Legislation Details

File #: HIST-3278    Version: 1 Subject:
Type: Historical Status: Historical
In control: HISTORICAL - REDEVELOPMENT
On agenda: 8/21/2006 Final action: 8/21/2006
Title: Joint City Council/Redevelopment Agency Consideration to Approve The Culver Studios Comprehensive Plan Amendment No. 5, Amend the Design For Development for the Culver Studios Area, and Determine that the Project is Consistent with the Redevelopment Plan for Component Area No. 3 of the Culver City Redevelopment Project.
Attachments: 1. SR_06-08-21_CCRA_Cuver Studios DFD Amend.doc, 2. ATT_06-08-21_CCRA Culver Studio Comprehensive Plan and DFD Amendment.pdf
City of Culver City, California Redevelopment Agency Agenda Item Report RECOMMENDATION: Staff recommends the Culver City Redevelopment Agency (Agency) approve the Amended Design For Development (DFD), and determine that project proposed by the Culver Studios is consistent with the Redevelopment Plan. BACKGROUND: The Agency adopted a DFD which was last amended in 1994, for the area of and around the Culver Studios. Since that year, much has occurred to render the existing DFD outdated or obsolete. For example, the 1994 edition preceded, but anticipated, the development of what is known in the DFD as the East Parcel, (generally the block bounded by Ince Boulevard, Washington Boulevard, Higuera Street and Lindblade Avenue.) Most of the planned developments on this parcel and all of the required off-site improvements are complete. Other changes that have occurred in the intervening years have included the merging and amending of the redevelopment plan and the revisions to the City’s zoning code. Recently, the owners of the Culver Studios applied to the City to amend the Comprehensive Plan that determines future development on their site. The Culver Studios site is a part of the DFD, and is referred to as the West Parcel in the DFD. In order for there to be consistency between the respective City and Agency approved documents, which regulate development on the Culver Studios site, the Agency is asked to consider an amendment to the DFD to incorporate the Amendment to the Comprehensive Plan, which the City Council will be considering on the same night as the Agency. The Meeting Date: 8/21/06 Item Number: J-1 AGENDA ITEM: Joint City Council/Redevelopment Agency Consideration to Approve The Culver Studios Comprehensive Plan Amendment No. 5, Amend the Design For Development for the Culver Studios Area, and Determine that the Project is Consistent with the Redevelopment Plan for Component Area No. 3 of the Culver City Redevelopment Project. Contact Person/Dept.: John Fisanotti Phone Number: (310) 253-5767 Fiscal Impact: Yes [] No [X] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [X] Consent Item: [] Attachments: [X] Public Notification: Notice of this item was included with the notice provided for the concomitant City Council item. Master Notification List (08/16/06). Department Approval: Susan Evans 08/10/06 Exec. Director Approval: Jerry Fulwood 08/16/06 City Controller Approval: Marlee Chang 08/16/06City of Culver City, California Redevelopment Agency Agenda Item Report amended DFD also updates outmoded, obsolete passages, and reflects the fact much of the anticipated construction in the 1994 edition has been completed. DISCUSSION: If approved by the Agency, the Amended DFD accomplishes the following: 1. Incorporate Comprehensive Plan Amendment No. 5 into the DFD to make the DFD consistent with the anticipated City approvals for the site. The major changes allowed in Comprehensive Plan Amendment No. 5 are: a. Construction of a 49,500 gross square foot, four-story (56 foot high) office building within approximately the same footprint of Building J, which has been demolished; b. Amending the required ratio of parking spaces to office space to match the ratio used citywide for office uses; c. Construction of a 200 space parking structure where an existing 60 space surface lot and Building R are now located. A more detailed description of the changes planned under Comprehensive Plan Amendment No. 5, and background material may be found in the City Council agenda packet with the City Council staff report 2. Reflects that much of construction on the east parcel of the DFD site is complete, and with it, many of the conditions of approval listed in the DFD are also completed and no longer need to be specified. 3. Re-formats the DFD to more clearly indicate which development criteria apply to each area of the DFD. Over time, the different parcels covered by this one DFD, were developed separately. This meant that each of the three main areas in the DFD, (which are identified in the DFD as the West Parcel, the East parcel and the North Parcel) had different criteria approved by the City and the Agency. Faced with this complexity, staff felt it was best to re-format the DFD to clearly divide it into sections so applicable criteria for each of the three main areas are grouped by location. 4. Updated obsolete requirements and references. For example, the merger and amendment of the redevelopment project into one project in 1998, rendered references to the old, Washington Culver Redevelopment Project No. 3 obsolete. Also, all references to sections of the Zoning Code have been changed to comply with the new numbering system that was a part of the Zoning Code revisions, recently adopted by the City. A copy of the Amended DFD is included in the Agenda packet as Attachment No. 1.City of Culver City, California Redevelopment Agency Agenda Item Report FISCAL ANALYSIS: There is no fiscal impact to adopting an Amended DFD. ATTACHMENTS: 1. Amended Design For Development For The Culver Studios Area, 9336, 9050 and 9000 Washington Boulevard MOTION: That the Redevelopment Agency: 1. Approve and adopt the Amended Design For Development For The Culver Studios Area, 9336, 9050 and 9000 Washington Boulevard; and, 2. Determine that the project proposed by the Culver Studios is consistent with the Redevelopment Plan for Culver City Redevelopment Project, Component Area No. 3. MEETING DATE: 08/21/06 AGENDA ITEM: Joint City Council/Redevelopment Agency Consideration to Approve The Culver Studios Comprehensive Plan Amendment No. 5, Amend the Design For Development for the Culver Studios Area, and Determine that the Project is Consistent with the Redevelopment Plan for Component Area No. 3 of the Culver City Redevelopment Project. ATTACHMENTS Pages 1. Amended Design For Development 1-64AMENDED DESIGN FOR DEVELOPMENT For The Culver Studios Area 9000, 9050 and 9336 Washington Boulevard Culver City Redevelopment Project, Component Area No. 3 Adopted August 21, 2006 by the Culver City Redevelopment Agency /AMENDED DESIGN FOR DEVELOPMENT For The Culver Studios Area 9000, 9050 and 9336 Washington Boulevard Culver City Redevelopment Project, Component Area No. 3 I. PURPOSE AND INTENT The Culver City Redevelopment Agency (Agency) has the authority to direct and guide the use and development of property within adopted project areas. Pursuant to Section 422 of the Redevelopment Plan for the Culver City Redevelopment Project, Component Area No. 3, the Agency wishes to amend established design standards for a particular area within Component Area No. 3. The Agency wishes to amend a specific Design for Development (DFD) to direct the use and redevelopment of a particular site in order to insure that the health, safety and welfare of the residents and business community are not adversely affected. This DFD addresses three specific development parcels (collectively the "Site"). The purpose of this DFD is to provide a guide to the potential redevelopment of the Site by describing the type of development which is acceptable to the Agency considering the known site and planning constraints of the area, based on the Environmental Impact Report prepared for the Project Area and certified in 1975, (the E1R) augmented by various supplemental El Rs prepared, certified, and focused on specific development locations and/or issues (the SEIRs) within the Project Area, including, but not limited to the Certified Final Program Subsequent Environmental Impact Report, dated November 16, 1998. The Agency will endeavor to insure that this DFD continues to be a relevant and useful document. The DFD is subject to revision by appropriate future amendments formally approved by the Agency. This document supplements, augments, enhances and focuses the various goals, policies and objectives of the various planning and redevelopment documents affecting this Site. However, the standards 1established herein are not inclusive of all applicable City procedures, provisions, regulations and requirements which will apply to development of the Site. This Amended DFD revises and updates the prior version of the DFD, which was last adopted by the Agency on June 20, 1994. This amended DFD: a) incorporates a revised Comprehensive Plan for the area described below as the West Parcel; b) updates obsolete references, and c) updates references to requirements that have since been completed in the intervening years since the DFD was last adopted. II. SITE DESCRIPTION The Site, known as The Culver Studios Area, consists of approximately 21 acres, is addressed as 9000 Block and 9336 Washington Boulevard, and is bounded by Washington Boulevard and the expanded Town Plaza on the north, Higuera Street on the east, Lindblade Street on the south, Ince Boulevard on the east, private residentially-developed properties on the south and west, a short portion of Van Buren Place on the west, and commercial structures on the northwest. The Site is illustrated on the map attached hereto as Attachment "A". The Site consists of West Parcel: Lots 1, 2, 3, 4, 5 and 6 of Tract 2530 (MB 35-10) and Lots 182 through 190 of Nolan Park Tract (MB 32-45), and commonly referred to as 9336 Washington Boulevard; East Parcel: Lots A, B and C of Tract 4419 (MB 48-1) except the most northerly 7,900 square feet of Lot A, and commonly referred to as 9050 Washington Boulevard; North Parcel: The most northerly 7,900 square feet of Lot A of Tract 4419 (MB 48-1), and commonly referred to as 9000 Washington Boulevard. The zoning of the East and West Parcels is Studio (S). The zoning of the North Parcel is Commercial General(CG). The City's General Plan, as amended in 1994, designates the East and West Parcels as Studio, and the North Parcel as General Corridor. 2Ill. REDEVELOPMENT PLAN DESIGNATION The Redevelopment Plan designates the East and West Parcels as Studio and the North Parcel as General Corridor. Additionally, the Redevelopment Plan includes the following provisions regarding non-conforming uses: "(S 410) Nonconforming Uses The Agency is authorized to permit an existing use to remain in an existing building in good condition, which use does not conform to the provisions of this Plan, provided that such use is generally compatible with the developments and uses in the Project area. The owner of such a property must be willing to enter into a participation agreement and agree to the imposition of such reasonable restrictions as are necessary to protect the development and use of the Project area. The Agency may authorize additions, alterations, repairs or other improvements in the Project area for uses which do not conform to the provisions of this Plan where such improvements are within a portion of the Project where, in the determination of the Agency, such improvements would be compatible with surrounding and Project uses and development." IV. USES PERMITTED The West and East Parcels shall continue to be used as a motion, picture (including television and video) studio including studio-related offices pursuant to Section 410 of the Redevelopment Plan for Component Area No. 3 and shall be redeveloped in accordance with this Design for Development and applicable zoning standards. The North Parcel shall be used and maintained as set forth in Section.V 4 North Parcel Standards. 3V. REDEVELOPMENT STANDARDS 1. GENERAL REDEVELOPMENT STANDARDS WHICH APPLY TO ALL PARCELS (I.E. NORTH, EAST AND WEST) OF THE SITE: A. City Zoning. Architectural And Other Requirements The City of Culver City has adopted zoning, architectural building code, fire code and other requirements relating to the development of land within its jurisdiction. These requirements shall be adhered to in the planning and implementation of all developments. The requirements contained in this Design for Development shall be construed as being in addition to City requirements and, in the case of conflict, the more stringent shall prevail. B. Plans The redevelopment of the Site shall be carried out according to plans and drawings approved by the Agency and City. Such plans and drawings shall conform to the requirements for submittal of plans for a Site Plan Review to the City according to Section 17.540 of the Culver City Municipal Code (CCMC). Such plans shall include, but not be limited to, a plot plan, parking plan and landscaping plan for the entire Site and floor plans and four-sided elevations for all proposed improvements. C. Building and Parking Area Setbacks Architectural projections such as cornices, canopies, eaves, balconies and similar architectural features not providing additional floor space within the building may encroach into the setback area a maximum of three feet (3') or twenty-five percent (25%) of the required setback, whichever is greater; provided that in no case shall such encroachment exceed fifteen feet (15'). Walkways and drives may exist within the front setback area where necessary for access and where approved by the City/Agency. C. Traffic Mitigation Measures Redevelopment pursuant to this DFD is anticipated to result in additional traffic utilizing local streets in the immediate area as well as adjacent arterial streets. Specific traffic mitigation measures will be 4imposed on the Site during review of the plans submitted by the property owner. Those traffic mitigation measures may include, but not be limited to: 1. Imposition of a Transportation System Management (TSM) plan similar to that imposed on other large land uses by the Agency, to achieve an overall goal 1.3 Site occupants per vehicle (excluding production vehicles) parked on or in conjunction with the Site. 2. Payment to the City of the New Development Impact Fund Fee pursuant to Chapter 33 H of the Municipal Code, and City Council Resolution No. 83-R115. 3. Street widening or dedication or improvements along streets adjacent to any portion of the Site that may be reasonably required by the City Engineer and consistent with the plans submitted. 4. Access through Lots 182-190 of the West Parcel, to Van Buren Place shall be limited to emergency access and subject to the approval of the City Planner, City Engineer and Fire Chief. D. Parking Requirements Required off-street parking may be located on Site or off Site. If located off Site, required parking shall be located within 750 feet (walking distance) of the Site. E. Architectural Design 1. General Parameters The development shall be designed, constructed and maintained in a manner consistent with plans approved by the Agency and City encompassing the following. 2. Building Exteriors a) All buildings on the Site shall be generally consistent in quality and appearance and consistent with the visual character of the surrounding area. b) Shall not produce excessive reflective glare from the 5sun which would adversely affect the comfort or safety of pedestrians or drivers. F. Lighting and Visibility 1. Adequate lighting shall be provided at the base of the buildings and adjacent to ince Boulevard to preserve the amenity and safety of those spaces for night-time pedestrian use, and to reduce dangerous places of concealment and areas of deep shadow. 2. Luminaires for display, spot, and flood lighting of facades, display cases, or landscaping must not be visible from streets and other public spaces nor neighboring structures. 3. Light from display, spot, flood, or other lighting shall not be allowed to spill or reflect on to adjacent properties and/or create excessive glare or light trespass onto public rights-of- way or neighboring properties. G. Building Siting and Window Placement New or relocated buildings shall be sited to minimize shade, shadow, light and/or glare impacts on the nearby residential properties. Building windows similarly shall be so located to minimize to the maximum extent possible any visual intrusion into adjoining residential areas. H. Signs Notwithstanding the CCMC Section 17.330, "Signs" the only signing permitted within the development shall be as specifically permitted by the Agency, taking into consideration the unique architectural style and use of the Parcel upon which the sign is to be located. Signage shall comply with Culver City Resolution Na. 94-R055. I. Refuse Detailed plans for refuse containers/enclosures shall be included for any/all new buildings or offices. Plans shall be developed in coordination with the City Sanitation Manager. 6J. Security Fencing Security fencing on the perimeters of the Site shall be consistent in design, material, finish and color with adjacent buildings on the Site. Such perimeter fencing shall not consist of chain link fencing or include barbed wire or razor ribbon. All such fencing shall be subject to approval of the Agency. K. Fire Safety Access shall be provided for Fire Department emergency vehicles and equipment to all structures subject to the approval of the Fire Marshall. Automatic sprinkler, alarm, smoke detector and/or other systems may be required. Modification to water supply systems serving the Parcel may be required for new developments or rehabilitation projects in order to ensure sufficient water supply for appropriate fire protection as determined by the Fire Marshall. . L. Minimum Building Maintenance Requirements 1. This section sets forth the minimum building maintenance requirements as the City Building Official determines necessary. All roofs shall be periodically inspected and re-roofed or repaired as necessary to maintain weather protection and appearance. 2. All building exteriors shall be inspected and rehabilitated as necessary. This shall include repair of stucco, brick or concrete facings,- replacement of wood exteriors unless such wood facings are appropriate to the scale of the building and are in reasonable repair, replacement of all sash and glazing where appearance or water tightness is questionable, and painting. M. Equipment Screening All equipment shall be screened in compliance with CCMC Section 17,300.035. 72. WEST PARCEL (9336 WASHINGTON BOULEVARD) STANDARDS A. Site Uses Redevelopment of the West Parcel shall conform to Comprehensive Plan, CP No, 87-01, as modified by Amendment No, 5 (Amendment No. 5) approved by the City Council and Agency on August 21, 2006 (CP/M P2006068) and is attached hereto as Attachment "B". The basic type of development for the West Parcel shall be a rehabilitation of existing motion picture and video studios, with supporting offices, sets, props, and lighting storage and distribution facilities to effect a full operating status of all such facilities. Buildings C, D, and E (Mansion) as identified in Amendment No. 5, and the lawn area between the Mansion and the expansion of Town Plaza shall be rehabilitated as necessary and maintained according to the provisions of this DFD. B. Building and Parking Area Setbacks Building and parking area setbacks shall be consistent with Amendment No. 5. No parking shall be allowed within the required front setback areas nor within the existing area between Building E facing the expanded Town Plaza, except on the existing driveway areas. C. Parking Requirements Office: 2.86 spaces per 1 1 000 s.f. of Gross Floor Area Production Stage: 2.46 spaces per 1,000 s.f. of Gross Floor Area Plus up to 100 additional parking spaces shall be provided upon a finding by the City that a parking deficiency exists whidh is causing significant adverse impacts on traffic flow and safety in the neighborhoods immediately adjacent to the Site. Live Audience: 1 space per 2.5 audience seats Support Facilities*: 0.52 space per 1,000 s.f. of Gross Leasable Floor Area (GLFA) defined as 85% of gross building area or per detailed floor plans whichever yields the greater GLFA*consisting of set/furniture storage/construction, dressing, editing, commissary & security facilities. D. Building Height The height of all existing or new buildings or structures on the West Parcel shall not exceed the height allowed in Amendment No, 5 or as permitted by Title 17, Article 2 of the CCMC, or the Redevelopment Plan. F. Landscaping Landscaping shall be in accordance with Amendment No. 5. G. Preservation of Building Exteriors No modifications shall be made to the exterior elevations of Buildings C, D and E except for maintenance and repair. Buildings C, D, and E shall be rehabilitated as necessary and maintained according to the standards set forth herein, and shall not be demolished. 3. EAST PARCEL (9050 WASHINGTON BOULEVARD) STANDARDS A. Site Uses Redevelopment of the East Parcel shall conform to Comprehensive Plan, CP No, 87-01 as modified by Amendment No. 3 approved by the City Council (via Resolution No. 94-R055) and Agency on June 20, 1994. B. Building and Parking Area Setbacks Building and parking area setbacks shall be consistent with Amendment No. 3, C. Parking Requirements The Site shall be developed with off street parking spaces as follows: Office Up to 30,000 s.f. of Gross Floor Area 3.8 spaces per 1,000 s.f. of Gross Floor Area|10 10|/0Over 30,000 s.f. of Gross Floor Area 3.4 spaces per 1,000 s.f. of Gross Floor Area Production Stage 2.46 spaces per 1,000 s.f. of Gross Floor Area Plus up to 100 additional parking spaces shall be provided upon a finding by the City that a parking deficiency exists which is causing significant adverse impacts on traffic flow and safety in the neighborhoods immediately adjacent to the site. Live Audience 1 space per 2.5 audience seats Support Facilities * 0.52 space per 1,000 s.f. of Gross Leasable Floor Area (GLFA) defined as 85% of gross building area or per detailed floor plans, whichever yields the greater GLFA. * consisting of set/furniture storage/construction, dressing, editing, commissary & security facilities. D. Building Height The height of all existing or new buildings or structures on the East Parcel shall not exceed the height allowed in Amendment No. 3 or as permitted by Title 17, Article 2 of the CCMC, or the Redevelopment Plan. E. Landscaping Landscaping shall be in accordance with Amendment No. 3. 4. NORTH PARCEL (9000 WASHINGTON BOULEVARD) STANDARDS A. Site Uses Redevelopment of the North Parcel shall conform to the requirements of the CCMC Zoning Code (Title 17) as modified by this Section V 4 et.seq. Unlike the East and West Parcels of the Site, there is no applicable Comprehensive Plan controlling the use and development of the North Parcel. 10 //B. Plans. The redevelopment of the North Parcel shall be carried out according to plans and drawings approved by the Agency and City. Such plans and drawings shall conform to the requirements for submittal of plans for a Site Plan Review to the City according to Section 17,540 of the City's Municipal Code. Such plans shall include, but not be limited to, a plot plan, parking plan, drainage plans, landscaping plans, floor plans and four-sided elevations for all proposed improvements. C. Building and Parking Area Standards Rehabilitation of existing buildings (excluding demolition of entire buildings) may occur with the continuance of existing setbacks providing such rehabilitation occurs pursuant to Section 17.540 of the City's Municipal Code. All new construction shall meet applicable zoning code setback requirements Walkways and drives may exist within the front setback areas where necessary for access and where approved by the City/Agency. No surface parking shall be allowed within the required front setback areas. D. Parking Requirements Parking for new construction and existing buildings shall meet the applicable City Municipal Code requirements in all respects notwithstanding any nonconforming status of existing buildings. On-street curb-side parking may be prohibited at the discretion of the City Engineer. E. Building Height No new building or structure shall exceed forty-three (43) feet excluding mechanical and equipment penthouse. Building height shall be determined as measured per Title 17 (Zoning Code) of the CCMC. F. Maximum Site Coverage All new construction shall confirm to the following restrictions on maximum site coverage and minimum site open space. For the purposes of this restriction, open space means landscaped areas, pedestrian areas, surface parking, or other areas not covered by a building. 11Development Height Maximum (Height of Highest Buildin_g) Site Coverage 1 Story 75% 2 Story j 65% Minimum Site Coverage 25% 35% 3 Story 50% 50% F. Landscaping The North Parcel shall be landscaped and irrigated in accordance with landscape plans approved by the City and the Agency, 9pursuant to Chapter 17.310 (Landscaping) of the CCMC. Landscape improvements shall be installed as part of the new construction or rehabilitation plans. Such landscaped areas shall be maintained thereafter in a sightly and well kept condition. All open areas not required to be paved for vehicular or pedestrian access shall be landscaped. To the extent possible landscaped berms shall be utilized to shield parking areas from the street. Landscaping shall be installed prior to the final building inspection by the City. VI, RESPONSIBILITY FOR SECURING PERMITS AND PAYING APPLICABLE FEES Nothing contained in this Design for Development or in subsequent agreements shall be construed in any way to exempt the Developer (or his assignee, buyer, transferee, conveyee, or lessee) from securing all permits and paying all fees required of developers of private property within the City of Culver City. 12 /3Attachment A Design for Development The Culver Studios Area: 9000, 9050, and 9336 Washington Boulevard West ParcelATTACHMENT "B"Table of Contents Project Description Project Summary - p.3 Site Aerial Map of Area Affected - p.4 Existing Conditions Site Plan - p.5 Proposed Master Plan Site Plan - p.6 Existing Domestic Water Plan - p.7 Existing Electrical/Communication Plan - p.8 Existing Natural Gas Plan - p.9 Existing Stormwater/Sewer Plan - p.10 Proposed Fire Access Plan - p.11 Buildings Design Concept - p.12 Photo Simulations (5 views) - pp.13-17 Elevation along Ince - p.18 Building J - Drawings North Elevation - p.19 West Elevation - p.20 South Elevation - p.21 Ground Floor Plan - p.22 Typical Floor Plan - p.23 Roof Plan - p.24 Elevation along Van Buren (parking structure) - p.25-26 Elevation perpendicular to Van Buren - p.27 Parking Parking Requirements Chart - p.28 Parking Supply - p.29 Parking Drawings Parking Site Plan - p.30 Proposed Surface Parking Bldg. J - p.31 Proposed Structure Layout - pp. 33-34 Parking Structure Lighting - pp.35-36 Trash Yard Detail - p.37 Landscaping & Planting p.38 Parking Structure Landscaping - p.39 Public Art - p.40 Building Signage (view of Studio Lot interior) - p.41 Shade and Shadow Study - pp.42-50 Documents under separate cover Traffic Study: Prepared by Kaku Associates Historic Survey: Prepared by Historic Resources Group Site Survey Gate #4 Policies Documentation City of Culver City Forms Comprehensive Plan Amendment Application The Culver Studios Title Report Art in Public Places Form Stormwater Planning Program Form First Notification Affidavit I Culver Studios Comprehensive Plan #5 Contents 05.5049.000 Master Man Gensler JR.s, 2ood Page 2LANDSCAPE Existing - Mansion Area - Bulgalow Area - Stages TOTAL Proposed - Mansion Area - Bulgalow Area - Stages TOTAL 31,000 sf 9,400 sf 1,400 sf 41,800 sf 31,000 sf 9,200 sf 1,500 sf 41,700 sf Conceptual Project Description As a continuously working movie and television production studio, The Culver Studios has long been an eco- nomic and community icon in Culver City. In order to build on this history and maintain its economic viability in light of an evolving production industry, The Culver Studios intends to amend the S-1 zone Comprehensive Plan to allow for additional production office space and upgraded facilities on the main Culver Studios lot. The enclosed drawings and exhibits illustrate a Master Plan that necessitates an amendment to the existing Comprehensive Plan for the Culver Studios lot. The Master Plan will include: - Demolition and rebuilding of existing Building J to provide approximately 49,500 SF of production office space in a four-story building on the existing Building J footprint - Demolition of Building R - Reconfiguration and re-striping of parking layouts in front of Building J and in the bungalow area - Construction of a new 200 car parking structure in the bungalow area - Landscaping around the new parking structure - Relocation of the emergency entrance to the Studio Lot on Van Buren Ave. In addition, The Culver Studios will upgrade the Comprehensive Plan to update parking requirements to reflect the Citywide parking requirements adopted by the City Council in Fall 2005. It should be noted that this Comprehensive Plan Ammendment #5 affects only the property currently owned and operated as a part of The Culver Studios main lot as identified on the following aerial photograph. Area Summary of Proposed Master Plan BUILDINGS Existing Office 70,618 sf Support 86,049 sf Stage 155,480 sf TOTAL 312,147 sf Proposed Office 117,872 sf Support 74,197 sf Stage 155,480 sf TOTAL 347,549 sf Culver Studios Comprehensive Plan #5 Project Summary Gensler June 13, 20061 Page 3 05.5049.000 .5Ia.rter PlanNote: Gale 04 to be operated accoding to Gath 04 policy as specified in Raped- thv documereatoon. The gate will cot be open tor pedesIdan use • n• n••1 ull 'ii cIIIii L_Lo ///ittlitig,jfir r__ •ever4 elepovtv_ „A :I_ .71' • etineet. 71.......rawdruaa hum, ron Culver Studios EXISTING 5.511.S3A1. Ir•al otraEm Culver Studios Comprehensive Plan #5 Existing Conditions 05.5049_000 :Wooer Nag Gensler Pone 15, 20561 Page 5V.111111.1.,, tuNier Studios NEW|1010|, i|1010|s 1 1—[ I - • ME -- la '11'5 1 t mr- IMII 1 ;1: :• .: 1:1 1 .1 . 1. 1 . • la., f 7- .._7.1..i,: MI .--,- 1 1 HUI Lrri a=i 111111Eial= 01, 11117111 . 1aTA.77.777:. 19111M 1.01[611,11 Slagy2.1161 am 2D-D-u .7 c34-- 7)1 m°1 1 74* 11111,16EIM rip;117 . 4111E L_00 rZsr:Ei ssoss .C11-11LVD -71-|1010|." Hap. 14 14 Culver Studios Comprehensive Plan #5 Proposed Master Plan 05.5049.000 Master Plem Gensler J., 5. 20061 Page 6Existing Utilities - Domestic Water Culver Studios Comprehensive Plan #5 Gensler pwe 20061 Page 7 05.5045.000 Master Plan 77 rip- [ [ 1=1=1111•=ler Culver Studios FX/STING tests71,2 VI. VAR BOREN PLACE • -- —I [ — --,—. • --,- v .--7. • .=•---,.- -, 7 5,-,,,,,.- , -- - • .::_ : .-• ----..,_ - • i 1 I|1010|7l i ] 0 ErnrEill 1. i 1 . " 157 1 ,/ ., E ir |1010| . !!:: / / 'l ... • — - -- _ _. — , -7 - .... - Gat. 03 i!! h'ir ULIE: !!I :'.• .i'l. ' \.,-7, J.- Tr .: , •:-: 9 , , , ._. . I . : • j;.;- .'. ' ,•'=''-:'-'---- ' i.: _ - _„.___H, ,..- _:„.„_:..-.. , ;--.: D —, i. . - 1 'Y -:,'::.. ' . . .;./ . .- Y . . -••` . - • . 1 - I .-- 1-1 f ",- Hi. : ..._,• ._ U " . r i . •• l' ••.- .:••••." ' • /----7:- --,/ : -, i / 7: :'.—.7, - i 1 .' -' t• s: 4 .-'-'. ..,. , . _ ! . . ri-H11|109| 7_41 LI Stsge2.1.1.4 J J 7TIL '|1010|Elr-7].- i., Ili 1 ---1 s.) : I f ---: l; I ) -., <1 r 0 ,-„--, 0 "7 .,',...:, I .= - — r41 . Mid — 11=t1Milie= CUI W er Studios EXISTING Utilities il Sa.5 Culver Studios Comprehensive Plan #5 Existing Utilities - Electrical/Communications 05.5049.00G Illathr Plan Gensler frpr 15. 20061 Page 8v•al 121.1/1EN PLACE Culver Studios XFSTING Utilities Culver Studios Comprehensive Plan #5 Existing Utilities - Natural Gas 05.5049.000 Al -after Plan Gensler jr... a 20061 Page 9VAX .111H.IPLACE Culver Studios Comprehensive Plan #5 05.5049.000 _tarter Plan Existing Utilities - Stormwater & Sewers Gensier JArne 15. 20061 Page 10 ==a111111=1 lInte...n -.Fn.. P.A. P. Culver Studios EXISTING UtilitiesSay V II 111-LIR. n LA-CE ----- .7 7-- L=1- .....,.....,:1:::1.1 . irlit .6,"&"6.6.• iTii:Jro J 0 tr-1— : ' TL ' — .1411pliv.|1010|LL =woo smae,eniaa,1•11 [Silver Studias PIPE TRUCK ACCESS PLAN Fire System Assessment and Upgrade Plan As a part of this Comprehensive Plan, The Culver Studios will implement a plan to assess and upgrade the fire safety system on the Studio Lot. The plan will be implemented in coordination with the City of Culver City Fire Department. I Culver Studios Comprehensive Plan #5 Proposed Fire Access Plan 05.5049_000 Master Plan Gensler _ince /5.20561 Page 11Arg ctift 1.• -1-7 , Fiq n r— n 11111 111 iniummima ninnunamin ° u{5 1 II 1—t AM" Design Concept NEW BUILDINGS WITHIN A HISTORIC DISTRICT The design of the Master Plan and new construction has been developed within the guidelines identified by the Secretary of the Interior related to new construction within a historic district. Specifically, this includes: - Building within the footprint of the existing Building J - Maintaining massing and scale that is proportionate to the existing working buildings on the Studio Lot - Utilizing concrete construction, which is a common material for construction on the Studio Lot - Utilizing color tones that are compatible with the existing colors of the adjacent working buildings on the Studio Lot - Maintaining the majority of the buildings that contribute to the historic district, specifically those desinated by the City of Culver City as landmark or significant In addition, as clearly identified by the Secretary of the Interior, new buildings within a historic district should be easily differentiated from historically significant buildings. New construction should also be developed such that it is able be removed from the site in the future without impairing the essential features of the district Building J and the parking structure have been designed to adhere to those concepts. Building J's interior lot-facing facade builds on the design vocabulary of adjacent Stage 2,3,4 incorporating exte- rior circulation and covered breezeways. These exterior circulation corridors that are also balconies for the offices allow the offices to visually connect with the studio as a whole. The differentiated pattern of the perforated metal guard-rail acts as a veil to the glass office fronts, creating an active interplay of shade, shadow and movement throughout the day. The Culver Studios parking structure is a simple, utilitarian precast concrete structure designed in the character of the lot's utilitarian working buildings. Special attention has been paid to the design of the top deck and lighting plan in order to minimize light spills into the surrounding neighborhood. All floors of the parking deck have a 6-foot high parapet designed to prevent any light spills either from deck lighting or auto head-fights. Special deck lighting has been selected and sited in order to avoid any light spill over this parapet height, while still providing the security necessary in a parking facility. The south- and west-facing facades of the structure are equipped with a green-screen type trellis system on which fast-growing plants will grow, creating a backdrop of greenery where the view had once been of a bare stage facade. Bushes will be planted between the property line on VanBuren and the parking structure and lanscaping along the Van Buren exterior wall will be replaced, enhancing the view from the residential neighborhood. BUILDING DESIGN The new Building J and parking structure are designed to fit within the character of the exisitng Studio Lot as well as the surrounding neighborhood. Understanding the studio's historic char- acter, the new structures utilize a design vocabulary that integrates existing elements from both the Studio Lot and the neighboring buildings in an engaging, contemporary architectural design. Building J develops the historically based design vocabulary. This includes: simple block mass- ing consistent with the historic working (stage and support) buildings; no building setbacks along Ince; concrete construction; painted concrete finishes; and exterior circulation paths on the interior facing facade (breezeways). In order to use this vocabulary while also fitting in with the existing neighborhood and creating effective work space, Building J has two distinct facades: a public, ince-facing facade and an internal lot-facing facade. Building J's Ince-facing facade relates to the existing neighborhood buildings, specifically in relation to the facade segmentation, materials, pattern, and color. The three facade elements —Base, Midsection and Roof- divide the building mass into a human scale, create visual interest and relate to surrounding buildings. The Base responds to the pe- destrian scale of the street, and also responds to the smaller windows of the colonnade on the opposite side of Ince (Eric Moss-designed building). The Midsection relates to the height of the neighboring two and three story buildings including the studio stages and working buildings. The darker toned Roof section gives the appearance of a hovering attic floor, and visually serves as a top that minimizes the appearance of height and mass. The Ince facade's materials and colors also draw from the neighborhood precedent. Three muted sand-yellow tones of painted con- crete, pick-up the facade colors already being used on the Studio Lot and surrounding buildings. I Culver Studios Comprehensive Plan #5 05.5049.000 blaster Man Gensler June T5,20061 Page 129s5t12.11-0 -- ; [ Culver Studios Comprehensive Plan #5 05 .5049.000 :Vaster War. Photo Simulation B Building J Page 147991. e5ed rooe 's • I J6 I st.ta,D I "Id 000"6frOcTO ampniis pupped - a uoneinun %mid S# Mid eApuege.idtuo3 schipms AeA1113 IWINOWS WITH TINTED GLASS BEA EJT1EBAHE BOBBBE: ip0110-El .[AU0a 3BEBEDOB ° E.Ja 6-2 . pEiappsaFiEaLl Ei h- .rr Er EL ifi ri q Er '0 if a b' fro[[ FACADE IN COLORED TILT-UP CONCRETE 4. MECHANICAL SCREEN ___MAPET HEIGHT 7 ROOF HEIGHT 055049.000 AlufrrPlan Elevation Along Ince Gensler Jane 15, 2006! Page 13 I Culver Studios Comprehensive Plan #5 8& 9 NEW BUILDING _I INCE BLVD. JED ... 1%N.gra. 81, to MAW! 0. SLAD - FOURTH tO SIJH - 2T-Cr to %AEI - mouto ti-rt Frare• 71.6.1ASLAV 45 CarNo Ar Cream VC PPG SCILARLCIOS. P) GPM. p.m Glimp Fr.ze. 77521.1LPV sz born, We PPG SOUPGREEN Rood Max. PPG 117.panar XL Silver fury P.arep 77.63,11.1, Amd Culver Studios Comprehensive Plan #5 Building J - North Elevation 05.5049.009 Alaver Nag Gensler pole 1 5. MOGI Page 1917.1m1712.0222A2m.227.21,(2 F Late. rrsam 2712 25 212142 21Gmor2 Frame (17222 LW el ,an,n 72, PPG 522_222222212 2125( 2,5552 2.77am5.2 (AMA Pan. ® ® rp|10109| . . mx...2=1.22.121.2.2 Co) 22712.2120 Galn •MI Panel Fmzny 7752M LITI 27 0222717 Frame 77222( LW 57 mow.' 222 116- 1121.7,51.42112002 (21 CAM. 7.21 G7552 Culver Studios Comprehensive Plan #5 Building J Elevation 015049.000 _Master Plan Gensler J., 15, 20061 Page 200 LC - {CURTI WMMMIffij I I 1 1„ I 1 1 I I I III 1 1 . .1 1 ill• ii 1 Ii i I :.' ' '''''' 111 ...-.:,:l. .tig.,:3:::4,-;a;;-:i.:;.-:!:, .:il_.• I! .11 . 11L111 1111 I I I I I HI H.---, 1i -,11i. 1., I i II ' , 1 s. 1,. 1 I • 1111 1I 1 11—, 1 I ', I .1 717- :t.. . ......., • _ .. , ....... 1M1144-0...”.• .1.1..1111 .1....11..e ................r•- n...t., ta-neW nPaalk. ......,a,P,.. . ...• .1.111.,.....I .W, •17.1- PPG 501111PGREEN mim,s w prNoricn.P G P. Gllivarlar/DO 1.W PPG P.m. Chil11 Pr Pt GM ry, PI G. pram, 1,,,G G... XI. 5.• GI, I Culver Studios Comprehensive Plan #5 05.5049SO Marter Platt Building J South Elevation Gensfer 15. 20061 Page 211a/ DATA ins 111 I 76 SF, EXEC. E3E aPEX 1140 1 634 51 STIR k0' I lao 72 SF. PANTRY LaoBY I 130 500 S.F. I 100 I 705 SF. 114 I 73 SF. [115 71 S.F. 113 151 - 156 SF. 90 Fl. 605 S.F. Scale: 111 6'=l -O 16 32 64 W._L_ .......... _.__ ! .____. - -. __- - -- - -- _____- - - - - !!'JIJ 1I [1 f' _ ___ vTO II i "-s F133. Li J ' I _—'I __ :ImL Is 1iI _ 05.51349.000 Mthr PJm, L Building J Ground Floor Plan Gscr J 55.2131361 Page 22 I Culver Studios Comprehensive Plan #5 121 J L123I- 19_Sj. 172. 223I. L 29-4 21-2 21-2' 11251-i 11201 129 '26 1 131 1-i I132Ii 294 PANIRY IJF1C PANIRY I1I-- 1iasI- 1136f_i 11411 297 135 SF SF j 112 417 SF, 150 S.F4. i. 60 SF,SMALL CFF10E SNAIL CFFME DEC. CFME RICO. CEFKE 1226 1 DEC. CFFICE SMALL CFFEE OPEN OFRCE LG. EXEC OFFEE OPEN CFF10E I 222 1 234 1 LG. EIEC. CFF10E I 225 1 L 2z) 1 1 22 1 OFFICE 1 231 1 1S-10' 220 S.F. 233 13.-11? 15=6" 150 S.F. 106 103 S.F106 S.F. —6" 10L0' 166 129 S.F. 233 189 166 163 S.F. 4L6" 106 16 11111.111.1111111111. 7 nimplaa IIIIMMEOP11.1] 272 S.F. CFEN OFFICE 230.4.F STAR #1 j 203 I WSW SMALL OFFICE OATh OFFICE DEC OFRZE 173 S.F. 91 SF. 726 SS. 91 SF. 77 S.F. 175 S.F. 171 S.F. 1 ?) Scale:1J16"=-1'-0" 16' 32' 64' Culver Studios Comprehensive Plan #5 Building J Typical Floor Plan 05.5049.000 ilela.rter Plan Gens:er 20061 Page 23 OPEN OFRCE I 223 LG. EXEC. CDICE 1 221 1 LG. DEC. EFFICE I- 225 I CRIFEREICE ROM NEI DEC CFF10E 1236) 169 S.F. DEC. %TICE 242 I CIPER OWE 243J OFF10E 214 EIMINICAL L zo 1 / 212 I 115 S.F. OFFICE 1 215 1 171 S.F. NEM 2E0 S.F. REG OFFICE r 245 1 172 55. 1 244 I 721 SS.ae-e 21-r av-e Culver Studios Comprehensive Plan #5 Building 3 Roof Plan 05.5049 000 Master Plan Gensler Alm 75, 20061 Page 2411111111111111111111 4002 4004 4008 4064 4070 4076 4082 4088 THE CULVER STUDIOS LOT EXISTING WALL NEW PARKING STRUCTURE IN PRECAST CONCRETE WITH GREEN SCREEN PARAPET HEIGHT • F HEIGHT I PARAPET HEIGHT|109| 11 ROOF HEIGHT I Culver Studios Comprehensive Plan #5 Elevation Along Van Buren 05.5049.000 Masier Nam Gensier jr... 15, 20061 Page 25 VAN BUREN PLACEEXISTING WALL NEW PARKING STRUCTURE IN PRECAST CONCRETE WITH GREEN SCREEN Elevation Along Van Buren I Culver Studios Comprehensive Plan #5 055049.900 Maurer Plan Gensler pm. 15. MO] Page 26NEW PARKING STRUCTURE FACADE IN PRECAST CONCRETE WITH GREEN SCREEN A:: • EXISTING WALL -;›,•:±. 41" •• PARAPET HEIGZ-IT ROOF HEIGHT I Culver Studios Comprehensive Plan #5 Elevation Perpendicular to Van Buren 055042.000 Marfer Plan Gensler pme 15. 20Z Page 27€ Culver Studios Master Plan Parking Summary , I 1 1 , l|109| -•-• J • I i 1 - - Existing ' . Proposed - - compr•iwriage Plan emithili7,,--,7-:::--,- . ..- , rxisrtrig aria -a& OIL Oleg. of messier. canpretwasty. eat;) .:- 1L - :,- - !Existing Conditions with New Paddng Requiresnoni Proposed Master Plan Building Off ice .Y.-. ':' • . hod De S 5 GLFA Ne • Pored ••• :, ' also' Exis • 1 Office Su port Sta• P186k/n' Ratlaf1008 WIEVMEMENNIIIIMMIEI=N • - . kil . 111011111111111111MMI 111111111;E=172=1= I Rat-wimp 01-A M1 EZ13:71 Oftica NEMIZE IMIM=n1 N Ra5c41080 201,11:13E21:11E2E3:1:1= MIIIMINIEZ=0 mmunnumempum. IIIM IIIIIIIIIIIIIIIIIIII=11.IIIIII IME IJIMIIEOMIMIIIIIIIMIIIII MII IIMIMI M31= 111c,i - J 58 cars 5. 40 sf NIIESZEI 1 3 500010 100 cars 1 00 55 cars 15.140 0 286 cars 1 90 ICE122111 5 cars ---t. 2 86 cars 2 86 cars MEM Immo 43001$ 15 cars • 5.387 of 3.00 cars • 20 cars 5.387 of 3.80 cars 1.50 29 cars 5.3675/ 88 st 3.80 cans 1.00 306th 881 3 80 cars 00 3 cars 88100 -2 88 cars 1.00 3 cars 286 cars 100 1 OD- 3 cars 1,806 sf 3 80 cars ISO 7 cars 1.8065 350c __,, 9 00 7 cars 1 806 s _ .85 cars Scars 2 85 cars 5 cars 1.0411/ 380 cars 1 00 6 cars 1,641 of 3.80 cars 1130 6 cars 1 641 s 2 86 cars 155 5 cars 756 00/r5 11:191 5 cars 11.852 51 52 ca 0.85 800 11,652 52 cars 005 5 cars 11 852 of 52 cars 005 Scars Sot 2.00 cars 100 14 cars 3 343 sf 3 BD cars 1 00 13001$ 3.343 sf 365 cars 152 13 cars 3.343 of 208 cars 160 10001$ 2.86 cars i 00 10 cars 3 566 sf 22,254 of 52 cars .52 cars 0.85 9 85 2 cars 3 566 sf 0 cars 22,264 of .52 cars 3.80 cars 085 1 00 2 cars 135 cars 22,-5E4 s 3.5665/ 52001$ 2 66 cars 0.55 cars 3,556 s 52 cars 0 85 2 o ars 00 64 cars 2 86 cars 1 00 84/0 4.704) 0) 52 cars 085 2 cars 4.7005/ 2 oars 008 2 cars 3 80 cars OD 5001$ C.701.1 st 52 cars 005 2 cars 22458 3.80 cars .60 9 cars 2.246 of 3.85 cars ISIS Scars 2,246 sf 2.05 cars 1720 Scars 286 cars 100 0 cars 1.91400 I 3.8/2 cars .00 700th .914 3 BD cars 00 70055 1 91 Os 265 cars 1 00 5 cars 2.85 cars 1 09 5 cars 300001$ cars DO 4 cars 1 DOB el 3 80 cars 1 00 4001$ 1.066 51 2.86 cars 102 cars 2 86 cars 1.03 3.am 1,066 644 sf 380 cars OD cars 644 sf 3 00 tars 00 2 cars 644 sf 2.86 cars 100 2 cars 1 1)81 2 cars 2.86 cars 605 ' 505 cars 1 00 0 cars 1.805 300 tars 1.05 6 cars 1,695 of 2.86 cars 1.00 Soars ----4 500 cars 100 5 cars 0 cars 014 of 87551 0 car 085 El 5 s -.52 cars 585 52 cars 005 0001$ 52 cars 085 sf 875 .52 cars 541 st t9106106 t 54 of 52 cars .52 cars 055 005 0 8 0 cars 2 cars 541 20.034 4 501 1 52 cars 0.05 .52 ears 0.O5 0.85 .52 cars 0 cars 54100 52 ca 82001/ cars .62 058 0 65 Oh 20.62 of 6106f - 26,624 sf , s 1.943|1010| II= s 1 cars I 1.943 of 008 52 airs ; 1 = 32 MIIIMMIll 60 cars f8Tb' 11111EM au = 2 20.45200 : .46 cars 1 00 0 85 52 cars OD 0.05 M' EM 8 460 sf 2 46 cars 1 55 52 cars 0 85 0•1600 69 505 cars =E MI|109| 8,460 s MI 111111123:13M 11460 sf 52 cars .52 ears , fl i_g cars 355001$ 2 0.85 1 1.00 00 5 85 cars 9 cars 67 8 1 874 of 4 Cars 12 68 sf .52 car -4.:'il-°, cars rs - " 085 0. ° 1 , 8 0 85 48 cars 67 cars Scars 12 691 sf 074 if 20,600 si 52 cars 2 B6 cars 2 46 cars .52 cars 005 1 00 1 00 C cars I 0 4 074 s f of 20 SOD st 2 40 cars 52 cars ...IEEE= 565 100 052 36001$ 67 cars 9 cars 36 cars 25.600 sf 9 cars 20,600 st 0 85 1 DO 4/ cars 2.46 cars DO 2 46 cars 1 co 246 cars 1 00 41 cars 11.5) Stars 240 cars 90 2.48 cars 1.00 2 46-cars .00 .= 50 40.0 sf 35,100 sf EIMMMIE 505 1 OD CU cars INCOMMI 2 46 cars 2 46 cars 088 1 00 1 00 5 cars 442 of SOS 1.00 2 46 cars 00 86 cars I 2 46 cars 2 46 cars 085 1.00 1 OD I go cars 86 cars 100 cars 86 cars rs 86 cars IMMO= ,MIIIM 5 572 51 .82 .ais 0 85 ME= MINIM 085 /105 Soars 5.0721/ OS cars 0.05 111. IMI MEM M 52 cars 2 cars 111101111111111111111111E MEMINIIIIIMMIEMME MIMEO MIMI MIMIIIII •11111111111 Sub Total by -". --.'1").. - . vr Building Q.0.54 sf 10 9 T55440 ,611 . ia al ga -ecom g a 155,4u .r 1,3 70 08 0 00,9490 55,480 sf 117.8725? 74,197 sf 1 ,48G sf ,. •• - • - •• '7,-,-IX,T.Cji -1|1010|.tri;aii:Pac. . rnifi;$ el.," krt ,F;iinoso. _ e4 '-- 2-1)24.4L6 Spoons Required : 1 1 -, . • -Aso-6W by Square ,,,,.,„,,,,, .r.P47.41"1 •- •,., -.i _ , „ .-:;.*1. -1,474, Orfice Wr3.50- 1 ss SF11 g2a - 0 Stage SP1.107 . M. w 5,3-50 . {5.3.7, 5 1,923 00' .[Slagc SF407 -|109| i Footage - 1,.1o..i 1 , ,.Irliaa 1, refie . _ _ -.":: '1'.00 CFA: 35 c7/1. Lc ye 1500 4 Ghee .11113GFA I $1 560 Of. 1 DO 0.8 ! --- fztli2 - , 4G - • 382 - El:MEM:MEE:I 330.78 32.80 382.01 - .:,117: : ...",.:-.-T•:::. r.-:;:-'...- .'',','.',7::Z.:.'7JiA::: 50 . _ . - BIEBEESEMEgi Iin=MEM= . -. : • - 'nMENIMMIN. • -- - , II - :7m IIIIIIIIII iMii 1111111.111.i |1010|1011111il. NOTES' I (t) All numbers are rounded to !he nearest whole number. I provided a shared pariung agreement that provided for the live aueien.urking requremen! In be addressed through a shared (1 ) It is understood that CUP 05.87-11 pa dung arrangement of required stage use parking with the understanding thal the Studio . • (2) it is understood that condition of approval No 11.11, of Resolution No. 94-6/055 deferred 100 spaces drrhciency was found to be inpacting traffic Sow and/or safely in Me adjacent neighborhood could be required to provide those spaces e a parking the total eluding building 31 Buildings A. S. F. G. K. P. M. and 0/as well as the Paint Siren. Water Tower and Stage 1 no longer exist The buildings listed ahnve In the "EasDng' columns reoresent SF on the Studio Lot -1 Parking Summary -Requirements Culver Studios Comprehensive Plan #5 Gensler jam 15, 20061 Page 28 05.5049.600 Master PlanI 752 cars - Required New Master Plan Total parking requirement: Parking required on-site: Parking provided: 1052 cars 752 cars 754 cars Parking Summary Proposed Parking Supply -.Parking Areas ": •,::':::i-biiiiing Proposed Master Plan 5&6 11&12 0 South J FT2-3 2-WL MIS I P/S PIT S/E FRT Gate #2 New Stage 6 New Parking Structure 61 cars 35 cars Scars 20 cars 9 cars 14 cars 19 cars 9 cars 251 cars 1613 cars 5 cars 9 cars 4 cars 3 cars 0 cars Scars 34 cars Scala 15 cars 17 cars 14 cars 19 cars Scars 251 cars 168 cars Scars Scars 2 cars 3 cars 200 cars . . ...Toiai.' •• .',....:.•615•car.s'•,:.Pi- • • 754 cars The proposed Master Plan includes the addition of a parking structure in order to accommodate the parking requirements on the Studio Lot. As a part of the Comprehensive Plan Amendment, the Master Plan will update the parking requirements on the studio lot to reflect the City-wide parking requirements adopted by the City Council in late 2005. The following calculations are based on the new parking requirement ratios (see chart on previous page for details). Previous Comprehensive Plan Entitled Total parking requirement: 920 cars Parking required on-site: 620 cars Parking provided: 615 cars Parking Area Drawings The following pages (pp.30-36) include drawings of the changes to surface parking in front of Building J/Stage 2-3 as well as the new parking structure. The drawings do not include the existing underground parking structure, since there will be no changes made to that structure. Parking Summary -Supply I Culver Studios Comprehensive Plan #5 05.5049.000 Master Plan Gensier frw 7520061 Page 29LEJ )4k I. 17=Zigi 144.1.1,c, ° Seye7.4 I 11 111111111M|109| LI I Ili 7 vat va A muriso mniumniful •unium- L---J Li L._ 1:117111111=51 Culver Studios PARKING I Culver Studios Comprehensive Plan #5 Parking Plan 05.5049.060 Illarkr Plum G.nsser J.- 15, 50061 Page 30Culver Studios Comprehensive Plan #5 05.5049,000 Gensler pine 15, 20061 Page 3171111111M11111111111111111111111111 1. 25-6a 20.-9" 3 stalls08-6- IVY ON EXISTING WALL 3 stalls10-6" 12 stalls 0 8'-6. 9 a 25-6- 3-8" IVY ON EXISTING WALL T02'—O" PARKING STRUCTURE FACADE WITH GREEN SCREEN Level 1 46 Cars + 7 HC 20C- 41111i r 10'-9a El ELEV pp- 0.00' kz+x- 7'-2" 19 23 NUM 1 . 11111 1111111111111 42-67 5 stalls8-6 HC 25'—r 111111111111911 Ii • HC Scale: 1 /32"=1'-0" r17.11.711111117.2MIMMISIMI Parking Structure|109| 32' 128' Culver Studios Comprehensive Plan #5 NEW PLANTERS 05.3649.000 Parking L.clants I Gensler fogs 7 5, 20061 Page 32I Culver Studios Comprehensive Plan #5 Level 3 68 Cars Level 2 79 Cars Level 1 46 Cars ÷ 7 HC , 20'-4' 25-6 /3 stallsatr— ' 102'-0 25-6" 12 stalls fl 5-6' stallste-6'|101010|52 1111 47 111111111 RAMP UP - 5% 11111.Mmr.-__ I 7-- ,, 93 . 11111 n ME 56 ELEv 5.00' 1113 fpsI II. 125 111 11-; 109I II II 120 co : RAMP --"''."IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII UP - 5%|1010|7,. c•J ELEV 10.00' I 65|1010|11 11 11 1111 63 . 9'-8" 25-6 3._8. 2,-10" 25-6' 2D'--9* 3 sta1ls06-6" 12 stalls 0 13'-6' 3 stalls445-6' Scaie:1/32"1'-0"|109| 32' 64' 128' Parking Structure Level 2 79 Cars 05.5049.000 Parkins I _. :70,as Gensicr Jrne 15, 20961 Page 33I m MEE JUNE. 1 111111 III Eivo, ;III mil w. I|1010|luMEE ME I I IN II 111110 11 „, 0,,I 1. ' 1.11 U1111111111 am I 25-6' 1C1Z-0. 2'-1Cr 2C-9 3 stallsee-6" 12 stalls 0 El`-6* 3 stalls08'-6" Level 3 68 Cars3-HEAD FIXTURE 17'-00' AFF. 2-HEAD FIXTURE 17'-00* AFT. 3-HEAD FIXTURE AFF. in ritiiiiiiimmimislommiliailmilimimo =MN T ara . 1 1n1 „a =49..• PARAPET HEIGHT ROOF HEIGHT CD CLOSED GREEN SCR L WITH EN 05.5049.000 A-faster-Pk. Parking Structure - Lighting Gensler _P., /5. 20051 Page 35 I Culver Studios Comprehensive Plan #5 Parking Structure Lighting Lighting in the parking structure has been de- signed to minimize impacts on the surrounding neighborhood. The floors of the parking deck have a high parapet (6-foot high on the top deck facing Van Buren Pl.) designed to prevent any light spills either from deck lighting or auto head-lights into the residential neighborhood. Special deck lighting has been selected and sited in order to avoid any light spill over this parapet height, while still providing the security necessary in a parking facility. These light fixtures were select- ed to maintain a controlled, downward angle of light that will illuminate the parking structure ground surface without allowing direct light to be emmitted into the neighboring parcels. Parking Structure Landscaping See pages 34-36 for images. See page 38 for more description. The tight fixtures are mounted at 17--0% with a fixture cut-off angle of 80 degrees, and a 6 .-0 high parapet wall. AU the Lighting from these fixtures wilt not fall outsrde of the garage to the neighborhood 134 1111111111111 - 1' M i ill 111111011 1 11 11 ::, ;: ; 135 EL l57° i 111111 93 II 1111 / E2L4 cm III1 111 111 159 . i • piCONFIGURATION PREFIX 30120 Triple at 12710|109| Quad Assembly Single Assembly Twin Assembly Twin Assembly at VP Triple at 90°|1010|2099 a EH14 14" Square Extruded Luminaire EH19 19" Square Ek1laded Luminaire H14 14" Square Fabricated Luminaire 1119 19" Square Fabricated Luminaire 1-IT19 19" Tall Square Fabricated Luminaire H26 26' Square Fabricated Luminaire Example of light fixture for use in parking structure. =NI MEM MIMI Enler the order ado into the appreprkie but ohms. mate- Santo reuses the rigid lo refuse a crinlpialm Nol al] comixratiens and configurateim as yak. %lute notes blob, For exclusions and Iiindationt For StelliOnS or Mneen15,. prose consul Its Maw. STRIBUTION WATTAGE liairrairLlanm|109| Type I|109| Type III 4X Type IV pamus- ono F61 Type IV 0 Type V Type 4Xcpfiim si.ppied pan sag glass hrils starndard. VS Type V Frond iroppodolti.iore agree nt• 04,440,411 sag gia. tam 444414ro base. 200. gm m 14" ands. FC3V- Full Cutoff Type III FCVS* Full Cutoff Type V Tr.3.2051.M4 &R,002 IVALW11931),E9281.1.0PSJamp Lida! !-4444, Poise Start Meta, Halide 020/0Pressure, So44.14rt 25 SOGINN Ti.91 7511PSMIV 1575P5R111. 750PS111111 75011PS 100095141f MOMS 13:10H195 Nan 151/NPV 25i2195 ROMPS 1_Med ha. la, 0.411211 MU O lanp opens ant, 2 Cptaes MISY AnS.t 5 04192 01154 011$ 4.155 111.77or U nV 11411.4 soy. A Olin 0a- 7.12.1.01¢Ora req 41.57501,51XWOIST37.tlep 2,02.a Sag Gass 40.0 VOLTAGE 104/1 104/1 P71.1/ 1 iNICIS2.10277, Factory Red to g770 11Ps 347 240 QUAD 1211 298 277 480 2506111 4E0E1 Notes: Job: Type: FORM 10 SQUARE EH/H/HT ARM MOUNT GENERAL DESCRIPTION: The Gardco arm mounted Square Form 10 products are sharp cutoff luminaires tor high Trnensity discharge lamps up In 1000 watts. The EH units are manufactured trom mitered ext ruded aluminum and finished in an Architectural Glass 1 anodizing. The H and HT style luminaires are deformed aluminum With a thermoset polyester finish_ Both products can accept one at eight (8) interchangeable and rotatable precision segmented optical systems. ORDERING Flat Vas- lens luminaires meet IESAIA Felt Cutaif criteria. S.ag tens luminaires meet ZESNA CAMPO criteria. PREFIX CONFIGURATION DISTRIBUTION wArrAGE VOLTAGE FINISH OPTIONS OPTIONS CD RAF Ml) AP UB AT PTF2 PTF3 PTF4 FINISH ELL4aigliZi BLA Black Anodized BRA Bronze Anodized NA Natural Aluminum Anodized oc Optianai Coltir Paint Specify MC &era*. DC•F141.7024 SC Special Color Paint 6re44. 9.4Powfote op LIffirt_600 Gap Bi-nriza Paint BLP Black Paint DC Optional Color Paint Speudy PAL designalam er 0C414L7g24 SC Special Color Paint .aaeip 11.s.vrlynaar ego Fusing e Haat LF In-Line/In-P[1e Fusing PC Photocontml and Receptacle • .41. 4000 PCR Photocanirei Receptacle only POLY Polycarbonate Sag Lens irr they al eke 04005 N/A with lX Wes_ 45241tna4105110t HS Internal Houseside Shield Swotted standard with P44 QS Quartz Standby SG Sag Glass Lens pi hap ./ glass & pp:mei shandani 0514(0 4X optics 022 20 VS Clear Drop Diffuser rit Slide at* Mast Arm Fiter 10" IVO! Bracket Quick Disconnect fix- Ballast Tray Adjustable Knuckle - Pole Mount Only amiable &KO I way and g ;M. rtsouna'ng Adjustable Knuckle - Tenon Mount Frr, 2.1a- ream NIR ifieth 14- taTits Pole Top Finer -2 3/8" Dia. Tenon Pole Top Finer • 3-3 1/2" Dia_ Tenon Pole Top Fitter - 3 1/2-4" Dia. Tenon GAROCO 50000 00055reser/es the ricpt 00 mange ...100r. or madly T. design at .1, 01,...101.41Noul 111.1xin al- pal .0 Me p0005 rbe 4. 0/00/ P, P.effi is pm...ea by US. paten' /000000 5690622_ o copyro,..doc, Lighling 200,2005 Rign. 5.0f4."090.0 A 000,40, Company Garda:, Lighting 2661 Alvarado Sired! San Leandre. CA 94577 800P2270759 570/357-6000 in California F.: 5100357-3000 eneneterteligniing LIGHTING let 15-451n7n5 I Culver Studios Comprehensive Plan #5 Parking Structure - Lighting Gensler pine 15, 20061 Page 36 05_5049.000 ewer PlanSECONDARY VAN BUREN PL ACE FIRE TRUCK ACCESS Culver Studios Comprehensive Plan #5 Scale:1/32"=V-0" 32' 64• 128' Trash Yard Detail 05.5049.000 .111u.rter Nem Gensler Jr., 15, 2006 Page 37Studio Lot Landscaping As noted on the site plans, the Master Plan calls for only a slight (100 SF) decrease in the square- footage of landscaped area on the Studio Lot. The majority of existing landscape (including the areas adjacent to the Mansion building and the historic landscaping in the bungalow courtyard) will remain as is. Plant Selection Plants will be selected to fit with thte existing landscaping on the Studio Lot. Following is a par- tial listing of plants currently being used by the Culver studios. The Culver Studios intends to use these or similar plants as part of the landscaping around the parking structure and the bungalow courtyard. GATE 3 FRONT OF MANSION The biggest change in on-site landscsaping will occur around the new parking structure. Special at- GATE 1 Iceberg Roses Privets tention will be paid to using climbing vines, and other plants to shield the parking structure from the Iceberg Roses Boxwood Sycamore tree residential neighborhood on VanBuren Pl. The south- and west-facing facades will be designed to Bird of Paradise Sycamore trees Sword fern create a "green screen" of climbing plants that will cover the structure's concrete exterior. In addition Santa Barbara Daisys Bronze Flax Rapheolepsis this Master Plan calls for the planting of bushes in the setback between the perimeter wall along Van- Hybiscus Lantana Agapanthus Buren Pl. and the parking structure, as well as the replacement of landscaping along the Van Buren Rapheolepsis Day Lilies Day Lilies Pl. wall. Juniper Morea Pigmy Palms Day Lilies Star Jasmine Peach Tree Iris Rapheolepsis Hybiscus Camphor Natal Plum Roses Xylosma Agapanthus Junipers Purple Princes Xylosma Eugenias Boxwood Axaleas Tree Roses Ficus Breath of Heaven Azaleas IL5-1 Azaleas Boxwood Gladiolas c\*) Breath of heaven Hydrangea Camellias Euonymous Society Garlic Brich Trees Star Jasmine Spider Plants Margarita Daisy Capanella Existing landscaping in front of Mansion Existing landscaping at Gate 2 Culver Studios Comprehensive Plan #5 Landscaping & Plantings 05.5049.000 Alaster Plan Gensler pme 15, 2551 Page 38Parking Structure - Palo Alto, CA Parking Structure - Tustin, CA Star Jasmine Parking Structure Green Screen Type Planting The images on this page illustrate the effective use of green screen type planting to create a lush, green cover for a utilitarian parking strucuture. While the scale of the structures in many of these im- ages is larger than the new Culver Studios parking structure, the technique used to create the green screen will be similar. Green Screen type planting utilizes a wire mesh armature attached to the surface of the parking structure as an armature for planted vines to grow on. The parking structure green screen will be planted with either Star Jasmine (the same material that is used on the De Mille theater) or Creeping Fig, which provides a lush green look year-round. Both of these are fast growing vines, and can be anticipated to fully cover the wire mesh with greeery within a year of plan iting. Parking Structure -Aptos, CA Parking Structure - Mountain View, CA Culver Studios Comprehensive Plan #5 Universal City, CA Universal City, CA Landscaping & Plantings 05.5049.000 Master Plan Gensier June T5.20061 Page 39PROPOSED BUILDING J Public Art As a part of the City of Culver City's Art in Public Plac- es program, the Culver Studios design team proposes to work with the City of Culver City to develop publical- ly visible art located adjacent to the North-west facade of Building J facing the Gate #2 entrance. The art will be visible to the public from the street and will add to the character of the Studio Lot Culver Studios Comprehensive Plan #5 Photo Simulation F - Public Art Location 05.5049.000 Alcutzt Plan Gensler jaw 15, 2006J Page 40Building J Signage Signage will be incorporated onto the lot facing (interior) facade of Building J. The signage will be used to idetify Building J and will be of a consistent look and feel as the exsiting singage on the Studio Lot. The location of this signage on the Building J facade is identified by the red square on this building image. Photo Simulation G - Building J Interiot Lot View Culver Studios Comprehensive Plan #5 05.5149.000 Ma.tter Nan Gensler .pmr 15. 7006! Page 41Shade & Shadow Study In the shade and shadow study the effects of the new construction were studied at three times of day during Winter Solstice, Summer Solstice and the Spring/Fall Equinox. The study looks at the shade and shadow effects at the completion of the Master Plan. The results are illustrated by the drawings on the following pages and summarized as follows: t Existing Building J 2. Winter Solstice 9:00 AM —Additional shadow from J cast onto Culver Studios Lot (entry Gate #2) 12 Noon — Some additional shadow cast onto Ince Ave and the street side of the commercial buildings on Ince. 4:00 PM — Some additional shadow on the commercial properties along Ince and minimally on the the back portion of some residential properties. These properties are already largely in the shade from the existing sound stages and evening twilight. 3. Summer Solstice 9:00 AM — Some shadow cast onto Culver Studios Lot 12 Noon — Minor shadow on ince 4:00 PM — Some shadow cast onto Ince Blvd, but not onto the Commercial properties 4. Spring/Fall Equinox 9:00 AM — Some shadow cast onto Culver Studios Lot 12 Noon — Some shadow cast onto ince. Blvd. 4:00 PM — Some additional shadow on the commercial properties along ince (not on the residential areas.) 5. Existing Parking Structure Location 6. Winter Solstice 9:00 AM — Minimal shadow cast onto Culver Studios Lot 12 Noon — Minimal shadow cast onto Culver Studios Lot 4:00 PM — Minimal additional shadow cast onto Culver Studios Lot. Studio and residential properties are already largely in the shade from existing trees and the evening twilight. 7. Summer Solstice 9:00 AM — Minor shadow cast onto Culver Studios Lot 12 Noon — No Shadow 4:00 PM — Some Shadow cast partially onto Culver Studios Lot 8. Spring/Fall Equinox 9:00 AM — Minor shadow cast onto Culver Studios Lot and partly onto edge of residential area 12 Noon — Minor shadow cast onto Culver Studios Lot 4:00 PM Shadow cast onto Culver Studios Lot Culver Studios Comprehensive Plan #5 Shade And Shadow Study 05.5049.000 Alasfrr Plan Gensler Jaw 15, 206 161 Page 42S 74.1C.)0Culver Studios Comprehensive Plan #5 Location of Proposed Parking Structure 05 5049 000 Maki+ , Srvdxs Gensler 75. 20061 Page 47Proposed Parking Structure WINTER SOLSTICE Culver Studios Comprehensive Plan #5 Existing 05.50-19.000 Sharlon Stuthes Gensler fim, 15, 2006J Page 48Proposed Parking Structure SUMMER SOLSTICE Culver Studios Comprehensive Plan #5 Existing 05.5049.000 Shaelav• S tndies GensJer Jaw 15, 2on(pi Page 49Existing Proposed Parking Structure SPRING/FALL EQUINOX Culver Studios Comprehensive Plan #5 05.5049.000 Shuou . Shams Gensler jr.me 15. 20061 Page 50