asphalt pavement overlays
on a variety of local/residential streets The construction cost was $1 million
Our Project Manager was responsible for
• Managing engineers, consultants and surveyors
• Complete project delivery
• Pavement Management System Updates
Street Rehabilitation Project, Phase II
City of El Cerrito
City of El Cerrito — City Contact Bruce King (510) 215-4322
The design of the City s street project in concert with the Pavement Management
System Using this approach the City was able to maximized the effect of
pavement dollars spent on City streets
This job was a cutting-edge-technology process called ultra-thin bonded
overlay that utilizes a special paver and materials The paver applies a heavily
polymer modified tack coat one foot in front of the A C The A C is also polymer
modified as well as having maximum aggregate size of 3/8 Total overlay
thickness is 3/4 for a resistance equal to a 1 5 overlay of standard DGAC The
construction cost was $1 million Our Project Manager was responsible for
• Managing engineers consultants and surveyors
• Complete project delivery
• Pavement Management System Updates
2003-2004 Various City Streets Resurfacing
City of Buena Park
City of Buena Park — City Contact Nabil S Henein (714) 562-3685
Design Survey and Cross-Sections Construction Staking and Monumentation
Perpetuation
Prepared base maps for design of street resurfacing rehabilitation and curb
gutter and sidewalk improvements — 9 adjacent residential streets (3 5 miles)
Project
Agency
Client
Tasks
Description
Project
Agency
Client
Tasks
Description
Project
Agency
Client
Tasks
Description
p-aMr Gaspar P0509 24
Statement of Qualifications September 28 2005
Provided construction staking services for concrete and intersection
improvements Prepared and filed Corner Records to County of Orange
Year
2003 - 2004
Year
2003/2004 Capital Improvements Projects
City of Laguna Beach
City of Laguna Beach — City Contact Derek Wieske (949) 497-0792
Design Survey and Cross-Sections Construction Staking and Monumentation
Perpetuation
Prepared base maps for design of street resurfacing rehabilitation curb & gutter
sidewalk and drainage improvements Provided construction staking services
for concrete and intersection improvements and rehabilitation construction of
City parks Prepared and filed Corner Records to County of Orange
2003 — 2004
Project
Agency
Client
Tasks
Description
LA KDM MERIDIANPRO.IFC:T STATUS REPORT
PM
Prolect
Number
Project Name Budget
council Ps&E
Approval
Coil t I BId
Awa d
Comments
LT/DG P 230 s w $300 000
Work partially completed due to heavy tree roots Benny to generate root cleaning priority list and obtain to another
proposal from Ramon Fierros Benny also to provide MH list for raising Four meetings were held regarding point repairs
priority based on the 4 year videotape program Need to video 15 line under 405 near Mesmer pump 9600 Lucerne
lateral was installed (10k) by Malloy VHS Tape to DVD conversion by May purchased DVDNHS burner Schedule
agenda item to approve 3 sewer contractors for point repairs and emergency repairs for up to $100K Mesmer Liner
Removal completed November 4
DG/MN P 295
C w tyd All y
Recon t t
$ 63 036 Alley w/o Washington between Elenda & Midway design by May Ng 90 / complete
LT P428
C b G tier S dewalk
R placement
$ 80 000 Met wrth Steven Cooper on 9/27 to coordinate repair locations Preparing list of repair locations
MG P 546
Pay rnent Managern I
Master Plan
$ 43 240
Council presentation October 2005 Received $53 000 of State funds in late October Priority list being generated and
final review by Charles
P 554
M a Pavement
mp overnent P og arn
c 50 000
'.
Projects as required Council agenda item Dec 12 for minor pavement and infrastructure repair and improvement of
$100000
LT P652
K eg Si Res rfac g
F. Imp adamant
$ 185 000 6/27/05
No bids received on 8/18105 for Streetlight Improvement Project Prepared and sent memo to Council 9/12 Will
combine with Iiiguera Traffic Signal
LT P 684
ad L dbl Street' ght
Upg ades
$ 241 725 6/27/05
No bids received on 8/18/05 for Streetlight Improvement Project Prepared and sent memo to Council 9/12 Will
combine with Higuera Traffic Signal Upcoming Streetlight Project Washington Place (Sawtelle to McLaughlin) and
Culver Blvd ( Sawtelle to Sepulveda) will be redesign in house
LT P741
H g St T aff
S g a
$ 237 000 12/1/00 09/12/05
One bid received from Chris Morales Inc for $230 750 00 Recommending Rejection of Bids to Council due insuffient
funds on 9/12 Will advertise to bid with Krueger & Lindblade Streetlight Project
LT P773
Comrnonw AM All y
Sewer Phas II
c 417 150
'
Issued RFP to CBM 9/15 and met with Kevin Kluas CBM regarding project Proposal received from CBM 9/29 for
$49494 NTP sent 10/20
DG P774 B ealock Sewer $ 709 215
Re-evaluate Wet Well and manhole issue Consider addressing the metering problem as well Dan Bob and Mate met
with Benny to review options of redesign Option to consider is creating a Phase 1 project
P 789
Sao IleJBlanc
Pedestr an T ff 5g al
c 146 425
Did pedestrian crossing study in October 2004 Study showed half the required number of pedestrians required to
warrant a pedestrian crossing but this number could increase if implemented Submitted SR2S grant application on
June 30 2005 to replace gas tax funding Decision on grant will be late October
P 797
Sep I en BI
St ersts op
$ 501 000 Need to ask MTA to transfer funds to Culver BI realignment
JR P801
Balton C eek CDS U t
@ Overland
$ 288 494 5/12/03 8/23/2004
Completed John to e-mail to County hewn person to transfer the unit to the County Also signage will have to be
placed as required by the Coastal Conservancy
GG/MGi P 804 T ff Flow Mon tor g $ 1 671 000 8/23/04
Award construction contract February 28 2005 Construction began May 2 l-inai completion date us October 3
Contractor will be asking for extension of completion date due to unexpected encounters with unmarked utilities on
Overland between Washington Blvd and Culver Blvd and at Sepulveda/Slauson Project completion date approved for
Pvtpncum nine In ram and iinfnnaoann rnnrIrtirmg
DG P 805
Pol Dept Pak g L t
Res rfac g
$ 80 000 Consultant completed surveying and conceptual plan Palter Robert to begin Final Design
JS/DG P816 Dog Perk
MOU and PS&E Bob Niewerth is CM City is in process of turning over the dog park to Valley Crest for park
improvements for the dog park organization Awaking verbal okay from County
JR P 819 Teen Center Remodel $ 315 000 7/26/2005 10/10/2005
Work program finalized on 2 23 05 Project appears severely under funded Asbestos abatement roof electrical and
ceiling needs are significant issues not addressed in the grant/funding Wolcott Architecture Interior award architect
contract 5 31 05 Design plan and matenals bid/specs authorized by Council on 7 25 05 Bid process begun 7 26 05
Add 1 issued 8 01 05 and Add 2 issued 8 24 05 both extending bid period which will close 9 29 05 Council award of
contractor contract scheduled for 10 10 05 The Budding Permit Plancheck process has been completed and the plans
approved on 8 26 05 Asbestos Contract approved by Council 822 05 and work scheduled to begin 10 17 05 Award
construction contract 10 10 05 to PCN3
JR P 827
El Mar Park
Imp ovements
$ 263 433
As of 2/22/05 Project pushed back to 05/06 CIP to focus on Teen Center project The project may be underfunded Is
the project a go?
MG P 829
Wash glon Blvd
Overland I ter ection
c 100 000
*
Feasibility study completed On hold for future Sony building additions
DG P 830 Permanent Sk I Perk $ 408 000
Kick off meeting was 8 25 05 and the first two Public Meetings were 9/8 and 9/22 The last Public meeting is scheduled
for 10/20 City Council Action was delayed to Novemeber 14 to approve the Conceptual design from SITE Design
Group Inc to allow time for the Skateboard Park Subcommittee to make recommendations
BA P 831
PI yg on d Res rfac g
K onenthal Park
c 45 000
'''
Project 90/ complete
DG P 832 F g Rang $600 000 City Council meeting scheduled for October 24th for approval of conceptual design and approval to advertise for bid
MG P 852
F H II A Toil
Sg a Syn h
$1 8M Received MOW To begin design early 2006
LT P 837
C Iva BI
Renoir to son L
Boo g t/Jasml
$ 100 000 7/25/05
09/19/2005
(Agency)
Made part of Washington Blvd Resurfacing Project as Add Alternate Bid Bids received w/ Shawnan as lowest bidder ©
$57 410 Recommending rejection of bids to Agency on 9/19 Will rebid project next year or when construction material
prices stabilize Met with Jerry Ichien & Alice Prasad and confirmed fund availability
LT P 838
Wash glen BI
Renoir In bon
Robert I Sentn y A
$ 100 000 7/25/05
09/19/2005
(Agency)
Made part of Washington Blvd Resurfacing Project as Add Alternate Bid Bids received w/ Shawnan as lowest bidder ©
$53 750 Recommending rejection of bids to Agency on 9/19 Will rebd project next year or when construction material
prices stabilize Met with Jerry Ichien & Alice Prasad and confirmed fund availability
P839 840
LT
841 &842
Eveward D ekewood
Wh lb Fladon Sewer
Replay
$115000
$540 000 $230 00
$240 000
8/22/05
Design Review completed by Bob Mate and Charles final review on 11/7 PSI completed boring and report to be
submitted 11/7 Advertise for Bid 1/06 Construction to Begin 3/06
LT P 843
Wash glon131
Elenda/Sep I
$ 600 000 7/25/05
9/19/05
(Agency)
Design Berryman & Henigar Pavement Coring & Testing PSI Bids received w/ Shawnan as lowest bidder ©
$597 525 + add Alternate $122 750 Recommending rejection of bids to Agency on 9/19 Will rebid project nest year or
when construction material prices stabilize Researching Heater Remix to possibly incorporate into project to help
reduce cost Met with Jerry Ichien & Alice Prasad and confirmed fund availability
DG P 844 UST Upg ades $ 40 000
Sealing of cracks in the PD parking lot area adjacent to the UST fuel tank appears to have solved the water intrusion
problem Transportation is coordinating the repairs necessary to comply with latest County requirements
JS P 846
coo I Chamber
A d oN al
$ 200 000 Joe Susca going to Council on September 26
MG P 851
Sawtelle/ Von
Widen g
$ 9 500 Design work to begin this fiscal year by City of Los Angeles
AO P 857 F Station 53 $4 million
Fire Station General Specifications approved by Fire Chief on 2 23 05 RCI awarded Const Mgmt contract on 5 02 05
WLC Architects awarded contract 6 13 05 Boundary survey undentvay Project kick off mtg schedule for 8 31 05
Design anticipated to be completed by end of 2005 construction through 2006 and occupancy in March or April 2007
P 858
C tywid For Ili
A es wont
$ 50 000 To be assigned to new Senior Management Analyst Also reviewing John Rivera s 2002 infrastructure report
DG/MN P 859
Sep Ived 51/0 eon
van y Cl i Pavement
Rehab
$ 50 000
Proposition C project May is designing concrete pad with loops for left turn lane from SB Sepulveda onto Green Valley
To use 4 000 psi concrete because no rebar due to traffic loops
DG/LT/
P860
MN
Car on St (H g er t|109| )
$ 550 000 Sent request for estimate from Berryman and Henigar to survey the street Survey estimate due on 11/7
BA P 863
Res dental Overlay
Ping arn
$ 325 000 Researching project specifications choosing streets
BA P 864
Res dental SI y 5 a
P og am
$ 75 000 Researching project specifications choosing streets
AO P 850
PI g Bldg
Recon U bon
$ 1 250 000 Construction complete punch list items to be completed and change orders to be reviewed
LT P 853
Wash gton Streak ski
I gleyvood I Ber yman
c 120 000
'
Sent NTP to Palter Roberts on 9/26
LT P 854 P 855
Blackwelder&Sm I v/
C ank 81,10,thg t
" $625 0004650 000
Proposal received on 9/19 Palter Roberts - $70 220 Berryman = $89 998 & CBM - $92 345 Sent NTP 9/27 to
Berryman & Herugar Kick off Meeting held on 10/10 Discussed with Berryman & Henigar additional scope to project of
constructing new sewer main to consifidate connection to NORS Add I scope proposed $27 270 proposed by
Berryman Discuss with Dan and decided not to make part of this project
LT P 856
Wash gton Btvd
Streak ght Redwood t
Lyceum
$ 130 000
Received Proposal from Palter Roberts for $21 000 Met with Huestace regarding scope and extended limits New limits
proposed is from Beethoven to Glencoe which would add 7 addition lights Council approved the apponation of
unallocated funds in the amount $26 105 78 Akil to amend CDBG Agreement
AO RDA project
Baldwi Motel
Demi:A tm
Received bids week of October 3 RDA to award contract late October Work to begin in November
PRO.IFC:T STATUS REPORT
PM
Prolect
Number
Project Name Budget
council Ps&E
Approval
Coil t I BId
Awa d
Comments
LT/DG P 230 s w $300 000
Work partially completed due to heavy tree roots Benny to generate root cleaning priority list and obtain to another
proposal from Ramon Fierros Benny also to provide MH list for raising Four meetings were held regarding point repairs
priority based on the 4 year videotape program Need to video 15 line under 405 near Mesmer pump 9600 Lucerne
lateral was installed (10k) by Malloy VHS Tape to DVD conversion by May purchased DVDNHS burner Schedule
agenda item to approve 3 sewer contractors for point repairs and emergency repairs for up to $100K Mesmer Liner
Removal completed November 4
DG/MN P 295
C w tyd All y
Recon t t
$ 63 036 Alley w/o Washington between Elenda & Midway design by May Ng 90 / complete
LT P428
C b G tier S dewalk
R placement
$ 80 000 Met wrth Steven Cooper on 9/27 to coordinate repair locations Preparing list of repair locations
MG P 546
Pay rnent Managern I
Master Plan
$ 43 240
Council presentation October 2005 Received $53 000 of State funds in late October Priority list being generated and
final review by Charles
P 554
M a Pavement
mp overnent P og arn
c 50 000
'.
Projects as required Council agenda item Dec 12 for minor pavement and infrastructure repair and improvement of
$100000
LT P652
K eg Si Res rfac g
F. Imp adamant
$ 185 000 6/27/05
No bids received on 8/18105 for Streetlight Improvement Project Prepared and sent memo to Council 9/12 Will
combine with Iiiguera Traffic Signal
LT P 684
ad L dbl Street' ght
Upg ades
$ 241 725 6/27/05
No bids received on 8/18/05 for Streetlight Improvement Project Prepared and sent memo to Council 9/12 Will
combine with Higuera Traffic Signal Upcoming Streetlight Project Washington Place (Sawtelle to McLaughlin) and
Culver Blvd ( Sawtelle to Sepulveda) will be redesign in house
LT P741
H g St T aff
S g a
$ 237 000 12/1/00 09/12/05
One bid received from Chris Morales Inc for $230 750 00 Recommending Rejection of Bids to Council due insuffient
funds on 9/12 Will advertise to bid with Krueger & Lindblade Streetlight Project
LT P773
Comrnonw AM All y
Sewer Phas II
c 417 150
'
Issued RFP to CBM 9/15 and met with Kevin Kluas CBM regarding project Proposal received from CBM 9/29 for
$49494 NTP sent 10/20
DG P774 B ealock Sewer $ 709 215
Re-evaluate Wet Well and manhole issue Consider addressing the metering problem as well Dan Bob and Mate met
with Benny to review options of redesign Option to consider is creating a Phase 1 project
P 789
Sao IleJBlanc
Pedestr an T ff 5g al
c 146 425
Did pedestrian crossing study in October 2004 Study showed half the required number of pedestrians required to
warrant a pedestrian crossing but this number could increase if implemented Submitted SR2S grant application on
June 30 2005 to replace gas tax funding Decision on grant will be late October
P 797
Sep I en BI
St ersts op
$ 501 000 Need to ask MTA to transfer funds to Culver BI realignment
JR P801
Balton C eek CDS U t
@ Overland
$ 288 494 5/12/03 8/23/2004
Completed John to e-mail to County hewn person to transfer the unit to the County Also signage will have to be
placed as required by the Coastal Conservancy
GG/MGi P 804 T ff Flow Mon tor g $ 1 671 000 8/23/04
Award construction contract February 28 2005 Construction began May 2 l-inai completion date us October 3
Contractor will be asking for extension of completion date due to unexpected encounters with unmarked utilities on
Overland between Washington Blvd and Culver Blvd and at Sepulveda/Slauson Project completion date approved for
Pvtpncum nine In ram and iinfnnaoann rnnrIrtirmg
DG P 805
Pol Dept Pak g L t
Res rfac g
$ 80 000 Consultant completed surveying and conceptual plan Palter Robert to begin Final Design
JS/DG P816 Dog Perk
MOU and PS&E Bob Niewerth is CM City is in process of turning over the dog park to Valley Crest for park
improvements for the dog park organization Awaking verbal okay from County
JR P 819 Teen Center Remodel $ 315 000 7/26/2005 10/10/2005
Work program finalized on 2 23 05 Project appears severely under funded Asbestos abatement roof electrical and
ceiling needs are significant issues not addressed in the grant/funding Wolcott Architecture Interior award architect
contract 5 31 05 Design plan and matenals bid/specs authorized by Council on 7 25 05 Bid process begun 7 26 05
Add 1 issued 8 01 05 and Add 2 issued 8 24 05 both extending bid period which will close 9 29 05 Council award of
contractor contract scheduled for 10 10 05 The Budding Permit Plancheck process has been completed and the plans
approved on 8 26 05 Asbestos Contract approved by Council 822 05 and work scheduled to begin 10 17 05 Award
construction contract 10 10 05 to PCN3
JR P 827
El Mar Park
Imp ovements
$ 263 433
As of 2/22/05 Project pushed back to 05/06 CIP to focus on Teen Center project The project may be underfunded Is
the project a go?
MG P 829
Wash glon Blvd
Overland I ter ection
c 100 000
*
Feasibility study completed On hold for future Sony building additions
DG P 830 Permanent Sk I Perk $ 408 000
Kick off meeting was 8 25 05 and the first two Public Meetings were 9/8 and 9/22 The last Public meeting is scheduled
for 10/20 City Council Action was delayed to Novemeber 14 to approve the Conceptual design from SITE Design
Group Inc to allow time for the Skateboard Park Subcommittee to make recommendations
BA P 831
PI yg on d Res rfac g
K onenthal Park
c 45 000
'''
Project 90/ complete
DG P 832 F g Rang $600 000 City Council meeting scheduled for October 24th for approval of conceptual design and approval to advertise for bid
MG P 852
F H II A Toil
Sg a Syn h
$1 8M Received MOW To begin design early 2006
LT P 837
C Iva BI
Renoir to son L
Boo g t/Jasml
$ 100 000 7/25/05
09/19/2005
(Agency)
Made part of Washington Blvd Resurfacing Project as Add Alternate Bid Bids received w/ Shawnan as lowest bidder ©
$57 410 Recommending rejection of bids to Agency on 9/19 Will rebid project next year or when construction material
prices stabilize Met with Jerry Ichien & Alice Prasad and confirmed fund availability
LT P 838
Wash glen BI
Renoir In bon
Robert I Sentn y A
$ 100 000 7/25/05
09/19/2005
(Agency)
Made part of Washington Blvd Resurfacing Project as Add Alternate Bid Bids received w/ Shawnan as lowest bidder ©
$53 750 Recommending rejection of bids to Agency on 9/19 Will rebd project next year or when construction material
prices stabilize Met with Jerry Ichien & Alice Prasad and confirmed fund availability
P839 840
LT
841 &842
Eveward D ekewood
Wh lb Fladon Sewer
Replay
$115000
$540 000 $230 00
$240 000
8/22/05
Design Review completed by Bob Mate and Charles final review on 11/7 PSI completed boring and report to be
submitted 11/7 Advertise for Bid 1/06 Construction to Begin 3/06
LT P 843
Wash glon131
Elenda/Sep I
$ 600 000 7/25/05
9/19/05
(Agency)
Design Berryman & Henigar Pavement Coring & Testing PSI Bids received w/ Shawnan as lowest bidder ©
$597 525 + add Alternate $122 750 Recommending rejection of bids to Agency on 9/19 Will rebid project nest year or
when construction material prices stabilize Researching Heater Remix to possibly incorporate into project to help
reduce cost Met with Jerry Ichien & Alice Prasad and confirmed fund availability
DG P 844 UST Upg ades $ 40 000
Sealing of cracks in the PD parking lot area adjacent to the UST fuel tank appears to have solved the water intrusion
problem Transportation is coordinating the repairs necessary to comply with latest County requirements
JS P 846
coo I Chamber
A d oN al
$ 200 000 Joe Susca going to Council on September 26
MG P 851
Sawtelle/ Von
Widen g
$ 9 500 Design work to begin this fiscal year by City of Los Angeles
AO P 857 F Station 53 $4 million
Fire Station General Specifications approved by Fire Chief on 2 23 05 RCI awarded Const Mgmt contract on 5 02 05
WLC Architects awarded contract 6 13 05 Boundary survey undentvay Project kick off mtg schedule for 8 31 05
Design anticipated to be completed by end of 2005 construction through 2006 and occupancy in March or April 2007
P 858
C tywid For Ili
A es wont
$ 50 000 To be assigned to new Senior Management Analyst Also reviewing John Rivera s 2002 infrastructure report
DG/MN P 859
Sep Ived 51/0 eon
van y Cl i Pavement
Rehab
$ 50 000
Proposition C project May is designing concrete pad with loops for left turn lane from SB Sepulveda onto Green Valley
To use 4 000 psi concrete because no rebar due to traffic loops
DG/LT/
P860
MN
Car on St (H g er t|109| )
$ 550 000 Sent request for estimate from Berryman and Henigar to survey the street Survey estimate due on 11/7
BA P 863
Res dental Overlay
Ping arn
$ 325 000 Researching project specifications choosing streets
BA P 864
Res dental SI y 5 a
P og am
$ 75 000 Researching project specifications choosing streets
AO P 850
PI g Bldg
Recon U bon
$ 1 250 000 Construction complete punch list items to be completed and change orders to be reviewed
LT P 853
Wash gton Streak ski
I gleyvood I Ber yman
c 120 000
'
Sent NTP to Palter Roberts on 9/26
LT P 854 P 855
Blackwelder&Sm I v/
C ank 81,10,thg t
" $625 0004650 000
Proposal received on 9/19 Palter Roberts - $70 220 Berryman = $89 998 & CBM - $92 345 Sent NTP 9/27 to
Berryman & Herugar Kick off Meeting held on 10/10 Discussed with Berryman & Henigar additional scope to project of
constructing new sewer main to consifidate connection to NORS Add I scope proposed $27 270 proposed by
Berryman Discuss with Dan and decided not to make part of this project
LT P 856
Wash gton Btvd
Streak ght Redwood t
Lyceum
$ 130 000
Received Proposal from Palter Roberts for $21 000 Met with Huestace regarding scope and extended limits New limits
proposed is from Beethoven to Glencoe which would add 7 addition lights Council approved the apponation of
unallocated funds in the amount $26 105 78 Akil to amend CDBG Agreement
AO RDA project
Baldwi Motel
Demi:A tm
Received bids week of October 3 RDA to award contract late October Work to begin in November
MEETING DATE November 28 2005|1010| AGENDA ITEM Authorization to Award Professional Services Agreements I
with CBM Consulting Inc , Paller-Roberts Engineering Inc , Berryman and
Henigar Hall and Foreman, and KDM Meridian, for General Civil Engineering
Services
ATTACHMENTS
Pages|109| CBM Consulting, Inc Statement of Qualifications 1-37|109| Paller-Roberts Engmeenng Statement of Qualifications 38-50|109| Berryman and Hemgar Statement of Qualifications 51-84|109| Hall and Foreman Statement of Qualifications 85-111|109| KDM Meridian Statement of Qualifications 112-124|109| Capital Improvement Project Status Report 125STATEMENT OF QUALIFICATIONS
Project Highlights
ACE Intelligent Roadway Rail Interface System (IRRIS) Demonstration Project
Construction Management for the installation of new Variable Message Signs (VMS) traffic signal
cabinets inductive loops conduit infrastructure and fiber optic cabling with respective communications
and software IRRIS will be tied into the Railroad Subsystem and the City s Traffic Management System
to reduce motorist queuing and delays during the passage of trains and to provide real time information
to motorists on a VMS including advisories to avoid grade crossings that may be occupied by trains for
extended period of times
Cost $2 000 000
Owner Alameda Corridor-East (ACE) Transportation Authority
Completed On going
Contact Rick Richmond Chief Executive Officer (626) 962 9292
Principal In-Charge Dino D Emilia P E
Office Engineer Curt Baker
Construction Manager Bill Harding
Project Controls Fady Al-Nabbout
ACE Jump Start Safety Projects
CBM provided construction management services for the Jump Start safety upgrade projects at up to
forty six (46) railroads grade crossings located along the Union Pacific Railroad (UPRR) corridor from
East Los Angeles to Pomona Safety improvements will provide better control or separation of vehicle
travel ways at railroad crossings upgrade railroad signal and warning systems and improved vehicle
and pedestrian crossing conditions CM services being provided include Resident Engineering
Constructability Analysis Scheduling Project Controls which include Cost Engineering / Estimating
Control of Change Orders and Claims Safety and Quality Control Utility Coordination Environmental
Services Document Control and Labor Compliance and DBE monitoring CBM also produced a
comprehensive RE Manual which includes all the procedures necessary to manage and construct this
project and will set the guidelines for all future ACE projects The construction value IS expected to be
$5M of civil construction and $19M of improvements constructed by UPPR and Metrolink under a force
account Specific storm drain work included extending a double barrel box culvert and reconstructing
flow lien channels at Mission Mills Rd as well as extending culverts and cleaning out culverts at other
intersections
CBM Consulting, Inc
Pate 7
9STATEMENT OF QUALIFICATIONS
Project Highlights
Cost $24 000 000
Owner Alameda Corridor-East (ACE) Construction
Authority
Completed On-going
Contact Rick Richmond Chief Executive Officer (626) 962
9292
Principal Dino D Emilia P E
Office Engineer Jim Nies
Construction Manager Bill Harding
Project Controls Fady Al Nabbout
CCRA Off Site Pedestrian and Traffic Improvements - Project Management
Represented Agency in developing concepts dealing with problem solving reconstructing roads
including Ince Blvd and widening Washington Blvd to accommodate the changing traffic patterns due
to Ince parking structure and undertaking the construction management with a large number of
contractors involved Project included new sidewalks ADA compliant ramps landscape median
islands new traffic signals relocating utilities repaving sidewalk enhancements curb extensions new
crosswalks traffic calming measures and NTMP work in the neighborhood
Cost $2 000 000
Owner Culver City Redevelopment Agency
Completed 2003
Contact Todd Tipton Redevelopment Specialist (310) 253 5783
Project Manager Alan Braatvedt
CCRAIlat Hoke Business Triangle Streetscape
CBM managed the design and implementation of this street and sidewalk improvement program
including upgrading area lighting (in coordination with SCE) landscaping alley reconstruction and A/C
resurfacing overlaid with Streetpnnt ® to improve the appearance and not comprise the alley s
structural integrity Design included analysis of existing pavement to determine pavement
reconstruction standards utility impacts and the City s life span requirements Coordinated funding
approvals design & bid documents and Public Works oversight Included extensive public relations with
the abutting business community and coordination between utility companies and subcontractors
Cost $150000
Owner Culver City Redevelopment Agency
Completed 2001
Contact Todd Tipton Redevelopment Project Specialist (310) 253-5783
Project Manager Alan Braatvedt
CBM Consulting, Inc
Page 8
119STATEMENT OF QUALIFICATIONS
Project Highlights
CCRA Screenland Development Coordination and Utility Relocation
CBM facilitated and coordinated the utility relocation
designed and coordinated the construction of two sewers for
the Culver City downtown Screenland development CBM
successfully negotiated participation by the utility companies
and the developer without cost to the public agencies CBM
negotiated the proper removal and disposal of a buried
underground fuel tank and obtained full clearance from the
Los Angeles County Department of Public Works CBM was
extensively involved in all aspects of the offsite work for the
Screenland development from construction managing the
demolition of existing contaminated improvements to design
input and coordination of traffic flow improvements The work
involved presentation of staff reports bid adjudication award
of contracts and coordination between various departments
within the City businesses other affected parties and contractors
Cost $2 000 000
Owner Culver City Redevelopment Agency
Completed 2001
Contact Todd Tipton (310) 253-5783
Principal Blake Mitchell P E
Project Manager Alan Braatvedt
Culver City Fire Station #3 Design Development
Managed the initial feasibility and design development for renovation/addition to this 4500 sq ft fire
station which had outgrown its effectiveness since its construction in 1955 Coordinated and expedited
the selection of the initial feasibility and design development architects Cost benefit analyses were
utilized to determine the preferred concept Prepared a funding application to the Department of the
Architect Project is currently pending funding
Cost $ 1 200 000
Owner City of Culver City
Completed June 1999
Contact Michael Thompson Fire Chief (310) 253 5900
Project Manager Dino D Emilia P E
Assistant Project Manager Steve Massetti
wtb.
CBM Consulting, Inc
Page 9
IISTATEMENT OF QUALIFICATIONS
Project Highlights
Culver City Veterans Memorial Building/Civic Center Hazmat Abatement & Renovation Projects
Managed the design bid and construction of interior and exterior improvements to classrooms offices
and multi-use rooms The project included over 70 000 square feet of roofing hazardous waste
removals and interior demolition and renovation Compiled specifications and managed contractors for
a follow-up renovation for a 12 000 square foot ancillary classroom facility Managed the move in
contractor and the various temporary relocations within the building to facilitate project completion and
the continued operation of the City s only public auditorium and public meeting areas
Cost $ 320 000
Owner City of Culver City
Completed May 1999
Contact James S Davis Public Works Director (310) 253
5600
Construction Manager Dino D Emilia P E
CCRA Washington Boulevard Streetscape / Overlay
CBM acted as lead project manager for this project administering the design and construction from
inception to completion The project consisted of approximately 1 5 miles of pavement rehabilitation
major streetscape median islands landscaping and R R coordination Duties included project
development bid and contract administration all public relations council meetings and reports review
of pavement analysis recommendations for rehabilitation strategies and management and
coordination of budget and funding for the entire project
Cost $ 6 900 000
Owner Culver City Redevelopment Agency
Completed January 1998
Contact Mark Winogrond Chief Administrative Officer (310) 253 6000
Project Manager Blake Mitchell P E
CBM Consulting, Inc
Page 10STATEMENT OF QUALIFICATIONS
Project Highlights
Culver City Public Services Facility Construction
CBM served as Public Works and Engineering representative on a 6 million dollar transportation
project which relocated the City s Public Works and Parks Department to a renovated office/
warehouse facility The project involved interior and exterior renovation Structural upgrading code
compliance personnel relocation landscaping and site work Worked with a project team consisting of
the Culver City Transportation Department Architects and a Construction Manager Provided
oversight value engineering bidability and constructability reviews and assisted in professional
services selection and fee negotiations Provided oversight value engineering bidability and
constructability reviews and assisted in professional services selection and fee negotiations
Cost $ 6 000 000
Owner City of Culver City
Completed January 1998
Contact Steve Cunningham Dep Transportation Dir (310)
253 6540
Project Manager Dino D Emilia P E
Assistant Project Manager Steve Massetti P E
Culver City SMART Corridor
CBM provided project management from inception through completion of construction Project included
upgrading approximately 24 intersections on the west side of Culver City along Washington Blvd and
Culver Blvd to provide an interconnected ATSAC system linked to City of LA and Culver City s Traffic
operations Project included several intersections in Caltrans right of way and one in shared LADOT
right of way There were cross maintenance agreements to negotiate Funding was provided via TEA
and local funds and the project was administered utilizing the Caltrans local programs manual
Intersections were upgraded to provide for HC Ramps and ped buttons as well
Cost $2 400 000
Owner City of Culver City
Completed 1997
Contact James S Davis Director of Public Works (310) 253-5600
Project Manager Blake Mitchell P E
Ili tbi. CBM Consulting, Inc
Page 11
taSTATEMENT OF QUALIFICATIONS
Project Highlights
Culver City SMART Corridor Extension
CBM provided project management from inception through completion of construction CBM also
provided construction management inspection and preparation of all audit paperwork for Caltrans and
the MTA Project included upgrading approximately 25 intersections on the west side of Culver City
along Washington Blvd Sepulveda and Culver Blvd to provide for an interconnected ATSAC system
linked to City of LA and Culver City s traffic operations Also included several intersections in Ca[trans
right of way and one in shared LADOT right of way thus cross maintenance agreements had to be
negotiated Funding was provided via TEA and local funds and the project was administered utilizing
the Caltrans local programs manual Intersections were upgraded to provide for HC Ramps and ped
buttons
Cost $1 700 000
Owner City of Culver City
Completed 1998
Contact James S Davis Director of Public Works (310) 253
5600
Project Manager Blake Mitchell P E
CCRA Downtown Streetscape
CBM provided Project Management and Public Works representation through the life of this downtown
revitalization project Project consisted of reconstruction of streets curbs & gutters drainage facilities
sidewalks (widening) and installation of lighting landscaping decorative paving and street furniture in
downtown Culver City Services included design development management of design consultants
design process and review and oversight of the project during construction as the City Engineer s
representative
Cost $ 6 800 000
Owner Culver City Redevelopment Agency
Completed December 1995
Contact Mark Winogrond Chief Administrative Officer (310) 253 6000
Project Manager Blake Mitchell P E
Culver City Concrete Bus Stop Pads
This project included the design and construction of 22 concrete bus stop pads throughout the City
CBM incorporated City s standard bus stop pad specifications and packaged the bid specifications for
this City-Wide infrastructure improvement project CBM provided construction oversight as the City
CBM Consulting, Inc
Page 12
'LkCBM Consulting, Inc.
Building the Future
To Provide
Civil Engineering Services
-
for
City ofCu
zSTATEMENT OF QUALIFICATIONS
OVERVIEW & EXECUTIVE SUMMARY 1
EXECUTIVE SUMMARY 2
PROJECT MANAGEMENT 3
CONSTRUCTION MANAGEMENT & OBSERVATION 4
CIVIL ENGINEERING DESIGN 5
STAFF ASSISTANCE 6
PROJECT HIGHLIGHTS 7
KEY PERSONNEL 31
REFERENCES 33
RATES 35
CBM Consulting, Inc
I,STATEMENT OF QUALIFICATIONS
Through proactive planning, personal service, exceptionally qualified staff and
the application of time tested design, project and construction management
systems, CBM provides timely and quality completion of major projects,
enabling clients to utilize their improvements and get back to business as usual
We are proud of our track record of involvement on more than 400 public
projects with no unresolved claims
CBM Consulting, Inc.
Building the Future
MISSION
CBM Consulting, Inc is a team of carefully selected professionals providing
Project Management, Construction Management and Civil Engineering
sentices CBM strives to deliver each project on time within budget and with
minimal disruption to the client and to the community, utilizing the most practical
technologies to ensure the most economical project solutions in the industry
VALUES
To provide Peace of Mind Freedom, and a Sense of Order
1461216 CBM Consulting, Inc
Page 1
3STATEMENT OF QUALIFICATIONS
CBM is an organization of professionals that works with the staffs of cities and other public agencies to
achieve superior results with Capital Improvement Projects Our services include Civil Engineering
Project Management Construction Management Staff Assistance and Construction Observation The
enclosed information has been abbreviated for quick review and we welcome the opportunity to
provide additional details and references
CBM is a California Corporation established in 1989 and incorporated in 1990 to provide Professional
Engineering Project and Construction Management and Staff Assistance Blake Mitchell founded the
company after his many years of Civil Engineering Project Management and Construction
Management experience identified a definite need within the industry to assist public sector clients
CBM continues to invest in itself its employees and its clients We have offices in Los Angeles and
Orange Counties We are fully equipped with the latest management information systems Regular
team meetings allow for continued refinement of proven strategies as team members share lessons
learned on their projects In this way all projects benefit from the entire team s experience
Now and in the future CBM is your resource for obtaining assistance ranging from temporary Staff
Augmentation to complete Pi oject Management Construdion Management and Civil Engineering
Design at rates that are highly competitive
OFFICES Headquarters
17601 S Denver Ave
Gardena CA 90248
Tel (310) 329 0102
Fax (310) 329 1021
Branch Office
1111 Town & Country Rd
Orange CA 92868
Tel (714) 565-0648
Fax (714) 565-0668
95 4380000 FEDERAL TAX IDENTIFICATION NUMBER
RECENT AWARDS
American Public Works Association (APWA) Southern California Chapter Project of the Year
• CM for City of Long Beach New Fleet Services Towing/Impound and Refuse Facilities (2003)
• Alameda Corridor East (ACE) Construction Authority Jumpstart Safety Program (2004)
• City of Long Beach Emergency Communications and Operations Center (2004)
• City of Signal Hill Spring Street Revitalization Corridor (2004)
• City of West Hollywood Spalding Parking Lot (2004)
CLIENT PORTAL
For up to the minute information regarding your project CBM allows secured access to your project(s)
through Remote Desktop We II issue you a User ID and Password Using Pnmavera Expedition you
can view reports plans contracts and invoices
CBM Consulting, Inc
Pae 2
4STATEMENT OF QUALIFICATIONS
CBM will streamline Project Management for any client Our staff
works with the most recognized instruments and codes such as the
Public Contracts Code the Standard Specifications for Public Works
Construction Green Book American Institute of Architects
documents Americans with Disabilities Act the Uniform Building
Code Caltrans Standard Specifications American Water Works
Association and local standards to assist clients in managing all
project phases from preliminary design through construction
completion As part of our Project Management services we develop
revisions to Boiler Plate specifications and bid documents to provide
tighter control over the selection and supervision of contractors CBM s
Project Management services saves time and money
CBM routinely develops project funding from Propositions A and C ISTEA State and Local
Partnership Program CDBG Assessment Districts energy efficiency programs and others We
encourage our clients to rely upon our funding development experience soliciting funds from all
possible sources
SERVICES AVAILABLE
Contract Administration
Capital Budget Preparation
Design/Build Administration
Performance Contract Administration
Maintenance Agreement Administration
Funding Applications
Consultant Selection
Preparation of Council Reports
Grant Administration
Prepare Bid Specifications RFPs RFQs
Develop Scopes of Work
Develop Update/Monitor Schedules
Assist with Negotiation of Consultant
Utility Agency & Contractor Contracts
Assist with Negotiation of Consultant Utility
Agency and Contractor Contracts
Project Public Relations
Analyses of Budget & Schedule Impacts
Adrnin of Environmental Requirements
PROJECT TYPES
Capital Program Coordination
Community Redevelopment Projects
Recreation & Parks Facilities
Parking Structures and Parking Lots
Building Construction and Renovation)
Design / Build Projects
Energy Conservation Upgrades
Residential Subdivision Planning
Utility Relocations & Undergroundings
Water System Improvements
Sewer Mains & Sewer Lift Stations
Water System Projects
Drainage Improvements
Library Renovation
Street Pavement Projects
Streetscape Improvements
Traffic System Upgrades
Transportation Facilities
Railways and Grade Separations
Freeways Bridges & Interchanges
Schools Police and Fire Station Projects
Manna Port & Wharf Projects
CBIVI Consulting, Inc
Page 3STATEMENT OF QUALIFICATIONS
Construction Management
CBM s construction managers apply many years of experience on Ca/trans municipal utility and
private construction projects Our team allows your agency access to some of the most practical
Construction Managers and Technicians available CBM provides all parties with up to the minute
information and is sensitive to the special needs of the community
Construction Observation
CBM provides construction observation services for many types of
projects CBM construction observers have experience with bridges
highways heavy civil projects roadways utilities transportation projects
rail wharf and port facilities federally funded projects and virtually any
other type of municipal or public projects Our construction inspectors
bring many years of accrued skills in dealing with contractors and
keeping the projects on track for timely completion
SERVICES AVAILABLE
Contract Administration
Cost Estimating and Budgeting
Projected vs Actual Budget Tracking
Scheduling Monitoring and Tracking
Change Order Evaluation & Negotiation Airports
Document Controls
Submittal Shop Drawing & RFI processing
Construction Observation
Materials Inspection
Specialty Inspection
As Built Documentation
Federal Fund Requirements Administration
Public Relations for Fire &
Police Department Projects
Storm Water Prevention Plan Monitoring
Hazmat Abatement Admin & Coordination
Warranty O&M Manuals and Training
Claims Avoidance
Full Time Daily Public Works Inspection
Daily and Weekly Reports
Quality Assurance
Photo and Video Documentation
Field Change Coordination
Quantity Measurement and Verification
Manpower and Equipment Tracking
As Built Documentation
Contract Time Monitoring
PROJECT TYPES
Multi Prime Projects
Streets & Highways
Building Construction
Manna Port & Wharf Projects
Municipal Pool Projects
Parking Structures and Lots
Storm Drains & Sewer Systems
Building Renovations
Natural Gas Pipelines
Railroad Grade Separations
Sound Walls & Guard Rails
School Projects
Park Projects
Municipal Building Construction
Earthquake Repairs
CBM Consulting, Inc
Page 4
IQSTATEMENT OF QUALIFICATIONS
CBM s talented staff of Registered Professional Engineers and Designers is complemented with a wide
range of experience in Engineering Design Project both in the public and private sector Coupled with
the latest design software tools CBM provides efficient cos! effective and timely engineering solutions
meeting a variety of project requirements In addition CBM draws from a substantial support base of
subconsultants for specialized engineering tasks including traffic signal engineering structural
engineering geotechnical engineering and architectural services as needed
CBM has over 15 years of comprehensive civil engineering experience CBM works almost entirely with
public agencies and as such is uniquely suited to respond to the specific needs of public works
projects Our highly qualified staff has completed a diverse range of civil engineering projects for many
agencies throughout Southern California
CBM Consulting has successfully designed and managed the construction of all aspects of public
works construction including storm sewer sanitary sewer and water pipelines curb gutter and
sidewalks pavement construction landscaping structures and buildings CBM Consulting works with
both new and existing infrastructure improvements but specializes in civil rehabilitation projects CBM
also provides complete program management services encompassing all aspect of a project or
program from conception through completion
SERVICES AVAILABLE
Civil Design
Entitlement & Permitting Services
Public Relations
Agency Processing
Expert Witness and Testimony
As Built Drawings
Plan Reproductions
PROJECT TYPES
Street Overlay Reconstruction & Widening
Commercial Land Development Design
Grading/Drainage Design
Hydrology Studies
Traffic Signalization Projects
Parking Lot Layout Design
Traffic Control
ADA Accessibility
Transit Centers
Utility Projects Water Sewer Storm Drain Natural Gas Electrical Street Lighting etc
CAD SOFTWARE
AutoCAD 2000 (R14)
Land Desktop 2004
14111)1. CBM Consulting, Inc
Page 5STATEMENT OF QUALIFICATIONS
CBM personnel act as an extension of your staff to reduce project backlogs and help ensure thorough
and timely project completion These services can be on a temporary or a full time basis and are
usually paid out of project budgets Utilize CBM staff assistance to administer all aspects or any portion
of a project from conceptual design through Notice of Completion
SERVICES AVAILABLE
Contract Administration
Capital Budget Preparation
Maintenance Agreement Administration
Funding Applications
Consultant Selection
Grant Funded Projects Administration
Construction Observation
Prepare Bid Specifications RFP s RFQ s
Develop Scopes of Work
CBM routinely develops and manages project funding from sources including Proposition A & C
ISTEA SLTPP CDBG assessment districts grants and others
Currently CBM is working with the City of La Habra providing CIP Engineering assistance serving as
an extension of engineering staff for the Public Works Department CBM helps manage the design bid
and construction of various CIP projects including street water storm drain and sewer projects with
local state and federal funding
Other clients we have provided staff assistance to are
• City of Culver City
• City of El Segundo
• City of La Canada Flintridge
• City of Malibu
• City of Torrance
• Culver City Redevelopment Agency
CBM Consulting, Inc
I Pa se 6
o